Loading...
HomeMy WebLinkAbout1. 920 West Wasington Street_COA 2022-0330STAFF REPORT CONCERNING APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Date: 13 April 2022 Application Number: 2022-0330 Property Location: 920 West Washington Street Architectural Style/Date/Architect or Builder: Queen Anne / 1902 / Freyermuth & Maurer Property Owner: Michael Pippenger and Andrea Crawford Landmark or District Designation: Local Landmark #7448-85 Rating: Notable DESCRIPTION OF STRUCTURE/ SITE: The two-story square-plan wood frame Queen Anne, has a 2/12 asphalt shingle roof, bell cast at eaves, and several brick chimneys. There are numerous gable dormers, flat soffits, and plain frieze. First floor walls are brick under porch roof and on side front; balance of house is covered in wood clapboard siding, cantilevered over first floor on north side, and supported by wood brackets. There are a variety of wood windows, predominantly 1/1 double-hung, but including a variety of elaborately divided lites and diamond paned casements, as well as various bow and bay windows. A porch stretches across the north façade, featuring stone balustrade, mosaic tile porch floor, and concrete entry steps. It has a low hip roof supported by short round ionic columns on stone piers. The glazed single-leaf front door has divided side lites. ALTERATIONS: COA 2017-0331A Remove two (2) existing windows in kitchen and replace with four (4) Marvin WUDH2422 wood double -hung windows. RME 2017-0203 Remove exterior porch lattice. COA 1987- 0720 allowed for the demolition of a rear porch, construction of a new porch, erection of fencing, and erection of an arbor. Originally located at 524 North Lafayette, this house was moved to its current location in 1978. APPLICATION ITEMS: “We would like to install solar panels on our garage. The detached garage was added as new construction in the 1980s, after our home was moved to its current location. To cover 100% of our electricity usage, we require panels on the south and east slopes of the garage roof. Prior to installation, the garage roof needs to be replaced. We have proposals out for standing seam metal in a matte, flat panel in dark bronze. We want metal for its durability and longevity, but also because aesthetically it will coordinate with both the current Burnt Sienna asphalt singles on the house, as well as a potential change to slate or architectural singles that look like slate when the house roof (installed in 2006) needs to be replaced in the future. “ DESCRIPTION OF PROPOSED PROJECT: The applicant has requested approval to: a. Replace garage asphalt shingle roof with metal standing seam roof. i. New roof will be Master Steel Roofing Snap Batten Panel Systems MSR-175B 24 Gauge painted steel in Matte Bronze color. See attached proposal for specific measurements and details. 1. Panel systems come in multiple sizes, per e-mail correspondence, the property owner has expressed a desire for a larger format of standing seam roof, approximately 16” or 18” in width. b. Install new solar panels on south and east slopes of the garage roof. i. 24 Crossroads 380 Solar panels installed by Advanced Solar. See attached proposed layout. The two-bay garage has west-facing garage doors and a gabled roof and was built soon after the house was moved to this location in the late 1970s. There is a shed-roofed addition attached to the garage on the east face that appears to have been built as early as 1987, per satellite imagery. Of these two projects, the installation of solar panels would qualify for administrative approval per the proposed location and configuration. The standing seam metal roof constitutes a material change and requires Commission review. The garage is a secondary structure to the main house that currently does not detract from the significance of the property. The proposed roof change could be interpreted as a “Treatment” change per the Group B Standards, as it would “involve a change that can potentially enhance or detract from the character of the landmark” but “not alter the style or original form.” This treatment change will alter the appearance of the landmark by replacing the existing asphalt shingles with a standing seam metal roof. The proposed roof change could be considered a “Renovation”, as it is a change that will not be altering the general massing of the landmark. The massing of the garage is remaining the same in relation to the main house. STANDARDS AND GUIDELINES: GROUP B The Commission has the authority to determine the architectural merits and the extent of any proposed treatment, renovation, or addition to a historic landmark. The commission will require drawings, plans, specifications, and/ or samples where appropriate. A. MAINTENANCE The maintenance of any historical structure or site shall in no way involve any