2. Riverside Drive Embankment_COA 2022-0225A
STAFF REPORT CONCERNING APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Date: March 14, 2022 Application Number: 2022-0225A Property Location: Riverside Drive Embankment Architectural Style/Date/Architect or Builder: N/A Property Owner: MULTIPLE Landmark or District Designation: Riverside Drive Local Historic District, #7469- 85 Rating: N/A DESCRIPTION OF STRUCTURE/ SITE: The Riverside Drive Local Historic district is characterized by its proximity to downtown South Bend and by its intimate relationship with the St. Joseph River. Parcels in the project’s immediate vicinity are owned by the property owners along the west side of Riverside Drive. ALTERATIONS: AA 2022-0225 allowed for the removal of trees in preparation of bank stabilization projects. APPLICATION ITEMS: “Please see attached letter.” “The City of South Bend is submitting two Certificate of Appropriateness (COA) forms for the Riverside Drive Bank Stabilization Project. The first COA is for initial tree removal of 8 trees from the bank before the Indiana Bat Roost Season beings. These initial trees have been identified as having bat habitat potential and will be removed before April 1, 2022 as required by the State of Indiana. The second COA is for the remainder of the bank stabilization work, which includes: additional tree clearing for access, Rock-Toe construction up to the ordinary high-water mark of the river, erosion control blanket installation, seeding, and shrubbery planting. The work will occur in late summer 2022.” DESCRIPTION OF PROPOSED PROJECT: The applicant has requested approval to: Stabilize the failing riverbank along Riverside Drive in the 1000 and 1100 blocks of Riverside Drive, including: • “Rock-toe” construction up to the ordinary high-water mark of the river, • “Erosion control blanket” installation, • Seeding and shrubbery planting. Erosion along the river embankment adjacent to Riverside Drive in this area has steadily increased, especially after the major flood events that our community experienced during the last four years. HPC staff documented the worsening condition in 2018. City of South Bend Engineering staff applied for financial assistance to remedy the failing river bank, resulting in the $800,000 project under review. The east side of Riverside Drive in this area is made up of individually owned parcels. The City has received approval from the property owners to access these parcels to execute this work. Approval and review from other city and regional entities has already been acquired. STANDARDS AND GUIDELINES: RIVERSIDE DRIVE I. THE ENVIRONMENT A. THE DISTRICT ENVIRONMENT The district is characterized by its proximity to downtown South Bend and by its intimate relationship with the St. Joseph River. The district encompasses the seven blocks of Riverside Drive which follow the river front from Lafayette Street to the east of Angela Boulevard to the west. For a portion of that route, there is a row of houses facing the river from across Riverside Drive, while in another portion, residences are situated on both sides of the street, with some properties abutting the river and others located across the drive. The district also includes homes located on Hudson and Golden Streets, between the drive and the alley defining the southern boundary of the district, as well as three separate park areas which lie adjacent to the river’s edge: a portion of Leeper Park to the East; all of Shetterly Park in the middle and a portion of Brownfield Part to the West. Required Distinctive existing features such as parks, gardens, streetlights, fences, signs, benches, walkways streets alleys and building setbacks shall be retained. New plant materials, fencing, walkways, streetlights, signs, and benches shall be compatible with the character of the neighborhood in size, scale, material and color. Street lighting should be maintained at levels recommended by the Illumination Engineering Society. Light sources must have spectral distribution in all color ranges. Sources and light posts should be uniform throughout the district. Lamp fixtures and supporting posts must be similar in proportion, scale and detail to existing historic lamps (see appendix) or a suitable replacement which closely duplicates the standard in size, shape, style, and appearance, i.e., Hedwig Lighting Company Standard or similar. Streetlights should be placed so that adequate illumination is afforded all sections of the public sidewalks. Tree and landscaping elements that must be removed for one reason to another shall be immediately replaced by suitable flora. The river front neighborhood character of the district shall be retained. Recommended Whenever possible, the original features should be restored. Plant materials and trees in close proximity to buildings, sidewalks, or streets that are causing deterioration to those elements should be removed. If erosion control efforts become necessary to preserve the riverbank, they should involve processes and materials consistent with the natural beauty of the banks. Large, deep-rooted trees and shrubs as well as fast spreading ground cover should be used when planting for erosion control. As much natural vegetation as possible should be preserved. If large shrubs become unsightly, they should be cut back and allowed to rejuvenate. Dead and diseased material should be selectively removed. Do not dump leaved and grass clippings on planted slopes as this practice will kill much of the low ground cover and leave soil more susceptible to erosion. When replacement od utility poles or power supply lines is necessary, consideration should be given to underground conduits or utility poles erected along rear property lines Prohibited Existing relationships of buildings and their environments shall not be destroyed through widening existing streets, application of asphalt or other bituminous coverings, or by introducing new streets or parking lots. Signs, streetlights, benches, major landscaping items, fencing, walkways and paving materials which are out of scale or inappropriate to the neighborhood may not be used. The introduction of heavy trucks or similar vehicles in the district shall be prohibited. SITE VISIT REPORT: HPC Staff have been monitoring and photographing the condition of the riverbank since 2018. Staff most recently visited this location in fall of 2021. STAFF RECOMMENDATION: Staff recommends approval. Prepared by Adam Toering, Historic Preservation Administrator HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov MAP OF THE AREA - Google Maps view of the subject area. SATELLITE/SANBORN IMAGERY - Satellite imagery from 2016, 2022. 5 HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov SUBJECT AREA - Picture of riverbank erosion, March 2018, looking west from West North Shore Drive. SUBJECT AREA - Riverside Drive erosion, March, 2018 - views NE and N from impacted area. 5 HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY County—City Building, South Bend, IN 46601 http://www.southbendin.gov/government/department/community-investment Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov Michele Gelfman, President A Certified Local Government of the National Park Service Adam Toering, Historic Preservation Administrator OFFICE USE ONLY>>>>>>DO NOT COMPLETE ANY ENTRIES CONTAINED IN THIS BOX<<<<<<OFFICE USE ONLY Date Received: ____________________ Application Number: ____________—___________________________________ Past Reviews: YES (Date of Last Review) _____________________________ NO Staff Approval authorized by: _________________________________________________________ Title: __________________________ Historic Preservation Commission Review Date: __________________________________________________________________________ Local Landmark Local Historic District (Name) ________________________________________ National Landmark National Register District (Name) _____________________________________ Certificate Of Appropriateness: Denied Tabled Sent To Committee Approved and issued: _____________________ Address of Property for proposed work: ________________________________________________________________________ (Street Number—Street Name—City—Zip) Name of Property Owner(s): __________________________________________________ Phone #: ______________________ Address of Property Owner(s): _______________________________________________________________________________ (Street Number—Street Name—City—Zip) Name of Contractor(s): _______________________________________________________ Phone #: ______________________ Contractor Company Name: __________________________________________________________________________________ Address of Contractor Company: ______________________________________________________________________________ (Street Number—Street Name—City—Zip) Current Use of Building: _____________________________________________________________________________________ (Single Family—Multi-Family—Commercial—Government—Industrial—Vacant—etc.) Type of Building Construction: ________________________________________________________________________________ (Wood Frame—Brick—Stone—Steel—Concrete—Other) Landscape New Replacement (not in-kind) Demolition Proposed Work: (more than one box may be checked) Description of Proposed Work: _______________________________________________________________________________ ___________________________________________________________________________________________________________ ___________________________________________________________________________________________________________ ___________________________________________________________________________________________________________ Owner e-mail: __________________________________ and/or Contractor e-mail: ___________________________________ X _______________________________________________ and/or X _______________________________________________ Signature of Owner Signature of Contractor By signing this application I agree to abide by all local regulations related to project and to obtain a Building Department Permit, if applicable. —APPLICATION REQUIREMENTS ARE LISTED ON REVERSE SIDE— APPLICATION FOR A — CERTIFICATE OF APPROPRIATENESS APPLICATION FEE The following schedule of fees shall apply to any Application for a Certificate Of Appropriateness: Routine Maintenance Exclusion (Staff Approval) $ 20.00 or Commission Review $ 20.00 Payment must accompany the application at the time of submission. For electronically submitted application, payment must reach the HPC office within 48-hours following transmission. REQUIRED DOCUMENTATION AND SITE PLANS The Historic Preservation Commission of South Bend and St. Joseph County cannot render judgment nor process an Application without specific documentation. Comprehensive documentation protects both the owner of the property submitting the Application as well as providing a complete understanding of the project for the commissioners and staff when rendering a decision. Problems often occur during a project review or during the execution of the project when one or both parties are unclear as to the specifics. Applications will NOT be processed without all required fees and documentation. When an Application has been scheduled for any meeting where a review and decision are to be rendered, the owner and any architect or contractor (s) retained for the project must attend such meetings. Failure by the owner, architect, or contractor to attend such meetings may result in denial of the Application due to insufficient representation. Documentation shall include: detailed written description of the project including materials to be used, scale, dimen- sions, construction methods, finishes, manufacturers’ brochures and specifications and photographs of the area(s) which the project will affect. Photographs may be submitted in digital format, or in photographic print. When a project involves blueprints and/or site plans, one (1) set shall be submitted with the Application. Any documentation submitted to this office cannot be returned to the applicant. INSPECTION AUTHORITY All projects will be inspected during and following execution, for compliance with the decision (s) rendered by the Historic Preservation Commission of South Bend and St. Joseph County. Owner acknowledges that while the Historic Preservation Commission only considers Certificates of Appropriateness for exterior features, under certain circumstances it may be necessary for the Commission Staff to have access to the interior of the building in order to accurately assess the condition of the exterior feature and that the lack of access to the interior may prevent the Commission Staff from making a favorable recommendation. Any work performed on a historic landmark or in an historic district which does not conform to the Certificate of Ap- propriateness certificate, shall be immediately halted by the Historic Preservation Commission and the Building De- partment of South Bend and St. Joseph County. INTERGOVERNMENTAL DISCLOSURE Certificates Of Appropriateness will be filed with the Building Department of South Bend and St. Joseph County when the applicant also is required to obtain a building permit or other such permit issued by that department . (The appli- cant may pick up their Certificate at that location). When no building or other permits are required from the Build- ing Department, the Certificate will be mailed directly to the applicant. TO ENSURE YOUR APPLICATION CAN BE PROCESSED IN A TIMELY MATTER WITHOUT DELAY, PLEASE INCLUDE THE FOLLOWING DOCUMENTATION, PER STAFF DISCRETION: ALL PROJECTS: ___ Certificate of Appropriateness application ___ Application fee $20.00 ___ Written description (existing condition, evaluation by repair professional) ___ Overview of project (materials, scale, dimensions, construction methods, alterations, etc.) ___ Photographs (full front from street view, each side effected by project, close up detail of project areas) ___ Specification of material (either manufacture brochure or link to product online) NEW CONSTRUCTION, ADDITIONS, FENCES, LANDSCAPING: ___ Site Plan* or Aerial View depicting existing property lines, buildings, structures and proposed project locations ROOFS: ___ Site Plan* of building only overview showing building footprint and proposed project locations WINDOWS, SIDING: ___ Elevations* (Existing and proposed new) ___ Evaluation / Quote by repair professional DEMOLITION (MANDATORY COMMISSION REVIEW): ___ Site Plan* or Aerial View depicting existing property lines, buildings, structures and proposed project locations ___ Structural drawings / Architectural drawings UPON REQUEST BY STAFF: ___ Blueprints ___ Drawings ___ Other * Hand drawn is acceptable February 25, 2022 South Bend Historic Preservation Commission 1400S County City Building 227 W. Jefferson Blvd. South Bend Indiana 46601 Subject: Certificate of Appropriateness Applications Dear Historic Preservation Commission, The City of South Bend is submitting two Certificate of Appropriateness (COA) forms for the Riverside Drive Bank Stabilization Project. The first COA is for initial tree removal of 8 trees from the bank before the Indiana Bat Roost Season begins. These initial trees have been identified as having bat habitat potential and will be removed before April 1, 2022 as required by the State of Indiana. The second COA is for the remainder of the bank stabilization work, which includes: additional tree clearing for access, Rock Toe construction up to the ordinary high-water mark of the river, erosion control blanket installation, seeding, and shrubbery planting. The work will occur in late summer 2022. History The 45-foot-tall sandy riverbank between Vassar Avenue and Angela Boulevard along Riverside Drive has eroded more and more over the years. Since my first week on the job in April 2017 with the Engineering Department, I have worked to find funding to address the failing riverbank. The erosion occurs in public right-of-way and across portions of private properties that extend across the street east of Riverside Drive. Each year, the erosion worsens with more trees, roots intact, sliding down the bank into the river. This eroding bank not only damages water quality by introducing significant sediment and nutrient loads into the river but also has the potential for impacting public infrastructure and the adjacent public road, Riverside Drive. I, on behalf of the Engineering Department, have applied for Indiana Department of Natural Resources and Great Lakes Commission Grants to help offset the cost of the bank stabilization. Through 2018 to 2021, the City was awarded funding from these agencies to perform a feasibility analysis, geotechnical investigations, survey, design, construction plans and specifications, and construction for bank stabilization.