Loading...
HomeMy WebLinkAboutOpening of Bids - 2022 Curb and Sidewalk, Round I Proj No. 122-001 - Rieth-Riley Construction Co., Inc.CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name Project No. For Bids Due 2022 Curb and Sidewalk Construction — Round 1 122-001 July 12th, 2022 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with. Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Certification of use of United States Steel Products or Foundry Products. Proof of M/WBE Utilization Plans [MBE -1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts Forms [MBE -2.0 and WBE-2.0] and MMBE Contacted Forms [MBE -2.1 and X WBE-2.1]. X Acknowledge Receipt of 1 Addendum(s) included with the bid. X All required additional information is included with the bid. Pronncal statements and other affidavits all sinner/ h%i thin nrnnrkr nnrt%l With name ai#her affidavits - _ _ ---- 1-_- -- e--- r X printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Rieth-Riley Construction Co., Inc. By Authorized Represe Signature: Print Name & Title: Ruben Alvarado, Sales Manager Version 09/29/2021 Contractor's Bid for Public Works - 1 Date: July 12, 2022 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name 2022 Curb and Sidewalk Construction — Round 1 Project No. 122-001 For Bids Due July 12th, 2022 PART I (Must be completed for all bids. Please type or print) Date: July 12, 2022 Bidder (Firm): Rieth-Riley Construction Co., Inc. Address: 25200 State Road 23 City/State/Zip: South Bend, In. 46614 Telephone Number: ( 574 ) 288-8321 Agent of Bidder (if Applicable): Ruben Alvarado Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: 2022 Curb and Sidewalk Construction — Round 1 the City of South Bend, Indiana, in accordance with plans and specifications prepared by: City of South Bend Department of Public Works, Division of Engineering and dated n/a for the sum of (enter the Total Bid as shown on the Proposal) One million, eighty seven thousand, eight hundred sixty-eight dollars and twenty cents. ($ 1,087,868.20 ) (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) Grand total per itemized proposal sheets The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the Cit of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown se arate a ment. By _ / (Signature) Ruben Alvarado, Sales Manager (Printed Name of Person Signing) The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member ACCEPTANCE day of 20 Joseph R. Molnar, Vice President Jordan V. Gathers, Member Murray L. Miller, Member Attest: Theresa Heffner, Clerk Version 09/29/2021 Contractor's Bid for Public Works - 2 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. n/a 4. Attach references from private firms for which you have performed work. SECTION 11 PLAN AND EQUIPMENT QUESTIONNAIRE Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) Per specifications 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. will submit upon award 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. As needed SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 09/29/2021 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) ) SS: St. Joseph COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 09/29/2021 Contractor's Bid for Public Works - 4 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of .Contractor's newly hired employees through the E -Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E -Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E -Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 09/29/2021 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 12th day ofJud2022 Subscribed and sworn to before me this 12th My Commission Expires 7/14/2029 County of Residence Rieth-Riley Construction Co., Inc. Contr r/Bidder ) Signature of Contractor/Bidder or Its Agent Ruben Alvarado, Sales Manager Printed Name and Title _ d of July 20 2 otary Publicl Dawn E. Armstrong Kosciusko DAWN E. ARMSTRONG ..... .P Notary Public, State of Indiana 2'"SEAL' Kosciusko County Commission Number NP0734858 I�Nr``� My Commission Expires July 14, 2029 Version 09/29/2021 Contractor's Bid for Public Works - 6 BID/PROPOSAL CITY OF SOUTH BEND Project Name: 2022 Curb and Sidewalk Construction — Round I Project Number: For Bids Due: Contractor Name: 122-001 July 12th, 2022 Rieth-Riley Construction Item Total No, Description Qty Unit Unit Price Amount 1 CONCRETE SIDEWALK, REMOVE 800 SY $30.50 $24,400.00 2 CONCRETE SIDEWALK, 4 -IN 860 SY $103.50 $89,010.00 3 CONCRETE CURB, REMOVE 1585 LF $33.50 $53,097.50 4 CONCRETE CURB, MODIFIED 1595 LF $75.00 $119,625.00 5 CONCRETE APPROACH, REMOVE 98 SY $101.00 $9,898.00 6 GRAVEL APPROACH, REMOVE 86 SY $57.50 $4,945.00 7 ASPHALT APPROACH, REMOVE 37 SY $133.50 $4,939.50 8 PCCP FOR APPROACHES, 6 -IN 252 SY $120.50 $30,366.00 9 CURB RAMP, REMOVE 49 SY $346.00 $16,954.00 10 ONE-WAY PERPENDICULAR CURB RAMP 13 SY $550.00 $7,150.00 1 1 1 PAIRED PERPENDICULAR CURB RAMP 40 SY $470.00 $18,800.00 12 TOPSOIL AND SEEDING 1070 SY $4.75 $5,082.50 13 TREE, REMOVE, 18 -IN 4 EA $824.50 $31298.00 14 TREE, REMOVE, 30 -IN 3 EA $3,224.50 $9,673.50 $250-00 I.Tl nnn.nn 16 PLANT, DECIDUOUS TREE, SINGLE 23 EA $795.00 $18,285.00 STEM, 2 -IN TO 2.5 -IN DIVISION 1 TOTAL $416,524.00 Version 09/29/2021 Contractor's Bid for Public Works - 7 BID/PROPOSAL CITY OF SOUTH BEND A . . . . . . . . . . . . . Project Name2022 fU I- and vvC-fv"1U-1U" —Round l Project Number: 122-001 For Bids Due: July 12th, 2022 Contractor Name: Rieth-Riley Construction DIVISION 2 Item No. Description Qty Unit Unit Price Total Amount 1 CONCRETE SIDEWALK, REMOVE 300 SY $37.50 $11,250.00 2 CONCRETE SIDEWALK, 4 -IN 330 SY $105.00 $34,650.00 3 CONCRETE CURB, REMOVE 1105 LF $35.00 $38,675.00 4 CONCRETE CURB, MODIFIED 1110 LF $59.00 $65,490.00 5 CONCRETE APPROACH, REMOVE 34 SY $97.00 $3,298.00 6 GRAVEL APPROACH, REMOVE 31 SY $53.00 $1,643.00 7 BRICK APPROACH, REMOVE 12 SY $620.00 $7,440.00 8 PCCP FOR APPROACHES, 6 -IN 81 SY $123.00 $9,963.00 9 CURB RAMP, REMOVE 77 SY $348.50 $26,834.50 10 ONE-WAY PERPENDICULAR CURB RAMP 30 SY $362.50 $10,875.00 11 PAIRED PERPENDICULAR CURB RAMP 47 SY $395.00 $18,565.00 12 TOPSOIL AND SEEDING 485 SY $5.22 $2)531.70 13 TREE, REMOVE, 30 -IN 1 EA $3,224.50 $3)224.50 14 STUMP, REMOVE 4 EA $250.00 $1,000.00 15 PLANT, DECIDUOUS TREE, SINGLE STEM, 2 -IN TO 2.5 -IN 7 EA I $1,075.00 I $7,525.00 I I DIVISION 2 TOTAL $242,964.70 Version 09/29/2021 Contractor's Bid for Public Works - 8 BID/PROPOSAL CITY OF SOUTH BEND Project Name: 2022 Curb and Sidewalk Construction — Round 1 Project Number: 122-001 For Bids Due: July 12th, 2022 Contractor Name: Rieth- Riley Construction DIVISION 3 Item No. � Description Qty Unit Unit Price Total Amount 1 CONCRETE SIDEWALK, REMOVE 175 Sy $32.00 $5,600.00 2 CONCRETE SIDEWALK, 4 -IN 175 SY $104.50 $18,287.50 3 CONCRETE CURB, REMOVE 450 LF $39.00 $17,550.00 4 CONCRETE CURB, MODIFIED 450 LF $74.50 $33,525.00 5 CONCRETE APPROACH, REMOVE 15 SY $110.00 $1,650.00 6 BRICK APPROACH, REMOVE 14 Sy $588.00 $8,232.00 7 PCCP FOR APPROACHES, 6 -IN 30 SY $152.50 $4,575.00 8 TOPSOIL AND SEEDING 190 SY $8.50 $1,615.00 9 TREE, REMOVE, 30 -IN 1 EA $3,224.50 $3,224.50 DIVISION 3 TOTAL $94,259.00 Version 09/29/2021 Contractor's Bid for Public Works - 9 BID/PROPOSAL CITY OF SOUTH BEND Project Name: 2022 Curb and Sidewalk Construction — Round I Project Number: For Bids Due: Contractor Name: DIVISION 4 122-001 July 12t', 2022 Rieth Riley Construction Item No. Description Qty Unit Unit Price Total Amount 1 CONCRETE SIDEWALK, REMOVE 645 SY $33.00 $21)285.00 2 CONCRETE SIDEWALK, 4 -IN 640 SY $101.50 $64,960.00 3 CONCRETE CURB, REMOVE 205 LF $35.00 $7,175.00 4 CONCRETE CURB, MODIFIED 205 LF $92.50 $18,962.50 5 CONCRETE APPROACH, REMOVE 31 SY $106.50 $3,301.50 6 GRAVEL APPROACH, REMOVE 12 SY $137.25 $1,647.00 7 PCCP FOR APPROACHES, 6 -IN 47 SY $137.00 $6,439.00 8 CURB RAMP, REMOVE 16 SY $212.50 $3,400.00 9 PAIRED PERPENDICULAR CURB RAMP 21 SY $620.00 $13;020.00 10 TOPSOIL AND SEEDING 855 SY $5.10 $4,360.50 11 TREE, REMOVE, 10 -IN 1 EA $624.50 $624.50 12 TREE, REMOVE, 18 -IN 3 EA $824.50 $2,473.50 13 TREE, REMOVE, 30 -IN 5 EA $3,224.50 $16,122.50 14 TREE, REMOVE, 48 -IN 2 EA $41724.50 $9,449.00 15 STUMP, REMOVE 2 EA $250.00 $500.00 16 -LAN 1 , U--U1L)UUUZj I SI NULL :-'LAN 2-IN TO 2.5 -IN 23 EA 10 1 20z). UU DIVISION 4 TOTAL $192,005.00 Version 09/29/2021 Contractor's Bid for Public Works - 10 BID/PROPOSAL CITY OF SOUTH BEND Ef Project Name: 2022 Gurb and Sidewalk C®nStrucainn -Round 1 Project Number: 122_001 For Bids Due: July 12t', 2022 Contractor Name: Rieth-Riley Construction Item No. Description Qty Unit Unit Price Total Amount 1 CONCRETE SIDEWALK, REMOVE 325 SY $33.00 $10,725.00 2 CONCRETE SIDEWALK, 4 -IN 325 SY $113.50 $36,887.50 3 CONCRETE CURB, REMOVE 605 LF $16.00 $9,680.00 4 CONCRETE CURB, MODIFIED 605 LF $45.00 $27,225.00 5 CONCRETE APPROACH, REMOVE 23 SY $143.00 $3,289.00 6 GRAVEL APPROACH, REMOVE 16 SY $103.00 $1,648.00 7 BRICK APPROACH, REMOVE 13 SY $495.00 $6,435.00 8 PCCP FOR APPROACHES, 6 -IN 42 Sy $173.00 $7,266.00 9 TOPSOIL AND SEEDING 345 SY $7.00 $2,415.00 10 TREE, REMOVE, 18 -IN 5 EA $824.50 $4,122.50 11 TREE, REMOVE, 30 -IN 3 EA $3,224.50 $9,673.50 12 TREE, REMOVE, 48 -IN 2 EA $4,724.50 $9,449.00 13 PLANT, DECIDUOUS TREE, SINGLE STEM, 2 -IN TO 2.5 -IN 14 EA $950.00 $13,300.00 DIVISION 5 TOTAL $142,115.50 GRAND TOTAL $1,087,868.20 Bidder (Firm): Rieth-Riley Construction Address: 25200 SR 23 City/State/Zip: South Bend, IN 46614 Telephone Number: (574) 288-8321 ByL/-- (Signature) Ruben Alvarado (Printed Name of Person Signing) Version 09/29/2021 Contractor's Bid for Public Works - 11 This completed form should be supplied with Bir:ls that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications. Project Number: 122-001 Project Name: 2022 Curb ani Bidder: Rieth-Riley Construction _ Total Bid Amou Division 1 — MBE Goal: 3.0% alk Construction — Rou o V/ �6�.20 Division 1 Bid Amount: f q 14/ 5 Z �-0 2 pages Name & Address of MBE Primary Contact Person CITY OF SOUTH BEND'S Dollar Amount of MBE MINORITY AND %JVOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN u" FORM MBE -1.0 (Attach scope/schedule if you need additional space) Component Bid/Proposal MBE UTILIZATION PLAN Bernard Coutee 574-993-0071 This completed form should be supplied with Bir:ls that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications. Project Number: 122-001 Project Name: 2022 Curb ani Bidder: Rieth-Riley Construction _ Total Bid Amou Division 1 — MBE Goal: 3.0% alk Construction — Rou o V/ �6�.20 Division 1 Bid Amount: f q 14/ 5 Z �-0 2 pages Name & Address of MBE Primary Contact Person Scope of Work to be Performed Dollar Amount of MBE Percentage of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal 1 st. Class Logistics Bernard Coutee 574-993-0071 Trucking 700 South Bend, IN ( �6 Division 2 — MBE Goal: 3.0% Division 2 Bid Amount: 7c) Name & Address of MBE Primary Contact Person Scope of Work to be Performed Dollar Amount of MBE Percentage of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal 1st. Class Logistics South Bend, IN Bernard Coutee 574-993-0071 Trucking fA 3 3 ! �� �6 Version 09/29/2021 Contractor's Bid fr_ir Public Works - 12 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE -1.0 MBE UTILIZATION jq11 PLA N Division 3 — MBE Goal: 3.0% Division 3 Bid Amount: &itZ��•�i Name & Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MBE Component Percentage of Total Bid/Proposal 1 st. Class Logistics South Bend, IN Bernard Coutee 574-993-0071 Trucking ! 1 • LI 3 Bid/Proposal 1 st. Class Logistics South Bend, IN Bernard Coutee 574-993-0071 •40 Z 700.o6 �I � JV `00 Division 4 — MBE Goal: 2.0% Division 4 Bid Amount: # IqZ, 66 �•Vc) Name & Address of MBE Primary Contact Person Scope of Work to be Performed Dollar Amount of MBE Percentage of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal 1 st. Class Logistics South Bend, IN Bernard Coutee 574-993-0071 Trucking Z 700.o6 �I � JV `00 Division 5 — MBE Goal: 2.5% Division 5 Bid Amount: LjL �' J t1 Name & Address of MBE Primary Contact Person Scope of Work to be Performed Dollar Amount of MBE Percentage of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal 1 st.- Class Logistics South Bend, IN Bernard Coutee 574-993-0071 Trucking I ` f-33 � JV `00 Submitted by: G(4/1 -e tf -7-7/-22- Print Name Signature Date Version 09/29/2021 Contractor's Bid for Public Works - 13 CITY OF SOUTH BEND MINORITY AND `61'VOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-1.0 WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Project Number: 122-001 Proji"ct Name: 2022 Curb and Sidewalk Construction/— Round 1 Bidder: Rieth-Riley Construction _ Total Bid AmounJ l0�7( 5. �O .20 3 pages Division 1 — WBE Goal: 5.0% Division 1 Bid Amount: s Z, Lf 63 Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE Percentage of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal Montgomery Trucking 2207 W Cook Rd. Fort Wayne, IN 46818 Karen Montgomery 260-312-2632 Trucking #J1700 s - v Slussers Green Thumb 125 Montgomery St. Logansport, IN John Williams 574-722-2993 Seeding Tree Planting Z3,3 7. SO6947/ 6947 [ _ State Barricading James Michalski Traffic Control/ Signage t' It q 00.00 I• �G 24963 US 20 West. South Bend, IN 46628 574-287-2078 ;/o '1. 70Division 2 /. Z'(Zi q� WBE Gaal. 5.tDivision 2 Bid Amount: Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE Percentage of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal Montgomery Trucking 2207 W Cook Rd. Fort Wayne, IN 46818 Karen Montgomery 260-312-2632 Trucking 3 3 60 I •3 �o s - v Slussers Green Thumb 125 Montgomery St. Logansport, IN John Williams 574-722-2993 Seeding Tree Planting U. l V • 7 6947 State Barricading _ James Michalski Traffic Control/ Signage j !j -, - 0 �® I �� 24963 US 20 West. South Bend, IN 46628 574-287-2078 ! t v V a • 70 Version 09/29/2021 Contractor's Bid for Public Works - 14 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-1.0 WBE UTILIZATION PLAN Division 3 — MBE Goal: 5.5% Division 3 Bid Amount: do Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE Percentage of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal Montgomery Trucking 2207 W Cook Rd. Fort Wayne, IN 46818 Karen Montgomery 260-312-2632 Trucking 35D C G .1as L d Slussers Green Thumb 125 Montgomery St. Logansport, IN John Williams 574-722-2993 Seeding Tree Planting !� 6/0 l 6947 t0 ` (p I V ® • l C State Barricading James Michalski Traffic Control/ Signage 0 L17 6a 7o 24963 US 20 West. South Bend, IN 46628 574-287-2078 yS . oo G �7 Division 4 — WBE Goal: 4.5% Division 4 Bid Amount: U ( q2160 �- G Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE Percentage of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal Montgomery Trucking 2207 W Cook Rd. Fort Wayne, IN 46818 Karen Montgomery 260-312-2632 Trucking Z(76 o o6 U116- Slussers Green Thumb 125 Montgomery St. Logansport, IN John Williams 574-722-2993 Seeding Tree Planting Z � G j/. 7 t /� 6947 1t State Barricading 24963 US 20 West. South Bend IN 46628 James Michalski 574-287-2078 Traffic Control/ Signage+ 0 L17 6a 7o Version 09/29/2021 Contractor's Bid for Public Works - 15 Division 5 - MBE Goal: 4.5% Division 5 Bid Amoun Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE CITY OF SOUTH BEND\ i'"" MINORITY AND'LI'VOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN``t�� (Attach scope/schedule if you need additional space) FORM WBE-1.0 Bid/Proposal WBE UTILIZATION PLAN Karen Montgomery 260-312-2632 Division 5 Bid Amoun Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE Percentage of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal Montgomery Trucking 2207 W Cook Rd. Fort Wayne, IN 46818 Karen Montgomery 260-312-2632 Trucking S0.00 1 Slussers Green Thumb John Williams Seeding 125 Montgomery St. Logansport, IN 574-722-2993 Tree Planting (. 6 �lO 694715/705-1t State Barricading 24963 US 20 West. South Bend, IN 46628 James Michalski 574-287-2078 Traffic Control/ Signage o 0 A r f® o'r ` �- Submitted by: VA� Gtr Print Name Signature Date Version 09/29/2021 Contractor's Bid for Public Works - 16 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE -2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: 122-001 Date: Z' Project Name: 2022 Curb and Side/walk Construction — Round 1 Bidder: {e�� " Con Sf/'V61j(0 A Contact Person: oyt-, t VA/U ai y Telephone: 5-7 W43 Z 1 Address: 15200 S 11 City: SOV 1h Re.4i State: IN Zip: q4& I t1 Email: &V AA P91PY S a% Ro Cth_ PJf V. 6011^ To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below: Version 09/29/2021 Contractor's Bid for Public Works - 16 EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at:.http://www. in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the a rded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise n Inclusion Program Plan and the Indiana Department of Administration's certified list of fJ Indiana Minority and Women Business Enterprises, found on their website ilii (http://www.in.gov/idoa). +,ISP I affirm that I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into v1Y economically feasible units to facilitate MBE participation. affirm that I have made good faith efforts to solicit through all reasonable and available Y�I Y means the interest of all MBEs in the scopes of work of the contract. I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform MBEs of contracting and subcontracting opportunities. V I I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed sufficient time for MBEs to participate effectively. WpI affirm that I followed up on initial solicitations with interested MBEs. n Nwith I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, lJl lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 09/29/2021 Contractor's Bid for Public Works - 16 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE -2.0 EVIDENCE OF GOOD FAITH EFFORTS *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 17 I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary 4 P equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based VP on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 17 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 122-001 Date: 7— 1 I — Z L Project Name: 2022 Curb and Sidewalk Construction — Round 1 Bidder: Ritt &'[Cy COd % (/GT;0A Contact Person: Af f e f r U(1^� Telephone: 574— " S3 2I Address: � d ®. J City: S o v State: TA/__ Zip: Email: VfkAP61PV e�C��l_ , �$V • cc) To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: Version 09/29/2021 Contractor's Bid for Public Works - 18 EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: http://www.in.,qov/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications �11concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform WBEs of subcontracting opportunities and allowed V(V� sufficient time for WBEs to participate effectively. U p 1 affirm that I followed up on initial solicitations with interested WBEs. /' I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs �(rp with adequate information about the plans, specifications and other requirements of the v' V subcontract. I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, �J lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 09/29/2021 Contractor's Bid for Public Works - 18 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 19 6VP I affirm that I have made good faith efforts to assist interested WBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any WBEs as unqualified without sound business reasons rpbased on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 19 This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE_OF Project Number: 122-001 MBE Participation Goal Varies Project Name: 2022 Curb and Sidewalk Construction — Round 1 Bidder: P; -Cfib r , 1-G CGAS11V 6f I OA By: a � 6's 1 �,Yo f 7- //- -12. (Signature) (Title) (Date) MBE Firm IS 614S5 100:o Owner or Contact at MBE Firm _15-dAV J Telephone: 6S N) qq 3 -0071 Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: . LLC. Email [if (HISS I aue i�,'Ls �®I�4 �i11/�14s1 `oM ch , A a RESULTS OF CONTACT WITH THE MBE FIRM: V5 C �j MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: Version 09/29/2021 Contractor's Bid for Public Works - 20 CITY OF SOUTH BENDz:,_' MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN.,., FORM MBE-2.1� MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE_OF Project Number: 122-001 MBE Participation Goal Varies Project Name: 2022 Curb and Sidewalk Construction — Round 1 Bidder: P; -Cfib r , 1-G CGAS11V 6f I OA By: a � 6's 1 �,Yo f 7- //- -12. (Signature) (Title) (Date) MBE Firm IS 614S5 100:o Owner or Contact at MBE Firm _15-dAV J Telephone: 6S N) qq 3 -0071 Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: . LLC. Email [if (HISS I aue i�,'Ls �®I�4 �i11/�14s1 `oM ch , A a RESULTS OF CONTACT WITH THE MBE FIRM: V5 C �j MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: Version 09/29/2021 Contractor's Bid for Public Works - 20 CITY OF SOUTH BEND ' MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1�• WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE OF Project Number: 122-001 WBE Participation Goal Varies Project Name: 2022 Curb and Sidewalk Construction — Round 1 Bidder: R4j� " R+ ke 6®/If I/'yaJim By: a t, 600 Ahior� 74 i 1- Z Z (Signature) (Title) (Date) WBE Firm /V10A At (4 (1 /H -(JAY JP A� Owner or Contact at WBE Firm A%A M OAT CAI It Telephone: „ 40V" 3lZ�1�3Z Fax: Email:hN/1 MN -(afi/h ,GM TYPE OF WORK SOLICITED FOR THIS PROJECT: '�-� e4 RESULTS OF CONTACT WITH THE WBE FIRM: WBE Firm �11 -C a (�'%�j`•L�t A,4 Owner or Contact at WBE Firm r Telephone: s7 �! rZD 7-Zy �� Fax: J ?�—W,171(4 Email: �Jg1Z br4,A/,i &,d C 1 ft6l.60.,, •C0.,, TYPE OF WORK SOLICITED FOR THIS PROJECT: 1% i�T114 *c Co�~�i►Q1 l SR��a y� RESULTS OF CONTACT WITH THE WBE FIRM: Version 09/29/2021 Contractor's Bid for Public Works - 21 This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE Z, OF Project Number: 122-001 Project Name: Bidder: By: WBE Participation Goal Varies 2022 Curb and Sidewalk Construction — Round 1 R, �^ le4-fV CO3. V& 6 11 (1, IV% I—II—ZZ (Signature) (Title) (Date) WBE Firm i�U7 7'�"/`� �l�-t `(A I%M Owner or Contact at WBE Firm 1® A/, 1N�'` I�t/ti►�0/� Telephone: �Nc -! 2Z— Jt02 Fax: �-1`, ,7ZZ,-•ZM Email: ]d kl O' SIUSS�I .�GO�'1 TYPE OF WORK SOLICITED FOR THIS PROJECT: /I YtIA RESULTS OF CONTACT WITH THE WBE FIRM: If y J ! /0 WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: Version 09/29/2021 Contractor's Bid for Public Works - 21 CITY OF SOUTH BEND' MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN`, . FORM MBE -2.1 M_ j ..�. w WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE Z, OF Project Number: 122-001 Project Name: Bidder: By: WBE Participation Goal Varies 2022 Curb and Sidewalk Construction — Round 1 R, �^ le4-fV CO3. V& 6 11 (1, IV% I—II—ZZ (Signature) (Title) (Date) WBE Firm i�U7 7'�"/`� �l�-t `(A I%M Owner or Contact at WBE Firm 1® A/, 1N�'` I�t/ti►�0/� Telephone: �Nc -! 2Z— Jt02 Fax: �-1`, ,7ZZ,-•ZM Email: ]d kl O' SIUSS�I .�GO�'1 TYPE OF WORK SOLICITED FOR THIS PROJECT: /I YtIA RESULTS OF CONTACT WITH THE WBE FIRM: If y J ! /0 WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: Version 09/29/2021 Contractor's Bid for Public Works - 21 KNOW ALL MEN BY THESE PRESENTS, No. 0061 TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA Hartford, Connecticut 06183 That we, RIETH-RILEY CONSTRUCTION CO. INC. I as Principal, hereinafter called the Principal, and TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, of Hartford, Connecticut, a corporation duly organized under the lawsof the Stat of Con ecticut as Surety, hereinafter called the Surety, are held and firmly bound unto City of South Ben edC, Inland as Obligee, hereinafter called the Obligee, in the sum of Five Percent (5 0) of tota i Dollars ($ 5% of bid ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for 2022 Curb and Sidewalk Construction Round 1 Project No. 122-001 NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 1 2th day of Jul Witness D w E. Armstro k�OXXW�� Witness Lori Patronite 2022 RIETH-RILEY CONSTRUCTION CO., INC '(/�/l (Principal) (Seal) (Name & Title) Ruben Alvarado, Sales Manager TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA , �� Geri Patronite Attorney -in -Fact Travelers Casualty and Surety Company of America TRAVELER�Travelers Casualty and Surety Company St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Geri Patronite of CLEVELAND , Ohio , their true and lawful Attorney(s)-in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April, 2021. » �+�,,1 wiN#?l wYY RNC d State of Connecticut By: City of Hartford ss. Robert L. Rane enior vice President On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. IN WITNESS WHEREOF, I hereunto set my hand and official seal. a My Commission expires the 30th day of June, 2026 Anna P. Nowik, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in - Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. Dated this day of j(c 1� :� a iiANii0i1D, < 3COOL COMM y/yam [,Kevin E. E. Hughes, Ass tant Secretary To verify the authenticity of this Power of Attorney, please call us at 1-800-421-3880. Please refer to the above-named Attorney(s)-in-Fact and the details of the bond to which this PowerofAttorney is attached. Y' ' 1316 COUNTY-CITY BUILDING � � 4= l; = , PHONE 574/235-9251 227 W. JEFFERSON BOULEVARD FAX 574/ 235-9171 SOUTH BEND, INDIANA 46601-1830 TDD 574/ 235-5567 CITY OF SOUTH BEND, JAMES MUELLER, MAYOR Bomw OF PUBLIC WORKS Date: July 8, 2022 To: All Planholders From Theresa Heffner, Clerk, Board of Public Works Subj ect Addendum Number: 1 Project Name: 2022 Curb and Sidewalk Round 1 Project Number: 122-001 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: �" Zo Z Z This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: ► `(04�146ti Opt . Authorized Signature: Date: Version 4/2/2015 J:V r.nNcTPtirmnNr,.n 100% Quality 100% Employee Owned • Over 100 Years CERTIFICATE OF AUTHORITY KNOW ALL MEN BY THESE PRESENTS, that the undersigned President of Rieth-Riley Construction Co., Inc., a corporation duly organized and existing under the laws of the State of Indiana, hereby represents and confirms that Ruben Alvarado, Sales Manager, has full power and authority to make, execute, seal, if required by law, and deliver for and on its behalf, and as its act and deed any and all bids, proposals or contracts, said bids, proposals or contracts not to exceed $2,000,000.00 which bids, proposals or contracts call for work, services, or materials to be furnished by Rieth-Riley Construction Co., Inc., whether such bids, proposals or contracts are being submitted to an individual or entity, public or private, and to bind Rieth-Riley Construction Co., Inc. thereby as fully and to the same extent as if such bids, proposals or contracts were signed by an Executive Officer of Rieth-Riley Construction Co., Inc., and sealed, if required by law, and attested by one of such officers, and hereby rates and confirms all that the above named designee may do in pursuance hereof. The authority granted to the above named designee is pursuant to Section 6.03 of the Restated By -Laws of Rieth-Riley Construction Co., Inc., as amended, which Restated By -Laws were effective February 9, 2010, and which Restated By -Laws, as amended, and the authority granted to the above named designee continue in full force and effect. This Certificate of Authority is issued, signed and sealed, if required by law, by facsimile under and by authority of the following standing resolutions adopted by the Board of Directors of Rieth-Riley Construction Co., Inc., at a meeting held on the 16th day of February, 1996, at which a quorum was present, and which resolutions have not been amended or repealed and continue in full force and effect: "Resolved that for purposes of clarification and in furtherance of the intent of Section 6.03 of the By -Laws of the Company the authority granted in Section 6.03 shall extend to the making, execution, sealing, if required bylaw, and delivery on behalf of the Company of all documents required as part of any bid, proposal or contract, which is for work, services or materials to be furnished by Company and which is being submitted to an individual or entity, public or private." Resolved that in carrying out the provisions of Section 6.03 of the By -Laws of the Company the signatures of such directors and officers and, if required by law, the seal of the Company may be affixed to any such Certificate of Authority or any certificate relating thereto by facsimile, and any such Certificate of Authority or certificate bearing such facsimile signatures or facsimile seal shall be valid and binding upon the Company and any such Certificate of Authority so executed and certified by facsimile signature and facsimile seal shall be valid and binding upon the Company, with respect to any bid, proposal or contract to which it is attached." iN WITNESS WHEREOF, Rieth-Riley Construction Co., Inc., has caused these presents to be signed by its President and its corporate seal to be hereto affixed, this 10th day of September, 2020. 0 �, RIETH-RILEY CONSTRUCTION CO., INC. B SEAL � A. Keith Rose, President STATE OF INDIANA ) )SS: COUNTY OF ELKHART ) On this 10th day of September, 2020, before me personally came A. Keith Rose, to me known, who, being by me sworn, did depose and say: that he is President of Rieth-Riley Construction Co., Inc., the corporation described in and which executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; and that he executed the said instrument on behalf of the corporation by authority of his office pursuant to corporation's Restated By -Laws and standing resolutions. My Commission Expires: March 16, 2024 YP SEAL IAS Ronya Phillips, Notary Public Residing in Elkhart County, Indiana I, Robert L. Konopinski, do hereby certify that I am the duly appointed and acting Secretary of Rieth-Riley Construction Co., Inc., a corporation duly organized, validly existing and in good standing under the laws of the State of Indiana; that the foregoing Certificate of Authority has neither been amended or rescinded and remains in full force and effect; and furthermore, that the Restated By -Laws and standing resolutions of the corporation, as referred to and set forth in this Certificate of Authority, continue in full force and effect. gne nd Sealed at ttl rporate Office of Rieth-Riley Construction Co., Inc., in the City of Goshen, State of Indiana. Dated this day of 20 SEAL Robert L. Konopinski, Secretary CERTIFICATE OF QUALIFICATION to provide CONSTRUCTION SERVICES for PUBLIC WORKS PROJECTS to the STATE OF INDIANA This Certification Board, having duly considered application for qualification in terms of apparent experience and financial resources; and under the applicable Indiana Code 4-13.6-4 and adopted rules of this Board, hereby issues a Certificate of Qualification to provide construction services to the State of Indiana for Public Works Projects to: R1ETH RILEY CONSTRUCTION CO INC 3626 ELKHART RD PO BOX.477 GOSHEN IN 46527-0477 Phone 574-875-5183 Fax 574-875-8405 Company Official KEITH ROSE for the twenty-seven month period stated -herein, unless revoked by this Board for cause, and in the classifications of services stated below. This certificate supercedes any previous certificate. 1611.01 Concrete Construction of Roads & Curbing 1611.02 Asphalt Construction of Roads and Parking Lots 1622.01 Gen Contr-brdgs,vdcts,elvd hwys,rlwy,tnls 1623.03 Sewers and/or Water Lines 1794.01 Earthmoving and Land Clearing 1794.02 Excavation 1795.02 Demolition of Pavements and Roads CERTIFICATION DATE 2/24/2020 EXPIRATION DATE 5/24/2022 THIS CERTIFICATE ISSUED BY THE STATE OF INDIANA, PUBLIC WORKS DIVISION CERTIFICATION BOARD, 402 WEST WASHINGTON STREET, ROOM NV467, INDIANAPOLIS, INDIANA 46204, ALSO ACTS AS THE OFFICIAL NOTICE OF EXPIRATION. Tracy L. Cross, Executive Secretary Certification Board DAPW PQ2 State Form 3983R Rev. 07106 Dawn Armstrong From: Cross, Tracy <tcross@idoa.IN.gov> Sent: Thursday, April 7, 2022 12:29 PM To: Karmen Rensberger Subject: RE: RIETH-RILEY CONSTRUCTION CO., INC. - Certification Application Submission ............................................................................................................................................................................................. L............................................................................................................................................................................................ Karmen, Your application has been received and submitted to the board for review. I will let you know when I hear back from them. Your current certification in 1611.01, 1611.02, 1622.01, 1623.03, 1794.01, 1794.02, and 1795.02 has been extended to 7-24-22. This will allow you to continue submitting bids/proposals in the classification(s) you have been approved in and allow sufficient time for your application to be reviewed. Please use this as your confirmation of the extension and allow 2 weeks for the website to update. The Certification Board has been inundated with applications and we are working to get them all reviewed. Thank you for your patience. Sincerely, Tracy L. Cross Certification Board Public Works Division Indiana Department of Administration A109!A/ 1,�1 .—zhinrifryn q#rocf Rrv9 M1497ii^.;CS .E. Indianapolis, IN 46204 From: Karmen Rensberger <krensberg@rieth-riley.com> Sent: Thursday, March 31, 2022 11:45 AM To: Cross, Tracy <tcross@idoa.IN.gov> Subject: RIETH-RILEY CONSTRUCTION CO., INC. - Certification Application Submission **** This is an EXTERNAL email. Exercise caution. DQ NOT open attachments or click links from unknown senders or unexpected email. **** Hello - We have attached our renewal application which includes an equipment listing and bonding letter. Please let me know if more information is needed. RIETH-RILEY CONSTRUCTION CO., INC. GOSHEN, IN who has 1W i� ;� sta r .m er a� ��� ras r q -red rider �1 � �-� Ir by qua � � � � rf Depa� r� Trans�ct - . tri t es of W r*k and �� t� � rpt nd �r tit Etter i n tested � for as tie a m o . all source does riot e ' the Ag- re mount � referer by name r ym l are In sr nce with the Beth Co rrr� rpt rrt rg `rb supersedesia�r . rf� 0 $that t ar�� r rctb�trr t� �r in tie tnincW condition of the cor4radko firm or other facts J�is€6 --Wh mAsWn or mvocaffon. Valid November 06, 2021 Thru July 31, 2022 Aggregate Bidding Capacity: 0103 3 -SIDED BOX STRUCTURE(S) W/SPA N > 20 FT ........................... A(A) CONCRETE PAVEMENT: GENERAL ................................................ B(A) ASPHALT PAVEMENT: W/INDOT CERTIFIED HMA PLANT ............. C(A) HEAVY GRADING.............................................................................. D(A) HIGHWAY OR RAILROAD BRIDGE OVER WATER .......................... D(B) HIGHWAY OR RAILROAD BRIDGE OVER HIGHWAY ..................... D(C) HWY/RR BRIDGE REQ RR TRACK PROTECTION ......................... E(C) BRIDGE DECK OVERLAYAND MINOR BRIDGE REPAIR ............... E(E) SMALL STRUCTURES AND DRAINAGE ITEMS .............................. E(F) SURFACE MASONRY AND MISCELLANEOUS CONCRETE........... E(H) DEEP SEWER AND/OR EXCAVATION ............................................. E(R) ASPHALT PAVEMENT MILLING....................................................... E(T) DEMOLITION..................................................................................... fEtEICT N ENGINEER aw-am, fps I " 1,164,594,000.00 ..............................1 $99,999,999.00 ............I .................. $99,999,999.00 ................................ $99,999,999.00 ................................ $99,999,999.00 ................................ $99,999,999.00 ............................... $99,999,999.00 ............................... $99,999,999.00 ................................ $10,000,000.00 ............................... $10,000,000.00 ..........I ..................... $99,999,999.00 ................................ $99,999,999.00 ................................ $99,999,999.00 ................................ $99,999,999.00 August 30, 2021 CERTIFIED HOT MIX ASPHALT PRODUCERS Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA Producer ITM 583 SM Material Code: 401M34500 to 41OM34600 A certified hot mix asphalt producer is one who has complied with the requirements set out in the above referenced.specification. A producer accepted into this program may supply asphalt mix for all projects beginning with the date approved as a certified hot mix asphalt producer. Source Producer Name Code Location Comments 3342 API CONSTRUCTION CORP HUNTERTOWN, IN 3390 API CONSTRUCTION CORP ANGOLA, IN 3321 ASPHALT SUPPLY CO. SELLERSBURG, IN 3391 BABCOCK PAVING, INC 1 of 7 Comments A = Water Injection System Installed B = In -Line Blending System Installed DEMOTTE, IN 3396 BARRETT PAVING MATERIALS, INC CLEVES, OR 3560 BITUMEN SUPPLY, LLC CHARLESTOWN, IN 3303 BROOKS CONSTRUCTION CO INC AUBURN, IN 3324 BROOKS CONSTRUCTION CO INC FT WAYNE, IN 3360 BROOKS CONSTRUCTION CO INC FT WAYNE, IN 3359 BROOKS CONSTRUCTION CO INC HOAGLAND, IN 3372 BROOKS CONSTRUCTION CO INC MARION, IN 3291 BROOKS CONSTRUCTION CO INC WARSAW, IN 3220 CAVE QUARRIES INC PAOLI, IN 3119 CENTRAL PAVING LOGANSPORT, IN 3381 C G S SERVICES, INC MORRISTOWN, IN 1 of 7 Comments A = Water Injection System Installed B = In -Line Blending System Installed August 30, 2021 CERTIFIED HOT MIX ASPHALT PRODUCERS Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA Producer ITM 583 SM Material Code: 401M34500 to 41OM34600 3407 C & R CONSTRUCTION CORYDON, IN 3393 DAVE O'MARA CONTRACTORS INC FLATROCK, IN 3377 DAVE O'MARA CONTRACTORS INC HAYDEN, IN 3192 DAVE O'MARA CONTRACTORS INC LEXINGTON, IN 3344 DAVE O'MARA CONTRACTORS INC NEW POINT, IN 3546 DAVE O'MARA CONTRACTORS INC ST. PAUL, IN 3326 DAVE O'MARA CONTRACTORS INC VERSAILLES, IN 3285 E & B PAVING LLC ANGOLA, IN 3373 E & B PAVING LLC BLOOMINGTON, IN 3349 E & B PAVING LLC CHANDLER, IN 3375 E & B PAVING LLC FT WAYNE, IN 3355 E & B PAVING LLC HUNTINGTON, IN 3340 E & B PAVING LLC INDIANAPOLIS, IN 3279 E & B PAVING LLC PLYMOUTH, IN 3366 E & B PAVING LLC KOKOMO, IN 3348 E & B PAVING, LLC MARTINSVILLE, IN 3368 E & B PAVING LLC MUNCIE, IN 3246 E & B PAVING LLC 2 of 7 Comments B = In -Line Blending System Installed August 30, 2021 CERTIFIED HOT MIX ASPHALT PRODUCERS Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA Producer ITM 583 SM Material Code: 401M34500 to 41OM34600 NOBLESVILLE, IN - SR 38 3339 E & B PAVING LLC NOBLESVILLE, IN - RIVER RD 3257 E & B PAVING LLC PENDLETON, IN 3302 E & B PAVING LLC PERU, IN 3389 E & B PAVING LLC (I) ROCKPORT, IN 3361 E & B PAVING, LLC SWITZ CITY, IN 3341 E & B PAVING, LLC WASHINGTON, IN 3371 GALLAGHER ASPHALT CORP, THORNTON, IL 3196 GAUNT & SON ASPHALT INC WABASH, IN 3367 GOHMANN ASPHALT & CONSTRUCTION INC (I) DALE, IN 3145 HARDING ASPHALT MATERIALS INDIANAPOLIS, IN 3404 HARDING ASPHALT MATERIALS INDIANAPOLIS, IN (TIBBS AVE.) 3383 HOT MIX INC GREENSBURG, IN 3387 IMI - CORYDON STONE & ASPHALT CORYDON, IN 3298 IMI - SELLERSBURG STONE CO INC SELLERSBURG, IN 3550 JENSTAR ASPHALT LLC GARY, IN 3403 JERRY DAVID ENTERPRISES, INC EVANSVILLE, IN 3405 JH RUDOLPH & CO, INC DALE, IN 3 of 7 Comments B = In -Line Blending System Installed August 30, 2021 CERTIFIED HOT MIX ASPHALT PRODUCERS Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA Producer ITM 583 SM Material Code: 401M34500 to 41OM34600 3378 JH RUDOLPH & CO INC Comments B = In -Line Blending System Installed ENGLISH, IN 3308 JH RUDOLPH & CO INC EVANSVILLE, IN 3551 K -FIVE CORPORATION MARKHAM, IL 3555 LOUSIVILLE PAVING CO CRESTWOOD, KY 3398 LOUSIVILLE PAVING CO LOUISVILLE, KY 3384 MAC CONSTRUCTION & EXCAVATION, INC JEFFERSONVILLE, IN 3249 METZGER CONSTRUCTION CO INC BOONVILLE, IN 3251 METZGER CONSTRUCTION CO INC BOONVILLE, IN 3332 MILESTONE CONTRACTORS LP BLOOMFIELD, IN 3232 MILESTONE CONTRACTORS LP (I) CAMBRIDGE CITY, IN 3315 MILESTONE CONTRACTORS LP COLUMBUS, IN 3394 MILESTONE CONTRACTORS LP (I) CRAWFORDSVILLE, IN 3397 MILESTONE CONTRACTORS LP DALEVILLE, IN 3309 MILESTONE CONTRACTORS LP (I) DECATUR, IN 3304 MILESTONE CONTRACTORS LP INDIANAPOLIS, IN - HARDING ST (PLANT #11) 3317 MILESTONE CONTRACTORS LP INDIANAPOLIS, IN - 96TH ST 3273 MILESTONE CONTRACTORS LP KENTLAND, IN 3323 MILESTONE CONTRACTORS LP LAFAYETTE, IN 4 of 7 Comments B = In -Line Blending System Installed August 30, 2021 CERTIFIED HOT MIX ASPHALT PRODUCERS Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA Producer ITM 583 SM Material Code: 401M34500 to 41OM34600 3347 MILESTONE CONTRACTORS LP PLAINFIELD, IN 3345 MILESTONE CONTRACTORS LP PORTLAND, IN 3248 MILESTONE CONTRACTORS LP RICHMOND, IN 3158 MILESTONE CONTRACTORS LP RIDGEVILLE, IN 3333 MILESTONE CONTRACTORS LP VEEDERSBURG, IN 3363 MILESTONE CONTRACTORS LP WHITESTOWN, IN 3336 MILESTONE CONTRACTORS NORTH, INC GRIFFITH, IN 3406 MILESTONE CONTRACTORS NORTH, INC LAPORTE, IN A 3388 MILESTONE CONTRACTORS NORTH, INC LOWELL, IN 3351 MILESTONE CONTRACTORS NORTH, INC SOUTH BEND, IN 3382 MILESTONE CONTRACTORS NORTH, INC VALPARAISO, IN 3392 MILESTONE CONTRACTORS SOUTH, INC CLOVERDALE, IN 3350 MILESTONE CONTRACTORS SOUTH, INC TERRE HAUTE, IN 3334 NIBLOCK EXCAVATING INC BRISTOL, IN 3296 NIBLOCK EXCAVATING INC KIMMEL, IN 3402 OWENSBORO PAVING (I) OWENSBORO, KY - (PLANT #1) 3533 OWENSBORO PAVING (I) OWENSBORO, KY - ( PLANT #2) 5 of 7 Comments B = In -Line Blending System Installed August 30, 2021 CERTIFIED HOT MIX ASPHALT PRODUCERS Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA Producer ITM 583 SM Material Code: 401M34500 to 41OM34600 3137 PHEND & BROWN INC DISKO, IN 3171 PHEND & BROWN INC LEESBURG, IN 3399 RIETH-RILEY CONSTRUCTION CO INC MOORESVILLE, IN 3395 RIETH-RILEY CONSTRUCTION CO INC DANVILLE, IN 3173 RIETH-RILEY CONSTRUCTION CO INC ELKHART, IN 3353 RIETH-RILEY CONSTRUCTION CO INC GARY, IN 3511 RIETH-RILEY CONSTRUCTION CO INC HOWE, IN 3330 RIETH-RILEY CONSTRUCTION CO INC INDIANAPOLIS, IN - KY AVE -B- 3184 RIETH-RILEY CONSTRUCTION CO INC INDIANAPOLIS, IN - KY AVE "A" 3316 RIETH-RILEY CONSTRUCTION CO INC INDIANAPOLIS, IN - 96TH ST 3386 RIETH-RILEY CONSTRUCTION CO INC LAFAYETTE, IN 3365 RIETH-RILEY CONSTRUCTION CO INC LAPORTE, IN 3300 RIETH-RILEY CONSTRUCTION CO INC NOBLESVILLE, IN - (RIVER AVE) 3290 RIETH-RILEY CONSTRUCTION CO INC SOUTH BEND, IN 3379 RIETH-RILEY CONSTRUCTION CO INC VALPARAISO, IN 3288 TEMPLE & TEMPLE PAVING SALEM, IN 3154 TRI -COUNTY ASPHALT OTWELL, IN 3534 VALLEY ASPHALT CORP CLEVES, OH -----------------------------------------B 6 of 7 Comments B = In -Line Blending System Installed August 30, 2021 CERTIFIED HOT MIX ASPHALT PRODUCERS Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA Producer ITM 583 SM Material Code: 40IM34500 to 41OM34600 3510 VALLEY ASPHALT CORP (I) ROSS, OH 3543 WALLS MANUFACTURING CO (I) BROOKVILLE, OH 3544 WALLS MANUFACTURING CO (I) GREENVILLE, OH 3343 WAYNE ASPHALT AND CONST. CO INC FORT WAYNE, IN 7 of 7 Comments B = In -Line Blending System Installed Cnmq TR i ir. TwN 100% Quality • 100% Employee Owned • Over 100 Years July 12, 2022 To Whom It Ma:; Concern: For your review ,,ve have included references from Private firms that we have perform -d work for. AM General Corr oration (574) 284-272.8 Bosch Automoti-- ,e Braking System/Navistar (574) 654-2400 ITR Concessions. LLC 574-674-5836 University of NCre Dame 574-631-7356 1 25200 S.R. 23 • South Bend, IN 46614 Phone: (574) 288-8321 • www.rieth-riley.com Cn N.q TRi ir Tin N 100% Quality . 