Loading...
HomeMy WebLinkAboutOpening of Bids - 2022 Curb and Sidewalk, Round I Proj No. 122-001 - Selge Construction Co., Inc.s- x CITY OF SOUTH BEND, INDIANA ' H" CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name 2022 Curb and Sidewalk Construction – Round 1 Project No. For Bids Due 122-001 July 1211, 2022 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and -X _ Certification of use of United States Steel Products or Foundry Products. Proof of M/WBE Utilization Plans [MBE -1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts Forms [MBE -2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE -2.1 and X WBE-2.1]. X Acknowledge Receipt of 1 Addendum(s) included with the bid. X - All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Selge Construction Co., Inc. By Authorized Representative. Signature: —�j A—_,_ Print Name & Title: Robert Kuhns. Professional Engineer Version 09/29/2021 Contractor's Bid for Public Works - 1 Date: July 12, 2022 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Project No. For Bids Due 2022 Curb and Sidewalk Construction — Round 1 122-001 July 12th, 2022 PART I (Must be completed for all bids. Date: July 12, 2022 Bidder (Firm): Address: 2833 South 11th Street City/State/Zip: Niles, MI 49120 Please type or print) Selge Construction Co., Inc. Telephone Number: ( 269 ) 684-0842 Agent of Bidder (if Applicable): n/a Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: 2022 Curb and Sidewalk Construction — Round 1 the City of South Bend, Indiana, in accordance with plans and specifications prepared by: City of South Bend Department of Public Works, Division of Engineering and dated July 12, 2022 for the sum of (enter the Total Bid as shown on the Proposal) One Million One Hundred Sixty Eight Thousand One Hundred Eighty One Dollars and Fifty Cents (s 1, 168,181.50 (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a s at attachment. By +� P (Signature) Robert Kuhns, Professional Engineer (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this Subject to the following conditions. BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member day of 20 Joseph R. Molnar, Vice President Jordan V. Gathers, Member Murray L. Miller, Member Attest: Theresa Heffner, Clerk Version 09/29/2021 Contractor's Bid for Public Works - 2 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. SEE ATTACHED 2. Attach a listing of public works projects currently in process of construction by your organization. SEE ATTACHED 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. NONE 4. Attach references from private firms for which you have performed work. SEE ATTACHED SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) Work will be completed in an orderly manner, according to specifications and as best suits the Owner and its Engineer. 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. SEE ATTACHED 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. Subcontractslist to be determined. Bond no required 4. Attach a listing of equipment you ave available to use or the proposed project. SEE ATTACHED 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. YES SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. SEE ATTACHED Version 09/29/2021 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Michigan ) SS: Berrien COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 09/29/2021 Contractor's Bid for Public Works - 4 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E -Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E -Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E -Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1).1 hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 09/29/2021 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 12th day of JUIy , 2022 Selge Construction Co., Inc. Contracfor�iddej r--11 Signature of Contractor/Bidder or Its Agent Robert Kuhns, Professional Engineer Printed Name and Title Subscribed and sworn to before me this. 12th day of J My Commission Expires 10/27/2027 County of Residence 101111M Berrien Version 09/29/2021 Contractor's Bid for Public Works - 6 MW BID/PROPOSAL CITY OF SOUTH BEND. Project Name: 2022 Curb and Sidewalk Construction — Round 1 '-"13 Project Number: 122-001 For Bids Due: July 1211, 2022 Contractor Name: Selge Construction CO., Inc. DIVISION 1 Item No. Description Qty Unit Unit Price Total Amount 1 CONCRETE SIDEWALK, REMOVE 800 SY $60.25 $48,200.00 2 CONCRETE SIDEWALK, 4 -IN 860 SY $83.00 $71,380.00 3 CONCRETE CURB, REMOVE 1585 LF $58.05 $92,009.25 4 CONCRETE CURB, MODIFIED CONCRETE APPROACH, REMOVE 1595 98 LF $46.65 $74,406.75 5 SY $69.75 $6,835.50 6 GRAVEL APPROACH, REMOVE 86 SY $40.00 $3,440.00 7 ASPHALT APPROACH, REMOVE 37 SY $40.00 $1,480.00 8 PCCP FOR APPROACHES, 6 -IN 252 SY $160.50 $40,446.00 9 CURB RAMP, REMOVE 49 SY $99.75 $4,887.75 10 ONE-WAY PERPENDICULAR CURB RAMP 13 SY $360.00 $4,680.00 11 PAIRED PERPENDICULAR CURB RAMP 40 SY $291.00 $11,640.00 12 TOPSOIL AND SEEDING 1070 SY $22.25 $23,807.50 13 TREE, REMOVE, 18 -IN 4 EA $840.00 $3,360.00 14 TREE, REMOVE, 30 -IN 3 EA $1,150.00 $3,450.00 15 STUMP, REMOVE 4 EA $350.00 $795.00 $1,400.00 16 PLANT, DECIDUOUS TREE, SINGLE STEM. 2 -IN TO 2.5 -IN 23 EA $18,285.00 DIVISION 1 TOTAL $409,707.75 Version 09/29/2021 Contractor's Bid for Public Works - 7 BID/PROPOSAL CITY OF SOUTH BEND Project Name: 2022 Curb and Sidewalk Construction — Round 1 Project Number For Bids Due 122-001 July 121h, 2022 Contractor Name: Se DIVISION 2 Construction Co.. Inc. Item No. Description Qty Unit Unit Price Total Amount 1 CONCRETE SIDEWALK, REMOVE 300 SY $66.00 $19,800.00 2 CONCRETE SIDEWALK, 4 -IN 330 SY $94.25 $31,102.50 3 CONCRETE CURB, REMOVE 1105 LF $65.60 $72,488.00 4 CONCRETE CURB, MODIFIED CONCRETE APPROACH, REMOVE 1110 LF $63.65 $70,651.50 5 34 SY $80.50 $2,737.00 6 GRAVEL APPROACH, REMOVE 31 SY $50.00 $1,550.00 7 BRICK APPROACH, REMOVE 12 SY $50.00 $600.00 8 PCCP FOR APPROACHES, 6 -IN 81 77 SY$187.00 SY $60.50 $15,147.00 $4,658.50 9 CURB RAMP, REMOVE 10 ONE-WAY PERPENDICULAR CURB RAMP 30 SY $330.00 $9,900.00 11 PAIRED PERPENDICULAR CURB RAMP TOPSOIL AND SEEDING 47 SY $325.00 $15,275.00 12 485 SY $25.00 $12,125.00 13 TREE, REMOVE, 30 -IN 1 EA $2,550.00 $2,550.00 14 STUMP, REMOVE 4 EA $300.00 $1,200.00 15 PLANT, DECIDUOUS TREE, SINGLE STEM, 2 -IN TO 2.5 -IN 7 EA $1,075.00 $7,525.00 DIVISION 2 TOTAL $267,309.50 Version 09/29/2021 Contractor's Bid for Public Works - 8 �Nlk,1 BID/PROPOSALAF CITY OF SOUTH BEND Project Name: 2022 Curb and Sidewalk Construction — Round 1 Project Number: For Bids Due: 122-001 July 1211, 2022 Contractor Name: Selge Construction Co., Inc. DIVISION 3 Item No. Description Qty Unit Unit Price Total Amount 1 2 CONCRETE SIDEWALK, REMOVE CONCRETE SIDEWALK, 4 -IN 175 SY $65.25 $11,418.75 175 SY $100.00 $17,500.00 3 CONCRETE CURB, REMOVE 450 LF $62.65 $28,192.50 4 CONCRETE CURB, MODIFIED 450 LF $47.50 $21,375.00 5 CONCRETE APPROACH, REMOVE 15 SY $79.25 $1,188.75 6 BRICK APPROACH, REMOVE 14 SY 1$50.00 $700.00 7 PCCP FOR APPROACHES, 6 -IN 30 SY $165.00 $4,950.00 8 TOPSOIL AND SEEDING 190 SY $33.50 $6,365.00 9 TREE, REMOVE, 30 -IN 1 EA $1,450.00 $1,450.00 DIVISION 3 TOTAL $93,140.00 Version 09/29/2021 Contractor's Bid for Public Works - 9 •�1 BID/PROPOSAL Ft� J CITY OF SOUTH BENDProject Name: 2022 Curb and Sidewalk Construction — Round 1 Project Number: For Bids Due: 122-001 July 1211, 2022 Contractor Name: Selge Construction Co., Inc. DIVISION 4 Item No. Description Qty Unit Unit Price Total Amount 1 CONCRETE SIDEWALK, REMOVE 645 SY $85.75 $55,308.75 2 CONCRETE SIDEWALK, 4 -IN 640 SY $96.00 $61,440.00 3 CONCRETE CURB, REMOVE 205 LF $131.75 $27,008.75 4 5 CONCRETE CURB, MODIFIED CONCRETE APPROACH, REMOVE 205 LF $131.75 $27,008.75 31 SY $58.25 $1,805.75 6 GRAVEL APPROACH, REMOVE 12 SY $25.00 $300.00 7 PCCP FOR APPROACHES, 6 -IN 47 SY $203.00 1$9,541.00 8 CURB RAMP, REMOVE 16 SY $48.50 $776.00 9 PAIRED PERPENDICULAR CURB RAMP 21 SY $510.00 $10,710.00 10 TOPSOIL AND SEEDING 855 SY $25.60 $21,888.00 11 TREE, REMOVE, 10 -IN TREE, REMOVE, 18 -IN 1 EA $535.00 $535.00 $2,520.00 12 3 EA $840.00 13 TREE, REMOVE, 30 -IN 5 EA $1,450.00 $7,250.00 14 TREE, REMOVE, 48 -IN 2 EA $2,575.00 $5,150.00 15 STUMP, REMOVE 2 EA $375.00 $750.00 16 PLANT, DECIDUOUS TREE, SINGLE STEM. 2 -IN TO 2.5 -IN 23 EA $795.00 $18,285.00 DIVISION 4 TOTAL $250,277.00 Version 09/29/2021 Contractor's Bid for Public Works - 10 BID/PROPOSAL CITY OF SOUTH BEND Project Name: 2022 Curb and Sidewalk Construction - Round 1 Project Number: 122-001 For Bids Due: July 1211, 2022 Contractor Name: Selae Construction Co DIVISION 5 I nc. Item No. Description Qt Unit Unit Price Total Amount 1 CONCRETE SIDEWALK, REMOVE CONCRETE SIDEWALK, 4 -IN 325 Sy $55.00 $17,875.00 2 325 Sy $79,00 $25,675.00 3 CONCRETE CURB, REMOVE 605 LF $56.25 $34,031.25 4 CONCRETE CURB, MODIFIED 605 LF $40.50 $54.50 $24,502.50 $1,253.50 5 rCONCRETE APPROACH, REMOVE 23 Sy 6 GRAVEL APPROACH, REMOVE 16 Sy $25.00 $400.00 7 BRICK APPROACH, REMOVE 13 Sy $25.00 $325.00 8 j PCCP FOR APPROACHES, 6 -IN 42 Sy $142.50 $5,985.00 9 TOPSOIL AND SEEDING TREE, REMOVE, 18 -IN 345 Sy $20.00 $6,900.00 10 5 EA $740.00 $3,700.00 11 TREE, REMOVE, 30 -IN 3 EA $2,550.00 $7,650.00 12 TREE, REMOVE, 48 -IN 2 14 EA EA $3,075.00 $6,150.00 13 PLANT, DECIDUOUS TREE, SINGLE STEM, 2 -IN TO 2.5 -IN f I $950.00 $13,300.00 DIVISION 5 TOTAL $147,747.25 GRAND TOTAL $1,168,181.50 Bidder (Firm): Selge Construction Co., Inc. Address: 2833 South 11th Street City/State/Zip: Niles, MI 49120 Telephone Number: ( 269 ) 684-0842 By��� (Signature) Robert Kuhns, Professional Engineer (Printed Name of Person Signing) Version 09/29/2021 Contractor's Bid for Public Works - 11 s� CITY OF SOUTH BEND tia MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN y;' Sri - FORM MBE -1.0 MBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications. Project Number: Bidder: 122-001 Project Name: 2022 Curb and Sidewalk Construction — Round 1 Selge Construction Co., Inc. Total Bid Amount: $1,168,181.50 Division 1 — MBE Goal: 3.0% Division 1 Bid Amount $409,707.75 2 pages Name & Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MBE Component Percentage of Total Bid/Proposal 1st Class Logistics, LLC Bernard Coutee (Attach scope/schedule if you need additional space) Component Bid/Proposal 2213 Saint Charles Ave. South Bend, IN 46614 574-993-0071 Trucking Services $12,350.00 3% 2213 Saint Charles Ave. South Bend, IN 46614 574-993-0071 Trucking Services $8,151.00 3% Division 2 — MBE Goal: 3.0% Division 2 Bid Amount: $267,309.50 Name & Address of MBE Primary Contact Person Scope of Work to be Performed Dollar Amount of MBE Percentage of Total (Namerrelephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal 1st Class Logistics, LLC Bernard Coutee 2213 Saint Charles Ave. South Bend, IN 46614 574-993-0071 Trucking Services $8,151.00 3% Version 09/29/2021 Contractor's Bid for Public Works - 12 b CITY OF SOUTH BEND, �+ MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-1.0� MBE UTILIZATION PLAN Division 3 — MBE Goal: 3.0% Division 3 Bid Amount: $93,140.00 Name & Address of MBE Primary Contact Person NamelTele hone ( p ) Bernard Coutee Scope of Work to be Performed Dollar Amount of MBE (Attach scope/schedule if you need additional space) Component Percentage of Total Bid/Proposal 1st Class Logistics, LLC 2213 Saint Charles Ave. h IN 46614 574-993-0071 Trucking Services 9 $2,800.00 3% of Total (NamelTelephone) (Attach scope/schedule if you need additional space) Component Division 4 — MBE Goal: 2.0% Division 4 Bid Amount: $250,277.00 Name & Address of MBE Primary Contact Person Scope of Work to be Performed Dollar Amount of MBE Percentage of Total Name & Address of MBE (Name/Telephone) (Attach scope/schedule if you need additional space) Component of Total (NamelTelephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal 1st Class Logistics, LLC Bernard Coutee 2213 Saint Charles Ave. South Bend. IN 46614 574-993-0071 Trucking Services 1$7,525.00 3% Division 5 — MBE Goal: 2.5% Division 5 Bid Amount: $147,747.25 Submitted by Robert Kuhns, Professional Engineer Print Name Signature Version 09/29/2021 Contractor's Bid for Public Works - 13 July 12. 2022 Date Percentage Name & Address of MBE Primary Contact Person Scope of Work to be Performed Dollar Amount of MBE of Total (NamelTelephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal 1st Class Logistics, LLC Bernard Coutee 2213 Saint Charles Ave. South Bend, IN 46614 574-993-0071 Trucking Services $4,450.00 3% Submitted by Robert Kuhns, Professional Engineer Print Name Signature Version 09/29/2021 Contractor's Bid for Public Works - 13 July 12. 2022 Date CITY OF SOUTH BEND `' l MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-1.0 WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Project Number: Bidder: 122-001 Project Name: Selge Construction Co., Inc. Division 1 — WBE Goal: 5.0% 2022 Curb and Sidewalk Construction — Round 1 Total Bid Amount: $1,168,181.50 2 pages Division 1 Bid Amount: $409,707.75 Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE Percentage of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal Slusser's Green Thumb, Inc. Nelson Slusser 125 Montgomery Street Logansport, IN 46947 219-851-2301 Erosion Control & Landscape $23,367.50 o 5.7 /o State Barricading, Inc. Esther Michalski Division 2 — WBE Goal: 5.0% Division 2 Bid Amount: $267,309.50 Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE Percentage of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal Slusser's Green Thumb, Inc. Nelson Slusser 125 LogansMontgomery ort N 4 947et 219-851-2301 Erosion Control & Landscape $10,056.70 3.8% State Barricading, Inc. Esther Michalski 2493 US 0 South Bend, IN 46628 574-287-2078 Maintenance of Traffic $3,400.00 1.3% Version 09/29/2021 Contractor's Bid for Public Works - 14 v� �-{X, Division 3-1 BE Goal: 5.5% CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-1.0 WBE UTILIZATION PLAN Division 3 Bid Amount: $93,140.00 Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE Percentage of Total Percentage of Total (NamelTelephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal Slusser's Green Thumb, Inc. Nelson Slusser Slusser's Green Thumb, Inc. Nelson Slusser Montgomery Street Log Logansport, IN 46947 Log 219-851-2301 Erosion onLandscape p Eion Ctrol & Lda $2,500.00 2.7% State Barricading, Inc. Esther Michalski 1 10.6% 24963 US 20 West South Bend, IN 46628 574-287-2078 Maintenance of Traffic $2,700.00 2.9% Division 4 — WBE Goal: 4.5% Division 4 Bid Amount: $250,277.00 Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE Percentage of Total Percentage of Total (NamelTelephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal Slusser's Green Thumb, Inc. Nelson Slusser Slusser's Green Thumb, Inc. Nelson Slusser 125 Logansport N 46947et 219-851-2301 Erosion Control & Landscape $22,645.50 �9% 219-851-2301 Erosion Control & Landscape p 1 10.6% W VA(-- Division 5 ,WE Goal: 4.5% Division 5 Bid Amount: $147,747.25 Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE Percentage of Total (NamelTelephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal . Slusser's Green Thumb, Inc. Nelson Slusser Log Montgomery Street Logansport, IN 46947 219-851-2301 Erosion Control & Landscape p $15,708.10 10.6% Submitted by: Robert Kuhns, Professional Engineer �o Print Name Signature Version 09/29/2021 Contractor's Bid for Public Works - 15 July 12, 2022 Date ±7I CITY OF SOUTH BEND ;�, MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN iy�_ t�, s FORM WBE-2.0, EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 122-001 Date: July 12, 2022 Project Name: 2022 Curb and Sidewalk Construction — Round 1 Bidder: Selge Construction Co., Inc. Contact Person Address: -Robert Kuhns, Professional Engineer Telephone: 269-684-0842 2833 South 11 th Street City: . Niles State: Michigan Zip 49120 Email bkuhns@selgeconstruction.com _ To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below': Version 09/29/2021 Contractor's Bid for Public Works - 18 EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: httr)://www.in.-gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website htt:/Iwww.in. ovlidoa . C I affirm that I have made good faith efforts to select portions of the contract work to be performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. c I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications c/ concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner OIL -" reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. I affirm that I followed up on initial solicitations with interested WBEs. I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements of the subcontract. L I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 09/29/2021 Contractor's Bid for Public Works - 18 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE -2.0 EVIDENCE OF GOOD FAITH EFFORTS "Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 17 0 I affirm that I have made good faith efforts to assist interested MBEs . in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. v� I affirm that I did not reject any MBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. "Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 17 Knmf CITY OF SOUTH BEND lr MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN r. FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 122-001 _ _ . Date: July 12, 2022 Project Name: 2022 Curb and Sidewalk Construction — Round 1 _ Bidder: SeI a Construction Co., Inc. Contact Person: Robert Kuhns Professional Engineer Telephone: 269-684-0842 Address: 2833 South 11 th Street City: Niles State: Michigan zip: 49120 Email bkuhns sel econstruction.com To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below": EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: httD://www.in.-gov/idoa/. Version 09/29/2021 Contractor's Bid for Public Works - 18 GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website htt11www.in. ov/idoa . I affirm that I have made good faith efforts to select portions of the contract work to be performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. I affirm that I followed up on initial solicitations with interested WBEs. I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements of the C subcontract. (� I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 09/29/2021 Contractor's Bid for Public Works - 18 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS "Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 19 I affirm that I have made good faith efforts to assist interested WBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any WBEs as unqualified without sound business reasons [�Y l based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. "Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 19 CITY OF SOUTH BEND 1 r. MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN y FORM MBE -2.1 MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE 1 OFA_ Project Number: 122-001 MBE Participation Goal Varies Project Name: 2022 Curb and Sidewalk Construction — Round 1 Bidder: Sel a Construction Co., Inc. BV.. �` �, Robert Kuhns, Professional Engineer July 12, 2022 (Signature) (Title) (Date) MBE Firm Owner or Contact at MBE Firm Telephone: Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: Email: ** Please see attached list of the South Bend Certified Directory and the IDOA listing. RESULTS OF CONTACT WITH THE MBE FIRM: MBE Firm Owner or Contact at MBE Firm Telephone: Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: Email: Version 09/29/2021 Contractor's Bid for Public Works - 20 CITY OF SOUTH BEND ?` MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE -2.1 WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE 1 OF 1 Project Number: 122-001 WBE Participation Goal Varies Project Name: 2022 Curb and Sidewalk Construction — Round 1 Bidder: SeI a Construction Co. Inc. By:11P Robert Kuhns, Professional Engineer July 12, 2022 (Signature) (Title) (Date) WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: ** Please see attached list of the South Bend Certified Directory and the IDOA listing. RESULTS OF CONTACT WITH THE WBE FIRM: WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: Version 09/29/2021 Contractor's Bid for Public Works - 21 Document A310 TM -2010 Conforms with The American Institute of Architects AIA Document 310 Bid Bond CONTRACTOR: (Name, legal status and address) Selge Construction Co., Inc. 2833 South 11th Street Niles, MI 49120 OWNER: (Nana, legal status and addrwss) SURETY: (Name, legal status and p►fncfpal place ofhueines ) The Cincinnati Insurance Company P.O. Box 145496 Cincinnati, OH 45250-5496 Mailing Address for Notices Same as above City of South Bend - Board of Public Works 227 W Jefferson Blvd South Bend, 46601 BOND AMOUNT: 5% Five Percent of Amount Bid PROJECT: (,Vmne, location oraddrusa andl'rgjectnumber, (/'any) 2022 Curb and Sidewalk Construction - Round 1, Project No. 122-001 This document has important legal consequences. Consultation with an attorney is encouraged with respect to Its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety are bound to the Owner in ilia amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond arc such that if the Owner accepts the bid of the Contractor within the tine specified in the bid documents, or within such tine period as may be agreed to by the Ovaier and Contractor, and ilia Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otlterwiso acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to ilio Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner play in good faith contract with another party to perlbri n the work covered by said hid, then this obligation %hull he null and void, otherwise to remuin in full liiroe and ell'ecl. The Surety hereby waives any notice ol'un agreement between the Owner and Contractor to extend the lime in which ilia Owner may accept the bid. Waiver ol'notice by the Surely shall not apply to any extension exceeding sixty (60) days in the aggregate beyond ilia lima fir acceptance ol'bids specilied in the bid documents, and ilia Omierund Contractor shull obtain the Surety's consent Im an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be doomed to be Subcontractor and the teen Owner shall be deemed to be Contractor. When this ilond has been furnished to comply with u statutory or other legul requirement in the locution ol'Ihc Project, any provision in this Bond Conflicting with said slututory or legal requirement %hull be deemed deleted herefrom and provisions confi►rnning to such statutory or other legal requirement shall be deemed incorporated herein. When so Iamished, Ilia intent is that this Bond shall be construed us a statutory bond and not us a common law bond. Signed and scaled this 12th day of July, 2022. 1 1 rff'fl►rvss) Allison Swinehart, Secretary Selge Construction Co., Inc (Principal) (Seal) t- t7'//le Robert Kuhns, Prof Engineer The Cincinn4 Insurance Companye 111 /►rasa) ❑ EspiCk By: �C. [' 'Z ��racie House, Attorn -in-Fact S•0054/AS 8/10 THE CINCINNATI INSURANCE COMPANY THE CINCINNATI CASUALTY COMPANY Fairfield, Ohio POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That THE CINCINNATI INSURANCE COMPANY and THE CINCINNATI CASUALTY COMPANY, corporations organized under the laws of the State of Ohio, and having their principal offices in the City of Fairfield, Ohio (herein collectively called the "Companies"), do hereby constitute and appoint Tracie House its true and legal Attorney -in -Fact to sign and deliver on behalf of the Companies as Surety, at any place within the United States, the following surety bond: Surety Bond Number: Bid Bond Principal: Selge Construction Co., Inc. Obligee: City of South Bend - Board of Public Works This appointment is made under and by authority of the following resolutions adopted by the Boards of Directors of The Cincinnati Insurance Company and The Cincinnati Casualty Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the President or any Senior Vice President be hereby authorized, and empowered to appoint Attorneys -in -Fact of the Company to execute any and all bonds, policies, undertakings, or other like instruments on behalf of the Corporation, and may authorize any officer or any such Attorney -in -Fact to affix the corporate seal; and may with or without cause modify or revoke any such appointment or authority. Any such writings so executed by such Attorneys -in -Fact shall be binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company. RESOLVED, that the signature of the President or any Senior Vice President and the seal of the Company may be affixed by facsimile on any power of attorney granted, and the signature of the Secretary or Assistant Vice -President and the Seal of the Company may be affixed by facsimile to any certificate of any such power and any such power of certificate bearing such facsimile signature and seal shall be valid and binding on the Company. Any such power so executed and sealed and certified by certificate so executed and sealed shall, with respect to any bond or undertaking to which it is attached, continue to be valid and binding on the Company. IN WITNESS WHEREOF, the Companies have caused these presents to be sealed with their corporate seals, duly attested by their President or any Senior Vice President this 16th day of March, 2021. e e STATE OF OHIO )SS - COUNTY OF BUTLER ) THE CINCINNATI INSURANCE COMPANY THE CINCINNATI CASUALTY COMPANY On this 16th day of March, 2021 before me came the above-named President or Senior Vice President of The Cincinnati Insurance Company and The Cincinnati Casualty Company, to me personally known to be the officer described herein, and acknowledged that the seals affixed to the preceding instrument are the corporate seals of said Companies and the corporate seals and the signature of the officer were duly affixed and subscribed to said instrument by the authority and direction of said corporations. Keith CgNtt, Attorney at Law Notary Public — State of Ohio My commission has no expiration date. Section 147.03 O.R.C. I, the undersigned Secretary or Assistant Vice -President of The Cincinnati Insurance Company and