(1) In coordination with these agencies, the City has hosted several public meetings at the Near Northwest Neighborhood center to engage the public and gain input and interest in the project.(2) Several residents and the District Council Member (at the time), Mr. Tim Scott, attended the meetings, were supportive of the project, and seemed excited for assistance in getting the bank stabilized. With assistance from the City’s legal team, we successfully acquired Right-of-Entry agreements from all landowners impacted by the work, see attached Exhibit A. Page | 2 Construction Schedule: The tree removal work for the bat habitat trees is anticipated to begin March 14th thru April 1st. The remainder of the work is expected to begin in August 2022 and the bank will be stabilized by Fall 2022. The City has received all other permits to perform the work. The City awarded the project to Milestone Contractors North, Inc. for over $800k (with $200k coming from the Great Lakes Commission and the remainder funded from the Stormwater Utility Fees paid for by City of South Bend constituents). Plans for the project are included in Exhibit B. This project will not only improve the water quality of St. Joseph River but will also provide a healthy wildlife and vegetative habitat, protect the property owner’s property from further deterioration, and provide stability and protection to the public infrastructure and roadway. I, along with the Great Lakes Commission and the Indiana Department of Natural Resources, are thrilled about the implementation of this project and all the benefits it will have on the community. Sincerely, Sue Ellen Doudrick, PE Assistant City Engineer City of South Bend References: 1) Grants: a. IDNR Grant https://www.in.gov/dnr/fish-and-wildlife/files/fw-LARE_BE_WLT_Funding_FY_2018-2019.pdf b. IDNR Grant https://www.in.gov/dnr/fish-and-wildlife/files/fw- LARE_Watershed_Land_Treatment_Biological_and_Engineering_-Projects_Funding_FY-2019-20.pdf c. Great Lakes Commission Grant https://www.glc.org/news/glsnrp-093021 2) IDNR LARE Grant Reports and Public Meeting Documents a. Pg. 14 of 2020 Report: https://larereports.dnr.in.gov/ b. Pg. 5 of 2019 Report: https://larereports.dnr.in.gov/ Exhibits: A) Right of Entry Agreements from property owners B) Riverside Drive Bank Stabilization Construction Plans 2018 Picture: Page 1 of 1 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Anne Fuchs, Clerk Board of Public Works FROM: Sue Ellen Doudrick, PE SUBJECT: Right of Entries for Project # 118-005B Riverside Drive Bank Stabilization (upcoming bid project) DATE: September 30, 2021 In preparation for construction of the bank stabilization project planned along St. Joseph River east of the Riverside Drive and Hudson Drive. The project includes stabilizing 575 feet of the riverbank that extends up to 40 feet in height. The project has access challenges and requires access thru private properties. The City’s Engineering Division and Legal Team prepared a Right- of-Entry agreement for contractor access throughout the project and the maintenance bond period. Jones Petrie Rafinski (JPR), on behalf of the City, consulted with each of the property owners listed below: Owner Address 1. Essence Neely 1001 Hudson Avenue 2. Susan M. St. Ville & Todd Whitmore 1101 Riverside Drive 3. Paul S. Kochanowski 1111 Riverside Drive 4. Brendan K. & Blanchard Sadie Bridgford 1115 Riverside Drive 5. Martin J. & Jane M. Murphy 1121 Riverside Drive 6. Lloyd H. Jr. & Shelley L. Ketchum* 1129 Riverside Drive 7. Joseph Blenkinsopp & Mildred Jean Porter 1201 Riverside Drive 8. Vlad M. Illuc & Daniel Theodore Burton 1207 Riverside Drive 9. JL Cronk Investment Co. 26626 Evans Drive Notes: *The Dr. and Mrs. Ketchum property was identified as having non-ownership on the east of Riverside Drive. Therefore, there is no Right-of-Entry agreement for this parcel. JPR obtained signed agreements from each of the property owners except one parcel, which was identified as having not been deeded. The City is very appreciative to each of the property owners for their willingness to allow access, and we look forward to protecting this bank from future erosion. The City intends to bid the project this year and will apply for another IDNR LARE grant to support the project. The majority of construction will begin in Fall 2022. Information packets or emails will be sent to each of the above property owners once a contractor has been selected. Enc. Eight (8) right-of-Entry Agreements and one (1) letter identifying non-ownership October 12, 21 October 12, 2021 October 12 21 October 12, 2021 RIGHT OF ENTRY and RIVERBANK STABILIZATION AGREEMENT This Right of Entry and Riverbank Stabilization Agreement (the “Agreement”) is entered into as of , 20 between the City of South Bend, Indiana, by and through its Board of Public Works (the “Grantee”), and Paul S. Kochanowski, (the “Grantor”), the owner of the property located as shown on the attached Exhibit B and described on the attached Exhibit A, each a party and collectively referred to herein as the parties. RECITALS A.The Grantor attests that Grantor is the owner of the real property located as shown on the attached Exhibit B and described on the attached Exhibit A (the “Property”), Tax Identification Number: 71-08-02-205-015.000-026, and as more specifically described on Exhibit A and depicted on Exhibit B, incorporated herein by reference and attachment. B.GRANTEE wishes to stabilize the St. Joseph River riverbank, a portion of which is located on GRANTOR Property, as more particularly depicted on Exhibit B, incorporated herein by reference and attachment. C.GRANTEE wishes to obtain authorization from GRANTOR to enter upon the Property for the purposes of stabilizing the portion of the St. Joseph River riverbank that is located on the Grantor’s Property. NOW THEREFORE, in consideration of the mutual promises contained herein the parties have agreed as follows: AGREEMENT 1.Grant of Right of Entry: The Grantor hereby grants the Grantee, its employees, consultants, contractors, agents and designees permission to enter upon the Property to perform the work as described in the Recitals above and the exhibits (the “Work”). Grantor shall not be responsible for any of the costs of the Work. Grantee shall direct and control all activities pertaining to the Work and shall not impose, at any time, any charge or exaction against Grantor. 2. Assumption of Risk: Grantee enters the Property and performs or causes to be performed the Work at its own risk and subject to whatever hazards or conditions may exist on the Property. October 12 21 the reasonable attorneys’ fees, costs, and expenses incurred in the action of proceeding by the prevailing party. 10.Notices: All notices required or permitted under the terms of this Agreement shall be in writing and sent to: Grantee Grantor City of South Bend Paul S. Kochanowski 227 W. Jefferson Blvd, Suite 1300 1111 Riverside Dr. South Bend, IN 46001 South Bend, IN 46616 Attn: City Engineer 11.Entire Agreement; Severability; Applicable Law: This Agreement constitutes the entire agreement between Grantee and Grantor, and no alteration, amendment or any part thereof shall be affective unless in writing signed by the parties. If any portion of this Agreement is ruled by a court of competent jurisdiction to be invalid, illegal or unenforceable, the remaining portions of this Agreement shall not be affected thereby and shall remain in full force and effect. This Agreement shall be construed and interpreted according to the laws of the State of Indiana. 12.Representation of Authority of Parties/Signatories. Each person signing this Agreement represents and warrants that he or she is duly authorized and has legal capacity to execute and deliver this Agreement. Each party represents and warrants to the other that the execution and delivery of the Agreement and the performance of such party’s obligations hereunder have been duly authorized, and that the Agreement is a valid and legal agreement binding on such party and enforceable in accordance with its terms. 