Loading...
HomeMy WebLinkAboutOpening of Proposal - Safe Routes to School - Our Lady of Hungary Neighborhood Proj No. 122-007 - VS EngineeringCIT Y OF SOUTH BEND PE SERVICES FOR SAFE ROUTES TO SCHOOL Our Lady of Hungar y Neighborhood Sidewalks and ADA Ramps LETTER OF INTEREST March 8, 2022 February 22, 2022   Finnian Cavanaugh, Project Engineer 227 W. Jefferson Blvd South Bend, IN 46601 Re: City of South Bend PE Services for Safe Routes to School – Our Lady of Hungary Neighborhood Sidewalks and ADA Ramps (Des # 2100025) in the LaPorte District. Dear Mr. Cavanaugh: On behalf of VS Engineering (VS), thank you for the opportunity to submit our proposal for the Our Lady of Hungary Neighborhood Sidewalks and ADA Ramps Safe Routes to School (SRTS) project. This VS team was strategically developed to provide the City of South Bend with proven leadership; local experience; experts in roadway, pedestrian, and traffic design; and ample capacity to deliver the SRTS project. VS and McCormick Engineering have partnered on roadway projects across northern Indiana. This is a partnership where each firm has taken the lead on projects based on the client, available capacity and required expertise. At VS, we know that our work reflects on you and understand your need for a superior and worry-free project delivered on time, within budget. Our team, led by Project Manager Mark Herald, PE, will communicate with you at every step of the way and work together with you to make sure it happens. His reliability and longstanding local experience is a benefit to the City, as Mark will take your project from start to finish and allow the City to work with one Project Manager for the entirety of the project. Mark’s experience on South Bend’s prior SRTS projects – Lincoln Primary and Perley Fine Arts Academy – and communities across Northern Indiana will allow him to hit the ground running by addressing items on the critical path early to help keep the project moving forward at the necessary pace. Mark understands the complexities that accompany an urban retrofit of pedestrian facility improvements and will put his expertise to use to keep this SRTS project on track. Mark’s leadership, local resources and past successes for the City of South Bend make him the perfect partner to complete this safety improvement project. The VS Team in place to support Mark includes Design Lead – Joe Dluzak, Quality Control by Chris Waidner, PE, and multiple other industry experts in signal design, utility coordination, environmental documentation and other facets of engineering necessary to deliver the SRTS project. The Our Lady of Hungary Neighborhood Sidewalks and ADA Ramps SRTS project will address substandard pedestrian infrastructure and level of service within the area, and will also serve to successfully blend public health and safety, community growth and enhanced amenities. South Bend has made a strong commitment to the community to provide a safe option for students to walk and bike to school. We recognize that this project is not simply a sidewalk improvement — it also creates an asset for future economic development and aids in continuing the City’s beautification efforts. This VS / McCormick Engineering Team is committed to delivering a great project from start to finish. As with each of our projects, we pledge our enthusiasm, complete customer satisfaction, and most importantly, VS Commitment. We will deliver a project of which you can be proud! Respectfully Submitted, SANJAY PATEL, PE President/CEO Principal-in-Charge sbpatel@vsengineering.com C: 317.626.0070 RESPONSIBLE OFFICE: 9910 Dupont Cir Dr E Suite 210, Fort Wayne, IN 46825 260.489.6635 www.vsengineering.com MARK HERALD, PE Project Manager Northern Region Director mherald@vsengineering.com C: 260.348.1768 5.2, 6.1, 8.1, 12.2 8.1 VS Engineering McCormick Engineering (DBE) 97%3% CIT Y OF SOUTH BEND PE Ser vices for Safe Routes to School Our Lady of Hungary Neighborhood Sidew alks and ADA Ra m ps VS Engineering, Inc. | Letter of Interest 2   PROJECT APPROACH PROJECT FAMILIARITY The City of South Bend has taken preliminary steps in improving the walkability and safety associated with pedestrian traffic to Our Lady of Hungary School and the surrounding neighborhood. The most compelling contribution to this safety commitment is the City’s continued completion of Safe Routes to School projects and ultimate desire to ensure all South Bend schools have safe, ADA compliant sidewalks within walkable areas of each school. The execution of this plan has shown great benefits from prior projects in South Bend and will continue this success, especially in areas such as Our Lady of Hungary School where other City assets such as Rum Village Park, Kaiser Park and several neighborhood restaurants, will benefit. Per the City’s preliminary recommendation, sidewalk and ramp improvements near Our Lady of Hungary School will be focused primarily east of Kemble Avenue, west of Franklin Street, and north-south from East Ewing Avenue to Indiana Avenue. All existing curb ramps and sidewalks within this area will be evaluated, and where necessary, new curb ramps and sidewalks will be installed. In completing a site visit for both the school and surrounding neighborhood, VS staff found many areas in dire need of improvements including missing curb ramps, heaved sidewalks (trip hazard) due to tree root intrusion, overgrown sidewalks, missing sidewalks, etc. The VS Team understands the importance of assessing and designing infrastructure improvements as part of a comprehensive SRTS Plan that will enhance safety and promote a healthier lifestyle for children throughout the community. Development and implementation of a quality SRTS Plan includes a balance of transportation planning and engineering design components, which are both strengths of Mark and his team. Our commitment to assisting communities with their SRTS plans is evident by our extensive planning, design and implementation experience with sidewalks, recreational trails, and SRTS projects throughout the state. Project Purpose The Project Purpose is to provide design services for recommended infrastructure improvements that will enhance the walkability and bikeability for proposed and existing routes, trails and sidewalks near Our Lady of Hungary School. Infrastructure improvements constructed shall be designed to promote increased pedestrian and bicycle traffic when combined with other non-infrastructure components of a SRTS Plan. Project Need The Project Need for infrastructure improvements as part of the SRTS Plan is a result of the continued decline of students walking and biking to school. In this case, the existing conditions of the project areas leave much room for improvement as far as pedestrian safety is concerned. The first step to changing the pattern of walking/biking decline is to better understand the factors that are contributing to it. Based on a survey taken by the U.S. Centers for Disease Control and Prevention, parents noted the following reasons for not allowing their children to walk or bike to school: ƒDistance to School – As schools expand in size and can accommodate more students, the average distance from home to school also lengthens. ƒTraffic Safety – A common perception among parents is that it is more dangerous to walk or bike to school as vehicular traffic increases. CIT Y OF SOUTH BEND PE Ser vices for Safe Routes to School Our Lady of Hungary Neighborhood Sidew alks and ADA Ra m ps VS Engineering, Inc. | Letter of Interest 3   ƒWeather – Although SRTS Plans can be successful in locations that frequently experience adverse weather, parents still noted poor weather conditions as a reason for not allowing their children to walk or bike to school. ƒCrime - Kidnapping and assault were the two largest concerns of crime among parents for the children who walk or bike to school. The above factors are likely contributing to the decline of those who walk or bike to school within the City of South Bend as well. VS has a clear understanding of the limiting factors for those walking or biking to school, which is important to ensuring that the design of improvements meet the needs of the community and provides the best opportunity for the overall SRTS Plan’s success. Specific to the City of South Bend, there are locations with gaps in the existing sidewalks, or no sidewalks at all. The missing sidewalks cause children who are walking or riding bicycles to school to traverse through grassy areas, or move to the edge of the roadway. Walking or riding in the grassy area becomes a difficult task when the ground is wet, muddy or snow covered. When pedestrian traffic is in the roadway, it causes a higher probability for a vehicle/pedestrian accident. It is critical that the City maintain its partnership with school staff, parents, local residents and businesses to continue to create enthusiasm for the SRTS program. A successful SRTS Plan will not only address the project need to stop the declining number of students who walk or bike to school, but will also result in additional positive impacts on the community such as: ƒDecreased traffic congestion around schools ƒImproved air quality ƒImproved childhood health ƒIncreased community involvement ƒEnhanced accessibility within the community ƒIncreased safety within the community The VS Team has the knowledge and experience to assist the City of South Bend in designing the improvements necessary to address community concerns that are critical to the SRTS plan’s overall success in achieving maximum participation. VS ENGINEERING QUALIFICATIONS VS was founded in March 1980 and provides planning, design, surveying, construction inspection and contract administration services for transportation projects. To date, the firm has completed over 600 transportation projects, all within budget and schedule restraints. VS President Sanjay B. Patel, PE, Transportation Director Chris Waidner, PE, and Northern Region Director Mark Herald, PE, are actively involved with management of the firm’s transportation projects – including SRTS, INDOT and municipal projects very similar in nature to the proposed project. VS has significant experience with SRTS infrastructure design projects and our service is comprehensive—from review and modification of the scope as necessary to delivering a high quality, functional design which will benefit the community. VS currently is assisting LaPorte County and City of Fort Wayne to provide ADA compliant sidewalks, curb ramps, and recreational trail projects in order to ensure each community receives the maximum value from the planned improvements. Our experience in completing these modifications through working directly with INDOT’s District Offices will prove beneficial to South Bend. In addition, our prior SRTS projects at Perley Fine Arts Academy and Lincoln Primary have proven to be a success for both schools and adjacent neighborhoods. CIT Y OF SOUTH BEND PE Ser vices for Safe Routes to School Our Lady of Hungary Neighborhood Sidew alks and ADA Ra m ps VS Engineering, Inc. | Letter of Interest 4   PROJECT APPROACH The VS project approach revolves around ensuring that the City of South Bend and the local community get maximum benefit from infrastructure improvements constructed as part of this project. Our approach is comprehensive right from the start, and will include an initial meeting with City staff to review the scope of work and discuss any critical design elements that may be encountered. VS representatives have working experience with City officials and City design standards. We have visited the site, and reviewed GIS maps to identify the significant pedestrian routes to each school location. As a result, the VS Team has a thorough understanding of the City’s intent for this SRTS project. UNDERSTANDING — We understand that the proposed Safe Routes to School improvements are focused on enhancing accessibility to Our Lady of Hungary School, with large numbers of students living within walking distance of the schools. We will discuss with City officials to understand the importance of dedicating construction funds toward providing ADA compliant curb ramps, correcting trip hazards, or providing pedestrian facilities in areas which are lacking. VS understands there are challenges associated with this project. One challenge is to design the improvements so that all construction activities are within the existing right-of way. Our surveyors will research existing property documentation, as well as thoroughly search for property monuments in the field. With this information, property lines and right-of-way will be accurately displayed on the plans, allowing the engineers to design the sidewalks, ramps, and drainage components within the existing right-of-way, eliminating the need for additional land acquisition. Right-of-way acquisition slows down the overall progress of the project due to the many required steps involved. PRELIMINARY ASSESSMENT — VS shall conduct a detailed on-site assessment for all pedestrian facility improvements proposed as part of this project. The preliminary assessment will account for areas that may present specific design challenges that could impact project schedule and/or costs. As necessary, these critical areas will be discussed with the City prior to the design phase in order to verify the project approach and ensure that there are not any feasible alternatives that need consideration. Having already conducted a preliminary site visit, the VS Team is steps ahead in identifying challenges that may be encountered during design. Our team’s previous experience in handling large SRTS infrastructure projects will be beneficial in assisting the City to avoid common pitfalls with the schedule, cost, and design of the improvements. Below are several challenges the VS Team has encountered on similar SRTS assignments. Cross Slope Reading on the Digital Level CIT Y OF SOUTH BEND PE Ser vices for Safe Routes to School Our Lady of Hungary Neighborhood Sidew alks and ADA Ra m ps VS Engineering, Inc. | Letter of Interest 5   Environmental Documentation A common misconception on SRTS projects is that a Programmatic CE is applicable, which saves time and money on the environmental documentation process. Unfortunately, for sidewalk and curb ramp replacement in which work is completed within the existing right-of-way, a CE Level 1 (or higher depending on the scope of work) may be required due to unexpected temporary right- of-way needs (for drive reconstruction or yard re-grading) or due to historical impacts that simply can not be avoided. VS will conduct an initial review of the funding granted and the costs associated with the environmental documentation to determine up-front if there will be any complications in the environmental process, which is a critical item in the project schedule. If Environmental Documentation is required, VS pre-qualified staff will proceed according to the National Environmental Policy Act (NEPA), Federal Highway Administration (FHWA), and INDOT regulations. Drainage In some instances, sidewalk improvement along roadways with zero or minimal curb exposure may result in reversing drainage flow back onto the sidewalk or private property. Additionally, the existing sidewalk’s elevation and grade could lead to improper drainage resulting in ponding and long-term maintenance issues. Also of concern: construction of new sidewalks can create areas of stormwater collection. Proper drainage behind the sidewalks to the existing storm sewer inlets will need to be ensured. Temporary right-of-way for grading behind the walk may be necessary to tie in the improvements if grades must be modified. Relocations The addition of new sidewalk and curb ramps can result in mailbox, sign and utility pole relocations where unavoidable. The goal is to construct the improvements within the existing right-of-way where possible and minimize the need for any relocations. Additionally, new curb ramps are strategically designed to avoid having storm inlets in the crosswalks when possible. In most cases, storm inlets can be avoided while still providing ADA compliant curb ramps in order to minimize more costly inlet relocations. Utilities & Landscaping Another significant challenge with the project will be negotiating around existing trees and utilities. Trees within the grass strip between the curb and sidewalk have root systems that have caused sidewalks to heave, creating unsafe and non-ADA compliant sidewalks. VS will make attempts to design around existing trees, however, saving all trees within the corridor is not feasible. Existing utilities are located intermittently throughout the project as well. FINAL DESIGN PLANS — Many consultants can develop technically sound design plans for SRTS infrastructure projects; however, the VS project approach leading up to the final design plan stage will ultimately result in improvements that receive the highest satisfaction from those who utilize the facilities every day. Additionally, VS understands the challenge of maximizing the awarded SRTS funding for construction and is currently working with INDOT to streamline the design process as much as possible. SCHEDULE — VS recognizes the importance of planning and adhering to a schedule on this project. This team is familiar with the intricacies and potential challenges involved in federally-funded projects, and will work with the City of South Bend to meet deadlines and milestone dates, in order that funds are not jeopardized. VS will have the environmental document, final plans, permits, and right-of-way clear prior to the letting requirements for this project. The VS Team will work diligently to design the proposed SRTS improvements within the existing right of way where possible. CIT Y OF SOUTH BEND PE Ser vices for Safe Routes to School Our Lady of Hungary Neighborhood Sidew alks and ADA Ra m ps VS Engineering, Inc. | Letter of Interest 6   MARK HERALD, PE Northern Region Director Project Manager Sanjay Patel, PE President Principal-in-Charge Chris Waidner, PE Transporation Director QA/QC CITY OF SOUTH BEND FINNIAN CAVANAUGH – PROJECT ENGINEER ROADWAY DESIGN ENVIRONMENTAL SURVEY & RIGHT-OF-WAY ENGINEERING UTILITY COORDINATION STORMWATER & DRAINAGE CONSTRUCTABILITY REVIEW FIRM LEGEND 1 McCormick