The Cincinnati Casualty Company, hereby certify that the above is the Original Power of Attorney issued by said Companies, and do hereby further certify that the said Power of Attorney is still in full force and effect. Given under my hand and seal of said Companies at Fairfield, Ohio, this 12th day of July 12022 . e� BN-1457-S (3/21) 1316 COUNTY -CITY Buiume 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAx 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND, ,TAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS Date: July 8, 2022 To: All Planholders From Theresa Heffner, Cl Subject Addendum Number Project Name Board of Public Works 1 2022 Curb and Sidewalk Round 1 Project Number: 122-001 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 07/08/2022 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Selge Construction Co., Inc. Authorized Signature: Date: 07/08/2022 Version 4/2/2015 I Part II, Section I Experience Ouestionnaire 1. What public works projects has your organization completed for the period of one (1) year prior to the date of the current bid? CONTRACT WHEN NAME AND ADDRESS AMOUNT CLASS OF WORK COMPLETED OF OWNER $669,623.00 CLARK & HANNAH COURT IMPROVEMENTS 2020 CIN OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-294-5471 $2,188,635.01 CARRIAGE HILLS SS EXTENSION 2020 SJ CNTY REG WATER & SEWER 1227 W. JEFFERSON BLVD, SOUTH BEND, IN 46601 -574-23 $1,987,254-40 JA DRIVE & LEXINGTON STREETSCAPES 2020 CITY OF ELKHART / 229 S- 2ND ST., ELKHART, IN 46516 574-294-5471 $2,254,710.00 WAWASEE CONKLIN BAY TRAIL 2020 SYRACUSE-WAWASEE PARK FDN 1801 N HUNTINGTON ST, SYRACUSE, IN 46567 -574-675-64 $248,928,65 CR 46 RR CROSSING SS REPAIR 2020 NEW PARIS CONSERVANCY DIST / 18121 CR 29, NEW PARIS, IN 46553 -574-831-6100 $120,352-75 LAUREL ROAD TRAIL CONSTRUCTION 2020 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD-, SOUTH BEND, IN 46601 -574-235-9216 $905,050.20 2020 CONCRETE REPAIR 2020 CITY OF GOSHEN, 204 E- JEFFERSON ST., GOSHEN, IN 46528 $12,500.00 MAIN STREET CULVERT REPAIR 2020 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $500,000.00 BRANDYWINE HS TENNIS COURTS 2020 BRANDYWINE COMM SCHOOLS 11830 S. THIRD ST, NILES, MI 49120 $223,000.00 PRESS GANEY CONCRETE REPLACEMENT 2020 PAI PROPERTIES, LLC / 3601 LATHROP ST., SOUTH BEND, IN 46628 $62,726.80 HYDRANT REPLACEMENT 2020 CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $173,678.20 PRAIRE CREEK RUN PH II WATER SERVICE! 2020 ELKHART HWY DEPT./ 610 STEURY AVE, GOSHEN, IN 46528 - 574-534-9394 $185,550.00 STEUBEN LAKES PUMP 1 2020 STEUBEN LAKES REG WASTE DISTRICT / 8119 W CR 150 N, ANGOLA, IN 46703 $753,811.04 ZIGLER/FILBERT STREET IMPROVEMENTS 2020 TOWN OF NEW CARLISLE / 124 MICHIGAN ST, NEW CARLISLE, IN 46552 $38,174.00 117 JACKSON AVENUE 2020 CITY OF ELKHART / 229 S. 2ND ST„ ELKHART, IN 46516 574-294-5471 $536,041.05 IRONWORKS DEV UTILITIES PHASE 2 2021 CITY OF MISHAWAKA / 600 E 3RD ST„ MISHAWAKA, IN 46545 - 574-258-1618 $319,951.66 HOME STREET LIFT STATION 2021 CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $4,847,000.00 NILES - AEP SERVICE CENTER 2021 E & L CONSTRUCTION, 3040 AIRPARK DR., FLINT, MI 48507 810-744-4300 $1,987,254.40 JA DRIVE & LEXINGTON AVE STREETSCAPE 2021 CITY OF ELKHART / 229 S, 2ND ST„ ELKHART, IN 46516 574-294-5471 $548,625.75 BURNS BUILDING UTILITY EXTENSION 2021 CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $105,063.00 ST JOE RIVER BACKWATER VALVES 2021 CITY OF SOUTH BEND / 227 W- JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $2,129,833.19 BUFFALO STREET PLAZA 2021 CITY OF WARSAW / PO BOX 817, WARSAW, IN 46581 - 574-372-9545 $1,230,212.00 LCRUD CONTRACT C REG B WWTP IMPROV 2021 LaGRANGE COUNTY REGIONAL UTILITY DISTRICT, LAGRANGE. IN $1,746,289.80 ROCK RUN SEWER IMPROVEMENT C 2021 CITY OF GOSHEN. 220 S. MAIN ST„ GOSHEN, IN 574-533-8621 $109,925-00 CSO3 BACKWATER VALVE REPAIR 2021 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $4,241,226-00 CASS - DOWNTOWN STREETSCAPES 2021 VILLAGE OF CASSOPOLIS, 117 S. BROADWAY, MI 49031 $2,361,212.00 CASS - STONE BEACH IMPROVEMENTS 2021 VILLAGE OF CASSOPOLIS, 117 S. BROADWAY, MI 49031 $288,491,20 DAWN ESTATES LIFT STATION REPLACEME 2021 TOWN OF MIDDLEBURY 1418 N MAIN ST, MIDDLEBURY, IN 46540 $1,148,483,84 EAST GOSHEN WM REPLACEMENT 2021 CITY OF GOSHEN, 220 S. MAIN ST., GOSHEN, IN 574-533-8621 $219,471.00 LIFT STATION 12 REPLACEMENT 2021 CITY OF ELKHART 1229 S. 2ND ST„ ELKHART, IN 46516 574-294-5471 $253,390.00 C-1 LIFT STATION 2021 ONTWA TOWNSHIP / 26225 US HWY 12, EDWARDSBURG, MI 49112 $113,786.40 WATER SERVICE REPLACEMENT 2021 CITY OF ST JOSEPH / 700 BROAD STREET, ST JOSEPH, MI 49085 $855,000.00 HILLS AT ST. JOE FARM & CURB 2021 THE VILLAGE DEVELOPMENT LLC / 52127 FALL CREEK DR, GRANGER, IN 46530-574-315-9661 $398,008-00 LS & MANHOLE IMPROVEMENTS 2021 VILLAGE OF MARTIN / 1609 N MAIN ST., MARTIN, MI 49070 $758,650.00 HILLS RESIDENTIAL DEVELOPMENT LIFT ST 2021 THE VILLAGE DEVELOPMENT LLC / 52127 FALL CREEK DR, GRANGER, IN 46530-574-315-9661 $486,92445 WATER SYSTEM IMPR COLFAX & MESSNER 2021 BENTON CHARTER TWP / 1725 TERRITORIAL ROAD, BENTON HARBOR, MI 49022 $486,92445 COLFAX AVE & MESSNER DR 2021 BENTON CHARTER TWP / 1725 TERRITORIAL ROAD, BENTON HARBOR, MI 49022 $162,750-00 GOSHEN POND DAM IMPROVEMENTS 2021 ELKHART COUNTY PARK & RECREATION BOARD 1211 W LINCOLN AVE, GOSHEN IN 46526 $125,142.00 LAUREL WOODS DRAINAGE IMPR 2021 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $24,630.00 2010 SUPERIOR ST SEWER REPAIR 2021 CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-294-5471 $449,064,51 COLFAX LIFT STATION 2022 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216 $731,154.29 PARK SHORE DR & EAST ST ROAD IMPR 2022 THE VILLAGE DEVELOPMENT LLC / 52127 FALL CREEK DR, GRANGER, IN 46530-574-315-9661 $4,554,745.21 CONTRACT 3 NE SECTION SS IMPR 2022 CITY OF BENTON HARBOR / 200 E WALL ST, BENTON HARBOR, MI 49022 $4,031,520.04 CRAWFORD PARK CONNECTOR SEWER 2022 CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $1,637,111.40 LAKESIDE SEWER RELOCATION 2022 CITY OF LAPORTE / 801 MICHIGAN AVE, LAPORTE, IN 46350 Attach a listing of public works projects currently in process of construction by your organization. Contract Amount $2,213,565 Class of Work Concrete -Pavement Expected Completion Date Summer 2022 Name and Address of Owner INDOT R41066 (672) $2,820,177 WW Treatment Summer 2022 LaGrange CRUD RN -(§"2 $1,461,885 Lift Station Summer 2022 LaGrange CRUD IN 683 $3,696,528 SW Quad Road Sewer Water Summer 2022 Town of Middlebu IN 687 $1355,455 Coloma Lift Station Re lacem Fall 2022 Coloma Charter Township 688 $1,623,701 INDOT Bike & Ped. Facilities Fall 2022 INDOT 838064 689 $1564,409 South Main St. Streetscapes Spring 2022 City of Elkhart, IN (694) $939,000 Lift Station Im Movements Summer 2022 Town of White Pigeon, MI 697 $1,242,475 WWTP Improvements Summer 2022 Town of White Pigeon, MI C698 $943,310.00 Lift Station Improvements Summer 2022 New Buffalo TwI2, MI 699 $2,693,838 Front Main Church Sts. Improv Fall 2022 CiIY of Mishawaka IN 703. $399,549 3'd Street Utilities Replacement Fall 2022 Buchanan MI 704 $253,004 2021 Drainage Improvements Spring 2022 City of South Bend IN 706 $124,980 CSO 18 Backwater Valve Re 1 Spring 2022 City of South Bend IN 707 $4,593,517 Northshore-Eastshore Collect Summer 2022 Turkey Creek RSD IN 708 $290,120 Elkhart Cnly Courthouse Pro' Summer 2022 Elkhart Com 1N 710 $830,456 INDOT Bike & Ped Facilities Fall 2022 INDOT 837502 714 $159,850 ADA Compliant Trail Spring 2022 ElkhartIN 717 $2,907,973 Cit Wide Water Service Re2l Spring 2023 Benton Charter Twp, Ml 718 $159,880 JA Drive Node Repair Spring 2022 Cily of ElkhartIN 719 $5,797 216 Conrail LS & Interceptor Im r Summer 2023 Benton Charter TwV, MT 720 $1,325,294 Sewer Extension Summer 2022 Qb of Elkhart IN 721 $158,441 Fountain Water Improvements Summer 2022 Ci of South Bend IN 722 $5,455,896,75 Sewer Improvements Summer 2023 CiIy of Mishawaka IN 723 $1,667,547 Lift Station Spring 2023 Ci1y of Mishawaka IN 725 "Attachment Section 1 No. 4 List references of private firms for which you have performed work. South Bend Orthopedics Pokagon Gaming Authority Elm Road Medical Campus 1111 Wilson Road 53880 Carmichael Drive New Buffalo, MI 49117 South Bend, IN 46635 AM General Precision Wall Systems Rolland Miller Jim Mroz 13200 McKinley Highway 3801 S. Main St Mishawaka, IN 46545 South Bend, IN 46601 South Bend Ethanol M.A.A.C. 3201 W. Calvert Street PO Box 262 South Bend, IN 46613 Niles, MI 49120 Notre Dame Federal Credit Union AEP Niles Service Center Bob Green 2603 Walton Rd PO Box 7818 Niles, MI 49120 Notre Dame, IN 46556 Flaherty & Collins Gospel City Church Art Smith 52277 Hickory Road One Indiana Square, Suite 3000 Granger, IN 46530 Indianapolis, IN 46204 Aeroplex Syracuse & Wawasee Park Foundation FM Stone Real Estate Jerry Wright 421 S. Second St. 1013 N. Long Drive Elkhart, IN 46516 Syracuse, IN 46567 DJ Landscaping C&S Machine 4436 Broadmoor Ave 2929 Sarratore Dr Grand Rapids, MI 49512 Niles, MI 49120 Altera David Kline 600-888 Dunsmuir Street Vancouver, BC 6C3K4 GOVERNMENTAL REFERENCES Selge Construction Eric Horvath, Director of Public Works 574-235-9251 City of South Bend 227 W. Jefferson Blvd., Ste 1300 South Bend, IN 46601 Toy Villa, Construction Manager 574-235-9251 City of South Bend 227 W. Jefferson Blvd. 1316 County -City Building South Bend, IN 46601 Sky Medors, Engineer 574-235-9626 St. Joseph County 227 W. Jefferson Blvd. South Bend, IN 46601 Tim Woodward 260-856-4341 Turkey Creek Regional Sewer District 4852 N. 1200 W Cromwell, IN 46732 Steve Haversperger, Area Engineer 219-362-6125 INDOT, LaPorte District PO Box 429 LaPorte, IN 46352 Brigid Forlenza 269-663-2347 Ontwa Township PO Box 209 Edwardsburg, MI 49112 Mike Koch, Area Engineer 260-484-9541 INDOT, Fort Wayne District 5333 Hatfield Road Fort Wayne, IN 46805 OVER Chris Jamrose, Director of Engineering 574-258-1619 City of Mishawaka 600 East Third Street Mishawaka, IN 46546-0363 Tory Irwin, Engineering Service Mgr. 574-293-2572 City of Elkhart Municipal Building 229 S. Second Street Elkhart, IN 46516 Dustin Sailor, Engineer 574-534-2201 City of Goshen 204 E. Jefferson St., Suite 1 Goshen, IN 46526 Mary Cripe, Town Manager 574-825-1499 Town of Middlebury 418 N. Main Street Middlebury, IN 46540 Joe Ray, Director Public Works 269-683-4100 City of Niles 333 N. Second Street Niles, MI 49120 Paul Warnke, Board President 574-586-7249 Koontz Lake Regional Sewer District 10870 Cherokee Rd. PO Box 204 Walkerton, IN 46574 James Emans, P.E. 574-267-6885 City of Warsaw 102 S. Buffalo Street Warsaw, IN 46580 ENGINEERING REFERENCES Selge Construction Rich Zielinski 317-547-5580 American Structurepoint 7260 Shadeland Station, Suite 100 Indianapolis, IN 46256 Jeremy Roschyk 574-288-4580 Donahue & Associates 100 N. Michigan, Ste 510 South Bend, IN 46601 Andy Lemberis 574-236-4400 DLZ Indiana, LLC 2211 East Jefferson Blvd. South Bend, IN 46615 Paul Hummel 574-234-3167 Lawson Fisher Associates, P.C. 525 West Washington Avenue South Bend, IN 46601 David Harvey Fleis & Vanderbrink Engineering, Inc. 2960 Lucerne Drive, S.E. Grand Rapids, MI 49546 Kenneth Jones 574-293-7762 Jones, Petrie, Rafinski, Inc. 200 Nibco Parkway Dr Elkhart, IN 46516 Matt Davis 269-927-0100 Wightman and Associates, Inc. 2303 Pipestone Road Benton Harbor, MI 49022 Jason Durr 574-282-8001 Christopher B. Burke Engineering, LLC 220 West Colfax Avenue, Suite 500 South Bend, IN 46601 Daryl Knip 574-232-8700 Abonmarche Consultants of IN, Inc. 750 Lincolnway East South Bend, IN 46601 SECTION II - PLAN AND EQUIPMENT QUESTIONNAIRE 2. SUBCONTRACTORS LIST WORK PERFORMED: Bailey Aggregates Aggregate Trucking 12609 Indianapolis Rd Yoder, IN 46798-9733 Brusky Construction Aggregate Trucking 70569 Elizabeth St Niles, MI 49120 V & R Trucking Aggregate Trucking 1845 Elmer St South Bend, IN46628 Niblock Excavating, Inc. Asphalt Construction PO Box 211 Bristol, IN 46507 Rieth-Riley Construction Co., Inc. Asphalt Construction PO Box 477 Goshen, IN 46527-0477 Milestone Contractors North Asphalt Construction 1700 E. Main St. Griffith, IN 46319-2999 Michigan Paving & Materials Co. Asphalt Construction 2300 Gendenning Kalamazoo, MI 49003 Abonmarche Consultants, LLC. Construction Engineering 750 Lincolnway East South Bend, IN 46601 Jones Petrie Rafinski, Inc. Construction Engineering 412 S. Lafayette Blvd South Bend, IN 46601 1 SUBCONTRACTOR LIST (continued) WORK PERFORMED Wightman & Associates Construction Engineering 2303 Pipestone Rd Benton Harbor, MI 49022 Deversified Dewatering Dewatering 9150 96th Ave. Zeeland, MI 49464 Bender Electric Electrical Wiring PO Box 143 Cassopolis, MI 49031 Hawk Enterprises, Inc. Electrical/Signal/Signage 1850 E. North Street Crown Point, IN 46307 Custom Fence Co Fencing PO Box 526 Niles, MI 49120 Mike's Fencing Fencing 68021 SR 19 North Nappanee, IN 46550 Milestone Fence Fencing 13399 McKinley Hwy Mishawaka, IN 46545 C -Tech Corporation Guard Rails 5300 W. 100 N. Boggstown, IN 46110-9706 Lowe Construction Jack and Bore 2535 Bader Road Horton, MI 49246 Weaver Consultants, LLC Laboratory Testing 7121 Grape Rd Granger, IN 46530 2 SUBCONTRACTOR LIST continued WORK PERFORMED Acorn Landscaping, LLC Landscape/Restoration 24930 Kern Rd. South Bend, IN 46614-9787 Fuerbringer Landscaping & Design, Inc. Landscape/Restoration 25530 Brick Road South Bend, IN 46628 Slussers Green Thumb, Inc. Landscape/Restoration PO Box 33 Logansport, IN 46947-0033 Turf Services Landscape/Restoration 57780 Sink Road Dowagiac, MI 49047 Ferguson Waterworks #1934 Lift Station Installation 1077 Oliver Plow Ct South Bend, IN 46601 Best Sweeping Specialists, Inc. Road Sweeping/Dust Control 632 S. Sixth Street Goshen, IN 46526 A-1 Striping Service, Inc. Road Striping 56825 Spirea Rd. New Carlisle, IN 46552 The Airmarking Co., Inc. Road Striping 1544 North State Road 25 Rochester, IN 46975 Michiana Contracting, Inc. Traffic Signal Work PO Box 929 Plymouth, IN 46563 Rathco Traffic Control 6742 Lovers Lane Portage, MI 49002 3 SUBCONTRACTOR LIST (continued) WORK PERFORMED Give `Em A Brake Traffic Control 2610 Sanford Ave Grandville, MI 49418 State Barricading, Inc. Traffic Control 24963 U.S. 20 West South Bend, IN 46628 KC Tree Tree Removal 1320 Third Street Osceola, IN 46561 Payne's Services Tree Removal 30296 Redfield St Niles, MI 49120 Construction Video Media Video Taping 111 E. Newberry St. Romeo, MI 48065 Watson Tree Service, Inc. Tree Removal 2953 E. Detroit Road Niles, MI 49120 S/T Bancroft Electric Electrical 25020 SR 2 South Bend, IN 46619 2022 rd Selge Construction Co., Inc. Equipment List QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR 2 JOHN DEERE 544L WHEEL LOADER 2021 1 VOLVO EWR170E WHEELED EXCAVATOR 2021 1 TRAIL KING TKT16 TILT 2021 1 TOWMASTER T16T DECKOVER TRAILER 2021 1 JOHN DEERE 245G LC EXCAVATOR 2020 1 VOLVO ECR355E EXCAVATOR 2020 1 IMPACT CONSTRUCTION TRAILER 2020 1 JOHN DEERE 345G LC EXCAVATOR 2020 1 2020 JOHN DEERE 650K II CRAWLER DOZER W/GPS 2020 1 VOLVO ECR145E EXCAVATOR 2020 1 DUAL SOCK TRACKER FOR JD EXCAVATOR 2019 1 YANMAR V1035 MINI EXCAVATOR 2019 2 JOHN DEERE 544K II 4WD LOADERS 2018 2 JOHN DEERE 624K 11 4WD LOADERS 2018 1 2"-8" DIP BUTT FUSION MACHINE 2018 1 DCI FS FALCON LOATING SYSTEM 2018 1 VERMEER D40X55 S3 DIRECTIONAL DRILL 2018 2 HAMM H101 SMOOTH DRUM COMPACTOR/ ROLLER 2018 1 2018 BOMAD BW 120 COMPACTOR / ROLLER 2018 1 GODWIN CD150M TRASH/BY-PASS PUMP 2018 1 YANMAR V1055 MINI EXCAVATOR 2018 1 ROFHDR ROADWIDENER 2017 1 JOHN DEERE 344K LOADER 2017 1 MULTIQUIP CONCRETE MIXER 2017 5 ARTIC HD 17 SNOW PLOWS 2017 1 ARTIC HD14 SNOW BOX 2017 1 ROAD WIDENER W/DUAL REMOVE 2017 1 VS 63-20-D Grout Machine 2016 1 YANMAR V1080 MINI EXCAVATOR 2016 1 KENWORTH T-800 CUMMINS TRACTOR 2016 1 DITCH WITCH TRACKER WITH BEACON/DISPLAY 2016 9 CATERPILLAR COMPACT TRACK LOADERS 2016 1 McLAUGHLIN VX30-500 VACUUM EXCAVATOR 2016 1 PERCUSSION DRILL 2016 2 YANMAR Vio35-6 MINI EXCAVATORS 2016 1 YANMAR Vio45 MINI EXCAVATOR 2016 1 MACK DUMP TRUCK MODEL GU813 2015 1 ETNYRE TRAILER WITH 4TH FLIP AXLE 2015 1 JOHN DEERE 245 LC EXCAVATOR 2015 3 ARTIC SNOW PUSHER PLOWS W/QUICK COUPLERS 2015 2 YANMAR V1055 MINI EXCAVATOR 2015 3 WESTERN PLOWS 2015 1 ISCO FUSION MACHINE 2014 2 JOHN DEERE 245 LC EXCAVATOR 2014 1 JOHN DEERE 544K 4WD LOADER 2014 2 MOVAX-SP60 HAMMERS 2013 1 KOMATSU PC490LC-10 EXCAVATOR 2012 1 KOMATSU PC390LC-10 EXCAVATOR 2012 1 JOHN DEERE 700K DOZER 2012 1 JOHN DEERE 650K DOZER 2012 QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR 3 JOHN DEERE 544K LOADERS 2012 1 CATERPILLAR CH 85E TRACTOR 2010 2 ROME SCRAPER PANS 2010 1 12" - 36" BUTT FUSION MACHINE 2009 1 VERMEER D100 X 120 NAVIGATOR W. ATTACHMENTS 2009 1 YANMAR V1075 EXCAVATOR 2008 1 MR MANHOLE CUTTER EXTRACTOR & AUGER 2008 1 CATERPILLAR 328D EXCAVATOR 2007 1 CATERPILLAR 321CLCR EXCAVATOR 2007 1 CATERPILLAR 314 CLCR EXCAVATOR 2007 1 D36X50 NAVIGATOR 2006 1 DUAL ELECTRIC MAST SYSTEM (LAZER FOR DOZER 2006 2 DITCH WITCH VAC SYSTEM W/TRAILER 2006 1 ROADTEC RX700-4 MILLING MACHINE 2006 1 IHI IC30-2 CRAWLER CARRIER 2006 1 JOHN DEERE 450D EXCAVATOR 2006 1 KENWORTH DUMP TRUCK 2006 1 DITCH WITCH JT27T2 WITH ATTACH./PIPE 2005 1 DITCH WITCH JT2020 WITH ATTACH./PIPE 2005 3 JOHN DEERE LOADERS MODEL 544J 2005 1 FELCO MINI CONVEYOR 2005 1 DITCH WITCH SK500 UNIT W/AUGER & TRENCHER 2004 2 FELCO COMPACTION BUCKETS 2004 1 SCISSOR LIFT 2004 1 CATERPILLAR CH85 CHALLENGER TRACTOR 2003 2 MISKIN SP -C17 SCRAPERS 2003 1 DYNA-PACK MODEL CC122 VIBRATORY ROLLER 2003 1 AMERICAN AUGER BORING MACHINE 2003 1 KUBOTA L3010HST TRACTOR 2002 1 TRAILER EXPESS 18' FLATBED TANDEM AXLE TRAILER 2002 1 TC -600 TEXTURE/CURE MACHINE & ACCESSORIES 2002 1 CURB FORM C55629 2002 1 FELCO 30 X 60 COMPACTOR BUCKET 2002 1 KOMATSU WA120-3 WHEEL LOADER 2001 1 EASI-POUR COMPACT 880 SLIPFORM TRIMMER/PAVER 2001 1 KOMATSU PC128US -2 006487 EXCAVATOR 2001 1 KOMATSU PC228US LC -3 020533 EXCAVATOR 2001 1 BOBCAT SKID STEER LOADER, MODEL 773K 2001 1 TREMIX COMPACTOR MODEL MV80 2001 3 JOHN DEERE 1-650H, 2-550H CRAWLER DOZERS 2001 1 KENWORTH DUMP TRUCK 2001 1 FREIGHTLINER FL80 DUMP TRUCK 2000 1 FREIGHTLINER FL112 DUMP TRUCK 2000 1 PMD 800 VAC-TRON VACUUM 2000 1 VERMEER T-555 TRACK TRENCHER 2000 1 DITCH WITCH JT7020 BORING UNIT 2000 1 MCS -325 PORTABLE BENTONITE MIXING & RECYCLING SYSTEM 2000 1 VOLVO L70D WHEEL LOADER 2000 1 CATERPILLAR 930 WHEEL LOADER 2000 1 DITCH WITCH JET TRAC MODEL 920L W/ MUD MIXER, SUBSITE ATT. 1999 1 ROSCO RB48 SWEEPER, WITH SNOW PLOW 1999 1 STERLING L8513 DUMP TRUCK 1999 1 920L DITCH WITCH DIRECTION BORR SYSTEM 1999 QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR 1 CHAMPION 730A VHP MOTOR GRADER 1999 1 CMI SF3002 SLIPFORM PAVER 1999 1 FORD F800 DUMP TRUCK 1998 1 CLEAN EARTH SFE-JET-VAC 1998 1 MCELROY #412 HYDRAULIC FUSION UNIT 1998 1 BELSHE T9 TRAILER 1998 2 928G CATERPILLAR WHEEL LOADERS 1998 1 NPK 8XA HYDRAULIC HAMMER 1998 1 EX750 - HITACHI EXCAVATOR 1998 1 FELCO VIBRATORY COMPACTOR BUCKET 1998 1 JCB 411 TOOL CARRIER, WITH FORKS 1998 1 INTERNATIONAL 4900 6 X 6 WATER TRUCK 1998 1 MACK CL713 TRACTOR 1997 1 VERMEER D-24x40 NAVIGATOR DIRECTIONAL BORE SYSTEM 1997 1 FINN HYDROSEEDER W/ ATTACH., GROUNDHOG 1997 1 MACK CL713 DUMP TRUCK 1996 1 MACK RD68 TRACTOR 1996 1 MACK TRACTOR MODEL CL713 1996 1 CATERPILLAR MODEL CS433 COMPACTOR 1996 1 PEMBERTON 72" DITCH CL. BUCKET FOR CAT 300LE 1996 1 PC200-6 KOMATSU EXCAVATOR 1996 1 MACK TRACTOR, MODEL CL713 1995 1 VERMEER 4" LW HAMMERHEAD MOLE 1995 1 VERMEER 3" HAMMERHEAD MOLE 1995 1 DITCH WITCH DIRECTIONAL BORE SYSTEM 1995 1 MELROE 853C BOBCAT 1995 1 CATERPILLAR HYD. EXCAVATOR MODEL 325L 1994 1 CATERPILLAR HYD EXCAVATOR MODEL 330L 3CY 1994 1 JOHN DEERE 624G LOADER 3 1/2 YD. 1994 1 JOHN DEERE 955 4WD TRACTOR W/TILLER AND BROOM 1994 1 FELCO BEDDING CONVEYOR, STAND. SLIDER, W/2' EXTENSION 1994 1 FORD TRACTOR MODEL LN 8000 1993 1 GMC WHITE TRACTOR TRUCK 1993 1 CATERPILLAR D5C DOZER 1992 1 JOHN DEERE 955 TRACTOR W/TILLER, BOX SCRAPER, BROOM 1991 1 FELCO ROLLER BEDDING CONVEYOR W/6 CY HOPPER 1991 1 JOHN DEERE 544 RUBBER TIRE LOADERS 1990 1 JOHN DEERE 455G CRAWLER LOADER 1989 1 KOEHRING 6644 HYD. EXCAVATOR 3 1/2 YD. 1988 1 FORD F800 UTILITY TRAILER WITH HI RANGER 1985 1 JOHN DEERE 570A ROAD GRADER 1980 1 KOEHRING 866 HYD. BACK HOE 4 YD. 1979 1 CATERPILLAR D4C DOZER SERIES 3 1979 1 FERGUSON TANDEM DRUM VIBRATOR ROLLER 1979 1 HARTMAN FABCO CONVEYOR 1979 1 EARTH BORING MACHINE 48" AND ACCESSORIES 1975 QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR 1 INTERNATIONAL T.D. DOZER 1972 1 BLAW-KNOX RW 195 ROAD WIDNER 1970 2 KOEHRING 505 HYD. BACK HOE 2 1/2 YD. 1969 & 70 WITH 6 CYLINDER HOPPER 1 150 KW CAT. GENERATOR, ELECTRIC PUMPS, DEEP WELLS, HYDRAULIC CLAM, ETC., COMPLETE 1 ONAN 30 KW STANDBY POWER ENGINE GENERATOR, TRAILER MOUNTED, W/CABLE & DIESEL FUEL TANKS, SUBMERSIBLE SEWER PUMP CEMENT SAWS, AIR COMPRESSORS, WELL POINT PUMPS, WELL POINTING EQUIPMENT, 4000 GAL. WATER TANKER & JET PUMP, BROOMS, SHOP TRAILERS, 3 FIELD OFFICE TRAILERS, COMPACTORS, POWER MORTAR MIXERS, TAMPERS, LASER BEAMS, SMALL TOOLS, 3 TANDEM DUMP TRUCKS, 1 SEMI - DUMP TRAILER, 4 LOWBOY TRAILERS, 3 TRUCK TRACTORS, PORTABLE TRAFFIC LIGHTS, PORTABLE FLASHING SIGN, STEEL SHEETS, GENERATORS, PAVING BREAKERS, ROCK DRILLS, TRENCH BOXES, WELLS CARGO PUMP TRAILER, 3 WELLS CARGO TOOL TRAILERS, WELLS CARGO CYCLE WAGON, 1 FRUEHAUF TRAILER, HENDERSON BLADE RAKE, PROSSER PUMPS, VIBRATORY ASPHALT PLATE, 1255HP DIALGRADE LASERS, INGERSOLL-RAND LIGHT TOWER, TAG TRAILER, ROSCO SWEEPER, FORKLIFT, CURB FORMS, DITCH WITCH SUB SITES, GENERATORS, VARIOUS BUCKETS, DUAL ELECTRIC MAST SYSTEM (LAZER FOR DOZER), VARIOUS TRAILERS, TEREX PAVING KIT, REROUND TOOL, SCRAPER TOOL, ELECTRIC PROCESSOR, 24" DIPS INSERT SET, HEATER ASSEMBLY FOR FUSION MACHINE, AUGER VERMEER DIRECTIONAL DRILL, LOCATORS 4 Selge Construction Company, Inc. Financial Report February 28, 2022 Contents Independent auditor's report 1-2 Financial statements Balance sheets Statements of income 4 Statements of stockholders' equity 5 Statements of cash flows 6 Notes to financial statements 7-15 Supplementary information Schedules of construction and general and administrative expenses 16 Independent Auditor's Report Board of Directors Selge Construction Company, Inc. RSM RSNI US LLP Opinion We have audited the financial statements of Selge Construction Company, Inc. (the Company), which comprise the balance sheets as of February 28, 2022 and 2021, the related statements of income, stockholders' equity, and cash flows for the years then ended, and the related notes to the financial statements. In our opinion, the accompanying financial statements present fairly, in all material respects, the financial position of the Company as of February 28, 2022 and 2021, and the results of its operations and its cash flows for the years then ended in accordance with accounting principles generally accepted in the United States of America. Basis for Opinion We conducted our audits in accordance with auditing standards generally accepted in the United States of America (GARS). Our responsibilities under those standards are further described in the Auditor's Responsibilities for the Audit of the Financial Statements section of our report. We are required to be independent of the Company and to meet our other ethical responsibilities, in accordance with the relevant ethical requirements relating to our audits. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion. Responsibilities of Management for the Financial Statements Management is responsible for the preparation and fair presentation of the financial statements in accordance with accounting principles generally accepted in the United States of America, and for the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to fraud or error. In preparing the financial statements, management is required to evaluate whether there are conditions or events, considered in the aggregate, that raise substantial doubt about the Company's ability to continue as a going concern within one year after the date that the financial statements are issued (or within one year after the date that the financial statements are available to be issued when applicable). Auditor's Responsibilities for the Audit of the Financial Statements Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditor's report that includes our opinion. Reasonable assurance is a high level of assurance but is not absolute assurance and therefore is not a guarantee that an audit conducted in accordance with GAAS will always detect a material misstatement when it exists. The risk of not detecting a material misstatement resulting from fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of internal control. Misstatements are considered material if there is a substantial likelihood that, individually or in the aggregate, they would influence the judgment made by a reasonable user based on the financial statements. THE POWER OF BEING UNDERSTOOD AUDIT TAXI CONSULTING $1WUSLLPla 11 :Us na -1 i#a In m nl k$IrS MIM 11At nL aph:11.V41 N WMV. bt ir.4!p"d"f} aAhl. l•1 c.wid41,; fxnr• H;6.•40.•. 