HomeMy WebLinkAboutOpening of Proposal - Bendix Improvements, Phase II - Lathrop to Voorde Proj No. 121-047 - HWC EngineeringFEBRUARY 22, 2022 Finnian Cavanaugh, Project Engineer 227 W. Jefferson Blvd South Bend, IN 46601 fcavanau@southbendin.gov RESPONSIBLE OFFICE 5920 Hohman Avenue Hammond, IN 463204 AUTHORIZED NEGOTIATOR James Rice, PE Partner Director, Transportation Engineering jrice@hwcengineering.com (317) 981-1241 - Office CITY OF SOUTH BEND PE/RW SERVICES FOR BENDIX DRIVE (LATHROP TO VOORDE) (DES # 2100022) LaPorte District Confidence in the Built Environment City of South Bend: PE/RW Services for Bendix Dr (Lathrop to Voorde) (DES# 2100022) | Page 2 TEAM PROJECT APPROACH RELEVANT EXPERIENCE HWC FIRM OVERVIEW HWC was founded in 1989 and has offices in Indianapolis, Lafayette, Muncie, New Albany, Hammond, and Terre Haute. As a full-service consulting firm, we provide water, wastewater, stormwater, transportation, inspection, site engineering, survey, landscape architecture, and planning services for both the public and private sectors. HWC has received multiple project awards from the American Council of Engineering Companies of Indiana (ACEC Indiana), has been recognized among the top 10 largest engineering firms in the Indianapolis Business Journal, and has been named one of the Best Places to Work in Indiana by the Indiana Chamber of Commerce for the last seven years. HWC TRANSPORTATION OVERVIEW With a reputation for completing projects on time and within budget, our INDOT-certified, solutions-driven staff is prepared to guide your project from the preconstruction stages through project completion. CONSTRUCTION INSPECTION Economic development for all communities depends upon viable transportation systems, allowing goods and services to come into and exit from communities in the most efficient manner possible. Our expertise includes the design of new or rehabilitated roadways, streets, intersections, and associated incidentals. Our professionals are fully prepared to assist your community with every facet of transportation project delivery from concept development through planning, design, and construction inspection of transportation projects. Equally as important, as an INDOT-certified engineering firm, our relationships throughout Indiana allow us to assist our clients in not only finding the best solutions for their communities but to move projects forward. Because of our working relationships with major municipal finance and bond counsel professionals, we know how to “package” your project for successful delivery. HWC Design Services • Road Design (Rural Systems) • Street Design (Urban Systems) • Highway Design (Arterial Systems) • Bridge Design • Bridge Rehabilitation and Replacement • Intersection Upgrades, including Roundabouts HWC Construction Engineering Services • Construction Observation Services for Roadway and Bridge Projects Planning, Studies, Permitting, Funding Services • Thoroughfare Plans, ADA Plans, Pavement Asset Management Plans • Transportation System Studies (Functional Classification Updates, Interchanges, etc.) • Permits (INDOT, IDNR, US Army Corps of Engineers, etc.) • Funding Assistance (Federal-aid highway funding for LPA Projects, Community Crossings Funds) City of South Bend: PE/RW Services for Bendix Dr (Lathrop to Voorde) (DES# 2100022) | Page 3 TEAM PROJECT APPROACH RELEVANT EXPERIENCE Right-of-Way Task Lead • Pat McCallister, SR/WA (WSP) CITY OF SOUTH BEND: INDOT LAPORTE DISTRICT Josh Grabijas, PE Project Manager & Design Lead (HWC) James S. Rice, PE Principal-in-Charge (HWC) Finnian Cavanaugh City Engineer Design Lead • Josh Grabijas, PE (HWC) Survey Task Lead • Luke Jahn, PLS, MBA, EI (HWC) Environmental & Permitting Task Leads • Beth Hillen (Metric) • Susan Castle (Metric) Utility Coordination Task Lead • Katie Olson (HWC) ADDITIONAL SERVICES 7% 93% Booked Annualized INDOT Design/Inspection Capacity Available Annualized INDOT Design/Inspection Capacity CAPACITY OF HWC STAFF HWC Engineering 80% 6.1 Topographical Survey Data Collection 8.1 Non-Complex Roadway Design WSP USA Inc. 10% 11.1 Right of Way Plan Development 12.1 Project Management for Acquisition Services Metric Environmental, LLC (DBE) 7% 5.2 Environmental Document Preparation - CE Woodco Enterprise, LTD 1% 12.2 Title Search Vale Appraisal Group 1% 12.4 Appraisal Rita Ann Gabriel & Associates, Inc. 1% 12.5 Appraisal Review PROJECT TEAM Lewie Allen, PE QA/QC (HWC) Joe Bell, PE, PMP QA/QC (HWC) Road Design Team • Joe Wright, PE, STP (HWC) • Micah Reynolds, EI (HWC) • Josh Hensley (HWC) City of South Bend: PE/RW Services for Bendix Dr (Lathrop to Voorde) (DES# 2100022) | Page 4 TEAM PROJECT APPROACH RELEVANT EXPERIENCE JOSH GRABIJAS, PE PROJECT MANAGER “Mr. Grabijas was Porter County Owner’s Representative for our LPA contract with INDOT. I was impressed with Mr. Grabijas’ diligence, communication to project stake holders, problem solving, and overall project management skills that he displayed throughout the design and construction