direct physical change except for the general cleaning and upkeep of the landmark. The Commission shall encourage the proper maintenance of all structure or sites ( appendix A: Minimum Maintenance Standards). B. TREATMENT Treatment shall be defined as any change of surface materials that will not alter the style or original form. Such improvements include reroofing, glazing, or landscaping lawns and may involve a change that can potentially enhance or detract from the character of the landmark. A treatment change of any surface whether on the landmark or in its environment may require a Certificate of Appropriateness if it significantly alters the appearance of the landmark. Although these kinds of changes may not require a Building Permit, a Certificate of Appropriateness may be necessary. The commission should review the proposed treatment for character and style consistency with the original surfaces. C. RENOVATION AND ADDITIONS Renovation is the modification of a structure, which does not alter the general massing while an addition, is a change in mass. A modification, which involves the removal of a part of the landmark, should be considered under demolition (see demolition). Additions to landmarks should not detract from the original form and unity of the landmark and should not cover singular examples of architectural detail. Additions to landmarks should be added in a manner that does not disrupt the visible unity of overall appearance of the site. The proportions, materials and ratios of the existing structures should be carried through in the additions. Care should be taken not to change or alter the following: 1. Structure—– Necessary structural improvements, where safety demands should be accomplished in such a way as to cause minimal visual change to the original style and construction. 2. Material— Additions and improvements involving any new material in the landmark should be of the same material as the original. It should be the same size and texture. An alternative material may be allowed if it duplicates the original. a. wood—all wood trim should conform with existing trim in shape and size. b. siding materials—the Commission discourages the covering or alteration of original materials with additional siding. Structures already sided with incompatible materials should be returned to a siding similar to the original when renovation is considered. D. DEMOLITION Historic landmarks shall not be demolished. When a landmark poses a threat to the public safety, and demolition is the only alternative, documentation by way of photographs, measured drawings, or other descriptive methods should be made of both the exterior and interior of the landmark. The person or agency responsible for demolition of the landmark shall be responsible for this documentation. E. MOVING The moving of landmarks is discouraged, however, moving is preferred to demolition. When moving is necessary, the owner of the landmark must apply to the Commission for a Certificate of Appropriateness. F. SIGNS No neon or flashing signs will be permitted unless they are original to the structure. Billboards and super-graphics will also be disallowed. Only one appropriate identifying sign will be permitted per business. G. BUILDING SITE AND LANDSCAPING These standards apply to both A and B) Required Major landscaping items, trees, fencing, walkways, private yard lights, signs ( house numbers) and benches which reflect the property’s history and development shall be retained. Dominant land contours shall be retained. Structures such as: gazebos, patio decks, fixed barbecue pits, swimming pools, tennis courts, green houses, new walls, fountains, fixed garden furniture, trellises, and other similar structures shall be compatible to the historic character of the site and neighborhood and inconspicuous when viewed from a public way. Recommended New site work should be based upon actual knowledge of the past appearance of the property found in photographs, drawings, and newspapers. Plant materials and trees in close proximity to the building that are causing deterioration to the buildings historic fabric should be removed. However, trees and plant materials that must be removed should be immediately replaced by suitable flora. Front yard areas should not be fenced except in cases where historic documentation would indicate such fencing appropriate. Fencing should be in character with the buildings style, materials, and scale. Prohibited No changes may be made to the appearance of the site by removing major landscaping items, trees, fencing, walkways, outbuildings, and other elements before evaluating their importance to the property’ s history and development. Front yard areas shall not be transformed into parking lots nor paved nor blacktopped. The installation of unsightly devices such as TV reception dishes and solar collectors shall not be permitted in areas where they can be viewed from public thoroughfares. SITE VISIT REPORT: N/A STAFF RECOMMENDATION: The Group B Standards allow for ‘treatment’ and ‘renovation’ changes to landmark properties, so as long as they do not alter the style, general form, or massing of the landmark. The proposed roof material change minimally impacts the style and general form of the landmark and does not alter the massing of the landmark. Staff recommends approval of the roof material change. The proposal for mounting solar panels is inconspicuous. Staff recommends approval of the installation of solar panels on the roof. Prepared by Adam Toering, Historic Preservation Administrator HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov MAP OF THE AREA - Google Maps view of the subject area. SATELLITE/SANBORN IMAGERY - Sandborn Maps: 1917, 1945, 1960, imagery from 2016 of property. HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov FRONT PICTURE (NORTH FACADE) - Picture of the front of the building, April 7, 2022. HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov PROJECT PICTURE (WEST FACADE) - Picture of the front of the garage, April 7, 2022. HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov PROJECT PICTURE (NORTHWEST FACADE) - from West Washington and Laurel, April 7, 2022. ESTIMATE Andrea Crawford 920 W Washington St South Bend, IN ( Abraham Gordillo 2208 Miami St South Bend, IN 46613 Phone: (574) 302-7977 Email: esaugordillo@gmail.com Web: reliableroofingonline.com Estimate #002088 Date 03/14/2022 Description Quantity Rate Total Standing Seam / Concealed Fastener Metal Roof 1200.0 $0.00 $0.00 26 Gauge Standing Seam / Concealed Fastener Metal Hip and Ridge cap 6''3.0 $0.00 $0.00 Metal cap for over the hip and ridge vent. Metal accessories and attachment 1.0 $0.00 $0.00 Trim profiles, accessories for metal panel, channel pieces, and transition plates to properly install the metal roof. Metal Flex Pro Vent 3.0 $0.00 $0.00 Installed throughout the ridge of the roof to allow for proper ventilation of the roof. Butyl Tape 15.0 $0.00 $0.00 Specifically designed tape for seams and valleys to help secure metal roof from water penetration. Metal roof installation 1200.0 $7.25 $8,700.00 The sum of materials, labor, overhead and disposal for new metal roofing system. Solar Barrier 12.0 $35.00 $420.00 Upgraded insulation for increased energy efficiency. Ice and snow rail 85.0 $9.00 $765.00 ice and snow rail is optional. Page 1 of 3 Subtotal $9,885.00 Total $9,885.00 *Financing up to $50,000 is available for all residential projects and provides multiple term options for customers. Monthly payments are approximated without review of customer credit and may be subject to change following a soft credit pull from the outside lender. Financing is approximated to be approved for all consumers with a minimum credit score of 500. Scope of Work: Company will provide services as described in the attached estimate. The company will provide all services, materials, labor, tools, and equipment needed for completion of services unless requested from customer to use specific materials purchased by the customer. Payment Terms: Credit card payments are subject to a 5% price increase due to processing fees. Financing agreements are subject to a 3% price increase due to a processing fees. A down payment of 50% is due upon acceptance of estimate. The balance of the contract is due the day of project completion. In the event of nonpayment of balance within 10 business days of job completion, the customer must pay to Reliable Roofing & Construction a late charge of 5% of the unpaid balance for the first 60 days. Any remaining unpaid balance after 60 days will be turned over to collections, and all collection and court costs will be paid by the customer. The customer further agrees that it will be charged $ 35.00 for each dishonored bank check. Change Order: Any deviation from the above quote involving a change in the scope of work or any additional costs will be executed only with a written change order signed and dated by both Reliable Roofing and Construction and Customer. No jobs can be subcontracted under any of Reliable Roofing and Construction, without approval by upper management. In case this happens we will not insure any of the work done by subs and will void warranty through Reliable Roofing and Construction. Changed Conditions: Any work not indicated in the plans or specifications, that must be added, repaired, or replaced as a result of hidden, concealed, or changed conditions, or that is required for compliance with buildings codes or other regulations, shall result in a change order, and shall be paid in full by the Owner/Customer, subject to terms and conditions of this contract. Warranty: Company