13.Counterparts and Electronic Signature. This Agreement may be executed in counterparts which when taken together shall constitute one fully executed original. The facsimile, email or other electronically delivered signatures of the Parties shall be deemed to constitute original signatures and facsimile or electronic copies hereof shall be deemed to constitute duplicate originals. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] October 12, 2021 EXHIBIT "A" Riverside Drive Riverbank Stabilization Project Parcel 8 Page 1 of 1 G:\2020 Projects\2020-0311\Parcel Info\Parcel 8\2021-02-22 Exhibit A - Parcel 8.docx Parcel No: 8 Sheet of Job No: Project: Riverbank Stabilization EXHIBIT 'B' PARCEL PLAT Drawn: 2020-0311 DWK Sec: 02 Town: 37 N. Range: 2 E. J O N E S PETRIE RAFINSKI © 2020 JPR - All Rights Reserved Prepared for: City of South Bend Owner: Paul S. Kochanowski Deed Rec.: Key Number: Elkhart, IN p: 574.293.7762 11 8022608 71-08-02-205-015.000-026 Checked: KJJ County: ST JOSEPH South Bend, IN p: 574.232.4388 Fort Wayne, IN p: 260.422.2522 This plat was prepared from information obtained from the recorder's office and other sources which were not necessarily checked by a field survey. Dimensions shown are from listed record documents. October 12 21 October 12, 2021 October 12, 21 October 12, 2021 Ketchum May 11, 2021 Page 2 of 2 August 3, 2021 Lloyd H. (Jr.) & Shelley L. Ketchum 1129 Riverside Dr. South Bend, IN 46616 RE: CITY OF SOUTH BEND - RIVERSIDE DR. RIVERBANK STABILIZATION PROJECT Dear Landowner(s): This letter serves as acknowledgement of the City’s receipt of your notification of non-ownership of Lots 63A and 64B to be included in the City’s Riverside Drive Riverbank Stabilization Project. In light of your claim of non-ownership, you will no longer automatically receive personal notifications and updates about the project. However, as a neighborhood property owner, please feel free to contact our office or the City of South Bend’s Engineering Department should you have any questions. Respectfully Submitted, Kenneth Jones, Jr., PS Vice President & Chief Financial Officer kennethjones@jpr1source.com 574-536-2743 G:\2020 Projects\2020-0311\Parcel Info\Parcel 5\2021-07-29 3rd Contact Letter - Parcel 5.docx October 12, 2021 October 12, 2021 October 12, 21 October 12, 2021 October 12, 21 October 12, 2021 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 9/30/2021 Name Sue Ellen Doudrick Department Engineering BPW Date 10/12/2021 Phone Extension 5903 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Right of Entries Ease./Encroach Required Information Company or Vendor Name TBD New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Riverside Drive Bank Stabilization Project Number 118-005B Funding Source n/a Account No. n/a Amount n/a Terms of Contract n/a Purpose/Description Memo to BPW regarding right of entry documentation for the Riverside Drive Bank Stabilization Project. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: 10-01-2021 LAND USE #CHECKEDSHEET NUMBERPROJECT #SHEET TITLEDESIGNEDDATEDRAWN DESCRIPTION#DATE BY TITLE SHEET AND SHEET INDEX Riverside Drive Bank Stabilization City of South Bend Board of Public Works CITY OF SOUTH BEND, INDIANATITLE SHEET1OCT 2021CODRAS JBRJ18X465600BID DOCUMENTS ----LOCATION MAPSITE MAPWALKERTON 708 Roosevelt Road Walkerton, IN 46574 USA TEL (1) 574-586-3400 www.cardno.com R:\Projects\18\18X\18X465600_CityofSouthBend_LARE_St.JosephRiverBankStabilization\CAD\DESIGN\20200519_StJosephRvierCOVER.dwg - 10/20/2021 1:59:25 PM PROJECT LOCATIONPROJECT SITERiverside Drive Bank StabilizationCity of South Bend Board of Public Works0 75 150 Feet0 500 1000St. Joseph RiverSheet List TableSheet Number Sheet Title1TITLE SHEET AND SHEET INDEX23PROPOSED PLANEXISTING CONDITIONSGENERAL NOTES45CROSS SECTIONS6STABILIZATION/ PLANTING PLAN78DETAILSCROSS SECTIONS9DETAILS10ACCESS, DEMOLITION AND EROSION CONTROLGRADING PLAN11SAMPLE TRAFFIC CONTROL PLAN12 Riverside DriveHudson AveRiverside DriveV a s s a r A v e Riverside DriveYuko n A v e LAND USE #CHECKEDSHEET NUMBERPROJECT #SHEET TITLEDESIGNEDDATEDRAWN DESCRIPTION#DATE BY GENERAL NOTES Riverside Drive Bank Stabilization City of South Bend Board of Public Works CITY OF SOUTH BEND, INDIANAGENERAL NOTES2OCT 2021CODRAS JBRJ18X465600BID DOCUMENTS ----WALKERTON 708 Roosevelt Road Walkerton, IN 46574 USA TEL (1) 574-586-3400 www.cardno.com R:\Projects\18\18X\18X465600_CityofSouthBend_LARE_St.JosephRiverBankStabilization\CAD\DESIGN\20200519_StJosephRvierCOVER.dwg - 10/20/2021 1:59:30 PM GENERAL NOTES1. CONTRACTOR shall not perform work on any day between the hours of 6:00 p.m. to 7:00 a.m. or onSaturdays, Sundays or Holidays without prior approval from OWNER. Working hours are 7:00 a.m. to6:00 p.m. Monday -Friday.2. There shall be no storage of equipment, materials, debris, soil, etc. in streets, parking areas, or thepublic right-of-way without written permission from the local jurisdiction.3. Coordinate locations for all required access with OWNER and ENGINEER.4. CONTRACTOR shall minimize interference with adjoining roads, streets, walks, and other adjacentoccupied or used facilities during construction operations. CONTRACTOR shall not close or obstructstreets, walks, parking areas, or other adjacent occupied or used facilities without permission fromOWNER and authorities having jurisdiction. CONTRACTOR may cross roads and streets during theperformance of the work, if necessary, at the approval of OWNER and the city. CONTRACTOR shallprotect all roads and streets at heavy-equipment crossings as needed to protect pavement.CONTRACTOR shall provide road barriers and/or a flag person to control traffic during all times whenconstruction equipment is crossing public roads or when otherwise warranted.5. CONTRACTOR shall be responsible to secure the construction site against unauthorized entrance bypersons and vehicles outside of and during working hours. The cost of any additional security measuresdeemed necessary by CONTRACTOR shall be incidental to the contract. If CONTRACTOR fails tomaintain security or safety measures at the project site, OWNER may at the expiration of a period of 48hours, after having given CONTRACTOR written notice, proceed to provide additional measures asdeemed necessary, and the cost thereof shall be deducted from any compensation due, or which maybecome due to CONTRACTOR under this contract.6. CONTRACTORshall allow OWNER, ENGINEER, OWNER'S REPRESENTATIVE(s), and othercontractors working for OWNER access to the site at all times.7. If CONTRACTOR finds a conflict, error or discrepancy in the construction documents or plans,CONTRACTOR shall report it immediately to ENGINEER in writing or by email before proceeding withthe work affected thereby and shall obtain a written interpretation or clarification from ENGINEER.8. All work shall be constructed in accordance with the lines and grades shown on the plans. The fullresponsibility for keeping alignment and grade shall rest upon CONTRACTOR at no additional cost toOWNER.9. CONTRACTOR shall be fully responsible to OWNER for all acts and omissions of hisSUB-CONTRACTORS, suppliers, and other persons and organizations performing or furnishing any ofthe work under a direct or indirect contract with CONTRACTOR just as CONTRACTOR is responsiblefor CONTRACTOR'S own acts and omissions. CONTRACTOR shall assume sole obligation for thepayment of any monies due to any SUB-CONTRACTOR, supplier, or other person or organization,except as may be otherwise required by laws and regulations.10.CONTRACTOR shall obtain permission from the necessary stakeholders for all work performed outsideof OWNER'S right-of-way.11.CONTRACTOR shall stake out and mark limits of construction so they are clearly visible. Allconstruction activities shall be performed within the designated construction limits.12.OWNER does not bear any responsibility for the cost of injuries to CONTRACTOR,SUBCONTRACTOR, or employees injured during the course of the contract. CONTRACTOR shall beresponsible for the transport of injured employees needing medical or other attention.13.CONTRACTOR shall, at all times, keep the premises free from accumulation of waste materials orrubbish caused by his/her employees or work and prevent the spread of debris during windy conditions.At the completion of work, CONTRACTOR shall leave the premises in a neat, clean, and orderlyfashion.14.CONTRACTOR shall power wash any mechanical equipment or vehicle to be used on the job site toremove all mud and debris prior to unloading on the site. No other vehicles/machines shall be permittedin the project area. All other equipment or project-related vehicles must be parked in specified parkingareas.15.CONTRACTOR shall immediately remove mud tracked by vehicles onto the public roadways when theroad is in use, otherwise, before a closed section is returned to service.16.Temporary traffic control is the responsibility of the CONTRACTOR. The CONTRACTOR shallcoordinate with the city and/or other authorities having jurisdiction to determine exact traffic controlrequirements.17.Shop drawings or product certification information of all constructed or supplied project materials shallbe submitted to OWNER or ENGINEER for review prior to implementation or installation. Shop drawingsare required for the following project components: permanent and temporary seed mixes, hydromulch,aggregates, riprap, erosion control blanket, borrow source (if applicable).18.Prior to demobilization, CONTRACTOR shall ensure that all excess construction materials and debris,including soil, aggregate, trash, temporary erosion control measures, and miscellaneous constructionmaterials are removed from the project site and disposed of properly. All disturbed areas shall berestored to the satisfaction of OWNER and ENGINEER.19.Upon completion of the work and prior to acceptance of the project, CONTRACTOR shall be required tofurnish the ENGINEER with one set of marked-up prints showing the as-built location of improvements,field changes, and details not on original drawings.20.CONTRACTOR shall attend a pre-construction meeting at the project site prior to beginning work.21.CONTRACTOR shall submit a project schedule for review by OWNER and ENGINEER atpre-construction meeting. Submit revised schedules with each application for payment.22.CONTRACTOR shall provide, maintain, and pay for temporary facilities and utilities as required tocomplete the work. Remove temporary facilities prior to the application for final payment.23.CONTRACTOR shall restore existing and permanent facilities used during construction to originalcondition or as otherwise specified.CONSTRUCTION NOTES1. CONTRACTOR shall clearly mark all underground utilities, culverts, and underground drains prior toconstruction.2. Responsibility for the repair of utilities and structures when broken or otherwise damaged shall be borneby CONTRACTOR. Materials damaged by CONTRACTOR during handling or placement operationsshall be replaced in-kind by CONTRACTOR at CONTRACTOR'S sole expense. Such damagedmaterials shall be removed from the site by CONTRACTOR.3. CONTRACTOR shall deploy suitable equipment for the excavation, compaction, and grading of soil toconstruct the work. CONTRACTOR shall perform excavation to the lines and grades shown on theplans.4. Positive drainage shall be provided and maintained at all times. CONTRACTOR shall be responsible forall costs associated with dewatering of any excavation in order to provide positive drainage and anycosts associated with the disposal of such water.5. Provide sheeting, shoring, bracing, or other protection measures as required to maintain safeexcavations. Sloping or benching for excavations greater than twenty (20) feet shall be designed by aregistered professional engineer.6. CONTRACTOR shall confirm all earthwork quantities prior to the start of construction. If an excess orshortage of earth is encountered, CONTRACTOR shall confirm with the OWNER and ENGINEER therequirements for stockpiling, removal or importing of earth.7. All fill material shall be approved by the ENGINEER prior to placement.8. On-site excavated soils, except topsoil, may be considered suitable for fill provided proper moisturecontent is maintained during placement and subject to inspection and approval by the ENGINEER. Aportion of the excavated soils may exhibit natural moisture content above optimum moisture. These soilsmay require air-drying and/or chemical modification prior to placement.9. Topsoil is not suitable for use as fill material unless approved by ENGINEER.10.Uniformly grade areas to create a smooth surface to thecross-sections, lines, and elevations indicated on the drawings. Provide a smooth transition betweenexisting grades and new grades.11.Topsoil shall be placed in one loose lift in all areas where the underlying soils will not support vegetativegrowth. If adequate topsoil volumes are not available from on-site sources, CONTRACTOR shall amendavailable soil to produce a suitable growth medium or import topsoil from offsite. The final surface shallbe graded smooth to final design grades. All significant surface variations,including vehicle tire or equipment track ruts, shall be smoothed out with a grader box or other method.Final grading performed by dozers shall be done in a manner such that the track cleats are orientedparallel to the contours to minimize runoff velocity down the slope and to help maintain moisture in thetopsoil.DEMOLITION NOTES1. CONTRACTOR shall be responsible for the protection of all facilities during the entire period of service.Any damages to the existing facilities, roads, or other property caused by CONTRACTOR orSUBCONTRACTOR shall be repaired at CONTRACTOR'S expense and in a manner and scheduleapproved by OWNER.2. Items noted or otherwise identified to be salvaged (if any) shall be returned to OWNER in the originalcondition.3. Notify ENGINEER immediately upon the discovery of any hazardous materials.4. Protect and maintain survey benchmarks from disturbance.5. Protect existing vegetation, structures, utilities, and other items to remain.6. All demolition items shall be removed from the site at CONTRACTOR'S expense and disposed of inaccordance with all local, state, and federal regulations.7. Regularly clean-up and remove demolished materials from the site so that they do not accumulate.EROSION AND SEDIMENT CONTROL NOTES1. The temporary erosion control systems installed by CONTRACTOR shall be properly maintained asrequired to control erosion and siltation at all times during the life of the contract. This work shall includerepair of the various systems, removal of trapped sediment, and cleaning or replacement of erosioncontrol measures. Accumulated silt in the work area shall be removed from the site as an incidental costto the project or shall be used on-site if approved by OWNER. If CONTRACTOR fails to maintain theerosion control systems as directed by ENGINEER, OWNER may at the expiration of a period of 48hours, after having given CONTRACTOR written notice, proceed to maintain the systems as deemednecessary, and the cost thereof shall be deducted from any compensation due to CONTRACTOR.2. CONTRACTOR shall install temporary erosion control measures prior to land-disturbing activities.3. CONTRACTOR shall repair erosion damage to the finished surfaces at no additional cost to OWNER.UTILITY NOTES1. CONTRACTOR shall call the Indiana Underground Plant Protection Service ("Indiana 811") by dialing811 at least 48 hours prior to commencement of land-disturbing activities to schedule a utility locate. Itis CONTRACTOR'S responsibility to verify the location of all existing utilities and to report anydiscrepancies or omissions with the existing utilities shown on the plans to ENGINEER immediately.2. CONTRACTOR shall protect all existing utilities as required to prevent damage.3. All utilities must be fully operational and accessible throughout the project unless otherwise coordinatedwith and approved by OWNER, ENGINEER, and utility company at least two (2) days in advance of theproposed interruption.4. Any and all damage to existing utilities must be repaired in kind at CONTRACTOR'S expense.5. UTILITY CONTACTS:AT&T (Cable TV/Internet),574-231-8035AEP (Electric): Tony Macias, 574-236-1658NIPSCO (Gas): Jonathan