441ki Yr4til til;+iu:rdn: nneiemn-A to d i i�,U nv vt 4wh*� k-wtwns In performing an audit in accordance with GAAS, we: • Exercise professional judgment and maintain professional skepticism throughout the audit. • Identify and assess the risks of material misstatement of the financial statements, whether due to fraud or error, and design and perform audit procedures responsive to those risks. Such procedures include examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. • Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control. Accordingly, no such opinion is expressed. • Evaluate the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluate the overall presentation of the financial statements. ■ Conclude whether, in our judgment, there are conditions or events, considered in the aggregate, that raise substantial doubt about the Company's ability to continue as a going concern for a reasonable period of time. We are required to communicate with those charged with governance regarding, among other matters, the planned scope and timing of the audit, significant audit findings, and certain internal control—related matters that we identified during the audit. Other Matters Our audit was conducted for the purpose of forming an opinion on the financial statements as a whole. The accompanying supplementary schedule of construction and general and administrative expenses is presented for purposes of additional analysis is not a required part of the financial statements. Such information is the responsibility of management and was derived from and relates directly to the underlying accounting and other records used to prepare the financial statements. The information has been subjected to the auditing procedures applied in the audit of the financial statements and certain additional procedures, including comparing and reconciling such information directly to the underlying accounting and other records used to prepare the financial statements or to the financial statements themselves, and other additional procedures in accordance with auditing standards generally accepted in the United States of America. In our opinion, the information is fairly stated in all material respects in relation to the financial statements as a whole. �s^r vs .44P South Bend, Indiana May 20, 2022 2 Cerffied Diredory as of 1/1/2020 MOW m wo i _110 MIN 1�111111101111101 i Q'i a6-�i aim 6-mrs w .......... AIM win Crissy Frickson From: Crissy Frickson Sent: Thursday, June 30, 2022 1:50 PM To: 1 stclasslogistics20l3@gmail.com Subject: RFQ: South Bend 2022 Curb & Sidewalk Round 1 Good afternoon, We are bidding the South Bend 2022 Curb & Sidewalk Round 1 Improvements project. We would like you to quote us, Trucking, on this project. Please forward your quote by noon, Monday, July 11, 2022 to Bob Kuhns, bkuhns(@selgeconstruction.com and Tom Lentz, tlentz@selgeconstruction.com. Please see the links below for the plans & specs. Plans: E-7 https:/IseIgeconstruction-my.sharepoint.com/:b:/P/cloud/EYie-8SD6RhHstQ azT30noBTowF7uB- xmin EOwBlkdvQ?e=PtRLD9 Specs: � httos:llse[Reconstruction- my-sharepoint.com/: b:cloud ER77wlJlsbhDhall2cRBwFs6 X o ZN C iBond42 siu ?e=Ec xA Thank you, Crissy Frickson Office Manager Project Management Administrator Selge Construction 2833 S. 11th St. Niles, MI 49120 (w) 269-684-0842 www.selgeconstruction.com Crissy Frickson From: Teresa Butler <tc@bucconstructionsupply.com> Sent: Friday, July 1, 2022 11:43 AM To: Crissy Frickson Subject: Re: RFQ: South Bend 2022 Curb & Sidewalk Round 1 Hello Crissy, Hope all is well. Thank you for sending and we'll provide you a quote. Have a great holiday weekend! Teresa Butler BUC Construction Supply, Inc. DBEW c: 765-412-3484 e: tc@bucconstructionsupply.com From: Crissy Frickson<cfrickson@selgeconstruction.com> Sent: Thursday, June 30, 2022 1:41 PM To: Teresa Butler <tc@bucconstructionsupply.com> Subject: RFQ: South Bend 2022 Curb & Sidewalk Round 1 Good afternoon, We are bidding the South Bend 2022 Curb & Sidewalk Round 1 Improvements project. We would like you to quote us on this project, ADA Tiles. Please forward your quote by noon, Monday, July 11, 2022 to Bob Kuhns, bkuhnsPseleeconstruction.com and Tom Lentz, tlentz@selgeconstruction.com. Please see the links below for the plans & specs. Plans: E https://selareconstruction-my.shareL)oint.coml-.b:LP/cloud/EYie-8SD6RhHstQazT3anoBTowF7u8- xmin EOwBlkdvQ?e=PtRLD9 Specs:'��' https://selgeconstruction- mv.sharenoint.com/:b:/D/cloud/ER77wIJlsbhDha 112cRBwFsBvXgogZNPCR[Bond42C siuQ?e=EcggxA Thank you, F-7 S'rRUCT10N Crissy Frickson Office Manager Project Management Administrator Selge Construction 2833 S. 11th St. Niles, MI 49120 (w)269-684-0842 www.selgeconstruction.com Crissy Frickson From: Teresa Butler <tc@bucconstructionsupply.com> To: Crissy Frickson Sent: Thursday, June 30, 2022 2:20 PM Subject: Read: RFQ: South Bend 2022 Curb & Sidewalk Round 1 Your message To: Subject: RFQ: South Bend 2022 Curb & Sidewalk Round 1 Sent: Thursday, June 30, 2022 6:19:49 PM (UTC+00:00) Monrovia, Reykjavik was read on Thursday, June 30, 2022 6:19:39 PM (UTC+00:00) Monrovia, Reykjavik. Crissy Frickson From: Crissy Frickson Sent: Thursday, June 30, 2022 1:42 PM To: Teresa Butler Subject: RFQ: South Bend 2022 Curb & Sidewalk Round 1 Good afternoon, We are bidding the South Bend 2022 Curb & Sidewalk Round 1 Improvements project. We would like you to quote us on this project, ADA Tiles. Please forward your quote by noon, Monday, July 11, 2022 to Bob Kuhns, hkuhns@selgeconstruction.com and Tom Lentz, tlentz@selgeconstruction.com. Please see the links below for the plans & specs. Plans: htt s: sel econstruction-m .share oint.com :b: cloud EYie-SSD6RhHst azT30noBTowF7uB- xmin EOwBlkdvQ?e=P#RLD9 Specs: iID httos://selgeconstruction- my.sharenoint.coml:b:lPlcloud/ER77wlJlsbhDhall2cRBwFsBvXgogZNPCRiBond42Qsiu ?e=EcggxA Thank you, CONSTRUCTION Crissy Frickson Office Manager Project Management Administrator Selge Construction 2833 S. 11th St. Niles, MI 49120 (w) 269-684-0842 www.selgeconstruction.com Criss Frickson From: John Williamson <JDW@slussers.com> To: Crissy Frickson Sent: Thursday, June 30, 2022 1:51 PM Subject: Read: RFQ: South Bend 2022 Curb & Sidewalk Round 1 Your message To: Subject: RFQ: South Bend 2022 Curb & Sidewalk Round 1 Sent: Thursday, June 30, 2022 5:51:15 PM (UTC+00:00) Monrovia, Reykjavik was read on Thursday, June 30, 2022 5:51:12 PM (UTC+00:00) Monrovia, Reykjavik. Crissy Frickson From: Crissy Frickson Sent: Thursday, June 30, 2022 1:43 PM To: John Williamson Subject: RFQ: South Bend 2022 Curb & Sidewalk Round 1 Good afternoon, We are bidding the South Bend 2022 Curb & Sidewalk Round 1 Improvements project. We would like you to quote us on this project. Please forward your quote by noon, Monday, July 11, 2022 to Bob Kuhns, bkuhns@selgeconstruction.com and Tom Lentz, tientz@seleeconstruction.com. Please see the links below for the plans & specs. Plans: l= htt s: sel eConstruction-m .share o!nt.com :b: cloud EYie-8SD6RhHst azT30noBTowF7uB- xmin EOwBlkdvQ?e=PtRLO9 Specs:' https:l/selgeconstruction- my.sharepoint.coml:b:lplcloudlER77wlJlsbh❑hall2cRBwFsByXgogZNrCgiBond42Qs!uQ?e=EcgaxA Thank you, CONS'I'RUC'I'lON Crissy Frickson Office Manager Project Management Administrator Selge Construction 2833 S. 11th St. Niles, MI 49120 (w)269-684-0842 www.selgeconstruction.com Crissy Frickson From: Crissy Frickson Sent: Thursday, June 30, 2022 1:44 PM To: statebarricade1 @aol.com Subject: RFQ: South Bend 2022 Curb & Sidewalk Round 1 Good afternoon, We are bidding the South Bend 2022 Curb & Sidewalk Round 1 Improvements project. We would like you to quote us on this project. Please forward your quote by noon, Monday, July 11, 2022 to Bob Kuhns, bkuhns@selgeconstruction.com and Tom Lentz, tientz sel econstruction.com. Please see the links below for the plans & specs. Plans:r-htti2s:/Iselgeconstruction-my.sharepoint.com/:b:Iplcloud/EYie-8SD6RhHstQ azT30noBT_owF7uB- xmin EOwBlkdvQ?e=PtRLD9 Specs: "' _httpsalseleconstruction- mv.sharepoint.coral:b:Iralc[oud1ER77wiJlsbhDhall2cRBwFsBy3(aNpCi8ond42CZsiuQ?e=EcgexA Thank you, Crissy Frickson sELUE Office Manager Project Management Administrator Selge Construction 2833 S. 11th St. Niles, MI 49120 (w)269-684-0842 www.selgeconstruction.com Crissy Frickson From: Crissy Frickson Sent: Thursday, June 30, 2022 1:45 PM To: rfightingirish@aol.com Subject: RFQ: South Bend 2022 Curb & Sidewalk Round 1 Good afternoon, We are bidding the South Bend 2022 Curb & Sidewalk Round 1 Improvements project. We would like you to quote us, Trucking, on this project. Please forward your quote by noon, Monday, July 11, 2022 to Bob Kuhns, bicuhns@selgeconst_ruction,com and Tom Lentz, tientz@seleeconstruction.com. Please see the links below for the plans & specs. Plans: f https:/f selgreconstruction my.sharep.oint.coml:b:Zp/cloud/EYie-8SD6RhHstQ azT3OnoBTowF7uB- xmin E0wBIkdvC?e=PtRLD9 Specs:"'" httos://selgeconstruction- my.sharepoint.coml:b:lp1cloud1ER77wlJlsbhDhall2cRBwFsBvXgogZNs)CiziBond42QsiuQ?e=EcggxA Thank you, no Crissy Frickson Office Manager Project Management Administrator Selge Construction 2833 S. 11th St. Niles, MI 49120 (w)269-684-0842 www.selgeconstruction.com SOUTHBENDTRIBUNEXOM I WEDNESDAY, JULY 6, 2022 1 718 teas •,.yy. -F"rriGi or l.Ull ,7]VV4,4-/404 I ales ;PW Estate Sale Thu. July 7th Noon-6pm, Fri. July 8th 9am- 6pm, & Sat:, July 9th, 9am- 4pm. 1517 E. LaSalle Ave, 46617. Antique furniture, glassware, pictures, lamps,- etc. amps;etc. Venmo%ash only. Automotive 2005 Harley Davidson Heritage Softail Classic 1 owner very well kept, 43000 miles. $8000.00 or best offer call 269-231-0618. PHDiQS ire >,vprth a thousand woY4 � included In your al-� Ll Bids & Proposals Selge Construction Co., Inc is requesting subcontractor bids from qualified MBE/WBE/VBE subcontractors, suppliers, manufacturers, and truckers for the CITY OF SOUTH BEND - 2022 CURB & SIDE- WALK ROUND 1 IMPROVE- MENTS project. Interested businesses please contact our main office at (269) 684-0842. Proposals will be accepted until 'noon, Monday, July 11, 2022. HSPAXLP 2x 7/6/22, 7/7/22 Selge Construction Co., Inc is requesting subcontractor bids from qualified MBE/WBE subcontractors, suppliers, manufacturers, and truckers for the CITY OF SOUTH BEND -SOUTH WELL FIELD WATER TREATMENT PLANT & DISTRIBUTION SYSTEM IMPROVEMENTS - CONTRACT C BACKWASH LINE RELOCATION. Inter- ested businesses please contact our main office at (269) 684- 0842. Proposals will be accepted until noon, Monday, July 11, 2022. HSPAXLP 2x 7/6/22, 7/7/22 t*trrcs re than wd1 vice Directory all: 866.937.7843 TO ADVERTISE IN THIS SPOT Projects meeting one of the three hationof ablectives - 1) benefit low- anti moderate - income persons, 2) -old in the Prevention or elimination of slums and bflght, or 3) meet other community development needs having a particular urgehcy. The proposed projects include Public Services (approximately $41,500); Code Enforcement ($95,000); Blight and Beautification ($35,068), Capital Improvements ($50,000) and Program Admin- istration (approximately $55,391). An electronic version of the 2022-2026 Consolidated Plan and the 2022 Annual Action Plan may be viewed on the City's website , at www.nilesmi.org under the Community Development Department tab or at Niles City Hall 333 N. 2nd St, Niles, MI at the Administration Desk. PLEASE BE NOTIFIED that you are invited to attend the hearings and to present your opinions or position concerning the subject of this hearing. If you are unable to attend the hearing, you may send a letter stating your opinions or posi- tion to the City of Niles (Attn. -CDBG Administrator) 333 -N - 2nd Street, Niles, MI 49120, or email NiIasCQBG@nilesmLarg by August 5, 2022 at 11 :30 am. The City of Niles will provide necessary reasonable auxiliary aids and services to those indi- viduals with impairments who wish to attend its public meet- ings upon receiving at least one week's notice. Any such individual requiring such aids or services should contact the City by writing to City of Niles ADA Coordinator, 333 N 2nd Integrity Turf & I I Ortiz's Top Notch L • _'R-• --- - -- American Electric Power is Proposing to construct a replacement 420 -foot self- support lattice telecommunica- tions tower at 31999 US 20, New Carlisle, St. Joseph County, Indiana 46552 (41 42 28.2 N 186 29 6.8 W). The tower is antick pated to have FAA Style E lighting. Interested persons may review the application for this proiect at www.fcc.gov/asr/applications and entering Antenna Struc- ture Registration (ASR) Form 854 File Number "A1217410" and may raise environmental concerns about the project by filing a Request for Environ- mental Review with the Federal Communications Commission. Requests for Environmental Review must be filed within 30 days of the date that notice of the project is published -on the FCC's website. The FCC strongly encourages interested parties to file Requests for Environ- mental Review online at WwW.fcc.gov/asr/environmerita Irequest. Parties wishing to submit the request by mail may do so by addressing the request to: -FCC Requests for Environmental Review, Attn: Ramon Williams, 45 L Street NE, Washington, DC 20554. Public comments regarding potential effects on historic properties may be submitted within 30 days from the date of this publication to: EBI Consulting, % Project #6122006126 MH, 6876 Susque- hanna Trail South, York, PA 17403, or via telephone at (785) 760-5938. HSPAXLP rMi ­1, -1 108 1 THURSDAY, JULY 7, 2022 1 SOUTH BEND TRIBUNE classifieds to advertise, visit our website: classifieds.southbendtribune.com aft. VISA I classifieds phone: 866.937.1843 RC1 KICVM '4..riuc.w 4t)" iv, car seat, mens 2x - - - mentS shall Include -repainting Silver, Huskey/English clothes, womens 5-10 bottoms I with two coats of epoxy. On the Breed, $600. 574-862-4382. and m-xl tops, dresses and 1 1 tank exterior, coating is wear- s,, e X mos and halloween Ino thin: rust and mold can be items, + collectables, win- for the latest... readily observed. The tank dow fan, bedding sets, house- exterior sholi be spndblasfed to hold items, Weathertech car remove oli lead-based point mats fit 2014 Malibu. r ' and repainted with one coat zinc one coat epoxy and one Cane Corso, socialized with children, UTD on shots & wormer, ready for good home. 260-499-0953 VM. French Mastiff .