Engineering Joe Dluzak – Team Lead Shailesh Desai, PE Landon Geiger, EI Andrew Matney, EI Andrew Magsam, EI David L. McCormick, PE 1 Alan Ball Meghan Hinkle Matt Roberts Matt Healy, PS, EI Andrew McClelland, PS Vince Barr, PS Ben Bruss Jeff LaChat Jeffrey Haw, PE Jon Mowery, EI Andy Holman Mike Crill Dick Furnish ORGANIZATIONAL CHART CIT Y OF SOUTH BEND PE Ser vices for Safe Routes to School Our Lady of Hungary Neighborhood Sidew alks and ADA Ra m ps VS Engineering, Inc. | Letter of Interest 7   MARK HERALD, PE PROJECT MANAGER Mark has 18 years of professional engineering experience and serves as Regional Director and Project Manager for the firm’s transportation and environmental projects. Mark has broad experience in Transportation Engineering, Civil/Site Design, Environmental Engineering, Construction Inspection, and Surveying. He is also proficient in AutoCAD and Civil3D. His experience includes design and inspection of transportation projects—including INDOT and locally funded, traffic impact studies, traffic signal design, pavement rehabilitation and widening with curbs, gutters and sidewalks, storm sewers with storm water retention and drainage. Mark also has a vast amount of experience in many transportation and storm projects. Mark excels in managing projects in which the schedules and timelines can fluctuate. He understands that shifting staff efforts toward the project at-hand is paramount to its success. He is skilled in managing staff during periods of schedule tightening to complete multiple tasks concurrently, with a keen eye to thoroughness and efficiency. SAFE ROUTES TO SCHOOL – CITY OF SOUTH BEND This project included the complete design services for retro- fitting sidewalks and curb ramps into a built-up environment. The existing sidewalks and curb ramps were deteriorated and not in compliance with ADA standards. Design services included topographic survey, environmental document, and the design of sidewalk and 123 curb ramps for Lincoln Primary and 98 curb ramps for Perley Fine Arts Academy. Many of the sidewalk and curb ramp design locations required unique design solutions to allow the ramp to be designed within the ADA guidelines, while negating the need for additional right-of-way or any utility relocations. Both locations were ultimately constructed under budget. PUFFERBELLY TRAIL– CITY OF FORT WAYNE This project included nearly 5 miles of new, 12’ wide asphalt recreational trail design and construction. The Pufferbelly Trail is part of the Poka-Bache Trail which will ultimately connect Pokagon State Park in Angola to the Ouabache State Park in Bluffton. This particular portion of the trail is located within a former railroad bed and included the rehabilitation of 2 bridge structures. The project also included a new parking lot and new trail spur located in Payton County Park. Other amenities included in the project were park benches, a new trail head, and pedestrian actuated rapid flashing beacon warning systems at selected right of way crossings. DUBAIL AVENUE RECONSTRUCTION – CITY OF SOUTH BEND This project included field survey and complete design services to the City of South Bend for the reconstruction of Dubail Avenue. The goal was to reconstruct the deteriorating, existing asphalt pavement and provide ADA compliant pedestrian facilities along the corridor. Design goals include reducing the existing Dubail Avenue cross section from 42’ wide to 36’ total width including 11’ wide travel lanes with on-street parking on both sides of the road. The project also included the design of curb “bump outs” at key intersections to provide an avenue of safety to the pedestrian traffic by narrowing the distance to cross Dubail Avenue. MARKET ST. REHABILITATION – CITY OF WARSAW This project included the widening and rehabilitation of Market Street to include designated on-street parking lanes with curb line bump outs at the public intersections. The purpose was to rehabilitate and widen Market Street to improve vehicular safety, and construct ADA compliant sidewalks, a recreational trail, and curb ramps to provide pedestrian connectivity along Market Street. Several public parks, light commercial properties, and residential properties are located throughout the Market Street Corridor, which create the bulk increase in usage of the roadway. Center Street is located one block to the north and serves as the primary route through the City of Warsaw. 