Erdahl, 574-800-6132South Bend Water Works (Water): Scott Horvath, 574-235-9236South Bend Sewer (Storm & Sanitary), 574-235-9444SURVEY NOTES1. CONTOURS ARE ACCURATE TO WITHIN ONE-HALF THE CONTOUR INTERVAL.2.COORDINATE SYSTEM: THE HORIZONTAL AND VERTICAL DATUMS FOR THIS SURVEYWERE BASED ON THE INCORS NETWORK STATION MINI (MICHIGAN STATION).GROUND SCALE FACTOR = 1.0000364012PROJECT SITE SETTINGS: LATITUDE N 41°41'29.04", LONGITUDE W 86°15'47.47".THE UNITS FOR THIS DATA COLLECTION ARE U.S. SURVEY FEET.NAME:US STATE PLANE 1983DATUM:NAD 1983 (CONUS)(MOL)ZONE:INDIANA EAST 1301GEOID:G12 AUSVERTICAL DATUM:NAVD 88 (NGS)CONTROL POINT #101MAG NAIL SET @ EDGE OF PAVEMENTCONTROL POINT #104MAG NAIL SET @ EDGE OF PAVEMENTCONTROL POINT #105MAG NAIL SET @ EDGE OF PAVEMENT Riverside DriveW. North Shore Drive< < St. Joseph RiverHudson AvenueYuk o n A v e n u e V a s s a r A v e 0+00 1+00 2+002+25HHHH0+001+002+003+004+005+006+006+500+001+002+002+35LAND USE #CHECKEDSHEET NUMBERPROJECT #SHEET TITLEDESIGNEDDATEDRAWN DESCRIPTION#DATE BY EXISTING CONDITIONS Riverside Drive Bank Stabilization City of South Bend Board of Public Works CITY OF SOUTH BEND, INDIANAEXISTING3OCT 2021CODRAS JBRJ18X4656BID DOCUMENTS ----PLAN VIEWWALKERTON 708 Roosevelt Road Walkerton, IN 46574 USA TEL (1) 574-586-3400 www.cardno.com R:\Projects\18\18X\18X465600_CityofSouthBend_LARE_St.JosephRiverBankStabilization\CAD\DESIGN\20211020_StJosephRiverDESIGN.dwg - 10/21/2021 1:41:15 PM 020 40 FeetLEGENDSTORMWATER LINEWATER LINESEWER LINEELECTRIC LINETELEPHONE LINECABLE TV LINEGAS LINEOVERHEAD ELECTRIC LINEEXISTING GRADEPROJECT LIMITSHISTORIC STREET LAMPSOIL BORING (SEE SPECIFICATIONS)PROPERTY LINEEDGE OF PAVEMENTORDINARY HIGH WATER MARK 670.0BASE FLOOD ELEVATION RANGE=675.1 to 674.9Primary Slope FailureExtended Slope FailureNOTE:1. All utilities depth, size and location areapproximate and to be verified by Contractorprior to construction.2. Base Flood Elevations based on FEMAFlood Insurance Study and flood hazardmaps.H Riverside DriveW. North Shore Drive< < St. Joseph RiverHudson AvenueYuk o n A v e n u e V a s s a r A v e HHHH0+001+002+003+004+005+006+006+500+001+002+002+35LAND USE #CHECKEDSHEET NUMBERPROJECT #SHEET TITLEDESIGNEDDATEDRAWN DESCRIPTION#DATE BY ACCESS, DEMOLITION AND EROSION CONTROL Riverside Drive Bank Stabilization City of South Bend Board of Public Works CITY OF SOUTH BEND, INDIANAACCESS/DEMO/EROSION4OCT 2021CODRAS JBRJ18X4656BID DOCUMENTS ----PLAN VIEWWALKERTON 708 Roosevelt Road Walkerton, IN 46574 USA TEL (1) 574-586-3400 www.cardno.com R:\Projects\18\18X\18X465600_CityofSouthBend_LARE_St.JosephRiverBankStabilization\CAD\DESIGN\20211020_StJosephRiverDESIGN.dwg - 10/21/2021 1:41:25 PM 0 20 40 FeetLEGENDSTORMWATER LINEWATER LINESEWER LINEELECTRIC LINETELEPHONE LINECABLE TV LINEGAS LINEOVERHEAD ELECTRIC LINEEXISTING GRADEHISTORIC STREET LAMPTREES GREATER THAN 4" DIAMETER ORLARGER AT 24" ABOVE GROUND FELLED TO 6"STUMP OR REMOVED (30 TOTAL)EDGE OF PAVEMENTORDINARY HIGH WATER MARK 670.0BASE FLOOD ELEVATION RANGE=675.1 to 674.9SILT FENCESTAGING AND STOCKPILE AREAPOTENTIAL ACCESS ROUTENOTE:1. All utilities depth, size and location are approximate and to be verified byContractor prior to construction.2. Protect trees during construction. No removal of trees 4" diameter or largernot indicated on plans. Any trees removed or damaged must be replaced atContractor's expense.3. All trees 4" or greater, not indicated by X for removal or approved forremoval by the Engineer, that are removed or damaged for site access orconstruction will be replaced with minimum 3 gallon stock replacementtrees at no cost to the City.4. Trees indicated for removal to be removed entirely (rootball included).5. Trees identified as potential bat trees to be removed in advance of batrestriction season. Work to be completed between February 15 and March31, 2022.6. Vegetative and material debris to be hauled off site. Clearing and grubbingto be limited to the vegetation and areas necessary for proper installation ofstructures proposed. Remove any debris necessary for the properinstallation of structures proposed.7. Base Flood Elevations based on FEMA Flood Insurance Study and floodhazard maps.8. Historic street lamps along with stone pillars, stone retaining wall, andfence along Riverside Drive to be protected in place. The Contractor isresponsible for any expense and replacment required due to damage ofthese structures.9. Regardless of access route selected by Contractor, all erosion andsediment control requirements of related permits will be required. This mayrequire additional blanketing, silt fence or other means.H# Riverside DriveW. North Shore Drive< < St. Joseph RiverHudson AvenueYukon AvenueV a s s a r A v e HHHH0+001+002+003+004+005+006+006+500+001+002+002+35LAND USE #CHECKEDSHEET NUMBERPROJECT #SHEET TITLEDESIGNEDDATEDRAWN DESCRIPTION#DATE BY PROPOSED PLAN Riverside Drive Bank Stabilization City of South Bend Board of Public Works CITY OF SOUTH BEND, INDIANAPROPOSED PLAN5OCT 2021CODRAS JBRJ18X4656BID DOCUMENTS ----PLAN VIEWWALKERTON 708 Roosevelt Road Walkerton, IN 46574 USA TEL (1) 574-586-3400 www.cardno.com R:\Projects\18\18X\18X465600_CityofSouthBend_LARE_St.JosephRiverBankStabilization\CAD\DESIGN\20211020_StJosephRiverDESIGN.dwg - 10/21/2021 1:41:30 PM 0 20 40 FeetLEGENDSTORMWATER LINEWATER LINESEWER LINEELECTRIC LINETELEPHONE LINECABLE TV LINEGAS LINEOVERHEAD ELECTRIC LINEEXISTING GRADEPROPOSED ROCK TOE (TOE OF SLOPE TO ELEV 670)COIR MAT (700 g) UNDERLAIN WITH NAG SC150BN ANDNATIVE SEED INSTALLATION APPROX. LIMITSNAG SC150BN EROSION CONTROL BLANKET AND NATIVESEED INSTALLATION APPROX. LIMITSHISTORIC STREET LAMPPROPERTY LINEEDGE OF PAVEMENTORDINARY HIGH WATER MARK 670.0BASE FLOOD ELEVATION RANGE=675.1 to 674.9HNOTE:1. Refer to Grading Plan and Access, Demolition and Erosion Control Plansheets.2. All roadway asphalt and curb damaged during construction shall berepaired or replaced in kind by the Contractor at no additional cost to theCity. Any asphalt pavement damaged shall be milled 1.5” and overlaid with1.5” Hot Mix Asphalt. Curb to be replaced in-kind.3. All utilities depth, size and location are approximate and to be verified byContractor prior to construction.4. Trees indicated for removal to be cut to stumps approximately 6" aboveground and removed from site. Trees located near the top of bank proposedfor 2:1 grading may need to be removed entirely (rootball included) ifproposed grade does not allow for stumps remaining.5. All trees 4" or greater, not indicated by X for removal or approved forremoval by the Engineer, that are removed or damaged for site access orconstruction will be replaced with minimum 3 gallon stock replacementtrees at no cost to the City.6. Clearing and grubbing to be limited to the vegetation and areas necessaryfor proper installation of structures proposed. Remove any debrisnecessary for the proper installation of structures proposed. Vegetative andmaterial debris to be hauled off site.7. Base Flood Elevations based on FEMA Flood Insurance Study and floodhazard maps.8. Historic street lamps along with stone pillars, stone retaining wall, andfence along Riverside Drive to be protected in place. The Contractor isresponsible for any expense and replacment required due to damage ofthese structures. Riverside DriveW. North Shore Drive< < St. Joseph RiverHudson AvenueYukon AvenueV a s s a r A v e HHHH0+001+002+003+004+005+006+006+500+001+002+002+35LAND USE #CHECKEDSHEET NUMBERPROJECT #SHEET TITLEDESIGNEDDATEDRAWN DESCRIPTION#DATE BY GRADING PLAN Riverside Drive Bank Stabilization City of South Bend Board of Public Works CITY OF SOUTH BEND, INDIANAGRADING PLAN6OCT 2021CODRAS JBRJ18X4656BID DOCUMENTS ----PLAN VIEWWALKERTON 708 Roosevelt Road Walkerton, IN 46574 USA TEL (1) 574-586-3400 www.cardno.com R:\Projects\18\18X\18X465600_CityofSouthBend_LARE_St.JosephRiverBankStabilization\CAD\DESIGN\20211020_StJosephRiverDESIGN.dwg - 10/21/2021 1:41:34 PM 0 20 40 FeetLEGENDSTORMWATER LINEWATER LINESEWER LINEELECTRIC LINETELEPHONE LINECABLE TV LINEGAS LINEOVERHEAD ELECTRIC LINEEXISTING GRADEPROPOSED GRADEHISTORIC STREET LAMPPROPOSED 2:1 GRADING. MAX SLOPE 1.8:1 AT TIE INLOCATIONS5+00 TO 6+00 FROM 695 ELEV. TO TOP-OF-BANK4+50 TO 5+00 FROM 690 ELEV. TO TOP-OF-BANK2+50 TO 4+50 