warrants all work will be performed in a good and workmanlike manner. Any warranties for parts or materials are subject to manufacturer terms on such products. Extended warranties are of additional cost and will be discussed at time of purchase. To make a claim on Company’s warranty, Customer must give Company written notice describing the alleged defect. Company will provide Customer a written response within 21 days of the day Company receives Customer’s notice. Company may offer to remedy the defect, pay the claim, or dispute the claim. Company will not honor claims unless Customer first gives Company notice in accordance with this section. Conditions: This proposal is valid for 15 days. Company reserves the right to withdraw this proposal or re-quote the project if contract acceptance is beyond 15 days. All contracts must be signed before work is performed and half payment is required 3 days before project start date. Accessories: When satellites are present, Reliable Roofing and Construction is not responsible for signal loss due to replacement or repair of roof. We are not liable for gutter damage existing prior to work being completed and when multiple layers and redeck are involved and present. Reliable Roofing and Construction cannot guarantee that gutters will be salvageable. Reliable Roofing and Construction will clean up the job site as well as possible but is not responsible for any damage caused to person, pets, or property as a result of nails or other job site hazards during or after the project. Customer: Homeowner to carry fire, tornado, and other necessary insurance. Please make checks payable to Reliable Roofing and Construction. Page 2 of 3 By signing this document, the customers agrees to the services and conditions outlined in this document. The customer is responsible for paying the first half of the total project upfront and the remaining balance will be received once the customer is satisfied with the project. Andrea Crawford Page 3 of 3 Monthly Shading Month GHI (kWh/m )POA (kWh/m )Shaded (kWh/m )Nameplate (kWh)Grid (kWh) January 51.2 66.4 66.3 483.2 476.4 February 69.1 83.3 83.0 608.3 598.2 March 112.4 124.9 124.3 917.5 867.2 April 149.4 158.1 157.6 1,167.9 1,054.9 May 174.8 177.3 177.0 1,312.8 1,158.5 June 188.8 188.4 187.9 1,395.0 1,193.8 July 200.3 201.3 200.7 1,490.4 1,269.3 August 168.7 175.5 175.0 1,298.1 1,110.4 September 125.8 139.4 138.9 1,028.1 893.9 October 84.9 98.6 98.3 724.4 667.7 November 53.2 66.1 65.9 482.6 462.0 December 45.5 59.6 59.5 433.5 428.8 2 2 2 Design Render Design BOM Component Type Quantity P340 buck_boost_optimizer 24 SE7600H-US inverter 1 Crossroads 325 module 24 Annual Production Report produced by Glen MIller PERC 5 BUSBAR CELLS 380 POWER OUTPUT 19% MAXIMUM EFFICIENCY PO?VER l OLE/RANCE 10/25 Year PRODUCT/PERFORMANCE WARRANTY /� CROSSROADS 0011SOLAR CROSSROADS 380 QCrossroads Solar manufactures solar panels in South Bend, IN Our core mission is to provide jobs and life training opportunities for recently released felons We make solar panels because it is good for the planet •0• IVWe help remake people because it is good for our communities 25 YEAR PERFORMANCE WARRANTY 100% 97 95 10 15 20 25 Years Power Output 380 W Module Efficiency >7 19 % Junction Box 85 -C (185 -F) Maximum Series Fuse Rating Tolerance 1.5 % Short Circuit Claes C (Canada) Hail Safety Impact Velocity Current Isc 9,9 A Open Circuit (79.17in x 39.96in x 1.575in) (LxWxH) Voltage Voc 49 V Rated Current 1, 9.35 A Rated Voltage V.,o 40.55 V Fuse Rating 20 A Thermal Characteristics Normal Operacting Cell 4512 C Temperature (NOCT) Temperature Coefficient of P„.. -0.38 %n/K Temperature Coefficient of Voc -036 %/K Temperature Coefficient of Isc 0.068 %n/K Maximum System Voltage 1500Vdc Frame -40 °C (-40 °F) to Operating Temperature Range EVA Junction Box 85 -C (185 -F) Maximum Series Fuse Rating 20 Connector Type 1 Fire Safety Classification Claes C (Canada) Hail Safety Impact Velocity 25mm at 23m/s Front Glass 3.2mm (tempered, low iron, ARC) Frame Anodized Aluminum Encapsulant EVA Junction Box IP 67 Cables 1 meter Connector MC4 Number of modules 26 per pallet Pallet Dimensions 1200mm x 1000mm x 200(mm Cell (47.2in x 39.4in x 78.7in) Pallet Weight 600kg Number of pallets per 28 container UL/IEC 61730 & 61215 PANEL DRAWING Units: mm of m Front View Back View Crossroads Solar Website: crossroads-solar.com Email: patrickregan@crossroads-solar.com Tel: 607-759-1058 Gl, Mono Crystalline Silicon Solar Cells 158.75mm x 158.75mm t0.25mm Cell 72 cells (6x12) Orientation Module 2011 mm x 1021 mm x 40mm Dimension (79.17in x 39.96in x 1.575in) (LxWxH) Weight 22kg(48.51b) UL/IEC 61730 & 61215 PANEL DRAWING Units: mm of m Front View Back View Crossroads Solar Website: crossroads-solar.com Email: patrickregan@crossroads-solar.com Tel: 607-759-1058