18 Years of Experience BS—Civil Engineering, Indiana Institute of Technology INDOT Employee of Responsible Charge (ERC) ACEC Leadership Program INDOT Certified Technician & Field Proficiency INDOT Utility Coordinator EXPERIENCE: EDUCATION: CERTIFICATIONS: PROJECT MANAGEMENT EXPERIENCE CIT Y OF SOUTH BEND PE Ser vices for Safe Routes to School Our Lady of Hungary Neighborhood Sidew alks and ADA Ra m ps VS Engineering, Inc. | Letter of Interest 8   Chris’s experience has ranged from complex interchanges, tight neighborhood intersections, non-for-profit trails, small structure maintenance and replacements, ADA ramps, and pavement rehabilitations. One of Chris’s strengths is listening to a municipality and its staff of professionals. He strives to learn the issues they face by working with the community they serve to maintain a safe infrastructure that facilitates and enhances their everyday lives. Learning the issues they face everyday while maintaining the communities infrastructure, and working with them to come up with low cost solutions. Adding value to the neighborhood and a piece of mind to its residents. Joe’s 41-year career, primarily focused on transportation engineering projects, has resulted in beneficial relationships. His utility coordination experience has allowed him to personally know many of the utility company representatives throughout northeast Indiana. These experience-based relationships exist with INDOT and the MPO as well. Joe’s extensive experience on sidewalk, curb ramp and intersection improvement projects prove valuable when working in an urban built-up environment where right- of-way is tight. His general knowledge of roadway design, as well as the relationships he’s built over his career, make Joe well equipped for this roadway reconstruction project. PROJECT EXPERIENCE ƒCity of Fort Wayne – Huguenard/Washington Center Intersection Improvements ƒCity of Fort Wayne – Johnny Appleseed Trail ƒCity of Fort Wayne - Pufferbelly Trail ƒAllen County Highway – Auburn Road Improvements ƒCity of Gas City – First Street Phase I Improvements ƒCity of Seymour – West Second Street Reconstruction, Phase I & Phase II ƒCity of Kokomo – Washington Street Improvements ƒ24 Years of Experience ƒBS—Civil Engineering, Purdue University ƒINDOT LaPorte District Trainer ƒBremen Community Cares Main Street – VP ƒ41 Years of Experience ƒAS—, Architectural Engineering, ITT Technical Institute ƒINDOT Certified Utility Coordinator ƒAutoCAD CIVIL 3D Certification CHRIS WAIDNER, PE TRANSPORTATION DIRECTOR QA/QC JOE DLUZAK ROADWAY LEAD KEY STAFF CULVER : Worked with Town on development of their Safe Routes to School projects, Bike Master Plan, Stellar application and projects implementation. GRANGER PATHS: Worked with Friends of Granger Paths (not-for-profit) on development, local fund raising campaign, project planning, design and construction of Granger Paths phases 1-3. Phases were federally funded and administered through St. Joseph County on behalf of Friends of Granger Paths. PROJECT EXPERIENCE NAPPANEE: One of Chris’s first projects was the design and construction inspection of Nappanee’s bike path along US 6, SR 19, CR 7, Woodview Dr and community park. PLYMOUTH: Chris oversaw the design and construction inspection of Plymouth’s Greenways Trail which connects the City’s parks to the High School. DOWNTOWN BREMEN: Worked with INDOT, Town of Bremen,OCRA, and JPR on development and coordination of four separate construction contracts for the complete reconstruction of Bremen’s downtown. CIT Y OF SOUTH BEND PE Ser vices for Safe Routes to School Our Lady of Hungary Neighborhood Sidew alks and ADA Ra m ps VS Engineering, Inc. | Letter of Interest 9   KEY STAFF SHAILESH DESAI, PE ROADWAY 32 Years of Experience Shailesh’s professional experience focuses on the firm’s major transportation projects. He has designed numerous complex roadways, small structures, drainage systems, multi-use paths, sanitary and storm sewers, complex signing, lighting and signal, complex MOT, and engineering assessment projects. is role as Project Manager includes all phases of each project to include project coordination and management, plan development, hydrologic & hydraulics design, utility coordination and geotechnical procedures, quantity calculations, cost estimates, special provisions, bundling projects, and bid package preparation. He also has experience in preparation of MOT schemes, complex regulatory permits, and mitigation measures for complex projects. Shailesh has completed multiple value engineering and practical design options that helped clients to save on construction cost as well as reduce the right-of-way and environmental impact. ALAN BALL ENVIRONMENTAL 22 Years of Experience