of the project.” - Porter County Highway Engineering Project Manager Communication is Key Josh will commit 25% of his time to this project. QUALIFICATIONS Josh has eight years of industry experience as a Civil Engineer and Project Manager. He has managed a wide variety of projects, including bridge replacements, road rehabilitation and reconstruction, and multi-use pedestrian trails, among others. As an analytical, self-motivated, and solutions-oriented leader, he has a history of developing proven results for many types of project improvements in local communities, including pavement deterioration, poor drainage, lack of shoulders, road realignment, and overall public safety improvements, to name a few. EDUCATION | DESIGNATIONS BS, Civil Engineering, Hope College Professional Engineer - Indiana RELEVANT EXPERIENCE Bridge #62 over Kankakee River (Porter County) – Porter County, IN* Project Manager, Designer • This project addressed the deteriorating condition of the existing bridge structure. Work also involved performing a thorough evaluation of all possible structure options to select the option that balanced construction cost and reduced future maintenance. South Bend SSL Survey (AECOM)* Project Manager/Surveyor • Josh was responsible for the survey and file creation of a corridor for a proposed Amtrak expansion moving into the City of South Bend. Complications included converting surface files between AutoCAD and Microstation as well as limited access to certain properties. WI Street Roadway Design (Hobart Storm Water Management Department)* Project Engineer • Josh was part of a team redesigning a roadway that consistently floods due to its low profile through the middle of a lake. Challenges include avoiding waterway impacts while also reducing the issue of a regularly flooded/closed roadway. There are also several major utilities that travel through this causeway that need consideration in the unique solution which includes the use of several hundred wick drains to reduce settlement of the new roadway. Lakeshore Drive Pedestrian Trail (City of LaPorte)* Surveyor/Designer • Josh performed the survey, created the existing CAD files, and proposed surface geometry for a project that turned an existing two-way street into a one way street with a dedicated bike lane around a lake including a pre- fabricated bridge over a narrow channel to direct cyclists to a nearby public beach park. Freedom Trail (Town of Lowell)* Project Manager, Surveyor, Project Engineer • Josh managed an INDOT/LPA project for the Town of Lowell to connect Liberty Park with Freedom Park using a multi-use pedestrian trail through wetlands, ravines, and an existing subdivision. The trail is using both federal and local funds through the INDOT system to design, build, and acquire necessary property from existing owners to construct a trail for the general public to use. *Previous Employer City of South Bend: PE/RW Services for Bendix Dr (Lathrop to Voorde) (DES# 2100022) | Page 5 TEAM PROJECT APPROACH RELEVANT EXPERIENCE QA/QC ROAD DESIGN TEAM • 12+ years of experience as a Civil Engineer and is skilled in project management in roadway design • Has served as both a Project Engineer and Project Manager for federally funded transportation projects around Southern and Central Indiana JOE BELL, PE, PMP Project Engineer (HWC) Education: BA, Liberal Arts Transylvania University BS, Civil Engineering University of Kentucky • 18+ years of experience • Experience with more than 40 projects ranging from intersection safety improvements to interstate rehabilitation and new interchange design LEWIE ALLEN, PE Project Engineer (HWC) Education: BS, Civil Engineering University of Louisville • 8+ years of experience with managing project deliverables, coordinating subconsultants, and leading multidisciplinary task teams on successful project completion • Design experience has been geared toward urban and rural road preservation, rehabilitation, and reconstruction including horizontal alignment and vertical profile correction, intersection sight distance improvements, guardrail improvements, pedestrian safety improvements, and drainage improvements JOE WRIGHT, PE, STP Project Engineer (HWC) Education: MST, Sustainable Transportation University of Washington BS, Civil Engineering, University of Cincinnati • 18+ years of experience • Experience includes CADD automation/ administration, traffic impact study reports, civil design, construction inspection and testing, and residential survey and construction layout • Extensive knowledge of industry software, Specifically Bentley, and Autodesk Products JOSH HENSLEY Project Engineer (HWC) Education: AS, Civil Technology Sinclair Community College • 2+ years of experience • Experience working in geometric design, drainage design and analysis, traffic data and capacity analysis, crash data and analysis, and construction inspection MICAH REYNOLDS, EI Project Engineer (HWC) Education: BS, Civil Engineering Purdue University UTILITY COORDINATION KATIE OLSON Utility Coordinator (HWC) Education: Ivy Tech (2 years) • 15+ years of experience • INDOT-certified utility coordinator • Previously INDOT Greenfield District Utility Coordinator • Maintains strong working relationships with all regional and local utility contacts BETH HILLEN Environmental (Metric) Education: BA, Arts Miami University SUSAN CASTLE Environmental (Metric) Education: Engineering Arkansas Tech University • 30+ years of experience • 15+ years managing NEPA environmental projects • Focused on cultural resource management projects • Qualified Professional in History • Well-versed in the National Historic Preservation Act Section 106 process • 17+ years of experience • Environmental experience in inspecting, researching, and preparing environmental assessment reports, air permit compliance, NEPA reports, and asbestos sampling • Experience with CE Level 1, 2, and 3 for multiple bridge replacements and rehabilitations throughout the State of Indiana ENVIRONMENTAL & PERMITS RIGHT-OF-WAY PAT MCCALLISTER SR/ WA (WSP) Right-of-Way Education: AS, Land SurveyingVincennes University • 28+ years of industry experience and • First R/W Manager in Indiana who provides management on transportation projects to receive an SR/WA designation, the highest designation in the R/W industry • Extensive experience in legal descriptions, right-of-way parcel plats, transfer documents, deed research, and obtaining subdivision plats and assessor maps City of South Bend: PE/RW Services for Bendix Dr (Lathrop to Voorde) (DES# 2100022) | Page 6 TEAM PROJECT APPROACH RELEVANT EXPERIENCE PROJECT APPROACH HWC has considerable experience in working with the City of South Bend. Our engineers are currently working on the next phase of the Western Avenue improvements between Walnut Street and Taylor Street. Our construction inspectors have worked on previous phases of the Western Avenue improvements as well water main improvements and the Olive Street Reconstruction project. HWC has been honored to serve the City of South Bend and looks forward to serving the City in the future. HWC has extensive experience in road reconstruction projects with clients such as INDOT, Indianapolis DPW, and large cities throughout Indiana. HWC has been recognized for years as an industry leader in using federal funds for LPA projects for municipalities throughout Indiana. We are also an industry leader in assisting our clients in the successful use of Community Crossing funds. In all of these projects, we consistently strive for common-sense solutions and opportunities to help our clients maximize the use of taxpayer dollars. This project will be challenging in terms of balancing the purpose and need for the improvements with the total amount of funding available. Creative thinking will be necessary ,and our approach will be to work intimately and comprehensively with South Bend staff, INDOT, and FHWA from the very beginning to find an acceptable solution in terms of project scope and limits that match the funding available. SOUTH BEND EXPERIENCE ROAD RECONSTRUCTION EXPERTISE PROJECT APPROACH City of South Bend: PE/RW Services for Bendix Dr (Lathrop to Voorde) (DES# 2100022) | Page 7 TEAM PROJECT APPROACH RELEVANT EXPERIENCE DES # 21000022 - LATHROP TO VOORDE Bendix Drive from Voorde Drive to Lathrop Street is approximately 0.67 miles in length. There are currently four travel lanes, two in each direction. Curb and gutter are present on both sides of the roadway throughout the limits. There are three commercial properties with driveways along the west side of the road, all within the southern half of the segment. Railroad tracks are present along the east side of the road up to the southern edge of the airport property, where they then cross Bendix Drive and continue to the west. The pavement is primarily concrete with several sections of HMA, especially near the railroad crossing. Both HMA and concrete pavement is in poor condition with heavy cracking and potholing throughout. There are no sidewalks present on either side. The purpose of this project is to rehabilitate the roadway due to poor conditions and reconfigure the lanes to allow for improved driver safety and the addition of a multi-use trail. According to the INDOT Traffic Count Database, the current AADT for this stretch of road is just under 14,000 VPD. This makes the road an ideal candidate for a Road Diet based on criteria laid out by FHWA. By reducing the number of lanes to three, studies show an average crash reduction of 19 to 47 percent, an overall reduced vehicle speed differential, and an added benefit in this scenario is a multi-use trail can be added to allow for safe pedestrian travel along this corridor. As part of the roadway reconstruction, new curb, gutter, and storm sewer will also be installed. HWC will explore the advantages of two different lane configurations. First is to have one lane in each direction with a shared center left turn lane. This is the preferred option as it will avoid queuing in the through travel lanes turning into commercial properties and the traffic split differential is negligible. This option will also be conducive to any future commercial driveways that may be added along this stretch. The other option is to have two lanes in one direction and one lane in the other. HWC will work with the City to determine what best fits your needs both now and in the future. PROJECT LIMITS Site Visit on 2/14/22VOORDE DRIVEBENDIX DRIVE LATHROP STREETPROJECT APPROACH City of South Bend: PE/RW Services for Bendix Dr (Lathrop to Voorde) (DES# 2100022) | Page 8 TEAM PROJECT APPROACH RELEVANT EXPERIENCE HWC’s project schedule contains flexibility to allow for an adjustment to an earlier letting date in the event that the need for the project increases or funding becomes available sooner. UTILITY COORDINATION HWC understands time constraints with the environmental process. A critical timeline component is getting Metric started as soon as possible. We achieve this by providing them Stage 1 plans as quickly as possible. There are no archaeological sites or aboveground historic resources in the immediate vicinity, therefore, it is anticipated to process the project under the Minor Projects Programmatic Agreement (MPPA) Categorical B-1 for the curb and gutter work; B-8 for the construction of the multi-use path; and B-9 for the installation of the new storm sewer. The project is adjacent to the South Bend Regional Airport and so coordination with INDOT-Aviation will be required. There are two mapped hazardous material concerns towards the south end of the project which will require a Red Flag Investigation. A Categorical Exclusion (CE) Level 1 is anticipated for this project. In review of the St. Joseph County GIS information and the scope of work planned, right-of-way acquisition is anticipated. Within the limits of this project, according to the GIS, there are five different property owners. On the west side of Bendix Drive, there are properties owned by St. Joseph County Airport Authority, Appletree Associates LP, Lalwani LLC, and Hollingsworth Capital Partners – Kentucky LLC. On the east side of Bendix Drive, there are properties owned by Kuert Concrete Inc. and St. Joseph County Airport Authority, but that parcel appears to be used by Kuert Concrete Inc. property. There are also existing railroad tracks on the east and west side of Bendix Drive. The tracks appear to run through Kuert Concrete, Inc. and St. Joseph County Airport Authority to the east until they cross N Bendix Drive and continue on St. Joseph County Airport Authority property to the west of the project. The GIS makes no reference to these tracks being in railroad company right of way, so further research will need to be performed to determine the full ownership and land interests that accompany these tracks. Our field work lead time is about one month. From the Notice to Proceed (NTP) date, our survey department will schedule the project. Our department is familiar with South Bend as they have conducted several surveys in the area over the past few years. From the NTP date, we should get a final survey deliverable in 2.5 to 3 months. HWC’s Katie Olsen will provide railroad coordination on the project. Chicago South Shore and South Bend Railroad have tracks paralleling the road along the east side of the road from Voorde Road to about 1,400’ North of Voorde Road where the tracks cross Bendix Drive. The contractor will be required to carry insurance through coordination with Chicago SS and SB RR. This is less time consuming than a flagging agreement but does require coordination with Chicago SS and SB RR. Katie will also provide Utility Coordination on the project/scope of work and refinement will determine the area of influence and level of utility impacts. There are overhead electrical lines running along the west side of the road immediately behind the existing back of the curb. These poles will likely need to be relocated as part of this roads reconstruction to accommodate removal of existing curb and gutter and the installation of new curb and gutter. Coordination could be timely depending on the scope of work. ENVIRONMENTAL AND PERMITTING RIGHT-OF-WAY SURVEY • Metro Fibernet, LLC • NIPSCO Gas (South Bend) • City of South Bend • American Electric Power • American Electric Power Telecom • AT&T - Distribution • Choice Light, Inc. (Formerly Street Joe V) • Comcast North 811 UTILITIES ESTIMATED SCHEDULE HWC and WSP will coordinate with South Bend, construction, maintenance, and asset teams to further refine a specific schedule of deliverables for project delivery, and verify related projects and maintenance work plans. Shown below is a preliminary project schedule identifying project progress and milestones. HWC will coordinate to expedite the project schedule to meet South Bend’s expectations. Notice to Proceed (July 2022) Stage I Plans (Nov. 2023) Stage II (if required) (May 2024) R/W Certification, Permit Approval (Sept. 28, 2025) Final Tracings (Mar. 15, 2026) 45 Days Prior to RFC Early Survey (Oct. 2022) PFC (Mar. 2024) CE Approval (Jan. 2025) Stage III Plans, Utility Certification (Nov. 28, 2025) RFC Deadline (April 29, 2026) 70 Days Prior to Letting Estimated Letting (July 8, 2026) City of South Bend: PE/RW Services for Bendix Dr (Lathrop to Voorde) (DES# 2100022) | Page 9 TEAM PROJECT APPROACH RELEVANT EXPERIENCERELEVANT EXPERIENCE HWC worked with INDOT to provide roadway design, utility coordination, erosion control permitting, traffic signal planning, right-of-way plan development, and public hearing coordination services for the SR 56/US 31 Intersection Improvement project. With the high volume of traffic, the SR 56/US 31 intersection experienced traffic operations issues. The intersection is controlled with an actuated traffic signal. The intersection is in an urban area, and there are continuous and uncontrolled access points along SR 56 and US 31. HWC reduced congestion by adding a right turn lane on eastbound SR 56 to southbound US 31 and widening US 31 to accommodate two through lanes in both directions. In addition, the segment of SR 56 from I-65 to US 31 was converted from four travel lanes (two lanes in each direction) to a three lane section (one lane in each direction with a two way left turn lane) by way of a road diet. This method provided additional safety to motorists making left turn from businesses and side roads by providing them a median to pull into before merging into the travel lane. It also reduced the number of travel lanes the motorist had to cross before entering the median. The two way left turn lane will allow motorists to make left hand turn from the median without impacting traffic in the travel lanes of SR 56. All of this work was able to be performed within the existing pavement limits of SR 56, eliminating expensive right-of-way costs from what was originally identified in the initial project scope. HWC worked closely with the INDOT Seymour District to achieve the highest level of service. The construction cost of the project was $1.8 million. SR 56/US 31 INTERSECTION IMPROVEMENTS SCOTTSBURG, IN HWC worked with INDOT to provide roadway design, utility coordination, traffic signal planning, and public information meeting coordination services for the US 31 Road Diet project. The need for this project is to address a number of rear-end traffic collisions. The purpose of this project is to enhance road safety and the overall quality of traffic flow by reducing rear-end traffic collisions. US 31 is a four lane Urban - Principal Arterial. Currently, there are no designated lanes for both northbound and southbound vehicles turning left along US 31 in Scottsburg, which has led to an increase in rear-end traffic collisions. HWC collaborated with INDOT and the City of Scottsburg to develop the road diet concept and establish the project limits. US 31 was converted from four travel lanes (two lanes in each direction) to a three lane section (one lane in each direction with a two way left turn lane) from SR 56 to York Road. The two way left turn lane will allow motorists to make left hand turns without impacting traffic in the travel lanes of US 31, reducing the number of rear end collisions. US 31 was milled and resurfaced to remove all existing pavement markings and new thermoplastic pavement markings were installed to delineate the three lane roadway section. The construction cost of the project was $563,000 US 31 ROAD DIET SCOTTSBURG, IN City of South Bend: PE/RW Services for Bendix Dr (Lathrop to Voorde) (DES# 2100022) | Page 10 TEAM PROJECT APPROACH RELEVANT EXPERIENCERELEVANT EXPERIENCE HWC worked with the City of Salem to provide survey, design, permitting, and construction administration services for the Market Street Rehabilitation project. Pavement width was decreased to provide two 12’ travel lanes, two 8’ parking lanes, 7’ sodded buffers behind the curb, and 5’ sidewalks. The project improved drainage issues and pedestrian/ADA safety. Project improvements included: The $655,000 project was funded through the Community Crossings Matching Grant Program. Construction began in June of 2018. The section west of Brock Creek was completed in October of 2018, while the section east of Brock Creek was completed in August of 2019. MARKET STREET REHABILITATION SALEM, IN HWC provided design, bidding, and construction inspection services for the Madison Street Resurfacing project in Muncie, Indiana. The overall project stretched from 28th Street to Wysor Street (approx. 2.4 miles). The project included the open cut installation of a new stormwater system at a railroad overpass that ties into a previously constructed pump system near Madison Street and Kirby Street. The project also included replacement of existing sidewalk, ADA ramps, roadway mill and resurfacing, installation of traffic striping and signal loop detectors, new curb and gutter, and installation of sodding between curb and sidewalks. The project was broken into two phases and locally funded. The $1.5 million first phase was completed in 2015 and the $700,000 second phase was completed in June 2018. MADISON STREET RESURFACING IMPROVEMENTSMUNCIE, IN • A mill and overlay roadway • A new storm drainage collection system • New sidewalks, bump outs, and ADA ramps • Installation of new curbs and gutters • New signage and pavement markings • A sodded buffer strip City of South Bend: PE/RW Services for Bendix Dr (Lathrop to Voorde) (DES# 2100022) | Page 11 TEAM PROJECT APPROACH RELEVANT EXPERIENCE The Market Street Streetscape has become a prominent public space in downtown New Albany. Originally conceived as a streetscape project, the existing extra-wide sidewalk allowed for a mini-plaza space to develop between the existing parking row and historic buildings. Infrastructure work included new sidewalks, curbs, pavement, drainage, and landscaping. Custom features included decorative crosswalks, a landscaped median with District archway feature, limestone pier light poles with black metal logos, catenary lighting, and a lit photographic map identity piece. Contemporary site furnishings, bright blue lounge chairs, and linear wood picnic tables were placed within the crushed limestone plaza space to invite and encourage visitors and residents to linger while enjoying the surrounding downtown happenings and many recently restored historic facades. HWC provided design and inspection services for this project. Work was completed in the fall of 2019. MARKET STREET STREETSCAPENEW ALBANY, IN HWC replaced all sidewalks and curb and gutter in this downtown District of Aurora, Indiana. This project included minor drainage improvements, as well as the installation of pavement markings, new signage, and decorative crosswalks using pavers. ADA compliant curb ramps were also constructed and the pavement received a preventative maintenance mill and overlay of 1.5”. Coordination with business owners was critical as sidewalk was removed and replaced and as milling and paving operations ensued. HWC not only designed the project but developed the bidding documents and conducted construction observation and administration. The project was completed at the end of 2018. 2ND STREET REHABILITATION AURORA, IN HWC provided both crack sealing and a PM 1.5” mill and overlay in different sections of this Main Street Rehabilitation project. HWC also met with the Town and contractor to identify specific areas that required full depth patching. Project improvements included: • Reconstruction of curb and gutter and sidewalks • Providing ADA curb ramps • Minor drainage improvements to the storm sewer system • Reworking of sidewalks and curb ramps in front of the Town Hall to improve pedestrian and ADA access This project required design, bidding services, construction observation, and administration. Throughout the project, HWC kept the Town informed on the construction status and involved them when necessary to respond to the contractor’s questions and concerns. The project was completed at the end of 2018. MAIN STREET REHABILITATION MOORES HILL, IN THANK YOU TO SOUTH BEND FOR THE OPPORTUNITY TO SUBMIT ON THIS LOI AND FOR YOUR CONSIDERATION! RELEVANT EXPERIENCE Standard RFP Form Ver. 3-01-2021 6 (Rev. 06/27/18) Des. #: 2100022 Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE) I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f). I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confirm that the firms listed below are currently certified DBEs: INDOT: https://entapps.indot.in.gov/DBELocator/ KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx I certify that I have contacted the certified DBE’s listed below, and if my company becomes the CONSULTANT, these DBEs have tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division. I.DBE Subconsultants to be applied toward DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* % % % % II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* % % % % Estimated Total Percentage Credited toward DBE Goal:___________ Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal:__________ Company Name: ____________________________________________________________________ Signature: ___________________________________________ Date: ________________________ ∗ It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result of negotiation of contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these or other certified and approved DBE firms. Indiana DBE Certification Program In accordance with 49 CFR Part 26 as published in the code of federal regulations, the Indiana Department of Transportation acknowledges Metric Environmental , LLC as a certfied DBE in the State of Indiana. Date Issued:03/24/2017 No Change Affidavit Due:02/28/2022 (Reference the Indiana Department of Transportation's DBE Public Search at http://www.in.gov/2674.htm for the most current information regarding this certification) Elizabeth Kiefner Crawford, Director Economic Opportunity Division Derrick Casson, Certification Manager Economic Opportunity Division