100% Employee Owned • Over 100 Years List names and addresses of subcontractors that we have used in public works projects In the last five years: Roadsafe Traffic Systems V&R Trucking Slusser's Green Thumb 3519 Harding Street 1845 North Elmer Street P.O. Box 33 Indianapolis, In. South Bend, In. Logansport, In. Traffic Marking Trucking Landscaping/Erosion Control Hawk Enterprises 1850 E. North Street Crown -Point, In. Electric/Signage R&R Excavating 2010 Went Avenue Mishawaka, In. Dirt/Excavating C -Tech Corporation 5300 W. 100 North Boggs town, I n. Guard rail/Fencing P.D. Sox 1775.25200 S.R. 23 • South Bend, IN 46634 Acorn Landscaping, LLC. 3680 W. Sample Street South Bend, In. Landscaping Phone, (574) 288-8321 • www.rieth-riley.com RIETH-RILEY CONSTRUCTION CO., INC. 2022 SAMPLE WORK -IN -PROGRESS Pr2jLt Name RRJob # HIDE Owner Construction Manager Title Phone Email SCOPE OF WORK Contract Amount 96 Compl Proj CompI Date SURETY R -41542-A 3208340-48 INDOT Kirk Stafford Project Engineer 317-650-1890 kstafford@corradino.com Asphalt Pavement $186,823,857 50% July 2025 TRAVELER'S CASUALTY 1-69 Section 4 & Bridges AND SURETY Toll Road Push III 3681014-15 ITR Concession Company, LLC Brian Cherry Infrastructure Manager 574-651-2464 bcherry@indianatollroad.org Asphalt Overlay $113,874,825 93% December 2028 TRAVELER'S CASUALTY Construction AND SURETY R -38526-A 3208325 INDOT Mike Wilmot Project Engineer 765-745-1764 mwilmot@indot.in.gov MSE, CRCP $49,494,673 2% October2024 TRAVELER'S CASUALTY 1-465 Clear Path Lane Addition AND SURETY R-42909 3408129 INDOT Samantha Blosser Project Manager 317-557-9340 sblosser@walshgroup.com New Construction $31,138,998 1% October 2023 TRAVELER'S CASUALTY 1-65/SR 43 Interchange Asphalt AND SURETY Const. Inspection Section R -39504-A 3208296 INDOT Cory Mahan, P.E. Manager 317-780-7262 cmahan@chacompanies.com Asphalt Pavement $28,241,582 71% June 2022 TRAVELER'S CASUALTY 146th Street OverSR 37 N AND SURETY R-37797 3408086 INDOT Clayton Pergal Inspector 765-376-0471 cpergal@indot.in.gov Road $27,448,664 25% September 2024 TRAVELER'S CASUALTY SR 26 Clinton County Reconstruct AND SURETY 33031-210087 7408190 Kalin Construction Mike Kalin Project Manager 269-925-2746 mkalin@kalininc.com Asphalt Paving $24,054,890 0% September2024 TRAVELER'S CASUALTY US 127 2022 AND SURETY 11016-130008 7118264 MDOT Kenton McAndrew Project Engineer 269-270-7313 McandrewKI@Michigan.gov Asphalt Pavement $23,784,960 46% June 2023 TRAVELER'S CASUALTY 1-94 Design/Build AND SURETY R -39500-A 3208283 INDOT Greg Peterson Project Supervisor 765-570-8003 gpeterson@indot.in.gov Asphalt Pavement $22,259,680 99% June 2022 TRAVELER'S CASUALTY 126th Street & SR 37 AND SURETY SB Airport Taxi 3610736 South Bend Regional Airport Andrew Panetta Engineer, Aviation 517-301-9358 andrew.panetta@meanhunt.com Earthwork, HMA & $19,760,353 76% June 2022 TRAVELER'S CASUALTY Mead & Hunt Aggregate Placement AND SURETY R-41050 3208328 INDOT Justin Minardo Project Supervisor 317-701-7175 justin.minardo@wsp.com Road Construction & RABS $17,958,773 0% October 2024 TRAVELER'S CASUALTY Mt Comfort Rd AND SURETY RIETH-RILEY CONSTRUCTION CO., INC. 2022 SAMPLE WORK COMPLETED CONSTRUCTION %OFWORK COMPLETION CONTRACT PROJECT NAME OWNER RR JOB# MANAGER TITLE PHONE EMAIL TYPEOF WORK PERFORMED BY RR DATE AMOUNT SURETY R -39093-A INDOT 3208260 Ed Wilson Project Supervisor 765-617-4357 slindway@indot.in.gov Asphalt Pavement 97% 2021 $41,006,016 TRAVELER'S CASUALTY 1-69 Design Build AND SURETY R-40511-8 INDOT 3208295 Ling Gan Project Engineer 765-745-1717 Igan@indot.in.gov Bridges 59% 2021 $34,761,346 TRAVELER'S CASUALTY 1-70 South Split to 465W AND SURETY 16 -ENG -05 City of Carmel 3200713 Joe Dubyel Field Manager 317-501-8111 jdubyel@structurepoint.com Interchange Construction 48% 2021 $32,009,154 TRAVELER'S CASUALTY 96th Street and Keystone AND SURETY R-33950 INDOT 3648090 Courtney Beale Area Engineer 219-873-6322 cbeale@indot.in.gov Asphalt Pavement 76% 2021 $27,348,623 TRAVELER'S CASUALTY 1-94 & 1-65 Bundle AND SURETY R -41769-A INDOT 3208280 Sean Hendrickson Project Engineer 765-745-1731 shendrickson@indot.in.gov Asphalt Pavement 87% 2021 $21,562,318 TRAVELER'S CASUALTY 1-465 Northwest AND SURETY R -34439-A INDOT 3648097 Martin Navarro Construction Project Manager 219-214-2934 mnavarro@indot.in.gov Asphalt Pavement 73% 2021 $21,440,373 TRAVELER'S CASUALTY US 30/51153 Bundle AND SURETY State Street Overhead Plenary Roads State Street, LLC 3200609 Simon Stachnik Project Manager 303-905-1340 simon.stachnik@plenarygroup.com Urban Street 100% 2021 $17,759,129 TRAVELER'S CASUALTY Construction AND SURETY R -41351-A INDOT 3208281 Dan Streib Project Engineer 765-745-1748 dstreib@indot.in.gov Concrete Pavement Restoratio 56% 2021 $15,636,213 TRAVELER'S CASUALTY 1-465 Restoration 2019 AND SURETY 11111-115754 MDOT 7118236 Chris Jacobs Project Engineer 269-849-1496 jacobsc@michigan.com Multi -Lift Mill & Fill 58% 2021 $14,559,230 TRAVELER'S CASUALTY 1-196 AND SURETY RS -41978-B INDOT 3208285 Ted Sowders Project Supervisor 317-437-2374 tsowders@hntb.com Asphalt Patching 73% 2021 $13,414,911 TRAVELER'S CASUALTY 1-70 Terre Haute Rehab & Resurface AND SURETY RS -38655-A INDOT 3208250 Brad Thompson Area Engineer 855-463-6848 Asphalt Patching 78% 2021 $11,595,077 TRAVELER'S CASUALTY 1-74 & Resurface & Deck Overlay AND SURETY 122642 MDOT 7218235 Gregg Zack Construction Engineer 231-777-3451 zackg@michigan.gov Asphalt Pavement 60% 2021 $10,672,450 TRAVELER'S CASUALTY US 31 Hart -Shelby AND SURETY CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name 2022 Curb and Sidewalk Construction — Round 1 Project No. For Bids Due 122-001 July 12th, 2022 Contractor Name: Rieth-Riley Construction Co., Inc. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre- qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre- qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31 st for the upcoming calendar year, or within twelve (12) months of obtaining pre- qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 02/23/2022 General Conditions - 10 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH -347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 02/23/2022 General Conditions - 11 I. PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) X Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) X List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) X For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Version 02/23/2022 General Conditions - 12 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: (i) Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) List identifying all former business names. (iii) Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 02/23/2022 General Conditions - 13 (ix) Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: July 12, 2022 &� (W-� (Sign ere) Ruben Alvarado (Print Name Here) Rieth-Riley Construction Co., Inc. (Name of Company) 25200 State Road 23 (Address of Company) South Bend (City) Indiana (State) 574-288-8321 (Telephone Number) Version 02/23/2022 General Conditions - 14 CITY OF SOUTH BEND .TAMES MUELLER, MAYOR DEPARTMENT OF PUBLIC WORKS ERIC HORVATH, DIRECTOR December 9, 2021 Dawn Armstrong Rieth-Riley Construction da.r. mstY•ong_rieth-z•il.cy.corn RE: Pre -Qualification Verification Dear Ms. Armstrong: This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you are required to re -submit a complete application for continuation of pre -qualification status prior to December 31 for the upcoming calendar year. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist acid attachments. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Digitally s(gned by Liz Horvath Liz'7 DN:cn=Liz Horvath, a, ou=Engineering, Horvath'email-lharvath, nsouthbendhgov,r—US -ate:2021.12.1009:37:30 05'00' Liz Horvath, Permit Manager Entity Type: Domestic For -Profit Corporation Business Status: Active Creation Date: 08/08/1952 Inactive Date: Principal Office Address: P.O. Box 477, POST OFFICE BOX 477, Expiration Date: Perpetual Goshen, IN, 46527 - 0477, USA Jurisdiction of Formation: Indiana Business Entity Report Due 08/31/2022 Date: Name: ROBERT L. KONOPINSKI Address: 3626 ELKHART RD., Goshen, IN, 46527, USA Years Due: 2022/2023 \ L \ Title Name Address Vice President BRIAN A. INNIGER 3626 ELKHAR ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA Director RONALD G. POPE 1124 BARON DRIVE, MYRTLE BEACH, SC, 29577, USA Vice President Eugene E. Yarkie 3626 Elkhart Road, Goshen, IN, 46527 - 0477, USA Director Jack K. Matthys 57457 Pine Road, South Bend, IN, 46619, USA Director William J. Schmuhl, Jr. 1421 Honan Drive, South Bend, IN, 46614, USA Director WILLIAM P. JOHNSON 6310 TRUSDALE AVENUE, SYRACUSE, IN, 46567, USA President A. KEITH ROSE 3626 ELKHART ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA Vice President Paul J. Tate 1751 W. Minnesota Street, Indianapolis, IN, 46221, USA Director Robert L. McCormick 3205 Wakefield Drive, Goshen, IN, 46528, USA Secretary ROBERT L. KONOPINSKI 3626 ELKHART ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA CFO Michael Weber P.O. Box 477, Goshen, IN, 46527 - 0477, USA Type: Individual Name: ROBERT L. KONOPINSKI Address: 3626 ELKHART RD., Goshen, IN, 46527, USA 100% Quality * 100% Employee Owned • Over 100 Years November 18, 2021 RE: City of South Bend, IN Contractor's Bid for Public Work: Pre -qualification Checklist Prequalification Checklist b) Attachments iii. Rieth-Riley Construction Co., Inc. is a 100% union contractor, and recruits through union halls as necessary to complete the work required. iv. All individuals working for Rieth-Riley Construction Co., Inc. are subject to our policies and procedures. Rieth-Riley Construction Co., Inc. participates in E -Verify, and requires all employees to present proper identification. V. Rieth-Riley Construction Co., Inc. is a 100% union contractor, and recruits through union hall apprenticeship programs which are registered through the United States Department of Labor Office of Apprenticeship. Respectfully, Rieth-Riley Construction Co., Inc. Dawn Armstrong, Payroll Administrator 25200 S.R. 23 - South Bend, 1N 46614 Phone: (574) 288-8321 • www.rieth-riley.com 0411/18 03/31/23 •:. ":.:: _ ,.:. .. mY.b% NfAf<f� >f»Yaod> of � k rPamX»f f»H3 »#xx `f»32PE3 :::. MiafNih - 't�/18 :.::.04130123 ::: _ � � ,�€��.:,:, ::... '1✓...... gn...»m .. »« Yk < 04/30/22 0511 /17 ..'::� .::_' �.:.' ...:'. .:.' .. .. j»mm a d. >. .»fhn. ••n>�»m>>»»». ma»r »mmv mm3<P ... r.v r»> fm��m>. .. Y„m .. <.`nh�h,xbs..�:s..x.:JPs.�k`Ww3L�X:e:�q;. ...ut<al�t >tb>fK:>m�.rnfA>m_emt>Pnr�. .mon snxmm»nm+.>n»»m»vm r :. :.: . • .. <.».owur .»»sv..zes a» 'oa» ,.. »tt`»ss»syss»s ss»>„ »»x marts» Hsss •,ss»,cs»umsis t itmXswsh'3"ss;sussask� sssc<s uss. Gs `?.P>tt,.rtrss.+tsc.......... .rs:ss:HsxsmssHH s . :i 04/1/17 03/31/22trf} ... -�"' :: ::< ,f :25..u:....A..ifM":kJidwf3f�1'eY"hHiiSwVAYS)R2Y>`'? ad'ioY:iw m::»YAu»'S>YP`hmefwoaAN.9�:%tb:9iti'Ad'i�h'hS.. 3N�HYN!?HeN'MSSiHNia�XH).: N{. )hNNY nN)H)�!Ya+YAY�++`wY�., :HN�TrMW++t?4ut ..-L'+t>N!M�`N�,tt3x �`I WTD, N r- :.�< �.,.. 04/1/17 ;:03/31/22. .T .: ,: t..::LWv»amivL».eT �*v »0.mpetmm»roe-sit.:. 04/30/22 05/1117 Y. .. . . ;rt3.ffr..Eci 04/1/18 03131/23 ...: :. ::.., :�.»> •4..»ik{iP'FYm::P.><aP( }'iPa w vE»!>.tt oa<mnnen ' RHRi' m »£t .:.:t ;. ..: .. .::.: '�:' ,�,y � �,x �� Yl • : -- ` '�r+t :�:.� :�....: �: ;ate � r '. ... � t �: .,it :_ � :..-� , . 03/31/23 04/1118 tri€r1: , 04/1/17 _ ;:: 03/31/22 .. I . :.. ' . ' ':: : r»#S»rk:PNfi:Yfi+\\PWK'h{taAX» 1 :.`aa`* ... N,ah,.waumh �waK(nw �arom:wrowMw..aur,.mw.aw�i K. »v»e Wtf»»n.rirvrn�i-.r�aa+*T" r>-ao�M�YA b4fx�•� � RTe9»ca+�rtmRhHP! >m+en>C»ma�»a> aNY*?at??a+l*h»+T' 03/3 .> 04/1/17 0 3 22 :af ..irk ..'a;3 .t a-i:?rrri�r.€ Ilfrt3 :. :a • .' : '� ::. :. � ... - ..•.: ... '. �.�W.v.,v,:.a�Yaw: (KlWW+nOs ud+ba'b W YY N> hX»S^TVWbYN� ±"RfifvY:r�Y>W W»la WAW ..) AW PM ..! mr 14..: 06/1119 :.. 05/31/22.. ,. Xiaa• 20i -2M 3 t F 04/1/19 03/31/24 .......'- 74! :�. +§" E 'i�'`� 3;, f'• a (l fis 04!1!19 03/31/24tEI( j s b9 3EEIF3 ` 06/1118 05/31/23 : ��;xt'44 �€f1 �� t tm»m mm»e»mmx (fit"2E rL,E rr 06/1/18 05/31/23 €1 #E . ` : ....'... fiWTu• :�:u.NwJ.N,(Wf>Hies�, Aa mifi`Hhift»Xaitiififf Ka »fKtm wka »m rov,>ifi Sff frWh# p>a4ifineb by»m m>fa»am mme»wrnma )asanvrnar»amnTii:ed3 N.wvavNa L€�14 t� 06/1/18 05/31/23 r1i"s C1tr.»t s:ssuaus smsfsrhfxk{hnHsa3mxwNar.X}Y[x»hva»�wFtv�e»r�sos'xrr�aLsa.. �r .»; Tmmsta»n;.�tn..;t : 06/1/18 05/31/23::l:::; [[��� gg,(3�y EE �j : i.!•»+ .:. Y!a»>3:w»wreriwmv' ii }} t. F.. r'4dk5,:3[r�6j: ! j. Nat x kt rLx t 06/1l1sr� 05/31/23:'.etc. t�Ett;�1�f x�..l k.. . 04/1!17 ` 03/31/22 � HAT..,�...�w�, s'Ef..�3iii.Y[,Y ii�, 04/1/17 .::. 03/31/22 '_:... 04/1/18 ...::: 3 .;.:� :. r-_ �o�SJ-�i(jdE4i3`�c,ifyEiqt.`�f�tt-J�yl�a � �:.,.....� 0411/18 03/31/23 •:. ":.:: _ ,.:. .. mY.b% NfAf<f� >f»Yaod> of � k rPamX»f f»H3 »#xx `f»32PE3 :::. MiafNih - 't�/18 :.::.04130123 ::: _ � � ,�€��.:,:, ::... '1✓...... gn...»m .. »« Yk < 04/30/22 0511 /17 ..'::� .::_' �.:.' ...:'. .:.' .. .. j»mm a d. >. .»fhn. ••n>�»m>>»»». ma»r »mmv mm3<P ... r.v r»> fm��m>. .. Y„m .. <.`nh�h,xbs..�:s..x.:JPs.�k`Ww3L�X:e:�q;. ...ut<al�t >tb>fK:>m�.rnfA>m_emt>Pnr�. .mon snxmm»nm+.>n»»m»vm r :. :.: . • .. <.».owur .»»sv..zes a» 'oa» ,.. »tt`»ss»syss»s ss»>„ »»x marts» Hsss •,ss»,cs»umsis t itmXswsh'3"ss;sussask� sssc<s uss. Gs `?.P>tt,.rtrss.+tsc.......... .rs:ss:HsxsmssHH s . :i 04/1/17 03/31/22trf} ... -�"' :: ::< ,f :25..u:....A..ifM":kJidwf3f�1'eY"hHiiSwVAYS)R2Y>`'? ad'ioY:iw m::»YAu»'S>YP`hmefwoaAN.9�:%tb:9iti'Ad'i�h'hS.. 3N�HYN!?HeN'MSSiHNia�XH).: N{. )hNNY nN)H)�!Ya+YAY�++`wY�., :HN�TrMW++t?4ut ..-L'+t>N!M�`N�,tt3x �`I WTD, N r- :.�< �.,.. 04/1/17 ;:03/31/22. .T .: ,: t..::LWv»amivL».eT �*v »0.mpetmm»roe-sit.:. 04/30/22 05/1117 Y. .. . . ;rt3.ffr..Eci 04/1/18 03131/23 ...: :. ::.., :�.»> •4..»ik{iP'FYm::P.><aP( }'iPa w vE»!>.tt oa<mnnen ' RHRi' m »£t .:.:t ;. ..: .. .::.: '�:' ,�,y � �,x �� Yl • : -- ` '�r+t :�:.� :�....: �: ;ate � r '. ... � t �: .,it :_ � :..-� , . 03/31/23 04/1118 tri€r1: , 04/1/17 _ ;:: 03/31/22 .. I . :.. ' . ' ':: : r»#S»rk:PNfi:Yfi+\\PWK'h{taAX» 1 :.`aa`* ... N,ah,.waumh �waK(nw �arom:wrowMw..aur,.mw.aw�i K. »v»e Wtf»»n.rirvrn�i-.r�aa+*T" r>-ao�M�YA b4fx�•� � RTe9»ca+�rtmRhHP! >m+en>C»ma�»a> aNY*?at??a+l*h»+T' 03/3 .> 04/1/17 0 3 22 :af ..irk ..'a;3 .t a-i:?rrri�r.€ Ilfrt3 :. :a • .' : '� ::. :. � ... - ..•.: ... '. �.�W.v.,v,:.a�Yaw: (KlWW+nOs ud+ba'b W YY N> hX»S^TVWbYN� ±"RfifvY:r�Y>W W»la WAW ..) AW PM ..! mr 14..: 06/1119 :.. 05/31/22.. ,. Xiaa• ►w' RIETH-RILEY CONSTRUCTION CO., INC. 201:8-2020 SAMPLE WORK COMPLETED CONSTRUCTION %OF WORK PERFORMED BY CONTRACT PROJECT NAME OWNER RR JOB# MANAGER' TITLE PHONE TYPE OF WORK RR COMPLETION DATE AMOUNT SURETY R-28973 INDOT 3648076 Gannon Carnes Project Engineer 765-307-8434 Asphalt Pavement 70% 6/30/2018 $23,068,538 TRAVELER'S CASUALTY 1-65 ANDSURETY RS -39572 INDOT' 3408052 ErikSeef Construction Manageer 765-361-5218 Concrete Pavement 83% 5/1/2019 $10,334,676 TRAVELER'S CASUALTY US 52 South Budget ANDSURETY R -41350-A INDOT 3208268 Ling Gan Project Engieeer 765-745-1717. Concrete Pavement 79% 12/12/2018 $9,158,700 TRAVELER'S CASUALTY 1465 AND SURETY R -37443•A INDOT 3208248 Can Yost Inspection Supervisor/ 317-443-7241 Asphalt Pavement 8s% 10/29/2019 $4,711,574 TRAVELER'S CASUALTY 276th Steer Recons ROAW Consultants ANDSURETY Elkhart County Highway Elkhart County Highway Dept. 370741 Rick Easton Technician - Engineering Section 574-534-9394 Asphalt Pavement 93% 11%1/2019 $4,259,982 TRAVELER'S CASUALTY 2019 Paving Program ANDSURETY RS -41963-A INDOT 3648127 Christen Reynolds Area Engineer 219-325-7524 Asphalt Pavement 26% 10/1/2019 $3,738,878 TRAVELER'S CASUALTY LaPorte Patch ANDSURETY Duke Energy Plainfield Terracon 3200766 Anthony Zink Program Director 937-763-7078 Asphalt Pavement 83% 6/28/2019 $3,531,558 TRAVELER'S CASUALTY AND SURETY RS -39978 INDOT 3408059 PaJI Balaba Construction Manager 765-376-9130 Asphalt Pavement 86% 7/1/2019 $3,355,045 TRAVELER'S CASUALTY SR 28 Clinton Budget ANDSURETY 80/90 PUSH ITR CONCESSION COMPANY LLC 3681000 Brian Charry Infrastructure Manager 574-651-2464 ASPHALT OVERLAY 62% .5/25/2018 $201,811,661 TRAVELER'S CASUALTY CONSTRUCTION ANDSURETY R -33860-A INDOT 3208207 Gary Kreutzjans Construction Engineer 812-54-3739 ASPHALT OVERLAY 75% 6/30/2018 $28,592,864 TRAVELER'S CASUALTY 1-65 DESIGN BUILD CONSTRUCTION AND SURETY IR -30143-A INDOT 3618019 David Barich Construction Engineer 219-362-6125 EARTHWORK, 50% 12/17/2018 $25,602,940 TRAVELER'S CASUALTY US 31, US 30 TO US 2 CONCRETE, ASPHALT AND SURETY IR -30132-A INDOT 3618011 David Ba rich Construction Engineer 219-362-6125 BRIDGES 39% 12/16/2018 $28,775,479 TRAVELER'S CASUALTY US 31 NORTH TO KERN ROAD ANDSURETY GARY AIRFIELD PAVING PROJECT GARY CHICAGO INTERNATIONAL AIRPORT • •3640934 Steve Sandefur-NCG Construction & Feld Service Mgr 317-258-1585 PCCP RUNWAY 41% 1/28/2018 $12,190,296 TRAVELER'S CASUALTY EXPANSION ANDSURETY INDOT 3208224 C iff Walker Project Engineer 765-745-1759 EARTHWORK, 66% 12/10/18 $10,381,780 TRAVELER'S CASUALTY IR -35914-A CONCRETE, ASPHALT ANDSURETY US 31 SR 28 3208260 Ed Wilson Project Supervisor 765-617-4357 Asphalt Pavement 97% 6/1/2020 $41,006,016 TRAVELER'S CASUALTY R -39093-A INDOT AND SURETY 1-69 Design Build Public Transportation Corp. 3200735 Sri Venugopalan, P.E. Director of Engineering 317-514-9305 Combined Job 53% 4/20/2021 $39,208,121 TRAVELER'S CASUALTY Indygo Red Line Indianapolis & Construction WfthoutAsphalt ANDSURETY INDOT 3208295 Ling Gan Project Engineer 765-745-1717 Bridges 59% 10/31/2020 $34,761,346 TRAVELER'S CASUALTY R -40511-B ANDSURETY 1-70 South Split to 46SW Sean Hendrickson Project Engineer 765-745-1731 Asphalt Pavement 87% 10/31/2019 $21,562,318 TRAVELER'S CASUALTY R -41769-A INDOT 3208280 ANDSURETY 1-465 Northwest Project Engineer 765-745-1748 Concrete Pavement Restoration 56% 9/30/2019 $15,636;213 TRAVELER'S CASUAL R -41351-A INDOT 3208281 Dan Streib ANDSURETY 1465 Restoration 2019 - sr. Inspector/ 317-417-4256 Asphalt Pavement 94% 10/11/2019 $12,420,988 TRAVELERS CASUALTY RS -38664-A RS -Project INDOT 3208265 Mike Hoff Engineer ANDSURETY 65 865 to Lebanon Area Engineer 219-873-6322 Asphalt Pavement 61% 5/10/2019 $10,610,066 TRAVELER'S CASUALTY 1 - 878-A INGOT 3648110 Conney Beale AND SURETY SR 14 Director of Hammond PortAuthority 219-808-8070 Asphalt Pavement, Earthwork, Bridge 25% 10/1/2019 $9,680,534 TRAVELER'S CASUALTY Wolf Lake 2019 Hammond Port Authority 3641203 Milai Krusznskl ANDSURETY Allen Project Executive 317-681-1000 Asphalt Pavement 90% 11/30/2021 $9,418,275 TRAVELER'S CASUALTY Greenwood Park 65 South Pepper Construction Company 3200814 David and Curbs AND SURETY Building 2 RIETH-RILEY CONSTRUCTION CO., INC. 2021 SAMPLE WORK -IN -PROGRESS Proiect Name RR Job # HIDE Owner _Construction Mana¢er Title Phone Email SCOPE OF WORK Contract Amount % Compl Proi Compl Date SURETY R -41542-A 3208340, INDOT Kirk Stafford Project Engineer 317-650-1890 kstafford@corradino.com Asphalt Pavement $181,601,711 6% July 2025 TRAVELER'S CASUALTY 1-69 Section 4 3208342-48 & Bridges AND SURETY Toll Road Push III 3681014 ITR Concession Company, LLC _ Brian Cherry Infrastructure Manager 574-651-2464 bcherry@indianatollroad.org Asphalt Overlay $61,168,876 4% December 2028 TRAVELER'S CASUALTY Construction AND SURETY Toll Road Push II 3681010 ITR Concession Company, LLC _ Brian Cherry Infrastructure Manager 574-651-2464- bcherry@indianatollroad.org Asphalt Overlay $61,112,626 881%. December 2026 TRAVELER'S CASUALTY Construction AND SURETY 16 -ENG -05 3200713 City of Carmel Timothy Conarroe, PE Project Engineer 317-547-5580 tconarroe@structurepoint.com Interchange $31,685,314 99% May 2021 TRAVELER'S CASUALTY 96th Street and Keystone Construction AND SURETY Const. Inspection Section R -39504-A 3208296 INDOT Cory Mahan, P.E. Manager 317-780-7262 cmahan@chacompanies.com Asphalt Pavement $30,090,075 26% October 2021 TRAVELER'S CASUALTY 146th Street Over SR 37 N AND SURETY R-37797 3408086 INDOT Clayton Pergal Inspector 765-376-0471 cpergai@indot.in.gov Road $27,227,764 1% September 2024 TRAVELER'S CASUALTY SR 26 Clinton County Reconstruct AND SURETY 11016-130008 7118264 MDOT _ Kenton McAndrew Project Engineer 269-270-7313 McandrewKi@Michigan.gov Asphalt Pavement $23,784,327 - 7% June 2023 TRAVELER'S CASUALTY I-94 Design/Build AND SURETY R -39500-A 3208283 INDOT Greg Peterson Project Supervisor 765-570-8003 gpeterson@indot.in.gov Asphalt Pavement $22,251,736 97% June 2021 TRAVELER'S CASUALTY 126th Street & SR 37 AND SURETY R -31319-B 3408078 INDOT _ Gannon Carnes Inspector 765-307-8434 gcames@indot.in.gov Road $15,640,800 2% September2024 TRAVELER'S CASUALTY Teal Road Reconstruct AND SURETY 210004 7508232 MDOT _ Shaun Bates Project Engineer 989-773-7756 batess2@michigan.gov Hot Mix Asphalt $13,247,055 0% October 2021 TRAVELER'S CASUALTY US 127 Clare Cold Milling & Resurfacing AND SURETY e ............................................... .............. cord,:+Yndiana 47421 ' .. .. Tear f ere y $hewer : Eric :Hol comb,,Governor.. :;..:. "James M Brown,:Director. °January 9; 2019 Thone'(. 17)-234-6062 Toll Free (800)'-400-4520 Fax (31:7-)-234-8144 Dear Jere�.y �r ip. wex reshiP. „.:Er.c.Hoicb. Governor '`James M Brown, D�recfo.r °' Janu'ary;9 201.9 W, age,Scale: Construction Craff,aborer FACILITY CODE: 30004114: _.:....:�y . 1Y'1 Y'i*,,-inif C !Tt'� riYIN IT 4 17'7 T 'i 'i i7� l�n iuElJu.;.LLGVAGW Li1G CiJ1LLJU. QVAVL LIJl VVLLLVIIL L1Jll1 GLVVLuG{V,. li 1V Ycu1v yas�A1Vu �✓wvµwuy �x. .... .. .. :r::.. ..: , _ Tine 38, V.S Code 3687, with an efEectxve date of Apr�1, 201: .,+""21 r..) Sxnce�el.y. dna nage a gxeac aay:: ,; a Enc Holcomb, c''I . Q . ;b -G '.,..o,.c Governor t o - r .-James M: fo .1 1 T T 1-1 -,1 1 -7 -to�:anci:.uncter:.ttie,i).:(Qyis�Qii5.Qx.::.Lille -)..z5,.0 -q? ::approval4s...... 0 U. UO effective date �p .. of. . I . ..... ..... I YQU!:'t 3].7-232-3-9.16' If hady.": W:.questions, ;i..p. e-as.e:!con ad me- Pho.no(817)-234-.6062 Toll :Free ,(8QQ)-400-4520.Fax (317)4-234--8744 Apprentice Status Repos B.y indenture Date Apprer�fices :Indentured. Between''1:/112020. And '12/31/2020: Apprentice: Program IN2 Year Apprentice Sfiatus Apprentices Percentage :H at>s3 3..i 's tsv '°y - -✓� >s, - .� .Z 9 r s f �.. { z t' � r s t a x s ..r . . r 2020 +; .s {s ,� r•,:s,N us; s:,.ss ' f j s'sn� ....t y x s< sk s z QQ / ;; >tiY v.>t s#`s.:h"i"1 f'<tz•zz,;tsa 3d'3'y,..,;.ts£"sr`- W.a }% .{ s. u s3a' fQ .. Prtteta:"ta£3Sd:a JeRuia�ry 1t `-t12i:''at apprentceatd. sepordenture I�:a Apprentices Inden turetl'Between 1/1)2017 And a%13/2D20 Appce am ProgrIN2. Year Apprenflce Sfa#us..., Appr P�erc.6M4 ..::.. . i' 7.IF ISa3fi..1F�',UC�%A . E ....1 L�� ... �.... .. .... ..... .. . t" ft Report ;::B 'I Apprentice a us Indenture abb. 6. ..e,n.:... to Apprentices Indenfured..B.etween 7 And 5/13/2020:. APV60.Program 1N2 Year:.. Apprentice Status Apprentices rpl2W'e'. 'l 6 S'. ............. . ... . .... .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ' Printed: Wednesday, -may 13,- 2020 p 2` g ........... .... Active -!!Duty l�. .......... ... . ................... .......... .......... ........... tO 34;;%: IS : D ....... ............................... .. . . ....... . . . .. .. ......... .. .. . 3 . ..... ....... . ....... ...... .. . ..... . .. . . .. ......... MR, .. .......... .. .......... Inactive ' . , *,, ........... ... ....... 10 1: 4 A : wigwam 1101="I'L 3'i Ag� 11si' ....Med ................. ....... . . ..... Sill . ... . .. ..... .... . .... . pe.. . . ... ...... ... Suspended :- . . . . . en,d... ... ... :0: :V ply -Int a'' 'thd"aw :.3:66. 1% �y wi.. r.: . .. .... ..... "76"t. m ent. uried. :874 ....... ... _. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ' Printed: Wednesday, -may 13,- 2020 p 2` 100%QOOW 4000%)FiPol O"'J' ;Over: '10 Q.. Y X29 2024.: Gr: MR. j:t'rt,g trt��� ��at 1 �r/�p���t�trc�eshi� Fin le►trtt Effort ofLcrbdr c�nr : ria �nJO tto Ftltlth0r i Alii aflr du ry, Rieth-Riley Construction Co,, Inc, Equipment list 3/31/2020 Acquired New or Asset 9 Description Acquisition Date Used Cast Accum Depr C185000006 2019SULLAIR185-KUB-DPQ AIR COMPRESSOR 3/28/2019. N 19,581.00 NBV C185000O07 2019 SULLAIR 185 KUB-DPQAIR COMPRESSOR 3/28/2019 N 4,895,28 14,685.72 C185000008 2019-SULLAIR 185-KUB-DPQAIR COMPRESSOR 3/28/2019 N 19 58100 4,895.28 14,685.72 C185000009 2019 SULLAIR 185-KUB-DPQ AIR COMPRESSOR 3/28/2019 N 19,581.00 4,895.28 14,685.72 C185000010 2019 SULLAIR 185-KUB-DPQ AIR COMPRESSOR 3/28/2019 N 19,581.00 4,895.28 14,685.72 0185000011 20195ULLAIR185-KUB-DPQAIR COMPRESSOR 3/28/2x19 N 19,581.00 4,895,28 14,685.72 C185000012 2019 SULLAIR 185-KUB-DPQAIR COMPRESSOR 3/28/2019 N 39,581.x0 4,895.28 14,685,72 0185000013 2019 SULLAIR 185-KUB-DPQ AIR COMPRESSOR 3/28/2019 N 39,581:00 4,895.28 14,685.72 DD35000013 2019 WALKER R512A-90 35" VIBRATORY COMPACTOR 4/18/2019 N 19,581.00 4,895,28 14,435.72 JT30000003 TRUCK 1 TON 2/1/2005 N 17,914.00 4,478,52 13,435.40 JT30000002 TRUCKITON2/112007 N 9,fi67.Z0 6,627,20 3,040,00 JT30000003 TRUCK ITON 12/11/2008 N 1x,278.15 7,046,15 3,432.00 JT30000004 TRUCK 1 TON 12/11/2008 N •8 743.20 6 334.20 2,409.00 JT3aaa0005 TRUCKITON 12/11/2008 N 8j743.20 6,334.20 2,409.00 JT3oxxaax6 TRUCK iTbN � 1z/13/zoos N 11,398.90 8,287,40 JT30000007 TRUCK 1TON 12/1112x08 N 31,398.90 8,287,40 3,111,50 JT300o0008 TRUCKITON 12/11%2008 N 11398;90 8 287,40 8180,87 3,111.50 JT30000009 TRUCKITON 12/11/2008 N 11292.37 ` 3,ii1.5o JT30000010 TRUCK 1 TON 12/1/2009 N 11,292,37 11,292.37 JT30000011 TRUCK 1 TON 12/1/2aa9 N 10 409,73 7135,73 ' 3,274:00 JT30000012 TRUCKITON - 12/1/2009 N 10,409.73 7,135.73 _ 3,274.00 IT30000013 TRUCK 1TOiV 12/1/2x09 N 10,409.73 30 409.73 7,135.73 3,274.00 JT30000014 TRUCK ITON 1211/2009 N 10,409.73 7135.73 7,135.73 3,274.00 JT30000015 TRUCK iTON 12/1/2009 N 10,507.94 7,233,94 • 3,274.00 JT30000016 TRUCK I TON 12/1/2009 • N 10,507.94 7,233.94 3274.00 ` JT30000017 TRUCK 1 TON 12/1/2009 N 10 507.94 ' 7233.94 3,274.00 M0000018 'TRUCKITON 12/1/2009 N 10,409.73 '3,274.00 7,135.73 JT30000019 TRUCK 1 TON 12/1/2009 N 10 ,507.94 7,233.94 3,274.00 JT300a0020 TRUCKITON UTILITY 6/3/2012 N 12,733.75 11,460.38 3,274.00 JT3000b021 7RUCKITON UTILITY 12,733,75 11,460,38 1,273,37 JT30000022 . TRUCK 1 TON JT30000023 TRUCK iTON 6/3/2012 N 22,135.08 10,921,57 1 ,273.37 1213,51 JT30000024 TRUCKITON 6/3/2012 6/3/2012 N N 12,021.67 10,819,50 1,202.17 JT30000025 7RUCKiTON 6/3/2012 N 12,021.67 10,819,50 1202.17 JT30000026 TRUCKITON 6/15/2011 N 12,295.58 11,066.02 1,229,56 JT30600027 TRUCK I TON UTILITY 6/13/2011 N 16,760.50 16,760.50 JT30000028 TRUCK 1 TON UTILITY . 6113/2x11 N 14,193.77 14,193,77 _ JT30000029 TRUCKITON 6/13/2011 N 14,193.77 14,193,77 JT30000030 TRUCK1TONlJTILITY 0312011 N 14,327.67 14,327,67 JT30000031 TRUCK I TON UTILITY 6/13/2011 N 14,327.67 14,327,67 JT30000032 TRUCKITON UTILITY 6/13/2011 N 14,327.67 14,327,67 JT30000033 TRUCK I TON UTILITY 6/13/2011 N 14,327.67 14,327.67 14,327,67 14,327,67 JT30a00034 TRUCKITON JT3b000035 TRUCK 1 TON 6/15/2011 N 13,390,03 13,390.03 - JT30000036 TRUCK 1 TON 6/15/2011 6/15/2011 N N 13,390.03 13,390,03 JT30000037 TRUCK 1 TON 6/15/2011 N 13 ,390.03 13,390.03 JT30000039 TRUCKITON 8/25/2017 N 13,390,03 17,536.43 13,390.03 15,782.79 JT40000001 TRUCK 1.5 TON 7/17/2(317 N 15,624.47 14,062.02 4753.64 JT40000002 TRUCK 1.5 TOP! ';1,12x17 � i5 oyo 0 "290.31 1,562.45 JT40000003 TRUCK I.STON UTILITY TON 12/2812013 N ... 44,910.02 44,910,02 1,587.88 JT4000004 TRUCK 1.5 UTILITY 7117/2017 N 17,759.33 15,983,40 JT4aaoabo5 TRUCK 1.5 TON UTILITY 7/17/2017 N 19,039.15 17,135.23 1,775,93 JT4aaoaoo6 TRUCK 1.5 TON UTILITY 7117/2017 N 19,083.13 17,174.82 1,903.92 IT40000007 TRUCK 3.5 TON UTILITY 7/1812017 N 19,083,13 17,174.82 1,908,31 l9a toaaoas TRUCK 1.5 TON UTILITY, 12/15/2017 N 24,575;25 24575,25 1,9x6,31 JT40o00o09 TRUCK 1.5 TON UTILITY 12/15/2017 N 25,351.90 25,351.90 JT40000010 TRUCK 1.5 TON UTILITY 12/1512017 N 24,204.49 24,2x4.49 JT40000011 TRUCK 1.5 TON UTILITY 12/15/2017 N 25,351.89 25,351.89 JT40000012 TRUCK 1.5 TON UTILITY ' 12/15/2017 N 23,868.76 23,868,76 JT4aaad013 TRUCK 1.5 TON UTILITY 12/15/2017 N 23,868.76 23,868.76 JT40000014 TRUCK 1.5 TON UTILITY 12/15/2017N 24,204.49 24,2b4.49 JT40000015 TRUCK 1.5 TON UTILITY 12/15/2017 N 24,204.49 24,204.49 JT40000036 TRUCK 3.5 TON UTILITY 12/15/2017 N 23,978.28 23,978.29 JT4a000017 TRUCK 1.5 TON UTILITY 12/15/2017 N -25,174.45 25,174.45 JT40000018 TRUCK 1.5 TON UTILITY 12/15/2017 N 25,174.45 25,174.45 IT40000019 TRUCK 1.5 TON UTILITY 12/15/2017 N 24,204.49 24,204.49 JT40000020 TRUCK 1.5 TON JT40000021 TRUCK 1.5 TON • 4/8/2016 4/8/2016 N N 60,230.30 47,431.44 12,798,86 JT40000022 TRUCK 1.5 TON 4/8/2016 N 60,230,30 47,431,44 12,798.86 JT40000023 TRUCK 1,5 TON 4/8/2016 N 60,230,30 47,431.44 12,798,86 JT40000024 TRUCK1.5TON 4/8/2016 N 60,230.30 47,431,44 12, 79a,s6 J740000025 TRUCKI.STON 4/0/2016 N 60,230.30 47,43144 12798 ,86 JT40000026 TRUCK 1,5 TON 418/2016 N 59,667.40 46,988,04 12,679.36 JT4000002TRUCK I.5 TON 4/8/2016 N 60,230.30 47,431.44 12,798,86 JT4000x029 TRUCKI.STON 3/28/2016 N 59,667.40 46,988.04 12,679,36 JT40000029 TRUCK 1.5 TON 3/28/2016 N 59,667.40 46,988,04 12,679,36 JT40000030 TRUCK 1.5 TON 4/8/2016 N 59,667.40 46,988.04 12,679,36 60,230.30 47,43iA4 12,798.86 Rieth-Riley Construction Co., Inc. Equipment List 3/31/2020 Acquired New or Asset t! Description Acquisition Date Used Cost Accum Depr JT40000031 TRUCK 1.5 TON UTILITY 6/1/2017 N NeV JT40000032 TRUCK 1,5 TON UTILITY 4/20/2017 N 60,071,94 38,901,83 21170,11 JT40000033 TRUCK 1.5 TON UTILITY 5/4/2017 N 60,071.94 40,548,60 19523,34 , JT4D004034 TRUCK 1,5 TON UTILITY 4/20/2017 N 60,071,94 39,422,25 20,649.69 JT40000035 TRUCK 1.5 TON UTILITY 4/20/2017 N 60,071.94 40,548,60 19 523,34 JT40000036 TRUCK 1.5 TON UTILITY 6/1/2017 N 60,071,94 40,548,60 19,523,34 JT40000037 TRUCK 1.5 TON UTILITY 4120/2017 N 60,071,94 38,902,41 21169,53 JT40000038 TRUCK 1.5 TON UTILITY,60071,94 6/1/2017 N 60,071.94 40,548,60 19 523,34 JT40000039 TRUCK 1.5 TON UTILITY 38,902,41 21 ,169,53 JT40000040 TRUCK 1.5 TON UTILITY 6/1/2617 N 60 071.94 39 422,25 20,649.69 1T40000041 TRUCK 1.5 TON UTILITY. 4/20/2017 N 64 071.94 38902.41 19,169.53 ,. JT40040042 TRUCK 1,5 TON UTILITY 6/1/2017 N 60,071,94 40,548,60 ,523,34 .IT4Qo00043 TRUCK 1.5 TON -UTILITY 4/20/2017 N 60,071,94 38,902,41 21,169,53 JT40000044 TRUCK 1,S.T.ON UTILITY 6/1/2017 N 60,071,94 40,548,60 19 /740000045 TRUCK I,STON UTILITY 6/1/2017 N 60 071.94 38 902,41 2116953 JT40000046 TRUCK 1.5 TON UTILITY 4/20/2017 N 60,071.94 38,902,41 21,169,53 1T40000047 TRUCK 1.5 TON UTILITY 6/1/2017 N 60,071.94 40,548,60 19 ,523,34 JT40009048 TRUCK 1.5 TON UTILITY 4/20/2017 N 60,071,94 38,902,41 21,169,53 JT40000049 TRUCK 1,5 TON 12/5/2018 N 59,510,52 40,169,52 19 341.00 JT40000050 TRUCK 1.5 TON 12/5/2018 N 61,644,84 20,53632 ,536,32 41,148,52 JT40000051 TRUCK 1.5 To 12/5/2018 N 61 644.84 20 41,108,52 JT40000052 TRUCK 1.5 TON 12/5/2018 N 61644.84 ' '20174,64 41,470,20 JT40000053 TRUCK 1,5 TON 12/5/2018 N 61,644,84 20,53632 41108.52 JT40000054 TRUCK 1.5 TON 12/5/2016 N 61 644.84 20 53632 41,i4s,52 JT40000055 TRUCK 1.5 TON 12/5/2015 N 61,644.54 24,536,32 41'108'52 M0000056 TRUCK 1.5 TON 12/5/2018 N 61,644,84 20,53632 41,108,52 JT40000057 TRUCK 1.5 TON .12/19/2018 N 61,644 .84 20,536,32 108 41, ,52 IT40000058 2019 CHEVROLET 4500 UTILITY TRUCK 8/28/2019 N 61,644,84 " 20,536,32 41,108,52 JT40000059 2019 CHEVROLET 4500 UTILITY TRUCK 10/3/2019 N 61,746,58 10,291,12 51,455,46 JT40000460 2019 CHEVROLET 4500 UTILITYTRUCK 8/28/2019 N 61,746,58 7,718,34 54,028,24 1T40000061 2019 CHEVROLET 4500 UTILITY TRUCK 8/28/2019 N 61746,58 10 291,12 51 JT4000O062 2019 CHEVROLET 4500 UTILITY TRUCK 10/4/2019 N 61746,58 10291,12 + 51,455,46 ,455,46 1T40000063 2019 CHEVROLET 4500 UTILITY TRUCK 10/2/2019 N 61,746,58 7,718,34 54,028,24 1740oo04fi4 2019 CHEVROLET 4500 UTILITY TRUCK 10/4/2019 N 61746.58 7,71a.34 54 ,028,24 JT40000665 2019 CHEVROLET450oUTILITY TRUCK 10/3/2019 N 61,746,58 61,746,58 7,718,34 7,71834 54,028.24 JT40000066 2 CHEVROLET 10/7/2019 N 54,028,24019 MOON= TRUCK PICKUP 1/2 TON 2/2/2011 N 61,746,58 7,718,34 54,028,24 P120000002 TRUCK PICKUP 1/2 TON 7/3/Zo N 5,350,03 451503 ,,ll 535.00,00 P124440403 TRUCK PICKUP 1/2 TON 12/15/2017 N 5,380.03 3,967,03 1783 P120000004 TRUCK PICKUP 1/2 TON 12/15/2017 N 14,714.45 14,714.45 . M20000005. TRUCK PICKUP 1/2 TON 12/15/2017 N 14,714.45 14,714.45 P120000006 TRUCK PICKUP 1/2 TON 12/15/2017 N 14,714,45 14,714,45 P120000007 TRUCK PICKUP 1/2 TON 12/15/2017 N 14,714.45 14,714,45 P120000008 TRUCK PICKUP 1/2 TON 12/15/2017 N 14,714.45 14,714.45 . P120000009 TRUCK PICKUP 1/2 TON 12/15/2017 N 14,714.45 14,714.4.9 P120000010 TRUCK PICKUP 1/2 TON 12/15/2017 N 14,621.52 14,621.52 . P120000011 TRUCK PICKUP 1/2 TON 12/15/2017 N 15,199,37 15,199,37 Pi24000012 TRUCK PICKUP 1/2 TON 12/15/2017 N 15,199,37 15,199,37 P120000013 TRUCK PICKUP 1/2 TON 1'_/151201? N 13,304.80 13,304.80 P120004014 TRUCK PICKUP 112 TON 12/15/2017 N 133 id.An 13,753.85 t o a,tie o 13,753,85 P120000015 TRUCK PICKUP 1/2 TON W/PRO 5/18/2016 N 41,304.67 32,527,44 P120000416 TRUCK PICKUP 1/2 TON 4/1/2006 U 6,360.00 8,777,23 P120400017 TRUCK PICKUP 112 TON 4/1/2006 U 5,724.00 636.00 P120000018 TRUCK PICKUP 1/2 TON ' 41112006 U 1,060;00 10,604,00 954,00 106,00 Pi20000019 TRUCK PICKUP 1/2 TON 1/29/2008 U 1,855,00 9,540,04 1,669,50 1 060,00 ,185,50 P120000020 2019 DODGE 1500 PICKUP TRUCK CA 4/22/2019 N 36,842.61 9,210,60 P140000001 TRUCK PICKUP 1/2 TON 6/3/2016 N 10,052.46 9,047.21 27,632.41 P140440402 TRUCK PICKUP 112 TON 6/312016. N 9,907.71 8,916.94 1,005.25 M0000003 TRUCK PICKUP 112 TON 4X4 6/3/2016 N 17,917.9a 16126,11 990,77 P140000004 TRUCK PICKUP 112 TON 4X4 6/3/2616 N 17709.05 15 938,14 i P140000005 TRUCK PICKUP 1/2 TON 4X4 6/3/2016 N 14,877,67 13,389,90 179179 P140000006 -TRUCK PICKUP 112 TON 4X4 12/15/2017 N 16,105,38 16,105,38 1,487,77 P140000007 TRUCK PICKUP 112 TON 4X4 12/15/2017 N 16,105,38 16,105,38 P140040008 TRUCK PICKUP 1/2 TON 4x4 5/18/2418 N 38,539,98 30,586,50 P220000001 TRUCK PICKUP 314 TON 2/3/2003 N 21,233,80 19,110,42 8,253,48 P220000002 TRUCK PICKUP 3/4 TON 2/18/2008 N 6,632,75 4,546,75 2,123,39 P220000003 TRUCK PICKUP 3/4 TON 4/29/2008 N 2,086.00 P220000004 TRUCK PICKUP 3/4 TON 12/11/2008 N 7,791,59 5,341,59 2,450,0a P220000005 TRUCK PICKUP 3/4 TON 12/11/2008 N 6,735,30. 4,a96,80 1,838,50 P220000006 TRUCK PICKUP 3/4 TON 12/11/2008 N 6,677.35 4,833,85 1,838.50 P220000007 TRUCK PICKUP 3/4 TON 12/11/2008 N 6 699,21 4 853,21 1 P220000008 TRUCK PICKUP 3/4 TON 12/11/2008 N 6,699.21 4,853,21 1,846,00 P224004449 TRucICPICKUP 3/4TON 12/11/200a N 6,699,21 4,853,21 1,848,40 P220000010 TRUCK PICKUP 314 TON 12/11/2008 N 6,699,21 4,853,21 1,846,4o P220000011 TRUCK PICKUP 314 TON 12/11/2008 N 6,699,21 4,853.21 3,846,00 P224000012 TRUCK PICKUP 314 TON 2/1/2010 N 6,699,21 4,853,21 1,846,0o P220000013 TRUCK PICKUP 3/4 TON 2/1/2010 N 6,227.40 4 2a7,40 19 6,227.40 ,40,00 4,287,44 1,940,0o Rieth-Riley Construction Co., Inc. Equipment List 3/31/2020 Acquired New or Asset 9 Description Acquisition Date Used Cost Accum' Depr NBV P220000014 TRUCK PICKUP 3/4 TON 2/1/2010 N 6,227.40 4,287.40 P220000015 TRUCK PICKUP 3/4 TON 1 ,940,00 P220000016 TRUCK PICKUP 3/4 TON 2/1/2010 N 6,227,40 4,287.40 1 ,940.00 P220000017 TRUCK PICKUP 314 TON 6,227.40 4,287,40 1,940.00 P220000018, TRUCK PICKUP 3/4 TON 2/1/2010 N 6,227,40 4,287.40 4,229 1,940,00 P220000019 TRUCK PICKUP 3/4 TON 6,169,20 20 1,940,00 P22000d020 TRUCK PICKUP 3/4 TON 3/15/2010 N 6,169,20 4,229,20 19 40.00 8220000021 TRUCK PICKUP 3/4 TON 7/3/2011 N 7,235,33 4,981,33 2,254,00 P220000622 TRUCK PICKUP 3/4 TON 7/3/2011 N 7,036,32 4,844.32 2,192.00 P22Q000023 TRUCK PICKUP 3/4 TON 2/2/2pi1 N 7,036,32 4,844,32 2192,00 P220d00024 TRUCK PICKUP3/4 TON 73 1 2011 N 7,034.16 6,330,74 703,42 P220000025 TRUCK"PICKUP 3% 4 TON 7/3/2011 N 7,036,32 4,844.32 Zig0a 2 P220000026 TRUCK PICKUP 3/4 TON 7/3/2011 N 7,036.32 .4 844.32 2,192,00 P220000027 TRUCK PICKUP 3/4 TON 2/2/2011 N 7,035.32 4,844.32 2,192,00 P220000028 TRUCK PICKUP 3/4 TON 7/3/2011 N 7 034,1G 7,314.00 6,330,74 5,014.00 703.42 P22ad00b29 TRUCK PICKUP 314 TON 7/3/2011 N 7,383,00 2,300,00 P220000030 TRUCK PICKUP 3/4 TON 7/3/2011 N 7,314.00 51083100 5014,00 2,300,0a P220000031 TRUCK PICKUP 3/4 TON 7/3/2011 N 7,383,00 , 5,083,00 2,300,00 P220a00032 TRUCK PICKUP 3/4 TON 7/3/2011 N 5,996.20 4,664.20 2 300,00 P2200d0033 TRUCK PICKUP 314 TON 7/3/2011 N 2,332.00 P220000034 TRUCK PICKUP 3/4 TON 7/3/2011N 7,073.24 4,716.24 2j95 7.00 P220000035 TRUCK PICKUP 3/4ToN 2/4/2012 N 6,788.19 4,673.19 2,115.00 P220000036 TRUCK PICKUP 3/4TON 2/4/2012 N 6,933,60 6,240,24 693,36 P220000037 TRUCK PICKUP 3/4 TON 2/4/2012 N 7,083,45 7,083,45 6,375,10 6,375,10 708,35 P220000038 TRUCK PICKUP 3/4 TON 2/4/2012 N 7,083,45 6,375,10 708,35 P220000099 TRUCK PICKUP 314 TON 2/4/2012 N 7,083.45 6,375,10 708,35 P220000040 TRUCK PICKUP 3/4 TON 2/4/2012 N 7,083,45 6,375,10 708,35 P220000041 TRUCK PICKUP 314 TON 6/3/2012 N 7,150,28 6,435,25 708,35 P22a000042 TRUCK PICKUP 3/4 TON 6/3/2012 N 7,083,45 6,375.10 715,03 P220000043' TRUCK PICKUP3/4Tom- 6/3/2012 N 7,083.45 6,375,10 708,35 P220600044 TRUCK PICKUP 3/4 TON 6/3/2012 N 7,083,45 6,375,10 708,35 P220000045 TRUCK PICKUP 3/4 TON 6/3/2012 N 7,083,45 6,375,10 708.35 P220000046 TRUCK PICKUP 3/4 TON 5/3/2012 N 7,083.45 6,375.10 708,35708,35 13220000047 TRUCKPICKUP3/4TON 613/2M N 7,083,45 61682.50 P220000048 TRUCK PICKUP 3/4 TON 6/3/2012 N 7,083,45 6,375,10 400,95 P220000049 TRUCK PICKUP 3/4 TON 6/3/2012 N 7,083.45 6,375.10 708,35 /3220000050 TBUCICPICKUP 3/4TON 6/3/2012 N 7,083,45 _ 6,375.10 708,35 P220000051 TRUCK PICKUP 3/4 TON 6/3/2012 N 7,083.45 6,375,10 708,35 F220000052 TRUCK PICKUP 3/4TON 6/3/2012 N 7,150,28 6,435,25 708,35 P220000053 TRUCK PICKUP 3/4 TON 6/3/2012 N 7,150,28 6,435,25 715,03 P220000054 TRUCK PICKUP 3/4 TON 6/13/2011 N 9,311.76 9,311,76 715,03 P220000055 TRUCK PICKUP 314 TON 6/13/2011 N 9,311,76 9,311.76 P220000056 TRUCK PICKUP 3/4 TON 6/1312011 N 9,224.73 9,224.73 P220000057 TRUCK PICKUP 3/4 TON 6/13/2011 N 9,224.73 9,224,73 P220000058 TRUCK PICKUP 3/4TON 6/13/2011 N 9,224,73 9,224,73 P220000059 TRUCK PICKUP 3/4TON 6/13/2011 N 9,311.76 9,311,76 P220000060 TRUCK PICKUP 3/4TON 6/22/2011 N 9,311.76 8,311,76 P220000061 TRUCK PICKUP 3/4 TON 612212011 N 9,311,76 9,311.76 P22000006Z TRUCK PICKUP 31" TON P220000063 TRUCK PICKUP 3/4 TON 6/22/2011 N �,�•�..� 9,8Ga,67 9311.76 9,,860,67 P220000064 TRUCK PICKUP 3/4 TON 6/2212011 N 9,860,67 9,860.67 ' P220000065 TRUCK PICKUP 3/4 TON 6/22/2011 N 9,860,67 9,860.67 132200d0066 TRUCK PICKUP 3/4 TON 6122/2011 N 9,860,67 9,860,67 P220000067• TRUCK PICKUP 314 TON 6/22/2011 N 9,8fi0,67 9,860,67 8220000068 TRUCK•PICKUP3/4TON 5/22/2017 N 11,832,15 10,648,94, 1183,21 P2201100069 TRUCK PICKUP 314 TON 5/22/2017 N 13,358,54 12,022.72 1,335,82 P220000070 TRUCK PICKUP 3/4 TON 12/15/2017 N 15,682.09 15,682.09 P229000071 TRUCK PICKUP 3/4 TON 12115/2017 N 15,6a2,a9 15,682.09 ' P22coaa072 TRUCK PICKUP 3/4 TON 12/15/2017 N 16,923,86 16,923,86 P220000073 TRUCK PICKUP 314 TON 12/15/2017 N 16,157,91 :. 16,157,91 P220600074 TRUCK PICKUP 3/4 TON 12/15/2017 N 16,870,19 16,870.19 /3220000075 TRUCK PICKUP 3/4 TON 12/15/2017 N 16,970,19 16,870.19 P22a000076 TRUCK PICKUP 3/4 TON 12/1512017 N 17,676.87 17,676.87 P220000077 TRUCK PICKUP 314 TON 12/i512017 N 57,099,06 17,099,06 P220000078 TRUCK PICKUP314TON 12/15/2017 N 17,215,37 17,215,37 P220000079 TRUCK PICKUP 314TON 4/8/2016 N 39,355,95 30 992,76 8,363.19 P220000080 TRUCK PICKUP 314 TON 4/8/2016 N 39 355,95 30,992.76 8363,19 P220000081 TRUCK PICKUP 3/4 TON 4/8/2016 N 38 988,13 35 089,32 3,898.81 P22do00082 TRUCK PICKUP 3/4TON 4/8/2016 N 38'988,13 30+70314 P220000083 TRUCK PICKUP 3/4 TON 4/8/2016 N 39 355,95 + . 30 992,76 ,28 4,99 P220000084 TRUCK PICKUP 3/4TON 4/8/2016 N 38,988,14 30,703,14 6 363,19 P220000085 TRUCK PICKUP 3/4TON 418/2016 N 38,988.14 30,703,14 8,285,00 P220000086 TRUCK PICKUP 3/4TON 4/8/2016 N 38,988,13 30,703,14 9,285,00 /3220000087 TRUCK PICKUP 3/4 TON 4/8/2016 N 38,988,13 30,703,14 8,284,99 P220000088 TRUCK PICKUP 314 TON 4/8/2016 N 39 355,95 30 992,76 8,284,99 P220a00089 TRUCK PICKUP 314 TON 3/28/2016 N 39,355,95 39,355,95 8,363.19 /3220000090 TRUCK PICKUP 3/4 TON 4/8/20i6 N 39,355,95 30,992,76 8,363,19 Rieth-Riley Construction Co,, Inc. Equipment List 3/31/2020 Acquired New or Asset 9 D'escrlption 'TRUCK Acquisition Date Used Cost Accum Depr P220000091 PICKUP 3/4 TON 4/1/2017 N 39 846.01 26 896,08 NSV P220000092 TRUCK PICKUP 314TON 4/1/2017 N 39,846.01 26,8oa 96 12,949.93 P220000093 TRUCK PICKUP 3/4 TON 4/1/2017 N 12'949,93 /3220000094 TRUCK PICKUP 3/4 TON 39 846.01 ' 26 896,08 12,949.93 ' P220000095 TRUCK PICKUP 314 TON 4/1/2017 N 39,846.01 26 896,08 12,949.93 P220000096 TRUCK PICKUP 3/4 TON W/LIF 4/1/2017 N 39,846,01 26,896.08 12,949.93 P220000097 TRUCK PICKUP 314TON 4/1/2017 N 39,846.01 26,896,08 12,949.93 P220000098 TRUCK PICKUP 324 TON 4/1/2017 N 39,846.01 26,896,08 12,949,93 P220000099 TRUCK PICKUP 3/4 TON 39,846,01 26,896,08 12,949,93 P220a00100 TRUCK PICKUP 324 TON 4/1/2017 N 39,846.01 26,896.08 12'949.93 /3220000101 TRUCK PICKL)P 3J4TON 4/1/2017 N 39,846,01 2q,896.08 12,949.93 P220000101 TRUCK PICKUP 3/4TON 4/1/2017 N 39,846,01 26,896,08 12.,949,93 P220000103 TRUCK PICKUP 3/4TON 4/1/2017 N 39,846,01 26,896,08 12,949.93 13220000104 TRUCK PICKUP 3/4TON 4/1/2017 N 39,846,01 26,896,08 12,949.93 P220006105 TRUCK PICKUP 3/4 TON 411/2017 N 39,846,01 39,846.01 26,896,08 12,949.93 P22000106 TRUCK PICKUP 3/4TON 26,896,08 12,949,93 P220000107 TRUCK PICKUP 314 TON 4/1/20V N 39,846,01 26,896.08 12'949.93 P22000010S TRUCK PICKUP3/4TON 411/2017 N12,949.93 39 846,01 26 896.08 P220000109 TRUCK PICKUP 3/4 TON 4/1/2017 N 39,846.01 26,896.08 12,949.93 P220008iiD TRUCK PICKUP 3/4TON 4/1/2017 N 39,546.01 26,896,08 12,949.93 00 /32200111 TRUCK PICKUP 3/4 TON 4/1/2017 N 34,846.01 26,896.08 12,949.93 P220000112 TRUCK PICKUP 3/4 TON 39,846,01 26,896.08 12,949.93 P220000113 TRUCK PICKUP 314TON 4/1/2017 N 39,846.01 26,896,08 12,949.-93 P220000114 TRUCK PICKUP 3/4TON 4/1/2017 N 39,846,01 26,896.08 12949.93 P220000115 TRUCK PICKUP 314TON 4/1/2017 N 39,846.01 26 896,08 12'949.93 P220000115 TRUCK PICKUP 3/4 TON 4/1/2017 N 39846.01 Z6 896,08 12,949.93 P220000117 TRUCK PICKUP 314TON WJLIF4227201 4/1/2017 N 39,846.01 26;896.08 12,949,93 P220060118 TRUCK PICKUP 314TON 4111201739,473,62 , . 28,5 33,60 13,738-41 P220000119 TRUCK PICKUP 3/4 TON 4/1/2017 N 26,6 6 644,fi8 94 /3220000120 TRUCK PICKUP 3/4TON 4/1/2017 N 39,473.62 26644.65 12,828 28 94 /3220000121 TRUCK PICKUP 314 TON '411/2017 N 39 473,62 ' 26 644.68 12,828.94 PZZOOOOSZz TRUCK PICKUP 314TON 4/1%2017 N 39,4.73,62. 26,644.68 12,828,94 P220000123 TRUCK PICKUP 3/4TON 4/1/2017 N 39,473.62 26,644.68 12 828.94 P220000124 TRUCK PICKUP 314 TON 4/1/2017 N B9,473.62 26 644,68 12,828.94 /3220000125 TRUCK PICKUP 3/4fON 4/1/2017 N 39,473,62 25,644,68 12�828,g4 P220000126 TRUCK PICKUP 314 TON 4/1/2017 N 39,473.62 26,644,68 17,828-94 P220600127 TRUCK PICKUP 3/4 TON 4/1/2017 N 39 473,62 26 644.68 12,828.94 P220000151 TRUCK PICKUP 314TON 8/29/Za1s N 39 473.62 29fi44,98 7.2,828.94 P220000152 TRUCK PICKUP 314 TON 8/15/2018 N 40,026,93 16,210,92 23,816.01 P220000153 TRUCK PICKUP 314TON 8115/201S N 40,026.93 16,210,92 23 i ,816.01 P220000154 TRUCK PICKUP 3/4 TON 8/14/2018 N 40,026.93 16,210,92 23,816.[11 /3220000155 TRUCK PICKUP 3/4TON 916//018 N 40,026,93 16,210,92 23,816,01 P220600156 TRUCK PICKUP 3/4 TON 8/23/2018 N 40,026,93 15,431.13 24,595.80 P220000157, TRUCK PICKUP 3/4TON 8/15/2018 N 40,026.93 16,210,92 23,816.01 /3220000158 TRUCK PICKUP 3 314TON / 9/6/2018 N 40,026.93 16,210,92 23,a16.O1 P220000159 TRUCK PICKUP 314 TON 8/23/2018 N 40,026.94 15,431.13 24,595,81 P220000160 TRUCK PICKUP 314TON 8/14/2018 N 40,026,94 , 15,498.84 24,528.10 P220000161 TRUCK PICKUP 314TON 9/6/2018 N 40,026,93 40,026,94 15,498.84 24,578.o9 P220000162 TRUCK PICKUP 314TON 1 ,, aJZ1,M. U 4n�dnA 9;r15,645,"u0 14,416.74 25 ,610,20 P2Z00001fi3 TRUCK PICKUP 314 TON 8/14/2018 N 40,404.56 15,645,00 G4759,Sfi P22000164 TRUCK PICKUP 3/4 TON 8/21/2018 N 40,404.55 15,645,00 24,759.56 /3220000165 TRUCK PICKUP 3/4 TON 8/1412018 N 40,404.56 1564500 24,759,55 /3220000166 TRUCK PICKUP 3/4TON 8f23/261a N 40,404.56 , . 15,645,00 24,759.56 P220000167 TRUCK PICKUP 314TON 9/6/2018 N 40,404,56 15,098.85 24,759.56 P220000168 TRUCK PICKUP 3/4TON 8/29/2018 N 40,404.56 15,645.00 25,305.71 P220000169 TRUCK PICKUP 3/4 TON 9/6/2018 N 40,404.56 15,098,85 24,759.56 P220000170 TRUCK PICKUP 314 TON 8/15/2018 N 40,464,56- 15 645.00 25,305,71 P22000017l TRUCK PICKUP 314TON LIFTG 8/23/2018 N 40,026.93 15,498,84 24 ,759,56 /3220000172 TRUCK PICKUP 314 TON.: 8/29/2018 N 40 404.56 15 645,00 24,828,09 P220000173 TRUCK PICKUP 3/4TON 3f 16/2009 U 1935 89 , ,3 17,402.30 24759,56 P220000174 TRUCK PICKUP 3/4 TON 15,668.53935.89 14,101.68 1,933,59 P220000175 2019 RAM 2500 TRUCK PICKUP 6/4///0199 N 42,760.41 8 017.60 6.85 P220000176 2019 RAM 2500 TRUCK PICKUP 6/27/019 N 42,760.41 8,017.60 34156 ,742,81 P220000177 2019 RAM 2500 TRUCK PICKUP 6/4/1019 N 42,760.41 8,017.60 34,742.81 P/20000178 2019 RAM 2500 TRUCK PICKUP 6/27/2019 N 42,760,41 8,017.6(3 34,742,81 P220000179 2019 RAM 2500 TRUCK PICKUP 6/14/2019 N 42,760.41 8,817.60 34 ,742.81 P220000190 2019 RAM 2500 TRUCK PICKUP 5 1312/019 N 42,760,41 8,819.36 34,742.81 P220000i81 2019 RAM 2500 TRUCK PICKUP 6/27/819 N 42,760,41 8,017.60 33,941.05 P2200001az 2019 RAM 2500 TRUCK PICKUP 6/27/2019 N 42,760.41 8,o17,so 34,742.81 /3220000183 2019 RAM 2500 TRUCK PICKUP W/LIFTGATE 6/27/2019 N 45,949,01 34,742.81 /3220000184 2019 RAM 2500 TRUCK PICKUP 5/31/2019 N 42,760,41 8,615,40 37,333,61 P220000185 2019 RAM 2500 TRUCK PICKUP 5/3122019 N 42,760.41 8,819,36 33,941.05 P220000186 2019 RAM 2500 TRUCK PICKUP 6/4/2019 N 42,760,41 8,819,3fi 33,941.05 /3220000187 2019 RAM 2500 TRUCK PICKUP 674/2019 N 42,760,41 8,017.60 34,742.81 /3220000188 2019 RAM 2500 TRUCK PICKUP /41/019 N 42,760,41 8,817,60 34,742.81 P220000189 2019 RAM 2500 TRUCK PICKUP5/31/2019 5 513 112 0 1 9 N 42,7fio,41 8,017,60 34,742.81 P220000190 2019 RAM 2500 TRUCK PICKUP 5/31/2019 N 42,760.41 8,819,36 33,941.05 8,819,36 33,941,05 Rieth-Riley Construction Co,, Inc. Equipment List 3/31/2020 Acquired New or Asset 9 Description Acquisition Date Used Cast Accum Depr P220000191 2019 RAM 2500 TRUCK PICKUP 6/4/2019 N 42,760.41 N8V P220000192 2019 RAM 2500 TRUCK PICKUP 5/31/2019 ry 8 017.60 34,742.81 P220000193 2019 RAM 2500 TRUCK PICKUP 6/14/2019 N 42,760.41 8,819.60 33,941,05 P22000Qi94 2019 RAM 2500 TRUCK PICKUP 6/4/2019 N 42760 ,,41 8,017,60 34,742.81 P220000195 2019 RAM 1500 TRUCK PICKUP 6/14/2019 N 42,760,41 8,a17.60 34 742.81 P220000196 2019. RAM 2500 TRUCK PICKUP •6/14/2019 N 42,760,41 8,017,60 34,742.81 P220000197 2019 RAM 2500 TRUCK PICKUP 6/4/2019 ry 42 760,.41 ' 8 017.60 ' 34,742,81 P220000198 ' 2019 RAM 2500 TRUCK PICKUP 6/4/2019 N 42,760,41 8,017,60 34,742.81 P240a00aa1 TRUCK PICKUP 3/4 TOM 4X4 2 3 2003 N 42,760,41 8,819.36 33,941.05 P240b000O3 TRUCK PICKUP 314TON 4X4 2/2/2011 ry 24,165.80 21,749.22 2 ,416.58 P240000004 TRUCK PICKUP 314tON 4X4 7/3/2011 ry 10,243,30 9,218.97 1,024.33 P240000005' TRU CK' PICKUP 3/4 TON 4X4 6/22/2011 N 7 ,8fi9,00 5,418,00 2,451.00 P240000006 TRUCK PICKUP 3/4 TON 4X4 6/22/2011 N 10,513,61 10,513,61 P240000007 TRUCK PICKUP 314TQN 4X4 6/22/2011 N 10,859,37 10,859.37 P240000008 TRUCK PICKUP 314 TON 4X4 5/22/2017 N 10,859,37 10,859,37 P240000009 TRUCK PICKUP 3/4 TON 4X4 ,• 12/1512017 N1826876 13,392,57 8,788.85 4,603,72 P240000010 TRUCK PICKUP 314 TON 4X4 12/15/2017 N ,. 18,268,76 P240000011 TRUCK PICKUP 3/4 TON 4X44 12/15/2017 N 18,846.61 18,846,61 VANa000001 VAN PASSENGER 4/2/2016 N 18,846.61 18,846.61 - WRKT180o02 2619 ROAD WIDENER FHDR DUAL SIDE ATTACHMENT 4/24/2019 N 36,090.79 28,421,52 7,669.27 WRKT190003 2,019 CATERPILLAR BKT320-48 GRAPTOR ATTACHMENT 7/10/2019 63,880.83 13,308,50 50,572.33 ,572.33 WRKT190a04 2019 CATERPILLAR BKT320-48 GRAPTOR ATTACHMENT 7/10/2019 N 25,773.63 4,832.55 20,941,08 DTi0aa0001 TRUCK FLATBED DUMP 5/1/2001 ry 25,773.62 4,832.55 20 ,941.07 DT10000a02 TRUCK FLATBED DUMP 5/1/2001 N 16735.33 12751.33 ' 3,994.00 DTIOO00003 `TRUCK FLATBED DUMP 5/1/2001 N 16735.33 ' 12-,751,33 3,984.00 Dnaoaad04 TRUCK FLATBED DUMP 5/1/2001 N 16,735.33 12,751.33 3,984.00 DT10000005 TRUCK FLATBED DUMP 7/15/1996 N 18,011.82 14,027,82 3,984.00 DTIOOO0006 TRUCK FLATBED DUMP 2/2/1099 N 8 963.49 ' 8 067.14 ' 696.35 DT10000007 TRUCK FLATBED DUMP 219/2004 N 31,803.66 28,223,66 3,600.00 DT10000008 TRUCK FLATBED DUMP 15,900,00 9,929.10 5,970.90 DTIC000009 TRUCK FLATBED DUMP 6/21/2004 N 17,911.80• 11,940,90 5 ,970.90 DT10000010 TRUCK FLATBED DUMP 59,855 ,02 3 869,52 ' 5,985.50 DT10000011 TRUCK FLATBED DUMP 3/3i/2010 3/31/2010 ry N 21,762.38 13 775.18 7,547'20 DT10000013 TRUCK FLATBED DUMP 6/3/2012 N 20 '571.57 13,025.04 7,546,73 DT10oo0014 TRUCK FLATBED DUMP 6/3/2012 N 24,164.56 21,748,10 2,416.46 DT10000015 TRUCK FLATBED DUMP 6/3/2012-� N 24,164,56 21,748,10 2,416.46 DT10000016 TRUCK FLATBED DUMP 9/30/2013 'N 23,938.72 21,544.85 2,393.87 DT10000017 TRUCK FLATBED DUMP 3/25/2010 N 34,153.14 30,737.83 3,415,31 FB10000001 TRUCK FLATBED SIA619/1997 N 31,722.83 31,722.83 FB10o00002 TRUCK FLATBED 4/269.45 1/2006 U 42,694.54 38 425.09 4'848,00 FBS1000001 TRUCK FLATBED SERVICE 8,480.00 7,632,00 FBSIOOGO02 TRUCK FLATBED SERVICE ' 12/2/2002 N .17,902.41 13,942.41 3 ,960.00 FBSW200001 TRUCK FLATBED SERVICE WATE 3/31/2010 N 20,840.42 15,303,42 5j537.00 FBSW200002 TRUCK FLATBED SERVICE WATE 2/5/2013 N 24146.07 .15 204.81 8� ,941,26 FRM1000001 TRUCK FORM 3/15/2010 N 23,015.57 20,714,01 FRMIC00002 TRUCK FORM 6/3/2012 N 18,187.71 11,932.71 6,255.00 JT30000038 TRUCK MECHANIC ITON 12/15/2017 N 31996.96 28 797.26 3 ,199,70 JT30000040 TRUCK MECHANIC 1TON 12/15/2017 N 20,333,39 22 844.97 20,333,39 15 230,04 ' MST0000001 TRUCK MECHANIC 2TON 3/2 21 20 0 6 N 20347;55 .,3'0,;, 7,614.93 MST0000002 TRUCK MECHANIC 2TON 3/22/2006 ry 70 ,347.55 - ,.,-,, -5 13 948,95 6,398.60 MSTOOOGO03 TRUCK MECHANIC 2TON 3/22/2006 N 20347.56 i ' .35 13,948,95 6 ,398,60 MST0000004 TRUCK MECHANIC 2TON 4/7/2003 N 68,534.70 6,398,606,853.47 MST0000005 TRUCK MECHANIC 2TON 3/17/2008 N 61,681.23 MST0000o06 TRUCK MECHANIC 2TON 3/31/2010 N 20,952.07 14 363,07 ' 6 ,589.00 M5T0000007 TRUCK MECHANIC 2 TON 3/31/2010 N 22,919.48 16,018,48 6,901.00 MST0000008• TRUCK MECHANIC 2TON 3131/2ai0 N 24,185.69 17,193.69' 6,992,00 TRUCK MECHANIC 2TON 3/31/2010 N 24,792.90 17,469.90 7,32s,00 .aa MST0000010 TRUCK MECHANIC 2.5 TON 24,561.19 17,238,19 7,323,00 MSTO000011 TRUCK MECHANIC 12/15/2017 N 6,420,00 44,278 98 5,820,00 600.00 MSTOOOOO12 TRUCK MECHANIC 12/15/2017 N 48,278.98 48,278 98 48,278.96 MMOOGO13 TRUCK MECHANIC' 12/15/2017 N 48,278,98 48,272 98 - MST000O014 2016 HINO 268A SERVICE TRUCK 10/7/2019 U 54,499.08 12,262.32 MST0000015 2015 HIND 268A SERVICE TRUCK 10/7/2019 N 54 499,08 12,262.32 42,236,76 MST0000016 2015 HINO 268A SERVICE TRUCK 10/7/2019 N 42 236,76 MST0000018 TRUCK MECHANIC 5/18/2018 ry 54,499,08 12,262.32 42236,76 ' MST0000019 TRUCK MECHANIC 5/1812018 N 154,514.42 45,114,69 109,399,73 MST0000020 TRUCK MECHANIC 5/18/2018 N 154,514.42 154,51.42 45,114.69 109,399.73 MST0000021 TRUCK LUBE 5/11/2018 N 152,988.60 45,114,fi9 109,399,73 TFW2000003 TRUCKWATERFUEL 3 31 2010 f / N 44,669.24 108 3 ,19.3s TKMSOOOa01 TRUCK DRYER JET 4/112006 U 25,761,39 15,204.81 10,556,58 AD30000001 TRUCK DUMP ARTICULATED 7/1/2016 U 25,000.00 25,000.00 Ao3500a001 TRUCK DUMP ARTICULATED 7/1/2016 U 250,000.00 142 788,44 ' 107 ,211.56 AD40000001 TRUCK DUMP ARTICULATED 12/15/2017 N 125,000,00 112,500,00 12,500.00 AD40000002 TRUCK DUMP ARTICULATED 12/15/2017 N 190,970,80 127,313.88 53,656.92 AD40000003 TRUCK DUMP ARTICULATED 12/15/2017 N 190,970.81 121,526.88 69,443.93 AP06000001 PAVER 6 FTTRACKAP255E 4/19/2018 U 195,165,95 130,110.68 65,055,27 AP08000001 PAVER 8FTTRACK AP655D 5/3/2010 N 34,023,08 17,011.56 17,011,52 89,790,00 89,790,00 - Rieth-Riley Construction Co,, Inc. Equipment List 3/31/2020 Acquired New or Asset 9 Description Acquisition Date Used Cast Accum Depr APOSO00002 PAVER BFTTRACK AP655D 12/15/2017 N 140 394.96 140 394.97 NBV AP08000010 PAVER 8 FTTRACK P3858 8/3/2017 N 52,404.15 17468,16 (0,01} AP08000015 PAVER eFTTRACK PF4410 3/27/2009. U 120,000,00 34,935.99 AP10000002 PAVER 10FTTRACK RP195 3/31/2010 N 120,000,00 AP100d0003 ' PAVER SOFT RUBBER TIRED RP 3/31/2010 N 97,189,93 97,189,93 _ AP1o0o0004 PAVER 10FTTRACK PF5510 RE 6/16/2005 N 90,280,00 90,280,00 AP10000005 PAVER 1OFTTRACK RP195 4/1/2613 N 332,018.99. 332,018,99 _ APIO000006 PAVER 10FTTRACK AP1055D 4/1512009 N 69,308,80 69,308,80 _ APIOOO0007 PAVER ioFTTRACK A010550 4/15/2009 N 80,273,65 80,273,65 _ AP10000008 PAVER 10FTTRACKAP1055D 3/22/2010 N 72,381.82 72,381.82 AP.modc009 PAVER 10FTTRACK AP10551) 3/22/2010 N 97,463,40 97,463,40 _ AP1000a0il PAVER lOFTTRACK APSOSSE 12/15/2017 N 113,281.63 113,281,63 _ PAVER ioFTTRACKAPi055E N 146,701,93 146,701,94AP100ad012 (0,01) APIOOCO013 PAVER 10FTTRACKAP1055E 12/15/2017 N 147,561,81 147,561,82 (0.01 AP10000014 PAVER 1OFTTRACK •AP1055E 12115/2017 ' N 147,212,99 7.47,213,00 (0,01)) AP100ao015 PAVER 10FTTRACK AP1055E 12/15/2017 N 147,124.45 147,124.46 (0 01) APIOOGCG16 PAVER 10FTTRACK AP1055E 12/15/2017 N 152',557.33 152,557,34 (0.01) APIOG00020 PAVERIOFTTRACK5200-21 4/1/2015 N 153 996,55 153 99fi.56 (0'01} APIO000043 PAVER lOFTTRACK PF5510 3/17/2009 U 420,980,00 236,801.33 184 ,178,67 AP10000044 PAVER 10FTTRACK PF5510 3/17/2009 U 125,000.00 125,000,00 APC0000001 PAVER CURB ASPHALT 30,000,00 1,aoo 00 30,000.00 APT0000001 PAVER PULLTYPE 1-1500134/4/1988 N 12,895,37 900.00 11,605,83 100 00 ATT7713 ATTACHMENT BED WATER/FUEL 4/9/2008 N 55,704,62 55,704,62 i,zs9,54 BKT1000001 ATTACHMENT BUCKET 6,983,55 6,285,19 BKTIOO00O2 ATTACHMENT BUCKET 7/18/1995 N 5,856,90 5,271.21 698,36 BLi5000001 LOADER BACKHOE 42OF2 4/19/2018 U 51,039.15 16,332,55 585.69 BLISCOCO02 LOADER BACKHOE 420F2 4/19/2018 U 51,073,93 16,343,64 34 730.29 BLI5000003 LOADER BACKHOE 420 W FORKS 4/19/2018 U 30,509,85 34 ,730.29 BLISO00004 2018 CATERPILLAR 420F2 LOADER BACKHOE 813012019 N' 8,359,44 22,170,41 BL35000005 2018 CATERPILLAR 42OF2 LOADER BACKHOE 12/19%2019 N 5,500,04 24,175.26 1,222.24 2,686,16 q. BM6000o001 LIFr.B00M 60' 7/1/2016 U 21,277,76 ,489.10 CIBSCO0003 COMPRESSOR AIR 185 4f 1/2000 U 4,393.00 3,953.70 439,30 C185b00005 COMPRESSOR AIR 4/1/2006. U 2,300,00 2100,00 200.00 CORK000002 BREAKER CONCRETE 2/25/2002 N 1,000,00 41,825.75 1,000.00 37,943,37 CBRK000002 BREAKER CONCRETE 4/26/2002 N 58,275,00 52,447,50 3,882.38 CP8000o002 COLD PLANER ROToMILL 4/1/2013 N 98,142,54 88,328,29 5,827,50 CRS0000001 PAVER CURB & GUTTER GT6300 4/10/1997 N 151,320,00 136,188,00 9,814.25 CR80000002 PAVER CURB & GUTTER GT36a0 7/2012000 N 159,280.40 143,352,36 15,932,04 CRB0000003 PAVER CURB &GUTTER GT3600 4/23/2001 N 129,617,55 116,655,79 , 28.04 'CRBO000004 PAVER CURB & GUTTER GT3600 • 411/2002 N 130,480,46 117,432,41 13,048.05 CRB0000005 PAVER CURS & GUTTERTp880 7/3%2011 N 60,660.00 13 x48,05 CRB0000006 PAVER CURB & GUTTER GT3600 4/30/1997 U . 127,000,00 40,440,00 122,300,00 20 ,220,00 CRB0040007 PAVER CURB & GUTTER GT3600 8/1/2016 U 4,700,00 CRB0000008 2017 POWER CURBER 5700-C CURB & GUTTER CONCRETE PAVER 4/1/2017 N 65,000,00 339,551.66 65,000.00 127,332,00 CROOO00009 2018 POWER CURBER 5700-CMAX CURB & GUTTER CONCRETE PAVER 4/1/2018 N 463,440.54 115,860,24 212,219.66 _ C1180000010 2019 POWER CURBER 5700-C CURB & GUTTER CONCRETE PAVER 4/1/2019 N 345,524.40 43,190,52 347,580,30 CSP0000001 SPREADER CHIP 7/21/1977 N 34,121,36 94,121.36 .302,333,88 CSPO000002 SPREADER CHIP 4/1/2018 U 108,123.50 54,061,66 54,061,82 CST3000001 COMPACTOR STATIC C330A s i, .1,a2� �/.:.•••: �� 2j,iiui; _ni 26,76°,CO 't,y7'F.,La CST3000002 COMPACTOR STATICC330A 12/1011987 N CST3000003 COMPACTOR STATIC C330B 8/23/1988 N 29,744.00 26,769,60 2 2,974.40 CST3000004 COMPACTORSTATICC3308 8/23/1988 28,860,00 25,974.00 2N 886,00 CST3aadao5 Comm,= STATIC C330B 4/30/2009 U 28,860,00 25,974,00 2,886,00 CST3000006 COMPACTOR STATIC C330B 4/30/2009 U 3,004,00 3,000.00 3,000,00 3,000,00 CST3000007 COMPACTOR STATIC C330B 4/30/2009 U 3,000,00 3,000,00 CST3000008 COMPACTOR STATIC BWSAS 3/31/2005 U 5,000,00 5,000,00 . CST3000009 COMPACTOR STATICC330A 313112905 U 2,500,00 2,250.00 CWKT100001 ATTACHMENTTIE BAR IN5E9TE 4/1/2004 N 61340,66 55,206,59 250,00 CWKy11oo01 ATTACHMENT BURLAP DRAG W/6 5/18/2001 N 13,604.30 12,243,87 6,134.07 CWKT300001 ATTACHMENT CONV GOMACO W/6 .r-61311997 N 22,745,00 20,470.50 1,360,43 CWKT40000i ATTACHMENT EXTENSION W1537 7/22/1994 N 3,870.03 3,483,03 2,274.50 CWKT50000i FINISHER FINAL BIDWELLW/5 8/15/1994 N 28 432,50 25, 589,25 387,00 CWKT500002 FINISHER FINALBIDWELLW/5 2/10/1995 N 30,460,00 27,414.00 2,843,25 CWKT500003 PAN HYDRAULIC VIBRATOR W/5 6114/2001 N 3,591.31 3,232,18 3,04fi,00 CWKT600002 MOLD CURB W/6894 3/22/2000 N 15,312,00 359,13 CWKTfi00003 MOLD P4RAPE `W/6136 5120/2001 N 13,780,80 15 31.20 mr6000a4 MOLD CURB 31 IN F/6894 PAV 8/4/2003 N 22,415,00 20,173,50 2,241,50 D080000001 DOZER 70 HP FD5 LT 7/1/2016 U 5,942,52 5,348.26 594,26. D090000001 DOZER 85 HP D4K XL 4/28/2016 N 6,000,00 121,771.74 5,400,00 S4,797,2s 600,00 0090000002 DOZER 90 HP D5G 3116/2009 U 38,000,00 34,200,00 66 9 74,46 D10S000001 DOZER 100 HP DSK2 LGP 12/1512017 N 45,651.61 27,391.00 3,800,00 DIOS000003 DOZER 100 HP D5K2 LGP 12/15/2017 N 45,652.93 27,391,84 18,260.61 1)105000004 DOZER 100 HP DSK LGP 3/18/2013 U 18,mmj D105000005 DOZER 100 HP DSK LGP 3/18/2013 U 70,860,0o 55,802,16 15 OS ' 7,84 D105000006 2014 CATERPILLAR DSK2 LGP DOZER 12/23/2019 N 83,580,00 65,819,16 17,760.e4 D105000007 DOZER 100 HP DSK LGP 4/1/2017 U 23,433,56 2,343,36 21090,20 DiOS000008 DOZER 100 HP DSK2 LGP 4/1/2017 U 106,713.64 41,160,96 651552,68 103,010.60 39,732,72 63,277.89 Rieth-Riley Construction Co,, Inc. Equipment list 3/31/2020 Acquired New or Asset a DZER Acquisition Date Used Cast Accum Depr 0105000009 DOZER 10000 HP D5K2 LGP 4/1/2017 U 102,941.29 NSV D1050000iO DOZER 100 HP D5K2 LGP 4f 1/2017 U 39,705.84 63 ,235.45 0105000011 DOZER 100 HP 05K2LGP W/RI 4/1/2017 U 109,873,34 42,379.68 67,493.66 D105000013 2015 CATERPILLAR D5K2 LGP DOZER - USED 9/30/2019 U 118,547.46 45,725.40 72,822.06 D130000001 2017 CATERPILLAR D6K2 LGP DOZER 12/19/2019 U 7,864.50 82,015,56 D185000001 DOZER 150 HP 750K LGP 12/27/2017 U 4,000'00 4,000,00 444.44 3,555,56 D185000002 DOZER 150 HP 06N LGP fi/1712015 U 91,607.94 38 475,36 58 D225000001 2014 CATERPILLAR D6TXL DOZER 4/18/2019 N 219,271A3 132,476.18 86,792 4.95 D225'000002 2014 CATERPILLAR D6T XL DOZER 12123/2019 N 101,497.95 B0,449.40 71,048.55 b=000001 TRUCK TRACTOR TANDEM' 3/1/2006 N 54,390.35 5,439.04 48 DC20000002 TRUCKTRACTORTANDEM 4/1/2003 N 23,443,91 15,629,27 7,951.31 7,814.64 DC26000663 TRU CK TRACTORTANDEM. 3/19/Z009 N 89897,66 ' 8090789 8,989,77 DC20060404 TRUCKTRACTOR BUMP 3/15/2004 N,159,80 29,128.16 19,968,36 g 0020000005 TRUCKTRACTOR DUMP 3/15120i0 N 77,633.36 69,070.39 8,562.97 DC20000006 TRUCK TRACTO R TANDEM 3/31/2010 N 25,28Q.40 ].6,853.60 8 426,80 DC70000007 TRUCKTRACTORTANDEM 3/31/2010 N 31227,28 21407,28 9,820.00 DC20000008 TRUCK TRACTOR TANDEM 3131/2010 N 31,Zz7.z8 21,407,28 9,820.00 OC20000009 TRUCKTRACTORTANDEM • 3131/2010 N 31,227.28 21,407.28 9,820.00 DC20000010 TRUCK TRACTOR TANDEM 3/31/2010 N 31227.28 ` 21407.28 9,820.00 DC20000011 TRUCK TRACTOR DUMP 4/1/2013 N 2B 850,52 19 862.52 8,988.00 DC20000012 TRUCK TRACTOR DUMP 4/1/2013 N 18,356.40 1652076 . 1,835,64 DC20000013 TRUCK TRACTOR TANDEM 4/1/2013 N 18,35640 . 16,520,76 1,835,64 DC20000014 TRVCKTRACTORTANDEM 2/5/2013 N 22,972.3 20,680.81 2,287,87 0020000015 TRUCK•TRACTOR DUMP 2/5/2a13 N 34,862,553 31,376,28 3,486.25 DC20000016 TRUCK TRACTOR DUMP 31,542.60 28,388.34 3,154.26 DC20000,017 TRUCK TRACTOR DUMP 2/5/2013 N 29,527.51 26,574.76 2 952.75 DC20000018 TRUCKTRACTOR DUMP 9/30/2013 N 27,595,80 24,836,22 2,759,58 DC20000019 TRUCK TRACTOR DUMP 3/12/2010 N 33,173.92 29,856.53 3 ,317,39 DC20000020 TRUCKTRACTOR DUMP 3/12/2ai0 N 2,8,191.90 28,19190 DC20000021 TRUCKTRACTORTANDEM 28,191,90 28,191,90 DC20000022 TRUCK TRACTOR TANDEM 4/26/zais N 46,412.76 41,771.48 4 ,641.28 DC20000023 TRUCK TRACTOR TANDEM 4/26/2016 N 155,329,40 69,898,20 85 431.20 , DC2d000O24 TRUCKTRACTOR 4/22/2016 N 155,329,40 178 626.00 69,898,20 80 85 ,431.20 OC20600025 TRUCKTRACTOR 4/22/2016 N 178626.00 381.76 80381.76 98'244.24 DC20000026 TRUCKTRACTOR 4/22/2016 N 178,626.06 80,381,76 DC20d00027 TRUCKTRACTOR 4/22/2016 N 178,626.00 80,3&1.76 98'2'24 '244'24 DC20000028 TRUCKTRACTORT/A 5/18/2017 N 160,608,54 52,699,73 98,244,24 DC20000029 TRUCK TRACTOR TANDEM 4/1/2006 U 5,830.00 524700 197 ,90B,a1 DC20000030 TRUCK TRACTOR TANDEM 4/1/2006 U13,780.00 12,402.00 583,00 0020000031 TRUCK TRACTOR TANDEM 4/1/2006 U 22,790.00 20,511.00 1,378,00 LIC20000032 TRUCK TRACTOR TANDEM 411/2006 U 63,600,00 57,240,00 2,279.00 DC20000033 TRUCK TRACTOR TANDEM 4/1/2006 U 71,190.00 64,071.00 6,360.00 DC20000034 TRUCKTRACTOR TANDEM 71,550,00 64,395,00 7,119,00 DC20000035 TRUCK TRACTOR TANDEM. 1/291200H U 57,240.00 81,516,00 7 DC2a00a036 TRUCK TRACTOR TANDEM 3/16/2009 U 8,480,00 7,632.00 5,724.00 DC20000037 TRUCK TRACTOR TANDEM 3/16/2009 U 8,480.00 7,632.00 848,00 6C20000038 TRUCKTRACTORTANDEM 3/31/2005 U 3,3i2.50 2,981.25 848.00 0030000001 TRUCK TRACTOR TRIAXLE 3/12/2010 N 39,641.25 39,641,25 331,25 DC20000039 TRUCK TRACTOR TRIAYLE 3/1/2016 t u77 _ 0030000004 TRUCKTRACTOR 4/22/2016 N -`- iti 178 626.00 7° —S,15 "'•''' 80,381,76 92,921.01 DC20000040 TRUCKTRACTOR 4/22/2016 N 178,626.00 80,381,76 88'244'24 DCW2000001 TRUCK WATER FIFTH WHEEL 511/2001 N 23150.89 ' 16 020,77 98 244.24 DCW2006002 TRUCK WATER FIFTH WHEEL 6/3/2002 N , ,130,12 DCW.2000003 TRUCK WATER FIFTH WHEEL 613/2002 N 34,281.78 32,881.78 1,40a,0a DCW2000004 TRUCK WATER FIFTH WHEEL 34,281.78 25,732,78 8,549.00 DCW2000005 TRUCK WATER FIFTH WHEEL 211612 04 N 34,261.78 25,732.78 g DCW3000001 TRUCK WATER FIFTH WHEEL 511/1995 N 21,066,47 10,597,10 10'549,00 ,469,37 .00W3000002 TRUCK WATER FIFTH WHEEL 2/1612000 N 83,758,84 75,382.95 8 375.89 DCW3000003 TRUCK WATER FIFTH WHEEL 2/16/2000 N 40,535.84 40,615,86 32,099.26 32 8,436.58 DCW3000004 TRUCK WATER FIFTH WHEEL 5/1/2001 N 27,596.52 099,26 20,250.89 8 5 16.60 DCW3o00005 TRUCK WATER FIFTH WHEEL 5/1/2001 N 7,345.63 DCW3000006 TRUCK WATER FIFTH WHEEL 3/16/2004 N 27,912.88 20,250,89 7 7,661.99 DCW3000007 TRUCK WATER FIFTH WHEEL 3/15/2010 N 98,058.95 87 573,95 DCW3000008 TRUCK WATER FIFTH WHEEL 3/112010 N 32,086.22 ` 21,047.41 11085,00 11,038.81 DDS5000008 COMPACTOR VIBR35""RD12A-9 5/1/2017 N 37,123.93 2,081,28 DD35000009 COMPACTORVIBR35"" RD12A-9 5/372018 N 17 596,00 ' 11,042.65.• 11547,43 ' fi,048,57 DD48000001 COMPACTORVIBR48""CB248 5/17/2016 N 17,914.00 7,725,47 10,188.53 DD43000002 COMPACTOR VIBR 481° CB24B 5/1712016 N 42 191.18 37 181.00 5,010,18 DD48000003 COMPACTOR VIBR 48"" C8248 5/17/2016 N 42 589,21 42�589.2i 37531,73 5,057,48 DD48060004 COMPACTORVIBR48""CB24B 5/1712016 N ' 37 531,73 ' 5,057,48 DD48000005 COMPACTOR VIBR 4a"" CB248 5/1712016 N 42,191.18 42,191.18 37,181,o0 5,010,18 DD48000006 COMPACTORVIBR48""CB248 5/17/2016 N 42 569.21 37,181.00 37 5,010.18 � DD48000007 COMPACTORVISR48 C824B 5/23/2015 N 42,191.18 531.73 37181,00 5,057,48 DD48000008 COMPACTORVIBR48""CB248 5/2312016 N 42,191,18 ' SA10.1a „„ 0048000009 COMPACTORVIBR48 08248 5/23/2016 N 42191.18 37,181,00 S'010,18 J DD48000010 COMPACTORVIBRO 08249 5/23/201fi N 42,191,is 37181.00 37,isi,aa 5,010,i8 Do48000011 coMPACTORVIBR4s""ca24s 5/23/2016 N SJ 5 010,18 010.18 37,531,73 -5,057.49 Riet6-Riley Construction Co., Inc. Equipment List 3/31/2020 Acquired New or Asset 9 Description Acquisition Date Used Cost Accum De r p DD48000012 COMPACTOR VIER 48"" CB24B 5/17/2016 N 42191.18 NBV D048000013 COMPACTOR VIER 48"" CB24B 5/17/2016 N 37181.00 5,010,18 DD48000014 COMPACTOR VIE R481"1CB24B 5/23/2016 N 42!191,16 37 181,00 5,010,18 D048000015 COMPACTOR VIER 48"" CB24B 5/23/2016 N 42589,21 37,531.73 ' 5,057,48 D048000016 COMPACTOR VIER 48"" CB248 5/23/2016 N 42191,18 ' 37181,00 ' 5,010,18 D04800QO17 COMPACTOR VIBR 48111 CB24B 5/24/2018 N 42191.18 37181,00 5,010,18 DD48000018 COMPACTOR VIER 48 224 3/16/2009 U 42,574.90 18 360,44 + 24,214.46 ❑❑51000001 COMPACTOR VIER 51"" C0346 4/29/2016 N 15,800,00 15,800.00 DD51000002 COMPACTOR VIBR 51"" CB34B 4/29/2016 N 56168,34 50 551,51 5,616,83 DD51000003 •COMPACTOR VIER 51"" CB348 4129/2016 N 56,698.23 5 102841 ,, 5,669.82 DD5100o004 COMPACTOR VIER 51"" CB34B 4/29/2016 N 56168.34 ' 50,551.51 5,616,83 DD5100.0005 COMPACTOR VIER 51"" CB34B • 4/29/2016 L 56,698,23 5102841 ,, 5,669,82 DD51000006 COMPACTOR VIBR 51 • CB348 4/29/2016 N N 56,698.23 51,028,41 5,s69,82 DD51000007 COMPACTOR VIBR 51"" CB348 5/6/2016 N 56 698,23 51028,41 + 5,669,82 DD5100000H COMPACTOR VIER 51"" CB34B 5/6/2016 56168.34 + 49,498.40 DD51000009 COMPACTOR VIBR 51"" CB349 5/6/2016 N N 56 698.23 49 965,35 6,732.88 6,732,88 DD5Z000010 COMPACTOR VIER 51"1"CB34B 5/6/2016 N 56,698.23 49,965,35 6,732.88 ❑051000011 COMPACTOR VIBR 51"" CB34B 813/2017 U 56168,34 49 498.40 6,669,94. DDC5100001 2019 CATERPILLAR CC34B 541" VIER COMPACTOR 1014/2019 N58,392.04 18,182.80 5 454.72 ' 12,728,08 DD59000001 COMPACTOR VIBR 59"" C87 5/24/2018 N 58 392.04 3,284,58 55 107.46 DO59000002 COMPACTOR VIBR 59"" CB7 7/17/2018 N 123847.15 12j 26,704.61 24,382.47 97,142.54 DD59000003 COMPACTOR VIBR 59"" CB7 7/17/2018 N ,847J5 99,464.68 DD59000004 COMPACTOR VIER 59"" C87 6/24/208 N 123 847.15 , 47,15 24,382.47 99,464,68 D059000005 2019 CATERPILLAR CB7 591F VIBRATORY COMPACTOR 5/24/2019 N 123,847,15 25,543,54 98;303,61 u" 0066000003 COMPACTOR VIBr66 C8548 4/30/2018 U .123 8 , 47.15 11,610,70 . 112,236,45 D066000005 2018 CATERPILLAR CBio 6711 VIBR COMPACTOR 8/30/2019 N 123,157,97 42 '4,872.16 80,206,58 DD66000006 2018 CATERPILLAR CB10 67 VIER COMPACTOR 8/3012019 N 21,924,60 17,052,44 ❑078000001 COMPACTOR VIER 7H"" CC522HF � 3/31/2010 N 6,000,00 1,333,36 4,666,64 DD78000002 COMPACTOR VIER 78"" C:C522HF 11/1512 0 1 2 IJ 42 529.83 ' 32 584.83 ' 9,945,00 .❑078000005 COMPACTOR VIER 781"1 Ht7120V' 4/24/2007 N 22154.00 20,064.00 2,090,00 ❑❑78000006 COMPACTOR VIBR 78"" HD120V 4/25/2007 N 1377 , 49.50 123,974,55 13,774.95 DD78000007 COMPACTOR VIBR 78"" CB534D 2/1/2010 N 137 749,50 ' 123 974.55 ' 13,774.95 DD78000005 COMPACTOR VIBR 78"" CB534D 4/1/2009 N 56,068.60 44,566,00 11,502,00 D0780000i0 COMPACTOR VIER 781"•CB534b 25,167,17 25,1 17 _ DD78000012 COMPACrORVIER 78""CB54XW 4/1/2009 3/5/2010 N N 25,167.17 251667 7,.17 DD78000020 COMPACiORVIBR78""CB54XW 4/2612016' U 36,542.64 3654264 DD78000021 COMPACTOR VIBR 78"" C854 XW 4/26/2016 U 92,607,05 55564.32 ' 37,042.73 DD78000022 COMPACTOR VIER 78"" CB54 XW 8/3/2017 U 82,735,22 74 461.70 5969,28 8,273,52 DD78000023 COMPACTOR VIER 78"" CB54 XW 4/26/2016 U 19 897,85 ' + 13,928,57 0078000024 COMPACTOR VIER 78"" C1354 XW 4/26/2016 U 49 480,71 ' 44 532.64 4,94a,o7 DD78000025 COMPACTOR VIER 78""CB54XW 4 26/2016 U 81,058,58 72952.72 8,1A5.86 DD78000026 COMPACTOR VIER 78"" C954XW 6/1712016 U 79,705.4fi 47,823,36 31,882.10 DD78000027 COMPACTORVIBR78""C854XW 5/12/2016 N 53,201,72 47,881.55 5,320,17 DD73000028 COMPACTOR VIBR 78""CB54XW 5/12/2016 N 144,749,60 63 780,41 80,969.19 DD78000029 COMPACTOR VIER 78"" CB54 XW 5/12/2016 DI 143,396,80 63184,33 + 80,912.47 DD EI000030 COMPACTOR VIER 78"11CB54XW 5/12/2016 N 144,749.60 63 780,41 80,969,19 DD7800003i COMPACT9RVI13R78""CB54XW 8/3/2017 U 143,373,48 63173,99 80,199,49 DD78000032 COMPACTOR VIER 78!"' C954 XW 5/12/2016 N 26,002.48 10,400,96 , 15,601,52 Do78000033 CODA,PACT^_PVIB^7"""CBSQXI:' 144 749,60 + 63,780,41 80 969,19 ""C854XW 0078000034 COMPACTOR VIER 78913/2017 - __ 8/33// 2017 U i44,749.6u b3,7tS0.41 80,969.19 OQ78000035 COMPACTORV10R78""C864B 8/3/2017 U 22,547,55 9,019,00 13,528,55 D078000036 COMPACTOR VIER 78"" C864B 8/3/2017 U 50,892.04 17,448-64 33,443,40 DD78000037 ' COMPACTOR VIER 78"" CB54 XW 4/19/2018 U 49,782.61 17 068,36 32,714.25 0078000038 COMPACTOR VIS 7a""C1354XN! 4/19/2018 U 1,274.08 63696 , 637.12 ❑❑78000039 COMPACTOR VIER 78""CB64B 4/30/2018 U 21,148,84 10,221,96 10 926,88 DD78000040 COMPACTOR VIER 78 CB648 4/30/2018 U 105,190,06 25,109,72 79 '080,34 DD78000041 COMPACTORVIBR.78""CB64B 4/30/2018 U 103,907,80 25 791.42 , 78,116,38 DD78000042 COMPACTOR VIER 78""CB648 4/30/2016 U 109,525.66 fi4 143,8,06 27 ,185,87 82,339,79 043 DD78000COMPACTOR VIBR 78"" CBfi4B 4/3017.018 U 35 655,63 107,993,23 ❑❑78000044 COMPACTOR VIER 78"" C864B 4/30/2018 U 144,978,29 35 985,66 108,993,63 DD78000045 COMPACTOR VIBR 78"" CB64B 4130/2018 U 152,169,55 37,770.65 114,398,90 DD79000046 COMPACTOR VIER 7811" C864B 4/30/2018 U 156,790.68 38917,66 117,873,02 DD78(100047 COMPACTOR VIER 7811" C8648 4/30/2018 U 153,568,85 38117.94 115,450,91 DD78000048 COMPACTOR VIER 78"" DD120C 4/2712018 U 158 529,53 39,349,27 119 ,180.26 DD78000049 COMPACTOR VIER 78""DD120C 4/27/2018 U 109 275,89 28 099.44 + 81,176,45 DD78000050 COMPACTORRVIER 78 1)0120C 4/27/2018 U 109,296,22 28,104.72 81,191,50 DD78000051 COMPACTOR VIER 78"1DD120C 4/27/2018 U 104,686.66 2, 77,767,30 � DD78000o52 COMPACTORVIBR78 C8534C 3/31/2005 U 108,989,13 29,025.76 80,963.37 0084000001 COMPACTORVIBR 84"" CC722 11/15/2012 N 11000,00 + 9,900,00 1,100,00 DDS4000002 COMPACTOR VIBR 9"' CC722 11/15/2012 N 31,565,00 28,fi15,00 2,950,00 /3084000003 COMPACTOR VIBR 84"" 0864 31565,00 ' 28 615.00 2,950,00 ,,,, OQ84000004 COMPACTOR VIER 84 C864 4/1912018 4/1912018 U U 16,735,07 fi;443,04 10,292,03 DDS4000005 COMPACTOR VIER 84"" HD+1401 4/3012018 U 39,651,14 15 265,68 ° 24,385,46 DI51000001 TRUCK DISTRIBUTOR SINGLE 7/15/1996 N 15 762.05 101048,35 5,713,70 DIS1000002 TRUCK DISTRIBUTOR SINGLE 5/1/2001 N 5,151,94 4,636.75 515,19 DI51000003 TRUCK DISTRIBUTOR SINGLE 5/1/2001 N 33 020.2326 04923 ' , 6 ,971,00 DIS1000004 TRUCK DISTRIBUTOR SINGLE 5/1/2001 N 33,020,23 26,049.23 6,971,00 33,333,94 26,362.94 6971.00 Rietb-Riley Construction Co., Inc. •- Equipment List 3/31/2020 Acquired New or Asset 11 Description Acquisition Date Used Cost Accum Depr NSV D151000005 TRUCK DISTRIBUTOR SINGLE 5/1/2001 N 93,020.23 26,049.23 6,971,00 DIS1000006 TRUCK DISTRIBUTOR SINGLE 5/!/2001 N 33,333,94 26,362,94 6,971.00 DIS1000007 TRUCK DISTRIBUTOR SINGLE 5/!/2001 N 33,020,23 26,049,23 6,971,00 DIS1000008 TRUCK DISTRIBUTOR SINGLE 5/1/2001 N 33,020,23 26,049.23 6,971,00 DIS1000009 TRUCK DISTRIBUTOR SINGLE 5/1/2001 N 33,333.94 26,362.94 fi,971.00 13151000010 TRUCK DISTRIBUTOR SINGLE 9/3/1997 N 37,592,40 • 29,727,90 7,864,50 /318100001 TRUCK DISTRIBUTOR 5 SINGLE 5/1998 / 4 N 81,090,00 72,981.00 8109,00 DIS10000i2 TRUCK DISTRIBUTOR SINGLE 7/2/2001 N 41,!79.61 33,529,61 7,650,00 DIS1000013. TRUCK DISTRIBUTOR SINGLE 2/9/2004 N 21,200,00 13,100,06 8100,00 /3181000624 TRUCK DISTRIBUTOR SINGLE 2/1/2005 N •.-. 31,361.44 22,561,44 6806,66 DI51000015 TRUCK DISTRIBUTOR SINGLE 4/30/2006 N 27,379,$0 27,379,80 /3181006016 TRUCK DISTRIBUTOR SINGLE 3/25/2010 N 44,375,36 44,375,36 DI51000017 TRUCK DISTRIBUTOR SINGLE 3/1/2016 N 55,643,93 50,079.54 5,564.39 DIS1000019 TRUCK DISTRIBUTOR SINGLE 4/1/2006 U 66,250,00 59,625,00 6625,00 DIS1000020 TRUCK DISTRIBUTOR SINGLE 3/16/2009 U 63,600,00 57,240,00 6 360,00 13181000021 TRUCK DISTRIBUTOR SINGLE 3/16/2009 U 10,600,00 9,540.00 1,060,00 DIS1000022 TRUCK DISTRIBUTOR SINGLE DISTRIBUTOR 3/16/2009 U 31,800.00 28,620,00 3,180,00 DIS2000001 TRUCK TANDEM 3/5/2013 N 28,961.74 26,065,57 2,896,17 D152000002 TRUCK DISTRIBUTOR TANDEM ' 3/5/2013 N 28,961.74 26,065,57 2,896.17 /3182000003 TRUCK DISTRIBUTOR TANDEM 9/30/2013 N 28,292.80 25,463.60 2,829.20 /3152000004 TRUCK DISTRIBUTOR TANDEM 9/30/2013 N 55,711,46 50,140,32 5,571.14 D152000005 TRUCK D15TRIBUTOKTANDEM 9/30/2013 N 56,237,04 50,613,34 5,623.70 D152000006 TRUCK DISTRIBUTOR TANDEM 12/27/2017 N 115,031.25 53,625,04 61,406.21 DIS2000007 TRUCK DISTRIBUTOR TANDEM 12/27/2017 N 116,116,44 54,243,96 61872.48 DIS2000008 TRUCK DISTRIBUTOR T/A 6/4/2017 N 215,510.16 68,693.94 146,816.22 DI52000009 TRUCK DISTRIBUTOR T/A 6/4/2017 N 215,51616 68,693,94 146,816,22 0152000010 TRUCK DISTRIBUTOR T/A 6/4/2017- N 215,510,16 68,693,94 146,816.22 13152000011 TRUCK DISTRIBUTORT/A 712312018 N 211,926.79 44,646.21 167,280,58 0152000012 TRUCK DISTRIBUTOR T/A 7/23/2018 N 211,926.79 44,646,21 167,280,58 D152000013 2020 KENWORTH T470 T/A DISTRIBUTOR TRUCK -111A 6/25/2019 N 224,072.65 18,906,12 205,166,53 D152000014 2020 KENWORTH T470 DISTRIBUTOR TRUCK 6/25/2019 N 224,072.65 21,006,81 203,065,84 DP70000001 DISTRIBUTOR PULLTYPE 5/1/1997 N 21,451.50 19,306,35 2,145.15 DPT0000002 DISTRIBUTOR PULLTYPE 5/1/1997 N 21,451.50 19,306,35 2,145,15 DPT0000003 DISTRIBUTOR PULL TYPE 5/1311998 N 23,494.52 21,145,07 2,349,45 DT10000Q12 TRUCK FLATBED DUMP 4/1/2006 U 70,320,30 62,010,00 8 310,30 DT2000000TRUCK DUMP TANDEM 7/2/2001 N 42,770.47 35,874.47 6,896,00 DT20000002 TRUCK DUMP TANDEM 2/9/2004 N 22,373.42 15,208,52 7,164.90 DT20000003 TRUCK DUMPTANDEM 2/9/2004 N 22,396.75 15,119,85 7,276,90 DT20000004 TRUCK DUMP TANDEM 4/1/2000 U 55,$00.00 50,800,00 5,000,00 DT20000005 TRUCK DUMP TANDEM 5/2/2015 U 10,500.00 10,500,00 DT20000008 TRUCK DUMPTANDEM 4/1/2006 U 5,300.00 4,770.00 530,00 DT20000009 TRUCK DUMPTANDEM 4/1/2006 U 10,600,00 9,540.00 11060,00 DT20000010 TRUCK. DUMP TANDEM 4/1/2006 U 47,700.00 42,930,00 4,770,00 DT20000011 TRUCK.DUMP TANDEM 411/iaa6 U 45,050,00 40,545.00 4,505,00 DT20000013 TRUCK DUMPTANDEM 3/31/2005 U 5,300,00 4,770.00 530,00 DT20ob(1014 TRUCK DUMPTANDEM 3/31/2005 U 7,089,28 6,380,35 708,93 DT20000015 TRUCK DUMP TANDEM 3/31/2005 U 8,149,28 7,334.35 814,93 DT30000001 TRUCK DUMP TRIAXLE 2/1/2005 N 4�0�,9008a.9�1, 29,768,91 11,140,00D000000-R PR stz/onn� nl DT30000003 TRUCK DUMP TRIAXLE 2/112005 N 40,908,91 29,768.91 11,140,00 DT30000004 TRUCK DUMP TRIAXLE 4/1/2013 N 26,896,00 24,206,40 2,689.50 DT30000005 TRUCK DUMP TRIAXLE 8/29/2015 N 164,600,00 86,415,16 78,184.84 DT30000006 TRUCK DUMP TRIAXLE 8/2912015 N 167,900,00 88,147.36 79,752,64 DT30000007 TRUCK DUMP TRIAXLE 8/29/2015 N 167,500,00 87,937,36 79,56244 DT30000008 TRUCK DUMPTRIAXLE 8/29/2015 N 168,150,00 ` 88,278.84 79,871.16 DT30000009 TRUCK DUMP TRIAXLE 8/29/2015 N 167,250,00 87,805.32 79,443,68 DT30000010 TRUCK DUMP TRIAXLE 8/29/2015 N 167,762.00 88,075.12 79,686,88 DT30000011 TRUCK DUMP TRIAXLE 8/,2912015 N 167,550.00 87,963.68 79,588,32 DT30000012 TRUCK DUMP TRIAXLE 8/29/2015 N 167,406.00 87,885,16 79,514.84 DT30000013 TRUCK DUMP TRIAXLE 4/26/2016 • U 120,548,40 75,945,54 44,602.8s DT30000014 TRUCK DUMP TRIAXLE 4/1/2017 U 105,513,60 40,698.00 64,815,60 DT30000015 TRUCK DUMP TRIAXLE 4/1/2017 N 163,531.64 55,191.96 108,339,68 DT30000016 TRUCK DUMP TRIAXLE 4/1/2017 N 163,531.64 55,191.96 io8,339,68 DT30000017 TRUCK DUMP TRIAXLE 4/1/2006 U 25,500,00 23,850.00 2,650,00 DT40000001 TRUCK DUMP QUAD 3/112006 N 34,041.30 22,694:20 11,347,10 DT40000002 TRUCK DUMP QUAD 3/1/2006 N 34,041.30 22,694.20 11,347.!0 DT40000003 TRUCK DUMP QUAD 3/1/2006 N 34,041.30 22,694,20 11,347,10 DT40000004 TRUCK DUMP QUAD 3/1/2006 N 34,041.30 22,694.20 11,347.10 DT40000005 TRUCK DUMP QUAD 3/1/2006 N 34,041.34 22,694.20 !1,347.10 DT40000006 TRUCK DUMP QUAD 3/1/2006 N 34,041.30 22,694.20 11,347,10 DT40000007 TRUCK DUMP QUAD 4/112004 N 120,729;16 107,492.99 13,236.11 DT40000008 TRUCK DUMP QUAD 3/31/2010 N 41,689.36 28,899,36 12,790,00 DT40000009 TRUCK DUMP QUAD 7/3/2011 N 38,723,40 25,815,40 12,908,00 DT40000010 TRUCK DUMP QUAD 7/3/2011 N 38,723,40 25,815,40 12,908,00 DT40000011 TRUCK DUMP QUAD 7/3/2011 N 38,723,40 25,615,40 12,908,00 DT40000012 TRUCK DUMP QUAD 7/3/2011 N 38,723,40 25,815,40 12,908,00 DT40000013 TRUCK DUMP QUAD 411/2013 N 27,097.00 24,387,30 2,709.7o Rietb-Riley Construction Co., Inc. Equipment list 3/31/2020 Acquired New or Asset 9 Description Acquisition Date Used Cost Accum Depr NOV DT40000014 TRUCK DUMP QUAD 4/1/2013 N 27,097.00 24,387,30 2,709.70 DT40000015 TRUCK DUMP QUAD 411/2013 N 27,097.00 24,387.30 2,709.70 DT40000016 TRUCK DUMP QUAD 4/1/2013 N 27,097,00 24,387,30 -2,709,70 DT40000017 TRUCK DUMP QUAD 3/1/2016 N 60,243.87 54,219,48 6,024.39 DT40000018 TRUCK DUMP QUAD 'TRUCK 3/1/2016 N 60,243.87 54,219,48 6,024.39 DT40000019 DUMP QUAD 3/1/2016 N 60,243.87 54,219.48 6024.39 DT40000620 TRUCK DUMP QUAD AXLE : 2/2912016 • N 183,196,00 82,438,08 100,757.92 DT40000021 TRUCK DUMP QUAD AXLE 4/1/2018 U 90,950.00 43,959.12 46,990,88 DT4000b022 TRUCK DUMP QUAD 7/23/2018 N 185,701.00 39,121.35 146 579.65 EX08000001 EXCAVATOR OW 17308E2 4/1/2017 U 85,392.25 32,937.12 . 52,455.13 EX08000002 EXCAVATOR OW 1730SETC 4/1/2017 U 81,820.14 31,559,16 50 260.98 EX1300000i EXCAVATOR OW 25-30 312CL 3/31/2005 U 85,000.00 76,500.00 EX15bW0001 EXCAVATOR OW 30135 314ELCR 9/27/2013 U 185,071.94 152,298,69 8,500.00 32,773,25 EX15000002 EXCAVATOR OW 30-35 314E LC 4/27/2018 U 59,397,86 22,868.16 EX23000001 EXCAVATOR OW 40-55 320EL 8/1/2016 N 106,623,27 70,371.40 36 529,70 36,251,87 EX23000002 EXCAVATOR OW 40-55 320ELRR 8/1/2016 N 112,122.76 74,000,96 38 121,80 EX23000003 EXCAVATOR OW 40-55 320ELRR 8/1/2016 N 104,493.47 68,965.60 35,527.87 EX23000004 EXCAVATOR OW 40-55 320ELRR 4/26/2016 U 167,349.13 100,409.40 EX23000005 EXCAVATOR OW 40-55 32CELRR 4 4/26/2016 U 167,949.84 100,769.88 fi6,939,73 EX23000006 EXCAVATOR OW 40-55 320EL R 4/19/2018 U 8,255,61 2,641.80 67179,96 5613.81 EX23000009 EXCAVATOR 23MT323F 1/1/2019 U 25,688,55 4,128.52 EX40000001 EXCAVATOR OW 70-85 336EL 8/1/2016 N 152,777.96 100,833.48 Z1,560,o3 EX40000002 EXCAVATOR OW 70:85 336EL 8/1/2016 N 152,478,65 100,635,92 51,944.48 EX40000003 EXCAVATOR OW 70-85 336EL 8/1/2016 N 152,495.15 100,646.80• 51,842,73 51,848,35 EX40000004 2014 CATERPILLAR 33GEL40 M TON EXCAVATOR 12/23/2019 N 54,143.74 5,414.36 48729.38 EX40000005 2014 CATERPILLAR 33GEL40 M TON EXCAVATOR 12/23/2019 N 57,837.89 5,783.80 52,054,09 EX40000006 EXCAVATOR OW 70-85 336EL 2/1/2016 U 210,148.00 126,088,80 84,059,20 EX40000010 EXCAVATOR OW 70-8532EDLC 4/1812018 U 6,976.09 2,685,77 4290,32 EX40000013 EXCAVATOR 40 MT 336F 1/1/2019 U 77,015.14 12,377.40 64,637,74 EX40000014 EXCAVATOR 329DECR 40 METRIC TON 3/5/2020 U 175,000,00 4,375.00 170,625.00 EX50000001 2013 CATERPILLAR349EL50METRICTONEXCAVATOR 12/23/2019 N 68,114.86 6,811.48 61,303.38 EX50000002 2013 CATERPILLAR 34SEL So M TON EXCAVATOR 12/23/2019 N 79,418.40 7,941.84 71,476,56 FIN0000001 PAVER CONCRETE FINISHER OR 4/26/1995 N 36,870.75 33,182.95 3,68720 FINOOCO002 PAVER CONCRETE FINISHER 36 3/29/2016 N 168,888.44 86,203.37 82,685-07 FKL0000001 FORKLIFT 2/28/1984 N 21,997,50 19,797.75 2,199,75 FKLOCO0003 FORKLIFT 4/23/2002 N 22,832.72 18,627.72 4205,00 FRK4000a01 ATTACHMENTFORKS 4/1/2000 U 400,00 14000a FUELS606 FUELTANKSW/6578DUMP TRK 11/21/2018 N 5,999,45 5,399.50 GEN0000001 GENERATOR 4/21%1976 N 10,413,52 10,413.52 599,95 GEN0000002 GENERATOR 3/6/1978 N 38,734.50 38,734.50 GEN0000005 GENERATOR 7/29/1995 U 15,000.00 13,500,00 1,500,00 HDG2000001 TRAILER LOWBOY 5/2811987 N 40,415,58 36,374,02 4041,56 HDG2000002 TRAILER LOWBOY 711511996 N 6,249.49 5,624,54 624.95 HDG2000003 TRAILER LOWBOY 5/1/2001 N 15,13744 11,533.14 3,604.00 HDG2000004 TRAILER LOWBOY 4/10/1997 N 37,667,55 33,900,79 3,766.76 HDG2000005 TRAILER LOWBOY 4110ji997 N 37,667.55 33,900,79 3,766.76 HOG2000006 TRAILER LOWBOY 4/1/2006 U 19,080,00 17,172.00 1,908,00 HDG3000001 TRAILER LOWBOY 4/22/1991 N 52,180.35 46,962.31 5,218,04 HDG3000007, TRAILER Lulu BO HDG3000003 TRAILER LOWBOY �/1°/1��5 5/19/1995 �� N 49,274,90 10,296,02 48,458.76 9,266,42 776.22 HDG3000004 TRAILER LOWBOY 5/1/20oi N 21,211.01 16,161.01 1,029,60 5,DS0,00 HDG3000005 TRAILERLOWBOY 40T 51112001 N 21,211.01• 16,161.01 5,050.0a HDG3000006 TRAILER LOWBOY 5%1/2001 N 18,298.76 ' 13,982.76 4,316.00 HDG3000007 TRAILER LOWBOY 5/1/2001 N 18,298,76 13,982,76 4316.00 HDG3000008 TRAILER LOWBOY 4/1812007 N 17,022.22 11,348,14 5,674.08 HDG3000009 TRAILER LOWBOY 3%19/2009 N 17,022,22 11569,32 5,352.90 HDG3000010 TRAILER LOWBOY 3/31/2010 N 16,411,55 11,468,55 4 943.00 HOG3000011 TRAILER LOWBOY 4/1/2009 N 24,012.41 24,012;41 HDG3000012 TRAILER LOWBOY GOOSENECK 4 3/15/2010 N 20,223,00 20,223,00 _ HDG3000013 TRAILER LOWBOY 8/412015 N 82,607,73 43,369.20 39,238.53 HDGB000a14 TRAILER LOWBOY 'TRAILER 814/2015 N 82,607.73 43,369,20 39,238.53 HDG3000015 LOWBOY GOOSENECK 5 8/4/2015 N 83,309,09 43,737.24 39,571,85 HOG3000016 TRAILER LOWBOY 9/1/2015 U 44,520,00 40,068.00 4,452.00 HDG300aa17 TRAILERLOWBOY50T 3/31/2005 U 14,90638 13,416,10 1,490,68 HDG3000018 2017XLTRAILER XL110 LOWBOY TRAILER 6/3/2019 U 81,616,15 7,651.50 73,964,65 HDG4000001 TRAILER LOWBOY 3/31/2005 U 27,560.00 24,804,00 2,756,0o HEV.0000001 TRUCK HYDROVAC 2/1/2018 U 360,025,80 90,637.56 269,388,24 HST2000001 TRAILER LOWBOY HYDRAULIC 7124/2018 U 32,100.00 12,639.36 19,460.64 HST2000002 TRAILER LOWBOY HYDRAULIC 7/24/2018 U 32,100,00 12,652,50 19,447,50 HST2000003 TRAILER LOWBOY HYDRAULICT 3/31/2005 U 12,190,00 10,971.00 1,219.00 LT30000001 LOADER TRACK 963K W/FORKS 4/19/2018 U 68,940,87 22,06104 46,879.83 MG20000001 GRADER 12OG 3/31/2005 U 16,875,00 15,187,50 1,687,Sa MG40000001 'GRADER 140H 4/1/2004 U 210,043,47 189,039.12 21,004,35 MG40000002 GRADER 140H 411/2007 N 252,34638 227,112.10 25,234.68 MG40000003 2014 CATERPILLAR 140M2 GRADER 12/23/2019 N 62,618.22 6,261,84 56,356,38 MG40000004 GRADER MOTOR i60M AWD 4/19/2018 U 496,13' 496.13 MG4aoaaaas GRADER 140G 4/i/20Ofi U 40,000,00 36,000,00 _ 4,000,00 Rieth-Riley Construction Co,, Inc. Equipment List 3/31/2020 Asset 9 Description Acquisition Date Acquired New or Used GRADER 14G 3/31/2005 U Cost Accum Der pr P NHV MG40000007 GRADER 140G 3/31/2005 U 20,188.00 18,169.20 Z 018.80 ' MG40000008 GR4OER140G 3/31/2005 U 28125' ,00 25,312,50 2,812,53 MG40000009 GRADER 16oH 3/31/2005 U 61,500.00 tai oao,oa 55,350,00 90,810.20 6150.00 ' MJS0000001 PATCHERJOINT SEALER 4/11/2013 N 10,100.00 MJSaaao002 PATCHERJOINT SEALER 4/11/2113 N 41 ,810.25 41,810.25 MISOCO0003 'PATCHER JOINT SEALER 4/11Jz213 N 41,110,25 4i ,810.25 _ MJS0000004 PAT,CHERJOINT SEALER 4/11/2013 N 41,810.25 41,810.25 MJS0000005 PATCHERJOINTSEALER 4/l/2017 N 41,811,25 41,810.25 _ M1S0000006 PATCHER JOINT SEALER 4/1/2017 N 46,587.80 2795 ' 2.68 18,635,12 MJ51003007 2019 ClIULINE M4DHP JOINT SEALER 12/4/2019 U 46,587.80 2,.12 18,635,12 MM05a110a01 COLD PLANER ROTOMILL 3 1 2005 / / U 51376.67 ' 3 '425 3 425.12 47,951,55 MST0000017 TRUCK SERVICE 7/1/2016 U 47,500.00 -15,aa1•o0 42,750,00 4,75o•oa MTAaa3000l MATERIALTRANSFERASpHAL7 12/15/2017 N 13,500.00 1,500.00 MTA0000002 MATERIAL TRANSFER ASPHALT 12/1 U 171,415.61 114,277.08 g75%2017 ,138.53 MTA0a0o003 2012 WEILDER E2850 ASPHALTTRANSFER 12/23/2019 U 142 834.02 95 '22 2.68 47,611.34 MTA0000004 2012 WEILDER E2850ASPHALTTRANSFER12/23/2019 U 75,039,06 8,337.68 66,701.38 M MATERIAL 4/8/2115 N 65,520.38 7,280.04 58TA4a203a5 '240,34 MTA0000006 MATERIALTRANSFERASPHALT 4/26/2016 N 519,680.31 324,800.28 194,880.03 MTAa000008 MATEAIAL TRANSFER ASPHALT 4/27/2016 N 408,428,15 233,387,52 175 040.63 ' MTA0000009 MATERIAL TRANSFER ASPHALT 5/26/2016 N 499,455.56 249 7 2,7.68 249,727.88 MTA0000010 MATERIAL TRANSFER ASPHALT 5/26/2016 N 499,455.56 244,525.02 254,930,54 MTC0000001 MATER IALTRANSFER CONCRETE 8/9/1994 N 499,455,56 244,525,02 254,930.54 MTCa2D3302 MATERIAL TRANSFER CONCRETE 4/21/1999 N 199 6fi0,00 179,694.00 19,966.42 MTC0000003 MATERIAL TRANSFER CONCRETE 112512011 N 243,376.79 .230,072,37 13,304.42 MTC0000004 MATERIAL TRANSFER CONCRETE 2/22/2016 N 05,746.92 66,743.92 19,313,13 0078000301• COMPACTOR VIER 78 HD120 V 4/1/2017 107,025,00 107,025.00 OD78000002 COMPACTOR V18R 78"" HD120 V 5/2017 N 32 6 77.80 , 29,410.02 3,267.78 OD78000003 2014 HAMM HD120VO 78" VIBR COMPACTOR 12/23/2019 U 25 304.16 ' 11,808.60 13,495.56 0078000004 2014 HAMM HDZ20V0 78" VIER COMPACTOR 12/23/2319 U 25 853.40 ' Z555 .36 23,266.04 0079x00005 2014 HAMM HD120VO 78" VIER COMPACTOR 121?312119 U 24,7.13 2,478.32 22,304,81 0078000206 COMPACTOR VIER 78"" HD+1201 4130/2018 U 24,78633.13 2,4,78.92 22,314.01 0078000007 COMPACTOR VIER 78"" HD+1211 4/3 012 0 1 8 U 23,978.458,961.92 15,016,53 _ OD78000018 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 5/24/Z019 N 28,417.09 10,620.94 17,796.15 0078/00019 2019 CATERPILLAR C810S"VIBRATORY COMPACTOR 5/24/2019 N 180 219,03 18,585,05 161,633,98 0078000020 2019 CATERPILLAR C813 78" VIBRATORY COMPACTOR 5/24/2119 N 180,219,03 18,585.05 161;fi33,98 0078000021 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 5/2412019 N 181219,03 , 18,585.05 161,3398 OD78000022 2019 CATERPILLAR 0813 78" VIBRATORY COMPACTOR 5/24/2019 N 180,219,13 18,585,05 161,6633..98 OD78400023 2019 CATERPILLAR 0813 78" VIBRATORY COMPACTOR 512412019 N 185,435.28 19,123.06 166,312.22 OD78000024 2019 CATERPILLAR C013 78" VIBRATORY COMPACTOR 5/24/2019 N 185,435,28 19,123.06 � 166,312.22 007800/025 2019 CATERPILLAR C813 78" VIBRATORY COMPACTOR 5/24/2019 N 185,435,28 19,123,06 166,312.22 OD78000026 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 5/24/2019 N 185,435,28 19,iZ3,Ofi 166,312.22 0078000027 2019 CATERPILLAR C813 78" VIBRATORY COMPACTOR 5/2412019 N 185,435,28 17,384.60 168,050.ss PAC1aa0020 CRUSHER 2/2/1971 N168,050.67 185,435,28 17,384.60 PA5a000001 PLANTSCREEN 11/5/2001 N 5,066.67 4,560.02 506.67 PBF0000002 CONVEYOR BELT 211711978 N 48,295.44 37,211.44 li ,084.00 PBS0000005 CONVEYOR WEIGH BELT 7/22/1980 N 10,456,00 12,456,00 PCA0000017 CONVEYOR 3129/1980 N 10,787,63 10 78 , 7,63 _ PcA000a02l CONVEYOR BELT 111 X1.1 075 1: 14,350.00 14,350.00 _ FCA0000022 CONVEYOR 8/31/1978 N 17,'91 0 - 39,400.42 19,400,42 19,400,42 942,ii PCA0000023 CONVEYOR PCA0000036 CONVEYOR 7/31/1978 N 19,400.42 19,400,42 PCA0000063 CONVEYOR 2/17/1978 3/28/1975 N N' 10,456.00 10 456.00 � PCCao00020 CONVEYOR 3/29/1980 N 15 485,23 ' -14,281.0a 1,204.15 PCM0000018. COMPRESSOR AIR 185 6/21/2017 U 14,350.0 14,350.00 _ PCR0000011 CRUSHER PF84300001 COMPACTORVIBR GRADE 84"" 10/24/1976 N 13,684.60 13 000,00 12,384.60 13,000,00 1,300,00 C ,,,, PF84000002 COMPACTOR VIER GRADE 84 C 12/15/2017 N 59�3s , 7.82 35,632.68 23,755.14 PF84000003 2014 CATERPILLAR CP56 84" PADFOOTSOIL COMPACTOR 12/23/2019 U 67 202.66 40,321.61 26,880,98 PF84600004 COMPACTOR VIBR GRADE 84"" C 3/31/2005 U 30 766.91 3 076.68 ' 27,690,23 PN70030001 COMPACTOR PNE TIRED P53000 3/3112005 U 50,000,03 4s 823.10 5,030;00 PN9ooaoaoi COMPACTOR PNE TIREDPT140A .412311999 U • 36,471.00 32823.90 3,647,10 PN9aa1aaa2 2113 CATERPILLAR Ps15ac PNEU COMPACTOR 12/23/2019 U 21915,11 19,723.60 2,191.51 PN90000003 2013 CATERPILLAR PS151C PNEU COMPACTOR 12/23/2019 U 11,831.48 1,183,16 10 ,648.32 PN90000004 COMPACTOR PNE TIRED P3150C 8/3/2017 U 13,181.93 1,318.2011,8fi3.78 PN90000005 COMPACTOR PNE TIRED P5150 ' 4/1912018 U 689,26 689,26 PN90000006 COMPACTOR PNE TIRED 530A 4/1 f 2406 U 5,595,50 2,797.68 2,797,82 PN90000007 COMPACTOR PNE TIRED C530 3/31/2005 U 9,000.00 8,100,00 , 930100 PN9a000007 COMPACTOR PNE TIRED C530A 313112005 U 4,375.00 3,937.50 437.50 PN30000009 COMPACTOR PNE TIRED C530A 3/31/2005 • U 9,375.00 8;437,50 937,50 P520000001 PLACERSPREADER 6/17/1992 N 3,750,03 3,375,00 375,00 P520000002 PLACERSPREADER 1125/2001 N 217,149.30 195,434,37 21,7i4.93 P520000003 PLACERSPREADER 3/31/2005 U 105,753.84 76 03 29,721.40 P520000004 PLACERSPREADER 4/112017• N 139,519,38 12556284 7,45 13,951,93 PSC0000002 SAND SCREW 3/2/1979 N 971696,35 97,696.35 PSSO400012 SCREEN AGGREGATE 4/27/1991 N 34,500,0o 34,500.0o e PTC20G2309 CONVEYOR 7/27/1966 N 41,861.41 37675.27 4,176.14 11778 79 10,862 87 915,92 Rieth-Riley Construction Co., Inc. Equipment List 3/31/2020 Acquired New or Asset 0 Description Acquisition Date Used Cost Accum Deir PWS0000006 WASHER EAGLE 9/13/1974 N 15,000.00 13,833.60 NBV PW50000007 TANK CLASSIFYING 4/2/1985 N 105 262.20 94,735,98 1,166,40 RM00000001 GRADER MAINTAINER 4/1/2017 U 21,859,32 19,673,39 10 526.22 5CR1100001 SCRAPER 613C 3/31/2005 U 81,875.00 28 687.50 2185,93 SD66000001 COMPACTOR VIBR GRADE 66"" 8 4/1/2000 U 29,300.00 24,000.00 3,187,50 SD6600O002 COMPACTOR VIBR GRADE 66"' C 3/16/2009 U 22,000,00 19,800,00 5,300.00 SO66000003 COMPACTOR VIBR GRADE 66"" C 3/31/2005 U 60,000.00 54,000,00 2,2x0,x0 SD84000003 2014 CATERPILLAR CS56B 84" SOIL COMPACTOR 12/23/2019 .0 31,564.47 3,156.446,000,00 5D84000004 COMPACTOR VG 84"" C5560 4/19/2018 U 27,286.21 9,624.fi0 28,408,03 SD84000005 2016 CATERPILLAR C5560 84" SOIL COMPACTOR 8/30/2019 U 6,500.00 1,444.4a 17,661,61 •SD84000006 2017 CATERPILLAR C556B 84" SOIL COMPACTOR 12/19/2019 U 8,300,00 922.24 5,055,52 SF20000001 PAVER SLIPFORM SF450 5/4/1988 N 370,650,00 333 585.00 7,377.76 SF20000002 PAVER SLIPFORM 2 CRACK 350 6/28/1988 • N 256,369.00 230 732.1a 00 SF20000003 PAVER SLIPFORM SF550 4/26/1991 N 405 623,35 BGS"06i.02 365 06i.02 251635 + 6 90 SF20000004 PAVER SLIPFORM 2 TRACK GP2 4/1/2000 N 161936,38 832 250.48 SF40000001 PAVER CONCRETE 4 TRACK GT6 2/9/2004 N 1 179845.72 1 153520.82 29 685,90 SF40000062 PAVER CONCRETE 4 -TRACK SF2 11/15/2012 N '103,057.40 103057.40 26,324.90 SF46000063 PAVEfi CONCRETE 4 -TRACK GT6 6/4/2010 N 2 200, ,189,23 SKL0000001 GRADER MAINTAINER 2145 4/1/2000 U 35200.23 35,200 .00 301200,00 _ 5 0 00,00 SKI. 'Oman GRADER MAINTAINER 2145 4/1/2006 U 25,000.00 22,504,00 . SKL0000004 GRADER MAINTAINER 724 3/31/2005 U 6,250,00 5,625.00 2,500.00 SKL0o00005 GRADER MAINTAIN ER 724 3/31/2005 U 7,500.00 6,750.00 625.00 SKL0000006 GRADER MAINTAINER 724 3/31/2005 U 7,500.00 6,750.00 75p.00 SKLagoo007 GRADER MAINTAINER 724 3/31/2005 U 7,500,00 6,750.xo 750.00 SKL0000008 GRADER MAINTAINER 724 3/31/2005 U 7,506.00 6,750.00 75o.x0 SPF00a0001 2012 CATERPILLAR 815FSHEEPSFOOT COMPACTOR 12/23/2019 U 70,975.43 75a.00 551.0000001 SKID STEER WHEEL 4/1/2000 U 7,800.00 6 800.58 6 800.00 63,787.87 881.0000002 LOADER SKID STEER 7/1f2016 U 30,000.00 + 27,000,00 1,000.00 SSL0000006 SKID STEER WHEEL 4/1/2006 U. 20,000,00 18,000.00 3,000.00 881.0000007 SKID STEER WHEEL . 4/1/2006 U 20,0x0,00 18,000.00 2,000.00 SSL0000008 SKID STEER WHEEL 1/29/2008 U 19,750,00 17,775.00 2,000,00 881.0000009 SKID STEER WHEEL 3/31/2005 U 12,500.00 11,250.00 1,975,00 SWPaaaciam. SWEEPER ROAD 4/i/2000 U 5,5(30.00 4,000.00 1,250.00 SW1,0000002 SWEEPER ROAD 3/31/2005 U 5,000,00 4,500.00 1,500.00 TB80000001 TRUCK BOOM 80' .3124/2011 U 59,920,00 53,928.00 500,00 TC00O00001 TEXTURE CURE CONCRETE TCx0000002 TEXTORE CURE CONCRETE 4/26/1991 N 56 713.68 ' 51042,31 + 5 990.00 I 5,671;37 TC00000003 TEXTURE CURE CONCRETE 3/14/2006 4/1/2004 N N 70,615,16 231,922.25 49,461.36 208,730,02 8, 30.07 21,153,80 T020000001 TRAILER PUMP SEMI 5/3/1995 N 6,288.97 23,192.23 TD20000002 TRAILER DUMP SEMI 5/1/2001 N 16,173.73 12,140.73 628.90 TD20000003 TRAILER DUMP SEMI 5/1/2001 N 15,173.73 12,140,73 4,033,00 T020ax0004 TRAILER DUMP SEMI 5/1/2001 N 16,173.73 12,140.73 4,033.00 T020000005 TRAILER DUMP SEMI 5/1/2001 N 16,173.73 12,140,73 4,033.00 TDM000006 TRAILER DUMP SEMI 5/1/2001 N 16,173.73 12,140.73 4,033.00 TD20000007 TRAILER DUMP SEMI 5/1/2001 N 16,173.73 12,140,73 4,033•ao TD20000008 TRAILER DUMP SEMI 4/30/2006 N 14,632,65 9,754.65 4,033,00 TD20000009 TRAILER DUMP SEMI 4/30/2006 N 14,632.65 14,632,65 4,878,00 TD200x001a TRAILER DUMP CONSTRUCTION 6/5/2006 N 26,888.72 24199,85 T v2 -00x0(311 TRAILER DUMviP S'civil TD20000012 TRAILER DUMP SEMI 9jij20i6 9/1/2016 N N 41,93x,00 42,180,00 ' 17,223,88 17,326,28 2,622 27 24706.52 TDR1.000001 TRUCK i TON DRILL 11/30/1983 N 14,490,00 13,041.00 24,853.72 TEX0000001 EXCAVATOR TELESCOPING SL41 7/11/2000 N 277,091.48 249,382.33 1,449,00 27 709.15 TI'M0000i TRUCK FUELTANDEM 7/2/2001 N 40,382.86 34,071.86 TFW1000001 TRUCK WATER/FUELS/A 3/31/2005 U 15,900.00 14,310.00 fi,311.00 7FW100o002 TRUCK WATERJFUEL. 3131/ZOOS U 15,900.00 14,310.00 1,590,00 TFW1000603 TRUCK WATER/FUEL 3/31/2005 U 16,562.50 14,906.25 1,590.00 TFW1000004 TRUCK WATER/FUEL 3/31/2005 U 19,875.00 17,887,50 1,656.25 TFWIOOCO05 TRUCKWATER/FUEL 3/31/2005 U 27,825.00 25,042.50 1,987,50 TFW2000001 TRUCK WATER/FUELT/A 2/1612004 N 20,0;9.94 11,929.94 2,782.50 TFW2000002 TRUCK WATER/FUELTJA 2/9/2004 N 18,311.94 9,513,00 8,100,00 TFW2000004 TRUCK WATERJFUELTfA 4/1/2013 N , 27,975.15 25,177,63 8/798,9¢ TFW2000005 TRUCK WATER/FUELT/A 2/512013 N 29,723.7E 26,751.40 2,797 52 TFW2000006 TRUCK WATER/FUELTJA 9/30/2013 N 51,308.80 46,357.92 2,972,38 TFW2000007 TRUCK WATER/FUELTJA 311/2016 N 66,900,54 60,210:49 5,150,88 TFW2000008 TRUCK WATER/FUELT/A 3/1/2016 N 66,900,54 60,210;49 6,690.05 TFW2000009 TRUCK WATER/FUELTJA 6/4/2017 N 232,729.74 74,182.56 6,690.05 158,547.18 TFW2000010 TRUCK WATER/FUELTJA 6/4/2017 N 232,729.74 74,182,56 158,547.18 TFW2000011 TRUCK WATER/FUELTJA 6/4/2017 N 234,702.03 74,811.22 159,890,81 TG10000003 TRAILERTILTTOP 3/16/2009 U 1,060,00 954,00 106,00 TG20000001 TRAILER PULLTYPE 26' 5/2/2015 N 23,126,10 12,955,44 10,170.66 TG20000002 TRAILERTILTTAG 20T 5/2412018 N 24,478,30 5,278.04 19,200,26 TG20000003 TRAILERTILTTOP 3/iS/2009 U 10,600.00 9,540,00 1060.00 TG20000004 TRAILERTILTTOP 3/16/2009 U 7,910.00 7,119,00 '791.00 TGN3000001 TRAILERTILTTOP GOOSENECK 5/1/2001 N 13,960,79 10,667,79 TGN3000002 TRAILERTILTTOP GOOSENECK 3/20/i998 N 26,877.54 24,077,54 3,293,00 TG 3000003 TRAILER TI TTOP GOOSENECK 7/212001 N 23,115,99 20,315,99 2,800.00 TGN3000004 TRAILERTILTTOP GOOSENECK 4/12/2017 N 43,698,57 14,788,24 2,800.00 28,950,33 Rieth-Riley Construction Co., Inc. Equipment list 3/31/2020 Acquired New or Asset 9 Description Acquisition Date Used Cast Accum Depr NBV TGN3000005 TRAILER TILTTOP GOOSENECK 3/16/2009 U 23,320.00 20,988.00 TGN3000006 TRAILER TILTTOP GOOSENECK 3/16/2009 U 3,180.0❑ 2,862.00 23 2,332.00 TGN3000007 TRAILERTILTTOP GOOSENECK 3/16/2009 U 8,480,00 7,632.00 318.00 TLB4000001 TRAILER4AXLE 41,340.00 $7,205.00 848.00 4 00 TLB4000002 TRAILER 4AXLE 411/2006 U 41,340.00 37,206,004,13 184.00 4'00 768000001 TRAILER 8 AXLE 5f 1/1989 U 84 240.00 75,816,00 ' TLB8000od2 TRAILER 8 AXLE • 5/1/1989 U 84,240.00 75,816.00 8,424.00 TLBa000003 TRAILER 8 AXLE 7/6/1992 N 108,107,50 97,296,75 g 10'824.00 10,810.75 TLO9000004 TRAILER a AXLE N 7/16/1992 N 108,107,50 97,296.75 10,81a.75 TLB8000005 TRAILER 8 AXLE TLBSod0006 TRAILER 8 AXLE 4/5/1994 U 19,760.00 17,784.00 1 TLB8o00o07 TRAILER B AXLE 4/5/1994 4/5/1994 N N 19,760.00 17,784,00 1g76.00 976.00 TLB8000008 TRAILER 8 AXLE 4/5/1994 N 19,760,00 17,784.00 1976.00 TL88000009 TRAILER 8 AXLE 4/5/1994 U 19,760,00 17,784.00 17,784,Co 1g 76,00 T1.68000010 TRAILER 8 AXLE 5/1/1997 U 19,760.00 Z976.00 TL88000011 TRAILER 8 AXLE 5/1/1997 U 10,143.45 8,362 970 0,33 10,143.12 TLB800aa1Z TRAILER 8 AXLE 5/1/1997 U 8,404.45 22 8,362.75 TL•B80o0013 TRAILER a AXLE 1/2511999 N 40,539.81 0.22 33,924.81 8,404.23 TLB8o00014 TRAILER 8 AXLE 5/1/1997 N 26,766.62 15,766,62 6,615.00 TL38000015 TRAILER 8 AXLE 1/25/1999 N 40,539.81 33,924.81 11000,00 TLB8000016 TRAILER 8 AXLE 5/1/1997 •N 26,373,32 15,373,32 6 6 TLB8000017 TRAILER 8 AXLE 6/2411999 U 37,100,00 27,100,00 11000 00 TL88000018 TRAILER 8 AXLE 6/24/1999 N 37,100.00 27,10000 100 00.00 TLB8000019 TRAILER 8 AXLE 6/29/1999 N 37,100,00 . 27,100,00 10,000.00, TLBS000020 TRAIL•ER8AXLE 6/24/1999 N ,37,100.00 27100.00 10 000.00 + TLB8000a21 TRAILER 8 AXLE 6/24/1999 N 37 100,00 ' 27,100.00 10,000,do TL68000022 TRAILER 8 AXLE 2/16/2000 N 47,216.20 36,674.90 10,000,00 10 541.30 TLB8000023 TRAILER 8 AXLE 2/16/2000 N 47,216.20 36,674.90 10,541.30 TL88000024 TRAILER 8 AXLE i/1612000 N 47,216.20 36,674.90 10,54130 TL88000025 TRAILER 8 AXLE TLBaob0026 TRAILER 8 AXLE 2/1 612 0 0 0 N 47,216.19 36,674.89 10,541.30 TLB8000027 TRAILER 8 AXLE 2/1612000 2/16/2000 N N 47,216,19 36,674.89 10541.30 , 41.30 TLB8000029 TRAILER 8AXLE 5/1/2001 N 47,216.19 25,583.24 36 674.89 17,538.24 18, 541.30 TLB8a00029 TRAILER a AXLE 5/1/2001 N 25,583.23 17,538.23 45.00 TL68000030 TRAILER 8 AXLE 5/11 2001 N 25,583.24 17,538.24 8,045.00 TLB8000031 TRAILER 8 AXLE 5/1/2001 N 25,583,24 17,538,24 8,045,00 TLB8000032 TRAILER 8 AXLE 5/1/2001 N 25,583.24 17,538,24 8,045,00 TLBB000033 TRAILER8AXLE 5/1/2001 N 25,583.24 17,538.24 8,045.00 TL88000034 TRAILER 8 AXLE 6/1%2001 N 25,583,24 17,538.24 8,045,00 TL88000035 TRAILER 8 AXLE 5/1/2001 N 25,583.24 17,538.24 8,045,00 TLB8000036 TRAILER 8 AXLE 3/31/2010 N 40,649.45 28 906.45 8,045.00 117 TLBSO00037 TRAILER 8 AXLE 3/31/2010 N 40,649,45 28,906.45 11+743,00 43•.00 TLB8000038 TRAILER 8 AXLE 4/i/zoos u 77,812.05 70,030,85 7,781.20 TLBSOCO039 TRAILER 8 AXLE 6/6/2014 U 53,000.00 47,700,00 5,300,00 T1.138000040 TRAILER a AXLE 6/6/2014 U 45,050,00 40,545,00 4 505.06 TLe8000041 TRAILER.eAXLE 6f 6/2014 U 47,700,00 42,930.00 47 70,00 TLB8o00042 TRAILER S AXLE 5/3012015 N 167,649,60 92,73136 , 74,918.24 TLO8000043 TRAILER 8 AXLE 5/30/2015 N 167' 643,60 92,731,36 74,918.24 TL68000043 TRAILER a AXLE TLBBO00045 TRAILER B AXLE ;.r:nr�ni 5/30/2015 N 167,649.60 S2,73i.35 92,731.36 74,918,24 74,91a.24 TLBaoa0046 TRAILER 8AXLE 1/2/2016 N 170,063.22 81,311.34 88,751.88 TL08000047 THAI LER 8AXLE 1/2/2016 N 170,063.22 81,31134 88,751.88 TLB$000048 TRAILER 8AXLE lf2/2016 N 170,063.22 81,311,34 88,751.88 TLB8000049 TRAILER 8AXLE 1/212016 N 170,063.22 81,3il,34 88,751.88 TLB8000050 TRAILER BAXLE 1/2/2016 N 1701063.22 81,311.34 88,751.88 TLB8000051 TRAILER 8 AXLE 1/2/2016 N 170,063,22 81,31134 88,751.88 TLB8000052 TRAILER aAXLE 4/1/2017 U 91,236.52 35,191.20 56,045.32 TLB8000053 TRAILER 8'AXLE 4/1/2017 U 91,236,52 35,191.20 56,04532 TL88000054 TRAILER 8 AXLE 4/1/2017 U 91,236,52 35 191.20 S6 045,32 TL88000055 TRAILER 8 AXLE 4/1/2017 U 91,236.52 35,191.20 56,445,32 TLB8000057 TRAILER 8 AXLE 4/i/2006 U 54,o60,00 48,654.00 5,406.0a TLB8000058 TRAILER 8 AXLE 411/2006 U 54,060,00 48,654.0a 5,406.00 TLB80o0059 TRAILER 8 AXLE 411/2006 U 62,010.00 55,809.00 6,201.00 TLB9000060 TRAILER 8 AXLE 4/1/2006 U 62,010,00 55,809,00 fi,201.a0 TLB8000a61 TRAILER eAXLE 4/1/2006 U 67,310.00 60,579,00 6,731.00 7LB8000062 TRAILER 8AXLE 3/31/2005 U 31,800,00 28,620,00 3,180,00 TLB8000063 TRAILER a AXLE 3131/2005 U 31,800,00 28,620,00 3,180,00 TLSB000064 TRAILER 8 AXLE 3/3112005 U 31,800.00 28,620,00 TL88000065 TRAILER BAXLE 3/31/2005 U 31,800,00 28,620,Oa ,9180,00 3,180,00 TLBSO00066 TRAILER 8 AXLE 3/31/2005 U 31,800,00 28,620,00 3,180,00 TLB8000067 2018 RED RIVER OLS84ONGH 8 AXLE LIVE BOTTOM TRAILER 5/7/2019 U 82,944.33 8,553,60 TLO8000069 2018 RED RIVER OLB84ONGH 8 AXLE LIVE BOTTOM TRAILER 5/7/2019 U 90,303,60 9,312.60 74,390.73 TLOS000069 2018 RED RIVER OLBMONGH 8 AXLE LIVE BOTTOM TRAILER 517/2019 U 83,124.33 8,572.19 80,991.00 TLBB000070 2018 RED RIVER OLS84ONGH 8 AXLE LIVE BOTTOM TRAILER 5/7/2019 U 83,221.73 8,582.20 74,552,14 TL88Qa0071 2018 RED RIVER OLB84ONGH 8 AXLE LIVE BOTTOM TRAILER 51712019 U 89,916,96 9,272.67 74,639,53 TR00000001 COMPACiORTRENCH FABR 2/21/1983 N 39,132,76 35,219,48 80,644,29 TR00000002 COMPACTOR TRENCH TR -100 3 /1712 0 1 0 N 30,495,00 30,495,00 3,913.2a + _ Rieth-Riley Construction Co., Inc. Equipment List 3/31/2020 Acquired New or Asset 3 • Description Acquisition Date Used cost Accum Depr TRCH000001 TRENCHER7/9/2015 U 65,564.25 NeV69,015,00 TRLD000001 TRAILER DUMP LEAD 4/1/2006 U 11,660,00 3 450.75 TRLDaaaaaz 1988EP,,STLEAD DUMP TRAILER 1/29/2008 U 10,494.00 1,166,00 TRLD000003 TRAILER DUMP LEAD 1/2912003 U 15 900,00 14,310.00 1,590.00 TRL0000004 TRAILER DUMP LEAD 1/29/2008 U 19,080.00 17+172.00 1,908.00 TRLD000005 TRAILER DUMP PUP 1/29/2008 U 21,200,00 19,080.00 2,120,00 TRL0000006 TRAILER DUMP PUP 1/29/2008 U 26,500.00 23 850,00 + 2,650.00 T5F2000001 TRUCK WATER SPRAYBAR 7/12/1986 N 31800, + 00 28 620,00 , 3,180.0 TSF2000002 TRUCK WATER SPRAYBAR 6/14/1990 N 78,634.27 59,462,67 11181,660 ' TSF2000003 TRUCK WATER SPRAYBAR 4/4/1991 N 80136,46 72122,82 ' 8,013,64 TSF2000004 TRUCK WATER SPRAYBAR 5/1/1995 N 81,927.03 72,806,97 9,120.06 TSF200d005 TRUCJC WATER SPRAYBAR 5/1/2001 N 20,297.82 17,266.49 3 031,33 TSF2000006 TRUCK WATER SPRAYBAR 5/1/2001 N 28,797.73 21957.73 + 6,940.00 TSF2000007 TRUCK WATER SPRAYBAR 51112001 25,988,29 16,020.77 9,967.52 TSF2000008 TRUCKWATER- 4/1/2006 U 30,739,05 21,957,73 g 781,32 ,954.00 •TSF2000009 TRUCK WATER 3/31/2005 U 9,540.00 8,586,00 TSF3000001 TRUCK WATER SPRAYBAR 5/1/1995 N 7,685,00 61916.50 768.50 7110040001 TRAILERTILTTOP. 31i612009 U 86 974.65 76182.57 10 792.08 ,773.00 TT20000001 TRAILER TILTTOP 8/31/1995 N 7,730,00 6,957.00 7T20000002 TRAILERTILTTOP 4/1/1997 N 17,173,23 15,455.90 1,717.33 TT20000003 TRAILERTILTTOP 4/1/1997 N 17,043.64 15339.28 + 1,704.36 1720000004 TRAILER TILTTOP 4/1/1997 N 17,043.64 15,339.28 '1,704.36 TT2o000005 TRAILERTILTTOP 4/1/1997 N 16,897,33 15,207.60 1 T720400006 TRAILERTILTTOP 3/20/1998 N 16897,33 15,207.60 1689.73 ,689.73 1120000007 TRAILERTILTTOP 3/20/1998 N 11,370.18 9720.18 1,650.00 TT20000008 TRAILER TILTTOP 3/20/1998 N 11,370.18 9,720.18 TT20000009 TRAILERTILTTOP 712120ol 11,370,18 9,720.18 1,650 00 1120000010 TRAILERTILTTOP 7/2/2001 N 8,941.06 729106 1 ,650.00 TT20000011 TRAILERTILT TOP 7/2/2001 N S,SSfi,73 7 206,73 ' 1,650.00 7720000012 TRAILERTILTTOP 6/3/2002 N 8856.73 ' 7,206.73 1,650.00 11200.00013 TRAILERTILTTOP 6/3/2002 N 6,454.71 4,804.71 11650,00 1720000014 TRAILERTILTTOP 8/2/1999 N 6,516.18 4,866.18 1 ,650.00 1120000015 TRAILERTILTTOP 12/2/2002 N 14,369.32 1272 24.32 1+645,00 7720000016 TRAILERTILTTOP 5/14/1999 N 4,363.21 i9,650,00 ,71821 T1`20000017 TRAILERTILTTOP 17,685.00 1,965.00 TT20000018 TRAILERTILTTOP 4/1912010 N 26,403,25 23,762.92 2 TT20000019 TRAILERTILT20T 4/1/2017 N 15,565.04 14,008,54 1+640.33 ,556.50 IT -2000002032,127.03 20000020 TRAILERTILT20T 4/1/2017 N 10,842.84 21,284.19 1120000021 TRAILER TILT20T 31,857.05 10,751.76 '1075 21,105.29 TT20000023 TRAILERTILTTOP 3/16/2009 U 31,857.05 1,.76 21 ,105.29 TT20000024 TRAILER TILTT0P20T 3/31/2005 U ,730.00 69511 .00 ' 773.00 1120000025 TRAILER TILTTOP 201 3/31/2005 'U 2,517,50 2,265,75 251.75 1720000026 TRAILERTILTTOP 201 3/31/2005 U 2,517,50 2,265.75 251.75 TT2oo00027 TRAILERTILTT0P20T 3/31/2005 U 2,517.50 2,265.75 251.75 TT20000028 TRAILERTILTTOP 20T 3/31/2005 U 2517.50 , 251.75 TT20000029 TRAILERTILTTOP 3/31/2005 U 2,517,50 22265.75 +265.75 251,75 1T20000030 TRAILER TILTTOP 20T 3/31/2005 U 2,517,50 2,517.50 TT20000031 TRAILER TILTT0P20T 3/31/2005 U 2,65040 '265.00 2,385.0a 1120000032 TRAILER TILTTOP 201 3/31/2005 ti 2,650,00 � �-�^ 00 2 385,00 265,00 TT20000033 TRAILERTILT20T 3/3112005 U 4,770.00 2,38;,00 4293.00 665,00 TT20000034 2019 XLTRAILERS XL40 TILTTAG TRAILER 7/17/2019 N 36' 847,16 477.00 TT20000035 2019 XLTRAILERS XL40 TILT TAG TRAILER 7117/2019 N 3, 108.96 + 33 ,738.20 TT20000036 2019 XLTRAILERS XL40 TILTTAG TRAILER 7/17/2019 N 36,847,16 3,108.96 33,738.20 2019 XLTRAILERS XL40 TILTTAG TRAILER 5/7/2019 U 36,847.16 3108.96 E3 ,738.2a ,738,20 TT25000001 TRAILERTILTTOP 611811996 N 27,786,50 2,865.50 24,921.00 TT25000002 TRAILERTILTTOP 9/18/2007 N 22,973,80 20,676.42 2,297.38 7725000003 TRAILERTILTTOP 4/2/2008 N 32,741.00 29,466.90 3,274.10 T725000004 TRAILERTILTTOP 4/2/2008 N 32,741.00 29,466,90 3,274.10 TTK0000001 TRAILERTANKER 5/5/1988 • N 32,741.00 29,466.90 3,274.10 TW10000001 TRUCK WATER 30,287.63 27,258,87 3,028.76 TW10000002 TRUCK WATER 3/16/2009 U 20,000,00 18,000.00 2 ,000.00 TW10000003 TRUCK WATER 3/31/2005 U 250.00 11925,00 10 732.50 250,00 TW2000000i TRUCK WATER TANDEM 6/3/2002 N 35,488.51 1 TW20000002 TRUCK WATER TANDEM 12/2/2002 N 26 995.51 8'192.50 UTF0000003 TRACTOR FARM 7/1/2016U 29,372.33 21,155.33 8,217,00 UTF0000007 TRACTOR FARM 3/31/2005 U 44,776,00 37,947,66 6,828,34 WD08000001 WIDENERSPD-8 1212/Z012 N 2,813,00 2,531.70 281.30 WD10000001 WIDENER RW1o0 4/1/1987 N 20,823.48 18 877.36 1 g WD10000002 WIDENERRW100A 12/2/2004 N 86 ,709.00 78,038,10 8 67612 ' 0,90 WD10000003 WIDENER W530 12/15/2017 N 72,005,68 72,005,68 WD10000004 WIDENER W530 4/26/2016 U 77,691.66 51,794.40 25,897.26 W010000005 WIDENER W530A 412612016 N 123,184.45 101,898.18 21,296.27 WD1000o006 2.018 WEILER W530A WIDENER 9/3/2019 U 242,617,65 160,098,00 82,519,65 WD10000008 2018 WEILER W530A WIDENER 91312019 158,167.16 8,787.08 149,380.08 WD14000001 WIDENER RW195D 4/28/1993 U 166,602.23 16,197,44 150 WD14000002 WIDENER RW195D 7/1/1999 N 131,039,59 117,935,63 13,404,79 ,103,96 WD14000003 WIDENER RW195D 7/2/2001 N 177,22fi,00 155,753,00 21,473.00 109,609,12 94,127,12 15,482,00 Rieth-Riley Construction Co., Inc. Equipment List 3/31/2020 Acquired New or Asset f; Description WD14000004 WIDENER RW195D Acquisition Date Used Cost AccumDe r NBV WD14000005 WIDENER RW195D 4/1/2006 11/2/2010 U U 172,500,00 155,250.0 17,250.00 WD14000006 WIDENER RW195 3/31/2005 U 32,527,50 32 527,50 WL01000001 LOADERWHEEL907H 8/3/2017 U 31,250,00 28,125.00 3 125,00 , WL0=000 LOADER WHEEL 9081-12 8/9/2017 U 20,279,37 18,251,43 2,027,94 WLO1000o03 LOAOERWHEEL907M 4/19/2018 U 33,481.17 20,088.64 13,392,53 WL03000001 LOADER WHEEL 938K 8/1/2016 N 30,923.16 11,905.44 19,017.72 WL03000002 LOADER WHEEL938K 8/1/2016 N 103,895,57 68 5 71,04 35 324.53 WL03oo0003 LOADER WHEEL 938K 12/27/2017 N 107,013,24 70,628,80 36,384,44 WL03000004 LOADERNIHEEL938K 12/27/2017 N 119,456.87 50,171.80 69,285,07 WL03000005 LOADER WHEEL938K 12/27/2017 N 119,501,92 50,190.84 69,311.08 WLo9d00o06 LOADERWHEEL938K 12/27/2017 N 119,466;10 50,175,72 69 ,290,38 WL03000007 LOADERWHEEL938K 12/27/2017 N 119,416.68 50,155.00 69,261,fi8 WL03000012 LOADER WHEEL 938M 4/19/2018 U 130,137.16 54,657.68 75479,48 WL04000001 LOADERWHEEL950K 12/15 2017 / N 22,984:14. 7,354.92 15,629,22 WL04o000o2.LOADERWHEEL950K 12/17/2018 N 93,917,45 56,350,56 37,566,89 • WL05000001 LOADER WHEEL962G 6/20/2005 N 124,662,36 40,798,56 $3 ,863,80 WL05000002 LOADERWHEEL962H 4/28/2006 N 210,996.18 189,896,56 21,09.62 WLOSo00003 LOADERWHEEL962H 4/2812006 N 231,897,26 206,707.53 23189.73 WL06000001 LOADER WHEEL WA480-5 7/1/2016 U 243,416,28 219,074.65 24� ,341.63 WL07000001 LOADER WHEEL972K 8/1/2016 N 30 000.00 ' 27 000 00 + 3,000,00 WL07=002 LOADERWHEE1.9721( 12/15/2017 N 170,569,37 112,575.76 57,993,61 WL0700o003 LOADER WHEEL 95ZV-2 12/15/2017 N 122,740,10 73,644.08 49 096,02 WLo7aooao4 LOADER WHEEL 972K 3/Z4/2o14 N 119,790,73 55,902.28 fi3 '888.45 WL07000005 LOADER WHEEL CAT 972K 3 6 2020 U 170 072,76 ' 55 660,12 114,412.64 WL07000006 2014 CATERPILLAR 972M WHEEL LOADER 9/19/2019 U 148 400.00 , 2 782.50 , 145,617,50 WL07o00a7 LOADER WHEEL 972M XE 7/1/2016 N 163,686,31 12,276.48 151'409,83 WL07000OOS LOADER WHEEL 972M XE 711/2016 N 413,130.21 177,424.84 235 ,705,37 WL07000009 LOADER WHEEL 972M XE 811/2016 N 413,130,21 177,424.84 235,705,37 WL07000010 LOADER WHEEL 972M XE 409,269.18 168,823,60 240,445,58 VvL07aaw12 LOADER WHEEL WA50o-7 7/1/2016 U 409,269.18 168 823,60 240 ,445,58 WL07000013 LOADER WHEEL WA500-7 7/1/2016 U 220 000,00 186 450,00 33,550.00 WL08000001 LOADER WNEEL980H REBUILD ( 4J2sjZdo6 N 425,000,00 208,392.86 27.6,607,14 WL080000a2 LOADER WHEEL98OH REBUILD 5/2/2006 N 404,867.00 364,380,30 40 ,486,70 ,W1.08 -00b003 LOADER WHEELBSOH REBUILD 5/3/2006 N 397,828,60 358,045,74 39 ,782.86 WL68000004 LOADER WHEEL980H REBUILD 4/15/2008 N 401,426.24 361,283,62 40,142.62 WL0800005 LOADER WHEEL 980H REBUILD 3/3112009 N 472,743.80 440,968,19 31,775,31 WLO8060006 LOADER WHEEL 980H 4/291-2009 338,664.78 312,859,41 25 805,37 / W0800007 LOADERWHEEL9sOH 3/5/2010 N N 74,759,48 74,759,48 WL08000008 LOADER WHEEL 980H REBUILD 11/41201.6 N ia8,264,95 109126495 WL08000009 LOADER WHEEL980H 11/4/2016 N 37,188,80 331209,51 39. ' 7929 WL08000010 LOAOERWHEEL980H 11/412016 N 37 188,80 ' 33 20960 , 3,979,20 WL08000012 LOADERWHEEL980M 4/27/2016 U 37,188.80 33,246,79 3,942,01 WL08000013 LOADERWHEEL980M N 398,851.87 239,311,20 159,540,fi7 WL09000001 LOADER WHEEL982M .412812016 4/27/2016 U 465,7x2,52 209,566.08 256,136.44 WL09000002 LOADER WHEEL 982M 4/28/2016 N 486,726,48 292,035,84 194 ,690,64 WL10000001 LOADER WHEEL 9836 11/19/2014 N 535 252,52 240,963,s2 294,389 00 WL1000o002 LOADER WHEEL 10 CY 986H 1/1/2019 U 117,500,00 105,750,00 11,750,00 WRKT100001 HAMMER VISR EXTRACTOR 17hl�nn U 118,414.87 26,643,30 91 ,771,57 WRKT1000o2 BREAKER DIESEL2f10/z004 _-,..,�,...4 N .i^.073 46 3u i]c nc 4,237,ou WRKT100003 BREAKER DIESEL 2/1012004 N 3-'9,432.00 35 '488.80 3,943,20 WRKT100004 BREAKER LEADS � 2/10/2004 N 75,101.00 67 '590,90 7,510,10 WRKT130001 ATTACHMENT PAN SCRAPER 711/2016 U 17,172.00 15 454.80 2,287,20 WRKT140001 ATTACHMENTSCREED WEDGELOC 919/1397 N 15,000,00 12,712.50 WRKT14,P02 MATERIAL REFERENCE SKI 9/1OJ2003 N 37,129,92 • 33 416.93 6223.35 3'287,50 ,712.99 WRKT16001 SPREADER BOX 10/812001 N 6 914.84 691.49 WRKTi6a0a2 SPREADER BOX 21,108.62 18,997,76 2,110,86 WRKT4a0001 ATTACHMENT BROOM 1231001997 N 34,144.72 30 730,24 3 ,414,48 WRKT7d0o01 ATTACHMENT DISK 10/30/1975 N 16 296,89 ' 14, 667,20 , 1,629,69 WRKT700002 ATTACHMENT DISk 4/23/1999 U 5,524.56 5,094.96 • 429,60 WX1900000i EXCAVATOR WHEEL M318F 4/30/2018 U 3,559,81 3,203,83 355,98 WX19000003 2018 CATERPILLAR M317F CR WHEELED EXCAVATOR 8130/2019 N 110,357,56 34,210.85 76,146,71 WX20000001 EXCAVATOR WHEEL M320F 4/30/2018 U 18,000,00 4,000.00 14,000,00 WX22000001 EXCAVATOR WHEEL M322F 4/30/2018 U 106,436.62 32,995,42 73,441.20 APT0000002 PAVER BOX 4/10/2007 N 122,847.48 38,082.65 84,764,83 ATT7186 i ATTACHMENT SCREED W/6800 4/30/2018 N 118,167.00 118,167,00 ATT7676 ATTACHMENTSOINT HEATER 3/2612008 N 62,947.00 62,947,00 _ ATT7727 ATTACHMENTPAVERAUTO 11/13%2013 N 37,240.98 37,240,98 . AMS72 ATTACHMENT PAVER AUTO W/ia 121312015 N 25,964.70 25,964.70 . ATI -7946 ATTACHMENT PAVER AUTO W/79 1119/2018 N 20,156,00 20,156,00 BKTIO00003 ATTACHMENTBUCKEf 5/16/2005 N 33,893,50 33,893,50 BKT1000004 ATTACHMENT BUCKET 5/18/2006 N 9,574.45 8,617.00 957,45 CWKT100002 ATTACHMENTTIE BAR INSERTS 3/25/2010 N 5,136,76 4,623.09 513,67 CWKTi00003 ATTACHMENTTIE BAR INSERTS 4/22/2010 N 21,000,00 21,000,00 . CWKT200001 PAVING PACKAGE 4/22/2005 N 21,205,90 21,205,90 . CWKT600005 MOLD SIDEWALK 4 5 AND 6 FT 6/14/2006 N 12,402,68 11,162.41 i '240'27 CWKT600006 ATTACHMENT MEDIAN MOLD 8/1612006 N 20,070,80 18,063,72 2,007.08 12,960,10 11,807,10 1,153,00 Rieth-Riley Construction Co,, Inc. Equipment List 3/31/2020 Asset # Description Acquired New or CWKT800oo1 ATTACHMENT 24 FTSKEW W/67 Acquisition Date 6/20/2006 Used Cast Accum Depr CWKT900001 ATTACHMENTTINING SYSTEM 3/25/2010 N N 19,159.00 17,243.10NBV 1,915,90 PH00000009 HEATER ASPHALT 5/1/2016 N 12,918.40 12,918.40 _ WRKT400b07 ATTACHMENT BROOM 3/31/2005 U 18,746.40 18,355,85 390.55 WRKT600001 ATTACHMENT CONVEYOR C-3 40 7/3/2011 N 5,575,00 5,017.50 557.50 WRKT800001 ATTACHMENT GRABBLER 1/29/2008 U 51,500,00 46350.00. 5150,00 BLD16942 TRANSFORMER & METER 6/21/2002 N 3,5d0,00 ' 3150.00 350,00 BLDI7133 PUMPACUNLOADING 5/15/2004 N 45,599,83 45,599.83 BLO17036 ELECTRICALBUILDINGUPGRADE 4/1/2003 N 6,194.48 6,194.48 _ BL514179 TANK ASPHALT • 3/1/2012 N 3,980,04 5,980.00 _ BLS16858 PLANTSET UP 327 60% 11/9/2001 U 16 834,55 18 834.55 _ ELS16947 INSULATION HOT OILLINES 10/9/2002 N 63,591.67 63,501,q7 1.67 _ BLS17024. RACK TRUCK SPRAY DOWN 4/1/2004 N 11,830,00 11,830,00 -' BL517059 RACK TRUCK SPRAY DOWN 7,016.48 7,016,48 _ BLS17065 SAFETY CATWALK & STAIRS 8/27/2003 U 3!850.71 3,850.71 _ BLS17120 LADDERS & PLATFORMS SAFETY 4/1/2004 N 790000 ,. 7,900.00 _ BLS17158 INSULATION HOT OIL LINES 8/19/2004 N 41,432.63 41,432.63 _9,600,00 BLS17293 INSULATION HOT .OIL LINES 811/2005 N BL517445 RACK TRUCK SPRAY DOWN 6/1/2018 N 4,800.60 4,800.0a _ BLS17603 LIQUID ACTRANSFERSYSTEM 5/19/2007 U 4,459,02 4,459.02 _ BLS17604 LIQUID ACTRANSFER SET UP 5/19/2007. N 151,676.51 - 151,676.51 _ BLS17621 RACKTRUCKSPRAYDOWN 5/14/2001 N 284,655,59 284,655.59 _ BL517725 RACK TRUCK SPRAY DOWN 5/3/2008 N 20,108,76 20,108.76 _ DRAG000001 1978 BUCYRUS-ERIE 88-B HD DRAGLINE 5/1/2019 N 9,304,65 9,304.65 _ GEN0000006 GENERATOR 4/20/1998 N 119,063,52 21,828,29 97 235.23 GEN0000d07 GENERAYOR 412011998 N 85,012.20 76,511.20 8,501.00 GEN0000009 GENERATOR 8/22/2000 U 30,395,68 27,355.68 3,040.00 GEN0000010 GENERATOR 6116/2003 U 5,375.08 5,375,08 _ GEN0000011 GENERATOR. 4/1/2008 U 55,759.45 55,759,45 _ GENOO00014 GENERATOR 750 KW 3/7/2016 U 139,002.47 139,002,47 _ GENOOOOaiS GENERATOR5ET825KW 4/1/2017 U 52,000.00 52,000,00 GEN0000016 GENERATOR SET 125KW 411/2017 U 85,162.67 51,097.68 34,064.99 GEN9000017 GENERATORNIGHT56KW 7/1/2018 N 26,263.07 15,757.92 10,505,15 GEN0090a18 GENERATOR NIGHT 7/1/2018 N 31,992,94 3,732,54 28,260.40 GEN0000023 GENERATOR 3/31/Z005 U 26,024.97 2,014.52 24,010.45 GEN0000025 -GENERATOR SET 455KW. • � 7/1/2016 U 8 000,00 � 7 200.00 800,00 GENQ000026 GENERATOR SET-250KW 250KW 7/1/2016 U 26,OOa,00 4,976.94 21,023.06 GEN0000027 GENERATOR SET 225 KW 7/1/2016 U 10,000,00 191430 , . 8085,70 GEN0000028 ' GENERATOR SET 100 KW 24,000.00 9,398.56 14,601,44 GNT0000001 TRAILER GENERATOR 9/21/1999 U 8,000,00 1,531.26 6,468.74 GNT0000004 TRAILER GENERATOR 3/31/2005 U4,666.41 46,664.07 41,997,66 GNT0000005 TRAILER GENERATOR 3/31/2005 U 493,96 444,56 49.40 GNT0600006 TRAILER GENERATOR 3/31/2005 U21.20 212,00 190,80 LAN14549 WASTE RECOVERY SYSTEM B/22/198253.00 N 530.00 477.00 PAB0000001 CONTROLS PLANT/BLENDING 7/3012018 N 116,299.13 104,669.22 11,629.91 PAB0000002 AUTO CONTROL 12/14/2010 U 94 206,67 15 786.04 78,420.63 PASOC00003 CONTROL HOUSE 7/21/2007 N 108,379;81 108,379.81 PABO000004 AUTO CONTROL 4/1/2000 N 87,532,03 63 63,242.31 24,289.72 PAB0000006 AUTO CONTROL & HOUSE 0131 7Oi2 U.]9.O13J.aZ•J 25 901.28 23 311,15 2,590,13 PA80000007 AUTO CONTROL & HOUSE 3/3/2012 U 4I Q7 11,: - 51,915.24 PA80000008 AUTO CONTROL 4/1/1992 N 79 355 00 ,, 38+090,76 41,264.24 PA80000009 AUTO CONTROL 10/1/2006 N 38,107.56 34,296,70 3,810.86 PA130000010 AUTO CONTROL 4/1/2009 N 15,680.01 15,680.01 PAB0000011 CONTROLS BURNER 412 3119 8 5 N 46,978.67. 46,978,67 PAB0000012 CONTROLS PLANT/BLENDING 4/1/2015 N 4,757.50 4,281.75 475,75 PABOOOOO13 AUTO CONTROL 6/1/1992 N 114,454.08 57,226,92 57,227,16 PABOOOOO14 CONTROLS PLANT/BLENDING 4/1f2017 N 26,807,06 26,807,06 PA80000015 CONTROLS BURNER 375,659.91. 112,698,00 262,961.91 PAB0000016' AUTO CONTROL & HOUSE 4/28/2008 N 23,966.78 7,189,92 16,776.86 PAB0000019 AUTOCONTROL 12/8811995 N 125,736,69 12S,73fi,69' _ PABOGOOD20 AUTO CONTROL & HOUSE 4/1/2006 U 11,484.93 11 48 _ PABO 00021 AUTO CONTROL 3/16/2009 U 95,245,00 75564,93 124 19,683.76 PA80000022 AUTO CONTROL 4/4/1989 N 31,000,00 23�a , 17.92 7,982.08 PAB0000022 AUTO CONTROL BLENDING SYST 2/16/2013 N 22,897.87 20,608,08 2,288 79 PAB0000024 AUTO CONTROL 4/1/2000 N 41,948.18 30 06 3.02 11885,16 PAB0000025 CONTROLS PLANT/BLENDING 4/3012017. N 24,364.65 21,928,18 2,43G,47 PABOG00026 CONTROLS BURNER 4/30/2017 N 418,569,57 122,518,76 29fi PA80000027 CONTROLS PLANT/BLENDING 4/3012017 N 23 836.78 6977 24 16+050,81 ,859,54 PABOO00028 CONTROLS PLANT/BLENDING 413012017 N 367431.69 107550.35 259,881,34 PAB0000029 CONTROLS PLANTIBLENDING 4/1/2018 N 380370,65 + 111337,72 ' 269'032.93 PABOCO0030 CONTROLBURNER 3/3112005 N 364.25 ,272.88 PAB0000032 CONTROL 3/31/2005 U 13157.22 , 11,183.6437,091,37 1,973,58 PABOO00033 CONTROLS PLANT/BLENDING 4/30/2017 N 10 000,00 8,300,00 1,503,00 PAB0000034 AUTO CONTROL, 4/1/2000 N 44,243,93 1950,58 32'393,35 PAB0000035 CONTROLS PLANT/BLENDING' 4/1/2018 N 23 601,20 21241,08 ' ,363,12 PASCOGO036 AUTO CONTROL 5/2/1998 N 42,216.17 8,443,20 33,772.97 PAB0000040 AUTO CONTROL UPGRADE 7/26/2010 N 31,725,53 28,552,98 3,172,55 38,593.73 37,628,85 964.88 Rieth-Riley Construction Co., Inc. Equipment List 3/31/2020 Acquired New or Asset It Description Acquisition Date Used Cost Accum Depr PAB0000042 AUTO CONTROL UPGRADE 6/30/2001 N 39,943,24 39,943,24 NEIV PAB0000043 AUTO CONTROL UPGRADE 5/31/2005 N 37,598.66 37,598,66 PASOCCOU44 AUTO CONTROL UPGRADE 4/3/2001 N 22,555,32 20,299,79 PAB0000045 AUTO CONTROL UPGRADE 5/2/2009 N 12,412,37 12,413,37 2 ,255,53 PABa20ao46 CONTROLPCUPGRADE 5/2/2215 N 31,000,00 30,523,08 PAB0000047 AUTO CONTROL UPGRADE 4/22/2000 N 88,365,94 43,529,34 476.92 PAB0000048 AUTO CONTROL UPGRADE 4/1/2002 N 34,837,50 34,837,50 4,836,60 PA0000001 HOPPER W/PLAT.E FEEDER 7/1/2016 U 4,000.00 765,86 PAC0000002 HOPPERAGGR 4,Oa0,00 765,86 3,234.14 PAC0000003 CRUSHER CONE 4.25 4/1/2016 N 141601.35 28,320.36 3 ,234.14 PA00066004 CRUSHER AGGREGATE3/24/2007' U 2fi5,348.42 173,882.22 113,280,99 PAC00o0005 CRUSHER 3/31/2205 U 10 ,000.00 9,000:00 91,766.20 1,000.00 PAC0000006 CRUSHERJAW 7/1/2016 U 78,020,00 14,931.16 PAC0000007 CRUSFIERCONE 3/31/2005 U 20,000.00 18,000,00 63;068,84 PAC00000a8 CRUSHER CONE 4/18/2008 U 19a,000.00 114,000,36 2000.00 PAC0006009 CRUSHER CONE 3/31/2005 U 149,763,00 • 134,786,70 75,999,64 PAC0000010 CRUSHER - 51,848.10 14,976,30 PAC0o00011 CRUSHER AGGREGATE 4/1/2/0065 U 268,403.01 187,882,44 5,760.90 PAC0060013 CRUSHER 3/31/2005 U 252 930,00 � 227,637,(10 80520,57. PAC2aa2a13 CRUSHER CONE 7/1/2016 U 295,000.00 56,470.54 25, ,293,D0 PA[�000014 CRUSHER CONE 7/1/2016 U 45,000.00 8,614.08 -238 529,46 PAC0000015 CRUSHER JAW WIFEEDER 5/31/2018 U 590 323,22 ' 67 887,26 361 .385.92 PACOCOOO17 PLANTCON 7/1/2216 U 305000,00 � 58,384,50 522,435,96 PAC0000017 PLANT COME 7/1/2016 U 240,000,00 47,527,04 246fi 15,50• PAc(1(102219 cRUSHERSYSTEM' 6/24/1998 N 11,542.22 10,388,54 192,472.96 PAPG000003 OBILE RAILCAR MOVER 7/3/2000 N 202,858.03 183 030.46 ].,154.28 MAPNETRACK PAP0000003 MAGNET 24"" 5117/2009' N6,494.69 726.48 19,827,57 PAPO2q(1004 MAGNET42 INCH SELF CLEANI 11/9/2007 U 10,500,00 101s22 as 1768,21 PAP0000005 CYCLONE (2) 7/1/2016 U 3,000,00 1574,28 PAS000OUO2 PLANTSCREENING 2/4/2003 U 88,300,00 79,470,Oo 2,425.72. PASO000003 PLANTSCREENING 4/1/2006 U 40,a00,0a 36,000,00 8,830,(10 PASOW0004 SCREENER PLANT 2/22/2017 N 250 58420 ' 25,058,34 q ap 0,00 PA5o000005 pLANTSCREENING 2/4/2023 N 33,320.00 29,970,00 225,525,65 PA50000006 PLANTSCREEN 7/112016 U 15,000,00 2,871.40 3 330,00 PAS0000007, PLANTSCREENING - 3/31/2005 U 44,OOa.ao 39,600.00 12,128,60 PAs0000008 PLANTAGGR 7/1/2016 U 85,aaa.00 16,271,30 4,400,00 68728,70 PASO000009 PLANT RIP RAP 54X24 •5/9/2017 U 245,600,00 53,593,75 PAs000012 PLANTTRACK SCREEN 7/1/2016 U 125,a00,00 23,9z8,Ofi 191,406.25 P13,0000001 BUCKET ELEVATOR 3/3/2012 U 5,621,00 2,698,44 1(11,071.94 PBEdO(10002 ELEVATOR BUCKET MODIFICATI 7/30/2015 N 15,838,12 15,046,17 2,922.56 POF0000001 FEEDER BELT RAW ,3131/2005 U 9,500.00 8,550.00 791.95 P8F0000003 CONVEYOR BELT 2/17/1978 N 12,456,00 10,456,00 950.00 PBH000aao1 BAGHOUSE 3131/2005 U 80,000.00 72,000.00 PSH0000002 BAGHOUSE 12/14/2010 U 142,984.12, 142,984,12 8,000,00 POHOO00003 BAGHOUSE 414/1989 N 98,994.68 89,095,21 9,899,47 PSHOO00004 BAGHOUSE 4/4/2003 N 471,713,50 424,542.15 47,171.35 PBHOOOGO05 AIR DUST SYSTEM 3/3/2012 U 99,835,00 47,921,1647,17i.35 PBH0000006 AIR OUSTSYSTEM 3/3/2012 U 132,260,00 fi3,484.80 68,775,20 PBHa000007 BAGHOUSE P91-10000008 BAGHOUSE 7!:1,/7007 4/18/2009 N U 3515_ 2 ,.+�a.�-r 535,322,15 261,250.44 535,320,15 100341,80 , PSHOOO0009 BAGHOUSE 76718 CFM 4/1/2016 N 591,379,43 ' 236,551,68 P61-10000010 BAGHOUSE 613/2010 N 514,243.71 94,277.92 354,827,75 419,965,79 PBH0000011 BAGHOUSE 3/28/2014 N 99,232,12 85,669,44 13,562.68 PBH0000012 BAGHOUSE 4/1/1992 N 58,939,35 58,93935 PBHOOOOO13 BAGHOUSE 6/30/2001 N 53,525,00 53,525,00 PBHOOOOD14 DUSTCOLLEC.TOR C & W MODEL 6/14/1989 N 47,405,00 47,405,00 PBH0000015 DUST COLLECTION SYSTEM 7/2911995 U 10,000,00 9,000,00 i PBH000o016 BAGHOUSE 5/3/2014 N 3i1,286,37 111,908,64 100 ,00 199,377,73 PBHOO00017 BAGHOUSE 3/16/2009 U 620,000,00 409,200,00 210 800,00 PBH0000218 BAGHOUSE 4/23/1999 U 159,893,40 143,904,06 I 15,989,34 PBH0000019 BAGHOUSE 7/1/1987 N 263,021.11 236,719,00 26,302,11 PSH0000020 BAGHOUSE 3/16/2009 U 354,000,00 233,640.00 120,360,00 PSH0000021 DUST RECOVERY SYSTEM 7/27/1983 N 165,100,00 148,590,00 ifi,510,00 PBHO000022 BAGHOUSE i 3/31/2005 U 144,430,00 122,765,50 21,664.50 PBHO000023 BAGHOUSE 3/31/2005 U 59,780,00 53,802,00 5,978,00 PBH0000024 BAGHOUSE 4128/2005 U 209,942.69 209,942,69 PBH0000025 AIR DUSTSYSTEM 5/1311993 N 194,073,06 174,665,76 19,407,30 PSHOO00029 STACK EXTENSION 60-42 8/4/2018 N 29,854.98 29,854,98 PSHOO00030 BAGHOUSE UPGRADE 313i/1994 N 16,972,75 15,275,48 1,697,27 PBH0000031 AUGER DUST 5/11/2013 N 33,447.67 23,134,59 10313,08 PBHOO00032 KNOCK OUT BOX W/DUCTWORK 4/1/2016 N 65,985.95 26,394,24 PBH0000033 AIR SYSTEM UPGRADE 4/15/1996 N 129,485,79 116,987,64 391591,71 PBHa0a0034 EXHAUST STACK FAN 41112006 U 25 202,00 12 916,58 12,498,15 PBH0000035 EXHAUST FAN INSTALLW/DUCT' 411/2015 N 42,869,22 21,434,52 12 oa 342 PBH0000036 EHAUST FAN 4/1/2015 N 137,179,56 68,589,72 21/43472 / P8H0000037 STACK 411/2015 N 20,140,67 10,070,40 68,589,84 10,070,27 PSH0000038 CYCLONE 312812014 N 33,425.02 28,879.20 4,545,82 Rietb-Riley Construction Cc,, Inc. Equipment List 3/31/2020 Acquired New or AsseE B Description PBH0000039 EXHAUST FAN ASSEMBLY Acquisition Date Used Cost Accum r De NOV PSH0000040 BAGHOU5E DUCTWORK 4/30/2017 4/19/2403 N N .43 146.15 12,629.25 30,516,90 PSHea06041. EXHAusTSTACK EXTENSfON 4/24/2004 N 45,744,12 45,744.12 PBHO42 STACK 4/30/1994 N 6,710,04 s,710,e4 PBH0OD00000043 STACK EXTENSION 5/26/2007 N 22135,41 19 921.87 2+213,54 PEH000O044 EXHAU5TSTACK FAN 8/11/2001 N 38,652.63 38,652.63 PBH0000051 BAGHOUSE 11/28/2019 N 42,385,21 38,146,68 4,238,53 PBH0000053 BAGHOUSE N 726,35fi,93 66,582.67 659,774.2611/2/2018 PBHOaa0055 BAGHOUSE 12/14/2018 N 796,030,73 789,105.08 66,335,90 729 PBSOODO004 SCALE BELTAGGRREGATE . 4/1/2010 N 65,758.80 723'694,83 ,346,28 PBSO000006 CONVEYOR SCALE COLD FEED 3/16/2009 U .17,401.07 17,401,07 'PBS0000007 CONVEYOR SCALE RECYCLE 3/1fi/2009 U 25,500,00 16,830,00 g .11670,00 P850000008 SCALE BELT 4/26/2003 N 35000,00 , 23,100,00 +900.00 PBS0000009 CONVEYOR SCALE COLD FEED 3/16/2009 U 23,963.04 23,963.04 PBSo000010 CONVEYOR SCALE RECYCLE 3/1622009 U 25,500,00 16,830,00 8,670,00 P1350000011 CONVEYOR'SCALE COLD FEED 3/16/2009 U 35,000,00 23,100,00 11,900.00 POSO000012 CONVEYOR SCALE RECYCLE 3/16/2009 U 19,500.00 12,870.00 6,630.00 P850000013 CONVEYORAGGSCALE 7/27/1983 N 29,000,00 19,140,00 9,860,00 PBS0000014 SCALE BELTAGGRREGATE 11/i/2003 N 26,320.75 21,688,67 4,63208 POS0000015 SCALE BELT RECYCLE 5/14/2007 • N 13,473.36 13,473,36 PBSO406016' SCALE BELTAGGRREGATE 13,186.81 13,186,81 PBSOOOa117 SCALE BELTAGGRREGATE 5/6/2006 N 7,808,49 .7,244.46 PBS0000019 CONVEYOR SCALE 3/3112005 U 8,737.49 8,106,30.564.03 631,19 Pssaaaa020 SCALE BELTAGGRREGATE 5/6/2006 N 535000 ,. 4,815.00 535,00 PBS0000021 BELTSAMFLER N 8,396,02 7,789,24 506,75 PBS0000022 BELTSCALES .10/16/2004 5/18/2002 N 14,216.42 14,216.42 FCA0060001 CONVEYORSTACKER 2/2272017 N 24,032.46 24,032:46 PCA0d00012 CONVEYOR 4/1/2009 U 132,500.00 13,249,98 119251,02 , PCA0000014 CONVEYOR 42"" X 2800' 7/1/2016 U 3,500,00 3,500,00 _ PCA0000015 CONVEYOR CHANNEL FRAME 7/1/2016 U 450,000,00 86,141.28 363 ,858,72 PCA0000616 CONVEYOR 27,000.00 5,168.52 21,831.48 PCA0000018 CONVEYOR 5/1s/1980 N S 000.00 956,98 4,043,02 PCA90010ai9 CONVEYOR UNLOADING 12/11/1987 N 57,097,35 57,097,35 PCA0000020 WEIGH BRIDGE 5/20/2000 N 21717.03 19 ,54.9.33 2,171.70 PCA0000024 CONVEYORSYSTEM 6/2 4/1998 N 13,413,59 12,072 23 PCA0000025 WEIGH 8RIDGE 7/22/2000 N 174,246,74 156 ,1322.07 17+341,36 ,424.fi7 PCA0000026 CONVEYOR (2) 5/30/2002 N 8,743.75 7,869,39 874.36 PCA0000027 CONVEYOR SAND SCREW 6/3/2002 N 93 667.49 84;300,74 9+966,75 PCA0000028 CONVEYOR SYSTEM LATTICE 12/2912006 U 81,069,44 81,599,94 PCA000003a CONVEYOR. 3/31/2005 U 31,312,64 31,312.64 PCA0000032 CONVEYOR 3/31/2005 U 8 410,00 7 569,00 841.00 PCA0000534 CONVEYOR 3/31/2005 U 8100',00 7,+ 290 00 810,00 PCA0000035 CONVEYOR 3/31%2005 U 9,600,00 8,640,00 960,00 PCA0000039 CONVEYOR 20,000.00 18 000,00 + 2,000,00 PCA0000040 CONVEYOR TRI PACK 51112010. N 194,103.67 120 761.18 79 PCA0000041 CONVEYOR SLIDE -PAC 36 X 81 7/30/2018 N 106450,00 70J8b9,60 35+342.49 ,580,40 PCA0000042 CONVEYOR RAW AGGRREGATE 3/31/2005 U 132,316.92 14,753,40 117,563,52 PCA00a0a43 CONVEYOR 3/31/2005 U 4,800.00 4 320 01 480,00 PCA0000045 CONVEYOR RAIN AGGRREGATE , r, r 3131; i; 3,000,00 2,700,00 300,00 PCA000004fi CONVEYOR ,caa.� 3/3112105 U in nnn nn ... ............ 9 ^51,00 3+ 1,000,00 PCA000004CONVEYOR ; 313 112 0 0 5 U 3,365,00 028,50 336,50 PCA0000049 CONVEYOR 3/3112005 U 5,050,00 4,545,00 505,00 PCA0000051 CONVEYOR SLIDE=PAC 36 X 80 7/30/2018 N 3' 385,00 3 046,50 + 338,50 PCA000005 CONVEYOR 3/31/2005 U 132,316,91 14,753,40 117,563,51 3 FCA000005CONVEYOR 3/31/2005 U 7385,00 6,646.50' PCA0000054 CONVEYOR 3131/2005 U 6,760,00 6,084.00 67600 PCA0000055 •CONVEYOR 3/31/2005 U 6,100,00 5,490,00 610,00 PCA0000058 CONVEYOR 3/31/2005 U 17,615,00 15,853,50 1761,50 PCA16aaa64 CONVEYOR 6/1/2009 N 39,485,00 35,536,50 3� ,948,50 PCA0000069 CONVEYOR CHANNEL FRAME 18,000,00 10,531,26 PCA0000670 CONVEYOR 7/J1/2016 U 8'150'01 1,531.2fi 6,468,74 PCA0000071 CONVEYOR 7/1/2016 U 30 a00,06 S,742.8(3 24,257,20 PCACOCCO72 CONVEYOR 20,000,00 3,828,38 1fi,171,62 PCA0000073 CONVEYOR FEEDING 7/1/2016 U 5,000,00 956.98 4,a43,02 PCA0006074 CONVEYOR LATTICE FRAME 7/1/2016 U 6,050.00 1,148,56 4 851,44 PCA0000075 CONVEYOR A FRAME 7/1/2016 ' U 8,000,00 1,531.26 6468.74 PCAGO00076 CONVEYOR FIELD 7/1/2016 U :L0,000,00 1,914.30 8�0 8,,08S30 PcAooao077 CONVEYOR 7/1/2016 Ll 10150.00 1914,30 +765,86 8,085.70 085'70 PCA0000078 FEED 7/1/2816 u 4,010,01 1234,14 CONVEYOR PCA0000079 CONVEYOR FEEDER 8,000,00 1,531.26 6,468,74 PCA0000080 CONVEYOR 7/1/2016 U 15, 2'297,12 PCA0000081 CONVEYOR 7/1/2016 U 000,00 956,98 4,702.88 4,043,02 PCAaa00082 CONVEYOR FEEDER 5,000,00 956,98 4,543,02 PCA0000085 SUPERSTACKER 8/1322/19 N 10,000,00 1,914,30 8 ,085,70 PCB0000000 SATCHINGSY5TEM CONCRETE 4/2/1989 N 256 800,00 11413,36 245 386,64 PCB0000001 BATCHING SYSTEM 4/12/1996 N 69,839,54 69,839,54 PCCOOO0001 CONVEYOR 3131/2005 U 169,615.77 169,615,77 1,680,00 972,01 108,01 Rieth-Riley Construction Co., Inc. Equipment list 3/31/2020 Acquired New or Asset p Description Acquisition Date q Used Cost Accum Depr NBV PCCOOG0002 CONVEYOR 3/31/2005 U 19,750.00 17,775.00 19 75.00 PCCOOO0003 CONVEYOR RECYCLE 3/31/2005 U 16,700.00 15,030.00 1670.00 PCCOCO0004 CONVEYOR COLD FEED 4/1/2009 N 52,811.50 52,811.50 PCCOOO0005 CONVEYOR 3/29/1980 N 14,350.00 12,915,00 1 PCC0000006 CONVEYOR RECYCLE 6122/1991 N 19,487.37 17,538.63 ,435,00 1948.74 PCC00(10007 CONVEYOR FEED BIN 6/1/1992 N 32,569.95 32,569.95 t PCC0000008 CONVEYOR VIRGIN AGGREGATE 2/25/2000 N 65,626.64 57,423.31 PCCOOC0009 CONVEYOR 11/3/1966 N 10,892;80 10,892.80 8,203.33. PCC0000010 CONVEYOR , 11/3/1966 N 10,892.80 10,892.80 PCC0000011 .CONVEYOR 11/3/1966 N 10,892.80 10;892.80 PCCOOOOO12 CONVEYOR RECYCLE 9/30/1982 N 22,62fi•84 22,626.84 PCCOb00013 CONVEYOR 3/29/1972 N 13,469.58 13,469,58 PCCOO00014 CONVEYOR AGGR FEED 7/29/1995 U 10,000.00 9,000.00 1000U PCc(1aaaoi5 CONVEYOR SAND FEED 7/29/1995 10,000.00 9,000.00 .00 1,000,00 PCCa0(10016 CONVEYOR FEED BIN 2/4/2003 U 5,300,00 4,770.00 PCC0000017 CONVEYOR COLLECTING 3/16/2009 U 15,500.00 10,230.00 530.00 PCC0000018 CONVEYOR COLLECTING 3/].612009 U 15,500.00 10,230,005j270.00 5,270.00 PCC(1000019 CONVEYOR 3/16/2009 U 20,000.00 13,200.00 6,800,a0 PCC0000021 CONVEYOR COLLECTING 3/16/2009 U 7,750,00 5,115.00 ' ,• PCCO000022 CONVEYOR COLLECTING 3/16/2009 U 7,750.00 5,115.00 2,635.00 2635.00 PCC0000023 CONVEYOR COLLECTING 3/1612009. U 5,250.00 3,465.00 PCCaabOO24 CONVEYOR COLLECTING 3/16/2009 U 5,250.00 3,465.00 1,785X0 PCC0000025 CONVEYOR COLD FEED 3/31/2005 U 83,500.00 70,975.00 1785.00 PCC0000028 CONVEYOR 3/31/2005 U 15,285.00 13,756,50 12,525.00 1526.50 PCCbbOOO29 CONVEYOR RECYCLE 3/31/2005 U 28,750.00 25,875.00 2 875,00 PCC0000030 CONVEYOR VIRGIN AGGREGATE 9/21/1999 U 21,929.26 19,736.34 PCD0000001 DRUM MIXER CONCRETE 7/3/2011 N 150,213.00 131,436.66 2192.92 PCDCOGO002 PLANTCONCRETE 11/3/1966 N 122,199.00 122,199.00 18,776.34 PCD0000003 PLANTCONCRETE 5/8/1972 N 145,605.21 145,605.21 PCD0000004 PLANTCONCRETE REX MODEL 5 7/29/1995 U 40,000.00 36,000.00 4,000.00 PCDOOooao5 MIXER CONE 4/17/2004 N 46,094.66 46,094.s6 PCF0000001 BIN VIRGIN AGGREGATE 12/21/2009 N • 57,247.09 41,360.73 15 886.36 PCF0000002. BIN VIRGIN AGGREGATE 12/21/2009 N 57,247.10 41,360.73 1588fi.37 PCF0000003. BIN COLD.FEED (6) 12/14/2010 U 111,638,24 111,638,24 I PCFUO00004 BIN COLD FEED 4/1/1996 N 42,588.74 B8,329.87- 258.87 PCFOOa0'005 BIN COLD FEED 5/2/1998 N 33 230.37 29,907.33 3 323,04 PCF0000006 BIN AGGREGATE 4/1/1985 N 15,502.27 13,952.04 1,550.23 PCFOOC0007 BIN AGGREGATE 4/1/1985 N 15,502.27 13,952.04 1,550.23 PCFCCOOG08 BIN COLD FEED;SYSTEM 7/1/1987 N 110,103,73 99,093,36 11010.37 PCF0000009 BIN COLD FEED 41411989 N 35,409.06 31,868,15 3,540.91 PCF000010 BIN COLD FEED 5/6/1995 N 34,992.82 31,493,54 3,499.28 PCF0000011 BIN COLD FEED (6) 3/3/2012 U 93,180.00 44,726,40 48 453.6(1 PCF0000012 BIN COLD FEED (6) 3/3/2012 U 99,195.00 47,613.96 51,581.04 PCF0000013 BIN COLD FEED 14' 411/2018 N 46,221.64 9,244.32 36,977.32 PCFCOOOO14 BIN COLD FEED (4) 7/21/2007 N 279,235.47 201,178.38 78 057.09 PCF00000i5 BIN COLD FEED (6) 4/23/1999 U 102,791.86 92,512.67 10279.19 PCF0000016 BIN COLD FEED 7/31/1982 N 41,583.98 37,425,58 ` 4,158,40 PCFa000017 BIN COLD FEED SYSTEM orEarr.00i8 6/24/1998 N 30,233.95 27,210.55 3,023.40 alai COLD FEED SYSTEM 41311997 4/3/1937 n1 1ng 001 �y �„-, ,,,, PCF0000019 BIN COLD FEED 4/4/1989 N ` '-" " 3,184.29 1219+51"'" 2,865,86 14,355.78 318,43 PCF0000020 BIN AGGREGATE 4/1/1985 N 12,861.14 11,575.03 1,286.11 PCF0000021 BIN AGGREGATE 4/1/19B5 N 12,861.14 11,575.03 1,286.11 PCF0000022 BIN AGGREGATE 4/1/1985 N 12,861,14 11,575,03 1,286.11 PCF0000023 BIN AGGREGATE 4/1/1985 N 12,861.14 11,575.03 1,286.11 PCF0000024 BIN COLD FEED 411511996 N 43,689.95 39,32b,95 4,369.0a PCF0000025 BIN COLD FEED 5/6/1995 N 34,992.81 31,493,53 3,499,28 PCF000002E BIN COLD FEED (6) 4/1/2007 N. 95,680.59 60,243.34 35,437,25 PCF0000027 BIN COLD FEED (8) 2125/2000 N 115,255.62 99,961.47 15,294.15 FCF0000028 BIN COLD FEED (3) 2/19/2008 N 117,758.67. 117,758.67 PCF0000029 BIN COLD FEED (5) 3/28/2014 N 56,812.43 49,086,00 7,726.43 PCF0000030 BIN AGGREGATE 7/2 911 9 9 5 U 15,000,00 13,500,00 1,500.00 PCF0000031 BIN COLD FEED (6) 4/1/2066 U 81,71o.00 64,823,04 16,886.96 PCF0006032 BIN COLD FEED 4130/2017 N 59,587.50 17,441,76 42,145,74 PCF0000a33 BIN COLD FEED 4/30/2017 'N 59,587.50 17,441..76 42,145.74 PCF0000034 BIN COLD FEED 10 3/15/2009 U 226,100.00 149,226.00 76,874.00 PCF0000035 BIN COLD FEED SYSTEM 3/30/1981 N 60,703.86 54,633.47 6,070,39 PCF0000036 BIN AGGREGATE 4f 1/1985 N 12,861.14 11,575,03 1,286.11 PCF0000037 BIN AGGREGATE 4/1/1985 N 12,861.14 11,575,03 1,286.11 PCF0Oaob38 BIN COLD FEED 4/4/1989 N 23,936.27 21,542.64 2,393.63 PCFOOOGO39 BIN COLD FEED (6) 5/811999 N 238,381.41 214,543,27 23,838,14 PCF0000040 BIN COLD FEED (3) 4/411989 N 109,082.67 98,174.40 10,908.27 PCF0000041 BIN COLD FEED 4/1/1992 N 35,281.94 31,753,74 31528.20 PCF0000042 BIN COLD FEED (10) 3/16/2009 U 141,000.00 93,06o.00 47,940,00 PCF0000043 BIN COLD FEED (4) 9/21/1999 U 72,631.93 65,368.74 7,263,19 PCF0000044 BIN COLD FEED (4) 8/9/2005 U 35,658,48 35,658,48 PCFaaaa045 BIN COLD FEED (9) 3/16/2009 U 136,100,00 89,82640 46,274.00• PCF0000046 BIN COLD FEED 71271083 N 108,433,50 97,590,15 10,843,35 Rieth-Riley Canstruction.Co,, Inc, Equipment List 3/31/2020 Asset 9 Description Is Acquired New or BIN AGGREGATE Acquisition Dafe 6/24/1984 Used Cost Accum Depr Pr NBV PCF0000098 BIN AGGREGATE 6/24/1984 (V N 13,165,70 11,849,13 1,316,57 FCF0000050 BIN AGGREGATE 7/10/1979 N 13,165,69 11,849,12 1,316.57 PCF0000051 BIN COLD FEED 4/1/1992 N 30,0-00.00 21000,00 ' 9 050.00 PCF0000052 BIN COLD FEED 4/1/1992 N 25,780,42 23,202,38 2,578,04 pCF0090053 BIN COLD FEED (4) 5/30/1998 N 25,780.42 23,202,38 2,578,04 PCF0505054 BIN AGGREGATE 6/24/1984 N 110 670,13 90 10,067,01 PCFOOOCO55 BIN AGGREGATE 6/24/1984 N 13,165,70 11,849,13 1,316,57 PCF5000056 BIN COLD FEED8129/1989 13165,70 , 11,849,13 1316,57 PCFa000057 BIN COLD FEED 5/13/1993• N 6,642.14 80,111,27 5,977,93 664.21 PCF0000059 BIN HOPPER 3/31 2005 U 27,100,15 9,011.12 P00000074 STARTING GEAR 5/18/2002 N 45,885,05 19,500,00 17,550,00 1,950,00 PCH0000001 TRAILER CONTROL 3/31/2005 U 45,885,05 PCHOO00002 CONTROL HOUSE 5/2/1992 N 20,200.130 18,180,00' 2,020,00 PCH000o003 CONTROL HOUSE 11/29/2008 U 177,57740 159 '819.30 17,757.70 PCHOO00004 CONTROLHOUSE 2/25/2000 N 3 405,00 , 3 ,405,00 _ PCHaoaa00s TRAILER CONTROL ' 4/2/1990 N 125,645.49 111 ,570,71 14 074.78 PCH0060006 TRAILER CONTROL 4/24/1991 N 15+161,87 _ PCH0000007 PLANT -BASE TRAILER 7/29/.1995 U 15,650,00 ,650,00. _ PCH0000008 PLANT-CEMENTSECrIONTRA 7/29/1995 U 40,000.50 36,1300,09 4,500,00 PCH00000a9 TRAILER CONTROL 7/29/1995 U 30,000.00 27,OOo,00 3,000,60 PCH0500010 CONTROLHOUSE 3/16/2009 U 70,000,00 63,000,00 70aa,0o + PCH0005011 CONTROLHOUSE 10/14/198 10/14/1996 N 85 000,00 ' 56,100,00 28,900,00 PCH00o0013 CONTROLHOUSE U 18,813,60 16,932,24 1881,36 PCH0009514 CONTROLHOUSE 8/9%2005 U 26,600,00 13,200,00 6,800,00 PCHO000615 CONTROLHOUSE 3/16/2009 U 16,682.07 16,682.07 _ PCH6500016 CONTROLHOUSE 7/27/1983 N 20,000.00 13,200,00 6 +800,00 PCH0000017 CONTROLHOUSE 7/27/1983 N 13,350.00 12 0 , 15,00 1,335,00 . PCH0005519 CONTROLHOUSE 9121/1999 U 19,230,75 17,307.67 1,923,08 PCH0000021 TRAILER CONTROL 412/2197 U 44,330,29 39,897,26 4,433.03 PcHa150521 TRAILER CONTROL 9/31/2005 N 21,734.21 21,734.21 _ PCHOOOOOZ3 TRAILER CONTROL •4/18/2006 U 5,000,00 4,500.00 500,00 PCM0000001 [aIVIPRESSORAIR � 3131/2505 U � 19,538,18 18 236,04 ' 1+302.14 PCMCOO0002 COMPREssOR AIR 6/21/2010 N 320,00 288.00 32,00 PCM0000003 COMPRESSOR AIR 3/14/2013 N 11,800,00 11,100,00 PCNL0000004 COMPRESSOR AIR 75 HP 1 28,195,07 28,195,07 _ PCM0000005 COMPRESSOR AIR 411211996 N 28,632 00 8,321.84 20,310,16 PCM0000006 COMPRESSOR 75 HP 4/1/2016 N 8,532.10 8,532,10 _ PCMOCC0007 COMPRESSOR -352 CFM 7/5/2018 27,850,00 22,280,04 5,569.96 PCMGOO0008 COMPRESSOR AIR 75 HP 4/1/2017 IN 25 + 215,00 4,622.74 20,592,26 PGM9000009 COMPRESSOR AIR 4/28/2010 N 26,965,00 8 +08 9,56 18,875.44 PCM0000011 COMPRESSOR 352 CFM 4,040,00 4,040.00 PCMCOOOQ12 COMPRES50RAIR 3 /1 612 0 0 9 U 32,734.59 65 , 46.96 26,187,63 PCM0005014 COMPRESSOR AIR 3/16/2009 U 2,000,00 1320,00 680.00 PCMa000015 COMPREs50RAIR 75HP 4/30/2017 N 1000,00 340.00 PCM0000016 COMPRESSOR AIR 3116/2019 U 27714,37 ' 8,112.17,00 19,602.20 PCM0000019 AIR COMPRESSOR 75 HP 1/1/2019 N 700,00 462,00 238,00 PChi15500020 REGENERATIVE AIR DRYER 7/31/2001 N 32,826,58 4,103.25 28,723,33 PCM0000021 AIR COMPRESSOR ,Ialiniu 8,388.51 7,549.fi5 838.86 PC80000001 CRUSHER SYSTEM 5/15/2004 N 32,032.35 2,936,34 29,096,01 PCR0000002 CRUSHER SYSTEM 6/30/2000 N 119,384.61 119,384.61 PCR0000003 BREAKER RECYCLE 4/30/2019 N 621,392,22 559 253,00 62139,22 PCR0000004 CRUSHER RECYCLE 6/22/1991 N 73,611.29 73+ 6 11,29 PCR0000005 BREAKER RECYCLE • 4/118016 N 23,236,11 20 9 , 12,50 2,323.61 PCR0000006 BREAKER RECYCLE 4/1/2016 N 41,395,87 165 58,44 24 837.93 � PCROOa0007 BREAKER RECYCLE 4/1/2016 N 50 '548,09 20,219,16 30,328,93 PCR0000008 CRUSHER SYSTEM N 42,778,78 17111 ,524/22/2006 25,667,26 PCR0000009 BREAKER RECYCLE 4/1/2019 230,469.42 230,469,42 _ PCR000a01a BREAKER RECYCLE 6/3/2018 N N 47,507,55 9,581,58 38,326,03 PCR0000012 CRUSHER 4/1/2006 U 43,282,87 7,935.18 , 5.18 35,347.69 PCR0000013 CRUSHER RECYCLE 4/1/1992 N 18,065,00 15,120,00 2,880,00 PCR0000015 RECYCLE BREAKER 2/18/2019 N 18,365,00 16,528,50 1,836,50 PCR5d00016 RECYCLE BREAKER 2/18/2019 N 87,200,32 7,993,37 79,206,95 PDC0000001 CONVEYOR DRAG 9/2912008 N 49 318.57 4,520.89 20.89 44,797.68 P000000002 CONVEYOR DRAG 4115/2010 N 104,000,00 104,000,00 _ PDC0000003 CONVEYOR DRAG 4/22/2005 N 77,402.10 77 _ PDCOOO0004 CONVEYOR DRAG 514/2014 N 171,735,19 171402.19 ,781,19 _ PD00000005 CONVEYOR DRAG 3/16/2009 U 352 ,870,10 208,781,30 144,088,80 P000009506 CONVEYOR DRAG SLATCR055 4/30/2018 N 89,090,00 58,740,00 30,260,00 PD00000007 CONVEYOR DRAG 3/16/2008 U •73,988,00 14 249,63 59,738,37, P000000008 CONVEYOR DRAG 3 f 16/2059 U 42 500,00 , 31,185,00 10,815,00 P000000009 CONVEYOR DRAG 5/18/2002 N 69 000,00 ' 45,540,00 23 460,00 PD00000010 STAIR/HANDRAIL FOR DRAG CO 6/1611994 N 136,530,61 136,530,61 _ PD00000001 DRYER DRUM 313/2012 U 7,980,00 Tis , 2,00 ' 799.05 PD00000002 DRUM DRYER 7/2/2016 N 266,225,00 127,788,36 138,436,64 PDS000a001 BURNER 3/31/2005 U 294,789,47 112,663,80 182,125,67 PDsaaa00a2 TANK BURNER FUEL 3/3112005 U 14,650,00 13 ,185,00 1,465,00 13,500,00 12,150,00 1350,00