& French Bulldog Mix Puppies, 8 -Wks. Shots/Wormed UTD. $600/ea. 260-350-0347 APkinds ted althings... 1W . , Santana Tandem Bike, excellent condition, $450. Call 574-217-7805. South Bend, 7/7-7/8, 9am- 4pm, 57215 Alan Rd, Moving sale: toys, clothes, furniture, mist. — Moving Sale: Friday & Saturday, 8th & 9th, 8am- 4pm, 1016 Tomahawk Lane, Niles, MI 49120. Estate Sale Thu. July 7th N6on-6pm, Fri. July 8th 9am- 6pm, & Sat., July 9th, 9am- 4pm. 1517 E. LaSalle Ave, 46617. Antique furniture, glassware, pictures, lamps, etc. Venmo/cash only. ` PHOTds am.wafth a thousand Wal�s PUBLIC AUCTION- lam coat urethane. A containment system in accordance with the 7/9/22 29031 Old US 33 Elkhart, Guide of Containing Debris Indiana 2013 Nissan NV2500 Generated During Paint VIN 1N6BF0LX2DN107847 Removal operations shalt be HSapxlp 1x 7:7 utilized to called all debris. Reseal and point the concrete r . r tank foundation. A mechanical mixer unit will be installed Selge Constructlori Co., Inc is inside the tank to maintain requesting subcontractor bids water temperature and chlo- residual. Finally, an,over- from .Ruollfied MSE/WBENBE subcontractors, suppliers, rine flow flapper valve, non•freeze manufacturers, and truckers aluminum vent and three (3) for the CITY OF SOUTH antenna p95ts for telemetry shall be provided and Installed. BEND - 2022 CURB & SIDE- WALK ROUND 1 IMPROVE- Tower #2 - (Liberty Drive): MENTS project. Interested This towerisa 250,000 gallon, galvanized steel structure. The businesses please contact our main office at (2¢9) 684-0842, tank interior shall be power Proposals will be accepted washed and sand blasted by brush to remove all existing until noon, Monday, July 11, paint and repainted with two 2022 HSPAXLP 2x 7/6/22, 7/7/22 coats of epoxy; tank interior seams shall be striped. Tank Selge Construction Co., Inc is interior dry coating improve - requesting subcontractor bids ments shall'inclu.de repainting from qualified MBE/WBE with one coat of epoxy. On the subcontractors, suppliers, tank exterior, coating is wear-, manufacturers, and truckers ing thin; rust and mold can be for the CITY OF SOUTH readily obwrved. The tank BEND - SOUTH WELL FIELD exterior shall be heavy power- Bus48 1 iness & Service Directory to advertise, email: SBTribuneousSery@gannett.com or call: 866.937.1843 Brick -Concrete Landscaping Is your concrete un evwed. crocked or need 4 rep1000ment4l We remove old concrete & asoholt driveways and replace w" new concrete or gravel. t3esldentioi & Commere lel We cater to Seniors II Lfcensed and Bonded Free estimates 7 daystweek (574) 780-7764 'Heating - Cooling HANDYMAN SPECIALIST 24/hr. HVACR (Mishawaka & Elkhart) Commercial Plumbing, Electrical, Appliances/ Remodeling Inspection 574-289=1701 EARLY'S TREE, SHRUBBERY & LANDSCAPING. Will top, trim or remove. stump grinding, weeding, edging, & fencerow clear- ing, mulching, rock & black dirt, planting, Complete Clean-up, No job is too big or too small. Fully insured. 24 hr. storm damage service: Free estimates. 'e 574.850-1803. FLORES LANDSCAPING 5prin4 clean-up, mow towns, top soil, muich, trimming, Plant plants, big and/or small lobs. commercial 4 resldentiol. Call 574-275-2369 or 574-472-0183 Integrity Turf & Landscaping 574-3404949 Design, Installation & Maintenance of Landscaping. Spring Cleanups: leaves, pruning, weed control, mulch or stone. New or renovation landscaping. Planting perennials, trees or shrubs.. New lawn or repair. Proper grading for drainage of lawn. Drainage corrections. Topsoil, sod or seed. installation of flagstone patios, koi ponds integrityturfand landscaping.com PHOTOS are worth a thousand ,w9rdsilrie}uded.A tnY 1 -• 1 GnY sixe ties or % os tunt' and roal removn1. Top sell. mukh, sod, pronfing. sni111art invured, IIce OIL- �&Wwiomwml_ 'A' rating with B8 TO IN ..I fled shall not be bid may be v the scheduled ( receipt of bids 1 (60) days. A conditional < will not be acce Award will be r responsive, res The low, respc ble bidder debarred, susP wise be exclude gible for partic ally assisted 1 Executive Orde All applicabl nances, and.th( lotions of all at jurisdiction o� of the project s project througt Bids shall be completely ea forms includes cations. Bids , information re ana Form 96 included with tions. Under Form 96, th submit a Fina A copy of the tial Statement with the bid is bid documents specifications. make such i deemed nese: mine the abili Orti4ls Lav Mowing, Hedges, We Rock Inst( Spring cleat mates. S discount! cuss 574 Lawn - Garden Care IW— Joe's Lawn Service Bushes & Hedges Trimmed with Complete Clean-up and Hauling. Cheap Rates. Senior Disc. Free Estimates. Call (574) 261-2,152 PH0T053Mb1b d { words included la xDtt1 Paint �Y Hang n( Texturii Plast) 30+ year Call Tim Crissy Frickson From: Gannett Legals Public Notices 7 <ganlegpubnotices7@gannett.com> Sent: Thursday, June 30, 2022 4:40 PM To: Crissy Frickson Subject: RE: 7486008, 7485998 - South Bend Tribune Legal Ad: July 6 & July 7 Attachments: Order #7485998.pdf, Order #7486005.pdf Hi Crissy, Please find attached your order confirmations and ad proofs. Your ads are set to run in: The South Bend Tribune on 7/6, 7/7 - $12.60 The South Bend Tribune on 7/6, 7/7 - $10.50 The total cost includes the affidavits, which will be mailed to you after the ads publish. Please reply by 4pm Friday, July 1st, with changes for the ads. Your notices are scheduled to run per your request and will publish unless you advise otherwise. You will be able to receive the affidavits 7-10 business days after the last day of printing. Thanks, Ashley Anderson Public Notice Representative GANNETT lllV%A TODAY NETWORK Office: 833-790-0905 From: Crissy Frickson <cfrickson@selgeconstruction.com> Sent: Thursday, June 30, 2022 1:58 PM To: IN -South Bend Legals <legals@sbtinfo.com> Subject: 7486008, 7485998 - South Bend Tribune Legal Ad: July 6 & July 7 Good afternoon, Please run the following (2) legal ads in the South Bend Tribune, on Wednesday & Thursday, July 6tn & 7t" 2022 Selge Construction Co., Inc is requesting subcontractor bids from qualified MBE/WBE/VBE subcontractors, suppliers, manufacturers, and truckers for the CITY OF SOUTH BEND — 2022 CURB & SIDEWALK ROUND 1 IMPROVEMENTS project. Interested businesses please contact our main office at (269) 684-0842. Proposals will be accepted until noon, Monday, July 11, 2022. Selge Construction Co., Inc is requesting subcontractor bids from qualified MBE/WBE subcontractors, suppliers, manufacturers, and truckers for the CITY OF SOUTH BEND — SOUTH WELL FIELD WATER TREATMENT PLANT & DISTRIBUTION SYSTEM IMPROVEMENTS — CONTRACT C BACKWASH LINE RELOCATION. Interested businesses please contact our main office at (269) 684-0842. Proposals will be accepted until noon, Monday, July 11, 2022. Thank you, Crissy Frickson From: Crissy Frickson Sent: Thursday, June 30, 2022 2:58 PM To: LEGALS@SBTINFO.COM Subject: South Bend Tribune Legal Ad: July 6 & July 7 Good afternoon, Please run the following (2) legal ads in the South Bend Tribune, on Wednesday & Thursday, July 6th & 7th 2022 Selge Construction Co., Inc is requesting subcontractor bids from qualified MBE/WBE/VBE subcontractors, suppliers, manufacturers, and truckers for the CITY OF SOUTH BEND — 2022 CURB & SIDEWALK ROUND 1 IMPROVEMENTS project. Interested businesses please contact our main office at (269) 684-0842. Proposals will be accepted until noon, Monday, July 11, 2022. Selge Construction Co., Inc is requesting subcontractor bids from qualified MBE/WBE subcontractors, suppliers, manufacturers, and truckers for the CITY OF SOUTH BEND — SOUTH WELL FIELD WATER TREATMENT PLANT & DISTRIBUTION SYSTEM IMPROVEMENTS — CONTRACT C BACKWASH LINE RELOCATION. Interested businesses please contact our main office at (269) 684-0842. Proposals will be accepted until noon, Monday, July 11, 2022. Thank you, Crissy Frickson SEi ry Office Manager Lv Project Management Administrator Selge Construction 2833 S. 11th St. Niles, MI 49120 (w)269-684-0842 www.selgeconstruction.com Slusser's Green Thumb, Inc 125 Montgomery Street Qp� [y][z� Post Office Box 33 VW1r1LJ! Logansport, Indiana 46947-0033 Phone: (574) 722-3102 Prequalified - Certified Indiana "DBE" & "WBE" Contractor Toll Free: (800) 762-7442 Fax: (574) 722-2993 �� �� Seeding Sodding, EYoslon Control, Landscaping Estimating Fax, .slu sers.c 28 Website: www.slussers.com QUOTA TION Email: info@slussers.com Customer: SELCON Quoted: July 11, 2022 Quote No. 2022131 Selge Construction, Inc. Bids: July 12, 2022 Project: 2022 Curb & Sidwalk Construction - Round 1 2833 South 11th Street Location: St. Joseph County, Indiana, USA Niles MI 49120-4421 Estimated by: John Williamson, Extension 3210 Phone: (269) 684-0842 Revised: Fax: (269) 684-0846 Revisions: Attn: Bob / Tom 2 16 Plant,Deciduous Tree, SS, 2" - 2.5" Cal. LINE $ 795.00 ITEM BID ITEM DESCRIPTION 18,285,00 QUANTITY UNIT UNIT PRICE AMOUNT DIVISION 1 1 12 Seeding w/ 30 Day Watering - Partial 1,070.000 SY $ 4.75 $ 5,082.50 (Topsoil or erosion blanket not included) 2 16 Plant,Deciduous Tree, SS, 2" - 2.5" Cal. 23.000 EA $ 795.00 $ 18,285,00 (Topsoil or planting soil not included) Total: $ 23,367.50 DIVISION 2 1 12 Seeding w/ 30 Day Watering - Partial 485.000 SY $ 5.22 $ 2,531.70 (Topsoil or erosion blanket not included) 2 15 Plant,Deciduous tree, SS, 2" - 2.5" Cal. 7.000 EA $ 1,075.00 $ 7,525.00 (Topsoil or planting soil not Included) Total: $ 10,056.70 DIVISION 3 1 8 Seeding w/ 30 Day Watering - Partial 190.000 SY $ 8.50 $ 1,615.00 (Topsoil or erosion blanket not included) Total: $ 1,615.00 DIVISION 4 1 10 Seeding w/ 30 Day Watering - Partial 855.000 SY $ 5.10 $ 4,360.50 (Topsoil or erosion blanket not Included) 2 16 Plant, Deciduous tree, SS, 2" - 2.5" Cal. 23.000 EA $ 795.00 $ 18,285.00 (Topsoil or planting soil not included) Total: $ 22,645.50 DIVISION 5 1 9 Seeding w/ 30 Day Watering - Partial 345.000 SY $ 6,98 $ 2,408.10 (Topsoil or erosion blanket not included) 2 13 Plant,Deciduous Tree, SS, 2" - 2.5" Cal. 14.000 EA $ 950.00 $ 13,300.00 (Topsoil or planting soil not included) Total: $ 15,708.10 '" *SPECIAL. NOTATIONS*"" Accepted by: Selge Construction, Inc. Date Subtotal: SPECIFIC CONDITIONS ARE LISTED ON THE NEXT PAGE Sales Tax: Equal Opportunely Employer Total: SLUSSERS SPECIAL CONDITIONS Concerning the Attached Quotation Quote Number: 2022111 STANDARD NOTATIONS: 1. Special note concerning seeding: Slussees will install seed year-round. However, we will not guarantee seeding performed May 15th through August 15th, and October 1 through March 1. Seeding during this period is very risky due to extreme climatic conditions (heat/drought/cold/etc.) This note does not apply to prairie or wetland seeding unless specified otherwise. 2. This quote is valid for a period of 60 days. 3. Lawn maintenance to include mowing or spraying is not included in this quotation. 4. Topsoil, topsoil placement and any necessary amendments are not included in this quotation. 5. Quantities on this quotation are approximate. Areas will be measured and invoiced per unit prices. 6. Performance & Payment bonds are available but not included in this quotation. 7. Removal of rocks, debris and existing vegetation is not included in this quotation. 8. Seeding or sodding off right-of-way or outside of the construction limits is not included in this quotation. 9. Inorganic and Organic soil amendments are not included in this quotation. 10. Seeding partial price includes special Kentucky Bluegrass Lawn mix, fertilizer, and straw or paper mulch, and watering for 30 days only. Topsoil, topsoil placement, mowing, or erosion blanket not included. 11. Tree price includes supplying and installing 2" - 2.5" Caliper size tree, staking, hardwood bark mulch, watering for 30 days, and 1 year warranty. 12. Tree price does not include supplying or installing topsoil, planting soil, or engineering soil. 13. Clearing, grubbing, removal of existing landscaping, vegetation, or debris is not included in this quotation. 14. Maintenance or warranty bond for seeding or trees is not included in this quotation. 15. Indiana State Sales Tax has not been included in pricing. 16. Traffic control is the responsibility of the contractorlowner. ?he Road To Success Is Always UnderConsfrucrlon` 2495.9 US 20 West South Send Indiana, W6628 Phone:574-287-2078 Far 574-287-1744 Od Una item # DescApDeu Dun Price Daily Rerdal Items- If Needed: Drums, Daily Rental, If Needed $1.05 Per Day, Needed Cones, Daily Rental, /f $0.95PerDay, Type 11/ Barricade, Dai/y Renta/, /f $6.50 Per Day, Needed , Type ///Barricade W1 Sign, Daily $8.50 Per Day, Rental, /fNeeded Construction Slgn, A, Daily Rental, $5.50 PerDa y /f Needed Type # Barricade W1 Sidewalk Closed S/g, Dally Rental, /f Needed $4.50 Per Day, De//very OfDai/v Rental Items, Per Each Requested Delivery (Includes $425.00 Per De Pick Up) WBEIDBE"Equa/ OpportunilyEmp/oyms•Indlana Labor w-ATSSA Cerh!"red" Quote Bate: 7/6/2022 Job 2022 Curb And Sidewalk Construction, Round 1. Project No. 122-001. City Of South Bend, IN. TO All Bidders Una Tete) Bid Memo *State of Indiana Certified MBE -DBE* FIN 46-3086979 Date: 07/10/2022 Project: 2022 Curb & Sidewalk Round 1 Project location: South Bend IN Project No.. 122-001 Quote prepared for: Seige Construction 2022-23 Tri -axle _ hourly rtes Regular rate $115.00 Overtime rate $129.00 2022-23 Quad -axle hourly rates Regular rate $119.00 Overtime rate $133.00 2022 -Q -Flatbed Dourly rakes Regular rate $150.00 Overtime consists of anything over 8 hrs daily and all day Saturday ■ 2, 4 and 8 hour rule applies for daily hourly minimums a 4, and 8 hour daily minimums for flatbed hauling a Trucks will be upon availability, 1st Class does not have control of scheduling ® To avoid 2 hour show up time please call our office 2 hours before start times for any job cancellations or delays a 1st Class shall be compensated for all time spent on the jobsite Truck daily order requires 24 hour notice for next day projects Any questions contact Bernard Coutee ... 574-993-0071 To learn more about our company visit our website www.1stclasslogistics.org CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name 2022 Curb and Sidewalk Construction — Round 1 Project No. 122-001 For Bids Due July 1211, 2022 Contractor Name: Selge Construction_Co., I Inc._ The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre- qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre- qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31st for the upcoming calendar year, or within twelve (12) months of obtaining pre- qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 02/23/2022 General Conditions - 10 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH -347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 02/23/2022 General Conditions - 11 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) X Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) X List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) X For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Version 02/23/2022 General Conditions - 12 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) _ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) _ By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: (i) (If) (iv) (v) (vi) (vii) (viii) Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). List identifying all former business names. Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 02/23/2022 General Conditions - 13 (ix) _ Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: July 12, 2021 (Sign Here) Robert Kuhns, Professional Engineer (Print Name Here) Selge Construction Co., Inc. (Name of Company) 2833 South 11 th Street (Address of Company) Niles (City) Michigan (State) 269-684-0842 (Telephone Number) Version 02/23/2022 General Conditions - 14 CITY OF SOUTH BEND JAMES MUELLER, MAYOR DEPARTMENT OF PUBLIC WORKS ERIC HORVATH, DIRECTOR December 15, 2021 Allison Swinehart Selge Construction aswinehart@selgeconstruction.com RE: Pre -Qualification Verification Dear Ms. Swinehart: This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you are required to re -submit a complete application for continuation of pre -qualification status prior to December 31 for the upcoming calendar year. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, gMlly signeE try uz HonalM1 pP.n•Iias.n.F, o. Liz Horvath='...%-, alga..=211112 16-6— Liz Horvath, Permit Manager State of Indiana Office of the Secretary of State Certified Copies To Whom These Presents Come, Greeting: I, HOLLI SULLIVAN, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of the State of Indiana, the custodian of the corporate records and the proper official to execute this certificate. I further certify that this is a true and complete copy of this 2 page document consisting of the following records filed in this office: Certification Date: June 28, 2022 Business Name: SELGE CONSTRUCTION CO INC Business ID: 197203-307 Transaction Date Filed No. of pages Business Entity Report 01/11/2022 2 Total No. of pages f _ 2 ,TAr,F 1�►.................In Witness Whereof, I have caused to be affixed my signature and the seal of the State of Indiana, at the Q;'�►► City of Indianapolis, June 28, 2022 'N`•• HOLLI SULLIVAN SECRETARY OF STATE 197203-307 / 14805801 All certificates should be validated here: https://bsd.sos.in.gov/ValidateCertificate Expires on July 28, 2022. Page 1 Of 3 CertificateID:14805801 BUSINESS ENTITY REPORT NAME AND PRINCIPAL OFFICE ADDRESS BUSINESS ID BUSINESS TYPE BUSINESS NAME ENTITY CREATION DATE JURISDICTION OF FORMATION PRINCIPAL OFFICE ADDRESS YEARS FILE] YEARS EFFECTIVE DATE EFFECTIVE DATE EFFECTIVE TIME REGISTERED OFFICE AND ADDRESS APPROVED AND FILED HOLLI SULLIVAN INDIANA SECRETARY OF STATE 01/11/2022 03:32 PM 197203-307 Foreign For -Profit Corporation SELGE CONSTRUCTION CO INC 03/15/1972 Michigan 2833 S. 11th Street, NILES, MI, 49120, USA 2022/2023 01/11/2022 3:32 PM REGISTERED AGENT TYPE Individual NAME BRENT E. INABNIT ADDRESS 210 S. MICHIGAN AVE, SOUTH BEND, IN, 46624, USA Page 2 Of 3 CertificateID:14805801 -Page 1 of 2 - APPROVED AND FILED HOLLI SULLIVAN INDIANA SECRETARY OF STATE 01/11/2022 03:32 PM GOVERNING PERSON INFORMATION TITLE President NAME Jim Boyles ADDRESS 2833 S 11TH ST., NILES, MI, 49120, USA TITLE Secretary NAME Allison Swinehart ADDRESS 2833 S. 11th Street, Niles, MI, 49120, USA TITLE CEO NAME Marvin L Selge JR. ADDRESS 2833 S. 11th Street, Niles, MI, 49120, USA TITLE Vice President NAME Justin Butler ADDRESS 2833 S. 11th Street, Niles, MI, 49120, USA SIGNATURE IN WITNESS WHEREOF, THE UNDERSIGNED HEREBY VERIFIES, SUBJECT TO THE PENALTIES OF PERJURY, THAT THE STATEMENTS CONTAINED HEREIN ARE TRUE, THIS DAY January 11, 2022. THE UNDERSIGNED ACKNOWLEDGES THAT A PERSON COMMITS A CLASS A MISDEMEANOR BY SIGNING A DOCUMENT THAT THE PERSON KNOWS IS FALSE IN A MATERIAL RESPECT WITH THE INTENT THAT THE DOCUMENT BE DELIVERED TO THE SECRETARY OF STATE FOR FILING. SIGNATURE TITLE Page 3 Of 3 ALLISON SWINEHART Secretary Business ID : 197203-307 Filing No.: 9281142 CertificateID: 14805801 - Page 2of2- STATE OF INDIANA OFFICE OF THE SECRETARY OF STATE CERTIFICATE OF AUTHORIZATION To Whom These Presents Come, Greetings: I, TODD ROKITA, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of the State of Indiana, the custodian of the corporate records, and proper official to execute this certificate. I further certify that records of this office disclose that SELGE CONSTRUCTION CO INC duly filed the requisite documents to commence business activities under the laws of State of Indiana on March 15, 1972, and was in existence or authorized to transact business in the State of Indiana on February 10, 2010. I further certify this For -Profit Foreign Corporation has filed its most recent report required by Indiana law with the Secretary of State, or is not yet required to file such report, and that no notice of withdrawal, dissolution or expiration has been filed or taken place. In Witness Whereof, I have hereunto set my hand and affixed the seal of the State of Indiana, at the city of Indianapolis, this Tenth Day of February, 2010. TODD ROKITA, Secretary of State 197203-307/2010021072953 CONSENT RESOLUTIONS OF THE SHAREHOLDERS AND DIRECTORS OF SELGE CONSTRUCTION CO., INC. The Shareholders and Board of Directors of Selge Construction Co., Inc., a Michigan corporation, take the following actions pursuant to Section 407 and Section 525 of the Michigan Business Corporation Act: 1. Financial Statement The financial statements have been reviewed by all shareholders and officers and approved as presented. 2. Board of Directors The following persons were elected to serve as directors of the Corporation until the next annual shareholders meeting or until their successors are elected and take office: Marvin L. Selge, Jr. 3. Officers The following person shall hold the offices set forth opposite their names until their successors are elected and shall qualify: Name James Boyles Justin E. Butler Allison Swinehart Marvin L. Selge, Jr. Office President Vice President Secretary Treasurer 4. Authorization to Sign Construction Documents The President, James Boyles, the Vice President, Justin E. Butler, the Treasurer, Marvin L. Selge, Jr., the Secretary, Allison Swinehart, and the Project Managers, Robert P. Kuhns, Robert S. Riley, Christian Baybutt, Ronald J. White, Jr., Thomas A. Lentz, Mathew Huss, Andrew Boyles and Kyle Silveus are all authorized to sign construction documents on behalf of the Corporation. The signature of the President, the Vice President, the Treasurer, the Secretary, or the Project Manager shall be sufficient to bind the Corporation as to any construction documents submitted. 5. Ratification of Past Acts The Shareholders and Directors hereby ratify and reaffirm all corporate actions of the officers and directors of the Corporation taken between the date of the last meeting and the date of this Resolution. & Authorization The officers of the Corporation are authorized and empowered for and on behalf of the Corporation to do any and all acts and things and execute any and all additional instruments, papers or documents that may be or become necessary, desirable, or appropriate to carry out, put into effect, and make operative any portion of portions of these Resolutions. DATED: September 1.2021 "Shareholders" MARIVIN L. SE LGE, JR. cniciA-Wr-4 kBIJUT P AMIE ANN BUTLER 1 "Director" 2 J BARBARA S. EL E STIN E. BUTLER CERTIFIED RESOLUTION I, ALLISON SWINEHART, hereby certify that I am the duly elected and acting Secretary of SELGE CONSTRUCTION CO., INC., a Michigan corporation, and that the following resolution was duly adopted by unanimous consent of the Shareholders and Directors of said Corporation, on September 1, 2021, and that said resolution is in fall force and effect: Board of Directors. The following person was elected to serve as director of the Corporation until the next annual shareholders meeting or until their successors are elected and take office: Marvin L. Selge, Jr. 2. Officers. The following persons shall hold the offices set forth opposite their names until their successors are elected and shall qualify: Name James Boyles Justin E. Butler Allison Swinehart Marvin L. Selge, Jr. Office President Vice President Secretary Treasurer IN WITNESS WHEREOF, I have signed this Certified Resolution this 1 st day of September, 2021. ALLISON SWINEHART 3 M --qoN rsELU 2833S. 11'h Street Niles, Michigan 49120 P: 269.684.0842 F: 269.684.0846 www.selgeconstruction. cam Selge Construction Staffing Capabilities and Employee Statement Selge Construction Co., Inc. is proud to be part of the Christian Labor Association (CLA), Local Union 10. Being part of the CLA provides an organized workforce that has gone through rigorous training and provides premium pay and benefits to everyone on staff. Our team is comprised of 75 individuals (19 office members and 56 field personnel). The team is made up of male, female, and minority members. The average employee has been with Selge Construction for 16 years. Each person on your project will be properly classified as an employee under all applicable state and federal laws and local ordinances. Selge has never defaulted on a contract and we do not bid any work that we cannot complete. Based on our current schedule and capabilities, we will utilize 100% Selge employees and equipment for your project. We do not foresee any issues being able to complete the project within the designated schedule. Let there be no doubt that Selge Construction has sufficient employees and resources to complete any work that is bid on. SELGE CONSTRUCTION CO., INC. COMPLETED PROJECT DESCRIPTIONS Description: Steuben Lakes — NED Phase 1 WW Collection System (610) — LaGrange County Regional Utility District. Installation of 120,000 LF of low-pressure sewer, 290 grinder pump units, 3 new lift stations and one upgrade to existing lift station. $10,144,631.00. Completed: 2021 Description: Buffalo Street Plaza (643) — Owner: City of Warsaw. Installation of helical piles to support deck, retaining walls, decorative concrete, site lighting, pavilion, and an interactive fountain. $2,129,833.00 Completed: 2021 Description: AEP Service Center (628) — Owner: E&L Construction. All site work, underground utilities, site concrete and asphalt pavement for new 35 -acre AEP facility. $4,847,000.00 Completed 2021 Description: C-1 Lift Station (670) — Owner: Ontwa Township. Equipment upgrade & to existing lift station. $253,390.00 Completed: 2021 Description: Hills at St. Joe Farm & Curb (676) — Owner: The Village Development LLC. Complete construction of 2,000 LF of new roadway including sanitary sewer, storm sewer and water main. $855,000.00 Completed: 2021 Description: Lift Station & Manhole Improvements (677) — Owner: Village of Martin. Rehabilitation of 2 existing sanitary lift stations. $398,008.00 Completed: 2021 Description: Hills Residential Development Lift Station (681) — Owner: The Village Development LLC. Installation of new sanitary lift station and 9,200 LF of forcemain. $758,650.00 Completed: 2021 Description: Goshen Pond Dam Improvements (701) — Owner: Elkhart County Park & Recreation Board. Removal and replacement of existing toe drain at the base of dam. $162,750.00 Completed: 2021 Description: Ironworks Dev Utilities Phase II (589) — Owner: City of Mishawaka. New sanitary sewer, water main and storm sewer for development at the Ironworks site. $536,041.00 Completed: 2021 Description: Home Street Lift Station (617) — Owner: City of Mishawaka. Removal and replacement of sanitary lift station. $319,952.00 Completed: 2021 Description: Burns Building Utility Extension (632) — Owner: City of South Bend. Extension of sanitary sewer and water main to a new convenience store. $548,626.00 Completed: 2021 Description: St. Joe River Backwater Valve Replacement (642) — Owner: City of South Bend. Installation of 2 new 36" backwater valve and 1 new 42" backwater valve. $105,063.00 Completed: 2021 Description: LCRUD Contract C Regional B Wastewater Treatment Plant Improvements (645) — Owner: LaGrange County Regional Utility District. Construction of two new buildings, installation of new blowers and all associated yard piping to connect to existing equipment. $1,230,212.00 Completed: 2021 Description: CS03 Backwater Valve Repair (652) — Owner: City of South Bend. Removal and replacement of existing sanitary lift station. $109,925.00 Completed: 2021 Description: Dawn Estates Lift Station Replacement (662) — Owner: Town of Middlebury. Removal and replacement of existing sanitary lift station. $288,491.00 Completed: 2021 Description: Lift Station 12 Replacement (667) — Owner: City of Elkhart. Removal and replacement of existing sanitary lift station. $219,474.00 Completed: 2021 Description: Water System Improvements Colfax & Messner (693) — Owner: Benton Charter Township. Installation of 1,600 LF of water main and restoration including concrete pavement. $486,924.00 Completed: 2021 Description: Rock Run Sewer Improvement C (649) — Owner: City of Goshen. Installation of 2,500 LF of 24" & 42" sanitary sewer, concrete siphon chambers and associated restoration. $1,746,290.00 Completed: 2021 Description: East Goshen Water Main Replacement (664) — Owner: City of Goshen. Installation of 4,000 LF of water main, 50 water services and associated street repairs. $1,148,484.00 Completed: 2021 2 Description: JA Drive & Lexington Streetscapes (629) — Owner: City of Elkhart. Complete reconstruction of the streets including new underground utilities, decorative sidewalk and new streetlights. $1,987,254.00 Completed: 2020 Description: Wawasee Conklin Bay Trail (633) — Owner: Syracuse-Wawasee Park Foundation. Installation of 1,700 LF of boardwalk and 2,500 LF of 10 concrete pathways. $2,254,710.00 Completed: 2020 Description: CR 46 RR Crossing SS Repair (638) — Owner: New Paris Conservancy District. Installation of sanitary sewer beneath the railroad crossing. $248,929.00 Completed: 2020 Description: Laurel Road Trail Construction (639) — Owner: City of South Bend. Installation of concrete pathway. $120,352.75 Completed: 2020 Description: 2020 Concrete Repair (640) — Owner: City of Goshen. Removal and replacement of concrete pavement patches at various locations in Goshen. $905,050.00 Completed: 2020 Description: Brandywine High School Tennis Courts (646) — Owner: Brandywine Community Schools. Installation of new tennis courts including all site work. $500,000.00 Completed: 2020 Description: Press Ganey Concrete Replacement (647) — Owner: PAI Properties, LLC. Removal of existing parking lot and replacement with concrete pavement. $223,000.00 Completed: 2020 Description: Hydrant Replacement (648) — Owner: City of South Bend. Removal and relocation of 6 fire hydrants. $62,727.00 Completed: 2020 Description: Prairie Creek Run Phase II Water Services (656) — Owner: Elkhart Highway Dept. Installation of 13 new water services. $173,678.00 Completed: 2020 Description: Steuben Lakes Pump 1 (660) — Owner: Steuben Lakes Regional Waste District. Installation of new lift station and associated bypass pumping. $185,550.00 Completed: 2020 Description: Zigler/Filbert Street Improvements (663) — Owner: Town of New Carlisle. Installation of new water main, storm sewers and road reconstruction. $753,811.00 Completed: 2020 Description: 117 Jackson Avenue (671) — Owner: City of Elkhart. Remove and replace existing manhole. $38,174.00 Completed: 2020 Description: Jackson Boulevard Streetscapes (587) — Owner: City of Elkhart. Remove and reconstruct the entire area including sewers, concrete, curbs, brick work. $5,237,724.00 Completed: 2020 Description: Region C — Wastewater Project — Contract A -Wastewater Treatment Plant (598) — Owner: LaGrange County Regional Utility District. Erection of 1800 square foot maintenance building and 1800 square foot blower/headworks building. Installation of 0.200 MGD extended aeration activated sludge process with aerobic sludge digestion. Main pump station, cast in place concrete tankage, UV disinfection, post aeration and effluent meter. $4,644,845.00 Completed: 2020 Description: Carriage Hills Sanitary Sewer Extension (625) — Owner: St. Joseph County Regional Water and Sewer District. Installation of 15,500 LF of sanitary sewer main and laterals for the Carriage Hills Subdivision. $2,188,635 Completed: 2020 Description: The Mill At Ironworks, Mishawaka, IN (571) — Owner: F&H Mishawaka Development, LLC. Subcontracted by Flaherty & Collins to complete demolition and removal of paving, site clearing and rough grading. Installation of Water, Sanitary Sewer and Storm Drainage. $1,413,067.00 Completed: 2019 Description: Ironworks Development Area Utility Design — Phase II (589) — Owner: City of Mishawaka. Installation of approximately 700 feet of storm sewer and structures, 825 feet of sanitary sewer and structures. Electrical and utility conduit, lighting foundations and appurtenances. $549,451.30 Completed: 2019 Description: Lincolnway West & Charles Martin Drive Improvements (592) — Owner: City of South Bend, IN Installation of storm sewer, structures, drains, curb, sidewalk and brickwork. $1,175,078.00 Completed: 2019 Description: 2018 Lift Station Improvements (597) — Owner: Town of Bremen, IN Removal and installation of lift stations, lift station pumps, electrical system and back-up generator and sanitary sewer and forcemain installation. $638,196.00 Completed: 2019 4 Description: Buffalo Street Plaza (572) — Owner: City of Warsaw, IN. Installation of boardwalk plaza and greenspace located at Buffalo and East Canal Street. $2,347,947.00 Completed: 2019 Description: Niles PO Apartments (636) — Owner: Bedrock Construction (Sub) Installation of the sanitary sewer for the Niles -Post Office Apartment project. Relocate Sanitary Main, Asphalt & curb replacement. $78,400.00 Completed: 2019 Description: Temporary Traffic Calming (635) — Owner: City of South Bend. Install temporary speed humps along miscellaneous streets in South Bend. 300 ft temp rubber speed hump, 400 ft rubber curbing. $67,350.00 Completed: 2019 Description: Riverbank Repairs (634) — Owner: City of Elkhart. Riverbank repairs for the City of Elkhart. Restack existing stone, 140 -ton natural stone boulders, 50 -ton rip -rap. $59,930.00 Completed: 2019 Description: East Race Boat Launch (631) — Owner: City of South Bend. Reconstruction of the boat ramp launch on the East Race. 250 sy turf reinforcement mat, 75 if coir roll, 29 sy riprap, 82 if fencing. $49,384:00 Completed: 2019 Description: 2019 CDBG Sidewalk (626) — Owner: City of Elkhart. Remove non-compliant curb ramps, curb & gutter, and portions of sidewalk in order to install 3,400 sf ADA compliant curb ramps, 250 sf sidewalk, 725 if concrete curb. $139,284.00 Completed: 2019 Description: 5th Street Sewer Lateral (624) — Owner: City of Goshen. Sewer lateral replacement, 6 sewer laterals & tie to a 24" clay sewer main approximately 16' deep. $175,675.00 Completed: 2019 Description: JPR Solar Covered Patio (623) — Owner: Jones Petrie Rafinski. Create a solar panel covered patio. $95,000.00 Completed: 2019 Description: Candy Lane Sanitary Sewer Improvements (621) — City of Plymouth. $ Description: Home Street Lift Station (617) — Owner: City of Mishawaka. Rehabilitation of the Home St. lift station including wet well modifications, valve vault, pumps, piping, controls, and all associated appurtenances. $285,791.00 Completed: 2019 Description: Small Drainage & Repair Division B (616) — Owner: City of South Bend. Storm sewer repairs at different locations around South Bend. 7,1871f pipe, 590 cy excavation, 223 if fencing replacement, 15,76 sy sodding. $100,620.00 Completed: 2019 Description: Hidden Hills Estates (615) — Owner: Hidden Hills Estates. Created 2 cul-de-sacs for the development of Hidden Hills Estates in Cass County Michigan. Earthwork & excavation, 2,175 If of Storm Sewer, 10 manholes, 7401f Curb & gutter $350,878.00 Completed: 2019 Description: Lakeland Riverfront Trail Expansion (614) — Owner: City of Niles & MDNR. Create trailhead on Lakeland Health property along St. Joseph River including ADA accessible observation, fishing platform, boardwalk, and foot vending plaza. $435,237.00 Completed: 2019 Description: Goshen Hospital Loading Dock (599) — Owner: Goshen Health (Sub for DJ Construction). Water main, sanitary sewer, storm sewer, excavation of basement, sheet piling, earthwork. $736,512.00 Completed: 2019 Description: Rodgers Lake Water System Improvements (600) — Owner: Pokagon Band of Potowatomi Indians. 11,445 ft of water main, 10 water main taps, 7 hydrants, 2,220 ft of directional drilling. $1,477,016.00 Completed: 2019 Description: Warsaw W. Center St. Watermain Improvements (604) — Owner: Indiana American Water. Replace 2,795 linear feet of water main with appurtances, 76 linear feet of concrete sidewalk/driveway/curb, 25 square yards of concrete sidewalk/driveway, 3 ADA ramps. Restoration, Landscaping $ 662,154.00 Completed: 2019 Description: Sewer Rehabilitation — Sewer Replacement (574) — Owner: City of Warsaw, Indiana. Sewer replacement, small diameter rehabilitation and large diameter rehabilitation. Funded through SRF. $ 1,205,769.00 Completed: 2019 Description: Region B Lift Station #2 & #6 Piping Replacement (607) — Owner: LaGrange County Regional Utility District. Replace piping and force main air release valves on 2 lift stations $ 158,500.00 Completed: 2018 Description: Jackson Landscape (603) — Owner: City of Elkhart. Landscape improvements around various locations on the Jackson Blvd project. $ 219,100.00 Complete: 2018 6 U. S. Department of Labor Office of Apprenticeship Date: December 13, 2021 From: Tiffanie L. Clawson, Michigan ATR Office of Apprenticeship Subject: Program Verification To: Bruce Dickie Selge Construction Company, Inc. 2833 South 11th Street Niles, MI 49120 Thank you for participating in the National Apprenticeship Program. You have been registered with the US Department of Labor, Office of Apprenticeship since 2009. Your program has two occupations registered, Construction Craft Laborer and Heavy Construction Equipment Operator. Both occupations have active apprentices registered with the US DOL and utilize NCCER as the RTI Provider. Thank you again for your participation in Registered Apprenticeship with the US Department of Labor, Office of Apprenticeship. If I can provide additional information or service, please feel free to contact me. Siris rely, I a ila So Appr ship & Training Representative U.S. Department of Labor Office of Apprenticeship 269-961-7337 — Office 269-601-2820 — Cell clawson.tifPanie.l@dol.gov uS DOL/OA Phone; (269) 961-7337 74 North Washington Ave., Rm 2-2-56 DISCOVER Cell: (269) 601-2820 Battle Creek, MI 49037 APPRENTICESHIP Clawson.tlffanie.l®dol.gov 0 10 I ztj .C2 4 w On -The -job Training PAriJD Hof& HELP CONTACT W,_,ka;ne AU V OJN SWIN HART Home / Partnership --Agreements Partnership Agreements Firm Name: Selge Construction Co., Inc. Year: 2022 Training Program: OJT Program & Partnership-6greement.pd Step 1: Determine Total Number of Hours worked in High way construction trades on INDOT federal -aid contracts(either as prime contractor or sub contractor during the past three years. Do not include hours worked on state -funded and private work.) Hours Worked During 2019 Hours 2020 Hours 2021 Hours Total 4 0 403 Step 2: Step 3: Add the total number of hours from each year and divide it by three (3): 4 0 403 2019 2020 2021 Multiply the "Average Hours" by five percent (5%): 135 5 Average Hours 407 /3 135 Average Hours 6 2022 Training Goal Approved Training Program: CIA Labor Agreement 2021-2024.pd aegisteredAporentice Stds.pd Work Proou5s13harQr_s.pdf Work Process Ogerators.gd j./ I here by agree all the terms and conditions contained herein and affirm under penalty and the prejury that the information stated above is true and accurate. Prepared on 1/27/2022 3:10:32 PM by SWINEHART, ALLISON Approved on 2/15/2022 11:34:15 AM by Daniels, Kathryn Fields with this color background are required Indiana Department of Transportation Version: 1.0.0 1/1