Loading...
HomeMy WebLinkAboutIndustrial Wastewater Discharge Permit - Pioneer Metal Finishing, LLCCity of South Bend Department of Public Works Industrial Pretreatment Program Significant Industrial User – Permit No. 160445-88012 In accordance with all the terms of Chapter 17 of the City of South Bend’s Municipal Code, and with any applicable provisions of federal or state law and regulations, permission is hereby granted to: Pioneer Metal Finishing, LLC 2424 Foundation Drive South Bend IN 46628 for the contribution of wastewater into the City of South Bend Publicly Owned Treatment Works. This permit is granted in accordance with the application filed on 14 July, 2017. Effective on: 8 October, 2017 Expires on the: 7 October, 2022 Revised: January 7, 2022 Any violation of the terms and conditions of this permit shall be deemed a violation of the City of South Bend Municipal Code and will subject the permittee to the sanctions set out in section 17-11 through 17-13 of the Municipal Code. The permittee shall file an application for a renewal permit, a minimum of 90 days prior to the expiration date. Approved By: January 25, 2022 Pioneer Metal Finishing, LLC Industrial Wastewater Discharge Permit page 1 of 42 Facility Description Pioneer Metal Finishing is classified as a Categorical Industrial User (CIU) as defined in the South Bend Municipal Code. Specifically, Pioneer Metal Finishing is classified as a metal finisher covered by 40 CFR 433.17 (PSNS) due to both the anodizing, chem film, and the electroless nickel plating. Pioneer also conducts masking/painting. Pioneer is a job shop. Raw materials and chemicals used in these processes include customer supplied parts, sulfuric acid, nitric acid, hydrochloric acid, caustic soda, nickel acetate, Teflon, organic dyes, alodine, alkaline soaps, and electroless nickel solution. PART I – EFFLUENT LIMITATION A. Sample Port and Collection Location 1. Sample Site Outfall #323 B is located inside the main facility after the indoor final weir tank on the west wall of the wastewater treatment room. Wastewater flows through the weir tank for flow measurement prior to discharge. Grab samples are collected from the flow out of the weir tank, and 24 hour composite samples are collected from the discharge pipe after the weir tank. The location of Sample Site Outfall #323 A is an outdoor manhole on the west side of the building and south of the outside door to the production area. Effluent Limitations are in effect for Outfall #323 A and will be sampled if the City deems it necessary. 2. Any discharge of water or waste having a pH lower than 6.0 S.U. or a pH higher than 11.0 S.U. is prohibited. In addition, the permittee’s wastewater discharge shall not exceed the following effluent limitations: Effluent limitations for Sample Site Outfall # 323A & #323B: Parameter Daily Maximum Limit (mg/L) Monthly Average Limit (mg/L) Arsenic (mg/L) 1.0 0.3 Cadmium (mg/L) Report* Report* Chromium (mg/L) 2.70 1.66 Copper (mg/L) 3.29 1.2 Cyanide (mg/L) 1.17 0.63 Lead (mg/L) 0.67 0.42 Mercury (mg/L) 0.00019 -na- Nickel (mg/L) 3.87 1.2 Oil and grease (mg/l) 300 -na- Oil and Grease TPH (mg/l) 100 -na- Silver (mg/L) Report* Report* TTO (mg/l) 2.07 -na- Zinc (mg/l) 2.61 1.48 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 1/7/2022 Name Serena Lozano-Shane Department UTILITIES BPW Date 1/25/2022 Phone Extension 5798 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution x Other: Pioneer Metal Finishing Industrial Discharge Permit Modification Required Information Company or Vendor Name New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description _______________________________________________________________ _______________________________________________________________ ___________________________________________________ For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: