Significant Industrial User – Permit No. 160445-88012
In accordance with all the terms of Chapter 17 of the City of South Bend’s Municipal Code, and with any
applicable provisions of federal or state law and regulations, permission is hereby granted to:
Pioneer Metal Finishing, LLC
2424 Foundation Drive
South Bend IN 46628
for the contribution of wastewater into the City of South Bend Publicly Owned Treatment Works.
This permit is granted in accordance with the application filed on 14 July, 2017.
Effective on: 8 October, 2017
Expires on the: 7 October, 2022
Revised: January 7, 2022
Any violation of the terms and conditions of this permit shall be deemed a violation of the City of South Bend
Municipal Code and will subject the permittee to the sanctions set out in section 17-11 through 17-13 of the
Municipal Code.
The permittee shall file an application for a renewal permit, a minimum of 90 days prior to the expiration date.
Approved By:
January 25, 2022
Pioneer Metal Finishing, LLC Industrial Wastewater Discharge Permit page 1 of 42
Facility Description
Pioneer Metal Finishing is classified as a Categorical Industrial User (CIU) as defined in the South Bend
Municipal Code. Specifically, Pioneer Metal Finishing is classified as a metal finisher covered by 40 CFR 433.17
(PSNS) due to both the anodizing, chem film, and the electroless nickel plating. Pioneer also conducts
masking/painting. Pioneer is a job shop. Raw materials and chemicals used in these processes include customer
supplied parts, sulfuric acid, nitric acid, hydrochloric acid, caustic soda, nickel acetate, Teflon, organic dyes,
alodine, alkaline soaps, and electroless nickel solution.
PART I – EFFLUENT LIMITATION
A. Sample Port and Collection Location
1. Sample Site Outfall #323 B is located inside the main facility after the indoor final weir tank on
the west wall of the wastewater treatment room. Wastewater flows through the weir tank for
flow measurement prior to discharge. Grab samples are collected from the flow out of the weir
tank, and 24 hour composite samples are collected from the discharge pipe after the weir tank.
The location of Sample Site Outfall #323 A is an outdoor manhole on the west side of the building
and south of the outside door to the production area. Effluent Limitations are in effect for Outfall
#323 A and will be sampled if the City deems it necessary.
2. Any discharge of water or waste having a pH lower than 6.0 S.U. or a pH higher than 11.0 S.U.
is prohibited. In addition, the permittee’s wastewater discharge shall not exceed the following
effluent limitations:
Effluent limitations for Sample Site Outfall # 323A & #323B:
Parameter Daily Maximum Limit (mg/L) Monthly Average Limit (mg/L)
Arsenic (mg/L) 1.0 0.3
Cadmium (mg/L) Report* Report*
Chromium (mg/L) 2.70 1.66
Copper (mg/L) 3.29 1.2
Cyanide (mg/L) 1.17 0.63
Lead (mg/L) 0.67 0.42
Mercury (mg/L) 0.00019 -na-
Nickel (mg/L) 3.87 1.2
Oil and grease (mg/l) 300 -na-
Oil and Grease TPH (mg/l) 100 -na-
Silver (mg/L) Report* Report*
TTO (mg/l) 2.07 -na-
Zinc (mg/l) 2.61 1.48
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 1/7/2022
Name Serena Lozano-Shane Department UTILITIES
BPW Date 1/25/2022 Phone Extension 5798
Review and Approval Required Prior to Submittal to Board Diversity Compliance
and Inclusion Officer Officer Name BPW Attorney Attorney Name
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
x Other: Pioneer Metal Finishing Industrial Discharge Permit Modification
Required Information
Company or Vendor Name
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description _______________________________________________________________
_______________________________________________________________
___________________________________________________
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount: