BENDIX DRIVE | 3
LATHROP STREET
VOORDE
DRIVE BENDIX DRIVE$ Potential Cost Savings $
Concrete pavement in better condition at Lathop Street -
may be able to rehabilitate this pavement.
South Bend International Airport runway may require FAA
permit
Existing railroad crossing will require coordination with NICTD.
Existing fiber along west curb line, consider relocating as
part of the project.
Existing outside northbound lane from Lincoln Way West
offers opportunity to add bike lane since the travel lane
would need to end at Voorde Drive. Bendix Drive At a GlanceDLZ provided engineering services for the track alignment
relocation for the NICTD/South Bend International Airport,
which included the installation of subsurface drains to
stabilize both the track bed and the adjacent roadway.
DLZ designed the previous Phase of the Bendix Road
Diet, from the Indiana Toll Road Bridge to Lathrop Street
N
LATHROP STREET
VOORDE
DRIVE BENDIX DRIVEDLZ
BENDIX DRIVE | 4
Approach
Existing Conditions
Bendix Drive is an important north/south
corridor within the City of South Bend along
the east side of the South Bend International
Airport. It is classied as a Principal Arterial
with a posted speed limit of 40 mph. The
current lane conguration has 4 travel lanes
with dedicated left turn lanes at the signalized
intersection with Lathrop Street intersection. The
intersection of Bendix Drive and Lathrop Street
was reconstructed in 1991, therefore the pavement
is newer than the rest of Bendix Drive corridor. Much
of the roadway consists of concrete pavement which
is failing, with joint deterioration and potholes that
have been patched with asphalt. The roadway is
curbed with storm sewer inlets to collect rain water,
and there is no existing sidewalk along the project
corridor. North of the project, a newly constructed sidewalk/multi-use
path is along the east side of Bendix, from Lathrop Street to Nimtz
Parkway. South of the airport, there are numerous driveways for
access to businesses located along the west side of the roadway. The
current 2021 trac AADT is 12,745, which has been decreasing from
a peak volume of almost 20,000 AADT in 2001. The truck trac is
relatively high at 6.5% (2021). Beginning south of the project limits,
NICTD railroad tracks are parallel along the east side of Bendix Drive
and continue approximately 1,400 feet north of Voorde Drive, where
they cross Bendix Drive and continue west toward the airport.
Proposed Improvements
As done on the previous section of Bendix Drive, the current 4 lane
roadway oers the City the an ideal opportunity to implement a
Road Diet by converting Bendix Drive into a 3 lane roadway. The
new corridor would be a continuation of the 2020 section to the north
from Lathrop Street to the south end of the bridge over the Toll Road
that DLZ designed. Road Diets have the potential to improve safety,
convenience, and quality of life for the traveling public while providing
the opportunity to improve pedestrian accessibility. Benets of a
Road Diet include reduction of rear-end and left-turn crashes, reduced
right-angle crashes and more consistent travel speeds. The reduction
to three lanes also allow additional space within the existing footprint
that can be used to provide a multi-use path.
POTENTIAL COST SAVINGS OPPORTUNITY:
SOUTH OF LATHROP STREET, THERE IS A
2,000 FOOT STRETCH WITH NO DRIVEWAYS ON
EITHER SIDE OF BENDIX DRIVE. THE CENTER
TURN LANE COULD BE ELIMINATED, IF DESIRED.
Safety Benefits
4-Lane to 3-Lane,Road Diet Conversions
19%-47%reduction intotal crashes
$
4 to 3 Lane
Conversions
19-47%
Reduction in Total
Crashes
N
DLZ
BENDIX DRIVE | 5
Pedestrian Improvements
During our site visits, we notice several pedestrians
being forced to walk on the roadway, creating a
dangerous situation for both them and the drivers
traveling around them. Reducing the number of
travel lanes will allow for the addition of a multi-use
path along the east side of Bendix Drive. This trail
can be extended north of Lathrop Street to connect
with the existing multi-use path constructed as part
of the previous Road Diet project along Bendix
Drive. Since there are no other existing sidewalks
present along Bendix Drive or Lathrop Street, it is
anticipated that curb ramps and cross walks would
only be added in the east approach of Lathrop
Street. If due to future development, sidewalks are
warranted they can be added in all four quadrants
of this intersection.
Added Bike Lanes
One of the challenges of reducing a roadway
section from 4 lanes to 3 lanes is adding the
appropriate lane drops and lane tapers to reduce
from 2 lanes northbound down to the new single
lane conguration. North of the proposed project
limits, the travel lanes have already been reduced
to a single travel lane northbound and southbound
with the Citys 2020 project designed by DLZ. At
the south end of this project, between Voorde
Drive and Lincoln Way West, there will be about a
half a mile section that is still four lanes until it can
be reconstructed in a future project. However, in
the interim, the opportunity would exist to stripe
the roadway as a 3 lane section with a bike lane,
as shown above. This would eliminate the need
for dropping a northbound lane approaching the
project from the south and will help reduce driver
confusion. And the Bendix Drive corridor would be
a uniform 3 lane section from Lincolnway Way West
north to Cleveland Road.
DLZ RECOMMENDATION: CONSIDER RESTRIPING THE SECTION OF BENDIX DRIVE, SOUTH OF
VOORDE DRIVE TO LINCOLN WAY WEST, TO A 3 LANE SECTION WITH BIKE LANE ALONG THE
EAST SIDE. THIS WILL MATCH THE LANE CONFIGURATION FOR BENDIX DRIVE TO THE NORTH
AND HELP REDUCE DRIVER CONFUSION BY ELIMINATING A LANE DROP. THE BIKE LANE CAN
CONNECT TO THE PROPOSED MULTI-USE PATH, BEGINNING AT VOORDE DRIVE.
DLZ
BENDIX DRIVE | 6
POTENTIAL MAINTENANCE OF TRAFFIC PLAN (ONE-WAY
THROUGH TRAFFIC)
Phase 1 Maintain one lane southbound on newly constructed roadway
and construct west half of roadway
Phase 2 - Maintain existing outer southbound trac lane and construct
east half of roadway
The anticipated detour for northbound trac would be from Lincoln Way
West, north on Portage Avenue to Cleveland Road back to Bendix Drive.
MOT OPTION PRO CON
Close Bendix Drive with
a detour
Most cost eective option
Removes trac from
construction area allowing
quickest construction
Most impact to traveling public
Does not provide good access to
businesses along Bendix within project
Keep one lane open
and provide one way
through traffic
Allows travel through the project
limits while limiting the number
of construction phases
Can be more challenging to maintain
access to all drives
Keep two lanes open
for both northbound
and southbound traffic
throughout construction
Least impact to traveling public
Most impact to contractor during
construction
Additional cost for Temporary widening
Requires multiple phases of MOT
Longest construction duration
Would be challenging with proximity of
NICTD overhead poles
Maintenance Of
Traffic
The single biggest impact
to the traveling public is
how it aects drivers as
they navigate through the
project all summer during
construction. There are 3
main options outlined in the
table below. Each comes
with its own Pros and Cons.
Ultimately, we will work with
the City to determine the best
Maintenance of Trac Option.
Traffic Signals
There are 2 trac signals within the project limits.
The signal at Voorde Drive will be replaced and
the signal at Lathrop Street could be replaced or
modernized.
VOORDE DRIVE SIGNAL REPLACEMENT
New signal poles
New signal heads
Gridsmart detection system
New signal controller
Emergency vehicle preemption detectors
LATHROP STREET SIGNAL
MODERNIZATION/REPLACEMENT
Paint span and catenary poles black
New signal heads
Gridsmart detection system
Add pedestrian signals
Emergency vehicle preemption detectorsPHASE 2 PHASE 1Existing Traffic Signal at Bendix Drive/Lathrop Street
DLZ
BENDIX DRIVE | 7
Drainage
Since the existing pavement footprint will be reduced
as part of this project, DLZ anticipates the existing
storm sewer system will have sucient capacity
for the 3 lane roadway section and multi-use path.
Reduction in the pavement width will reduce the
allowable ponding width in the gutter. Therefore,
DLZ will perform inlet spacing calculations to
determine if additional inlets are required to reduce
spread to an acceptable width.
Many of the curb inlets were observed to be lower
than the existing pavement and will be raised to the
roadway curb line. DLZ will visually inspect all inlets
and castings to determine if the castings can simply
be adjusted to grade or if the inlets and castings
must be replaced. We would anticipate holding the
west curb line allowing those inlets to continue to be
used. The east curb line will be shifted west due to
the reduced 3 lane section, therefore the curb inside
will be replaced. The storm sewer connects to a 24
trunk sewer that ows south and connects to a 48
storm sewer along Lincoln Way West.
Northern Indiana Commuter
Transportation District
Coordination
Railroad coordination will be required with the
Northern Indiana Commuter Transportation District
(NICTD) for replacement of the existing at-grade
railroad crossing on Bendix Drive. This project
is anticipated to require a railroad agreement
between NICTD and the City of South Bend for
replacement of the crossing by NICTD. In addition,
INDOT requires that the railroad crossing, including
warning signals, be brought up to current standards.
Fortunately, DLZ has extensive railroad coordination
experience from performing railroad coordination
for other INDOT and local projects, and over
the years, DLZ has developed a great working
relationship with NICTD, which will benet the City
in helping to expedite the coordination process.
Permits
Bendix lies directly to the east of the South Bend
Internationals main runway and is in the ight path.
A Federal Aviation Administration (FAA) permit,
form 7460-1 will likely be required for construction
within the ight path. We have experience ling
this permit for other projects. The only other
permit anticipated would be Storm Water Pollution
Plan permit which we prepare on virtually all our
roadway projects.
Utilities
In an urban project many utilities such as water,
sanitary sewer, storm sewer, gas, electric, and
ber will be encountered. With the roadway
footprint decreasing, it reduces the potential for
additional utility relocations. When possible, the
new storm sewer system would be designed around
the existing utilities to minimize the number of
relocations. There is a 12 water main running
along the west side of Bendix Road. From our
experience in the previous phase, we are aware
of ber conduits running right along the west
curb lane. Some challenges were encountered
by the contractor working around this line during
construction in Phase 1. Our solution for this project
would be to include in the project a new conduit
run west of the reconstructed Bendix Drive curb
line and allow the ber to relocate at the start of the
project eliminating potential conicts.
High Pressure Gas Line being relocated for Bendix
Phase 1, it is anticipated that this line will also need to be
relocated as part of this project as well
DLZ
BENDIX DRIVE | 8
Existing Right of Way
The existing right of way along Bendix Drive from
Voorde Drive to Lathrop Drive is generally 80 feet
wide, based on the Citys GIS data. Because the
projects pavement area is anticipated to stay within
the existing footprint, we do not expect additional
permanent right of way to be required. However,
there are several inconsistencies shown on GIS in
the existing right of way (see area shown to the
right), specically along the west side of Bendix
Road, adjacent to the airport runway, that will need
to be investigated further during design. INDOT
requires the Local Public Agency to certify that the
required right of way is all properly documented.
If both the Airport and City are in agreement,
this right of way transfer could be handled by a
donation.
AIRPORT EAST PROPERTY LINE
EXTENDS PAST BENDIX DRIVE’S CENTER
LINE.
Environmental
Challenges Solutions
Section 106 The project proposes work types for which Section 106 approval may be issued under
the Minor Projects Programmatic Agreement (MPPA). MPPA applicability will expedite
completion of the NEPA documentation.
Section 4(f)No Section 4(f) properties were noted in the project area. No impacts are anticipated.
Stream and
Water Quality
Impacts
Implementation of INDOT Standard Specications is anticipated to adequately address water
quality concerns. Impacts requiring mitigation are not anticipated.
Wetlands NWI-mapped wetlands were noted near the project area. A Waters of the U.S. Reports will
be prepared to document the presence of wetlands. Impacts requiring mitigation are not
anticipated.
Floodplains/
Floodways
No oodplain areas were noted within the project area. No impacts are anticipated.
Threatened and
Endangered
Species
DLZ will conduct programmatic consultation for bat species of concern using the on-
line USFWS IPaC system, which streamlines the consultation process. No Eect
determinations, or May Aect, Not Likely to Adversely Aect determinations are
anticipated. If trees are removed/trimmed, a seasonal tree clearing restriction is expected
(trees may not be removed from April 1 through September 30).
Hazardous
Materials Sites
A leaking underground storage tank (LUST)/Institutional Controls site that is encumbered
with an Environmental Restrictive Covenant (ERC) is located in the southwest quadrant of
the Bendix Drive/Voorde Drive intersection. One other LUST site is located on the west
side of Bendix Drive, approximately 1,500 feet south of Lathrop Street. Review of IDEM
Virtual File Cabinet (VFC) records indicates contamination at the LUST/Institutional Controls
site is limited to the rear (west side) of the parcel, and that a No Further Action (NFA)
determination has been issued for the remaining LUST site. No impacts are anticipated.
N
BENDIX DRIVE025-1023-0681025-1023-0681
025-1023-068101025-1023-068101
DLZ
BENDIX DRIVE | 9
Schedule
From MACOG’s funding website, DLZ understands that this project is scheduled for July 8, 2026 letting. In order to meet this
schedule, the Project will need to be proactively managed for not only design, but more importantly, for the non-design elements
such as utility coordination and R/W activities. Our average INDOT schedule score in 2021 was a 1.2, representing an average
submittal between 7 and 15 days ahead of the established schedule. This is indicative of DLZ’s ability to manage projects and
make project milestone submissions ahead of schedule.
NOV 2022STAGE 1 PLANS
MAR 2023PFC
MAY 2023STAGE 2 PLANS
MAY 2022 - AUG 2023ENVIRONMENTAL DOCUMENT APPROVED
OCT 2023 - SEP 2025R/W ACQUISITION (If required)
SEP 2025STAGE 3 PLANS (95%)
MAR 2026FINAL TRACINGS
APR 2026READY FOR CONTRACT
JUL 2026LETTING
MAY 2022NTP
JUN 2022SURVEY
DLZ
BENDIX DRIVE | 10
Anthony
Glenn, PE
PROJECT MANAGER
Tonys project
experience with City
of South Bend projects
and direct experience
as lead designer of the
previous Bendix phase,
makes him the ideal
project manager to
make this a successful
project for the City! Bendix Drive Road Reconstruction, South Bend, Indiana.
Northern Indiana Commuter District: South Bend Airport
Realignment, South Bend, Indiana.
Washington Street Improvement Project, South Bend, Indiana.
Colfax Avenue Two-Way Conversion, South Bend, Indiana.
Tucker Drive, South Bend, Indiana.
Olive Street and Sample Street, St. Joseph County, Indiana.
Douglas Road Relocation, South Bend, Indiana.
Michigan Street S Curve, South Bend, Indiana.
Tonys 15 years of experience includes being a lead engineer and
project manager for various urban roadway design projects. His
experience with these projects includes roadway, storm sewer,
signal and signing, maintenance of trac plans and right of way
engineering. Tony has been directly involved in numerous City of
South Bend projects as outlined below. Tonys experience with the
Bendix Road Phase 1 project gives him the perfect background to
lead this project as the phases are very similar. Tony was often the
DLZ eld representative when Contractor questions arose during
Phase 1 and design support was needed.
COMMUNICATION PLAN
Tony, your one
point of contact!
Schedule and facilitate
meetings for all
stakeholders, including
progress meetings.
Work with the City
to develop a public
involvement plan.
Establish and confirm
expectations and goals
early in the planning
process.
Return phone calls and
emails the same business
day or within 24 hours.
CITY
PROJECT
MANAGER
Clearly communicate
through meeting
minutes/summaries and
time-critical action items.
DLZ
BENDIX DRIVE | 11
A team built
for success.
PROJECT MANAGER
Anthony Glenn, PE
PRINCIPAL IN
CHARGE
Laurie D.
Johnson, PE
TEAM PARTICIPATION
DLZ | 92% | 5.2, 6.1, 8.1, 11.1, 12.1, 12.2, 12.6, 16.1
K & S Engineers, Inc. (DBE) | 4% | 7.1
Courtland Title & Escrow (DBE) | 1% | 12.2
Vale Appraisal Group | 1% | 12.4
Rita Ann Gabriel & Associates (DBE) | 2% | 12.3, 12.5
ENVIRONMENTAL | 5.2
Jason Stone
Daniel Stevens
SURVEYING/RIGHT OF WAY
ENGINEERING | 6.1, 11.1
Steven Jones, PS, CFedS
Aaron Springer, PS
GEOTECHNICAL ENGINEERING
SERVICES | 7.1
Timothy Hampshire, PE
K & S Engineers, Inc. (DBE)
ROADWAY | 8.1
Paul Foster
Michael Prescott, EI
Mathieu Doyle, PE
Michael Geiger, EI
PM FOR ACQUISITION (If Required)
| 12.1
Qasim Asghar
TITLE RESEARCH | 12.2
Courtland Title & Escrow (DBE)
APPRAISALS (If Required) | 12.4
Vale Appraisal Group
VALUE ANALYSIS & APPRAISALS
REVIEW (If Required) | 12.3, 12.5
Rita Ann Gabriel & Associates (DBE)
NEGOTIATION (If Required) | 12.6
Qasim Asghar
UTILITY COORDINATION | 16.1
Hannah Whisler
RAILROAD COORDINATION (If
Required)
Wyatt Bower, LS
Hannah Whisler
QUALITY
MANAGER
Ryan Carrington,
PE, LEED AP
Ryan Carrington, PE, LEED AP
Quality Manager
Paul Foster
Senior Technical Advisor
40 YEARS EXPERIENCE
12th Street Improvement Project from Dodge
Street to Campbell Street, Mishawaka, Indiana.
Washington Street and LaPorte Avenue
Intersection Improvement, South Bend, Indiana.
Bendix Drive Reconstruction, South Bend.
Olive Street/Sample Street Overpass
Reconstruction, South Bend, Indiana.
19 YEARS EXPERIENCE
Bendix Drive Reconstruction, South Bend.
US 33 Realignment, Goshen
Douglas Road, Ivy Road to SR 23, St. Joseph
County
Silhavy Road, LaPorte Avenue to Evans Avenue,
Valparaiso
Kercher Road, Dierdor Road to US 33, Goshen
Jason Stone
Environmental Services
29 YEARS EXPERIENCE
Bendix Drive Reconstruction, South Bend.
Bridge Rehabilitation, SR 933 over St. Joseph
River in South Bend.
Olive Street and Sample Street, South Bend,
Indiana.
US-31/Adams Road Interchange, South Bend,
Indiana.
Hannah Whisler
Utility Coordination
5 YEARS EXPERIENCE
I-69 Section 5 Design Services, INDOT.
SR 258 Intersection Sight Distance Project,
Seymour District, INDOT.
US 35 over Conrail, LaPorte County, Indiana.
Bendix Drive Reconstruction, South Bend.
Douglas Road, Ivy to SR 23, St. Joseph County,
Indiana.
DLZ
BENDIX DRIVE | 12
Road Diet/3 Lane
Roadway
Sidewalk/Trail Storm Sewer Right of Way Survey
Project Experience
BENDIX DRIVE ROAD DIET
SOUTH BEND, INDIANA
TAYLOR ROAD RECONSTRUCTION
COLUMBUS, INDIANA
KERCHER ROAD RECONSTRUCTION
GOSHEN, INDIANA
12TH STREET AND HARRISON ROAD
MISHAWAKA, INDIANA
OLIVE/SAMPLE ROAD AND BRIDGE
SOUTH BEND, INDIANA
DOUGLAS ROAD REALIGNMENT FEASIBILITY
STUDY AND DESIGN, ST. JOSEPH COUNTY
KEY ELEMENTS
BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM
Date February 11, 2022
Name Leslie Biek, PE Department PW
BPW Date February 22, 2022 Phone Extension 9323
Review and Approval Required Prior to Submittal to Board Diversity Compliance
and Inclusion Officer Officer Name BPW Attorney Attorney Name
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach
Required Information
Company or Vendor Name
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Bendix Improvements Ph 2- Lathrop to Voorde
Project Number 121-047
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description Receipt of proposals for design of this project. This is a federally funded LPA
project following INDOT’s RFP guidelines. Once a consultant has been selected, a contract will be drafted and will be approved by BPW at a later date.
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase Decrease
%
( %)
Time Extension Amount:
New Completion Date: