HomeMy WebLinkAboutOpening of Proposal - Safe Routes to School - Muessel Primary and Holy Cross Area Proj No. 122-006 -HWC EgineeringFEBRUARY 22, 2022
Finnian Cavanaugh, Project Engineer
227 W. Jefferson Blvd
South Bend, IN 46601
fcavanau@southbendin.gov
RESPONSIBLE OFFICE
5920 Hohman Avenue
Hammond, IN 463204
AUTHORIZED NEGOTIATOR
James Rice, PE
Partner
Director, Transportation Engineering
jrice@hwcengineering.com
(317) 981-1241 - Office
CITY OF SOUTH BEND
PE SERVICES FOR SAFE ROUTES TO SCHOOL – MUESSEL PRIMARY AND
HOLY CROSS SCHOOL AREA
(DES # 1900447)
INDOT LaPorte District
Confidence in the Built Environment
City of South Bend: PE Services for Safe Routes to School – Muessel Primary and Holy Cross School Area (DES# 1900447) | Page 2
TEAM PROJECT APPROACH RELEVANT EXPERIENCE
HWC FIRM OVERVIEW
HWC was founded in 1989 and
has offices in Indianapolis,
Lafayette, Muncie, New Albany,
Hammond, and Terre Haute.
As a full-service consulting firm,
we provide water, wastewater,
stormwater, transportation,
inspection, site engineering,
survey, landscape architecture,
and planning services for both
the public and private sectors.
HWC has received multiple
project awards from the
American Council of Engineering
Companies of Indiana (ACEC
Indiana), has been recognized
among the top 10 largest
engineering firms in the
Indianapolis Business Journal,
and has been named one of the
Best Places to Work in Indiana
by the Indiana Chamber of
Commerce for the last seven
years.
HWC TRANSPORTATION OVERVIEW
With a reputation for completing
projects on time and within budget,
our INDOT-certified, solutions-driven
staff is prepared to guide your
project from the preconstruction
stages through project completion.
CONSTRUCTION
INSPECTION
Economic development for all communities depends upon viable transportation systems, allowing goods and services to
come into and exit from communities in the most efficient manner possible. Our expertise includes the design of new or
rehabilitated roadways, streets, intersections, and associated incidentals. Our professionals are fully prepared to assist
your community with every facet of transportation project delivery from concept development through planning, design,
and construction inspection of transportation projects.
Equally as important, as an INDOT-certified engineering firm, our relationships throughout Indiana allow us to assist our
clients in not only finding the best solutions for their communities but to move projects forward. Because of our working
relationships with major municipal finance and bond counsel professionals, we know how to “package” your project for
successful delivery.
HWC Design Services
• Road Design (Rural Systems)
• Street Design (Urban Systems)
• Highway Design (Arterial Systems)
• Bridge Design
• Bridge Rehabilitation and Replacement
• Intersection Upgrades, including
Roundabouts
HWC Construction Engineering Services
• Construction Observation Services for
Roadway and Bridge Projects
Planning, Studies, Permitting,
Funding Services
• Thoroughfare Plans, ADA Plans,
Pavement Asset Management Plans
• Transportation System Studies
(Functional Classification Updates,
Interchanges, etc.)
• Permits (INDOT, IDNR, US Army
Corps of Engineers, etc.)
• Funding Assistance (Federal-aid
highway funding for LPA Projects,
Community Crossings Funds)
City of South Bend: PE Services for Safe Routes to School – Muessel Primary and Holy Cross School Area (DES# 1900447) | Page 3
TEAM PROJECT APPROACH RELEVANT EXPERIENCE
Right-of-Way Task Lead
• Pat McCallister, SR/WA (WSP)
CITY OF SOUTH BEND:
LAPORTE DISTRICT
Josh Grabijas, PE
Project Manager &
Design Lead
(HWC)
James S. Rice, PE
Principal-in-Charge
(HWC)
Finnian Cavanaugh
City Engineer
Design Lead
• Josh Grabijas, PE (HWC)
Survey Task Lead
• Luke Jahn, PLS, MBA, EI (HWC)
Environmental &
Permitting Task Leads
• Beth Hillen (Metric)
• Susan Castle (Metric)
Utility Coordination Task Lead
• Katie Olson (HWC)
ADDITIONAL SERVICES
7%
93%
Booked Annualized
INDOT Design/Inspection
Capacity
Available Annualized
INDOT Design/Inspection
Capacity
CAPACITY OF HWC STAFF
HWC Engineering 90%
6.1 Topographical Survey Data Collection
8.1 Non-Complex Roadway Design
WSP USA Inc. 5%
12.2 Title Search
Metric Environmental, LLC (DBE) 5%
5.2 Environmental Document Preparation - CE
PROJECT TEAM
Lewie Allen, PE
QA/QC
(HWC)
Joe Bell, PE, PMP
QA/QC
(HWC)
Road Design Team
• Joe Wright, PE, STP (HWC)
• Micah Reynolds, EI (HWC)
• Josh Hensley (HWC)
City of South Bend: PE Services for Safe Routes to School – Muessel Primary and Holy Cross School Area (DES# 1900447) | Page 4
TEAM PROJECT APPROACH RELEVANT EXPERIENCE
JOSH GRABIJAS, PE
PROJECT MANAGER
“Mr. Grabijas was Porter County Owner’s
Representative for our LPA contract with
INDOT. I was impressed with Mr. Grabijas’
diligence, communication to project
stake holders, problem solving, and
overall project management skills that
he displayed throughout the design and
construction of the project.”
- Porter County Highway Engineering Project
Manager
Communication is Key
Josh will commit 25%
of his time to this project.
QUALIFICATIONS
Josh has eight years of industry experience as a Civil Engineer and Project Manager. He has managed a wide variety of
projects, including bridge replacements, road rehabilitation and reconstruction, and multi-use pedestrian trails, among others.
As an analytical, self-motivated, and solutions-oriented leader, he has a history of developing proven results for many types
of project improvements in local communities, including pavement deterioration, poor drainage, lack of shoulders, road
realignment, and overall public safety improvements, to name a few.
EDUCATION | DESIGNATIONS
BS, Civil Engineering, Hope College
Professional Engineer - Indiana
RELEVANT EXPERIENCE
Bridge #62 over Kankakee River (Porter County) – Porter County, IN *
Role: Project Manager, Designer
• This project addressed the deteriorating condition of the existing bridge structure. Work also involved performing
a thorough evaluation of all possible structure options to select the option that balanced construction cost and
reduced future maintenance.
South Bend SSL Survey (AECOM)*
Project Manager/Surveyor
• Josh was responsible for the survey and file creation of a corridor for a proposed Amtrak expansion moving into
the City of South Bend. Complications included converting surface files between AutoCAD and Microstation as well
as limited access to certain properties.
WI Street Roadway Design (Hobart Storm Water Management Department)*
Project Engineer
• Josh was part of a team redesigning a roadway that consistently floods due to its low profile through the middle of
a lake. Challenges include avoiding waterway impacts while also reducing the issue of a regularly flooded/closed
roadway. There are also several major utilities that travel through this causeway that need consideration in the
unique solution which includes the use of several hundred wick drains to reduce settlement of the new roadway.
Lakeshore Drive Pedestrian Trail (City of LaPorte)*
Surveyor/Designer
• Josh performed the survey, created the existing CAD files, and proposed surface geometry for a project that
turned an existing two-way street into a one way street with a dedicated bike lane around a lake including a pre-
fabricated bridge over a narrow channel to direct cyclists to a nearby public beach park.
Freedom Trail (Town of Lowell)*
Project Manager, Surveyor, Project Engineer
• Josh managed an INDOT/LPA project for the Town of Lowell to connect Liberty Park with Freedom Park using a
multi-use pedestrian trail through wetlands, ravines, and an existing subdivision. The trail is using both federal and
local funds through the INDOT system to design, build, and acquire necessary property from existing owners to
construct a trail for the general public to use.