Alan is a NEPA practitioner and wetland scientist who manages the VS Engineering environmental team. His responsibilities include preparing all elements of CE and EA-level NEPA documentation, GIS data analysis and mapping, and wetland delineations. He also prepares USACE 404 and IDEM 401 wetland and stream permits. Alan has demonstrated success in all elements of wetland and stream mitigation from site selection to design and construction. Alan’s broad range of project experience and thorough understanding of NEPA allows him to establish and manage project budgets and timelines tailored to the challenges of each unique project. He is excellent at balancing the needs of the client with the competing interests of resource agencies. Through Alan’s leadership, VS Engineering has secured over 70 NEPA document approvals in the past four years. LANDON GEIGER, EI ROADWAY 9 Years of Experience Landon is a Project Engineer with experience in the support of transportation projects. His duties include development of preliminary design plans, preparation of quantities and estimates and providing general engineering support to senior staff members. In addition to providing engineering support in the office, Landon also has field survey and construction inspection experience in many storm and sanitary sewer projects. Landon has broad experience in transportation-related projects, including surveying, design, cost estimating and construction. Landon has a complete understanding of Fort Wayne’s design and drafting standards. Added to his transportation and roadway experience, he is a qualified engineer for utilities projects including preliminary design and cost estimating. MATT HEALY, PS, EI SURVEY & RIGHT-OF-WAY 15 Years of Experience Matt has experience in all aspects of survey projects including numerous construction surveys on route, topography, boundary and recorded easement surveys for the public and private sectors. He is versed in deed research, field work adjustments, preparation of engineering drawings for route surveys, and construction staking. Matt manages field survey crews and in-house survey technicians. Matt is experienced in R/W engineering and performing R/W stakings for appraisals and deed plotting (AutoCad). He has prepared ALTA/ACSM land title surveys, survey recording plats, assisted with FEMA flood elevation certificates as well as surveyors location reports, construction surveying calculations, and numerous topographic surveys. Matt is well versed in use of the RIEGL VZ-400 3D Terrestrial Laser Scanner and accompanying acquisition and processing software packages. He is directly responsible for all of the firm’s laser scanning and mobile LiDAR projects from planning to final deliverables. CIT Y OF SOUTH BEND PE Ser vices for Safe Routes to School Our Lady of Hungary Neighborhood Sidew alks and ADA Ra m ps VS Engineering, Inc. | Letter of Interest 10   PROJECT EXPERIENCE VS has completed an engineering feasibility study and is currently under design for a 4.5-mile-long trail from Life Bridge Church to Fitch Road in northwest Allen County, Indiana. The study included route alternatives, preliminary design plans, and an estimate of construction cost for a 12’ wide asphalt trail, a new trail head, two existing bridge rehabilitations, and connection spur to the parking area within Payton County Park. The project is a key link to the 81 mile long Poka-basche Trail, which will ultimately connect Pokagon State Park near Angola to Ouabache State Park, in Bluffton. The trail is generally located within the abandoned New York Central railroad corridor. The project required coordination with Allen County Highway Department, Allen County Parks & Recreation, Fort Wayne Trails, and local stakeholders. The ADA compliant trail includes one public road crossing, and a trail spur to access Payton County Park. Special design considerations were given to ensure the existing trees and waterways were minimally impacted in order to preserve the trail corridor in natural setting. Construction of the trail section is scheduled for 2020. PUFFERBELLY TRAIL CITY OF FORT WAYNE This project included the complete design services for retro-fitting sidewalks and curb ramps into a built-up environment. The existing sidewalks and curb ramps were deteriorated and not in compliance with ADA standards. Design services included topographic survey, environmental document, and the design of sidewalk and 123 curb ramps for Lincoln Primary and 98 curb ramps for Perley Fine Arts Academy. Many of the sidewalk and curb ramp design locations required unique design solutions to allow the ramp to be designed within the ADA guidelines, while negating the need for additional right-of-way or any utility relocations. Both locations were ultimately constructed under budget. SAFE ROUTES TO SCHOOL CITY OF SOUTH BEND CIT Y OF SOUTH BEND PE Ser vices for Safe Routes to School Our Lady of Hungary Neighborhood Sidew alks and ADA Ra m ps VS Engineering, Inc. | Letter of Interest 11   PROJECT EXPERIENCE VS provided the field survey and complete design services to the City of South Bend for the reconstruction of Dubail Avenue from Michigan Street to Miami Street. The goal of this project was to reconstruct the deteriorating, existing asphalt pavement and provide ADA compliant pedestrian facilities along the corridor. Design goals include reducing the existing Dubail Avenue cross section from 42’ wide to 36’ total width including 11’ wide travel lanes with on-street parking on both sides of the road. The new cross section configuration required 3 feet of pavement to be eliminated from each side of the roadway. The beginning of the project was located at the Dubail Ave./Michigan St. intersection south of downtown South Bend. From this intersection, the project continued east to the Dubail Ave./Miami St. intersection. The total project length was approximately 4100-feet (0.78 miles). The project also included the design of curb “bump outs” at key intersections. The bump outs provide an avenue of safety to the pedestrian traffic by narrowing the distance to cross Dubail Avenue. The bump outs also help calm and channelize the vehicular traffic through these intersections. Curb turnouts allow stormwater runoff to exit the roadway and enter the grassy area. The grassy areas allow for pre-treatment for roadway stormwater runoff by allowing the runoff to flow over vegetation, and infiltrate into the ground before flowing into a stormwater inlet. DUBAIL AVENUE RECONSTRUCTION CITY OF SOUTH BEND The 4,860-foot multi-use trail began at the Brownsburg Public Library, and proceed south to Tilden Road, extending past past Brown Elementary School to O’Dell Street. The trail then jogs to the south and parallel the west side of O’Dell Street extending past Brownsburg High School to Sycamore Street. VS conducted an on-site assessment of the proposed route for walkability and bikeability, as well as determined any key design issues that impacted the cost of construction and subsequently the final location of the route. Coordination with property owners was required to facilitate reloaction of their mailboxes from the street to the front of their homes. SAFE ROUTES TO SCHOOL TOWN OF BROWNSBURG Standard RFP Form Ver. 3-01-2021 6 (Rev. 06/27/18) Des. # 2100025 Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE) I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f). I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confirm that the firms listed below are currently certified DBEs: INDOT: https://entapps.indot.in.gov/DBELocator/ KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx I certify that I have contacted the certified DBE’s listed below, and if my company becomes the CONSULTANT, these DBEs have tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division. I.DBE Subconsultants to be applied toward DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* % % % % II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* % % % % Estimated Total Percentage Credited toward DBE Goal:___________ Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal:__________ Company Name: ____________________________________________________________________ Signature: ___________________________________________ Date: ________________________ ∗ It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result of negotiation of contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these or other certified and approved DBE firms. McCormick Engineering 3 3% VS Engineering, Inc. 03/07/2022 8.1 Non-Complex Roadway Design Indiana DBE Certification Program In accordance with 49 CFR Part 26 as published in the code of federal regulations, the Indiana Department of Transportation acknowledges Elizabeth Kiefner Crawford, Director Economic Opportunity Division Derrick Casson, Certification Manager Economic Opportunity Division (Reference the Indiana Department of Transportation's DBE Public Search at http://www.in.gov/2674.htm for the most current information regarding this certification) as a certfied DBE in the State of Indiana. Date Issued:01/26/2017 No Change Affidavit Due:12/31/2022 McCormick Engineering, LLC