Dear Selection Committee:
Thank you for the opportunity to submit our Letter
of Interest (LOI) to provide the City of South Bend
with engineering services for the Our Lady of
Hungary School sidewalk improvements. (Des
#2100025) Our submission of this LOI indicates
that our team agrees to the affirmations described
in your posted RFP.
We have assembled a highly qualified team to
deliver all aspects of your project successfully.
From sidewalks to trails, we are confident that our
combined experience, resources, and dedication
will lead to the quality product that South Bend
expects from its consultants.
Contained within this LOI are the reasons you
can trust the Troyer Group team as your partner
on your SRTS sidewalk project. We firmly believe
that everything we do comes down to people and
their experiences and we hope to demonstrate that
belief in working with you on this project.
Thank you for your consideration.
Our team has an in-depth knowledge of the project Our team has an in-depth knowledge of the project
and its surrounding area - having worked with the and its surrounding area - having worked with the
City on the design of adjacent SRTS projects.City on the design of adjacent SRTS projects.
John E. Leszczynski
President
Authorized Negotiator
jel@troyergroup.com TOGETHER, WE WILLStephan Summers
Project Manager
ssummers@troyergroup.com
DEMONSTRATED QUALIFICATIONS +
COMMITMENT:
• Project Leadership: Project Manager, Stephan
Summers and Project Landscape Architect,
Jonathon Geels have both worked closely on
numerous unique and impactful projects over their
careers.
• Project Management: Stephan has led many
pedestrian infrastructure projects from planning to
design through construction.
• Project Experience: The local familiarity will enable
our team at Troyer Group to better serve the South
Bend community and deepen our commitment to
its future success.
CAPACITY + KNOWLEDGE
• We have extensive experience designing according
to INDOT standards/specifications, including
PROWAG ADA compliance requirements.
• Sequencing of sidewalk and pedestrian oriented
projects are extremely important. Having the
knowledge gained from previous sidewalk and Safe
Routes to School (SRTS) projects will allow Troyer
Group to get the correct scope, budget, survey, and
design to meet the City’s needs.
• We have ample capacity and availability to
complete this project ahead of schedule.
• A diverse team with a breadth of knowledge and
strong catalog of streetscape, multi-use trail, SRTS/
sidewalk and improvement projects in Northern
Indiana, including South Bend.
EFFICIENT, EFFECTIVE COORDINATION:
Our mission is to work together as a team to
accomplish your goals. Our objective is to make your
job easier through efficient and effective collaboration
resulting in quality projects completed on time and
within budget. We strive to present clear and concise
information for sound solutions that reflect on the
scope, schedule, and budget set for the project.
• With team members having worked on recent
simlar projects, we fully understand the unique
components of these projects, providing a valuable
synergy between our team and the City on all of the
potential components of this project.
• You will spend less time on every issue because of
our ability to communicate efficiently with you on
the items that require your input and our ability to
manage the items that do not.
PAGE 2
TEAM
OUR LADY OF HUNGARY NEIGHBORHOOD SRTS
Finnian Cavanaugh
Project Engineer
CITY OF SOUTH BEND
SJCA (DBE) (5%)
Metropolitan (1%)
A multi-disciplined firm offering
engineering and enivronmental / cultural
services
Accomplished firm committed to
handling title needs diligently
Prequal: 5.2, 6.1
Prequal: 12.2
Troyer Group (94%)
Stephan Summers (PM)
We understand the City’s needs on this project, from
initial design to public engagement and answering
residents’ questions.
Throughout this process, communication is key, and
this team organization ensures the most efficient
communication, reducing any potential bottlenecks
and prioritizing overall project success.
Our extensive experience managing similar projects
ensures the success of this design project.
Prequal: 5.2, 8.1
PROJECT MANAGEMENT + DESIGN
SURVEY + ENVIRONMENTAL SUPPORT
TITLE SEARCH SUPPORT
We understand that our team is an extension of you and
that we serve the South Bend community. With that in
mind we bring, not only a commitment to that service, but
a wealth of knowledge working on similar projects around
the region. These include the projects shown to the right:
TROYER GROUP
Related Project Experience
Multi-use
Path Sidewalks Utility
Coordination Drainage RW and
Title
Local
Projects
Federal
LPA Project
LaSalle & Marquette SRTS,
South Bend
Harrison School SRTS,
South Bend
Coquillard & St. John SRTS,
South Bend
Lincoln / Perley SRTS,
South Bend
CR 300 N Trail,
Warsaw
Adam’s Trail - Granger Paths
St. Joseph County
US6 and US30 ADA Ramps
SR 23 ADA Ramps
Plymouth SRTS
Culver Schools SRTS Phase 1 & 2,
Culver
Merrifield Park Trail
Mishawaka
Diamond Ave Reconst. and Trail
South Bend
Mishawaka Riverwalk
Vale Park West Pathway
Valparaiso
Plymouth Greenways Trail
Silhavy Rd. and Vale Park
Roundabout (and trail)
Valparaiso Downtown Signal, &
Intersection Improv.
Auten Trail,
St. Joseph County
Nappanee Pedestrian Trail
Indiana Dunes State Park Trails
Eddy Street Commons
PAGE 3
TEAM
OUR LADY OF HUNGARY NEIGHBORHOOD SRTS
Stephan and Jonathon have worked closely through
the management and development of many projects.
They form a dynamic, responsive team whose goal is
to make our partner’s lives easier.
Together, Stephan and Jonathon will determine the
best team to fit the needs of this sidewalk project. They
will draw upon their extensive experience managing
local contracts to aid South Bend in maximizing the
value of this project. They are adept in assessing
sidewalk and streetscape related issues that arise by
defining the impacts to safety, long term maintenance,
budget, and schedule of possible solutions; ensuring
that the correct design is incorporated in the plan set.
TEAM LEADERSHIP
Commitment
Stephan and Jonathon are fully committed to this
project and will participate in 100% of the key
decisions, ensuring that the City of South Bend has the
tools they need to most effectively serve its citizens.
27
10
18
REGIONAL MULTI-USE PATHWAY PROJECTS
SAFE ROUTES TOSCHOOL AND SIDEWALKPROJECTS
STREETSCAPEMUNICIPALPROJECTS
PEDESTRIAN INFRASTRUCTURE DESIGN + CONSTRUCTION LEADERSHIP EXPERIENCE
Maximizing Value
Stephan’s primary focus will be to serve as Project
Manager and Design Lead: ensuring that the team delivers
a high quality project, on time and on budget. He will
work diligently to provide timely, cost effective, and value-
added solutions to any challenges that arise.
Practical Design
He will utilize his technical expertise and understanding
of design procedures, acute attention to detail, and
communication skills to make this project a success.
Demonstrated Qualifications and Commitment
Stephan joined Troyer Group as a Program Manager
specializing in the management of the firm’s contracts.
Previously, Stephan worked at the INDOT LaPorte District
office for three years as one of its main project managers
(250+ projects). He is fluent in INDOT’s process in regards
to project milestones, utility & railroad coordination,
environmental and R/W processes, and ATR/WIM sites
coordination. Stephan’s leadership ensures that projects
are completed on time, on budget, and to INDOT’s
expectations.
Related Projects:
• CR300 N Ped. Improvements - Warsaw, IN
• SR 10 Sidewalks Construction Inspection - Culver, IN
• Lake Max Trail Ph. 2 - Culver, IN
• Lake Max Trail Ph. 2 Construction Inspection - Culver, IN
• Lincoln Neighborhood Sidewalks - Warsaw, IN
• US 41 Corridor Plan - Cedar Lake, IN
• Park St. Reconstruction - La Porte, IN
• West Jefferson Streetscape - Culver, IN
• West Jefferson Streetscape Construction
Inspection - Culver, IN
• Miriam Ave Reconstruction- Nappanee, IN
• US 31 Road Reconstruction - St. Joseph Co., IN
• US 41 Aux Lanes/Corridor Imp. - Lake Co., IN
• SR 23 ADA Curb Ramps - St. Joseph Co., IN
• US & US 30 ADA Curb Ramps - Lake Co., IN
Project Coordination/Support
B.S. Construction Management, 2014
A.S. Civil Engineering, 2013, Purdue
University
Project Landscape Architect
B.S. Landscape Architecture, 2005, Ball
State University
Stephan Summers Jonathon Geels, PLA, FASLA
As a landscape architect, Jonathon works on public
sites with a focus on pedestrian experiences and
community engagement. He is passionate about urban
sociology applications in landscape design, seeing
it as integral to environmental and infrastructure
management as well as economic development. He
has been very involved with the Safe Routes to School
program, advocating for more complete transportation
infrastructure funding, specifically through his efforts
with the American Society of Landscape Architects.
Jonathon has won several community and national
awards, being recognized for his outstanding service
and leadership. His oversight and experience in
multimodal transportation planning ensures that all
aspects of this project are considered.
Related Experience:
• Harrison SRTS - South Bend, IN
• LaSalle Marquette SRTS - South Bend, IN
• VPA Parks ADA Improvements - South Bend, IN
• Erie Trail Extension - Starke County, IN
• Adams Trail Phase II- Granger, IN
• Vale Park West Path - Valparaiso, IN
• 300 N Trail - Warsaw, IN
• Merrifield Park and Trail - Mishawaka, IN
• Lake Maxinkuckee Trail Phase I - Culver, IN
• 100 Wayne Plaza + Streetscape - South Bend, IN
• Lake Max Trail Ph. 2 - Culver, IN
• Lake Maxinkuckee Trail Master Plan - Culver, IN
• Land-Use and Connectivity Study - Porter Co., IN
• Bike and Pedestrian Master Plan - Gary, IN
• Sterling E. Multi-use Trail Master Plan - Elkhart, IN
• Enviro. Center Trail Master Plan - Elkhart, IN
PAGE 4
TEAM
OUR LADY OF HUNGARY NEIGHBORHOOD SRTS
At Troyer Group, Patrick has been responsible for
preparing design and construction documents for public
sector and transportation-related projects. This includes
developing the design, calculations, plans, and estimates
pertinent to the success of many roadway projects. This
experience encompasses the whole process of plan
development including geometric layout, site modeling,
maintenance of traffic, quantity calculations, plan
preparation, and document preparation.
Related Experience:
• Lincoln Neighborhood Sidewalks - Warsaw, IN
• LaSalle & Marquette SRTS - South Bend, IN
• US6/US30 ADA Curb Ramps - Lake CO., IN
• Culver Schools SRTS Phase 1 & 2 - Culver, IN
• Lincolnway Streetscape Improvements -
Mishawaka, IN
Troyer Group Design Team
B.S. Civil Engineering, Trine University, 2019
Patrick Richardville
As a lead project engineer on Troyer Group’s
Transportation Team, Laila is responsible for the
design and construction documents for public sector
transportation projects and leads the day-to-day work
of the Civil Team’s support engineers.
Laila possesses extensive experience reviewing INDOT
projects and provides valuable knowledge of the
State’s design standards and project development
process, which are invaluable in her QA/QC role. She
is responsible for design, preparation, and review of
construction documents for all types of INDOT and
local government projects.
Related Projects:
• Harrison SRTS - South Bend, IN
• LaSalle Marquette SRTS - South Bend, IN• Adams Trail Ph I & II - Granger, IN
• Lake Max Trail Phase 2 - Culver, IN
• Lincoln Neighborhood Sidewalks - Warsaw, IN
• SR 10 Sidewalks - Culver, IN
• West Jefferson Sidewalks - Culver, IN
• SR 51 (US 30 - US 20) - Lake Co., IN
• Diamond Ave. Pathway - South Bend, IN
• Culver Schools SRTS Phase 1 & 2 - Culver, IN
• SR 2 at Heavilin Pathway - Porter Co., IN• Vale Park West Path - Valparaiso, IN• Merrifield Park Trail - Mishawaka, IN
Project Engineer, P.E.
B.S. Civil Engineering Technician,
Institute of Technology, Haifa, Israel
Laila Dow
QUALIFICATIONS:
• NEPA Certified
• USACE Wetland Delineation
• Wetland Flora Identification
• Wetland & Weeds Flora
• Grass, Rush, and Sedge Identification
• Fluvial Geomorphology for Impact Assessment &
Sustainable Design
PROJECTS DELIVERED:
James understands NEPA delivery is critical to
overall project delivery, and his experience and
communication skills will ensure a smooth NEPA
process from task assignment through project
completion. He knows INDOT PMs want to deliver
projects on time and on budget. His and Troyer Group’s
understanding of INDOT project delivery and ability to
manage schedules and cost can be relied upon. James
manages all waters report preparation and permit
applications for INDOT and LPA sponsored projects.
He became certified in Categorical Exclusion
preparation in Fall 2019. In the last 15 months, James
has prepared 21 approved NEPA documents and has
two other high-level CEs awaiting review by INDOT.
His knowledge gained in preparing those documents
has further cemented Troyer Group as an industry
leader in INDOT environmental policy.
Related Experience:
• Lake Max Trail Phase 2 - Culver, IN
• West Jefferson Streetscape - Culver, IN
• Lake Max Trail Phase 3 - Culver, IN
• Cass, Jefferson, & Slate St Sidewalks - Culver, IN
• SR 55 at 73rd Ave Intersection Improvement,
Roundabout CE-2 - INDOT LaPorte District
• SR 39 from US 20 to MI State Line, Shoulder
Widening CE-3 - INDOT LaPorte District
Environmental Services Manager
B.S.–Marine Science + Chemistry,
University of Alabama
James Landry
PAGE 5
EXPERIENCE
OUR LADY OF HUNGARY NEIGHBORHOOD SRTS
Ohio Street, Main Street, School Street SRTS
Culver, INLaSalle Marquette SRTSSouth Bend, IN
The Culver Safe Routes to School (SRTS) project
established safe pedestrian routes along Ohio St.,
Main St. and School St. These three long routes
connect two thirds of the town with the Elementary,
Middle and High Schools, as well as a number of other
heavily utilized public and private facilities.
This was accomplished through the construction of
new sidewalk to fill in gaps, reconstruction of sidewalk
in poor condition, rehabilitation of curb ramps to
current ADA requirements, striping of crosswalks, and
installation of solar powered school zone beacons.
PROJECT INFORMATION
• Another main element of coordination and
management involved the certification of clear
Right-of-Way for the project.
• Removed section that had already been replaced
from the scope to save federal dollars.
• Coordinated with authorities to maximize scope
of project and use of funds.
These two South Bend Safe Routes To School (SRTS)
projects have recently been designed to establish
ADA compliant facilities. Harrison SRTS project
encompassed a 5 block radius of poor sidewalk and
non-compliant ADA curb ramps. Coquillard SRTS
project encompassed areas around Coquillard School
and St. John’s School. Sidewalk around Kennedy
Primary and a subdivision north of Coquillard School
were also added maximizing the use of Federal funds.
These areas are an important system of sidewalks
utilized by children commuting to and from school
as well as the general public.
PROJECT INFORMATION
• Curb ramps were non-standard and modifications
were made to make approximately 200 curb ramps
ADA compliant.
• Maximize the use of federal funds by expanding
curb ramp and sidewalk replacement to other
nearby schools, adding additional value to the
original project scope.
Harrison and Coquillard Primary, SRTSSouth Bend, IN
This Safe Routes to School project involved
upgrading existing routes near the LaSalle
Intermediate Academy and Marquette Primary
Montessori. Each school is surrounded by single
family neighborhoods with major thoroughfares
that define their walker zones.
One of the primary concerns indicated on parent
surveys was the safety of their children walking or
biking to school. They listed vehicle volume and
speed, sidewalk safety, and intersection safety
as reasons for their concerns. This project gives
students and faculty a safe alternative to driving to
school, with potential to reducing vehicle volumes.
PAGE 6
EXPERIENCE
OUR LADY OF HUNGARY NEIGHBORHOOD SRTS
SRTS DESIGN PROJECTSRelated Project Experience
1
SAFE ROUTES TO SCHOOL PROJECTS
Troyer Group has worked with a number of regional
communities on inspecting pedestrian infrastructure
projects, such as Safe Routes to School. These
projects each involved important coordination
between the municipalities, residents, and INDOT
that facilitated a smooth construction process.
1. Culver SRTS - Phase 1
2. Plymouth Baker St. SRTS
3. Adams Trail SRTS
4. Culver SRTS - Phase 2
5. Lincoln Primary School SRTS
4
55
4
2 3
PAGE 7
EXPERIENCE
OUR LADY OF HUNGARY NEIGHBORHOOD SRTS
PICTURED MULTI-USE PATH PROJECTS
1. Culver Bike/Pedestrian Master Plan &
Trail Phase 1 and 2
2. Mishawaka Riverwalk - Design and CI
3. Indiana Dunes Trail - Design
4. South Bend Riverside Trail - Design
and CI
5. Diamond Avenue Trail and Sidewalk
Improvements.
6. Vale Park West Pathway - Design and
CI
7. Merrifield Park Trail - Design and CI
OTHER TRAIL & SIDEWALK PROJECTS
• Plymouth Greenways Trail
• Vale Park / Silhavy Roundabout and
Trail
• Potawatomi Park Pedestrian Path
• Portage Road Ped. Path
• Diamond Avenue Ped. Path
4
3
76
1
1
5
2
TRAILS & SIDEWALK EXPERIENCERelated Pedestrian Infrastructure Experience
PAGE 8
EXPERIENCE
OUR LADY OF HUNGARY NEIGHBORHOOD SRTS
1
2
5
3
4
6
SOUTH BEND EXPERIENCERelated Local Experience
2
1
Troyer Group has completed many projects within
South Bend over the last decade. Through these
projects and other outreach efforts we have
developed a relationship with regional personnel
and a knowledge of the community.
PICTURED PROJECTS
1. Pulaski Park
2. Lincolnway Streetscape Design
3. 100 Wayne Plaza and adjacent Streetscape
4. Fire Station #9 Streetscape Design
5. Diamond Ave. Roundabout and Streetscape
Improvements
6. Eddy / Colfax / LaSalle Intersection
Improvement
3
4
5
6
PAGE 9
APPROACH
PAGE 9 OUR LADY OF HUNGARY NEIGHBORHOOD SRTS
RUM VILLAGEPARK
ARMED FORCESRESERVE CENTER
?
?
?
Existing Walks (to Remain)
Existing Ramp (ADA Compliant)
Existing Walks (Non ADA)
Existing Ramp Needs Work (Non or Partial ADA)
No Walks Existing
No ADA Ramps Existing
Lincoln Area Sidewalks
2017-11-13
?
?
?
Existing Walks (to Remain)
Existing Ramp (ADA Compliant)
Existing Walks (Non ADA)
Existing Ramp Needs Work (Non or Partial ADA)
No Walks Existing
No ADA Ramps Existing
Lincoln Area Sidewalks
2017-11-13
?
?
?
Existing Walks (to Remain)
Existing Ramp (ADA Compliant)
Existing Walks (Non ADA)
Existing Ramp Needs Work (Non or Partial ADA)
No Walks Existing
No ADA Ramps Existing
Lincoln Area Sidewalks
2017-11-13
LEGEND N
EWING ST.
DONALD ST.
CALVERT ST.
SHERRILL ST.
DUBAIL ST.
INDIANA AVE.OLIVE ST.FRANKLIN ST.OUR LADY OF HUNGARY SCHOOL
OLIVE ST.DOUGLAS ST.PRAIRIE AVE.KEMBLE AVE.CATALPA ST.CHAPIN ST.KENDALL ST.SCOTT ST.TAYLOR ST.WILLIAM ST.With each endeavor, Troyer Group seeks to provide
satisfaction for our clients while contributing to the
overall wellness of the community. We take pride
in building and maintaining close relationships
with our clients while helping them achieve their
goals. This is accomplished by listening to their
needs, continued advancement of proficiency
through planned training and development of staff
and procedures, and dedicating the appropriate
resources for the task at hand to provide the best
and most economical service and solution available.
Our approach is simple - Serve South Bend in
whatever capacity is required by providing proven
experience, the necessary manpower, and forward
thinking solutions. Our team will be led by Project
Manager, Stephan Summers. We have developed
a firm understanding of the scope of construction
knowledge and communication skills necessary for
the delivery of an outstanding final product. This
has been done through review of the plans, visits to
the project site, and discussions with the City.
OUR LADY OF HUNGARY NEIGHBORHOOD SIDEWALKS
Des 2100025
UNDERSTANDING
We value your trust in us to serve as the representative of
the City. Our past experience with several SRTS projects,
including LaSalle and Marquette, have involved many
residents and business owners, as well as heavy traffic
routes with extensive utility work. This demonstrates that
the City can have confidence in our ability to do this work
successfully.
While the implementation of these sidewalks is a relatively
simple project, it will have made a massive improvement
towards increasing the safety and connectivity for the Our
Lady of Hungary neighborhood residents.
SIDEWALK ASSESSMENT
• Sidewalks will be at least 5’ wide.
• Sidewalks will be designed to avoid existing utilities to
avoid associated costs and potential utility conflicts.
• Sidewalks will meet ADA requirements for slope and
curb ramps at intersections.
DRAINAGE ASSESSMENT:
• Existing drainage will be maintained to avoid any
major utility changes and associated costs.
• Minor structure adjustments may be necessary near
curb ramp areas.
• Sufficient borrow quantities are often neglected for
areas of sidewalk needing to be raised to maintain
proper drainage. Borrow can also eliminate the need
for return curb/block wall in certain cases.
PAVEMENT ASSESSMENT:
• 2’ wide HMA surface patches are often necessary in
front of curb ramps and approach installations due to
pavement separation at time of concrete & asphalt
removal.
MAINTENANCE-OF-TRAFFIC (MOT) ASSESSMENT:
• Pedestrian MOT will be provided using newly
constructed sidewalks along all roadways that have
been identified as needing to be updated to ADA
standards or have no existing walks/ramps all-
together.
PAGE 10
APPROACH
PAGE 10 OUR LADY OF HUNGARY NEIGHBORHOOD SRTS
SURVEY
A location control route survey will identify
the Right of Way limits and alignments for the
required sidewalk improvements. A topographic
survey will provide the information needed for
proper design of the sidewalk, grading, utilities,
and context of existing infrastructure.
UTILITY COORDINATION
• On this project, the Troyer Group will look to
coordinate potential upgrades and infrastructure
maintenance needs with the various utilities in an
effort to minimize future construction impacts on
the community and the environment (see above).
ADA COMPLIANCE
• We will meet the newly updated INDOT standards
and Public ROW Accessibility Guidelines for curb
ramps on design plans. Troyer Group has vast
experience with curb ramp design and consistently
coordinates with INDOT about plan documents
meeting required ADA standards.
QUALITY ASSURANCE / QUALITY CONTROL
• Troyer Group uses a QA/QC checklist thoughout
each project to ensure the quality of our design
and construction documents. Our QA/QC process
serves the design team and the City of South Bend
by limiting unnecessary changes and budget
overruns.
ADDITIONAL COMPONENTS
• A walk through with the City will be necessary to
confirm begin and end points of existing sidewalks
and to schedule a list of priority areas in order to
maximize funding utilization.
• Conforming to INDOT standards, pedestrian
detours will need to be developed and shown on
plans.
• Signs and crosswalk markings will be included
where INDOT and City standards require them.
Survey Points required to compute slope of curb ramps and to allow for design of ADA curb ramps per INDOT guidelines
Survey Points required for tie-ins to existing sidewalk
Survey Points required for tie-ins at service walks and approaches
DESIGN AND CONSTRUCTION EXPERIENCE
Our managers also work as designers on multi-use trail,
storm sewer, roadway and signalization projects.
• An enhanced perspective comes with working on
projects from many different angles, which allows
us to make every decision with the success of the
overall project in mind.
• We use this understanding to be proactive instead
of reactive.
• Our awareness of all stakeholders involved in a
project allows our designers to not only respect
the chain of command in decision-making and
notification, but motivates the process by going
above and beyond in providing pertinent
project updates to all affected parties.
• An understanding of INDOT policy, procedure,
and organization through a multitude of different
projects allows us to efficiently meet all project
requirements. We have:
• Extensive experience interpreting and
enforcing INDOT standards and specifications
• An understanding of the project from the
City’s perspective. All of our decisions are
based upon building the project on time, on
budget, to specifications, in line with local
aesthetics, and with little inconvenience to the
traveling public.
• An extensive municipal construction
experience that guarantees an optimum
buildable project that streamlines the
construction process.
PAGE 11
APPROACH
PAGE 11 OUR LADY OF HUNGARY NEIGHBORHOOD SRTS
SECTION 106
• The project area is not located within or adjacent
to a historic district. No sites listed on the National
Register of Historic Places are located within the
project area; however, two “Outstanding” rated
sites, the Our Lady of Hungary Church & School
and the Toth State Bank, and one “Notable”
rated county survey site, the Weisser Market, is
located within or adjacent to the project area. A
Historic Property investigation may be required.
Additionally, archaeological investigation will
be required in areas of new disturbance. If the
Historic Property and Archeological investigations
determine that impacts to cultural resources will
be minimal, the project will be eligible for the
INDOT Minor Projects Programmatic Agreement.
All Cultural Resource coordination will be
performed by SJCA, Inc.
STREAM IMPACTS
• No streams are present within the project area;
therefore, there will be no stream impacts.
WETLAND IMPACTS
• The project takes place in developed residential
areas. Portions of the project area contain existing
sidewalk facilities, and areas that do not consist
of landscaped residential lawns. Based on a
desktop review, no wetlands appear to be present
within the project area. If any wetland features,
are discovered during field visits, they will be
delineated by Troyer Group to determine potential
impacts, which are expected to be minimal.
RIGHT-OF-WAY
• Impacts from ROW acquisition are expected to be
minimal. If greater than 0.5 acre of ROW acquisition
is required, the NEPA document will be elevated to
a CE-2 or greater.
THREATENED & ENDANGERED SPECIES
• Some residential trees are present within or
adjacent to the project area, providing potential
habitat for endangered bats. If the project includes
any tree clearing or trimming, it may result in some
minimal impacts to endangered bats. However,
impacts to habitat are not expected to be great
enough to warrant a “Likely to Adversely Affect”
finding from USFWS. Due to the limited scope,
any impacts to other species are expected to be
minimal.
SECTION 4(F) IMPACTS
• Rum Village Park, a recreational facility owned by
the City of South Bend, is located across Ewing
St. from the southern edge of the project area.
Additionally, Our Lady of Hungary School has an
outdoor recreation area that appears to be at least
partially open to the public. Both are considered
Section 4(f) resources. Impacts to both are
expected to be minimal, and will likely fit criteria
for an exemption from full Section 4(f) analysis.
Coordination with INDOT to determine the level
of Section 4(f) documentation needed may be
required.
ENVIRONMENTAL
Since federal funding is involved, preparation of a
NEPA document is required and will be completed
by Troyer Group. Based on the above-listed factors,
impacts from Section 106 and ROW acquisition
are likely to be the determining factors in deciding
the overall CE level. If the project meets the
MPPA and requires less than 0.5 acre of ROW,
a CE-1 will likely be required. If either of these
conditions are not met, the most likely CE level
would be a CE-2. Archaeological and/or historic
property investigation may be required, and will
be performed by a qualified sub-consultant. Troyer
Group will be responsible for the fulfillment of
any public involvement tasks, if the project meets
INDOT’s requirements for offering a public hearing.
ENVIRONMENTAL
PAGE 12
APPROACH
PAGE 12 OUR LADY OF HUNGARY NEIGHBORHOOD SRTS
Summary
In conclusion, our team has the expertise and
experience to successfully manage this Our Lady of
Hungary Safe Routes to School project for the City
of South Bend. Because of our recent experience
on SRTS projects with the City, we are confident
in our understanding of both the area and the
unique aspects of SRTS projects. Our combined
experience, knowledge, and extensive familiarity
with the project area will lead to the successful
construction of your project.
We look forward to the opportunity to continue
working with the City of South Bend on these
important pedestrian infrastructure improvements.
We understand the roll of sidewalk and curb ramp
infrastructure for these neighborhoods, especially
with the number of students walking to each of
these schools. Because of this understanding and
our expressed commitment, we are confident the
City will be pleased with our performance.
COMMUNICATION
We will meet with all interested parties early in the
process and continually update them through status
reports, efficient coordination, attending meetings
with City officials, stakeholder groups, permitting
agencies, INDOT and other groups as necessary. Our
goal is to build consensus early to minimize changes
later in the design process.
COLLABORATION
Constant coordination with all collaborating parties
throughout the design process is critical to its success.
Located a short drive from the proposed project and
the City offices, we can provide in-person services
quickly and efficiently. We will continually update
all interested parties through status reports, efficient
coordination, attending meetings with City officials,
stakeholder groups, permitting agencies, and others
as necessary. Our goal is to build consensus early to
minimize changes later in the process.
PEOPLE
Project Managers (PM) and City personnel each
have their individual style. The Troyer Group team
has worked with the City of South Bend on various
projects, developing a better understanding of the
specific needs, preferred methods of communication,
and expectations of each.
CONTEXT SENSITIVE DESIGN
Understanding a project’s context (neighborhood,
safety, traffic, developments, budget, etc) helps
foster informed decision making and directly leads
to successful projects. Troyer Group, through an
unbiased lens and comprehensive analysis process,
sees and weighs the influence of each variable on the
overall project (people, safety, budget, constructability,
schedule, etc) and uses them to create efficient and
effective engineering solutions. This comes from our
focus on people. End users drive much of the decision
making, but our relationships with City personnel,
public officials, utilities and regulatory agencies make
them possible. Based on trust and mutual respect,
these relationships have evolved into a shared desire
to implement great work.
BUDGET AWARENESS
Meeting the project’s economic constraints while
maximizing the amount of improvements is a top
priority. We understand that South Bend projects
must be designed and built on tight budgets. Our
experience on SRTS and other sidewalk projects make
this easier for everyone.
Standard RFP Form Ver. 3-01-2021
6
(Rev. 06/27/18)
Des. # 2100025
Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE)
I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified
by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this
proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their
respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f).
I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a
blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confirm that
the firms listed below are currently certified DBEs:
INDOT: https://entapps.indot.in.gov/DBELocator/
KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx
I certify that I have contacted the certified DBE’s listed below, and if my company becomes the CONSULTANT, these DBEs have
tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE
utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be
applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division.
I.DBE Subconsultants to be applied toward DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to
be Paid*
%
%
%
%
II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to
be Paid*
%
%
%
%
Estimated Total Percentage Credited toward DBE Goal:___________
Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal:__________
Company Name: ____________________________________________________________________
∗ It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result
of negotiation of contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these
or other certified and approved DBE firms.
SJCA, Inc.Survey 3
2Environmental Document Preparation - CESJCA, Inc.
3%
2%
The Troyer Group, Inc.
Signature: ___________________________________________ Date: _____________ 03/07/2022