*Previous Employer
City of South Bend: PE Services for Safe Routes to School – Muessel Primary and Holy Cross School Area (DES# 1900447) | Page 5
TEAM PROJECT APPROACH RELEVANT EXPERIENCE
QA/QC ROAD DESIGN TEAM
• 12+ years of experience as a Civil Engineer
and is skilled in project management in
roadway design
• Has served as both a Project Engineer
and Project Manager for federally funded
transportation projects around Southern
and Central Indiana
JOE BELL, PE, PMP
Project Engineer (HWC)
Education:
BA, Liberal Arts
Transylvania University
BS, Civil Engineering
University of Kentucky
• 18+ years of experience
• Experience with more than 40 projects
ranging from intersection safety
improvements to interstate rehabilitation
and new interchange design
LEWIE ALLEN, PE
Project Engineer (HWC)
Education:
BS, Civil Engineering
University of Louisville
• 8+ years of experience with managing
project deliverables, coordinating
subconsultants, and leading
multidisciplinary task teams on successful
project completion
• Design experience has been geared
toward urban and rural road preservation,
rehabilitation, and reconstruction including
horizontal alignment and vertical profile
correction, intersection sight distance
improvements, guardrail improvements,
pedestrian safety improvements, and
drainage improvements
JOE WRIGHT, PE, STP
Project Engineer (HWC)
Education:
MST, Sustainable
Transportation
University of Washington
BS, Civil Engineering,
University of Cincinnati
• 18+ years of experience
• Experience includes CADD automation/
administration, traffic impact study reports,
civil design, construction inspection
and testing, and residential survey and
construction layout
• Extensive knowledge of industry software,
Specifically Bentley, and Autodesk
Products
JOSH HENSLEY
Project Engineer (HWC)
Education:
AS, Civil Technology
Sinclair Community College
• 2+ years of experience
• Experience working in geometric design,
drainage design and analysis, traffic data
and capacity analysis, crash data and
analysis, and construction inspection
MICAH REYNOLDS, EI
Project Engineer (HWC)
Education:
BS, Civil Engineering
Purdue University
UTILITY COORDINATION
KATIE OLSON
Utility Coordinator (HWC)
Education:
Ivy Tech (2 years)
• 15+ years of experience
• INDOT-certified utility coordinator
• Previously INDOT Greenfield District Utility
Coordinator
• Maintains strong working relationships with
all regional and local utility contacts
BETH HILLEN
Environmental (Metric)
Education:
BA, Arts
Miami University
SUSAN CASTLE
Environmental (Metric)
Education:
Engineering
Arkansas Tech University
• 30+ years of experience
• 15+ years managing NEPA environmental
projects
• Focused on cultural resource
management projects
• Qualified Professional in History
• Well-versed in the National Historic
Preservation Act Section 106 process
• 17+ years of experience
• Environmental experience in inspecting,
researching, and preparing environmental
assessment reports, air permit compliance,
NEPA reports, and asbestos sampling
• Experience with CE Level 1, 2, and 3
for multiple bridge replacements and
rehabilitations throughout the State of
Indiana
ENVIRONMENTAL & PERMITS RIGHT-OF-WAY
PAT MCCALLISTER SR/
WA
(WSP)
Right-of-Way
Education:
AS, Land SurveyingVincennes University
• 28+ years of industry experience and
• First R/W Manager in Indiana
who provides management on
transportation projects to receive
an SR/WA designation, the highest
designation in the R/W industry
• Extensive experience in legal
descriptions, right-of-way parcel plats,
transfer documents, deed research,
and obtaining subdivision plats and
assessor maps
City of South Bend: PE Services for Safe Routes to School – Muessel Primary and Holy Cross School Area (DES# 1900447) | Page 6
TEAM PROJECT APPROACH RELEVANT EXPERIENCE
PROJECT APPROACH
HWC has considerable experience in working with the
City of South Bend. Our engineers are currently working
on the next phase of the Western Avenue improvements
between Walnut Street and Taylor Street. Our
construction inspectors have worked on previous phases
of the Western Avenue improvements as well water
main improvements and the Olive Street Reconstruction
project. HWC has been honored to serve the City of
South Bend and looks forward to serving the City in the
future.
HWC has extensive experience in road
reconstruction projects with clients such as INDOT,
Indianapolis DPW, and large cities throughout
Indiana. HWC has been recognized for years as
an industry leader in using federal funds for LPA
projects for municipalities throughout Indiana.
We are also an industry leader in assisting
our clients in the successful use of Community
Crossing funds. In all of these projects, we
consistently strive for common-sense solutions
and opportunities to help our clients maximize the
use of taxpayer dollars.
This project will be challenging in terms of
balancing the purpose and need for the
improvements with the total amount of funding
available. Creative thinking will be necessary
and our approach will be to work intimately and
comprehensively with South Bend staff, INDOT,
and FHWA from the very beginning to find an
acceptable solution in terms of project scope and
limits that match the funding available.
SOUTH BEND EXPERIENCE
ROAD RECONSTRUCTION EXPERTISE
PROJECT APPROACH
City of South Bend: PE Services for Safe Routes to School – Muessel Primary and Holy Cross School Area (DES# 1900447) | Page 7
TEAM PROJECT APPROACH RELEVANT EXPERIENCE
DES # 1900447 - AREA BOUNDED BY WILBER STREET,
LINCOLN WAY W., SHERMAN AVENUE, AND VASSAR AVENUE
PROJECT APPROACH
The area bounded by Wilber Street, Lincoln Way West, Sherman Avenue, and Vassar Avenue
is approximately 0.2 square miles and contains over 30 intersections and two schools. The
majority of the curb ramps in this area are not ADA compliant and there are numerous locations
of sidewalks that are in need of repair or replacement. Some corners do not even have a
curb ramp. There are no compliant ramps at alley crossings and some school driveways are
missing compliant ramps. Crossing stripes in place are in need of re-striping and the non striped
crossings need adequate striping to allow for safe pedestrian crossings.
The purpose of this project is to improve pedestrian safety with an emphasis on major walking
routes to and from the local schools. Non-compliant ramps will be removed and replaced with
new compliant ramps. Pavement markings will either be added or renewed to delineate and
make crossings safer for pedestrians. Sidewalks will be replaced where they have shoved and
become separated. HWC also proposes the investigation of installing a HAWK (High Intensity
Activated Crosswalk) beacon on Lincoln Way West due to the high traffic volume along this route.
HWC will work closely with the City of South Bend to choose the optimal and most preferred
crossing locations and improve upon existing signing and pavement markings to ensure the
general public has safe routes to and from the local schools.
PROJECT LIMITS
Site Visit on 2/14/22
City of South Bend: PE Services for Safe Routes to School – Muessel Primary and Holy Cross School Area (DES# 1900447) | Page 8
TEAM PROJECT APPROACH RELEVANT EXPERIENCE
UTILITY COORDINATION
HWC understands time constraints with the environmental process. A critical timeline component is getting Metric started as soon as
possible. We achieve this by providing them Stage 1 plans as quickly as possible. There are no archaeological sites or aboveground
historic resources in the immediate vicinity, therefore, it is anticipated to process the project under the Minor Projects Programmatic
Agreement (MPPA) Categorical B-1 for sidewalk replacement and handicap accessible curb ramps. There are several properties in the
area that are considered eligible for the National Historic Register of Historic Places. The project is 7,200’ southeast of the South Bend
Regional Airport which requires coordination with INDOT-Aviation. If right-of-way is required from Muessel Elementary or Muessel Park,
then Section 4(f) coordination will be required with the South Bend Park Board and/or the school. There are three mapped hazardous
material concerns in the project area which will require a Red Flag Investigation. It is anticipated that a Programmatic Categorical
Exclusion (PCE) will be required.
WSP will oversee the right-of-way development for this project. They will provide the
title and encumbrance reports and manage any required right-of-way engineering for
any parcels where acquisition is deemed necessary. All work will be designed to avoid
the need for any acquisition, however, in order to improve upon existing ramps and
depending on existing conditions, it may not be able to be avoided. Should additional
right of way be required, we’ve found one way to prepare for acquisition is to conduct
no-contact appraising and review appraising as a part of the preliminary engineering
process. This allows us to control the schedule and have the appraisal work completed
around the same time as the expected environmental approval, which will then
expedite the purchasing process.
Our field work lead time is about one
month. From the Notice to Proceed
(NTP) date, our Survey Department will
schedule the project. Our department
is familiar with South Bend as they
have conducted several surveys in the
area over the past few years. From the
NTP date, we should get a final survey
deliverable in 2.5 to 3 months.
HWC’s Katie Olsen will provide Utility Coordination
on the project. The primary utility conflict seen on
these types of projects is utility pole relocations when
new ramps are needed to be installed. Katie will
coordinate early and often with all identified utilities
in the project area to ensure any potential conflicts
are addressed in a timely manner and do not delay
the project schedule. A summary of the utilities in the
area identified by an 811 request is provided below.
ENVIRONMENTAL AND PERMITTING
RIGHT-OF-WAY SURVEY 811 UTILITIES
ESTIMATED SCHEDULE
HWC and WSP will coordinate with South Bend, construction, maintenance, and asset teams to further refine a specific schedule of deliverables for project delivery, and
verify related projects and maintenance work plans. Shown below is a preliminary project schedule identifying project progress and milestones. HWC will coordinate to
expedite the project schedule to meet South Bend’s expectations. Letting schedule and design will be based on current INDOT Letting Prep Schedule.
• American Electric Power
• AT&T - Distribution
• Choice Light, Inc. (Formerly Street Joe V)
• Comcast North
• Metro Fibernet, LLC
• NIPSCO Gas (South Bend)
• City of South Bend
HWC’s project schedule contains flexibility to allow for an adjustment to an earlier letting date
in the event that the need for the project increases or funding becomes available sooner.
Notice to Proceed
(May 2022)
Stage I (if required)
(Aug. 2022)
Stage II (if required)
(Oct. 20242)
R/W Certification,
Permit Approval
(Nov. 2, 2022)
Final Tracings
(Mar. 19, 2023)
45 Days Prior to RFC Early
Survey
(June 2022)
PFC
(Sept. 2022)
CE Approval
(Nov. 2, 2022)
Stage III Plans,
Utility Certification
(Dec. 2, 2022)
RFC Deadline
(May 3, 2023)
70 Days Prior to Letting
Estimated
Letting
(July 12, 2023)
City of South Bend: PE Services for Safe Routes to School – Muessel Primary and Holy Cross School Area (DES# 1900447) | Page 9
TEAM PROJECT APPROACH RELEVANT EXPERIENCERELEVANT EXPERIENCE
HWC provided survey, design, bidding, and construction inspection services for the
rehabilitation of a 4,000’ section of Hoyt Avenue from Memorial Drive to Liberty
Street for the City of Muncie. The project entailed a mill and resurface improvement
along with many areas of new curb, sidewalk, and full depth patches to revitalize
the area. It also included a 2 block section of new storm sewer to disconnect the
stormwater from the Sanitary District combined sewer. HWC worked with the Muncie
Sanitary District (MSD) to study the stormwater needs in the area in advance of the
road project.
The $1.3 million construction project was in part funded with an Indiana Crossroad
Community Matching Grant (CCMG) and contributions from the MSD.
HOYT AVENUE REHABILITATION
MUNCIE, IN
HWC provided survey, design, bidding, and inspection services for the 26th
Street Repairs and Sidewalk Improvements.
The scope of the project included improving the existing concrete sidewalk, curb,
ADA ramps, and drives along 26th Street from Madison Street to Macedonia
Avenue. This project also included repairs to the roadway. The worst parts of
the road had full depth patching. The whole road received road fabric with a
wedge and level. 1.5” of surface was placed on top of this. The road fabric
was used to help prevent cracking from the existing concrete road underneath.
New sidewalk was run in front of the school at the intersection of 26th Street
and Macedonia to give students a better and safer walking area to and from
school. New loops were run for the light at the intersection of Madison Street
and 26th Street. Sod and seed were placed in areas that were disturbed by the
construction.
The roadway improvement project was part of the Community Crossings
Matching Grant (CCMG) Program. Construction cost was approximately
$800,000.
26TH STREET REPAIRS AND SIDEWALK IMPROVEMENTS
MUNCIE, IN
City of South Bend: PE Services for Safe Routes to School – Muessel Primary and Holy Cross School Area (DES# 1900447) | Page 10
TEAM PROJECT APPROACH RELEVANT EXPERIENCERELEVANT EXPERIENCE
HWC worked with the City of Salem to provide survey, design, permitting, and
construction administration services for the Market Street Rehabilitation project.
Pavement width was decreased to provide two 12’ travel lanes, two 8’ parking
lanes, 7’ sodded buffers behind the curb, and 5’ sidewalks. The project improved
drainage issues and pedestrian/ADA safety.
Project improvements included:
The $655,000 project was funded through the Community Crossings Matching Grant
Program. Construction began in June of 2018. The section west of Brock Creek was
completed in October of 2018, while the section east of Brock Creek was completed
in August of 2019.
MARKET STREET REHABILITATION
SALEM, IN
HWC provided design, bidding, and will provide construction inspection services
for the Safe Routes to School project in Brookville, Indiana. The project was
located along Fairfield Avenue, SR 101, and Oxford Pike.
All three road segments are either missing sidewalk, have sidewalk that needs
to be rehabilitated, needs compliant curb ramps, or a combination of all three.
HWC designed new sidewalk and a safe pedestrian crossings along Fairfield
Avenue. Along SR 101, approximately 40’ of sidewalk that has deteriorated will
be replaced. On Oxford Pike, a new sidewalk was designed to safely convey
pedestrian foot traffic. All non compliant ramps will be removed and replaced
with ADA compliant curb ramps.
The project also includes the installation of new curbs, drainage structures, and
pipes along Oxford Pike from SR 101 to Whitewater Drive.
The project was successfully bid, awarded, and is moving to construction this
year. Estimated construction cost was $490,000 the and awarded bid was under
this amount.
BROOKVILLE SAFE ROUTES TO SCHOOLBROOKVILLE, IN
• A mill and overlay roadway
• A new storm drainage collection
system
• New sidewalks, bump outs, and ADA
ramps
• Installation of new curbs and gutters
• New signage and pavement
markings
• A sodded buffer strip
City of South Bend: PE Services for Safe Routes to School – Muessel Primary and Holy Cross School Area (DES# 1900447) | Page 11
TEAM PROJECT APPROACH RELEVANT EXPERIENCERELEVANT EXPERIENCE
The Market Street Streetscape has become a
prominent public space in downtown New Albany.
Originally conceived as a streetscape project, the
existing extra-wide sidewalk allowed for a mini-plaza
space to develop between the existing parking row
and historic buildings. Infrastructure work included
new sidewalks, curbs, pavement, drainage, and
landscaping. Custom features included decorative
crosswalks, a landscaped median with District archway
feature, limestone pier light poles with black metal
logos, catenary lighting, and a lit photographic map
identity piece. Contemporary site furnishings, bright
blue lounge chairs, and linear wood picnic tables were
placed within the crushed limestone plaza space to
invite and encourage visitors and residents to linger
while enjoying the surrounding downtown happenings
and many recently restored historic facades.
HWC provided design and inspection services for this
project. Work was completed in the fall of 2019.
MARKET STREET STREETSCAPE
NEW ALBANY, IN
HWC replaced all sidewalks and curb and gutter
in this downtown District of Aurora, Indiana. This
project included minor drainage improvements, as
well as the installation of pavement markings, new
signage, and decorative crosswalks using pavers.
ADA compliant curb ramps were also constructed
and the pavement received a preventative
maintenance mill and overlay of 1.5”. Coordination
with business owners was critical as sidewalk was
removed and replaced and as milling and paving
operations ensued. HWC not only designed the
project but developed the bidding documents
and conducted construction observation and
administration. The project was completed at the
end of 2018.
2ND STREET REHABILITATION
AURORA, IN
HWC provided both crack sealing and a PM 1.5”
mill and overlay in different sections of this Main
Street Rehabilitation project. HWC also met with the
Town and contractor to identify specific areas that
required full depth patching.
Project improvements included:
• Reconstruction of curb and gutter and sidewalks
• Providing ADA curb ramps
• Minor drainage improvements to the storm
sewer system
• Reworking of sidewalks and curb ramps in front
of the Town Hall to improve pedestrian and ADA
access
This project required design, bidding services,
construction observation, and administration.
Throughout the project, HWC kept the Town informed
on the construction status and involved them when
necessary to respond to the contractor’s questions
and concerns. The project was completed at the end
of 2018.
MAIN STREET REHABILITATION
MOORES HILL, IN
THANK YOU TO SOUTH BEND FOR THE OPPORTUNITY TO SUBMIT ON THIS LOI AND FOR YOUR CONSIDERATION!
Standard RFP Form Ver. 3-01-2021
6
(Rev. 06/27/18)
Des. # 1900447
Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE)
I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified
by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this
proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their
respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f).
I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a
blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confirm that
the firms listed below are currently certified DBEs:
INDOT: https://entapps.indot.in.gov/DBELocator/
KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx
I certify that I have contacted the certified DBE’s listed below, and if my company becomes the CONSULTANT, these DBEs have
tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE
utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be
applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division.
I.DBE Subconsultants to be applied toward DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to
be Paid*
%
%
%
%
II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to
be Paid*
%
%
%
%
Estimated Total Percentage Credited toward DBE Goal:___________
Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal:__________
Company Name: ____________________________________________________________________
Signature: ___________________________________________ Date: ________________________
∗ It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result
of negotiation of contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these
or other certified and approved DBE firms.
Indiana DBE Certification Program
In accordance with 49 CFR Part 26 as published in the code of federal regulations, the Indiana
Department of Transportation acknowledges
Metric Environmental , LLC
as a certfied DBE in the State of Indiana.
Date Issued:03/24/2017 No Change Affidavit Due:02/28/2022
(Reference the Indiana Department of Transportation's DBE Public Search at
http://www.in.gov/2674.htm for the most current information regarding this certification)
Elizabeth Kiefner Crawford, Director
Economic Opportunity Division
Derrick Casson, Certification Manager
Economic Opportunity Division