FROM 670 ELEV. TO TOP-OF-BANKHNOTE:1. All utilities depth, size and location are approximate and to be verified byContractor prior to construction.2. Protect trees during construction. No removal of trees 4" diameter or largernot indicated on Access, Demolition, Erosion Control Plan sheet unlessapproved by the Engineer. Any trees removed or damaged must bereplaced at Contractor's expense.3. Historic street lamps along with stone pillars, stone retaining wall, andfence along Riverside Drive to be protected in place. The Contractor isresponsible for any expense and replacment required due to damage ofthese structures.670675680685690695700670675680685690695700 650650655660665670675680685690695700650650660670680690700655655660665670675680685690695700705655660670680690700648650655660665670675680685690695700648650660670680690700647650655660665670675680685690695700647650660670680690700LAND USE #CHECKEDSHEET NUMBERPROJECT #SHEET TITLEDESIGNEDDATEDRAWN DESCRIPTION#DATE BY CROSS SECTIONS Riverside Drive Bank Stabilization City of South Bend Board of Public Works CITY OF SOUTH BEND, INDIANAPROPOSED PLAN7OCT 2021CODRAS JBRJ18X4656BID DOCUMENTS ----WALKERTON 708 Roosevelt Road Walkerton, IN 46574 USA TEL (1) 574-586-3400 www.cardno.com R:\Projects\18\18X\18X465600_CityofSouthBend_LARE_St.JosephRiverBankStabilization\CAD\DESIGN\20211020_StJosephRiverDESIGN.dwg - 10/21/2021 1:41:40 PM OHWM ELEV 670BFE ELEV 675.1GAS LINEELECTRIC LINESTORMWATER LINENOTE:1. All structure elevations at bottom of river are approximate with the routinelychanging nature of river bottoms.2. Cross sections facing downstream.3. All utilities depth, size and location are approximate and to be verified byContractor prior to construction.PROPOSED ROCK TOEMINIMUM 2-2.25' THICK; MAX 1.5: 1TOP OF ROCK SLOPE TO 668 ELEVPROPOSED ROCK TOEMINIMUM 2-2.25' THICK;MAX 1.5: 1TOP OF ROCK SLOPE TO 668 ELEVPROPOSED ROCK TOEMINIMUM 2-2.25' THICK; MAX 1.5: 1TOP OF ROCK SLOPE TO 670 ELEVPROPOSED ROCK TOEMINIMUM 2-2.25' THICK;MAX 1.5: 1 TOP OF ROCK SLOPE TO 670 ELEVREMOVE TREES DESIGNATED FOR REMOVAL. PROTECTTREES 4" DIAMETER OR LARGER.REMOVE TREES DESIGNATED FOR REMOVAL. PROTECTTREES 4" DIAMETER OR LARGER.OHWM ELEV 670BFE ELEV 675.1OHWM ELEV 670BFE ELEV 675.0OHWM ELEV 670BFE ELEV 675.0FILL VOID WITH ON SITE CUT SOILEXISTING GRADEEXISTING GRADEEXISTING GRADEEXISTING GRADESEEDED WITH NATIVE SEED MIX AND BLANKETEDWITH COIR MAT. ELEV. 670 to 680SEEDED WITH NATIVE SEED MIX AND BLANKETED WITH NAGSC150BN OR EQUIVALENT ELEV. 680 to TOP OF EMBANKMENTSEEDED WITH NATIVE SEED MIX AND BLANKETEDWITH COIR MAT. ELEV. 670 to 680GAS LINEELECTRIC LINEGAS LINEELECTRIC LINEGAS LINEELECTRIC LINEQUANTITIESESTIMATE:Class I Rip Rap~45 FT2QUANTITIESESTIMATE:Class I Rip Rap~70 FT2QUANTITIESESTIMATE:Class I Rip Rap~70 FT2Cut ~3 FT2Fill ~3 FT2QUANTITIESESTIMATE:Class I Rip Rap~100 FT2Cut ~200 FT2Fill ~15 FT2STORMWATER LINESTORMWATER LINE 650650655660665670675680685690695700705650650660670680690700654655660665670675680685690695700654660670680690700653655660665670675680685690653660670680690LAND USE #CHECKEDSHEET NUMBERPROJECT #SHEET TITLEDESIGNEDDATEDRAWN DESCRIPTION#DATE BY CROSS SECTIONS Riverside Drive Bank Stabilization City of South Bend Board of Public Works CITY OF SOUTH BEND, INDIANAPROPOSED PLAN8OCT 2021CODRAS JBRJ18X4656BID DOCUMENTS ----WALKERTON 708 Roosevelt Road Walkerton, IN 46574 USA TEL (1) 574-586-3400 www.cardno.com R:\Projects\18\18X\18X465600_CityofSouthBend_LARE_St.JosephRiverBankStabilization\CAD\DESIGN\20211020_StJosephRiverDESIGN.dwg - 10/21/2021 1:41:44 PM NOTE:1. All structure elevations at bottom of river are approximate with the routinelychanging nature of river bottoms.2. Cross sections facing downstream.3. All utilities depth, size and location are approximate and to be verified byContractor prior to construction.STORMWATER LINEPROPOSED ROCK TOEMINIMUM 2-2.25' THICK;MAX 1.5: 1 TOP OF ROCK SLOPE TO 670 ELEV REMOVE TREES DESIGNATED FOR REMOVAL. PROTECTTREES 4" DIAMETER OR LARGER.OHWM ELEV 670BFE ELEV 675.0EXISTING GRADESEEDED WITH NATIVE SEED MIX AND BLANKETED WITH NAGSC150BN OR EQUIVALENT ELEV. 680 to TOP OF EMBANKMENTSEEDED WITH NATIVE SEED MIX AND BLANKETEDWITH COIR MAT. ELEV. 670 to 680GAS LINEELECTRIC LINEQUANTITIESESTIMATE:Class I Rip Rap~70 FT2Cut ~180 FT2Fill ~0 FT2STORMWATER LINEPROPOSED ROCK TOEMINIMUM 2-2.25' THICK;MAX 1.5: 1 TOP OF ROCK SLOPE TO 668 ELEVREMOVE TREES DESIGNATED FOR REMOVAL. PROTECTTREES 4" DIAMETER OR LARGER.OHWM ELEV 670BFE ELEV 675.0EXISTING GRADESEEDED WITH NATIVE SEED MIX AND BLANKETED WITH NAGSC150BN OR EQUIVALENT ELEV. 680 to TOP OF EMBANKMENTGAS LINEQUANTITIESESTIMATE:Class I Rip Rap~63 FT2Cut ~68 FT2Fill ~0 FT2PROPOSED ROCK TOEMINIMUM 2-2.25' THICK;MAX 1.5: 1 TOP OF ROCK SLOPE TO 668 ELEVOHWM ELEV 670BFE ELEV 675.0EXISTING GRADEGAS LINEQUANTITIESESTIMATE:Class I Rip Rap~53 FT2 Riverside DriveW. North Shore Drive< < St. Joseph RiverHudson AvenueYukon AvenueV a s s a r A v e 0+00 1+00 2+002+25HHHH0+001+002+003+004+005+006+006+500+001+002+002+35LAND USE #CHECKEDSHEET NUMBERPROJECT #SHEET TITLEDESIGNEDDATEDRAWN DESCRIPTION#DATE BY STABILIZATION / PLANTING PLAN Riverside Drive Bank Stabilization City of South Bend Board of Public Works CITY OF SOUTH BEND, INDIANASTABILIZATION / PLANTING9OCT 2021CODRAS JBRJ18X465600BID DOCUMENTS ----PLAN VIEWWALKERTON 708 Roosevelt Road Walkerton, IN 46574 USA TEL (1) 574-586-3400 www.cardno.com R:\Projects\18\18X\18X465600_CityofSouthBend_LARE_St.JosephRiverBankStabilization\CAD\DESIGN\20211020_StJosephRiverDESIGN.dwg - 10/21/2021 1:41:50 PM 0 20 40 FeetLEGENDSTORMWATER LINEWATER LINESEWER LINEELECTRIC LINETELEPHONE LINECABLE TV LINEGAS LINEOVERHEAD ELECTRIC LINEEXISTING GRADEHISTORIC STREET LAMPPROPOSED ROCK TOEAPPROX LIMITS OF NATIVE SEED MIX ANDCOIR MAT (700 g) UNDERLAIN WITH NAGSC150BN. INSTALL WITH HEAVY DUTYGRIPPLE 12" TWIST PINS AT 2'X' ONCENTER (500 Sq. YD)APPROXIMATE LIMITS OF NATIVE SEEDMIX AND NAG SC150BN OR EQUIVALENT.INSTALL WITH 18" GEOPINS AT 2'X2' ONCENTER (1,050 Sq.YD)STAGING AREASHRUB INSTALLATIONPROPERTY LINEEDGE OF PAVEMENTPLANTING NOTES1. Trees and shrubs shall be installed in offset (angled) rows between thetop of rip rap and top of bank 10 ft on center.2. Same species shall not be planted adjacent to each other.3. Native Seed Mix to be seeded in all disturbed areas from top of bank torock toe.4. All disturbed areas, not already designated for other seeding/planting, tobe seeded with INDOT R Mix and blanketed and pinned with NAGS75BN or equivalent.H BANK TREATMENT WITH ROCK TOE 2+70 TO 4+50NOT TO SCALEINDOT CLASS I RIP RAP TYP 2.0 - 2.25' THICKSEEDED WITH NATIVE SEED MIX AND BLANKETED WITH NAGSC150BN OR EQUIVALENT ELEV. 680 to TOP OF EMBANKMENTELEV.670ELEV.680ELEV. 704/ TOP OF BANKPROPOSED 2:1 GRADESEEDED WITH NATIVE SEED MIX AND BLANKETED COIRMAT (700g) UNDERLAIN WITH NAG SC150BN. 670 to 680OR AS INDICATED BY PLANS2OHWMBFETOP OF ROCK MAX 1.5H: 1V SLOPETYP 2.0 - 2.25'THICKPER MANUFACTURER'S RECOMMENDATIONTRENCH MINIMUM 0.5'EXISTING STREAMBEDBANK TREATMENT WITH ROCK TOE 0+80 to 2+70 and 6+00 to 6+50NOT TO SCALEINDOT CLASS I RIP RAPTYP 2.0 - 2.25' THICKELEV.6701OHWMBFETOP OF ROCKMAX 1.5H: 1V SLOPETYP 2.0 -2.25'THICKEXISTING STREAM BEDPROTECT TREES 4" IN DIAMETER ORLARGERLAND USE #CHECKEDSHEET NUMBERPROJECT #SHEET TITLEDESIGNEDDATEDRAWN DESCRIPTION#DATE BY DETAILS Riverside Drive Bank Stabilization City of South Bend Board of Public Works CITY OF SOUTH BEND, INDIANADETAILS10OCT 2021CODRAS JBRJ18X4656BID DOCUMENTS ----WALKERTON 708 Roosevelt Road Walkerton, IN 46574 USA TEL (1) 574-586-3400 www.cardno.com R:\Projects\18\18X\18X465600_CityofSouthBend_LARE_St.JosephRiverBankStabilization\CAD\DESIGN\20211020_StJosephRiverDESIGN.dwg - 10/21/2021 1:41:53 PM REMOVE TREES DESIGNATED FOR REMOVAL. REFER TO ACCESS,DEMOLITION AND EROSION CONTROL PLAN SHEET FOR GUIDELINESON TREE REMOVAL.BANK TREATMENT WITH ROCK TOE 4+50 TO 6+00NOT TO SCALEINDOT CLASS I RIP RAP TYP 2.0 - 2.25' THICKSEEDED WITH NATIVE SEED MIX AND BLANKETED WITH NAGSC150BN OR EQUIVALENT ELEV. 690 / 695 to TOP OF EMBANKMENTELEV.670ELEV. 704/ TOP OF BANKPROPOSED GRADE3OHWMBFETOP OF ROCK MAX 1.5H: 1V SLOPETYP 2.0 -2.25'THICKPER MANUFACTURER'S RECOMMENDATIONTRENCH MINIMUM 0.5'EXISTING STREAMBEDREMOVE TREES PROPOSED FOR REMOVAL. REFER TO ACCESS,DEMOLITION AND EROSION CONTROL PLAN SHEET FORGUIDELINES ON TREE REMOVAL. LAND USE #CHECKEDSHEET NUMBERPROJECT #SHEET TITLEDESIGNEDDATEDRAWN DESCRIPTION#DATE BY DETAILS Riverside Drive Bank Stabilization City of South Bend Board of Public Works CITY OF SOUTH BEND, INDIANADETAILS11OCT 2021CODRAS JBRJ18X4656BID DOCUMENTS ----WALKERTON 708 Roosevelt Road Walkerton, IN 46574 USA TEL (1) 574-586-3400 www.cardno.com R:\Projects\18\18X\18X465600_CityofSouthBend_LARE_St.JosephRiverBankStabilization\CAD\DESIGN\20211020_StJosephRiverDESIGN.dwg - 10/21/2021 1:41:58 PM NOT TO SCALEINLET PROTECTIONSilt Fence shall be a machine produced, non-woven geotextile of 100%polypropylene meeting the physicalproperties below. Reference City of South Bend Standard Details for infoAll stakes shall be 2" X 2" hardwood 36" tall with 24" tall lath stapled to stakes over fabric as reinforcement.Install silt fence as needed to insure sediment control.Fabric Weight........................................................... 4 oz/sydGrab Strength.......................................................... Warp 125 lbs.Elongation................................................................ Warp 50 %Trapezoidal Tear Strength....................................... 50 lbs.Burst Strength......................................................... 200 psiUV Resistance.......................................................... > 70 %A.O.S......................................................................... 50-80Slurry Flow Rate...................................................... 225 gpm/sq. ftSediment Retention................................................. 75 %STAKES @ 5' O.C.GROUND SURFACESILT FENCE MATERIALSHOULD BE BURIED 6"BELOW GROUND SURFACEFENCE POSTSILT FENCE MATERIALFENCE POST SHOULD BEBURIED 1' BELOW GROUNDSURFACE1'2'SILT FENCE65NOT TO SCALETYPICAL EROSION CONTROL BLANKET INSTALLATIONNOT TO SCALE2:1 SLOPE TAMP SOIL OVER MAT/BLANKETTRENCHING REQ'D.18"6" MIN. OVERLAP18"EROSION CONTROL BLANKETINSTALLED HORIZONTALLYACROSS SIDE SLOPESSECURED WITH PINS/STAPLESAND TRENCHED AT BOTTOM, TOPAND SIDES OF EMBANKMENTGEOPININSTALLED WITHNAG SC150BN BLANKET1. EROSION CONTROL BLANKET SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS AND GRASS.2. APPLY PERMANENT SEEDING BEFORE PLACING BLANKETS.3. BLANKETS SHALL HAVE GOOD SOIL CONTACT.4. LAY BLANKETS LOOSELY AND STAPLE TO MAINTAIN DIRECT CONTACT WITH THE SOIL. DO NOT STRETCH.5. INSTALL PER MANUFACTURER'S RECOMMENDATIONS INCLUDING OVERLAP OF 6" AT EACH BLANKET.6. UPSTREAM AND DOWNSTREAM ENDS OF EROSION CONTROL BLANKET SHALL BE KEYED 6" OR MORE INTO SUBSTRATE.7. UPPER AND LOWER EDGE OF EROSION CONTROL BLANKET SHALL BE KEYED INTO SUBSTRATE 6" OR MORE AS SHOWN.8. COIR MAT (700 g) UNDERLAIN WITH NAG SC 150BN SHALL BE INSTALLED PARALLEL TO FLOW FROM THE TOP OF THEROCK TOE TO AT MINIMUM ELEVATION 680'. GRIPPLE 12" HIGH LOAD TWIST ANCHOR PINS OR EQUIVALENT TO PINBLANKET 2' ON CENTER.9. NAG SC150BN EROSION CONTROL MAT SHALL BE INSTALLED FROM TOP OF COIR MAT TO 5' BEYOND TOP OF BANK. 18"GEOPINS TO SECURE BLANKET 2' ON CENTER.EROSION CONTROL BLANKET NOTES18" MINIMUM6"(15 cm)12"12"6"TWIST ANCHOR PININSTALLED WITHIN AREAS OF COIR MAT (700 g)12" MINIMUM6"4"- 6"6"12"4SILT FENCE NOTES LAND USE #CHECKEDSHEET NUMBERPROJECT #SHEET TITLEDESIGNEDDATEDRAWN DESCRIPTION#DATE BY SAMPLE TRAFFIC CONTROL PLAN Riverside Drive Bank Stabilization City of South Bend Board of Public Works CITY OF SOUTH BEND, INDIANATRAFFIC CONTROL12OCT 2021CODRAS JBRJ18X465600BID DOCUMENTS ----PLAN VIEWWALKERTON 708 Roosevelt Road Walkerton, IN 46574 USA TEL (1) 574-586-3400 www.cardno.com R:\Projects\18\18X\18X465600_CityofSouthBend_LARE_St.JosephRiverBankStabilization\CAD\DESIGN\20211020_StJosephRiverDESIGN.dwg - 10/21/2021 1:42:04 PM 0 75 150 FeetSAMPLE TRAFFIC CONTROL PLAN1. Project shall entail a full road closure from Angela Blvd to Vassar Avenue.2. After the award of the contract and before beginning the work, the Contractorshall submit their proposed Maintenance of Traffic (MOT) to the Engineer forreview. Additional signage may be required and shall be considered incidentalto the work.3. Sidewalk closure signage and detour signage at intersections to be required inaddition to detail shown on this sheet.4.Maintenance of traffic during construction shall conform to the "IndianaManual on Uniform Traffic Control Devices" and the City of South BendDesign and Construction Standards.5.The City's "Traffic Closure Request" form is to be used for any lanerestrictions or closures and required to be filled out and sent to theDepartment of Public Works.6.The Contractor shall arrange and prosecute the work specified for thiscontract in accordance with the approved MOT plan throughout the Project.No construction equipment, vehicles, materials, supplies or temporaryfacilities shall be left unattended in the right-of-way of any street or left parkedovernight without proper marking and lighting.7.MOT adjustments may be required to encourage additional traffic safety.8.Contractor shall specify MUTCD signage.A. Road Closed Ahead signs shall be located a minimum of 500 feet from roadclosure in addition to the nearest intersection.B. LOCATION: See Plan View for specific locations. Signs to be located on theright-hand side of the street or highway in the following order. Additionalsignage for sidewalk closure and detours to be required.C. SIZE – The standard size for advance warning signs in work zones isgenerally 48 inches by 48 inches. Where speeds and volumes are moderatelylow, a minimum size of 36 inches by 36 inches may be used. Temporarypost-mounted signs should be mounted at a height of at least 7 feet,measured from the bottom of the sign.D. DURATION - Warning signs shall be installed a minimum of 5 days prior towork starting and remain in place until the project completion.ROADWAY SIGNSNOT TO SCALEHUDSON AVENUEYUKON AVENUEVASSAR AVENUE RIVERSIDE DRIVEANGELA BLVD500 FEET500 FEETSIDEWALKS CLOSEDEAST SIDE OF RIVERSIDESIDEWALKS OPENWEST SIDE OF RIVERSIDE Michele Gelfman, President HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY CERTIFICATE OF APPROPRIATENESS The Historic Preservation Commission of South Bend and St. Joseph County has approved the following work: Removal of 8 trees from the embankment along Riverside Drive and the St. Joseph River, approximately between Vassar Avenue and Hudson Avenue (with access and consent from properties as per the supporting documentation). Work to be completed in advance of embankment stabilization project. Milestone Contractors North, Inc, Contractor for the following location: RIVERSIDE DRIVE RIVER EMBANKMENT South Bend, IN, 46616 Riverside Drive Application No. 2022-0225 in the County of St. Joseph; State of Indiana; which is: Located in a Local Historic District A Local Historic Landmark and found this application to be appropriate according to the Standards pertaining to Local Historic Landmarks and/or Local Historic Districts. Regulations pertaining to the Historic Preservation Commission are found in Chapter 21 (Zoning), South Bend Municipal Code and Chapter 26 of the St. Joseph County Code. The issuance of this certificate does NOT in any manner, release the recipient from the responsibility of complying with the requirements of the zoning ordinances, building codes, safety codes, ADA or other requirements of the City of South Bend, the County of St. Joseph, the State of Indiana, or the United States Federal Government. This certificate is good for one year from the date of issuance and is effective from the date entered herein. Plans are on file and open for public inspection at the office of the Historic Preservation Commission of South Bend and St. Joseph County, 227 West Jefferson Blvd., Suite 1400 S, South Bend, Indiana, during normal business hours. THIS CERTIFICATE IS NOT TRANSFERABLE NAME OF APPLICANT:CIVIL CITY CITY OF SOUTH BEND CERTIFICATE ISSUED BY: Adam Toering Historic Preservation Administrator POST IN A CONSPICUOUS PLACE ON THE STREET SIDE OF THE PROJECT UNTIL COMPLETION OF ALL WORK. Phone: (574) 235-9371 E-mail: SBSJCHPC@southbendin.gov ADAM TOERING Historic Preservation Administrator 2/25/2022DATE CERTIFICATE TAKES FORCE:2/25/2023DATE CERTIFICATE EXPIRES: Ord No. 7469-85 Riverside Drive ADMINISTRATIVE APPROVAL