HomeMy WebLinkAboutRejection of Quote - Studebaker Fountain Water Improvements Proj No. 121-032 - Culligan Water  ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS February 8, 2022 Mr. John Murphy Culligan Water 56861 Ferrettie Ct. Mishawaka, IN 46545 jmurphy@heywaterman.com RE: Rejection of Quotes – Studebaker Fountain Water Improvements – Project No. 121-032 Dear Mr. Murphy: At its February 8, 2022 meeting, the Board of Public Works approved the rejection of all quotes for the above referenced project due to the quotations not including materials and labor. This project will proceed to the open market, in accordance with City procurement procedures. Thank you for quoting, and we hope you quote with us in the future. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Laura Hensley/Acting Clerk Enclosures Page 1 of 1 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Laura Hensley, Clerk Board of Public Works FROM: Sarah Beam, Project Engineer SUBJECT: Reject Quotes Project No. 121-032 Studebaker Fountain Water Improvements DATE: February 1, 2022 On January 25, 2022, the Board of Public Works opened and read quotes for the Studebaker Fountain Water Improvements project. One quote was received from Culligan for $16,249. Culligan’s quote included only the equipment price of the water softener system and brine tanks. The quote did not include the materials and labor required in the quote specifications in relation to the following tasks: directional drilling and installation of sanitary lines, connection to existing utilities, installation of indoor plumbing and equipment, paving, earthwork, and landscape restoration. I request that the Board declare the Culligan quote as non-responsive and advance the project to the open market because: 1)The quote fails to conform in all material respects to the specifications. 2)The quote fails to comply specifically with the invitation to quote and the instructions to quoters. The project Quote Specifications and Culligan quote are attached for reference as needed. Please contact me with questions. Enclosures February 8, 2022 Version 08/25/2021 Page - 1 Public Works Quote SCOPE OF WORK CITY OF SOUTH BEND PROJECT NAME: Studebaker Fountain Water Improvements PROJECT NO. 121-032 QUOTES DUE January 25, 2022 at 9:00am local time to bpwbids@southbendin.gov I.PROJECT DESCRIPTION A.The project includes the furnishing of all equipment, material, insurance, and labor for Studebaker Fountain Water Improvements project that includes the installation of new water lines to be installed via horizontal directional drilling, coring existing concrete foundation walls, installation of indoor water plumbing and equipment, new water softener and phosphate injection systems, electrical work, sanitary drain lines, new sanitary manhole and sanitary sewer line, connection to existing sanitary sewer lines, HMA pavement, new concrete sidewalk, earthwork, and landscape restoration at Leeper Park within the City of South Bend, IN. II.PREVAILING SPECIFICATIONS AND CONSTRUCTION STANDARDS AND SPECIFICATIONS A.The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and CONSTRUCTION STANDARDS AND SPECIFICATIONS, most recent version, are to be used on this project. B.Each Quote provider is specifically instructed to become completely familiar with the most recent version of the PREVAILING SPECIFICATIONS and the CONSTRUCTION STANDARDS AND SPECIFICATIONS prior to submitting a quote. C.Wherever the PREVAILING SPECIFICATIONS refer to “State Specifications,” it shall mean the 2022 INDOT Standard Specifications for the letting effective after September 1, 2021. D.These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS. E.In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS, the SPECIAL PROVISIONS will govern. III.TERM “OR EQUAL” A.Prevailing Specifications: None B.Additions 1.Where the term "or equal" is used in these specifications, the Quote provider deviating from specified item shall file with his/her/its Quote a letter fully explaining and justifying his/her/its proposed article or equal. The City of South Bend shall be the sole judge in determining if the “or equal” offered meets the specification. IV.TAX EXEMPT A.Prevailing Specifications: None B.Additions 1.Materials and properties purchased under contract with the Owner that becomes a permanent part of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax). The exemption number will be furnished to the Contractor upon award. V.INDEMNIFICATION A.Prevailing Specifications: None B.Additions Version 08/25/2021 Page - 2 Public Works Quote 1.Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agent s, officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees, and other expenses, arising from or out of the negligent performance of this Contract by Contractor, or because of arising out of any defect in the goods, materials or equipment supplied by the Quote provider. VI.INSURANCE A.Prevailing Specifications: 2022, INDOT Standard Specifications Section 103 B.Additions: 1.All Contractors and subcontractors doing business with the City of South Bend shall present a Certificate of Insurance showing coverage in the following minimum amount: a.General Liability: Premises-Completed Operations or Products, Bodily Injury and Property Damage Combined Single Limit - $5,000,000. b.There shall be no exclusion for explosion, collapse or underground hazard. c.Workmen’s Compensation: Statutory State of Indiana Employer's Liability - $100,000. d.Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000. e.The City of South Bend shall be named as additional insured on the Certificate of Insurance. VII.CONTROL OF WORK A.Prevailing Specifications: 2022, INDOT Standard Specifications Section 105 B.Additions: 1.The complete responsibility for this project lies with the Director of Public Works of the City of South Bend, Indiana acting through his authorized representatives. 2.Construction Engineering - The Contractor shall provide all the necessary, qualified personnel, equipment and supplies to perform all work required under this item. There will be no direct payment for this item. 3.The contractor is responsible to maintain the site which includes but is not limited to; dust control, site security, erosion control, and protecting adjacent properties. 4.Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No work shall be permitted on weekends, Holidays, or after hours unless approved by the City of South Bend Department of Public Works. VIII.LEGAL RELATIONS A.Prevailing Specifications:2022, INDOT Standard Specifications Section 107 B.Additions: 1.The Owner, where mentioned in these documents, is the City of South Bend. The Engineer, where mentioned in these documents, is Jones Petrie Rafinski. 2.The Contractor shall apply for and obtain any and all required perm its for the work from local, state, and federal agencies and shall comply with permit requirements, including the St. Joseph County / City of South Bend Building Department. 3.If the Contractor awarded this contract is not a resident of Indiana, within thirt y days, the Contractor shall provide the Owner with proof that the Contractor is duly licensed, qualified and registered with the Secretary of State of Indiana to engage in business within the State of Indiana. 4.The Contractor shall comply with all provisions of Indiana Code 5 -16-13, as amended. The Owner reserves the right to immediately terminate the public work project awarded should the Contractor be found to be in violation of any provision of Indiana Code 5 -16-13 and such violation shall result in the forfeiture of Contractor’s performance bond to the Owner. IX.PROSECUTION AND PROGRESS A.Prevailing Specifications: 2022, INDOT Standard Specifications Sec. 108 B.Additions: Version 08/25/2021 Page - 3 Public Works Quote 1.The project will have a completion date of April 22, 2022. The contract time will start when the Notice to Proceed is delivered and signed. 2.The City, Engineer, and Contractor will hold a pre-construction meeting following award of the contract. The date of the Notice to Proceed will be agreed at that meeting. 3.Contractor shall provide a schedule to the Owner prior to beginning any work on the site. X.CHANGE OF CONTRACT TIME A.Prevailing Specifications: 2022, INDOT Standard Specifications Section 108 B.Additions 1.The Contract Time may only be changed by Change Order. Any Claim for an extension in the Contract Time shall be based on written notice delivered to the Department of Public Works within seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent of the claim with supporting data shall be delivered within fourteen (14) cale ndar days after such occurrence unless an official of the Public Works Department allows an additional period of time to ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost to delays beyond the control of the Contractor if a claim is made in accordance with this provision. Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God. 2.Unless otherwise provided, the Contract time is based upon normal weather conditions. An extension is granted for weather conditions significantly more severe than normal if the Contractor demonstrates to the satisfaction of the City that the delay in the progress of the work was due to such weather. The basis to define normal weather with be the data compiled by the United States Department of Commerce, National Oceanic and Atmospheric Administration (NOAA). 3.No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including fault or negligence of Contractor’s subcontractors, caused the delay, or for which any remedies are provided under any other provision of this agreement. 4.The grant of an extension of time under this Section in no way constitutes a waiver by the City of any rights or remedies existing under this contract at law or in equity. XI.DEFAULT AND TERMINATION A.Prevailing Specifications: 2022, INDOT Standard Specifications Section 108 B.Additions: 1.Events of Default shall include Contractor’s failure to perform any of its obligations under this contract including failure to commence work at the time specified, failure to perform the work in accordance with these specifications, unauthorized discontinuation of the work, failure to carry out the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or regulations, and failure to comply with any other term of this contract. 2.If an Event of Default occurs, the City shall provide Contractor written notice and may permit Contractor ten (10) calendar days after the date of the notice to cure the default. If the default is not cured within the ten (10) day cure period, the City may a t any time thereafter terminate this contract in which case the termination shall be final and effective. 3.Upon an Event of Default, the City may invoke the following remedies in addition to those remedies provided under separate provisions of this contract, the right of set-off against any payments due or to become due to the Contractor against the retainage, the right to take over and complete the Work. If the City notifies Contractor that City is invoking its right to complete the Work, all rights that the Contractor has in order under Contractor’s subcontracts are assigned to the City, subject to the City’s right to take assignment of all or only selected subcontracts at the City’s discretion. The sole obligation accepted by the City under such subcontrac ts is to pay for Work satisfactorily performed after the date of the assignment. In the event a conditional assignment has not been executed, the Contractor shall execute or cause to be executed any assignment, agreement, or other document that may be necessary in the sole opinion of legal counsel to the City’s Board of Public Works to evidence compliance with this provision. The Contractor shall promptly deliver such documents upon the City’s request. In the case of such assignment, unless otherwise agreed in writing, The Contractor remains liability to subcontractors for any payment already involved, and for any claim, Version 08/25/2021 Page - 4 Public Works Quote suit or cause of action based upon or resulting from any error, omission, negligence or other breach of contract by the Contractor, its officers, employees, or agents arising prior to the date of assignment to the City. XII. LIQUIDATED DAMAGES A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 108 B. Additions: 1. The contractor shall proceed with the work at such rate of progress to insure full completion within the Contract Time. It is expressly understood and agreed, by and between the Contractor and the Owner, that the Contract Time for completion of the work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the work, and excludes the time for unavoidable delays which were beyond the control and without the fault of the Contractor. 2. If the Contractor shall fail to complete the work within the Contract Time, or extension of time granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages a sum of five hundred dollars ($500.00) for each calendar day that the Contractor shall remain in default after the time of completion stipulated in the Contract Documents. 3. The Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the work is due to the following and the Contractor has promptly given wr itten notice of such delay to the Owner and Engineer/Architect. a. To any preference, priority, or allocation order duly issued by the Owner. b. To unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God, acts of public enemy, acts of the Owner, acts of another Contractor in the performance of a Contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather. XIII. RETAINAGE AND FINAL PAYMENT A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 109 B. Additions: 1. Payments will be made every thirty (30) calendar days 2. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of payments throughout the duration of the project. 3. Before final payment and retainage are released the Contractor must satisfy the following: a. All parts and labor meet requirements stated in the specifications. b. Provide copies of test reports or cut sheets on all materials supplied. c. Provide As-Built drawings in accordance with the City of South Bend Prevailing Specifications for Public Works. d. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final Waiver of Lien. XIV. WARRANTY A. Prevailing Specifications: None B. Additions 1. All Parts shall include the following: a. Performance specifications b. Bill of Materials c. Warranties on all parts d. Installation and safety requirements Version 08/25/2021 Page - 5 Public Works Quote XV. OTHER UTILITIES A. Prevailing Specifications: None B. Additions: 1. The Contractor shall verify the locations of all utilities by contacting Indiana811 by calling 811 (in Indiana) or 1-800-382-5544 (outside of Indiana), or via www.indiana811.org, at least two (2) working days, not counting Saturdays, Sundays or federal and state holidays before proceeding with construction. It shall also be the Contractor’s responsibility to contact any other utility that is not contacted by Indiana811 and verify the utility locations. 2. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone, etc. in order to assure that all utilities that need to be replaced or relocated can be done with a minimum disturbance to service. The Contractor shall also be responsible for coordinating schedules with the various utilities such that they can proceed with their relocation work as efficiently as possible. 3. If the odor of natural gas is detected in a work area at any time during the course of work, the Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also immediately notify the residents of adjacent properties. The Contractor shall advise the residents to evacuate their homes immediately if the odor is present within the dwelling. 4. Contractor shall verify location of all existing utilities and water lines prior to commencement of construction operations and horizontal directional drilling operations. Damage to existing utilities shall be repaired by the Contractor at no additional cost to the City. 5. Restoration of sprinkler systems damaged by the Contractor's operations shall be repaired by the Contractor at no additional cost to the City or the Owner of the system. XVI. MAINTENANCE OF TRAFFIC A. Prevailing Specifications: 2022, INDOT Standard Specifications Sections 105 & 801 B. Additions: 1. Maintenance of traffic during construction shall conform to the “Indiana Manual on Uniform Traffic Control Devices” and the City of South Bend Design and Construction Standards. 2. The attached “Traffic Closure Request” form is to be used for any lane restrictions or closures and required to be filled out and sent to the Department of Public Works 3. The Contractor shall arrange and prosecute the work specified for this contract in such a manner that traffic on existing streets is unrestricted throughout the Project. The Engineer shall approve the method of traffic control. No construction equipment, vehicles, materials, supplies or temporary facilities shall be left unattended in the right-of-way of any street or left parked overnight without proper marking and lighting. 4. After the award of the contract and before beginning the work, the Contractor shall submit his/her/its proposed schedule of operations for the review of the Engineer. The schedule of operations as reviewed by the Engineer shall be maintained at all times. 5. There will be no direct payment for this work. 6. Accommodations to the nearby school bus schedule should be made as necessary. XVII. DESCRIPTION OF WORK A. Prevailing Specifications: None B. Additions 1. Work to be performed shall include furnishing all labor, services, materials, insurance and equipment necessary for the installation of new water lines to be installed via horizontal directional drilling, coring existing concrete foundation walls, installation of indoor water plumbing and equipment, new water softener and phosphate injection systems, electrical work, sanitary drain lines, new sanitary manhole and sanitary sewer line, connection to existing sanitary sewer lines, HMA pavement, new concrete sidewalk, earthwork, and landscape restoration for the Studebaker Fountain Water Improvement project the City of South Bend. 2. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and their property from damage caused by the Contractor’s operations. Version 08/25/2021 Page - 6 Public Works Quote XVIII. PLANS A. Prevailing Specifications: City of South Bend Design and Construction Standards B. Additions: 1. The plans consist of 2 Sheets. 2. The work shall conform to the plans. 3. The drawings are schematic in nature. 4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. 5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall gover n. IV. M/WBE GOALS A. Prevailing Specifications: City of South Bend Ordinance No. 10761-21, Minority and Women Business Enterprise Inclusion Program Plan B. Additions: 1. The M/WBE Goals for this Project are a. MBE _1.3__ %. b. WBE _4.3__ %. 2. Complete FORMS MBE-1.0 MBE Utilization Plan and WBE-1.0 WBE Utilization Plan, and submit with Bid Proposal 3. Complete FORMS MBE-2.0 Evidence of Good Faith Efforts and WBE-2.0 Evidence of Good Faith Efforts and submit with Bid Proposal. 4. Complete FORMS MBE-2.1 MBE Contacted and WBE-2.1 WBE Contacted and submit with Bid Proposal. V. SAMPLING AND TESTING A. Prevailing Specifications: 2022, INDOT Standard Specifications Sections 106 B. Additions: 1. Quality control sampling and testing shall be the sole responsibility of Contract or. Quality control sampling and testing will be required for compaction testing of all backfill placed in the pipe trenches and around manhole structure. 2. Concrete sampling and testing for quality control will be required for all concrete. Air content te st, slump test, 7-day and 28-day compression cylinders shall be provided for each 25 cubic yards of concrete utilized for driveways, cast-in-place structures, sidewalks, and curb construction. 3. Asphalt testing will be in accordance with City Standard Specifications. 4. Earthwork: a. Maximum density shall be determined by AASHTO T-99 as modified by Section 203.24 of the State Specifications using Method A for soil and Method C for granular material. b. In addition to the compaction requirements provided in the Site Geotechnical Report, the following compaction levels shall be met: (i) Topsoil used in all but the top 6-inches of fill in areas specified 90% (ii) Existing ground receiving fills 100% Version 08/25/2021 Page - 7 Public Works Quote (iii) Backfill in pipe and conduit trenches under pavement and curbs (existing and future) 100% (iv) Backfill in pipe and conduit trenches in easement and open areas (existing and future) 95% (v) All other areas receiving fill, unless otherwise noted 100% c. Where cold weather conditions do not allow for adequate soil compaction, flowable fill shall be used in lieu of structural backfill and shall be paid for as structural backfill. 5. Compaction Testing Frequency: a. A minimum of one (1) Compaction Test will be required on the backfill for each sewer or water main pipe transverse run that is under the pavement or concrete curb. A minimum of three (3) Compaction Tests will be required on the backfill for sewer or water main pipe run. A pipe run is the length between structures or valves, not to exceed 400-feet. b. A minimum of one (1) Compaction Test per 1,500 square yards of roadway per lift of earth fill or subgrade. c. Location of the Compaction Tests will be selected by the Engineer. 6. Contractor shall provide copies of each sampling and testing report to Engine er as soon as said samplings and reports are available. Failure to provide these reports in a timely manner shall permit Owner to withhold payment until such time as the reports are received by Engineer. 7. Neither observations by Engineer nor inspections, tests or approvals by others shall relieve Contractor from Contractor’s obligations to perform the Work in accordance with the Contract Documents. 8. Quality control sampling and testing shall be the sole responsibility of Contractor and will not be paid for directly, but the cost thereof shall be included in the cost of other items of the Contract. VI. PUBLIC SAFETY A. Prevailing Specifications: 2022, INDOT Standard Specifications Sections 107.08 B. Additions: 1. It shall be the Contractor’s responsibility to secure the construction site against unauthorized entrance by persons and vehicles outside of and during work hours. This includes securing the site against dumping and public safety of the Owner, Owner’s representatives, pedestrians, bystanders and neighborhood residents. 2. Maintaining public safety will not be paid for directly, but shall be included in the cost of various items of the contract. VII. STREET CLEANING A. Prevailing Specifications: 2022, INDOT Standard Specifications Sections 107.08(b) B. Additions: 1. The Contractor shall provide effective dust control. Loader-mounted pick up, power sweepers, or other types of pull type models shall be used in all phases of street cleaning of streets adjacent to the limits of active construction. 2. Street cleaning will not be paid directly, but shall be included in the cost of various items of the contract. Version 08/25/2021 Page - 8 Public Works Quote VIII. CONTACT DESIGNEES A. Prevailing Specifications: None B. Additions: 1. The names and contact information for each representative designated by the Contractor for specific areas of authority shall be provided no later than the project Preconstruction meeting. At a minimum, such representatives would include, but not be limited to those responsible for overall project supervision, erosion control, traffic control operations, and project safety and compliance. IX. PERMITS A. Prevailing Specifications: None B. Additions: 1. The Contractor shall be solely responsible for filing all paperwork required for City of South Bend permits, including but not limited to the City building permit. 2. The Contractor shall be required to observe and obey all requirements of the permits. 3. A City of South Bend standard Street Closure Form shall be submitted by the Contractor prior to each change in access or traffic flow. The Contractor shall submi t the enclosed form to the Public Works Customer Service Staff for approval of the change. Traffic Closure Request Form is included. X. MOBILIZATION AND DEMOBILIZATION A. Prevailing Specifications: 2022, INDOT Standard Specifications Sections 110 B. Additions: 1. The mobilization portion of this pay item will be limited to 75 percent of the Lump Sum price. The balance of the Lump Sum price will be considered demobilization and will be paid for when all work including final cleanup is completed. 2. Measurement and Payment a. Payment for all costs of Mobilization and Demobilization, including the cost of all materials, equipment, tools, labor, transportation, operations, and all other incidentals, shall be paid for on a lump sum basis for all parts under the pay item: MOBILIZATION AND DEMOBILIZATION………………………………………………….LS XXIII. COMMON EXCAVATION A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 203 B. Additions: 1. Excavation and embankment shall be in accordance with the following: 2. The minimum soil compaction requirements for backfill material and pavement subgrade will be as follows: Subgrade under any roads, pavements, curbs, and drainage structures 100% Version 08/25/2021 Page - 9 Public Works Quote Topsoil used in all but the top six inches (6”) of fills in areas specified 90% Existing ground receiving fills 90% Backfill in pipe and conduit trenches under any roads, pavements, and curbs 95% Backfill in pipe and conduit trenches not under pavement or curbs 95% All other areas receiving fill 90% Compacted Aggregate Base 100% Maximum density shall be determined by AASHTO T 99 as modified by section 203.24 of the State Specifications using Method “A” for soil and Method “C” for granular material. 3. The Contractor shall keep all public roadways that are used for hauling excavation or borrow material clean and free of any spillage of material. Said public roadways shall be cleaned on a daily basis. The cost of removal of any spillage shall be included in the unit cost of excavation or bor row material and no further compensation will be made. Failure to comply with this requirement will result in cleaning of the spillage by the Local Public Agency with a back charge of two hundred fifty dollars ($250.00) per occurrence. 4. All excavations and trenches shall be properly braced to furnish safe working conditions in accordance with Federal, State and Local laws, statues and ordinances. The Engineer may order the Contractor to provide additional bracing should there be danger of injury to existing or adjacent structures. Whenever running sand is encountered, close sheeting, well points, or both, shall be used. 5. All excavation, grading and compaction of the subgrade under the pavement by a vibratory roller necessary for the completion of this Project including, but not limited to, shaping of subgrade under pavement and sidewalks, shall be incidental to the contract and not paid for separately, but included in the various bid items. 6. If large rocks or boulders are encountered during excavation for thi s project, these boulders shall be removed. The cost of removing these rocks or boulders will not be paid for directly but shall be included in the cost of Common Excavation. 7. The established pay item for pavement removal shall include removal of concrete or brick pavement, with removal of asphalt pavement overlay being incidental to the cost of the removal of the pavement below. 8. Topsoil shall be spread on all slopes and disturbed areas to a depth of 4 inches. 9. All topsoil on the site shall be stockpiled and re-used. The cost for removal, stockpiling and re-use will not be paid for directly but shall be included in the cost of Common Excavation. 10. The Contractor shall field verify the location of all utilities prior to beginning work. 11. All excavation, backfill, and compaction in lifts for pipe construction shall be incidental to the cost of the established pipe construction pay items as bid. 12. Measurement and Payment a. Payment for all costs of “Additional Common Excavation, Undistributed” shall be only for specific neat line volumes as approved by the Engineer on a case by case basis for any common excavation required during the work which is not included in any established pay item including the cost of all materials, equipment, tools, labor, transport ation, operations, and all other incidentals, shall be paid for on a cubic yard basis for all parts under the pay item: Version 08/25/2021 Page - 10 Public Works Quote COMMON EXCAVATION ……………………..…………………..……………..………….CYS XI. PAVEMENT, REMOVE A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 202, 203 B. Additions: 1. The Contractor shall remove and dispose of any concrete pavement areas shown on the plans to be removed or as directed by the Engineer. 2. All pavement areas to be removed shall be neat line saw cut at removal lim its for full depth removal. 3. Measurement and Payment a. Concrete type pavement removal shall be paid for on a square yard basis under the pay item: PAVEMENT, REMOVE…………………..……………………………………………....SYS b. Asphalt type pavement removal, other than that called out for milling, shall be paid for within the pay item for Common Excavation for all parts: COMMON EXCAVATION…………………..…………………………………………….CYS c. Saw cutting for removal shall not be measured for pavement but shall be considered incidental to the Contract for all parts. XII. CONCRETE SIDEWALK REMOVAL A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 202 B. Additions: 1. Measurement and Payment a. Payment for all costs of Sidewalk, Concrete, Remove, including the cost of all materials, equipment, tools, labor, transportation, operations, incidental neat line sawcut, and all other incidentals, shall be paid for on a square yards basis for all parts under the pay item: SIDEWALK, CONCRETE, REMOVE…………..…………………………………………SYS XIII. CURB REMOVAL A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 202 B. Additions: 1. Disposal of debris resulting from the removal operations shall be at an off -site area, provided by the Contractor and approved by the Engineer. No debris shall be left overnight. 2. All asphalt, concrete, and curb shall be neat line saw cut at established removal limits prior to removal. All vaults underneath sidewalks shall be located and marked on walkways prior to sawcutting operations. There will be no direct payment for saw cutting but it shall be included in the various removal items. 3. Pavement or curb outside of the limits of removal as shown in the plans that are damaged by the Contractor shall be removed and replaced to existing or better conditions at the Contractor’s expense. Version 08/25/2021 Page - 11 Public Works Quote 4. Where curb is to be removed and replaced adjacent to pavement to remain, any pavement disturbed during the removal of the curb shall be replaced with a 10” asphalt base with 1 1/2" of HMA surface. The cost of the pavement removal, concrete and asphalt re placement will not be paid for separately, but shall be included in the cost of the removal of the curb. 5. Removal limits shall be marked by the Owner prior to giving the Contractor authorization for removal. The City will not pay for any removal outside of the marked limits unless authorized by the Owner. 6. Measurement and Payment a. Payment for all costs of concrete curb and curb and gutter removal, including the cost of all materials, equipment, tools, labor, transportation, operations, and all other incidentals, shall be paid for on a linear foot basis under the pay item: CURB, CONCRETE, REMOVE……………..……………………………………………....LFT XIV. MILLING, ASPHALT A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 306 B. Additions: 1. The depth of asphalt pavement milling shall be according to the contract documents or as directed by the Engineer. 2. All areas of asphalt pavement milling shall be established by the Engineer and the Contractor prior to the commencement of work. 3. The Contractor shall be responsible for determining and performing depth of variable depth pavement milling where depth of milling is governed by thickness of concrete pavement to be placed over milled areas. The Contractor shall provide milling depth in order to c onstruct the planned thickness of concrete pavement as a minimum. No additional payment will be made for concrete pavement thickness above planned thickness as a result of the depth of milling by the Contractor 4. Measurement and Payment a. Payment for all costs associated with asphalt pavement milling, including the cost of all materials, equipment, tools, labor, transportation, operations, and all other incidentals, shall be paid for on a square yard basis under the pay item: SURFACE MILLING, ASPHALT, 1.5 IN………..…………………………………….SYS XV. EXISTING BACKFLOW PREVENTER, REMOVE AND ADJUST A. Prevailing Specifications: INDOT 2022 Standard Specifications Section 402, 406 B. Additions: 1. The Contractor shall remove the existing backflow preventer and adjust the existing plumbing to accept the new 1” water supply line. Backflow preventer to be returned to the City. 2. The Contractor shall install 1”x3/4” water line reducer where new water line connects to existing ¾” copper piping prior to fill line valves. 3. All fill line valves (2) shall remain functional after all work is completed. 4. Contractor shall install new inline 1” brass ball valve/drain valve prior to fill line valves and install within valve box, flush with adjunct grades. 5. Contractor shall provide submittals of all new fittings, valve boxes and related equipment to Owner for approval. Version 08/25/2021 Page - 12 Public Works Quote 6. Measurement and Payment a. Payment for all costs associated Existing Backflow Preventer, Remove and Adjust, including the cost of all materials, equipment, fittings, ball valved, line adjustments, tools, labor, transportation, operations, and all other incidentals, shall be paid for on a Lump Sum basis for under the pay item: EXISTING BACKFLOW PREVENTER, REMOVE AND ADJUST.….….….….….….….….….….LS XVI. TEMPORARY EROSION CONTROL MEASURES A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 205 B. Additions: 1. The Contractor shall be responsible for adhering to the City of South Bend specifications and requirements regarding erosion and sedimentation control. Temporary Erosion Control shall include the cost implementation of the plan and maintenance of the erosion control elements. Should the Contractor fail to comply with the requirements of the Erosion Control Plan, or fail to adequately implement or maintain the elements of the plan, the Contractor shall be solely responsible for fines, imprisonment or any other penalties lawfully imposed. 2. Erosion control measures shall be installed in accordance with current City of South Bend Standard Specifications and the Indiana Stormwater Quality Manual. 3. The Contractor shall be responsible for erosion control measures and keeping the sedimentation on site. Measures include but are not limited to installing silt fence where the ground slopes away from the project site, installing inlet protection as necessary to keep sediment out of inlets during construction, installing gravel pads, installing concrete washout or other necessary measures to prevent tracking sediment offsite. 4. The contractor shall vegetate all areas that lay bare for more than fourteen (14) days with temporary seeding. The contractor shall inspect all erosion control measures a minimum of once per week, and within 24 hours after every rainfall event of ½” or more. The Contractor shall take corrective measures as necessary and maintain all temporary erosion control measures. 5. Measurement and Payment a. Payment for all erosion control measures for all parts not specifically paid for in ot her items shall be included in the lump sum cost of Temporary Erosion Control. All maintenance and monitoring of erosion control measures will not be paid for separately, but shall be included in the cost of the contract item Temporary Erosion Control. TEMPORARY EROSION CONTROL………………………………..…………………..LS b. Temporary inlet protection will be paid for per each inlet protection provided for all parts under the pay item: TEMPORARY INLET PROTECTION ……………………………………..EACH XVII. EARTHWORK A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 203 B. Additions: Version 08/25/2021 Page - 13 Public Works Quote 1. Earthwork includes all excavation of soils, and any other materials within the project limits not paid for elsewhere, to establish the grades required by the work, including undercut required to establish pavement base grades. 2. Earthwork includes the transportation, hauling and disposal of excess material from the project limits, with the exception of pavement removal, which is to be considered incidental to the PAVEMENT, REMOVAL and COMMON EXCAVATION Pay Items. 3. Contractor may not spoil excavated material within the lawn area between the curb and sidewalk if such placement would cause the gradient to be towards the sidewalk without prior written authorization of the Owner for the specific area in question. 4. Measurement and Payment a. Payment for all costs associated with earthwork as defined above, will not be paid directly, but shall be included in the cost of various items of the contract for all parts. XVIII. WATER SERVICE LINE A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 715 B. Additions: 1. General Requirements a. All pipe, fittings, valves, hydrants, and appurtenances shall be shown on drawings and such drawings and specifications shall be submitted to the City’s authorized representative for approval prior to any construction. Water main installation shall meet all requirements of these specifications. All pipe, fittings, valves, hydrants, and appurtenances shall be new and unused. b. The design of water mains shall be in accordance with the most recent edition of the “Recommended Standards for Water Mains” as adopted by the Great Lakes -Upper Mississippi River Board of State Sanitary Engineers, commonly known as “Ten State Standards” and 327 - IAC-Article 8. c. All necessary permits shall be obtained by or on behalf of the developer. d. These standards are to be used in conjunction with other Town Ordinances. 2. Quality Assurance a. The contractor shall test and disinfect water main in accordance with current City of South Bend standards. b. The contractor shall provide hydrostatic pressure testing for water main in accordance with current City of South Bend standards. c. Testing shall be at the direction and in the presence of authorized City staff. 3. Water Service Lines Installed by Horizontal Directional Drilling a. Pipe (i) Water service lines installed by horizonal directional drilling shall be PE CTS DR 9 (ii) PE CTS piping connections shall be CTS compression adapters. 4. Horizontal Directional Drilling System Requirement. a. The system shall be remotely steerable and permit electronic monitoring and chart recording of tunnel depth and location. This system shall be able to control the depth and direction of the pipe and must be accurate to a window of six (6) inches. The system shall also monitor and record the pullback force required and applied for direction of each pull. b. The system shall be capable of turning 90-degrees in a 200' radius. c. The system will utilize a fluid-cutting process, using liquid clay such as bentonite. This clay shall be totally inert and contain no risk to the environment. d. The liquid clay shall remain in the tunnel to increase the stability of the tunnel and to provide a lubricant to reduce directional drag when the pipes are installed. Version 08/25/2021 Page - 14 Public Works Quote e. Spoils and excess drilling fluid shall be recovered by use of a vacuum system mounted on a vehicle for removal of the spoils. Spoils may not be discharged into sewer or storm drains. The Contractor is responsible for disposal of spoil, excess drilling fluid and excess excavated material. f. Equipment shall be fitted with a permanent alarm system capable of detecting an electrical current. This system will have an audible alarm to warn the operator when the drill head nears electrified cables within a safe operating distance. g. Execution (i) Work shall be performed in accordance with AREMA and NUCA guidelines (ii) All existing utilities to be crossed by the directional drilled service lines shall be potholed and the depth and location field verified by the contractor. The contractor shall adjust the routing of the drilled service lines as required to successfully complete the installation and avoid conflict with existing utility infrastructure as required at no additional cost to the project. Any route adjustments made shall be documented by as-built plans and the engineer shall be notified. (iii) Intercept and divert all groundwater away from all excavation areas, pits and pipe installation areas. (iv) Excavate approach trenches and pits as site conditions and proposed construc tion requires. 5. Valves a. Gate Valves (i) Buried gate valves 4” and larger shall be full ductile iron body, non-rising stem, fusion bond epoxy coated and resilient seat gate valves. Valves shall meet the requirements of ANSI/AWWA C509 and shall have mechanical joint ends. Mechanical joints and joint accessories shall meet the requirements of ANSI/AWWA/C111/A21.11. Valve opening direction shall be consistent with operation of existing valves in the waterworks in which the valves are installed, unless otherwise directed by the Town’s authorized representative, valves shall open counter clockwise. (ii) Three-inch buried gate valves shall be iron body, non-rising stem gate valves. Valves shall meet the requirements of ANSI/AWWA C509 except ends shall be screwed. Screwed ends shall meet the requirements of ANSI B16.3. Valve opening direction shall be consistent with operation of existing valves in the waterworks in which the valves are installed, unless otherwise directed by the Town’s authorized representat ive. (iii) Gate valves 4” and larger installed above ground or in structures shall be resilient seat, iron body, outside screw, and yoke gate valves. Valves shall meet the requirements of ANSI/AWWA C509, except those parts of ANSI/AWWA C509 only applicable to non-rising stem gate valves and wrench nuts. Outside screw and yoke gate valves shall have flange joint ends and malleable iron handwheels. Flange joints and accessories shall meet the requirements of ANSI/AWWA C110. Nuts and bolts shall be cadmium plate d. Gaskets shall be full face and shall be red rubber or equal. (iv) Gate valves smaller than 4” installed above ground or in structures shall be resilient seat bronze, 125 lb. S.W. P. double disc, screwed-in bonnet, rising stem, inside screw gate valves with screwed ends and malleable iron handwheels. Valves shall meet the requirements of Federal Specification WW-V-54d for Class A, Type III valves. (v) The following requirements apply to all gate valves: Wedge shall be ductile iron, fully encapsulated in synthetic rubber except of guide and wedge nut areas. Synthetic rubber shall be molded in place and bonded to the wedge; mechanical fasteners are not allowed. Stem shall be sealed by at least two O-rings; contained within the stuffing box (grooving of stem O-rings is not allowed). All stem seals shall be replaceable with the valve wide open and while subjected to full rated pressure. Valve body and bonnet shall be coated, inside and out; with fusion-bonded epoxy. Bonnet and stuffing box bolts and nuts shall be type 18-8 stainless steel and must be installed by the manufacturer. (vi) Gate valves shall be manufactured by Mueller, Clow or American Flow Control. (vii) Gate valves shall be configured for installation within 3 feet of adjoining fittings. Version 08/25/2021 Page - 15 Public Works Quote (viii) Valves shall include a valve box adapter as manufactured by Adapter, Inc., 2033 S. 54th Street, West Allis, Wisconsin. 6. Curb Stops a. Buried valves 2” and smaller shall be curb stops. Curb stops shall meet the requirements of AWWA C800, ASTM B-62 for 85-5-5-5 composition bronze, and USAS B2.1. Curb stops shall be Mueller, A.Y. McDonald within utility easement or right of way, and no more than 5’ from curb line. 7. Valve Boxes a. Valve boxes for butterfly valves and gate valves shall be cast iron. Valve boxes shall be two piece or three piece type. Each two piece type box shall be complete with bottom section, top section, and cover. Each three piece box shall be complete with base, center section, top section and cover. Valve boxes shall be extension type with slide or screw type adjustment. Each base and bottom section shall be the proper size for the valve served. Each valve box assembly shall be the proper length for the valve served. The minimum thickness of metal shall be 3/16-inch. Cast the word “WATER” in each valve box cover. b. Valve boxes for curb stops shall be cast iron. Curb boxes shall be extension type. Each curb box shall be complete with foot pieces, curb box and lid. Curb box shall be Ford EAI 5040-42R or equal. c. Valves shall include a valve box adapter as manufactured by Adapter, Inc., 2033 S. 54th Street, West Allis, Wisconsin. 8. Flange-Mechanical Joint Adapters a. Flange-mechanical joint adapters shall be Dresser Style 126, Smith-Blair Type 912 or equal. 9. Water Service Connection a. Corporation stop shall be compression. A.Y. McDonald 7470IQ. b. Curb stops shall be round ball curb stops. Mueller 300. c. Curb stop box shall be Ford EA1 5040-42R. d. Curb box key shall be compatible to the above. Supply two for every 50 services. e. Service connection requirements: (i) Service connections shall be in accordance with AWWA C-800. (ii) Taps to the water main shall be made so that the corporation cock is installed 45 degrees from the vertical axis of the main. The residential corporation stops shall be 1”. Corporation stops for commercial or multi-dwelling unit sites shall be 2”. (iii) Residential service lines shall be 1” HDPE pipe unless otherwise approved. Installation depth shall be a minimum of 60” and/or 72” maximum cover. (iv) Commercial or multi dwelling unit sites shall be 2” HDPE pipe, at minimum 60 and/or 72” maximum cover. (v) Service pipe shall be laid 90 degrees to the main. (vi) Service assembly shall extend from the main to the right-of-way limits. f. Service locations: (i) The location of the service connection shall be located in the field by the Town Representative and coordinated with the property owner. Generally, the location should be near a property line appropriate for the most direct or shortest route from the service shutoff to the home. The route shall be selected to avoid plantings, landscaping, driveways, sidewalks, and other exterior appurtenances wherever possible. In no case shall a water service be placed closer than 10 feet from a sewer utility or any part of a septic system. (ii) Water meters and meter pits shall be installed for each water service connection and/or extension, size as noted in the plans. Version 08/25/2021 Page - 16 Public Works Quote (iii) Water pits shall be constructed as detailed in the plans. Water meter assemblies and antenna for electronic meter reading are to be installed in each meter pit and sha ll be supplied by the Town of Bremen Water Department. g. Services crossing pavement: (i) Service leads, when crossing undisturbed pavement, shall be installed by boring, molding or other acceptable methods, which does not disturb the pavement or its support. h. Marking service connection locations (i) Each service connection location shall be marked at the right-of-way line by a 2” by 2” blue painted treated wood stake 24” long driven exactly above the terminal end of the connection. The service shall also be permanently marked in the top of the concrete curb along the street exactly above the service line with the letter “W” imprinted thereon. 10. Measurement and Payment a. The cost for all costs of installing Water Line, PE CTS SR-9 Directional Drill, 2 IN and Water Line, PE CTS SR-9 Directional Drill, 1 IN, including the cost of all materials, equipment, tools, labor, transportation, operations, and all other incidentals will be paid for on a linear foot basis for all parts under the pay item: WATER LINE, PE CTS DR-9 DIRECTION DRILL, 2 IN, ..………………………………….LFT WATER LINE, PE CTS DR-9 DIRECTION DRILL, 1 IN, ..………………………………….LFT b. The cost for all costs of installing Corporation Cock & Curb Stop, 2 IN , and Corporation Cock & Curb Stop, 1 IN including the cost of all materials, equipment, tools, labor, transportation, operations, and all other incidentals will be paid for each installed basis for all parts under the pay item: CORPORATION COCK & CURB STOP, 2 IN ..………………………… ……….……….EA CORPORATION COCK & CURB STOP, 1 IN ..………………………… ……….……….EA XIX. STANDARD INLETS, MANHOLES, AND CATCH BASINS A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 720 & City Standard Drawings, Sheets D-3 & WW-1 B. Additions: 1. Structures and castings shall be of the size and type as identified on the Plan Drawings, or approved equal, unless otherwise approved by the Engineer. 2. Structures shall be provided with flexible watertight connections for all pipe connections of size 30 - inch diameter or less without exceptions, per current City of South Bend policy. 3. The Contractor shall submit dimensioned scalable shop drawings for all manhole and inlet structures which clearly indicate the base elevation of the structure, inverts of all incoming and outgoing pipes, top of slab, and casting elevations. 4. No brick or block shall be used in the construction of a new manhole or when adjusting the elevation of the frame and cover. 5. All pipe connections shall be made with integral resilient fittings complying with ASTM C -923 (30” or less). 6. Where one solid riser or barrel section cannot be used, the final adjustments in elevation of the frame and cover shall only be accomplished by the use of precast concrete adjusting rings of a Version 08/25/2021 Page - 17 Public Works Quote nominal thickness of not less than 2-inches, or greater than 12-inches conforming to ASTM C-478. Not more than 12-inches of total adjusting rings shall be allowed per structure. 7. Precast concrete sections shall conform to ASTM C-478 for round structures and ASTM C-913 for rectangular/square structures. 8. The Contractor is directed to review the Prevailing Specifications of Section 2100. 9. Prior to structure construction including connection to existing pipe, the existing pipe ends shall be cleaned of all foreign materials. Existing anchors, toe walls, end sections, or headwalls shall be removed as shown on the plans or as directed. Such obstruction removal shall be considered incidental to the work, and shall not be paid for directly but shall be included in the cost of other pay items. In addition, cutting of existing pipe ends required to provide a flush connection with the inside wall of a proposed manhole shall also be considered incidental to the project. 10. Furnishing and adjusting frames and castings to grade is to be included in the cost of the manhole, catch basin, drywell or inlet, rather than being measured as a separate pay item. 11. The costs of excavation, backfill, reinforcing steel, B borrow or other Engineer-approved or required material for structure backfill, concrete collar required for pipe connection to structures, geotextile, removal, disposal and replacement of pavement, or surface material, and necessary incidentals shall be included in the costs of the pay items. Bedding for manhole structures shall be incidental. 12. Benching of structures without a sump shall be considered incidental to the Pay Item for the structure, rather than paid as a separate pay item. Structures shall have no sump per City of South Bend Standards. 13. Costs associated with plugging existing pipes at manholes as noted in the Plans, shall be incidental to the respective manhole item. 14. The specified casting assembly including 3142 ring & 6001 ADA grate shall be by US Foundary, or alternate approved by the Engineer prior to the work. 15. Measurement and Payment a. Payment for all costs of Standard Inlets, Manholes, and Catch Basins, including the cost of all materials, equipment, tools, labor, transportation, operations, and all other incidentals, shall be paid for on each basis under the pay items: MANHOLE, SANITARY, 4’ DIA………...….…………………………………………EACH XX. SANITARY SEWER PIPE A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 715 B. Additions: 1. Pipe, Type 2, shall be one of the following material, unless otherwise noted on the plans: a. SDR 35 or 26 PVC Pipe (Not to be used for circular pipe 21” and larger) 2. Pipe with material thickness, strength classification, or protective coatings in excess of the minimum required as specified herein or noted on the Plans may be used, if such additional thickness doe s not cause further conflict with existing utilities. 3. Only Rubber O-Ring Joints are to be used. 4. Pipe joints shall be water tight conforming to AASHTO M-294 and ASTM F-477. Version 08/25/2021 Page - 18 Public Works Quote 5. All trenches shall be kept free from water until any joint filling material has hardened sufficiently not to be harmed. Work associated with pipe trench dewatering should be in conformance with the special provision noted elsewhere for Dewatering. 6. Other pipe installations shall be backfilled as shown on the plans or as directed. Prio r to and during placement of bedding material and backfill, all standing water shall be removed from the trench. 7. An adequate earth cover shall be placed over the structure before heavy equipment is driven over it. 8. This work will be measured in accordance with Section 715.13 of the INDOT Specifications, except trench excavation, backfill material, trench backfilling, pipe bedding, aggregate for pipe bedding, and excavation trench safety systems shall not be measured directly, but shall be included in the unit cost of the various other pay items. 9. Where indicated on the plans or as required, a concrete saddle shall be provided for support of utility lines that have a clearance of 0.5-foot or less. Payment for the concrete saddles, as required, shall be incidental to the project. 10. Measurement and Payment a. Payment for all costs of storm sewer and including the cost of all materials (excluding pavers), equipment, tools, labor, transportation, operations, and all other incidentals, shall be paid for on a per unit basis under the pay items as described below: SANITARY SEWER PIPE, 6 IN………….…...….…………………………….LFT XXI. PIPE CONNECTIONS A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 715, 720 B. Additions: 1. Pipe connections to existing structures shall be made by coring a circular hole of the appropriate size to accept the new pipe connection and boot. Oversized holes and grouting shall not be used. 2. The Contractor shall utilized a Fernco Connection to make the sanitary connection to the existing 42” sanitary sewer line. Contractor shall install per City requirements and per manufacturers written specifications. 3. Measurement and Payment a. Payment for all costs of sanitary sewer pipe connections including the cost of all materials, equipment, tools, labor, transportation, operations, and all other incidentals, shall be paid for on a per unit basis under the pay items as described below SANITARY SEWER PIPE FERNCO CONNECTION……...….…………………………….EA XXII. EXISTING PUMP HOUSE WATER AND SANITARY PLUMBING AND EQUIPMENT A. Prevailing Specifications: INDOT 2022 Standard Specifications Section 402, 406 B. Additions: 1. The Contractor shall be responsible for the installation of all required Type K copper water piping, fittings, ball valves, drain valves, 2” RPZ backflow preventer, coupling devices and all other related equipment and materials required for a fully operation water supply system connection from the 2” PE CTS DR-9 water supply line into the into the building to the water softener system and from the Version 08/25/2021 Page - 19 Public Works Quote water softener system to the outgoing 1” PE CTS DR-9 water supply line. Water system shall be set up to provide the ability for removal of water from the lines through a drain valve. Final system shall be set up for easy winterization. 2. The Contractor shall be responsible for the installation of all required PVC sanitary sewer drain line fittings, p-traps and all other related equipment for a fully operational drain line from the water softener system, through the building and out to the sanitary sewer manhole. 3. Contractor shall be responsible for all required coring through the existing concrete deck and foundation wall for the installation of the water and sanitary lines. 4. Contractor shall be responsible for securing all water and drain lines through bracket and hangers as required to provide a solid and sound water and drain line system 5. Contractor shall install pipe insulation around all exposed water lines within the building. 6. Damages will be assessed if the Contractor varies from the above specification. 7. RPZ Backflow preventer shall be per City of South Bend standards and installed between City of South Bend meter and first plumbing equipment or plumbing branch. 8. Measurement and Payment a. Payment for all costs associated with Existing Pump House Water And Sanitary Plumbing Equipment, including the cost of all materials, backflow preventer, water meter, fittings, valves, insulation, equipment, tools, labor, transportation, operations, and all other incidentals required for a fully operations and functioning water supply and drain system, shall be paid for on a Lump Sum basis under the pay item: EXISTING PUMP HOUSE WATER AND SANITARY PLUMBING AND EQUIPMENT….….LS XXIII. AUTOMATIC WATER SOFTENING SYSTEM A. Prevailing Specifications: INDOT 2022 Standard Specifications Section 402, 406 B. Additions: 1. The Contractor shall furnish and place in operation, an automatic water softening based on product by Hellenbrand, H200M QC-450 Duplex Demand Recall System using System Mate Controller, or by pre-approved manufacturer prior to bid release. a. MINERAL TANKS: Rotational molded fiberglass non-corrosive tanks with six-inch top flange opening. 150 psi w.p. and 120 F temperature rating. Steel tanks shall not be allowed. Lower distribution system shall be a hub and lateral design with full two -inch hub & laterals. Two (2) 30" Diameter x 72” Height Vessels are Required. b. MINERAL: Each mineral tank shall contain 15 cubic feet of high capacity 8% cross-linked cation exchange resin. Each mineral tank shall contain a layer of gravel support for the ion exchange resin. c. BRINE SYSTEM: (2) 39" x 48" polyethylene salt keeper, complete with cover, grid system for dry salt storage operation, five-inch brine well, safety brine valve, air check and overflow. d. CONTROL VALVES: The main operating control valves shall be a solid lead-free two-inch brass valve with an electro-deposited epoxy coating NSF food grade material to protect against corrosion, 24-volt output with AC adapter for safe and easy installation, DC drive, and 6” Stainless Steel Top Mount Flange adapter with hinged clamp to allow for quick disconnect and allows valve to swivel 360°. Control valves will have 2” Female NPT or 2.5” groove lock Inlet, Outlet, and Drain connections. Control valves will have 2” distributor pilot for high flow rates with minimal pressure loss through control valves. Control valves will have a single piston, 1 - Version 08/25/2021 Page - 20 Public Works Quote piece seal/ spacer stack assembly, and have an internal brine piston. Two (2) Control valves required. Control valves that do not meet these specifications are not acceptable. e. INTERLOCK WIRING: All interlock wiring between controls must be pre -wired and electrically tested by the water softening system manufacturer at the factory prior to shipment. f. MICROPROCESSOR CONTROLLER: The 24-volt solid state microprocessor shall have allow for easy access and remote mounting. The system shall be capable of operat ing as single, twin, design systems in an alternating fashion, parallel with multiple units on line at one time or as a demand recall/stage by flow system. The display shall be able to show time of day, current flow rate, total gallons used and volume remaining/days until regeneration, it shall be capable of initiating regeneration via meter delayed, meter immediate, time clock delayed or pressure differential. All cycle times shall be fully programmable and be capable of providing up to nine maximum cycle sequences including multiple cycles for each of the following: backwash, brine (a separate cycle from slow rinse) slow rinse, fast rinse and brine tank refill with treated water on either a pre-fill or post-fill basis. It shall be capable of operating on an optional clock basis with either a 7-day calendar or 28-day calendar, along with an optional 1 – 28 day calendar override and have up to (time periods) for regeneration to occur for either time clock or demand regeneration. Optional programming shall allow for pre-programming a multiple regeneration sequence in which the microprocessor can adjust the salting level automatically every so many regenerations, turn on a chemical feed pump to sanitize the media bed …etc. without any manual intervention. Two relay outputs shall be provided and controlled by the microprocessor to allow output signals based on time, a specific regeneration cycle window or volume of processed water from the meter output signal. The microprocessor must be capable of adapting to any external meter that provides an electronic pulse and be able to control up to four units and be able to add a second, third or fourth unit at a later date if needed to adjust to increased water usage demand. The diagnostics shall be capable of providing data days since last regeneration, gallons or gallons x 1000 since last regeneration, reserve history for the current day and previous 6 days, total volume processed for the current day and the previous 63 days by daily total and hourly, the peak flow rate for each of the last 28 days of operation along with the time of day for each day that the peak flow rate occurred, peak flows may also be viewed by the hour along with total volume processed through the unit. Indicator lights on the microprocessor shall indicate whether the unit is on line, in regeneration or on standby. Systemmate Controller to be used to monitor and record the flow rates of the system the flow. g. REGENERATION SEQUENCE: Up to nine maximum cycle sequences including multiple cycles for each of the following: backwash, brine (a separate cycle from slow rinse) slow rinse, fast rinse, and brine tank refill with treated water on either a pre -fill or post-fill basis. All regeneration cycles shall be adjustable and may have multiple occurrences. h. METER: -----2” electronic meters shall be incorporated into the control valves. Each meter shall be accurate from 1.5 – 150 gallons per minute at +/- 5%. i. DEMAND RECALL: Demand recall systems utilize motorized alternating valves (MAV) for demand recall purposes. The motorized alternating valve (MAV) shall be a 2” ported solid lead free brass 3-way valve with an electro-deposited epoxy coating NSF food grade material to protect against corrosion. The MAV allows multiple control valves to become a mult i-tank demand recall/ stage by flow system with one unit on line and the remaining units on stand -by or in regeneration. Note: only one unit is in regeneration at a time. It will provide no hard water bypass and the choice for treated water regeneration if desired. The MAV offers piping connections either 2” female pipe thread connection or you can use the 2.5” groove lock. The poppet valve internal design and its full 2” ports provide high flow rates with minimal pressure loss. The drive 24 Volt drive system is powered by the control valve so no extra power source or supply is necessary. The MAV has a sight glass that allows you to view the position of the valve to know which valve is on line and which is on stand by without removing any covers. Multi-tank demand recall/ stage by flow systems will have a MAV installed on each control valve with one port plugged. The demand recall/ stage by flow systems use a predetermined flow Version 08/25/2021 Page - 21 Public Works Quote rate set point to bring on-line additional units to meet peak flow rate requirements. Once the flow rate set point is reached for greater than 30 seconds the unit(s) in standby will be driven on-line or immediately if the flow exceeds 150% of the predetermined set point to meet peak flow rate demands. Once the peak flow rate demand decr eases by 95% of the set point for greater than 1 minute the standby unit(s) that were driven on-line will return back to standby mode. This system configuration determines the need to regenerate based on a unit reaching zero capacity or day override. j. PRESSURE GAUGES & SAMPLE TEST PORTS: Inlet and outlet pressure gauges shall be factory installed on each softener, along with inlet and outlet test ports with ball valve for sample testing. k. SYSTEM FLOW RATE: (i) One Unit 78 gpm @ 10 psi 89 gpm @ 15psi (ii) Two Units 156 gpm @ 10 psi 178 gpm @ 15psi l. CAPACITY PER TANK: (i) Low Salting: 270,000 grains @ 90 lbs salt (ii) Medium Salting: 390,000 grains @ 150 lbs salt (iii) High Salting: 450,000 grains @ 225 lbs. salt m. INSTALLING CONTRACTOR: The installing contractor shall provide and install individual ball valves and unions on the inlet and outlet of each water softener and provide a three -valve by- pass for the entire system. ¼” Test ports with with pressure gauges on each control. Installation requirements will include provisions to winterize the equipment via compressed air. n. FLEXIBLE CONNECTORS: If installation to and from the systems are being done in rigid piping such as copper or galvanized, 2” Stainless Steel flexible connectors are required and need to be installed on the inlets and outlets of each control valve. (4) Flexible connectors are needed (2 per tank). o. TEST KIT: Furnish Hach 5B hardness test kit. p. DISTRIBUTION SYSTEMS, MEDIA LOADING AND CONTROL VALVE MOUNTING: Successful bidder shall follow the manufacture’s printed instructions for the media loading, and installation to ensure proper procedures are followed. If needed, the successful bidder shall contract with an approved authorization service agent from the manufacture to assist with these procedures. q. START-UP: Successful equipment provider shall follow the manufacture’s printed instructions to start up the system after plumbing and electrical requirements are completed. This includes raw water testing, programming, individual start-up for each softener column, system operation, and product water testing for each column and training of personnel. Set system for medium salting/capacity levels with fixed reserve and immediate regeneration. If needed, the succes sful bidder shall contract with an approved authorization service agent from the manufacture to assist with these procedures. r. SERVICE: Successful manufacturer of equipment, shall have a factory trained and authorized service agency that can provide job site service located within (150) miles of this job site. 2. Measurement and Payment a. Payment for all costs associated with Automatic Water Softening System, including the cost of all materials, equipment, tools, labor, transportation, operations, and all ot her incidentals, shall be paid for on a lump sum basis under the pay item: AUTOMATIC WATER SOFTENING SYSTEM….….….….….….….….….….….….….….LS Version 08/25/2021 Page - 22 Public Works Quote XXIV. PHOSPHATE INJECTION SYSTEM AND CONTROL PANEL A. Prevailing Specifications: INDOT 2022 Standard Specifications Section 402, 406 B. Additions: 1. The Contractor shall furnish and place in operation, an Phosphate injection and control panel system based on product by Zinkan Enterprises, Inc., RT-15X1-INJ-1 Chemical Pump with Programmable Timer M-500, or by pre-approved manufacturer prior to bid release. 2. The M-500 Phosphate shall be connected to the supply water for the injection of the M -500 with a a ½” NPT Nipple. 3. The controller, chemical feed pump and manifold , if required, shall be mounted on a 20” x 24” x 5/8” plywood painted white. The controller runs off of a 110 volt outlet. 4. The Contractor and equipment installer shall coordinate with the Water Softener System provider/installer to synchronize both pieces of equipment and controllers. 5. Any required junction boxes required for this equipment shall be #190851, Junction Box, NEMA 4x, 2 strain, reliefs, 7 terminal blk. 6. Measurement and Payment a. Payment for all costs associated with the Phosphate Injection System and Control Panel, including the cost of all materials, equipment, tools, labor, transportation, operations, and all other incidentals, shall be paid for on a lump sum basis under the pay item: PHOSPHATE INJECTION SYSTEM AND CONTROL PANEL….….….….….….….…..….….LS XXV. HOT MIX ASPHALT PAVEMENT A. Prevailing Specifications: INDOT 2022 Standard Specifications Section 402, 406 B. Additions: 1. The Contractor shall submit a job mix formula for approval five (5) working days prior to any mix placed. The Contractor will not be allowed to proceed with the placement of asphalt without an approved job mix formula. The Contractor shall notify the City forty eight (48) hours prior to placing any asphalt. Mixed placed without notification will be subject to no payment to the Contractor. 2. The Contractor shall perform smoothness tests for all base, intermediate, and surface pavements in accordance with 2018 INDOT Standard Specification Section 402.18 if requested by the Owner. The test shall be done in the presence of a city representative. The Con tractor shall straight edge each course prior to the placement of the next course. 3. Damages will be assessed if the Contractor varies from the above specification. 4. No recycled asphalt pavement (RAP) or recycled asphalt shingles (RAS) or native grave for coarse aggregate will be allowed in the HMA surface mixture. All pavement shall be INDOT Type A HMA. HMA design and testing shall be in accordance with INDOT Standard Specification Section 402. The total content of recycled material, both RAP and RAS, sha ll be limited to 25% of the binder replacement. 5. Limestone aggregate will be the only coarse aggregate allowed in the HMA Surface mix. The binder in the HMA surface mix shall be PG70-22P. 6. Asphalt for tack shall be used between each lift of HMA, unless prior approval by the Engineer is obtained. The cost of the tack coat will not be paid for directly, but shall be included in the cost of other HMA items. 7. HMA Surface, Intermediate, and Base will be paid for by the accepted tons of asphalt placed aT the contract unit prices as set forth in the proposal. Version 08/25/2021 Page - 23 Public Works Quote 8. Measurement and Payment a. Payment for all costs associated with Hot Mix Asphalt Pavement, including the cost of all materials, equipment, tools, labor, transportation, operations, and all other incidentals, shall be paid for on a tonnage basis for under the pay item: HMA BASE, TYPE B, 8 IN …………………..…………………………………….TON HMA SURFACE, TYPE B, 1.5 IN…………………..…………………………………….TON XXVI. COMPACTED AGGREGATE A. Prevailing Specifications: City of South Bend Design and Construction Standards / 2018, INDOT Standard Specifications Section 301 B. Additions: 1. All coarse aggregate shall be of the specified size. Crushed limestone and concrete are allowed. The cost of placing, compacting, water and necessary incidentals shall be included in the cost of the compacted aggregate. 2. Sources of aggregate shall be in accordance with Section 904 of the INDOT Standard Specifications. Sources of aggregate will not be considered f or acceptance of material until a preliminary investigation has been made. As part of this investigation, samples will be obtained and tests conducted to determine the quality and classification of the aggregates in accordance with ITM 203. 3. The depth of compacted aggregate shall be 6-inches below proposed pavement and drives. Quantity shall be based on plan neat lines. 4. Plan quantities are based on an assumed compacted density of 1.9 tons/cubic yard. 5. The condition of the subgrade at the time paving material is placed is required to be in accordance with INDOT Standard Specifications 105.03 and 207.03. 6. Prior to placing the base course of asphalt on the prepared aggregate subgrade, proof rolling in accordance with INDOT Standard Specifications 203.09 and 203.26 is required. 7. Measurement and Payment a. Payment for compacted aggregate for construction entrance, pipe and structure bedding will be considered incidental to furnishing and installing the respective Pay Item. b. The cost of placing, compacting, water and necessary incidentals associated with the compacted aggregate, other than the material described above, will be paid for on a tonnage basis for all parts under the pay item: COMPACTED AGGREGATE NO. 53, ..……………………………………….TON XXVII. CONCRETE CURB, CONCRETE CURB AND GUTTER A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 605 B. Additions: 1. Expansion material is required at all cold joints, POC’s, POT’s, alignment changes, and at 80’ intervals in all other areas. 2. Transverse control joints shall be placed at equal intervals not to exceed 10 feet. Version 08/25/2021 Page - 24 Public Works Quote 3. See the City of South Bend Standard Drawings for curb details to be used on this project. 4. Where abutting existing curb, the new curb height shall be adjusted during the last ten (10) feet to match the existing curb profile. 5. The only acceptable method of curing will be white membrane. All concrete shall be membrane - cured regardless of weather conditions. 6. Concrete Curb, as a pay item, stops at the commencement of any c oncrete approach or curb ramp. For a concrete approach with a wing, this is at the beginning of the wing. For an approach/curb ramp with a radius, the approach/curb ramp ends and the curb begins at the tangent point of the radius of the approach/curb ramp and the curb line. (Running a curb slip-forming machine through a concrete approach will not be considered in the quantity for curb) 7. Where existing curb is to be removed and replaced without replacing the adjacent pavement, the contractor shall saw cut the existing pavement near the curb prior to removal. The area between the proposed curb and existing pavement shall be filled with Compacted HMA Base to a depth of 1 ½” below the finished elevation, with 1 ½” of HMA Surface applied to the concrete, in accordance with the details shown in the plans. The cost of the pavement removal, restoration, concrete, and asphalt will not be paid for separately but shall be included in the cost of the item. 9. Areas disturbed during the removal and replacement of curb shall be restored in accordance with the plans. If disturbance is outside of the construction limits shown in the plans, the areas shall be restored to original or better condition. All costs associated with this restoration shall be included in the unit price for the concrete curb. 10. Measurement and Payment a. Payment for all costs of concrete curb and concrete curb and gutter, including the cost of all materials, equipment, tools, labor, transportation, operations, and all other incidentals, shall be paid for on a linear foot basis under the pay items: STANDARD CURB, CONCRETE…………………...….………………………………LFT XXVIII. CONCRETE SIDEWALKS A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 604 B. Additions: 1. Expansion joints shall be placed at a maximum spacing of forty (40) feet and at any additional places as shown on the City of South Bend “Design and Construction Standards”. Payment for joint material for sidewalk and curb ramps will be included in the unit price for the respective Pay Item. 2. Transverse control joints shall be placed at equal intervals not to exceed five (5) feet. 3. The use of slag or local aggregate will not be permitted. 4. The Contractor shall provide job mix formula information, admixtures, with specified finish for approval by the Owner in advance of ordering the material. All work shall be done in accordance with the color material manufacturer’s recommendations. 5. The Contractor shall provide job mix formula information including admixtures to the City a minimum of five (5) working days prior to the work. 6. Measurement and Payment a. Payment for all costs associated with concrete sidewalks and curb ramps, including the cost of Version 08/25/2021 Page - 25 Public Works Quote all materials, equipment, tools, labor, transportation, operations, and all other incidental s, shall be paid for on a square yard basis for all parts under the pay item: SIDEWALK, CONCRETE, 5 IN ……………………….…………………………… SYS XXIX. CURING COMPOUND A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 501 B. Additions: 1. The only acceptable method of curing standard concrete pavement and curbs will be white membrane unless otherwise specified. All concrete shall be membrane -cured regardless of the weather conditions 2. Measurement and Payment a. Payment for all costs associated with the curing compound will not be paid directly, but shall be included in the cost of various items of the contract for all parts. b. No payment will be made for concrete that is not cured. XXX. PAVEMENT TRAFFIC MARKINGS A. Prevailing Specifications: 2022 INDOT Standard Specifications Section: 808 B. Additions: 1. Work to be performed shall include furnishing all labor, services, materials, insurance and equipment to apply pavement markings as shown in the plans. 2. All pavement markings on asphalt pavement shall be thermoplast ic markings. All pavement marking on concrete shall be epoxy. All pavement markings shall be in accordance with INDOT Standard Specifications Section 808. 3. Thermoplastic markings shall be applied in molten form by conventional extrusion when the pavement and ambient air temperature are minimum of 50 degrees Fahrenheit and rising, or by ribbon type extrusion or spray when the pavement and ambient air temperatures are a minimum of 50 degrees Fahrenheit and rising. Heat bonded preformed thermoplastic may be use d for transverse or message markings. 4. The material shall be warranted to retain its color and adherence to the pavement for 180 days from substantial completion. 5. All pavement markings shall be in accordance with the Indiana MUTCD. 6. Contractor shall be responsible for pavement grooving per INDOT and City of South Bend standards prior to placement of pavement marking material 7. Measurement and Payment a. Payment for all costs of installing pavement markings, including the cost of all materials, equipment, pavement grooving, tools, labor, transportation, operations, and all other incidentals, shall be paid for on a linear foot basis under the pay items: LINE, THERMOPLASTIC, SOLID, WHITE, 4 IN ...……………………………….LFT Version 08/25/2021 Page - 26 Public Works Quote XXXI. MISC ELECTRICAL AT EXISTING PUMP HOUSE A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 807. B. Additions: 1. The Contractor shall be responsible for all electrical work including piping, wiring, circuits, GFCI receptalces, electrical boxes, and all related appurtenances to extend electrical service from the existing electrical panel located on the north side of the pump house (exterior panel) to the inside of the building at the location of the Water Softener and Phosphate Injection system control panels. 2. All conduit, boxes and fittings shall be galvanized metal, 3. In use covers shall be installed on all boxes, receptacles, switches, etc. 4. Any junction boxes shall meet NEMA 3R ratings. 5. Contractor shall core through existing building wall as required to run new electrical wiring. 6. All components and installation shall meet or exceed NEMA 3R requirement. 7. Measurement and Payment a. Payment for all costs of the Misc. Electrical work to extend electrical service , including the cost of all materials, equipment, tools, labor, transportation, operations, and all other incidentals, shall be paid for on a Lump Sum basis under the pay item: MISC. ELECTRICAL……………………………………………………………………………..LFT I. MULCHED SEEDING AND TOPSOIL A. Prevailing Specifications: INDOT 2022 Standard Specifications Section 621 B. Additions: 1. All seeded areas shall receive a minimum of 4” of approved topsoil prior to seeding operations. a. A PH test is required to be run before topsoil is brought on site. 2. Debris 1” or larger shall be removed from the topsoil prior to seeding operations. 3. Sow seeds with drill seeding machine. Evenly distribute seed by sowing equal quantities at right angles to each other. 4. Do not use wet seed or seed that is moldy or otherwise damaged. 5. After completion of drill seeding operations the Contractor shall hydromulch the entire seeded area. 6. Do not seed against existing trees. Limit extent of seed to outside edge of planting saucer. 7. Sow seed at total rate of 4 pounds/1000 square feet. Seed Type % by Weight % by Purity % by Germination Kentucky Blue Grass 36 85 80 Red Fescue 30 98 85 Version 08/25/2021 Page - 27 Public Works Quote Manhattan Perennial Rye 17 98 90 Norlea Perennial Rye 17 98 90 8. Measurement and Payment a. Payment for all costs for seeding, hydromulch and topsoil, including the cost of all materials, equipment, tools, plant guarantee, labor, transportation, operations, and all other incidentals, shall be paid for on a Square Yard basis for under the pay items: SEEDING, HYDROMULCH AND TOPSOIL...….………………………………SYS Version 08/25/2021 Page - 28 Public Works Quote CITY OF SOUTH BEND, INDIANA CONTRACTOR’S QUOTE FOR PUBLIC WORK PROJECT NAME: Studebaker Fountain Water Improvements PROJECT NO. 121-032 QUOTES DUE January 25, 2022 at 9:00am local time to bpwbids@southbendin.gov (Must be completed for all quotes. Please type or print) Date: Firm: Address: City/State/Zip: Telephone Number: ( ) Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Studebaker Fountain Water Improvements the City of South Bend, Indiana, in accordance with plans and specifications prepared by: Jones Petrie Rafinski and dated for the sum of (enter the Total Quote as shown on the Proposal) ($ ) (Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. ACCEPTANCE The above quote is accepted this day of 20 Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Joseph R. Molnar, Member Gary A. Gilot, Member Jordan V. Gathers, Member Murray L. Miller, Member Attest: Laura Hensley, Acting Clerk By (Signature) (Printed Name of Person Signing) Version 08/25/2021 Page - 29 Public Works Quote CITY OF SOUTH BEND EQUAL EMPLOYMENT OPPORTUNITY CONTRACTING PROVISIONS DIVERSITY UTILIZATION It is the policy of the City of South Bend to provide equal employment and business opportunity for all persons, partnerships, companies, and corporations in accordance with the rules, regulations and guidelines of the applicable federal, state and local laws. This policy of equal employment and business opportunity shall apply to every contractor or subcontractor bidding or holding a public contract with the City of South Bend. In furtherance of this policy, the following Equal Opportunity Clauses are hereby made a part of every construction contract entered into by the City of South Bend and all subcontractors entered into pursuant to any such contract and the bidder hereby certifies that it/he/she will abide by these provisions. The contractor will not discriminate against any applicant or employee because of race, color, religion, sex, national origin, or handicap. The contractor will take affirmative action to ensure that all applicants or employees are treated fairly and equitably. Such action shall include but not be limited to the following: hiring, up-grading, demotion or transfer, recruitment, advertising, lay-offs or termination, rates of pay or other forms of compensation and selection for training including apprenticeship programs. The contractor shall agree to post in conspicuous places available to employees and applicants, notices to be provided setting forth the provisions of the Non-Discrimination Clause. The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. The contractor will send to each labor union or representative of workers with which it/he/she has a bargaining agreement or other contract or understanding, a notice to be provided, advising the labor union or worker's representatives of the contractor's commitment under this section, and shall post copies of the notices in conspicuous places available to applicants and employees. The contractor will comply with all provisions of Executive Order 11246 (as amended by 11375) and of the rules, regulations and relevant orders of the Department of Labor. Subpart B -- Contractors' Agreements Sec. 202. Except in contracts exempted in accordance with Section 204 of this Order, all Government contracting agencies shall include in every Government contract hereinafter entered into the following provisions: "During the performance of this contract, the contractor agrees as follows:" "(1) The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated equally during employment, without regard to their race, color, religion, sex or national origin. Such action will include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause." "(2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex or national origin." Version 08/25/2021 Page - 30 Public Works Quote "(3) The contractor will send to each labor union or representative of workers with which i t /he/she has a collective bargaining agreement or other contract of understanding, a notice, to be provided by the agency contracting officer, advising the labor union or workers' representative of the contractor's commitments under Section 202 of Executive Order No. 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants for employment." "(4) The contractor will comply with all provisions of Executive Order No. 11246 of September 24, 1965, and of the rules and regulations, and relevant orders of the Secretary of Labor." "(5) The contractor will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders." "(6) In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of such rules, regulations, or orders, in this contract may be cancelled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts in accordance with procedures authorized in Executive Order No. 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked* as provided in Executive Order No 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law." "(7) The contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions including sanctions for noncompliance: Provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency the contractor may request the United States to enter into such litigation to protect the interests of the United States." The applicant further agrees that it will be bound by the above equal opportunity clause with respect to its own employment practices when it participates in federally assisted construction work: Provided, that if the applicant so participating is a State or local government, the above equal opportunity clause is not applicable to any agency, instrumentality or subdivision of such government which does not participate in work on or under the contract. The applicant agrees that it will assist and cooperate actively with the administering agency and the Secretary of Labor in obtaining the compliance of contractors and subcontractors with the equal opportunity clause and the rules, regulations, and relevant orders of the Secretary of Labor, that it will furnish the administering agency and the Secretary of Labor such information as they may require for the supervision of such compliance, and that it will otherwise assist the administering agency in the discharge of the agency's primary responsibility for securing compliance. The applicant further agrees that it will refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965, with a contractor debarred from, or who has not demonstrated eligibility for, Government contracts and federally assisted construction contracts pursuant to the Executive Order and will carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon contractors and subcontractors by the administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the applicant agrees that if it fails or refuses to comply with these undertakings, the administering agency Version 08/25/2021 Page - 31 Public Works Quote may take any or all of the following actions: Cancel, terminate, or suspend in whole or in part this grant (contract, loan, insurance, guarantee); refrain from extending any further assistance to the applicant under the program with respect to which the failure or refund occurred until satisfactory assurance of future compliance has been received from such applicant; and refer the case to the Department of Justice for appropriate legal proceedings. * Corrected to read "invoked". In the original text the word "involved" was printed in error. Version 08/25/2021 Page - 32 Public Works Quote MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN The City of South Bend, Indiana has shown its commitment to addressing Minority and Women’s Business Enterprise (“MWBE”) participation in public contracting through the adoption of the City of South Bend Ordinance No. 10761-21. Persons, partnerships, corporations, associations, or joint ventures awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age or disability that does not affect that person’s ability to perf orm work. Minority and Women’s Business Enterprises are described in the Ordinance. A list of MBEs and WBEs (both certified and non-certified) can be found on the Indiana Department of Administration website: http://www.in.gov/idoa/. Documentation shall be provided with the bid that states the MBEs and WBEs that will be contracted, the dollar amount of the work that will be performed by the MBEs and WBEs on the project and the percentage of the dollar amount as it relates to the total bid amount by using Form MBE-1.0, MBE Utilization Plan, and Form WBE-1.0, WBE Utilization Plan. The City, its agencies, boards, or commissions requires the Contractor’s good faith efforts to obtain participation by those Contractors classified as MBEs and WBEs. Failure to either meet the MBE and WBE goals or to provide evidence of good faith efforts for the bid will be grounds for rejecting a bid as non-responsive. Bidders shall demonstrate good faith efforts to have active participation from MWBEs on this Project and supply written documentation evidencing such efforts by using Forms MBE-2.0, Evidence of Good Faith Efforts and WBE- 2.0, Evidence of Good Faith Efforts and Forms MBE-2.1, MBE Contacted and WBE-2.1, WBE Contacted. Such documentation shall include, but is not limited to, the following items: a. A listing of all M/WBEs contacted including: (1) the name and address of the M/WBE; (2) the date of contact; (3) the type of contact (i.e., phone call, written solicitation, etc.); (4) the nature or type services or goods requested; and (5) the result of the contact. b. Written evidence of outreach and copies of email exchanges inviting and receiving bids, quotes or other responses from M/WBEs or other documentation of efforts to encourage and secure competitive responses from M/WBE and local businesses to be included in the benefits of building this Project. c. Written documentation of letters of introduction, invitations to forging majority/minority strategic alliances for capacity building, including but not limited to, mentoring, extensions of assistance on payroll, insurance, bonding, line of credit, technical skills or business skills. All bidders are actively encouraged to reach out to the M/WBEs in St. Joseph County, Indiana, other Indiana counties, and Berrien County, Michigan to utilize a good faith effort to forge constructive and lasting business partnerships. Notwithstanding the foregoing, the award and performance of all City contracts shall comply with applicable federal, state, and local laws. The City reserves the right to request verification of goal implementation throughout the course of the project. Version 08/25/2021 Page - 33 Public Works Quote When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF ___________ ) ) SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, “Iran” means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time-to-time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time-to-time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in Version 08/25/2021 Page - 34 Public Works Quote the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor’s newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor’s documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor’s good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business (“MBE”) or as a Women’s Business Enterprise (“WBE”) as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal-eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter Version 08/25/2021 Page - 35 Public Works Quote directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16- 8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. *** I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this day of , 20__ Contractor/Bidder (Firm) Signature of Contractor/Bidder or Its Agent Printed Name and Title Subscribed and sworn to before me this day of , 20 My Commission Expires Notary Public County of Residence Version 08/25/2021 Page - 36 Public Works Quote QUOTE/PROPOSAL CITY OF SOUTH BEND PROJECT NAME Studebaker Fountain Water Improvements PROJECT NO. 121-032 QUOTES DUE January 25, 2022 at 9:00am local time to bpwbids@southbendin.gov Item No. Description Quantity Unit Unit Price Total Amount 1 CONSTRUCTION ENGINEERING 1 LS $ 2 MOBILIZATION AND DEMOBILIZATION 1 LS 3 MAINTENANCE OF TRAFFIC 1 LS 4 VIDEO RECORD 1 LS 5 COMMON EXCAVATION 95 CYS 6 PAVEMENT, REMOVE 48 SYS 7 SIDEWALK, CONCRETE, REMOVE 14 SYS 8 CURB, CONCRETE, REMOVE 20 LFT 9 SURFACE MILLING. 1.5 IN 42 SYS 10 EXISTING BACKFLOW PREVENTER, REMOVE 1 LS 11 TEMPORARY EREOSION CONTROL 1 LS 12 TEMPORARY INLET PROTECTION 5 EA 13 WATERLINE, PE CTS DR-9, DIRECTIONAL DRILL, 2 IN 235 LFT 14 WATERLINE, PE CTS DR-9, DIRECTIONAL DRILL, 1 IN 228 LFT 15 CORPORATION COCK & CURB STOP, 2 IN 1 EA 16 CORPORATION COCK & CURB STOP, 1 IN 1 EA 17 MANHOLE, SANITARY, 4’ DIA. 1 EA 18 SANITARY SEWER PIPE, PVC, 6 IN 160 LFT 19 SANITARY SEWER PIPE FERNCO CONNECTION 1 EA 20 EXISTING PUMP HOUSE WATER AND SANITARY PLUMBING AND EQUIPMENT 1 LS Version 08/25/2021 Page - 37 Public Works Quote 21 AUTOMATIC WATER SOFTENING SYSTEM 1 LS 22 PHOSPHATE INJECTION SYSTEM AND CONTROL PANEL 1 LS 23 HMA BASE, TYPE B, 8 IN 12 TON 24 HMA SURFACE, TYPE B, 1.5 IN 4 TON 25 COMPACTED AGGREGATE, NO 53 9 TON 26 STANDARD CURB, CONCRETE 20 LFT 27 SIDEWALK, CONCRETE, 5 IN 19 SYS 28 THERMOPLASTIC LINE, SOLID, YELLOW, 4 IN 20 LFT 29 MISC. ELECTRICAL. 1 LS 30 SEEDING, HYDROMULCH AND TOPSOIL 200 SYS $ Total Amount of Quote $ Firm: Address: City/State/Zip: Telephone Number: ( ) Fax Number: ( ) By (Signature) (Printed Name of Person Signing) CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-1.0 MBE UTILIZATION PLAN Version 08/25/2021 Page - 38 Public Works Quote This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder’s sole responsibility to verify whether any listed minority or woman business meets the MBE qualifications. Project Number: 121-032 Project Name: Studebaker Fountain Water Improvements Bidder: Total Bid Amount: MBE Goal: 1.3 % Page_______of___ ____ Name & Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MBE Component Percentage of Total Bid/Proposal Submitted by: Print Name Signature Date CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-1.0 WBE UTILIZATION PLAN Version 08/25/2021 Page - 39 Public Works Quote This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE parti cipation. It is the bidder’s sole responsibility to verify whether any listed minority or woman business meets the WBE qualifications. Project Number: 121-032 Project Name: Studebaker Fountain Water Improvements Bidder: Total Bid Amount: WBE Goal: 4.3 % Page_______of___ ____ Name & Address of WBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of WBE Component Percentage of Total Bid/Proposal Submitted by: Print Name Signature Date CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 08/25/2021 Page - 40 Public Works Quote This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: 121-032 Date: Project Name: Studebaker Fountain Water Improvements Bidder: Contact Person: Telephone: Address: City: State: Zip: Email: To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goal set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non-certified) found at: http://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration’s certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by MBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all MBEs in the scopes of work of the contract. I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed sufficient time for MWBEs to participate effectively. I affirm that I followed up on initial solicitations with interested MBEs. I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 08/25/2021 Page - 41 Public Works Quote I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 08/25/2021 Page - 42 Public Works Quote This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain WBE participation. Project Number: 121-032 Date: Project Name: Studebaker Fountain Water Improvements Bidder: Contact Person: Telephone: Address: City: State: Zip: Email: To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non-certified) found at: http://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration’s certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MWBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. I affirm that I followed up on initial solicitations with interested WBEs. I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 08/25/2021 Page - 43 Public Works Quote I affirm that I have made good faith efforts to assist interested WBEs in obtaining necessary equipment, supplies, materials, or related as sistances or services, where appropriate. I affirm that I did not reject any WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the WBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Work s. The City of South Bend reserves the right to request additional information. CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 MBE CONTACTED Version 08/25/2021 Page - 44 Public Works Quote This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder’s sole responsibility to verify whether any listed minority or woman business meets the MBE qualifications. Attach additional pages if necessary. PAGE_______OF________ Project Number: 121-032 MBE Participation Goal 1.3% Project Name: Studebaker Fountain Water Improvements Bidder: By: (Signature) (Title) (Date) MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.1 WBE CONTACTED Version 08/25/2021 Page - 45 Public Works Quote This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder’s sole responsibility to verify whether any listed minority or woman business meets the WBE qualifications. Attach additional pages if necessary. PAGE_______OF________ Project Number: 121-032 WBE Participation Goal 4.3% Project Name: Studebaker Fountain Water Improvements Bidder: By: (Signature) (Title) (Date) WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: TRAFFIC CONTROL AND OCCUPANCY REQUEST City of South Bend – Division of Engineering 227 W Jefferson Boulevard, Ste 1316 South Bend, IN 46601 Name of Contractor/Company: Name of Applicant: Phone: Email Address: On-Site Contact: Phone: Requested Dates (mm/dd/yyyy): _______ /_______ /20_______ to _______ /_______ /20_______ Time of Work: _____________________ to ____________________ Location of Work:  Entire Street  Travel Lane  Parking Lane  Sidewalk  Tree Lawn  Alley Type of Work:  Excavation/Boring (Also requires Excavation Form)  New Drive Approach (Also requires Curb Cut Application)  Sidewalk Address of Project: Project Boundaries: Description of Work:  Traffic control plan including detour map and traffic devices.  Communication (letter, door hanger, signs, etc.) to affected property owners Failure to use traffic control for traffic restrictions or closures will result in stop w ork orders and/or delay in permitting. This Occupancy Permit Request is non-transferable. A signature subjects the named contractor/permittee to all applicable rules, duties and obligations imposed by the South Bend Municipal Code and to all regulations imposed by the City’s Board of Public Works. Signature of Applicant: Date: Applications should be dropped off to the City’s Engineering Office or emailed to rowpermitsoffice@southbendin.gov. For questions, contact Liz Horvath at 574.235.9254. DEADLINE: DUE FIVE BUSINESS DAYS PRIOR TO PROJECT START DATE PROJECT INFORMATION OFFICE USE ONLY: Date Received: Fee Paid: Approval Date: INCLUDE THE FOLLOWING ITEMS WITH YOUR APPLICATION: APPLICANT INFORMATION EXCAVATION PERMIT REQUEST City of South Bend – Division of Engineering 227 W Jefferson Boulevard, Ste 1316 South Bend, IN 46601 Name of Contractor/Company: Phone: Email Address: Date of Work (mm/dd/yyyy): _______ /_______ /20_______ to _______ /_______ /20_______ Time of Work: _____________________ to ____________________ Location of Work Address: Type of Work:  Cable  Electric  Fiber  Gas  Manhole repair  Sanitary Sewer  Water  Other Type of Cut: Number of Cuts  Boring Trenching Cut Location:  In Street  Tree lawn/sidewalk right-of-way Description of Work: Excavation in right-of-way WITHOUT a permit will result in a stop work order and/or delays in permitting. Emergency excavations must be called into the Permits Office at 574.235.9254 no later than noon the following day. This excavation permit request is non-transferrable. A signature subjects the named contractor/permittee to all applicable rules, duties and obligations imposed by the City of South Bend Municipal Code and to all regulations imposed by the City of South Bend’s Board of Public Works. Signature of Applicant: Date: Completed application should be dropped off to the City’s Engineering Office or emailed to rowpermitsoffice@southbendin.gov. For questions, contact Liz Horvath at 574.235.9254. APPLICANT INFORMATION: PROJECT INFORMATION: OFFICE USE ONLY: Date Received: Fee Paid: Approval Date: EXCAVATION PERMIT REQUEST (continued) First Subcontractor Name of Subcontractor/Company: Name of Contact: Phone: Email Address: Second Subcontractor Name of Subcontractor/Company: Name of Contact: Phone: Email Address: Third Contractor Name of Subcontractor/Company: Name of Contact: Phone: Email Address: LIST ALL OTHER CONTRACTORS TRAFFIC CONTROL AND OCCUPANCY REQUEST City of South Bend – Division of Engineering 227 W Jefferson Boulevard, Ste 1316 South Bend, IN 46601 Name of Contractor/Company: Name of Applicant: Phone: Email Address: On-Site Contact: Phone: Requested Dates (mm/dd/yyyy): _______ /_______ /20_______ to _______ /_______ /20_______ Time of Work: _____________________ to ____________________ Location of Work:  Entire Street  Travel Lane  Parking Lane  Sidewalk  Tree Lawn  Alley Type of Work:  Excavation/Boring (Also requires Excavation Form)  New Drive Approach (Also requires Curb Cut Application)  Sidewalk Address of Project: Project Boundaries: Description of Work:  Traffic control plan including detour map and traffic devices.  Communication (letter, door hanger, signs, etc.) to affected property owners Failure to use traffic control for traffic restrictions or closures will result in stop w ork orders and/or delay in permitting. This Occupancy Permit Request is non-transferable. A signature subjects the named contractor/permittee to all applicable rules, duties and obligations imposed by the South Bend Municipal Code and to all regulations imposed by the City’s Board of Public Works. Signature of Applicant: Date: Applications should be dropped off to the City’s Engineering Office or emailed to rowpermitsoffice@southbendin.gov. For questions, contact Liz Horvath at 574.235.9254. DEADLINE: DUE FIVE BUSINESS DAYS PRIOR TO PROJECT START DATE PROJECT INFORMATION OFFICE USE ONLY: Date Received: Fee Paid: Approval Date: INCLUDE THE FOLLOWING ITEMS WITH YOUR APPLICATION: APPLICANT INFORMATION EXCAVATION PERMIT REQUEST City of South Bend – Division of Engineering 227 W Jefferson Boulevard, Ste 1316 South Bend, IN 46601 Name of Contractor/Company: Phone: Email Address: Date of Work (mm/dd/yyyy): _______ /_______ /20_______ to _______ /_______ /20_______ Time of Work: _____________________ to ____________________ Location of Work Address: Type of Work:  Cable  Electric  Fiber  Gas  Manhole repair  Sanitary Sewer  Water  Other Type of Cut: Number of Cuts  Boring Trenching Cut Location:  In Street  Tree lawn/sidewalk right-of-way Description of Work: Excavation in right-of-way WITHOUT a permit will result in a stop work order and/or delays in permitting. Emergency excavations must be called into the Permits Office at 574.235.9254 no later than noon the following day. This excavation permit request is non-transferrable. A signature subjects the named contractor/permittee to all applicable rules, duties and obligations imposed by the City of South Bend Municipal Code and to all regulations imposed by the City of South Bend’s Board of Public Works. Signature of Applicant: Date: Completed application should be dropped off to the City’s Engineering Office or emailed to rowpermitsoffice@southbendin.gov. For questions, contact Liz Horvath at 574.235.9254. APPLICANT INFORMATION: PROJECT INFORMATION: OFFICE USE ONLY: Date Received: Fee Paid: Approval Date: EXCAVATION PERMIT REQUEST (continued) First Subcontractor Name of Subcontractor/Company: Name of Contact: Phone: Email Address: Second Subcontractor Name of Subcontractor/Company: Name of Contact: Phone: Email Address: Third Contractor Name of Subcontractor/Company: Name of Contact: Phone: Email Address: LIST ALL OTHER CONTRACTORS BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 2/1/2022 Name: Sarah Beam Department of Public Works – Engineering Division BPW Date: 2/8/2022 Phone Extension: 9805 Required Prior to Submittal to Board BPW Attorney X Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Studebaker Fountain Water Improvements Project Number 121-032 Funding Source Fund 201 Park Capital; and Fund 452 Land Improvements Account No. PR # 00014464 Amount Terms of Contract Special Contract Provisions Purpose/Description Request rejection of the quote for Studebaker Fountain Water Improvements due to quote being non-responsive. Request the project go to the open market For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: