HomeMy WebLinkAboutResolution No 35-2021 - Ameresco Inc. Qualified Provider Approval Guaranteed Energy Savings Contract MorrisRESOLUTION NO. 35-2021
A RESOLUTION OF THE CITY OF SOUTH BEND BOARD OF PUBLIC WORKS
CONFIRMING COMPLIANCE WITH IC 36-1-12.5-1 ET. SEQ, AND
RECOMMENDING APPROVAL OF AMERESCO, INC. AS A QUALIFIED
PROVIDER AND APPROVAL OF A GUARANTEED ENERGY SAVINGS CONTRACT
RELATING TO THE MORRIS PERFORMING ARTS CENTER AND PALAIS
ROYALE
WHEREAS, on December 18, 2017, the Common Council of the City of South Bend,
Indiana (“the Common Council”) designated the City’s Board of Public Works and Department of
Public Works to be the Common Council’s authorized agents: “for purposes of meeting the
provisions required of Indiana Code §36-1-12.-5 and other Indiana laws leading up to the final
review of and the execution by the South Bend Common Council of a Guaranteed Energy Savings
Contract for implementing a program to replace old or failing equipment across many facilities in
the Department of Venues Parks and Arts.” (Common Council Resolution No. 4690-17, Section
1 (1)); and
WHEREAS, in that same Resolution No. 4690-17, the Common Council also requested
the City’s Board of Public Works and the Department of Public Works to “make an advisory
recommendation to the Common Council concerning the selection of a company to contract with
for a Guaranteed Energy Savings Contract.” (Id., Section 1 (2) ); and
WHEREAS, in compliance with the notice and publication requirements of Ind. Code 36-
1-12.5-5 (b) and (c), the City Department of Public Works and Board of Public Works sought
proposals from qualified providers to propose conservation measures through a guaranteed energy
savings contract and received, a proposal, among others that it fully evaluated, from Ameresco,
Inc. (the “Qualified Provider”) to evaluate, recommend, and then undertake certain energy
conservation measures at the Morris Performing Arts and the Palais Royale (each located within
one integrated building structure hereafter designated as “the Morris facility”);
WHEREAS, Ameresco Inc., is a corporation with its principal place of business in
Framingham, Massachusetts, experienced in the design, implementation, and installation of energy
conservation measures. It provides engineering services with respect to conservation measures by
a professional engineer licensed under IC 25-31 who is under Ameresco’s direct employment and
supervision. Therefore, Ameresco is a “Qualified Provider” within the scope and meaning of Ind.
Code 36-1-12.5-3; and
WHEREAS, the City through the Common Council and by recommendation of this
Board previously approved on April 13, 2015 a Guaranteed Savings Contract between the City
and Ameresco, Inc. regarding energy savings at Century Center in Ordinance No. 10357-15 which
to date has delivered effective guaranteed savings to the City; and
WHEREAS, attached hereto and incorporated herein as Exhibit 1 is a proposed contract
between the City and Qualified Provider Ameresco (Exhibit 1) which includes as attachments all
2
of Ameresco’s recommendations for energy conservation measures and the details required by
Indiana law under 36-1-12.5 for such energy savings. Specifically, the energy conservation
measures recommended by Ameresco and described in the Scope of Services Attachment B to
Exhibit 1 include but are not limited to the following: (a) LED lighting upgrades; (b) replacement
and/or renovation of the heat and air conditioning equipment (boiler, pump, heat pump controls,
replacement of roof top units (RTU) and MAU); (d) plumbing fixture replacement; (e) fire alarm
system replacement; (f) roofing replacement for the facility; and (g) any projects related to any
of the foregoing projects (clauses (a) through and including (f) collectively, the “Conservation
Measure Projects”); and
WHEREAS, Ameresco’s evaluation and recommendation is supported by detailed cost
estimates pursuant to IC 36-1-12.5-6 for the design, engineering, installation, maintenance, repair,
and the amounts by which energy or water consumption, wastewater costs, and operating costs
will be reduced, the amounts by which billable revenues will be increased.(Attachment C-Savings
Guarantee; Attachment G-Measurement and Verification Plan; Methodology and Calculation of
Savings). Ameresco itself will be the contractor for the guaranteed energy savings services; and
WHEREAS, this Board recommends to the Common Council that it approve Ameresco,
Inc. as the Qualified Provider for the Conservation Measure Projects to be implemented at the
Morris facility and further, that it approve Exhibit 1 together with all of the Attachments to Exhibit
1 as a Guaranteed Energy Savings Contract in compliance with IC 36-1-12.5.
NOW, THEREFORE, BE IT RESOLVED, by the Board of Public Works of the City of
South Bend, as follows:
SECTION I. The recitals contained in this Resolution are true and correct and are
incorporated in this Resolution by reference.
SECTION II. Ameresco Inc. is a Qualified Provider within the meaning and scope of Ind.
Code §36-1-12.5-3 and the Common Council should approve it as such because among other
reasons, Ameresco, Inc. has performed similar services for the City of South Bend in the past
which have resulted in guaranteed energy savings as promised, and because Ameresco, Inc. has
considerable experience performing such services throughout Indiana and the nation.
SECTION III. Exhibit 1 together with its incorporated attachments constitutes a
Guaranteed Energy Savings contract in compliance with Indiana law requirements and it should
be confirmed, ratified, and approved by the Common Council for the Conservation Measure
Projects at the Morris facility.
SECTION IV. To the extent not expressly included in Common Council Resolution No.
4690-17, the Common Council should designate the Mayor, the City Clerk, the Controller, and all
members of the Board of Public Works to execute and deliver on behalf of the City any and all
documents and instruments necessary or proper, and further to do and cause to be done any and all
other acts necessary or proper to carry out the transactions contemplated by Exhibit 1 or by law.
3
Adopted the 26th day of October, 2021.
Jordan V. Gathers, Member
Joseph R. Molnar, Member
Murray L. Miller, Member October 26, 2021
INTER-OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING
TO: Anne Fuchs, Clerk and Members of the Board of Public Works
FROM: Becca Plantz
SUBJECT: Recommendation for Selection of Guaranteed Energy Savings Contract Provider for Morris Performing Arts Center Agreement
DATE: October 26, 2021
On behalf of the review committee I would like to recommend the provider for the Morris
Performing Arts Center Guaranteed Energy Savings Contract be Ameresco, Inc.. After careful
review of evaluations from the review committee based upon all submissions to the Request for
Qualifications and presentations and interviews by the top three candidates, Ameresco, Inc. was
chosen by collaborative scoring by the review committee as per the RFQ in October 2017.
I confirm that advertisements for the RFQ were published, two addendums were published, four
applications were received and reviewed, interviews were performed for those considered
qualified, and a selection was made. Qualification applications were received from Ameresco,
Inc., EMCOR Construction Services, Inc., Honeywell International, Inc., and Siemens Industry,
Inc.
Ameresco, Inc. offers a local presence and a strong portfolio of successful local government
performance contracts in Indiana, including South Bend. Representatives of these projects give
highly positive reviews for working with Ameresco, Inc. under a performance contracting model.
I ask that the Board of Public Works approve the accompanying resolution, which will ratify the
recommendation of the review committee and authorize an Energy Savings Agreement with
Ameresco, Inc. to execute the energy savings project
RESOLUTION
No. 4690-17
Passed by the Common Council of the City of South Bend, Indiana
December 11, 20 17
Attest: City Clerk
Attest President of Common Council
Presented by me to the Mayor of the City of South Bend, Indiana
December 12, 20 17
City Clerk
Approved and signed by me 2 I 20 1 I
Maw
Amended Bill No. 17-80
A RESOLUTION OF THE COMMON COUNCIL OF THE CITY OF SOUTH BEND INDIANA TO
APPOINT THE BOARD OF PUBLIC WORKS AND THE DEPARTMENT OF PUBLIC WORKS
AS ITS AGENTS FOR OVERSEEING THE GUARANTEED ENERGY SAVINGS CONTRACT
FOR VENUES PARKS AND ARTS
Whereas, the City of South Bend desires to implement a program to replace old or failing
equipment with energy-efficient and reliable equipment across many facilities in the Department of
Venues Parks and Arts; and
Whereas, these upgrades will decrease energy consumption and greenhouse gas emissions;
reduce utility, operations, and maintenance budgets; and improve the quality of our parks and public
spaces; and
Whereas, pursuant to Indiana Code §36-1-12.5- 5 the Common Council is authorized to enter into
an agreement to participate in a utility efficiency program or a guaranteed savings contract in order to
implement energy savings measures; and
Whereas, in 2015, the City of South Bend executed a guaranteed savings contract for a similar
project at the Century Center, resulting in significant energy cost savings and operational improvements,
and over-performing guaranteed savings by 14.6% in its first year.
Now, Therefore, Be It Resolved by the Common Council of the City of South Bend, Indiana, as
follows:
Section I The South Bend Common Council hereby believes that the following guidelines and policies are
in the best interests of the City of South Bend Indiana in order to advance potential energy efficiencies
and energy savings at Venues Parks and Arts facilities:
1. The Board of Public Works and the Department of Public Works of the City of South Bend Indiana
shall be the authorized agents for the South Bend Common Council for purposes of meeting the
provisions required of Indiana Code §36-1-12.5-5 and other Indiana laws leading up to the final
review of and the execution by the South Bend Common council of a Guaranteed Energy Savings
Contract for implementing a program to replace old or failing equipment with energy-efficient and
reliable equipment across many facilities in the Department of Venues Parks and Arts. Such
authorization would include without limitation the preparation of specifications and evaluation
criteria, advertisement for proposals, opening of proposals, evaluating proposals, rejecting non
responsive proposals, and making advisory recommendations to the Common Council.
2. The Board of Public Works and the Department of Public Works shall make an
advisory recommendation to the South Bend Common Council concerning the selection of a
company to contract with for a Guaranteed Energy Savings Contract, with the South Bend
Common Council retaining the sole and exclusive authority to enter into such a contract.
3. The Board of Public Works and the Department of Public Works are authorized to supervise all
work done on the Guaranteed Savings Contract concerning replacement of old or failing
equipment at facilities in the Department of Venues Parks and Arts, including the power to
authorize change orders and amendments.
4. The Board of Public Works and the Department of Public Works shall report to the South Bend
Common Council via the Parks Arts Recreation and Culture Committee and at a regular Common
Council meeting under Special Business as requested by the Council.
Section II This Resolution shall be in full force and effect from and after its adoption by the Common
Council and approval by the Mayor.
Member of the Com on Council
Filed in Clerk's Office
OEC 11 2011
KAREEN1.11AH POWLER
CITY
S TEDOP ,
o
SOUT City of South Bend 574)235-9321
Fax(574)235-9173
Common Council TDD 574 235-5567
pBACE
http://www.southbendin.gov
441 Count-City Building• 227 W.Jefferson Blvd
1865
South Bend,Indiana 46601
Tim Scott
President
December 11,2017
Oliver Davis South Bend Common Council
Vice-President 4t'Floor, County
City Building
Gavin Ferlic South Bend, IN 46601
Chairperson,Committee
of the Whole Re: Bill No.17-80 Proposed Resolution appointing the Agents for overseeing
Tim Scott guaranteed energy savings continue facts for venue parks and arts
First District Dear Council Members:
Regina Williams-Preston I am filing a proposed amended resolution which appoints the Board of Public Works
Second District and the Department of Public Works as the Council's agents for overseeing the
Guaranteed Energy Savings contracts for old and failing equipment with energy
Randy Kelly efficient equipment across the facilities in the Department of Venues Parks and Arts.
Third District These contracts should result in significant energy savings for the City as similar
contracts have done for the Century Center.
Jo M.Broden
Fourth District Thank you for your consideration.
Dr.David Varner
Fifth District
Sincerely Yours,
Oliver Davis
Sixth District
Gavin Ferlic Robert J. Palmer
At Large Attorney for Sou h Bend Common Council
John Voorde
At Large
Karen White
At Large
Filed in Clerk's Office
DEC 112017
KAREEMAH FOWLER
CITY CLERK,SOUTH BEND,IN
ENERGY SERVICES AGREEMENT
BY AND BETWEEN
CITY OF SOUTH BEND
AND
AMERESCO, INC.
Confidential & Proprietary Information of Ameresco, Inc. Page 1 of 54
Confidential & Proprietary Information of Ameresco, Inc. Page 3 of 54
TABLE OF CONTENTS
SECTIONS
1 Scope of Services
2 Ownership of ECM(s)
3 Financing and Ability to Pay
4 Contract Cost; Progress Payments
5 Term
6 Savings Guarantee
7 Right of Entry/Space
8 Changes in Services
9 Warranties
10 Customer’s Responsibilities
11 Defaults
12 Remedies for Default
13 Dispute Resolution
14 Insurance and Bonds
15 Indemnification and Limitation of Liability
16 Agreement Interpretation and Venue
17 Privileged and Proprietary Information
18 Severability
19 Assignment and Subcontracting
20 Waiver
21 Force Majeure
22 Contract Documents
23 Notices
24 Records
25 Representations and Warranties
26 Additional Representation and Warranties of Customer
27 Independent Contractor
28 Negligent/Wrongful Acts
29 Further Documents and Events
30 Third Party Beneficiaries
31 Notifications of Governmental Action - Occupational Safety and Health
32 Appropriations; Termination for Convenience
33 References
ATTACHMENTS
ATTACHMENT A PROPERTY DESCRIPTION
ATTACHMENT B SCOPE OF SERVICES
ATTACHMENT C SAVINGS GUARANTEE
ATTACHMENT D(1) DELIVERY AND ACCEPTANCE CERTIFICATE
ATTACHMENT D(2) PERCENT COMPLETE ACKNOWLEDGEMENT
CERTIFICATE
ATTACHMENT D(3) SUBSTANTIAL COMPLETION CERTIFICATE
ATTACHMENT E NOTICE TO PROCEED
ATTACHMENT F CHANGE ORDER
Confidential & Proprietary Information of Ameresco, Inc. Page 4 of 54
ATTACHMENT G MEASUREMENT AND VERIFICATION PLAN;
METHODOLOGY OF CALCULATING SAVINGS
ATTACHMENT H TRAINING
ATTACHMENT I MEASUREMENT AND VERIFICATION FEE SCHEDULE
ATTACHMENT J CUSTOMER’S MAINTENANCE RESPONSIBILITIES;
STANDARDS OF SERVICE AND COMFORT
ATTACHMENT K
CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT
AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH
IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF
USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY
PRODUCTS
ENERGY SERVICES AGREEMENT BY AND BETWEEN
CITY OF SOUTH BEND
AND
AMERESCO, INC.
THIS ENERGY SERVICES AGREEMENT (the “Agreement”) is entered into on
, 2021, by and between City of South Bend having its principal place of
business located at 219 South Saint Louis Boulevard, South Bend, IN 46617 (hereinafter
referred to as “Customer”) and Ameresco, Inc., having its principal place of business at 111 Speen
Street, Suite 410, Framingham, MA 01701 (hereinafter referred to as “Ameresco”). The parties to
this Agreement shall be collectively referred to as the “Parties ” and individually as a “Party .”
WHEREAS, Customer issued a Request for Proposals submitted on March 14, 2014 (the “RFP
”) seeking proposals from qualified energy service companies to provide performance-based
services for the design and execution of an energy consumption reduction plan including
acceptance of payment for such services via guaranteed cost savings accrued as a result of plan
implementation;
WHEREAS, Ameresco has prepared and issued a Proposal to Customer, in response to the RFP;
WHEREAS, Customer wishes Ameresco to perform a project (“Project”), in phases, consisting
of certain energy conservation services and installations as set forth on Attachment B (as amended
and/or otherwise modified from time to time as provided herein, the “Scope of Services ”) at
Customer’s facilities described in Attachment A (the “Property ”), and Ameresco wishes to
perform such services; and
WHEREAS, Customer owns and controls the Property.
NOW, THEREFORE, in consideration of the covenants, representations, warranties, and
mutual promises and agreements contained herein, and other good and valuable consideration, the
receipt and sufficiency of which are hereby acknowledged, the Parties hereby agree as follows:
SECTION 1 Scope of Services
(a)Work: Upon Ameresco’s receipt of a “Notice To Proceed,” substantially in the form
October 26
Confidential & Proprietary Information of Ameresco, Inc. Page 5 of 54
attached to this Agreement as Attachment E, Ameresco shall furnish all labor, materials and equipment
and perform all work (the “Work ”) required for the completion of the Scope of Services, including
installation of the energy conservation and facility improvement measures (“ECM (s)”), included in the
Scope of Services, as such Scope of Services may be modified in accordance with the terms of this
Agreement. Customer and Ameresco shall mutually plan the scheduling of the installation of the
ECM(s), so as to minimize disruption of the daily routine of Customer’s personnel.
(b)Disposal: As part of the Scope of Services Ameresco shall (i) be responsible for the disposal
of all non-hazardous equipment and materials which are rendered useless and removed as a result of
the installation of the ECMs and (ii) cause all lamps which are classified as hazardous wastes by the
rules and regulations of the U.S. Environmental Protection Agency (40 CFR Parts 260 through 279)
and PCB-contaminated ballasts, if any, which have been rendered useless and removed as a result of
the installation of the ECMs to be disposed of. All other existing PCB-contaminated ballasts, lamps
and any other hazardous materials, however, shall remain the sole responsibility of Customer and
Ameresco shall assume no liability whatsoever in connection with their removal, transportation and
disposal.
(c)Asbestos and Lead Paint:
(i)Asbestos: Ameresco’s Scope of Services is predicated on the viability of the Project
without Ameresco’s encountering or disturbing asbestos or being required to perform
any asbestos abatement or taking any other action with respect to asbestos. Customer
hereby represents and warrants to Ameresco that to the best of its knowledge there
is no asbestos or other hazardous material in any area wherein Ameresco shall be
performing the Scope of Services. If: (a) Ameresco encounters any friable asbestos
which is in the vicinity of the Project that is not identified in the Scope of Services,
(b)Ameresco determines that its work will result in the disturbance of asbestos
containing material, or (c) Ameresco determines that the presence of asbestos
containing material may impede Ameresco’s work, Ameresco shall notify Customer
of the same and Customer shall either: (x) at its cost, cause the asbestos to be lawfully
removed, enclosed, encapsulated or otherwise abated in accordance with applicable
laws, rules and regulations; (y) at its cost, provide written test reports showing that
asbestos in that area has been properly removed, enclosed encapsulated or otherwise
abated in accordance with applicable laws rules and regulations; or (z) abandon the
Project and terminate this Agreement. If Ameresco cannot determine whether any
particular material contains asbestos, Customer, upon Ameresco’s written request,
shall either: (I) at Customer’s cost, lawfully perform tests or cause tests to be
performed in order to determine whether such material contains asbestos and/or
whether there are unacceptable levels of airborne particulate material containing
asbestos and provide such test report to Ameresco; or (II) abandon the Project and
terminate this Agreement. Under no circumstances shall Ameresco be required to
handle asbestos. If Ameresco encounters asbestos that materially affects the Scope
of Services or the Project schedule, Ameresco, at its option, may demobilize and
cease construction in the area affected by the presence of asbestos until such time as
Customer elects and performs one of the options afforded Customer as described in
this Subsection. If Customer does not promptly take action, as provided herein, or
notifies Ameresco that it shall not take such action, Ameresco may, at its option,
either remove the affected area from its Scope of Services (and make commensurate
adjustments to its rights and obligations) or terminate this Agreement in its entirety.
Customer shall be responsible for payment of the portion of Scope of Services
implemented prior to termination. Customer shall be responsible for any and all
costs (including termination) incurred by Ameresco that relate to the presence of
asbestos.
Confidential & Proprietary Information of Ameresco, Inc.Page 6 of 54
(ii)Lead Paint: Ameresco’s Scope of Services is predicated on the viability of the Project
without Ameresco’s encountering or disturbing lead paint or being required to
perform abatement or providing any notice or taking any other action with respect to
lead paint. Customer hereby represents and warrants to Ameresco that there is no
exposed lead paint in any area in which Ameresco shall be performing the Scope of
Services. If Ameresco encounters lead paint in any area where it is to perform the
Scope of Services, which performance would require disturbing lead paint, and
Ameresco reasonably believes that such paint may be lead paint, Customer, upon
Ameresco’s written request, shall either (a) at Customer’s cost, lawfully perform tests
or cause tests to be performed in order to determine whether such paint contains lead
and shall provide a test report to Ameresco; or (b) abandon the Project and terminate
this Agreement. If such test report demonstrates the presence of lead paint or
Ameresco reasonably believes that performing its services under this Agreement is
likely to cause the disturbance of lead paint in such a manner as to require Ameresco
to provide any notification or take any actions pursuant to any federal, state or local
laws, rules, or regulations and Ameresco notifies Customer of the same, Customer
shall: (x) at its cost, cause the lead paint to be lawfully removed, or otherwise abated
in accordance with applicable laws, rules and regulations; or (y) abandon the Project
and terminate this Agreement. Under no circumstances, shall Ameresco be required
to perform services which cause the disturbance of lead paint. If lead paint materially
affects the Project Schedule, Ameresco, at its sole option, may demobilize and cease
construction in the area affected by the presence of lead paint until such time as
Customer has elected and performed one of the options afforded Customer as
described in this Subsection. If Customer does not promptly take action as provided
herein or notifies Ameresco that it shall not take such action, Ameresco may, at its
sole option, either remove the affected area from its Scope of Services (and make
commensurate adjustments to its rights and obligations) or terminate this Agreement
in its entirety. Customer shall be responsible for payment of the portion of Scope of
Services implemented prior to such termination. Customer shall be responsible for
any and all costs (including termination) incurred by Ameresco that relate to the
presence of lead paint.
(d)Compliance With Law: Ameresco shall, at its expense, comply with and obtain all applicable
licenses and permits required by federal, state and local laws in connection with (i) the installation of
the ECMs and (ii) the operation and/or maintenance of the ECMs (to the extent that Ameresco agrees
to perform such operations and/or maintenance services). In the event that Ameresco cannot procure
any such license or permit in light of a requirement that Customer is required to do so, the Parties shall
work jointly to obtain such permit or license.
(e)Taxes: Customer represents that it is a tax exempt entity and that it shall cooperate with
Ameresco and provide Ameresco with appropriate resale exemption documentation so that Ameresco
may attempt to establish that it is not obligated to pay taxes, fees and assessments or other charges of
any character which may be imposed or incurred by any governmental or public authority as an incident
to title to, or operation of the ECM(s) which would otherwise be levied upon or in respect to said
interest component or of the ECM(s). Notwithstanding the foregoing, Customer shall pay (or, if
applicable, reimburse Ameresco for the payment of) all property, sales taxes, use taxes or other fees
and assessments associated with Scope of Services. Customer shall have no liability for taxes measured
by the net income of Ameresco.
(f)Monitoring, Measurement and Verification: To the extent provided for in Attachment G,
Ameresco will supply such ongoing monitoring, measurement and verification services (the “M&V
Services”) during the Term, as such term is defined in Section 5, at a cost to Customer as set forth in
Section 4 and Attachment I.
(g)Duties, Obligations and Responsibilities of Ameresco:
Confidential & Proprietary Information of Ameresco, Inc. Page 7 of 54
(i)All labor furnished under this Agreement shall be competent to perform the tasks
undertaken, all materials and equipment provided shall be new and of appropriate,
reasonably good quality and the completed work shall comply in all material
respects with therequirements of this Agreement.
(ii)Ameresco shall maintain the Project site in a reasonably clean condition during the
performance of the Scope of Services.
(i)Ameresco shall regularly clean the Project site of all debris, trash and excess material
or equipment generated by Ameresco’s construction work hereunder.
(ii)Ameresco shall permit Customer or any of its representatives to enter upon the
Project site to review or inspect construction work, provided, in each case, Customer
and/or its representatives coordinate such review or inspection with Ameresco and
agree to comply with all applicable federal, state and local safety laws, rules and
regulations, including, without limitation, those promulgated by the U.S. Department
of Labor Occupational Safety & Health Administration.
(iii)Ameresco shall provide equipment manuals, as-built drawings and other appropriate
information regarding equipment installed hereunder to Customer at or about the
time of delivery of the Delivery and Acceptance Certificate (as provided in Section 4).
(iv)Ameresco shall provide the training described in Attachment H. Such training is
included in the Contract Cost, as such term is defined in Section 4, unless included as
a separate cost in Attachment I.
(h)Customer Cooperation During Construction: Customer shall reasonably cooperate in
relocating occupants, staff, personnel, furniture and equipment and taking such other actions as may
be necessary by Customer in order to prepare space for work by Ameresco to enable Ameresco to
timely perform its obligations hereunder.
SECTION 2 Ownership of ECM(s)
Ownership and title to each ECM or portion thereof, as applicable, shall automatically pass to
Customer upon Ameresco’s receipt of both (i) the executed Substantial Completion Certificate
(Attachment D(3)), or each Percent Complete Acknowledgement Certificate (Attachment D(2)),
(including Customer payment certification) delivered pursuant to Section 4 for such ECM or portion
thereof, and (ii) the indefeasible payment in full of all of Customer’s payment obligations to Ameresco
pursuant to such Substantial Completion Certificate or Percent Complete Acknowledgement
Certificate for such installed ECM or portion thereof. Prior to satisfaction of the conditions set forth
in (i) and (ii) in the previous sentence with respect to an ECM or portion thereof, title to each ECM
or portion thereof shall remain in the name of Ameresco. If, notwithstanding the intent of the Parties,
Customer is deemed to hold title to any or all of the ECMs or portion thereof prior to the satisfaction
of the conditions set forth in (i) and (ii) above, as security for the payment in full of Customer’s
obligations with respect to each such ECM or portion thereof, Customer hereby assigns, transfers and
grants to Ameresco a security interest in such ECMs. Customer hereby authorizes Ameresco to file,
from time to time, Uniform Commercial Code financing statements in such jurisdictions as may be
necessary to perfect and maintain its security interest in such ECMs. If requested by Ameresco,
Customer agrees to execute and deliver all further instruments and documents and take all further
action that may be necessary in order to create, perfect and protect Ameresco’s security interest in the
ECMs and hereby irrevocably appoints Ameresco as Customer’s attorney-in-fact with full power to
sign such instruments and documents. Upon delivery of the Substantial Completion Certificate and
satisfaction of clause (ii) above for each ECM, Ameresco’s interest in the related ECMs shall be released
Confidential & Proprietary Information of Ameresco, Inc. Page 8 of 54
and terminated, in each case without further action on any Party’s part.
SECTION 3 Financing and Ability to Pay
(a)By its execution of this Agreement, Customer hereby represents and warrants to Ameresco
that Customer has adequate funds for payment of the Contract Cost, and for any portions which
Customer may need to borrow, Customer intends to enter into a separate financing through a bond
issuance, lease purchase, or similar structure (“Financing ”) with a third party finance company or
other third party entity.
(b)Customer agrees and acknowledges that its obligation to make the payments to Ameresco set
forth in this Agreement are in no way contingent on the effectiveness of the Financing. However,
Ameresco acknowledges that under Indiana law, all payments to Ameresco are subject to annual
appropriation by the South Bend Common Council, the fiscal body for the City of South Bend,
Indiana.
SECTION 4 Contract Cost; Monthly Progress Payments
(a)Subject to the terms of this Agreement, Ameresco shall perform the Scope of Services at a
contract cost of FIVE MILLION THREE HUNDRED SIXTY-ONE THOUSAND AND 00/100
DOLLARS ($5,361,000.00) (subject to adjustment as provided in Section 8, the “Contract Cost”).
(b)Upon execution of this Agreement and delivery by Customer to Ameresco of the Notice to
Proceed, substantially in the form attached to this Agreement as Attachment E, Customer shall pay
Ameresco ten percent (10%) of the Contract Cost for mobilization. Thereafter, Ameresco shall submit
invoices to Customer for monthly progress payments to Ameresco based upon the percentage of the
Project construction and equipment procurement completed at the end of each month, so that
Ameresco is paid the percentage of the Contract Cost that is commensurate with the percentage of
completion of the Scope of Services. A Percent Complete Acknowledgement Certificate in the form
attached hereto as Attachment D (2) will be executed by Customer during each month of the
construction period showing the percent complete and monthly payment due. Customer shall make
payment to Ameresco, within thirty (30) days after the submission of each such invoice. Customer
shall not unreasonably withhold, condition or delay the execution and delivery of any Percent Complete
Acknowledgement Certificate.
(c)Upon Substantial Completion of the installation of an ECM, Ameresco will deliver to
Customer a Substantial Completion Certificate in the form of Attachment D (3). Within five (5)
calendar days after receipt of each Substantial Completion Certificate, Customer shall complete,
execute and deliver to Ameresco each such Substantial Completion Certificate. As used in this
Agreement the term “Substantial Completion” shall mean that each subject ECM has been installed
by Ameresco, and, if such ECM is equipment, such equipment is then operating in a manner such that
Customer is deriving beneficial use thereof. A Delivery and Acceptance Certificate, in the form of
Attachment D(1), shall be executed by Customer upon Substantial Completion of the installation of
the final ECM. Customer shall not unreasonably withhold, condition or delay the execution and
delivery of any Substantial Completion Certificate or the Delivery and Acceptance Certificate.
(d)Within thirty (30) calendar days following the first day of each Guarantee Year, as such term
is defined in Section 6, Customer shall pay Ameresco the additional amounts set forth on
Attachment I, Measurement and Verification Fee Schedule, as an annual fee for the M&V Services.
(e)All payments made by Customer under this Agreement shall be made in accordance with
the provisions of any Prompt Payment Act applicable to Customer, and subject further to the South
Bend Common Council’s annual appropriation as required by Indiana law . All
Confidential & Proprietary Information of Ameresco, Inc. Page 9 of 54
amounts not paid to Ameresco onor before the due dates specified in Subsections 4(b) and (d), shall
accrue interest at the interest rate prespecified in any Prompt Payment Act applicable to Customer
or, if no such rate is specified, at thePrime rate of interest as published in the Wall Street Journal for
major banks or such lower rate as is prescribed by applicable law.
SECTION 5 Term
This term of this Agreement (the “Term ”), shall begin on the date first above written and shall remain
in effect through the “Guarantee Period ” as such term is defined in Attachment C, unless terminated
prior to such date, as provided for in this Agreement. Termination of this Agreement shall also
terminate the Guarantee Period. Anything in this Agreement to the contrary notwithstanding,
Customer shall not be relieved of its obligation to pay Ameresco when due all amounts which accrued
prior to such termination.
SECTION 6 Savings Guarantee
To the extent set forth in Attachment C, and solely in accordance with Attachment C, Ameresco
guarantees that the “Annual Savings ” (as defined below) to be achieved as a result of installation and
operation of the ECMs shall equal or exceed the Guaranteed Savings (as defined in Attachment C)
over the “Guarantee Period ” (as defined in Attachment C).
For purposes of this Savings Guarantee, the following assumptions and provisions shall apply:
(a)Ameresco guarantees that the Guaranteed Savings will be achieved by operation and beneficial
use of all ECMs taken in the aggregate, but does not guarantee the savings amount achieved by each
ECM individually.
(b)The total cumulative savings achieved by the combined ECMs, determined as provided in the
M&V Plan, shall be deemed the total “Annual Savings ”. Calculation of the Annual Savings shall be
performed under, and governed by, the methods, formulas, and procedures described in the
Measurement and Verification Plan set forth in Attachment G (the “M&V Plan”).
(c)As it relates to the Annual Savings and this Savings Guarantee, the term “Guarantee Year”
shall mean the consecutive twelve (12) month period beginning with the first day of the month
following the date of Substantial Completion of the ECMs, and each similar twelve (12) month period
thereafter.
(d)Ameresco’s obligations in respect of this Savings Guarantee are subject to Customer
performing all of its maintenance, repair, service and other obligations under this Agreement, including,
without limitation, performance of its obligations in Section 10 and maintenance of the Standards of
Service and Comfort set forth in Attachment J, if any, which may affect achievement of the Guaranteed
Savings. If Customer fails to perform its obligations under this Agreement or interferes with, or
permits any third party to take any action which, in the reasonable opinion of Ameresco, may prevent
the achievement of the Guaranteed Savings under this Agreement, Ameresco may, after providing
Customer thirty (30) days advance notice, adjust the Annual Savings amount during the period in which
such savings were affected to reflect the impact such actions had on same. Ameresco’s rights set forth
herein shall not be in limitation of any other rights it is entitled to by law or under this Agreement.
Any disputes regarding achievement of Guaranteed Savings or any M&V Report delivered pursuant to
Attachment G shall be resolved in accordance with the dispute resolution provisions of Section 13.
SECTION 7 Right of Entry/Space
Confidential & Proprietary Information of Ameresco, Inc. Page 10 of 54
During the Term of this Agreement, Customer shall provide Ameresco and its employees, agents and
subcontractors access to the Property for the purpose of fulfilling Ameresco’s obligations under this
Agreement. Customer shall provide rent free space for the installation and operation of the ECM(s)
and shall protect such items and equipment in the same careful manner that Customer protects the
Property.
SECTION 8 Changes in Services
(a)The Scope of Services may be changed only by agreement of the Parties evidenced by
execution of a “Change Order” substantially in the form attached to this Agreement as
Attachment F, including the quantity, quality, dimensions, type or other characteristics of the
ECMs. During the Term hereof, either Customer or Ameresco may suggest that other energy
efficiency measures and facilities be added to the Scope of Services, in which case the Parties
shall endeavor to agree upon any new ECMs to be installed and may either amend this
Agreement or execute a Change Order for the installation, financing and commissioning of
any such new ECMs. Nothing in this paragraph shall obligate either Party to proceed with
installation of any ECMs which are not part of the original Scope of Services or evidenced by
execution of an amendment or a Change Order.
(b)Should Ameresco encounter subsurface or latent physical conditions at the site which differ
materially from those indicated in the Scope of Services or from those ordinarily encountered
and generally recognized as inherent in work of the character provided for in this Agreement,
Ameresco shall give written notice to Customer before any such condition is disturbed or
further disturbed. Customer will promptly investigate and, if it is determined that the
conditions materially differ from those which Ameresco should reasonably have been
expected to discover or anticipate, Customer shall either (a) approve such changes in the Scope
of Services as are necessary, with a corresponding adjustment in the Guaranteed Savings
amount; or (b) abandon the Project and terminate this Agreement, provided that Customer
has paid to Ameresco all amounts due as set forth in Section 4 (including, without limitation,
pro-rata portions thereof accrued under Subsections 4(b), (d), (e) and Attachment I and
pursuant to any Change Order). If such differing conditions cause an increase or decrease in
Ameresco’s cost or time of performance, and the Parties agree upon a change in the Scope of
Services, the Parties shall negotiate an equitable adjustment to Ameresco’s cost and/or time
for performance, as the case may be and a Change Order shall be issued and executed by
Customer to reflect such adjustment(s).
(c)If at any time prior to Substantial Completion of an ECM, Ameresco determines that an ECM
is not commercially viable, Ameresco may, at its option, remove such ECM from the Scope
of Services and from the Property. In such event, Ameresco shall refund to Customer the
portion of the Contract Cost attributable to such ECM and the Guaranteed Savings amount
will be reduced by an amount equal to the portion of the Guaranteed Savings amount
attributable to such ECM.
(d)If Ameresco and Customer agree to an adjustment of the Contract Cost and the Project
schedule established for the Scope of Services, such an agreement shall be effective
immediately upon execution of a Change Order.
SECTION 9 Warranties
Ameresco hereby agrees as follows:
(a)Ameresco warrants that the Work and all materials and equipment to be installed in the Project
shall be free from defects in materials and workmanship arising from normal usage on an ECM by
Confidential & Proprietary Information of Ameresco, Inc. Page 11 of 54
ECM basis for a period of one (1) year from the date of Substantial Completion of such ECM. Any
manufacturers’ warranties which exceed this one (1) year period shall be assigned to Customer to the
extent allowed by the manufacturer. This section does not apply in any way to the Savings Guarantee.
(b)EXCEPT AS PROVIDED IN THIS SECTION 9, AMERESCO MAKES NO
WARRANTIES OR REPRESENTATIONS OF ANY KIND, WHETHER STATUTORY,
WRITTEN, ORAL OR IMPLIED, INCLUDING WITHOUT LIMITATION, WARRANTIES AS
TO THE VALUE, DESIGN, AND CONDITION OR FITNESS FOR USE OR PARTICULAR
PURPOSE AND MERCHANTABILITY, REGARDING THE WORK, THE ECM(s) OR THE
EQUIPMENT.
SECTION 10 Customer’s Responsibilities
(a)Operations: Customer shall operate all equipment installed hereunder in accordance with the
manufacturer’s recommendations and the manuals supplied to Customer by Ameresco.
(b)Standards of Service and Comfort: Customer shall operate the ECMs and the Property in a
manner that shall provide the Standards of Service and Comfort provided for in Attachment J.
(c)Maintenance: Customer shall, at its expense, repair, operate and maintain the Property in good
working condition during the Term of this Agreement. Customer shall maintain, repair and operate,
at Customer’s expense: (i) all equipment and other components included as part of the ECMs, and (ii)
all other equipment which is attached thereto and/or is integral to the proper functioning of the ECMs.
(d)Malfunctions: During the Term and throughout the warranty period, Customer shall notify
Ameresco immediately in the event of any malfunction in the operation of the ECM(s) or the
equipment installed hereunder.
(e)Protection of ECMs: Except in the case of emergency, Customer shall not remove, move,
alter, turn off or otherwise significantly alter the operation of the equipment installed hereunder or
the operation of the ECMs, or any individual part thereof, without the prior approval of Ameresco,
which approval shall not be unreasonably withheld. After receiving Ameresco’s written approval,
Customer shall proceed as instructed. Customer shall act reasonably to protect the ECMs from
damage or loss, if, due to an emergency; it is not reasonable to notify Ameresco before acting.
Customer agrees to protect and preserve the facility envelope and the operating condition of all
ECMs, mechanical systems, and other energy consuming systems located on the Property.
(f)Monitoring System: Customer shall not move, modify or otherwise alter the energy
management system/building automation system (EMS/BAS), temporary data loggers, or any other
data collection or measurement and verification system (collectively, the “Monitoring System ”)
installed as part of the ECM(s) or any component thereof without the written consent of Ameresco
unless such action is in accordance with operating manuals and procedures provided by Ameresco.
(g)Adjustment to Baseline: If, in the reasonable opinion of Ameresco, Customer does not
reasonably operate, maintain, repair or otherwise protect the ECMs and/or maintain the Property in
good repair and good working condition, then Ameresco may equitably adjust the baseline, as
referenced in Attachment G, for any increased energy usages at the Property.
(h)Changes to Property or Addition of Equipment: Excepting emergency or disaster when
reasonably prompt notice shall be given, Customer shall notify Ameresco in writing at least thirty
(30) days prior to making any changes to the Property that could reasonably be expected to affect the
energy usage on the Property, such as changes in the hours or days or time of year that
the Property is occupied or operated, the number of occupants, the activity conducted, the equipment,
the facilities, the size of the Property etc. Customer shall also notify Ameresco regarding material
increases over time in numbers and usage of “plug in” devices such as computers and printers. If
Confidential & Proprietary Information of Ameresco, Inc. Page 12 of 54
Ameresco receives such notification or otherwise determines that such a change has occurred, it may
make appropriate revisions to the Attachments to reflect any adjustment to the baseline or the
Guaranteed Savings amount. Ameresco may also make retroactive adjustments to the baseline or
calculation of Annual Savings if Customer has not provided timely notice and any payments shall be
retroactively reconciled to reflect the changed baseline.
(i)Energy Usage Data: Customer shall make available to Ameresco, on an ongoing basis for the
Term of this Agreement, copies of all energy bills, energy usage data, and any and all other such data
maintained by Customer, including remote access to the Monitoring System or Customer’s network
server for purposes of collecting such data, as may be requested by Ameresco, which are required for
it to perform all of its obligations under this Agreement.
(j)Insurance and Risk of Loss or Damage: Without limiting any of its obligations or liabilities
under this Agreement, Customer shall, at its expense, provide and maintain at all times during the Term
of this Agreement, sufficient insurance against the loss, theft of or damage to the ECM(s), related
equipment, and all equipment installed hereunder, for the full replacement value thereof. Customer’s
Commercial General Liability insurance shall be primary for any property damage or bodily injury
during the performance of the Work.
Upon Substantial Completion of an ECM, Customer assumes all risk of loss of or damage to such
ECM from any cause excepting loss or damage caused by Ameresco’s negligence or willful
misconduct. In the event of loss or damage to any equipment installed hereunder, Customer shall
promptly notify Ameresco and promptly return the same to good repair with the proceeds of any
insurance received to the cost of such repair or demand that Ameresco perform such repair, in which
case Ameresco shall promptly do so for such compensation to which the Parties agree. If Customer
determines that any of the ECM(s) are lost, stolen, confiscated, destroyed or damaged beyond repair,
Customer shall replace the same with like equipment in good repair in a timely fashion under the
circumstances. If at any time after the date of the Delivery and Acceptance Certificate and after
Customer’s complete payment to Ameresco in accordance with Subsection 4(a), as such amount may
be modified from time to time in accordance with this Agreement, any fire, flood, other casualty, or
condemnation renders a majority of the Property incapable of being occupied and renders the ECMs or
the equipment installed hereunder inoperable and, in the case of a casualty, the affected portion of
such ECMs or equipment is not reconstructed or restored within one hundred twenty (120) days from
the date of such casualty, Ameresco and/or Customer may terminate this Agreement by delivery of a
written notice to the other Party. Upon such termination, Customer shall pay Ameresco any amounts,
or pro-rata portions thereof, under Subsections 4(b), (c), (d) and (e), Attachment I and any Change
Order, which accrued prior to such termination. Ameresco may also make appropriate adjustments to
the baseline or the Guaranteed Savings amount to reflect the impact of such casualty or condemnation,
including corresponding revisions to the Attachments.
(k)Telephone and Internet: Customer shall install and maintain telephone lines and pay all
associated costs for the ECM(s) telephone lines or applicable energy management system
communication systems. Ameresco may use Customer’s LAN for the purposes of any energy
management system that may be included in the Scope of Work.
(l)Protection: Customer shall at all times act reasonably to protect the ECM(s) from loss or
damage to the same extent and in the same manner in which it protects the Property.
(m)Alteration: Except in cases of emergency, Customer shall not move, alter or change the
ECM(s) in any way that may cause a reduction in the level of efficiency or savings generated by the
ECM or the equipment installed hereunder without obtaining Ameresco’s written approval, which shall
not be unreasonably withheld.
(n)Storage: Customer shall provide rent free space for Ameresco, or any of its subcontractors,
Confidential & Proprietary Information of Ameresco, Inc. Page 13 of 54
to mobilize and store supplies, tools and equipment during installation of the ECM(s) as available
pursuant to this Agreement for which such storage space may be required, with locking capacity
acceptable to Ameresco. Only Ameresco or any of Ameresco’s subcontractors, and Customer’s
assigned personnel shall have access to storage.
(o)Fuel: Customer shall procure and pay for all energy, utilities and fuel for the operation of the
Property.
SECTION 11 Defaults
(a)By Customer: Customer shall be in default under this Agreement upon the occurrence of any
of the following:
(i)Customer fails to pay when due any amount to be paid under this Agreement and
such failure continues for a period of five (5) business days after notice of overdue
payment is delivered by Ameresco to Customer;
(ii)any representation or warranty made by Customer in this Agreement or in any writing
delivered by Customer pursuant hereto proves at any time to have been false,
misleading or erroneous in any material respect as of the time when made;
(iii)Customer fails to perform any of its required duties or obligations under this
Agreement and fails to cure such failure and the effects of such failure within thirty
(30)days of receipt of written notice of default, unless such failures and effects cannot
be completely cured within thirty (30) days after said written notice, in which case a
default shall exist only if Customer does not commence and diligently pursue to
curesuch failures and effects as soon as practicable;
(iv)Customer enters receivership, or makes an assignment for the benefit of creditors,
whether voluntary or involuntary, or a petition is filed by or against Customer under
any bankruptcy, insolvency or similar law and such petition is not dismissed within
sixty (60) days; or
(v)Customer fails to cooperate in relocating occupants, staff, personnel, furniture and
equipment or to take such other actions as may be necessary by Customer in order to
prepare space for work by Ameresco as is reasonably requested by Ameresco in a
timely manner in order to allow the Scope of Services to be accomplished hereunder.
(b)By Ameresco: Ameresco shall be in default under this Agreement if Ameresco fails to perform
any of its material duties or obligations under this Agreement and fails to cure such failure or effects
of such failure within thirty (30) days of receipt of written notice of default, unless such failure or
effects of such failure cannot be completely cured within thirty (30) days after said written notice, in
which case a default shall exist only if Ameresco does not promptly commence and diligently pursue
to cure such failure as soon as practicable.
SECTION 12 Remedies for Default
If either Party defaults under this Agreement, the other Party may, subject to the dispute resolution
procedures in Section 13 below:
(a)bring actions for any remedies available at law or in equity or other appropriate proceedings
for the recovery of damages, including amounts past due; and
(b)with or without recourse to legal process, terminate this Agreement by delivering written
Confidential & Proprietary Information of Ameresco, Inc. Page 14 of 54
notice of termination at least ten (10) days prior to the requested termination date.
SECTION 13 Dispute Resolution
Claims, disputes, or other matters in controversy ( a “Dispute ”) arising out of or related to the
Agreement or the Project shall be subject to informal dispute resolution and mediation as a condition
precedent to any and all remedies at law or in equity. If during the term of this Agreement a Dispute
arises concerning the Project or this Agreement, the Dispute shall initially be submitted to Customer’s
project representative and Ameresco’s project manager for resolution by mutual agreement between
the Parties. Any mutual determination by Customer’s project representative and Ameresco’s project
manager will be final and binding upon the Parties. However, should Customer representative and
Ameresco’s project manager fail to arrive at a mutual decision as to the Dispute within ten (10) business
days after notice to both individuals of such Dispute, such Dispute will be submitted to a representative
from management of both Parties who shall meet in person or by phone within ten (10) business days
after either Party gives the other Party written notice of the Dispute (the “Dispute Notice ”). The
Dispute Notice shall set forth in reasonable detail the aggrieved Party’s position and its proposal for
resolution of the Dispute. If the Dispute is not resolved within thirty (30) calendar days after the first
meeting of the Parties, then the Parties shall endeavor to resolve the Dispute by mediation. A request
for mediation shall be made in writing and delivered to the other Party. The request may be made
concurrently with the filing of any and all remedies at law or in equity but, in such event, mediation
shall proceed in advance of any proceedings filed in a judicial forum, which shall be stayed pending
mediation for a period of sixty (60) days from the date of filing, unless stayed for a longer period of
time by agreement of the Parties or court order.
The Parties shall share the fees of the mediation equally. The mediation shall be held in the place
where the Project is located, unless another location is mutually agreed upon. Agreements reached in
mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof.
If the Parties do not resolve the Dispute through informal dispute resolution or mediation, either
Party is free to pursue any other available remedy in law or at equity.
SECTION 14 Insurance and Bonds
(a)By Ameresco: Ameresco shall provide and maintain at its expense the following insurance
coverage:
(i)Workers’ Compensation and Employer’s Liability Insurance as required by applicable
State law.
(ii)Commercial General Liability Insurance, including contractual liability, Bodily Injury
per person, $-5 million; Bodily Injury per occurrence, $5million; Property Damage per
occurrence, $ 5 million; Personal Injury per occurrence, $ 5 million.
(iii)Comprehensive Automobile Liability Insurance, including owned, non-owned and
hired automotive equipment of, Bodily Injury per person, $ 5 million; Bodily Injury
per occurrence, $ 5 million; Property Damage per occurrence, $ 5 million.
Ameresco shall deliver to Customer a Certificate of Insurance naming Customer as an additional
insured party under paragraphs (ii) and (iii), above.
(b)Ameresco shall deliver to Customer Payment and Performance Bonds in a sum equal to the
Contract Cost conditioned upon faithful performance of the Agreement by Ameresco, for the
implementation of the ECM(s) as it may be from time to time modified by Change Orders within ten
(10)days of issuance of a Notice to Proceed. Notwithstanding any provision to the contrary herein,
Confidential & Proprietary Information of Ameresco, Inc. Page 15 of 54
any payment and performance bonds associated with this Agreement guarantee only the performance
of the installation portion of this Agreement, and shall not be construed to guarantee the performance
of: (1) any efficiency or energy savings guarantees, (2) any support or maintenance service agreement,
or (3) any other guarantees or warranties with terms beyond one (1) year in duration from the
completion of the installation portion of this Agreement.
(c)By Customer: Without limiting any of its obligations or liabilities under this Agreement,
Customer shall provide and maintain at its expense, insurance coverage consistent with the
requirements of Subsection 10(j) above, and its obligations under this Agreement.
SECTION 15 Indemnification and Limitation of Liability
(a)Anything in this Agreement to the contrary notwithstanding, neither Party nor its respective
officers, directors, agents, employees, parent, subsidiaries or affiliates or their affiliates’ officers,
directors, agents or employees shall be liable, irrespective of whether such claim of liability is based
upon breach of warranty, tort, (including negligence, whether of any of the Parties to this Agreement
or others), strict liability, contract, operation of law or otherwise, to the other Party, or its affiliates,
officers, directors, agents, employees, successors or assigns, or their respective insureds, for incidental,
delay, punitive or consequential damages connected with, related to or arising from performance or
non-performance of this Agreement, or any action or inaction in connection therewith including claims
in the nature of lost revenues, income or profits (other than payments expressly required and due under
this Agreement), and increased expense of, curtailment, reduction in or loss of power generation
production or equipment used therefor.
(b)Ameresco agrees to indemnify and hold Customer harmless from and against any and all third
party claims for damages but only to the extent such damages arise by reason of bodily injury, death or
damage to property caused by Ameresco’s negligence or willful misconduct. In
no event, however, shall Ameresco be obligated to indemnify Customer to the extent that any such
injury or damage is caused by the negligence of Customer or any entity for which Customer is legally
responsible.
(c)Customer agrees to indemnify and hold harmless Ameresco, its officers, agents and employees,
from and against any and all third party claims for damages but only to the extent such damages arise
by reason of bodily injury, death or damage to property caused by Customer’s negligence or willful
misconduct. In no event, however, shall Customer be obligated to indemnify Ameresco to the extent
that such injury or damage is caused by the negligence of Ameresco or any entity for which Ameresco
is legally responsible.
SECTION 16 Agreement Interpretation and Venue
Each Party hereto has had ample opportunity to review and comment on this Agreement. This
Agreement shall be read and interpreted according to its plain meaning and an ambiguity shall not be
construed against either Party.
This Agreement shall be governed as to all matters, whether of validity, interpretations, obligations,
performance or otherwise exclusively by the laws of the State in which the Project is located (the
“State”). Regardless of where actually delivered and accepted, this Agreement shall be deemed to have
been delivered and accepted by the Parties in the State of Indiana. Any mediation and legal
proceedings involving the negotiation, formation, interpretation, or enforcement of this Agreement
may be brought in any court located in St. Joseph County, Indiana having jurisdiction over the case
unless the parties agree to a different venue.
Confidential & Proprietary Information of Ameresco, Inc. Page 16 of 54
SECTION 17 Privileged and Proprietary Information
Ameresco’s systems, means, cost, and methodologies of evaluating, implementing, accomplishing and
determining energy savings and the terms of the Agreement for this Project shall be considered
privileged and proprietary information. Customer shall use the same level of effort to protect and
safeguard such information as it employs to safeguard its own confidential information, provided,
however, that Customer is a public entity which has very little information that is not open to the
public. Customer shall not disclose such proprietary information without the express written consent
of an officer of Ameresco unless required to do so by statute or regulation. When any request for
disclosure of such information is made under the Indiana Access to Public Records Act (APRA) or any
applicable freedom of information law, Customer shall provide prompt written notice to Ameresco
such that Ameresco will have the opportunity to timely object under the APRA or other law should it
desire to object to such disclosure of that information in whole or in part. In the event that Customer
is required to make a filing with the Indiana Public Access Counselor or any other agency or
governmental body, including a court of law, which includes such information, Customer shall notify
Ameresco and cooperate with Ameresco in order to seek confidential treatment of such information
included within any such filing or, if all such information cannot be protected from disclosure, to
request that Customer be permitted to redact portions of such information, as Ameresco may
designate, from that portion of said filing which is to be made available to the public. Ameresco shall
defend and indemnify the City for the costs it incurs including attorney fees, for any administrative or
judicial action in which the City must participate to preserve Ameresco’s privilege of proprietary or
confidential information.
SECTION 18 Severability
If any provision of this Agreement is found by any court of competent jurisdiction to be invalid or
unenforceable, the invalidity of such provision shall not affect the other provisions of this Agreement,
and all other provisions of this Agreement shall remain in full force and effect.
SECTION 19 Assignments and Subcontracting
(a)Ameresco may elect to use subcontractors in meeting its obligations hereunder. Nothing
contained in this Agreement shall create any contractual relation between any subcontractor and
Customer.
(b)Customer shall not assign, transfer, or otherwise dispose of this Agreement, the ECM(s) or
the Property, or any interest therein, or sublet or lend the ECM(s) or permit the ECM(s) to be used by
anyone other than Customer and Customer’s employees without the prior express written consent of
Ameresco; provided that Customer may, without obtaining the consent of Ameresco, assign its rights
in the ECMs to any financial institution, lender or investor in connection with a leasing or financing
arrangement for funding of the Contract Cost. If Customer transfers ownership or its interest in the
Property without the prior written consent of Ameresco, this Agreement shall, at Ameresco’s option,
terminate automatically.
(c)Ameresco shall not assign this Agreement in whole or in part to any other party without first
obtaining the consent of Customer, which consent shall not be unreasonably withheld; provided that,
Ameresco may assign, without obtaining the consent of Customer, its rights and obligations under this
Agreement in whole or in part to any affiliated or associated company of Ameresco and its rights for
payments only under this Agreement to any financial institution, lender or investor in connection with
a credit facility to which Ameresco is a party.
SECTION 20 Waiver
Confidential & Proprietary Information of Ameresco, Inc. Page 17 of 54
Any waiver of any provision of this Agreement shall be in writing and shall be signed by a duly
authorized agent of Ameresco and Customer. The waiver by either Party of any term or condition of
this Agreement shall not be deemed to constitute a continuing waiver thereof nor of any further or
future waiver of any additional right that such Party may be entitled to under this Agreement.
SECTION 21 Force Majeure
If either Party shall be unable to carry out any part of its obligations under this Agreement (except
Customer’s obligations to make payments when due), due to causes beyond its control (“Force
Majeure ”), including, but not limited to, an act of God, strikes, lockouts or other industrial
disturbances, acts of public enemies, orders or restraints of any kind of the government of the United
States or any state or any of their departments agencies or officials, or any other civil governmental,
military or judicial authority, war, blockage, insurrection, riot, sudden action of the elements, fire,
explosion, flood, earthquake, storms, utility power outage, drought, landslide, or explosion or nuclear
emergency, plague, epidemic, pandemic, outbreaks of infectious disease or any other public health
crisis, including quarantine or other employee restrictions, this Agreement shall remain in effect but
the affected Party’s obligations shall be suspended for a period equal to the disabling circumstances,
provided that:
(a)the non-performing Party gives the other Party prompt written notice, unless such other Party
would not be prejudiced by a delay in notification, describing the particulars of the event of Force
Majeure, including the nature of the occurrence and its expected duration, and continues to furnish
timely regular reports with respect thereto during the period of Force Majeure;
(b)the suspension of performance is of no greater scope and of no longer duration than is
required by the event of Force Majeure;
(c)no obligations of either Party that arose before the event of Force Majeure causing the
suspension of performance are excused as a result of the event Force Majeure;
(d)the non-performing Party uses reasonable efforts to remedy its inability to perform; and
(e)the Term of this Agreement shall be extended for a period equal to the number of days that
the event of Force Majeure prevented the non-performing Party from performing.
Any decision by Customer to close or change the use of the facilities or ECM’s at the Property, except
to the extent such closure or change is itself caused by Force Majeure, shall not constitute a Force
Majeure excusing Customer’s performance under this Agreement.
SECTION 22 Contract Documents
(a)Upon execution of this Agreement by both Parties, this Agreement and its Attachments, which
are hereby incorporated herein by reference, shall constitute the entire Agreement between the Parties
relating to the subject matter hereof, and shall supersede all requests for proposals, proposals, previous
agreements, discussions, negotiations, correspondences, and all other communications, whether oral
or written, between the Parties to the subject matter of this Agreement. Ameresco acknowledges
that Attachment K is required by Indiana and local law in public contracts and that this document
will be executed and notarized by Ameresco. (Exhibit K is titled Contractor’s Non-Collusion and Non-
Debarment Affidavit, Certification Regarding Investment with Iran, Employment Eligibility Verification, Non-
Discrimination Commitment and Certification of Use of United States Steel Products or Foundry Products.)
(b)This Agreement may not be modified or amended except in writing signed by the Parties.
(c)Headings are for the convenience of reference only and are not to be construed as a part of
Confidential & Proprietary Information of Ameresco, Inc. Page 18 of 54
the Agreement.
SECTION 23 Notices
All notices, requests, demands, elections and other communications under this Agreement, other than
operational communications, shall be in writing and shall be deemed to have been duly given on the
date when hand-delivered, or on the date of the confirmed facsimile transmission, or on the date
received when delivered by courier that has a reliable system for tracking delivery, or six (6) business
days after the date of mailing when mailed by United States mail, registered or certified mail, return
receipt requested, postage prepaid. All notices shall be addressed to the following individuals:
(a)If to Customer:
City of South Bend
219 S Saint Louis Boulevard
South Bend, IN 46617
Attention: Jeff Jarnecke
(b)If to Ameresco:
Ameresco, Inc.
111 Speen Street, Suite 410
Framingham, MA 01701
Attention: General Counsel
Either Party may from time to time change the individual(s) to receive notices and/or its address for
notification purposes by giving the other Party written notice as provided above.
SECTION 24 Records
To assist Ameresco in its performance of this Agreement, Customer shall (to the extent it has not
already done so) furnish (or cause its energy suppliers and transporters to furnish) to Ameresco, upon
its request, accurate and complete data (kept by Customer or Customer’s energy suppliers and
transporters in the regular course of their respective businesses) concerning energy usage for the
existing facilities at the Property, including the following data for the most current thirty-six (36) month
period: utility records, occupancy information; descriptions of any changes in building structure or
heating, cooling or other systems or energy requirements; descriptions of all energy consuming or
saving equipment used on Property; descriptions of all energy management procedures presently
utilized. If requested by Ameresco, Customer shall also provide any prior energy analyses of the
Property, to the extent available.
SECTION 25 Representations and Warranties
Each Party warrants and represents to the other Party that:
(a)it has all requisite power, authority, licenses, permits, and franchises, corporate or otherwise,
to execute and deliver this Agreement and perform its obligations hereunder;
(b)its execution, delivery, and performance of this Agreement have been duly authorized by, or
are in accordance with, as to Ameresco, its organizing instruments and as to Customer, by all requisite
action and are not in breach of any applicable law, code or regulation;
(c)this Agreement has been duly executed and delivered by the signatories so authorized, and
Confidential & Proprietary Information of Ameresco, Inc. Page 19 of 54
constitutes each Party’s legal, valid and binding obligation;
(d)its execution, delivery, and performance of this Agreement shall not result in a breach or
violation of, or constitute a material default under, any agreement, lease or instrument to which it is a
party or by which it or its properties may be bound or affected; and
(e)it has not received any notice, nor to the best of its knowledge is there pending or threatened
any notice of any violation of any applicable laws, ordinances, regulations, rules, decrees, awards,
permits or orders which would materially adversely affect its ability to perform hereunder; and
(f)the persons executing this Agreement are fully authorized by law to do so.
SECTION 26 Additional Representations and Warranties of Customer
Customer hereby warrants and represents to Ameresco that:
(a)Customer intends to continue to use the Property in a manner reasonably similar to its present
use;
(b)Customer does not contemplate any changes to the electrical and thermal consumption
characteristics of the Property except as may have been disclosed to Ameresco by Customer in writing
prior to the execution of this Agreement;
(c)Customer has provided Ameresco with all records heretofore requested by Ameresco;
(d)Customer has not entered into any other agreements or understandings for the Property with
persons or entities other than Ameresco regarding the provision of the Scope of Services;
(e)Since the date of the audit report previously delivered by Ameresco to the Customer, if any,
there has been no change, event, circumstance or development that has or could reasonably be
expected to have a material adverse effect on (i) the operation or condition of the Property, (ii) the
energy usage at the Property, or (iii) the ability of Customer to perform its obligations hereunder; and
(f)Customer has obtained all necessary governmental, legal, administrative and any other
approval necessary for it to enter into and perform this Agreement.
SECTION 27 Independent Contractor
Nothing in this Agreement shall be construed as reserving to Customer any right to exercise any control
over or to direct in any respect the conduct or management of business or operations of Ameresco.
The entire control or direction of such business and operations shall be in and shall remain in
Ameresco, subject only to Ameresco’s performance of its obligations under this Agreement. Neither
Ameresco nor any person performing any duties or engaged in any work on the Property on behalf of
Ameresco shall be deemed an employee or agent of Customer.
Nothing in this Section shall be deemed to be a waiver of Customer’s right to use the Property.
Customer and Ameresco are independent of one another and shall have no other relationship relating
to or arising out of this Agreement. Neither Party shall have or hold itself out as having the right or
authority to bind or create liability for the other by its intentional or negligent act or omission, or to
make any contract or otherwise assume any obligation or responsibility in the name of or on behalf of
the other Party.
Confidential & Proprietary Information of Ameresco, Inc. Page 20 of 54
SECTION 28 Negligent/Wrongful Acts
Neither Party to this Agreement shall be liable for any negligent or wrongful acts, either of commission
or omission, chargeable to the other. This Agreement shall not be construed as seeking to either enlarge
or diminish any obligation or duty owed by one Party against the other Party or against third parties.
SECTION 29 Further Documents and Events
The Parties shall execute and deliver all documents and perform all further acts that may be reasonably
necessary to effectuate the provisions of this Agreement.
Customer shall execute all documents which may be reasonably required for Ameresco to obtain all
licenses, permits and governmental approvals required by Ameresco for installation and operation of
the ECM(s). Ameresco’s obligations hereunder are also subject to obtaining all such licenses, permits
and governmental approvals as are required to perform its obligations under this Agreement.
Customer agrees that Ameresco shall have the right to all environmental, energy, tax, financial, and
electrical-related attributes, rights, credits, deductions, benefits and characteristics associated with or
arising out of the transactions contemplated by this Agreement or associated with the ECMs or with
the energy, capacity or electrical savings created under this Agreement, howsoever created or
recognized. Customer shall provide Ameresco all reasonable assistance in perfecting its rights to such
attributes, rights, credits, benefits and characteristics.
SECTION 30 Third Party Beneficiaries
The Parties hereto do not intend to create any rights for, or grant any remedies to, any third-party
beneficiary of this Agreement.
SECTION 31 Notifications of Governmental Action - Occupational Safety and
Health
The Parties shall notify each other as promptly as is reasonably possible upon becoming aware of an
inspection under, or any alleged violation of, the Occupational Safety and Health Act or any other
provision of federal, state or local law, relating in any way to the undertakings of either Party under
this Agreement.
SECTION 32 Appropriations; Termination for Convenience
(a)Customer shall take all necessary and timely action during the Term to obtain funds and
maintain appropriations sufficient to satisfy its obligations under this Agreement.
(b)The foregoing notwithstanding, subsequent to the date of the Delivery and Acceptance
Certificate, this Agreement may be terminated by Customer in accordance with the provisions of this
Section 32. Customer shall provide notice to Ameresco of its election to terminate no later than ninety
(90) days in advance of the end of the then current Guarantee Year. The termination shall become
effective on the last day of said Guarantee Year. The termination of this Agreement by Customer shall
release Ameresco from its obligation to provide maintenance, monitoring and training services after
the effective date of termination, as well as its obligation to provide the Savings Guarantee after the
termination date; provided, however, that Customer is responsible for payment for maintenance,
monitoring and training services performed in accordance with the terms of this Agreement prior to
the termination date and Ameresco shall remain responsible for any Savings Shortfall (as defined in
Attachment C) payments due Customer prior to the date of termination.
Confidential & Proprietary Information of Ameresco, Inc. Page 21 of 54
SECTION 33 References
Unless otherwise stated, all references to a particular Attachment or to Attachments herein are to
the referenced Attachment or Attachments which are attached to this Agreement and all such
referenced Attachments are incorporated by reference within this Agreement. All references herein to
a Section shall refer to a Section of this Agreement unless this Agreement specifically provides
otherwise.
IN WITNESS WHEREOF, the duly authorized officers or representatives of the Parties have set
their hand on the date first written above with the intent to be legally bound.
CITY OF SOUTH BEND AMERESCO, INC.
By:
Authorized Signature
By:
Authorized and Required Signature
Name: Name: Louis P. Maltezos
Title: Executive Vice President
Date: Date: September 30, 2021
Title:
Confidential & Proprietary Information of Ameresco, Inc.
Page 23 of 54
ATTACHMENTS TO ENERGY SERVICES AGREEMENT
BETWEEN
AMERESCO, INC.
AND
CITY OF SOUTH BEND
ATTACHMENT A
PROPERTY DESCRIPTION
The following buildings, facilities, and areas, which are owned and operated by CUSTOMER, are
included in the Scope of Services set forth in Attachment B:
Building Name Address City, State, Zip Code
Morris Performing Arts Center 211 N. Michigan Street South Bend, IN 46601
Palais Royale 105 W. Colfax Avenue South Bend, IN 46601
Confidential & Proprietary Information of Ameresco, Inc.
Page 24 of 54
ATTACHMENT B
SCOPE OF SERVICES
This Attachment sets forth a description of existing equipment and the Energy Conservation Measures
(ECM) and related equipment to be installed by Ameresco at the buildings, facilities, and areas set forth
in Attachment A within the Property. Installation of the ECM(s) and the included equipment is subject
to change if Ameresco discovers unforeseen conditions at the Property that render its preliminary
analysis of the Property inaccurate, or significantly affect achievement of the Guaranteed Savings. Any
changes to the installation of the ECM(s) and the included equipment are subject to approval of
Customer and issuance of a Change Order, which approval shall not be unreasonably withheld,
conditioned or delayed.
The ECMs described below are included in the Scope of Services:
•ECM 1: Boiler & Pump Replacement
•ECM 2: AHU-1 Replacement
•ECM 3: RTU & MAU Replacement
•ECM 4: Heatpump Controls Upgrades
•ECM 5: New Building Automation System
•ECM 6: Plumbing Fixture Replacement
•ECM 7: Roofing Replacement
•ECM 8: Fire Alarm System Replacement
•ECM 9: LED Lighting Upgrades
ECM 1: Boiler & Pump Replacement
•Remove (3) existing boilers and associated boiler pumps
•Furnish and Install (3) New high efficiency condensing, natural gas fired boilers with 1200
MBH input and 1138 MBH output. New boiler pumps and boilers will be installed on
existing housekeeping pads. (3) boilers will be installed to provide redundancy and safety in
case of any individual boiler going down
•New boiler exhaust flues will be routed up through vertical chase in boiler room. Roof
penetrations and rain caps provided.
•New boilers will be connected to the existing main hot water piping manifold
•New boilers will be connected to the existing main natural gas line
•Remove heating pumps HP‐1,2,3 and 4 and replace with new equivalent sized pumps and
motors with VFDs. Use existing housekeeping pads and electrical connections
•Remove SP‐1, WP‐1 and GP‐1 and replace with new equivalent sized pumps and motors.
Use existing housekeeping pads and electrical connections.
•New Boilers and pumps will be connected and controllable on the new BAS installed under
ECM 5.
Confidential & Proprietary Information of Ameresco, Inc.
Page 25 of 54
ECM 2: AHU-1 Replacement
•Remove existing AHU-1
•Remove and dispose of existing chiller (C-2) connected to AHU-1
o Infill metal grating of rooftop steel superstructure where chiller C-2 previously was
located
•Demolish and dispose of roof mounted piping between chiller C-2 and AHU-1
•Steel support structure to be modified to accept new packaged air handling unit
•Route new single location electrical connection from basement electrical panels to new AHU
connection point.
•Provide and install a single packaged air handling unit with matching supply air quantity,
heating/cooling capacity, approximately:
o 45,000CFM airflow
o 150Ton cooling
o 2,000MBH heating
•New AHU to include new energy recovery wheel
•Include bipolar ionization (BPI) technology in new AHU
•Structural engineering is included
ECM 3: RTU & MAU Replacement
•Remove existing rooftops units RTU‐2, RTU‐4, RTU‐6 and RTU‐7. Properly dispose of
refrigerant.
•Replace with new rooftop units with equivalent capacity and greater efficiency,
approximately:
o RTU-2 – 18,000CFM/620MBH
o RTU-4 – 8,000CFM/400MBH
o RTU-6 – 3,000CFM/108MBH
o RTU-7 – 5,000CFM/297MBH
•Units will be provided with improved fan efficiency, cooling efficiency, and multi stage
heating.
•Remove and dispose of chiller C‐1 and replace with one (1) 40 ton air cooled chiller, to serve
new RTUs.
•All new RTUs and new chiller will be integrated with the new BAS installed under ECM 5.
•Replace large rooftop ductwork with new that is insulated with weatherproof white outer
shell similar in look to new roofing. Existing exhaust fans to remain.
•Remove existing makeup air unit to restaurant space in basement storage room. Properly
dispose of unit and associated piping.
o Replace with new makeup air unit with equivalent capacity and greater efficiency.
o MAU – 4,000CFM
•Include bipolar ionization (BPI) technology in new RTUs and MAU.
•Structural engineering is included
Confidential & Proprietary Information of Ameresco, Inc.
Page 26 of 54
ECM 4: Heatpump Controls Upgrades
•Nineteen (19) Existing heat pumps will have new BAS connected thermostats installed.
•Thermostats will be wired and connected to the new BAS installed under ECM5. Heat
pumps will be controlled by a schedule.
ECM 5: New Building Automation System
Ameresco will engineer, provide, install, commission, program, startup and check-out, project
management, train the owner and provide the electrical installation on the following:
•A new Tridium Niagara front end computer will be installed for access to all connected
equipment.
•Similar graphics and user interface to Century Center for ease of use and familiarity.
•Final ethernet connection to Morris LAN is to be completed by City of South Bend IT
department for security purposes. A maximum of five connections will be required, with all
connections on the same network. (Same final connection requirement as the Century
Center BAS connection).
•Thirteen (13) existing VAV boxes will have new digital programmable thermostats installed
along with upgraded internal controller with new connection to BAS.
•Thermostats will be connected to new VAV control box and controllable via BAS.
•Four (4) new thermostats will be installed in locations specified by engineering design in the
Morris Theater to average the overall space temperature and humidity
•Building controls will be configured to allow for separate controls for the following three
areas of the building.
o Morris Theater – Unit will be set to unoccupied with setpoints as specified in
Attachment J. The zone will have an event schedule that will be utilized to enable
equipment for events only. The schedule will feature a warmup/cooldown mode
that enables heating or cooling without outside air intake for a configurable period
of time prior to the event start. Humidity controls will be in place to allow the unit
to cycle to reduce humidity during unoccupied times.
o Palais Hall – Units will be set to unoccupied with setpoints as specified in
Attachment J. The zone will have an event schedule that will be utilized to enable
equipment for events only. The schedule will feature a warmup/cooldown mode
that enables heating or cooling without outside air intake for a configurable period
of time prior to the event start. Humidity controls will be in place to allow the unit
to cycle to reduce humidity during unoccupied times.
o Offices – Units will be set to run on a weekly 7-day schedule. Units will be set to
unoccupied with setpoints as specified in Attachment J. Monday through Friday 8-5
are to be in occupied mode, all other times including Saturday/Sunday are
unoccupied.
Confidential & Proprietary Information of Ameresco, Inc.
Page 27 of 54
ECM 6: Plumbing Fixture Replacement
•Low flow battery operated touchless faucets will be installed in the (37) existing sinks
•Low flow battery operated touchless flush valves will be installed for (26) existing toilets and
twelve (12) existing urinals in the restrooms
•Existing porcelain fixtures to remain
•Tank type fixtures are not able to be retrofitted with touchless capabilities
•Three (3) strap on flow meters will be installed in basement on three separate incoming
water lines
o BAS alert will be programmed to alarm when an unusual quantity of flow is detected
for an extended time.
Confidential & Proprietary Information of Ameresco, Inc.
Page 28 of 54
Confidential & Proprietary Information of Ameresco, Inc.
Page 29 of 54
ECM 7: Roofing Replacement
•Installation of new roofing membrane over existing roofing system
o Overlay new white colored TPO roofing membrane on existing black rubber roof.
New membrane will wrap up and over stone façade cap on South and East
edges of the Palais. Black metal cap will be installed to match the rest of the
roofing cap throughout the facility.
Existing roofing insulation to remain. Up to 1,500 square feet of damaged
insulation will be replaced if needed. Extra insulation will be installed to
help mitigate standing water where ponding is currently an issue.
New roof will carry a 20-year manufacturer’s warranty.
ECM 8: Fire Alarm System Replacement
•Provide and install one (1) Addressable Fire Alarm Panel and voice dialer
o Provide and install five (5) remote annunciators
o Provide and install twenty-three (23) pull stations
o Provide and install fifty-nine (59) photo smoke sensors at locations specified in final
design.
o Provide and install nineteen (19) photo heat sensors at designated locations
o Provide and install addressable monitor modules at RTU units supervising factory
installed sensors
o Provide and install monitor modules associated with sprinkler riser locations and fire
suppression locations
o Provide and install addressable relays associated with sound system alarm shunt
o Provide and install power supplies in sufficient quantity to support speaker strobe
devices
o Provide and install one (1) remote paging cabinet for voice annunciation
o Provide and install one hundred twenty-six (126) wall mount speaker strobe devices
o Provide and install thirty-seven (37) wall mount strobe devices
o Provide and install relay associated with elevator recall
o Provide and install two Hyperspike directional speakers for auditorium voice
annunciation
o Provide and install cabling to initiating devices and notification appliances
o Program panels, provide commissioning services and training
o Provide and install document box by FACP
ECM 9: LED Lighting Upgrades
•At the Morris Theatre, retrofit 2,352 interior light lamps to LED. Includes 3 exit signs with
battery backup and a total of 15 occupancy sensors in the private offices and restrooms in
locations as specified in Appendix 1. Excludes incandescent rope integral seating lighting (By
others as part of seat replacement project).
Confidential & Proprietary Information of Ameresco, Inc.
Page 30 of 54
•Exterior Morris Theatre lighting retrofits and replacements include 25 can lights, wall packs
and canopy lights. 1,700 lamps in marquee sign to be upgraded to LED, 14 fluorescent tube
lamps inside the marquee backlight box. Includes upgrade of 2 pole mounted shoebox
fixtures to LED fixture with photocell. The lighting for the marquee is not color changing.
•At Palais Royale, retrofit 531 interior light fixtures to LED. Two exit signs to be replaced with
LED fixtures with battery backup. Occupancy sensors in the private offices and restrooms in
locations as specified in Appendix 1. One new lighting panel to be provided for theatre lights
in same location as existing panel.
•Exterior Palais Royale lighting work to include 2 new wall pack fixtures with photocell to
replace jelly jar fixtures.
•Includes dimming to 0% in the Palais Ballroom.
•Excludes decorative artwork lighting and elevator lighting. Existing LED lights to remain.
•New LED color changing lighting system will be installed on the wall wash and window
highlight fixtures to provide colored lighting schemes for the façade of both buildings
(searchlights excluded).
•Existing HID flood fixtures will be removed, and new LED color changing fixtures will be
installed along the ledge running beneath the windows.
o New control hardware and interface to be installed inside the building.
o Upper building and lower building cold cathode lamp fixtures will be left alone.
•Existing HID searchlights will be left as-is.
•See Appendix 1 for detailed line by line scope of work
Scope of Services Appendices
•Appendix 1 – Lighting Line by Line, Fourteen (14) pages
Confidential & Proprietary Information of Ameresco, Inc.
Page 31 of 54
General Notes and Clarifications
General Scope of Services Comments:
•Unless specifically noted in the Scope of Services – abatement of ACM and other hazardous
materials is excluded.
•As final engineering is not started and equipment is not ordered until Ameresco has a signed
contract / notice to proceed - Ameresco cannot guarantee delivery dates / system start-up and
is not responsible for costs associated with additional mobilizations, temporary equipment,
etc. if long lead times affect construction schedule.
•Material ordering and final scheduling will not occur until a signed agreement is received.
•Ameresco pricing assumes 100% availability of rooms to do the work. Unless noted otherwise,
pricing based on first shift only (Monday through Friday).
•Unless specifically noted in the Scope of Services – paint / patch is excluded. If noted in the
Scope of Services – only the affected areas will be addressed (not the entire area / wall). Paint
will match existing adjacent as close as possible but an exact match cannot be guaranteed.
•Piping / conduit / wire mold may be run exposed in occupied spaces (as applicable).
•Unless specifically noted in the Scope of Services – conduit / wire mold is un-painted.
•Some existing equipment may be left abandoned in place.
•Unless specifically noted in the Scope of Services – no piping covers have been included.
•If applicable - tile and carpet in-fill strips will match adjacent existing as close as possible but
an exact match cannot be guaranteed.
•If applicable - existing ceiling tiles will be removed and reinstalled. New ceiling / grid is not
included in the Scope of Services unless specifically noted.
Lighting Scope Clarifications:
•The scope includes retrofit of the noted fixtures only and does not address or include any fix-
up / upgrade / replacement of existing wiring, switching, conduits, hangers, etc. If items are
found to be in need of repair or replacement – this is not included in the Scope of Services
and associated costing. The Scope of Services does include replacement of existing broken
lighting sockets when replacing bulbs.
•It is assumed that all emergency lighting is on generator or independent battery control.
Replacements of emergency ballasts are not included in the project.
•Replacement or repair of fixture lenses or louvers are not included, fixture lenses will be wiped
with a dry cloth.
•Ameresco is not responsible for fixtures that are found to be damaged prior to
commencement of its Scope of Services.
•All manufacturers’ warranties (and related information) will be transferred to Customer at
project close-out.
•With respect to the specific lighting scope - Ameresco will remove and lawfully recycle /
dispose of existing lamps and PCB ballasts. All ballasts that are determined to be non-PCB
shall be disposed of with non-hazardous waste. Noted items will be carefully recycled and
disposed of through a licensed recycling firm in accordance with all state and federal
guidelines. Certificates verifying the proper disposal and recycling of PCB containing materials
will be provided by the vendor.
•Lighting levels, if existing is identified to be over-lit per recommended standards, may be
reduced.
•Ameresco is not responsible for any pre-existing electrical code violations or electrical system
deficiencies.
Confidential & Proprietary Information of Ameresco, Inc.
Page 32 of 54
General Roof Scope Clarifications:
•Issues with existing roof deck and associated structural are excluded from the Scope of
Services. If identified during the project – this will be brought to the attention of Customer.
•Tuck pointing is excluded from roofing scope.
•Unless noted otherwise, the Scope of Services was developed in a manner that existing
equipment / rails / etc. do not need to be raised. If during installation, issues are noted – this
will be brought to the attention of Customer.
•ACM and hazardous materials abatement is excluded from the work scope.
•Replacement of existing water damaged interior ceiling tiles is not included.
•Replacement of existing water damaged insulation is excluded in the Scope of Services.
General Plumbing Scope Clarifications
•Plumbing materials, mounting hardware, and piping material are included.
•Any repairs to previous floor, tile or wall damage is excluded. Repairs (painting, patching,
etc.) to damage caused by Ameresco during installation is included.
•Caulking of new fixtures is included.
•Where ADA water closets exist that are scheduled for replacement as part of the Scope of
Services, Ameresco will replace with ADA water closets.
•Labor to replace shut off valves or repair main water valves that do not close completely or
that will not fully re-open is excluded. Ameresco will require the assistance of maintenance
staff, at no additional cost to Ameresco, to shut off zone valves or operating water mains
when bathroom fixture shutoff does not function correctly.
•Labor to repair previously deteriorated plumbing not associated with the work defined in
this scope is excluded.
•Upgrading bathrooms that are not ADA compliant to meet such standards is excluded.
•All warranty replacements of material when the contractor is not on site during warranty
period shall be installed by Customer.
•Temporary toilets are excluded.
•Major adjustments to wall hung toilet carriers to accept new fixtures are excluded.
•Enhancements to fixtures that are not covered in existing plumbing code are excluded.
•Remediation / replacement of floor or walls that are damaged due to existing leaks, etc. is
excluded.
Confidential & Proprietary Information of Ameresco, Inc.
Page 33 of 54
ATTACHMENT C
SAVINGS GUARANTEE
GUARANTEED SAVINGS AMOUNT; GUARANTEE PERIOD
Ameresco hereby guarantees to Customer that the amount of the Annual Savings shall equal or exceed
the “Guaranteed Savings” (as specified in Table C-1 below), over the Guarantee Period (defined
below).
The Annual Guaranteed Savings Amount is made up of two (2) savings components:
1.Energy (Electricity, Gas, and Water) Savings
2.Operating Cost Savings
Ameresco, guarantees the total Annual Guaranteed Savings Amount, but does not guarantee the
savings amount achieved by each individual savings measure.
Sources of Energy and Operating Cost Savings are set forth in Attachment G. Operating Cost Savings
can result from avoided expenditures for operations, maintenance, equipment repair, or equipment
replacement and/or capital funds for projects that, because of the project, will not be necessary
including costs of planned renovation, renewal, or repair avoided as a result of the Project.
Ameresco and Customer acknowledge and agree:
a)By completing the Project contemplated in this Agreement, Customer will eliminate the need
for the planned project(s) (identified in Attachment B, Scope of Services) and, in so doing,
customer will realize long term operating cost savings related to the related capital expense
associated with the planned project(s);
b)Accordingly, the Guaranteed Savings set forth herein and the Savings determined under the
M&V Plan include long term operating cost savings associated with related capital costs for
the planned project(s) (identified in Attachment B, Scope of Services) that, because of this
Project, will not be necessary.
Calculation of the Annual Savings, inclusive of Agreed Upon Savings, shall be performed under, and
governed by, the methods, formulas, and procedures described in the Measurement and Verification
Plan set forth in Attachment G.
Table C-1
Year Energy Savings Operating Cost Savings Total Guaranteed
Savings
1 $47,448 $199,866 $247,314
2 $48,871 $205,862 $254,733
3 $50,338 $212,038 $262,375
4 $51,848 $218,399 $270,247
5 $53,403 $224,951 $278,354
6 $55,005 $231,699 $286,705
Confidential & Proprietary Information of Ameresco, Inc.
Page 34 of 54
7 $56,655 $238,650 $295,306
8 $58,355 $245,810 $304,165
9 $60,106 $253,184 $313,290
10 $61,909 $260,780 $322,689
11 $63,766 $268,603 $332,369
12 $65,679 $276,661 $342,340
13 $67,649 $284,961 $352,611
14 $69,679 $293,510 $363,189
15 $71,769 $302,315 $374,085
16 $73,922 $311,385 $385,307
17 $76,140 $320,726 $396,866
18 $78,424 $330,348 $408,772
19 $80,777 $340,258 $421,035
20 $83,200 $350,466 $433,666
The Guarantee Period shall be 20 years unless terminated earlier as a result of termination of the
Agreement.
The Customer has reviewed the Guaranteed Savings calculations, assumptions, and methodologies
contained in the M&V Plan, Appendix 1, and Appendix 2, and the Baseline set forth in Attachment
G, and the Standards of Service and Comfort set forth in Attachment J and finds them to be reasonable.
This Attachment C, comprising 2 (two) pages, is attached to and made part of the Agreement.
CITY OF SOUTH BEND AMERESCO, INC
By: By:
Name: Name: Louis P. Maltezos
Title: Title: Executive Vice President
Date: Date:
Confidential & Proprietary Information of Ameresco, Inc.
Page 35 of 54
ATTACHMENT D (1)
DELIVERY AND ACCEPTANCE CERTIFICATE
PROJECT COMPLETION LOG
Sub-Project Tasks/Punch List items Completion Date
Items furnished to CUSTOMER with this Delivery and Acceptance Certificate:
Receipt of owner’s manuals; sets.
Receipt of instruction and training; ______________
Completion of inspection and walk-through.
Receipt of warranty information.
The punch list items are hereby completed in accordance with the Agreement. [Customer agrees that
the Energy Savings and Operating Cost Savings, as applicable, have been satisfied for the term of the
Guarantee Period.]
CUSTOMER By: Title: Date:
Notes (special instructions, etc.):
Confidential & Proprietary Information of Ameresco, Inc.
Page 36 of 54
ATTACHMENT D (2)
PERCENT COMPLETE ACKNOWLEDGEMENT CERTIFICATE
Customer hereby acknowledges receipt and acceptance of the __________ portion of the Energy
Conservation Measure (the "ECM") described in Attachment B to the Energy Services Agreement (the
"Agreement") dated _________________, 202_ between Customer and Ameresco. Customer
certifies that the work described in the related application for payment submitted by Ameresco has
been completed in accordance with the Agreement and that the ECM(s) are _____ percent complete,
as substantiated by sufficient detail provided by Ameresco. Customer agrees to make payment to
Ameresco as set forth in Section 4 of the Agreement.
Date Accepted by Customer:________________________
Accepted for:
Accepted by:
Name: _______________________________
Title: ______________________________
ACKNOWLEDGMENT OF AMERESCO
Ameresco hereby acknowledges that the total amount due based upon percent complete for the
ECM’s described in Attachment B, and the Notice to Proceed, hereto is $__________________.
Date Accepted by Ameresco:
Accepted for: AMERESCO, INC.
Accepted by:
Name:
Title:
Confidential & Proprietary Information of Ameresco, Inc.
Page 37 of 54
ATTACHMENT D (3)
SUBSTANTIAL COMPLETION CERTIFICATE
PROJECT NAME & ADDRESS: PROJECT NO.:
CONTRACT DATE:
DESCRIPTION:
The installation of [list each ECM being accepted with this certificate] under the Agreement has/have
been reviewed and found to be substantially complete. The date of Substantial Completion of the
forgoing ECM(s) is hereby established as:
SUBSTANTIAL COMPLETION DATE: ________________________________________
The date of Substantial Completion of an ECM is the date when such ECM is sufficiently
complete in accordance with the Agreement so that Customer derives beneficial use thereof.
The punch list items are hereby completed in accordance with the Agreement. [Customer
agrees that the Energy Savings and Operating Cost Savings, as applicable, have been satisfied
for the term of the Guarantee Period.]
The Substantial Completion date set forth above is the date of commencement of applicable warranties
for such ECM(s), as required by the Agreement. A list of items to be completed or corrected is
identified below as punch list items.
CONTRACTOR: Ameresco, Inc., 111 Speen Street, Suite 410, Framingham, Massachusetts
01701
AUTHORIZED
DATE:
NAME:
(type or print)
CUSTOMER:
AUTHORIZED
DATE:
NAME:
(type or print)
PUNCHLIST ITEMS
Attach additional page(s) as necessary. Number of pages attached .
Confidential & Proprietary Information of Ameresco, Inc.
Page 38 of 54
[Please Print On Customer Letter Head]
ATTACHMENT E
NOTICE TO PROCEED
MONTH DAY YEAR
Louis P. Maltezos
Executive Vice President
Ameresco, Inc.
10 S. LaSalle Street, Suite 3450
Chicago, IL 60603
SUBJECT: NOTICE TO PROCEED
Mr. Maltezos:
In accordance with the terms of the Energy Services Agreement dated ___________, 2021,
Customer hereby issues this Notice to Proceed to Ameresco in relation to the Scope of Services for
this Phase set forth this Agreement.
Sincerely,
CITY OF SOUTH BEND
_______________________
Name:
Title:
Confidential & Proprietary Information of Ameresco, Inc.
Page 39 of 54
ATTACHMENT F
CHANGE ORDER
Change Request No.
CUSTOMER:
Department:
Project No. Contract No. Site:
Title:
I. REQUEST Date:
(a)Requested by:Of
(b)Description of change:
II. AMERESCO’S AGREEMENT
For all costs involved in this change including extensions of time herein requested, Ameresco proposes
to perform the work described in accordance with the provisions of the Agreement for the price as
follows.
Payment shall be made on the basis of:
(a)Predetermined lump sum total of (add) (deduct)$
(b)Lump sum "not-to-exceed” (add) (deduct)$
(Max. price based on contract or Negotiated unit prices)
NOTE: ONLY IF RATE TABLE INCLUDED: ()
(c)Time & Material Basis
"not-to-exceed” (add) (deduct)$
(Computed in accordance with provisions of the Contract)
Place an "X" beside selected proposal method and strike out either (add) or (deduct) whichever does
not apply. If necessary, attach detailed estimates and breakdown for above in accordance with
change order instruction. A claim for work performed under protest may be submitted per (c)
above.
An extension of contract time of calendar days to
is requested.
ATTACHMENTS
Confidential & Proprietary Information of Ameresco, Inc.
Page 40 of 54
[Tailor to Change Order and Scope]
All references in the Agreement to Attachments shall also mean and refer to Attachments A-_, B-_
etc., as a separate Scope of Services. Attachments A-_ through J-_ shall be read and construed
separately from Attachments A-_ through J-_
All other provisions of the Agreement not expressly modified by this Change Order #__ shall
remain in full force and effect including, but not limited to, Section 25 of the Agreement,
Representations and Warranties, which representations and warranties are incorporated herein by
reference with respect to this Change Order #__.
IN WITNESS WHEREOF, the Parties hereto have caused this Change Order #__ to be duly
executed and delivered by their proper and duly authorized officers.
AMERESCO, INC.
:
______________________ ______________________
By: Louis P. Maltezos By:
Title: Executive Vice President Title:
Date: Date:
(Signature Required)
CUSTOMER APPROVAL:
CUSTOMER
Contract Award $
______________________ Previous Additions $
Previous Deductions $
By: __________________________ Net Total $
Title: ________________________ This Change $
Date: ________________________ Total $
Confidential & Proprietary Information of Ameresco, Inc.
Page 41 of 54
ATTACHMENT G
MEASUREMENT AND VERIFICATION PLAN;
METHODOLOGY OF CALCULATING SAVINGS
SECTION 1: SAVINGS MEASUREMENT AND VERIFICATION
Utility Rates
Table G1 summarizes the baseline utility rates. These rates were used in establishing the Baseline and
calculations in this Attachment G. Throughout the Term of the Guarantee Period the utility rates in
Table G1, escalated at 3.0% per year shall be used in determining Annual Savings. The Customer
acknowledges and accepts the utility rates set forth in Table G1 as reasonable. Table G2 summarizes
baseline data received by Ameresco from Customer.
Table G1: Utility Rates
Facility Electric Natural Gas
$/kWh $/kW $/Therm
Morris Performing Arts Center $0.097 $6.90 $0.57
Table G2: Existing Utility Information
Energy Savings
Actual Annual Savings from Energy Savings for the First Guarantee Year shall be determined as set
forth in Table G3 below based on U.S. DoE Federal Energy Management Program M&V Guidelines
Version 4.0. In each subsequent Guarantee Year, the actual Annual Savings determined for the First
Guarantee Year shall be escalated at a rate of 3.0% per year to determine the actual Annual Savings
from these measures for such Guarantee Year.
Confidential & Proprietary Information of Ameresco, Inc.
Page 42 of 54
Table G3: Measurement & Verification Methods for each ECM
ECM Minimum Baseline M&V
Requirements
Minimum Post Installation
M&V Requirement
Metered or
Measured Variables
Stipulated
Variables
Minimum Performance
Period M&V Requirements
ECM 1: Boiler &
Pump Replacement
M&V approach based on Option
A. The operation of the existing
equipment and the energy use
associated with this equipment has
been based on information
provided by the City as gathered
during the audit.
Ameresco will utilize a portable
combustion efficiency analyzer to
determine the actual efficiency of
the boiler at different firing rates.
Boiler combustion
efficiency
Weather, building
load
Measured combustion
efficiencies will be utilized to
determine achieved energy
savings. Ameresco will visually
inspect the equipment to verify
that the systems are operating
properly.
ECM 2: AHU-1
Replacement
ECM 3: RTU &
MAU Replacement
ECM 4: Heatpump
Controls Upgrades
ECM 5: New
Building Automation
System
M&V approach based on Option
A. The operation of the existing
equipment and the energy use
associated with this equipment has
been based on information
provided by the City as gathered
during the audit.
Ameresco will utilize the building
automation system to track
equipment performance data to
ensure that the equipment is
performing as intended.
Ameresco will monitor and
report equipment operation,
including runtimes, setpoints, and
VFD speeds to ensure that key
parameters are being achieved.
Equipment runtime,
setpoints, outside air
dampers, and VFD
speeds will be
recorded by the
building automation
system to verify the
savings are occurring
as expected.
Fan horsepower,
power draw of
equipment, and
annual load profile
will be as noted in
the savings
calculations.
Ameresco will visually inspect
the equipment to verify that the
systems are operating properly,
and the variable speed drives are
capable of reducing the motor
speeds. Analysis will be
performed of the trend data on
an ongoing basis to verify the
correct operation and the
reduction in speed.
ECM 6: Plumbing
Fixture Replacement
ECM 7: Roofing
Replacement
ECM 8: Fire Alarm
System Replacement
Agreed Upon Savings shall be
utilized for this ECM. The costs
associated with performing
measurement and verification for
this ECM would exceed the cost
savings projected for this ECM.
Not applicable Not applicable Not applicable Not applicable
Confidential & Proprietary Information of Ameresco, Inc.
Page 43 of 54
ECM 9: LED
Lighting Upgrades
M&V approach based on Option
A. Fixture wattages are from an
industry standard wattage table.
Operating hours to be based on
information provided by the city,
and industry standard burn hour
assumptions.
Fixture wattages, on a sample of
post-project installed fixtures
consisting of either single fixtures
or a circuit of fixtures shall be
measured on fixtures with a
population of 50 or more. Power
measurements will be compared
to values in the energy audit
tables.
One time
instantaneous power
using a true RMS
power meter.
Measurements will
follow 80/20
statistical precision
and confidence
criteria.
Baseline and post-
installation
(subject to one-
time post-retrofit
measurements)
fixture power
draw. Operating
hours will not
change and will be
as noted in the
savings calculation
table. Interactive
effects.
Adjust savings to measured
results.
Ameresco will visually inspect a
sample of lamps to verify the
lighting system performs as
intended and the lamp types are
as efficient as those proposed in
the energy audit.
Confidential & Proprietary Information of Ameresco, Inc.
Page 44 of 54
Operating Cost Savings
Actual Annual Savings from Operating Cost Savings shall be determined as set forth in Table G4
below, based on guidance from the U.S. DoE Federal Energy Management Program’s publication How
to Determine and Verify Operating and Maintenance (O&M) Savings in Federal Energy Savings
Performance Contracts, November 2007. This guidance allows for cost savings from avoided
renovation, renewal, or repair costs as a result of the Project.
Table G4: M&V Approach for Operating Cost Savings
M&V Plan
Description
Methods for the measurement and verification of Operating Cost Savings have
not been developed for either FEMP or IPMVP M&V Guidelines. However,
FEMP does provide a guidance publication on verification of O&M Savings,
including avoided current or planned capital expense. This approach has been
customized for this project based on the FEMP guidance document.
For this project, there is one (1) stream of Operating Cost Savings – Related
Capital Expenditures.
•Operating Cost Savings – Related Capital Expenditures - Avoided
future equipment replacement and/or capital fund project (Related Capital
Expenditures). This is associated with all ECMs (1-9)
Baseline
Performance
Parameters
For Operating Cost Savings – Related Capital Expenditures, the baseline
performance parameters are the cost budget estimates for the alternative project
that the Customer would have undertaken to complete the Scope of Services and
meet the functional requirements for such Scope
Post Installation
Performance
Parameters
For Operating Cost Savings - Avoided future equipment replacement and/or
capital funded project (Related Capital Expenditures) associated with ECMs (1-9),
the post installation performance parameters are the actual cost for completing
the Scope of Services under this Agreement and the delivered functional
capability of the Scope of Services as documented prior to final delivery and
acceptance and / or the M&V Report.
The Operating Cost Savings for the first Guarantee Year (“Year 1 Operating Cost
Savings”) is noted in Table G6.
Performance
Assurance
Activities
The Project site will be surveyed with the Customer to confirm the Scope of
Services is complete and in conformance with the Scope of Services and are
performing as specified prior to delivery and acceptance.
If the Scope of Services has been completed per the specifications / Scope of
Services, meeting the functional requirements of the Customer, then at final
acceptance, it will be agreed that the Operating Cost Savings identified in Table
G6 will be deemed achieved and will be documented in the delivery and
acceptance certificate and / or the M&V Report.
Ameresco shall develop, send to Customer for signature, and submit the GESC
Report to the State of Indiana for as long as GESC Services are provided.
M&V Services
For each Guarantee Year for which M&V Services are to be performed, Ameresco will perform the
M&V Services and submit to Customer a measurement and verification report for the Property (the
“M&V Report”), which shall include a guarantee reconciliation (the “Guarantee Reconciliation”) upon
the later of (i) ninety (90) days after the end of each Guarantee Year and (ii) sixty (60) days after
Confidential & Proprietary Information of Ameresco, Inc.
Page 45 of 54
Ameresco receives or obtains Customer’s available energy usage data for the Guarantee Year in
question, if requested. The Guarantee Reconciliation will set forth the calculation of the cumulative
Annual Savings achieved in relation to the cumulative Guaranteed Savings for the period being
reconciled.
The M&V Services will be performed and an M&V Report delivered for Guarantee Years 1 through
20 of the Guarantee Period. By written notice to Ameresco provided no later than ninety (90) days
after the commencement of any subsequent and consecutive Guarantee Year, Customer, in its sole
discretion, may elect to discontinue the M&V Services. If the Customer does elect to discontinue the
M&V Services within the stated timeframe, the Guaranteed Savings will be deemed achieved for the
balance of the Guarantee Period and no further M&V Services will be performed. The Guaranteed
Savings will be deemed achieved for each year for which M&V Services are not required to be
performed.
The Customer must pay the stated M&V fee listed in Attachment I in advance of each given year for
the M&V Services to be provided as required by the Section 4(d) of the ESA. Failure to pay the M&V
Services fee when due on an annual basis will result in termination of the M&V Services, and the
Guaranteed Savings shall be deemed achieved for each Guarantee Year for which payment was not
made and for the balance of the Guarantee Period.
In the event of early termination of this Agreement or of the M&V Services, unless termination is
effective on the last day of the Guarantee Year then in effect, no annual M&V Report will be produced
for the Guarantee Year then in effect, and the Guaranteed Savings shall be deemed achieved for the
Guarantee Year then in effect and for the balance of the Guarantee Period.
Routine and Non-Routine Adjustments to the Baseline
This Attachment G: Savings Measurement and Verification Plan describes the specific measurement
and verification plan for each energy conservation measure. Contained within each plan are the
calculation formulas for determining energy savings, including adjustments to the energy baseline
during the M&V Term to address routine and non-routine adjustments. Baseline adjustments for
routine and non-routine adjustments are discussed below:
Routine Adjustments
Routine adjustments are changes to the baseline energy consumption due to factors which are both
significant to the energy consumption and vary predictably. Factors resulting in routine adjustments
include, but are not limited to, weather, building temperature setpoint, hours of operation, and number
of occupants. Routine adjustments, if required according to the respective measurement and
verification plan, will be performed annually and will affect the Guarantee Period in which the
adjustment occurs only, and will not be continued into later Guarantee Periods. If routine adjustments
result in a reduction of energy savings and are beyond the control of Ameresco, the value of the Savings
Guarantee will be reduced by the magnitude of the routine adjustment.
Non-Routine Adjustments
Non-routine adjustments are changes to the baseline energy consumption due to factors that are
significant to the energy consumption but do not vary predictably. Factors resulting in non-routine
adjustments include, but are not limited to, additions or reductions to the area of a building, changes
to the use of a building, installation, modification, or replacement of equipment, and changes to the
building envelope. Non-routine adjustments, if required according to the respective measurement and
verification plan, will be performed once and will be affective for the remainder of the Guarantee
Period. If non-routine adjustments result in a reduction of energy savings and are beyond the control
of Ameresco, the value of the Savings Guarantee will be reduced by the magnitude of the routine
adjustment.
Confidential & Proprietary Information of Ameresco, Inc.
Page 46 of 54
Reporting of Routine and Non-Routine Adjustments
Both Ameresco and Customer share responsibility in identifying routine and non-routine adjustments.
Ameresco will monitor key parameters and perform site visits as required per the measurement and
verification plan. If, during the course of these actions, Ameresco identifies operations or changes to
the buildings or systems that would result in a baseline adjustment, Ameresco will notify Customer
accordingly as outlined in the measurement and verification plan. Customer is obligated to notify
Ameresco when material changes occur within the facilities and provide additional information, if
required, to perform baseline adjustments, including, but not limited to, equipment submittals, building
plans, and dates that such changes occurred. Ameresco will calculate baseline adjustments, when
required, and submit the results to Customer and its agents.
Guarantee Reconciliation
If, for any Guarantee Year during the M&V Term, the Guaranteed Savings is not achieved, as
evidenced by the fact that the Annual Savings as detailed in the M&V Report is less than the
Guaranteed Savings for the same period, Ameresco shall pay Customer the amount (the “Savings
Shortfall”) by which the Guaranteed Savings exceeds the Annual Savings, or, by mutual written
agreement of the Parties, in lieu of making a payment of the Savings Shortfall Ameresco may rectify
the Savings Shortfall through installation of additional ECM(s) or modifications. Such payment,
installation or modification shall be the sole and exclusive remedy of Customer in the event of a Savings
Shortfall. Any such payments shall be included in the aggregate savings total for purposes of future
Guarantee Reconciliations.
In addition, in the event of a Savings Shortfall, Ameresco shall have the right but not the obligation, at
Ameresco’s sole discretion and expense, to install additional ECM(s) or modifications to mitigate any
future Savings Shortfall with the approval of Customer, such approval not to be unreasonably withheld,
conditioned or delayed. If, in any Guarantee Year, the Annual Savings exceed the Guaranteed Savings
for such Guarantee Year, the excess savings will be used first to reimburse Ameresco for any Savings
Shortfall payments made in previous years, whether such payment was made in cash or through
installation of additional ECMs, with the balance included in the Annual Savings amount for the
succeeding Guarantee Year.
Dispute Resolution
Any dispute, claim or disagreement of any kind or nature between the Parties arising out of or in
connection with this M&V Plan, Adjustment to the Baseline or the Savings Guarantee shall be resolved
in accordance with the Dispute Resolution procedures set forth in Section 13 of the Agreement.
Confidential & Proprietary Information of Ameresco, Inc.
Page 47 of 54
SECTION 2: METHODOLOGY USED TO CALCULATE PROJECT SAVINGS
The methodology used for projecting savings resulting from the implementation of the Project is
summarized in the following equation:
Annual Savings = Energy Savings + Operating Cost Savings
Savings = (Baseline Period Use or Demand – Reporting Period Use of Demand) ±
Adjustments
Where:
Annual Savings: The total annual savings associated with implementation of this Project.
This is the savings figure that will be used for comparison to the Guaranteed Savings as part
of the Guarantee Reconciliation.
Energy Savings: The total Energy Savings associated with reduction in energy consumption
as a result of implementation of this Project.
Operating Cost Savings: Operating Cost Savings can result from avoided expenditures for
operations, maintenance, equipment repair, or equipment replacement and/or capital funds
for projects that, because of the Project, will not be necessary. Sources of Operating Cost
savings may include: i) avoided current or planned capital expense, ii) avoided O&M and/or
equipment repair and replacement expense, and, iii) avoided renovation, renewal, or repair
costs as a result of the Project.
ENERGY SAVINGS
Table G5: Summary of Annual Savings
The following details the savings calculations associated with each Energy Conservation
Measure (ECM) included in Attachment B.
See Appendix 2 for detailed savings calculations.
Confidential & Proprietary Information of Ameresco, Inc.
Page 48 of 54
OPERATING COST SAVINGS
Operating Cost Savings includes avoided related capital expenditures for equipment replacement
and/or capital funds for projects that, because of the Scope of Services of this project, will not be
necessary. Sources of Operating Cost savings may include: i) avoided current or planned capital
expense, ii) avoided O&M and/or equipment repair and replacement expense, and, iii) avoided
renovation, renewal, or repair costs as a result of the project.
Deferring the related capital expenditure Scope of Services items included in this Agreement will result
in increased costs in the future when implemented. Ameresco uses RS Means construction data, as
well as recent project cost information (including data from bids for work to be performed), to
determine approximate replacement values for the various building systems impacted by this Project.
The current costs are then modified for performing this work in the future utilizing inflation, cost of
money, economies of scale, and other factors as applicable. The increased future costs are then
annualized, based on a project term, to determine the Year 1 Operating Cost Savings value.
From the Scope of Services related to the installation of the ECMs, the Customer will have a Year 1
Operating Cost Savings (related capital expenditures) of $199,866
Table G6: Year 1 Operating Costs Savings
Year Related Capital
Expenditures Savings
1 $199,866
The Customer has identified the need for improving its existing facilities in order to address known
building deficiencies, extend the building / systems useful life, and address occupant comfort issues.
As a result, the Customer has developed estimates for the costs of the Scope of Services included in
the ECMs if a separate project had to be performed to complete such Scope. The Customer desires
to incorporate the Scope of Services into this Agreement in order to ensure such Scope is completed
within the schedule and cost agreed to with Ameresco. The Customer finds that the Year 1
Operating Cost Savings identified in Table G6 are reasonable estimates of the costs avoided by
incorporating the Scope of Services into the Agreement and agrees and accepts these Year 1
Operating Cost Savings subject to completion of the M&V Services set forth in this Attachment G.
In each subsequent Guarantee Year, the Year 1 Operating Cost Savings determined for the First
Guarantee Year shall be escalated at a rate of 3.0% per year to determine the total Operating Cost
Savings.
Confidential & Proprietary Information of Ameresco, Inc.
Page 49 of 54
This Attachment G, comprising nine (9) pages, is attached to and made part of the Agreement.
CITY OF SOUTH BEND AMERESCO, INC
By: By:
Name: Name: Louis P. Maltezos
Title: Executive Vice President
Date: Date: Date:
Title:
Confidential & Proprietary Information of Ameresco, Inc.
Page 50 of 54
ATTACHMENT H
TRAINING
Ameresco shall provide training on the intent, design, operating requirements and operational and
maintenance requirements for all ECMs installed. The following section defines the intent, personnel
to be involved, logistics, and tracking and documentation for the Training Plan that shall be provided
by Ameresco. The table below indicates total number of training hours per ECM.
Ameresco will implement a training program that involves classroom and hands-on/field training.
Training sessions will include a review of the overall installation and performance characteristics of
installed Energy Conservation Measures. Documentation will include review of O&M manuals,
drawings, and equipment specification literature. Facilities personnel, and select building occupants,
will receive comprehensive manuals for reference. The primary goal of Ameresco’s training program
will be to educate designated operations, maintenance, and building staff in the key areas that relate
to the ECMs installed throughout the project. Ameresco has identified three (3) levels of training
which may be required depending on the specific ECMs which are installed. Refer to the following
Training Matrix for applications of Training Levels.
•Level 1: For systems and equipment which are essentially direct replacements of existing
equipment, such that no additional skills will be required to perform operations and
maintenance functions, the training will be limited to a general overview of the equipment
installed, a review of the manufacturer’s O&M manuals, and an explanation of equipment
warranties. This level of training will provide operations and maintenance staff the familiarity
with the equipment that is installed, manufacturer’s recommended maintenance procedures,
and all warranty information. This training will be conducted one time and will include up to
8 hours of classroom instruction for all ECMs designated for Level 1 training.
•Level 2: For systems and equipment which are new to the site, and require some general
understanding as to their function and operation, training will include a minimum amount of
classroom instruction that will provide an overview of the specific technology selected, specific
equipment installed, review of the manufacturer’s O&M manuals, and an explanation of
equipment warranties. Following the classroom training session, a site tour will be scheduled
to view the specific installation and operation of the equipment. This level of training will
provide operations and maintenance staff with additional equipment details (including
equipment cut sheets), familiarity with the equipment that is installed, manufacturer’s
recommended maintenance procedures, and all warranty information. This training will be
conducted one time and will include up to 12 hours of combined classroom and field
instruction for all ECMs designated for Level 2 training.
•Level 3: For systems and equipment which are new to the site, and are more complex in
nature - training will be directed to facilities engineering and the operations and maintenance
staff. Level 3 training will require more extensive classroom training to discuss design intent,
specific system design, energy efficiency considerations, seasonal modes of operations,
comfort conditions, operation of individual components, emergency conditions, sequences of
operations, alarms, diagnostics, and any additional ECM specific information as required. This
Confidential & Proprietary Information of Ameresco, Inc.
Page 51 of 54
training will be conducted up to two (2) sessions and will include up to 12 hours per session
of combined classroom and field instruction for all ECMs designated for Level 3 training.
o Level 3 classroom training will also include a review of the manufacturer’s operation
and maintenance manuals, and an explanation of equipment warranties. Following
the classroom training session, a site tour will be scheduled to view the specific
installation, operation of the equipment, and hands on maintenance instructions by
qualified personnel and manufacturers’ representatives. This level of training will
provide staff with a comprehensive understanding of all equipment details as well as
hands on familiarity with the equipment that is installed and a detailed review of
manufacture’s recommended maintenance procedures and warranty information.
Note: “Classroom” refers to a setting where information is presented to
Customer personnel and may occur on-site in a meeting room, office, boiler
room, etc.).
The Customer shall provide suitable space and make personnel available, as reasonably
required for Ameresco to conduct training under this Attachment H.
Training Matrix
ECM# ECM Description Level 1 Level 2 Level 3
1 Boiler & Pump Replacement X
2 AHU-1 Replacement X
3 RTU & MAU Replacement X
4 Heatpump Controls Upgrades X
5 New BAS for Complete Building
Control
X
6 Plumbing Fixture Replacement X
7 Roofing Replacement X
8 Fire Alarm System
Replacement
X
9 LED Lighting Upgrades X
Confidential & Proprietary Information of Ameresco, Inc.
Page 52 of 54
ATTACHMENT I
MEASUREMENT AND VERIFICATION FEE SCHEDULE
Fees for M&V Services will be due and payable as provided in Section 4(d) of the ESA and
Attachment G.
Year M&V Cost IC § 36-1-12.5-10
GESC Report Cost
1 $3,600 $500
2 $3,708 $515
3 $3,819 $530
4 $3,934 $546
5 $4,052 $563
6 $4,173 $580
7 $4,299 $597
8 $4,428 $615
9 $4,560 $633
10 $4,697 $652
11 $4,838 $672
12 $4,983 $692
13 $5,133 $713
14 $5,287 $734
15 $5,445 $756
16 $5,609 $779
17 $5,777 $802
18 $5,950 $826
19 $6,129 $851
20 $6,313 $877
Fees for M&V Services are based on Customer’s compliance with its obligations to provide energy
usage data, including remote access to, and the collection of data from, the Monitoring System
and/or Customer’s network server.
Ameresco’s compensation for performing M&V Services is included in the table above. If the M&V
Services are terminated for any reason, Customer shall continue to pay Ameresco, as provided in
Section 4(d) of the Agreement, an annual fee, for preparing all GESC reports under IC § 36-1-12.5-
10 and providing them to Customer to sign and submit, in the amount of $500 for the second
Guarantee Year, and escalating at 3.0% per year for each Guarantee Year thereafter. For clarity, the
IC § 36-1-12.5-10 Cost is only required if M&V Services are terminated.
Confidential & Proprietary Information of Ameresco, Inc.
Page 53 of 54
ATTACHMENT J
CUSTOMER’S MAINTENANCE RESPONSIBILITIES;
STANDARDS OF SERVICE AND COMFORT
SECTION 1. CUSTOMER’S MAINTENANCE RESPONSIBILITIES
Customer, at its own expense, will keep and maintain, or cause to be kept and maintained, the ECMs
and all equipment in as good operating condition as when delivered to the Customer hereunder,
ordinary wear and tear resulting from proper use thereof alone excepted, and will provide maintenance
and service and make all repairs necessary for such purpose. Responsibility for the proper
maintenance, service, repair and adjustments to each ECM, ECM system and related ancillary systems
and equipment, including related expenses, shall transfer to the Customer on an ECM by ECM basis
on the date of “Substantial Completion” of each ECM as such date is determined in accordance with
the definition of Substantial Completion set forth in Section 1 of the Agreement. The Customer will
be responsible for such maintenance, service, repair and adjustments for the remainder of the Term.
Operation and Maintenance Manuals (O&M Manuals) will be provided to the Customer, by the ESCO.
Included with the O&M manuals will be a list of maintenance responsibilities and tasks for the
Customer.
Start-up and Shutdown: The Customer’s responsibilities include all system start-ups and shut-downs.
System start-up (beginning of season) and shut-down (end of season) refers to specific manufacturer
recommendations with respect to “proper” system start-up, operation, maintenance, and shut-down
as defined in the manufacturer’s installation / operation / maintenance (O&M) manuals which will be
provided to the Customer upon Substantial Completion and / or Delivery and Acceptance, as
appropriate.
Operations: The Customer shall operate the equipment installed hereunder in accordance with
parameters noted in the manufacturers’ recommendations, and any supplemental procedures supplied
to the Customer by ESCO, including those set forth in the O&M manuals. The Customer shall also
operate the equipment and systems (including ancillary related systems) in accordance with Section 2
below, Standards of Comfort.
Maintenance: The Customer’s maintenance responsibilities include the proper operation and prompt
repair and maintenance of each ECM, ECM system and related ancillary systems and equipment such
that they are maintained in good working order during the Term. The Customer shall repair and
maintain (i) the equipment and all other components which comprise the ECM and (ii) all other
equipment which is attached thereto and/or is integral to the proper functioning of the ECM, including
performance of the maintenance tasks, manufacturer’s recommendations and supplemental procedures
included in the O&M Manuals. Maintenance also refers to performing required maintenance of
ancillary systems.
In addition to any of its other obligations under this Agreement, Customer agrees to operate and maintain
all ECM’s to the standards set forth in this Attachment J. Deviation from these standards may result in
adjustments to the Baseline, the Guaranteed Savings or the determination of Annual Savings.
Confidential & Proprietary Information of Ameresco, Inc.
Page 54 of 54
SECTION 2. STANDARDS OF SERVICE AND COMFORT
Space temperature set points for locations served by new controls and programmable thermostats will be
set and maintained by Customer as shown in the tables below. Ameresco shall not be responsible for
existing HVAC equipment and ancillary services (HVAC equipment ancillary services not replaced as part
of project) ability to meet the space temperatures provided in the following tables. Deviation from these
standards may result in adjustments to the Baseline, the Guaranteed Savings Amount and/or the
determination of Annual Savings.
Heating Set Points:
Space Maximum Temperature
Occupied/Events
e 72°F
Palais Ballroom 72°F
Offices 72°F
Unoccupied
Morris Theater 68°F
Palais Ballroom 68°F
Offices e
Storage area requiring heat 40° F, except where existing use does not permit
Areas not requiring heat Minimum temperature required to prevent damage to the facility
Cooling Set Points:
Space Minimum Temperature
Occupied
Morris Theater 72°F
Palais Ballroom 72°F
Offices 72°F
Unoccupied
Morris Theater 74°F
Palais Ballroom 74°F
Offices 74°F
Storage area requiring heat N/A
Areas not requiring heat N/A
Non-Collusion Non-Debarment Affidavit Non Iran Form 2016
ATTACHMENT K
CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
Non-Collusion Non-Debarment Affidavit Non Iran Form 2016
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this
Affidavit.
CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT AFFIDAVIT,
CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY
VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE
OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF )
) SS:
COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that:
1.Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or
agreement with any person relative to the price to be bid by anyone at such letting nor to prevent
any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made
without reference to any other bid and without any agreement, understanding or combination with
any other person in reference to such bidding. Contractor further says that no person or persons,
firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift,
commission or thing of value on account of such sale; and
2.Contractor certifies by submission of this proposal that neither contractor nor any of its
principals are presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from participation in this transaction by any Federal department or agency;
and
3.Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment
activities in Iran.
a.For purposes of this Certification, “Iran” means the government of Iran and any agency or
instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from
time-to-time.
b.As provided by Ind. Code § 5-22-16.5-8, as amended from time-to-time, a Contractor is
engaged in investment activities in Iran if either:
Illinois
Cook
Non-Collusion Non-Debarment Affidavit Non Iran Form 2016
i.Contractor, its successor or its affiliate, provides goods or services of twenty million
dollars ($20,000,000) or more in value in the energy sector of Iran; or
ii.Contractor, its successor or its affiliate, is a financial institution that extends twenty
million dollars ($20,000,000) or more in credit to another person for forty-five (45)
days or more, if that person will (i) use the credit to provides goods and services in
the energy sector in Iran; and (ii) at the time the financial institution extends credit, is
a person identified on list published by the Indiana Department of Administration.
4.Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized
alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of
Contractor’s newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3.
Contractor’s documentation of enrollment and participation in the E-Verify Program is included
and attached as part of this bid/quote; and
5.Contractor shall require his/her/its subcontractors performing work under this public contract
to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien,
nor retain any employee or contract with a person that the subcontractor subsequently learns is an
unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify
Program. The Contractor agrees to maintain this certification throughout the term of the contract
with the City of South Bend, and understands that the City may terminate the contract for default
if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being
notified by the City.
6.Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against
any employee or applicant for employment in the performance of a City contract with respect to
hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly
related to employment because of race, sex, religion, color, national origin, ancestry, age, gender
expression, gender identity, sexual orientation or disability that does not affect that person's ability
to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or
any combination of the foregoing including, but not limited to, public works contracts awarded
under public bidding laws or other contracts in which public bids are not required by law, the City,
its agencies, boards, or commissions may consider the Contractor’s good faith efforts to obtain
participation by those Contractors certified by the State of Indiana as a Minority Business
(“MBE”) or as a Women’s Business Enterprise (“WBE”) as a factor in determining the lowest,
responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a
subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said
Non-Collusion Non-Debarment Affidavit Non Iran Form 2016
WBE/MBE. A finding of a discriminatory practice by the City’s MBE/WBE Utilization Board
shall prohibit that person or entity from being awarded a City contract for a period of one (1) year
from the date of such determination, and such determination may also be grounds for terminating
the contact for which the discriminatory practice or noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be
made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana
or any of its agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for
employment in the performance of this contract with privileges of employment, or any matter
directly or indirectly related to employment, because of race, religion, color, sex, gender
expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of
this provision may be regarded as material breach of contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-
8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel
products or foundry products made in the United States on this project if awarded. I understand I
have an affirmative duty to notify the City in my bid that my proposal does not include the use of
steel products or foundry products made in the United States. I understand it is my sole obligation
and responsibility to provide a justification to the City, subject to review and approval, why the
cost of United States made steel or foundry products is unreasonable. Prior to award and upon
submission of bid which does not use steel products or foundry products made in the United States,
the City, through its director of public works, shall make a determination if the price of United
States made steel or foundry is unreasonable. I understand that violations hereunder may result in
forfeiture of contractual payments.
***
SIGNATURE PAGE FOLLOWS
APPENDIX 1: LIGHTING LINE BY LINE
ECM 1: LED Lighting Upgrades
Type Qty Watts KWH Use Type Qty Watts KWH UseKWH SavingTypeQtyBurnWH UH SavDemand kWkWhg Penalty Tling Savings kMOREXT157 EXTERIOR 4,380 RC12 8 75 2,628LD5.28 10 350 2,278000 0 0.52 2,278‐38 44RECESS CAN: WITH (1) 75 WATT R30 HALOGEN FLOOD LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEMOREXT158 EXTERIOR 4,380 WP3 7 26 797LED197 18 552 245000 0 0.06 245‐45WALL PACK JELLY JAR: WITH (1) 26 WATT CFL LAMPWALL PACK: NEW REPLACEMENT 18 WATT LED FIXTURE, PHOTOCELLLEAVE ALONEMOREXT159 EXTERIOR 4,380 H21 7 215 6,592LED137 25 767 5,825000 0 1.33 5,825‐96 113WALL PACK: WITH (1) 175 WATT MH LAMP, (1) MAGNETIC BALLASTWALL PACK: NEW REPLACEMENT 25 WATT LED FIXTURE, PHOTOCELLLEAVE ALONEMOREXT160 EXTERIOR 4,380 C2 1 60 263LED181 25 110 153 PC11##55 55 0.04 208‐34 60 WATT INCANDESCENT LAMPCANOPY: NEW REPLACEMENT 25 WATT LED FIXTURE, PHOTOCELL FIXTURE MOUNTED PHOTOCELLMOREXT161 EXTERIOR ‐ POLES 4,380 H26 2 460 4,030LED16.12 109 955 3,075000 0 0.70 3,075‐51 59POLE MOUNTED SHOE BOX WITH (1) 400 WATT MH LAMP, (1) MAGNETIC BALLASTSHOE BOX: NEW REPLACEMENT 109 WATT LED FIXTURE, PHOTOCELLLEAVE ALONEMOREXT162EXTERIOR 4,380 WP3 1 26 114LED19.11187935000 0 0.01 35‐11WALL PACK JELLY JAR: WITH (1) 26 WATT CFL LAMPWALL PACK: NEW REPLACEMENT 18 WATT LED FIXTURE, PHOTOCELLLEAVE ALONEMOREXT163EXTERIOR 4,380 LD6 2 16 140LA2 16 140 0000 0 0.00 0 0 016 WATT PAR38 LED FLOOD LAMPLEAVE ALONELEAVE ALONEMOREXT164EXTERIOR 4,380 H22 1 295 1,292LED201 70 307 986000 0 0.23 986‐16 19WALL PACK: WITH (1) 250 WATT MH LAMP, (1) MAGNETIC BALLASTWALL PACK: NEW REPLACEMENT 70 WATT LED FIXTURE, PHOTOCELLLEAVE ALONEMOREXT169 MARQUE SIGN 4,380 CC1 1,700 3 22,338LD291,700 2 11,169 11,169000 0 2.55 11,169‐185 216 3 WATT COLD CATHODE LAMPRETROFIT WITH (1) 1.5 WATT LED S14 LAMP LEAVE ALONEMOREXT170 MARQUE SIGN 4,380 S4H 4 75 1,314LT20.24 11 193 1,121000 0 0.26 1,121‐19 224' SIGN LIGHTING STRIP: WITH (1) 4' 60 WATT T12HO LAMP, (1) MAGNETIC BALLASTRETROFIT WITH (1) 4' 11 WATT LED T8HO LAMP, BYPASS BALLASTLEAVE ALONEMOREXT171 MARQUE SIGN 4,380 S8H 4 125 2,190LT22.24 21 368 1,822000 0 0.42 1,822‐30 358' SIGN LIGHTING STRIP: WITH (1) 8' 110 WATT T12HO LAMP, (1) MAGNETIC BALLASTRETROFIT WITH (1) 8' 21 WATT LED T8HO LAMP, BYPASS BALLASTLEAVE ALONEMOREXT172 MARQUE SIGN 4,380 S6H 6 100 2,628LT21.26 16 420 2,208000 0 0.50 2,208‐37 436' SIGN LIGHTING STRIP: WITH (1) 6' 85 WATT T12HO LAMP, (1) MAGNETIC BALLASTRETROFIT WITH (1) 6' 16 WATT LED T8HO LAMP, BYPASS BALLASTLEAVE ALONEMORRIS1 B HALL/VASES 3,000 F11 2 7 42LD126 33 9000 0 0.00 9 0 0 7 WATT CFL LAMPRETROFIT WITH (1) 5.5 WATT A19 LED LAMP LEAVE ALONEMORRIS2 B HALL 3,000 CH3 6 30 540LD116 14 243 297000 0 0.10 297‐56 CHANDILIER: WITH (3) 10 WATT CFL LAMPSRETROFIT WITH (3) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEMORRIS3 B STORAGE 200 I1R 1 59 12LT2L.1127 5 6000 0 0.03 6 0 04' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS4 B GRANADA 2,000 CH1D 4 320 2,560LD124 54 432 2,128000 0 1.06 2,128‐35 41CHANDILIER: WITH (8) 40 WATT INCANDESCENT TORCH LAMPS, DIMMINGRETROFIT WITH (12) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEMORRIS5 B GRANADA 2,000 RC4D 35 100 7,000LD435 16 1,120 5,880000 0 2.94 5,880‐97 114RECESS CAN: WITH (1) 100 WATT INCANDESCENT A LAMP, DIMMINGRETROFIT WITH (1) 16 WATT LED A21 LAMP LEAVE ALONEMORRIS6 B GRANADA 2,000 RC6 2 65 260LD52 10 40 220000 0 0.11 220‐44RECESS CAN: WITH (1) 65 WATT INCANDESCENT R30 FLOOD LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEMORRIS7 B ELECT 500 I1R 2 59 59LT2L.12272732000 0 0.06 32‐114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS8 B REST 2,000 RF4 9 26 468LT119 10 180 288000 0 0.14 288‐56RECESS CAN: WITH (1) 26 WATT PL LAMP, (1) ELECTRONIC BALLASTRETROFIT WITH (1) 10 WATT LED PL LAMP, BYPASS BALLASTLEAVE ALONEMORRIS9 B REST 2,000 SC4 2 69 276LD32 12 48 228000 0 0.11 228‐44SCONCE: WITH (1) 69 WATT A INCANDESCENT A LAMPRETROFIT WITH (1) 12 WATT LED A19 LAMP LEAVE ALONEMORRIS10 B CUST 500 W1R 1 59 30LT2L.11271416000 0 0.03 16 0 04' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS11 B COATS 1,500 RC2 5 60 450LD35 12 90 360000 0 0.24 360‐67RECESS CAN: WITH (1) 60 WATT INCANDESCENT A LAMPRETROFIT WITH (1) 12 WATT LED A19 LAMP LEAVE ALONEMPAC Room by Room ReportArea InformationLightingDescriptionBld Map Flr Description BurnExisting Fixture Proposed Fixture Occupancy SensorsExisting Fixture Proposed Fixture Proposed SensorSavingsPage 1 of 14
Type Qty Watts KWH Use Type Qty Watts KWH UseKWH SavingTypeQtyBurnWH UH SavDemand kWkWhg Penalty Tling Savings kMPAC Room by Room ReportArea InformationLightingDescriptionBld Map Flr Description BurnExisting Fixture Proposed Fixture Occupancy SensorsExisting Fixture Proposed Fixture Proposed SensorSavingsMORRIS12 B CONCESSIONS 1,500 CH7D 4 102 612LD134 14 81 531000 0 0.35 531‐910CHANDILIER: WITH (3) 34 WATT INCANDESCENT A LAMPS, DIMMINGRETROFIT WITH (3) 4.5 WATT LED FILAMENT A15 LAMPSLEAVE ALONEMORRIS13 BMURAL2,000 MR16 1 45 90LD91 8 16 74000 0 0.04 74‐11 45 WATT MR16 HALOGEN FLOOD LAMPRETROFIT WITH (1) 8 WATT LED MR16 LAMP LEAVE ALONEMORRIS14 BREST2,000 RF4 15 26 780LT1115 10 300 480000 0 0.24 480‐89RECESS CAN: WITH (1) 26 WATT PL LAMP, (1) ELECTRONIC BALLASTRETROFIT WITH (1) 10 WATT LED PL LAMP, BYPASS BALLASTLEAVE ALONEMORRIS15 BREST2,000 SC4 5 69 690LD35 12 120 570000 0 0.29 570‐911SCONCE: WITH (1) 69 WATT A INCANDESCENT A LAMPRETROFIT WITH (1) 12 WATT LED A19 LAMP LEAVE ALONEMORRIS16 B CONCESSIONS 1,500 RC2D 6 60 540LD26 9 81 459000 0 0.31 459‐89RECESS CAN: WITH (1) 60 WATT INCANDESCENT A LAMP, DIMMINGRETROFIT WITH (1) 9 WATT LED A19 LAMP LEAVE ALONEMORRIS17 B STAIRS 3,000 CH7D 1 102 306LD13.11 14 41 266000 0 0.09 266‐45CHANDILIER: WITH (3) 34 WATT INCANDESCENT A LAMPS, DIMMINGRETROFIT WITH (3) 4.5 WATT LED FILAMENT A15 LAMPSLEAVE ALONEMORRIS18 B OPEN AREA 8,760 I1R 2 59 1,034LT2L2 27 473 561000 0 0.06 561‐9114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS19 B OPEN AREA 3,000 I1R 10 59 1,770LT2L10 27 810 960000 0 0.32 960‐16 194' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS20 B ORCHESTRA PIT 200 F4 2 26 10LD4.2216 6 4000 0 0.02 4 0 0 26 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 16 WATT LED A21 LAMP LEAVE ALONEMORRIS21 B LOUNGE 3,000 T2R 5 59 885LT2L5 27 405 480 O21##### ### 0.16 683‐11 132X4 TROFFER: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTOCCUPANCY SENSOR: (1) LOW VOLTAGE CEILING MOUNTEDMORRIS22 B TASK 3,000 S1R 5 32 480LT1L.15 14 210 270000 0 0.09 270‐454' STRIP: WITH (1) 4' LINEAR 32 WATT T8 LAMP, (1) ELECTRONIC BALLASTRETROFIT WITH (1) LINEAR 4' 13 WATT LED T8 LAMP, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS23 B HALL 8,760 I1R 5 59 2,584LT2L5 27 1,183 1,402000 0 0.16 1,402‐23 274' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS24 B HALL 3,000 I1R 9 59 1,593LT2L9 27 729 864000 0 0.29 864‐14 174' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS25 B FAC REST 500 I1R 1 59 30LT2L.11271416000 0 0.03 16 0 04' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS26 B DRESSING 8,760 I1R 1 59 517LT2L1 27 237 280000 0 0.03 280‐554' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS27 B DRESSING 1,000 I1R 8 59 472LT2L8 27 216 256000 0 0.26 256‐454' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS28 B DRESSING 1,000 I1R 2 59 118LT2L2275464000 0 0.06 64‐114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS29 B DRESSING 750 C1G 32 40 960LD1432 5 108 852000 0 1.14 852‐14 16 40 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPLEAVE ALONEMORRIS30 B CUST 500 I1R 1 59 30LT2L.11271416000 0 0.03 16 0 04' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS31 B DRESSING ROOMS (5) 1,000 I1R 5 59 295LT2L5 27 135 160000 0 0.16 160‐334' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS32 B DRESSING ROOMS (5) 750 C1G 120 40 3,600LD14120 5 405 3,195000 0 4.26 3,195‐53 62 40 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPLEAVE ALONEMORRIS33 B RESTS (2) 500 RF4 2 26 26LT112101016000 0 0.03 16 0 0RECESS CAN: WITH (1) 26 WATT PL LAMP, (1) ELECTRONIC BALLASTRETROFIT WITH (1) 10 WATT LED PL LAMP, BYPASS BALLASTLEAVE ALONEMORRIS34 B DRESSING ROOM 8,760 I1R 1 59 517LT2L1 27 237 280000 0 0.03 280‐554' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPage 2 of 14
Type Qty Watts KWH Use Type Qty Watts KWH UseKWH SavingTypeQtyBurnWH UH SavDemand kWkWhg Penalty Tling Savings kMPAC Room by Room ReportArea InformationLightingDescriptionBld Map Flr Description BurnExisting Fixture Proposed Fixture Occupancy SensorsExisting Fixture Proposed Fixture Proposed SensorSavingsMORRIS35 B DRESSING ROOM 1,000 I1R 1 59 59LT2L1272732000 0 0.03 32‐114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS36 B DRESSING ROOM 1,000 I1R 6 59 354LT2L6 27 162 192000 0 0.19 192‐344' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS37 B DRESSING ROOM 750 C1G 50 40 1,500LD1450 5 169 1,331000 0 1.78 1,331‐22 26 40 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPLEAVE ALONEMORRIS38 B DRESSING ROOM 750 C10G 138 25 2,588LD14138 5 466 2,122000 0 2.83 2,122‐35 41 25 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPLEAVE ALONEMORRIS39 B RESTS (2) 2,500 RF7 8 52 1,040LT128 20 400 640 O3.21##### ### 0.26 840‐14 16RECESS CAN: WITH (2) 26 WATT PL LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) 10 WATT LED PL LAMPS, BYPASS BALLASTOCCUPANCY SENSOR: (1) LINE VOLTAGE CEILING MOUNTEDMORRIS40 B RESTS (2) 2,500 C12 12 40 1,200LD14.112 5 135 1,065 O3.21##68 68 0.43 1,133‐19 22 40 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPOCCUPANCY SENSOR: (1) LINE VOLTAGE CEILING MOUNTEDMORRIS41 BRESTS (2) 2,500 W1R 5 59 738LT2L5 27 338 400 O3.20##### ### 0.16 569‐9114' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTCONTROLLED BY MAP 40.0MORRIS42 B RESTS (2) 2,500 W8R 1 32 80LT8L.21184535O3.20##23 23 0.01 58‐112' WRAP: WITH (2) LINEAR 2' 17 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 2' 8 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTCONTROLLED BY MAP 40.0MORRIS43 B SHOWERS 500 RF4 8 26 104LT118104064000 0 0.13 64‐11RECESS CAN: WITH (1) 26 WATT PL LAMP, (1) ELECTRONIC BALLASTRETROFIT WITH (1) 10 WATT LED PL LAMP, BYPASS BALLASTLEAVE ALONEMORRIS44 B DRESSING ROOM 8,760 I1R 1 59 517LT2L1 27 237 280000 0 0.03 280‐554' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS45 B DRESSING ROOM 1,000 I1R 7 59 413LT2L7 27 189 224000 0 0.22 224‐444' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS46 B DRESSING ROOM 750 C1G 166 40 4,980LD14166 5 560 4,420000 0 5.89 4,420‐73 86 40 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPLEAVE ALONEMORRIS47 B LAUNDRY 1,000 I1R 2 59 118LT2L.12275464000 0 0.06 64‐114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS48 B ELEV MECH 200 I1R 2 59 24LT2L.12271113000 0 0.06 13 0 04' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS49 STAIRS 8,760 W1R 8 59 4,135LT2L.28 27 1,892 2,243000 0 0.26 2,243‐37 434' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS50 B VENDMISER 8,760 U1 1 427 3,741LA1 427 3,741 0 U11##### ### 0.00 1,870‐31 36 COLD VENDING MACHINELEAVE ALONEOCCUPANCY SENSOR: (1) LOW VOLTAGE VENDING MACHINE MORRIS51 1 ENTRANCE 8,760 W1R 1 59 517LT2L.11 27 237 280000 0 0.03 280‐554' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS52 1 BACK STAGE 8,760 I1R 3 59 1,551LT2L.23 27 710 841000 0 0.10 841‐14 164' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS53 1 BACK STAGE 6,000 I1R 3 59 1,062LT2L.23 27 486 576000 0 0.10 576‐10 114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS54 1 BACK STAGE 6,000 I1R 14 59 4,956LT4LT.27 53 2,226 2,730000 0 0.46 2,730‐45 534' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTTANDEM RETROFIT WITH (4) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS55 1 BACK STAGE 6,000 RF7 2 52 624LT122 20 240 384000 0 0.06 384‐67RECESS CAN: WITH (2) 26 WATT PL LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) 10 WATT LED PL LAMPS, BYPASS BALLASTLEAVE ALONEMORRIS56 1 REST 1,000 W1R 1 59 59LT2L.11272732000 0 0.03 32‐114' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS57 1 CUST 500 I1R 1 59 30LT2L.11271416000 0 0.03 16 0 04' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPage 3 of 14
Type Qty Watts KWH Use Type Qty Watts KWH UseKWH SavingTypeQtyBurnWH UH SavDemand kWkWhg Penalty Tling Savings kMPAC Room by Room ReportArea InformationLightingDescriptionBld Map Flr Description BurnExisting Fixture Proposed Fixture Occupancy SensorsExisting Fixture Proposed Fixture Proposed SensorSavingsMORRIS58 2 MEZZ 6,000 I1R 4 59 1,416LT4LT.22 53 636 780000 0 0.13 780‐13 154' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTTANDEM RETROFIT WITH (4) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS59 2 MEZZ 6,000 I1R 2 59 708LT2L.22 27 324 384000 0 0.06 384‐674' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS60 2 MEZ 6,000 F9 6 23 828LD6.16 16 576 252000 0 0.04 252‐45 23 WATT R40 CFL FLOOD LAMPRETROFIT WITH (1) 16 WATT LED PAR38 LAMP LEAVE ALONEMORRIS61 2 MEZZ OFFICE 3,000 I1R 1 59 177LT2.21329681000 0 0.03 81‐124' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) NORMAL POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS62 1 DRESSING (2) 1,000 F8 8 18 144LD58108064000 0 0.06 64‐11 18 WATT R30 CFL FLOOD LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEMORRIS63 1 DRESSING (2) 1,000 C1G 38 40 1,520LD1438 5 171 1,349000 0 1.35 1,349‐22 26 40 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPLEAVE ALONEMORRIS64 1 DRSSSING (2) 1,000 C10G 12 25 300LD1412 5 54 246000 0 0.25 246‐45 25 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPLEAVE ALONEMORRIS65 1 REST 500 RF7 3 52 78LT123203048000 0 0.10 48‐11RECESS CAN: WITH (2) 26 WATT PL LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) 10 WATT LED PL LAMPS, BYPASS BALLASTLEAVE ALONEMORRIS66 1 REST 500 C12 6 40 120LD14.165 14 107000 0 0.21 107‐22 40 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPLEAVE ALONEMORRIS67 1REST500 RF4 3 26 39LT113101524000 0 0.05 24 0 0RECESS CAN: WITH (1) 26 WATT PL LAMP, (1) ELECTRONIC BALLASTRETROFIT WITH (1) 10 WATT LED PL LAMP, BYPASS BALLASTLEAVE ALONEMORRIS68 1HALL8,760 RF7 2 52 911LT122 20 350 561000 0 0.06 561‐911RECESS CAN: WITH (2) 26 WATT PL LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) 10 WATT LED PL LAMPS, BYPASS BALLASTLEAVE ALONEMORRIS69 1HALL6,000 RF7 3 52 936LT123 20 360 576000 0 0.10 576‐10 11RECESS CAN: WITH (2) 26 WATT PL LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) 10 WATT LED PL LAMPS, BYPASS BALLASTLEAVE ALONEMORRIS70 1STAGE2,000 Q1 9 1,599 28,782LED69 160 2,880 25,902000 0 12.95 25,902‐429 501 FLOOD: WITH (1) 1500 WATT QUARTZ LAMPFLOOD: NEW REPLACEMENT 160 WATT LED FIXTURELEAVE ALONEMORRIS71 1STAGE8,000 F4 1 26 208LD41 16 128 80000 0 0.01 80‐12 26 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 16 WATT LED A21 LAMP LEAVE ALONEMORRIS72 1 RIGGING LIGHTS 2,000 C7D 22 69 3,036LD3.122 12 528 2,508000 0 1.25 2,508‐42 4969 WATT INCANDESCENT LAMP, DIMMINGRETROFIT WITH (1) 12 WATT LED A19 LAMP LEAVE ALONEMORRIS73 5 UP STAGE 1,500 W1R 30 59 2,655LT2L.330 27 1,215 1,440000 0 0.96 1,440‐24 284' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS74 1 SIDE STORAGE 500 I1R 1 59 30LT1L.2114 7 23000 0 0.05 23 0 04' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (1) LINEAR 4' 13 WATT LED T8 LAMP, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS75 1 SIDE STORAGE 500 W1R 2 59 59LT2L.22272732000 0 0.06 32‐114' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS75 1 REST 500 RF4 2 26 26LT112101016000 0 0.03 16 0 0RECESS CAN: WITH (1) 26 WATT PL LAMP, (1) ELECTRONIC BALLASTRETROFIT WITH (1) 10 WATT LED PL LAMP, BYPASS BALLASTLEAVE ALONEMORRIS76 1 UP LIGHT 100 C2 1 60 6LD3.1112 1 5000 0 0.05 5 0 0 60 WATT INCANDESCENT LAMPRETROFIT WITH (1) 12 WATT LED A19 LAMP LEAVE ALONEMORRIS77 1 HALL 3,000 F3 2 23 138LD3.12127266000 0 0.02 66‐11 23 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 12 WATT LED A19 LAMP LEAVE ALONEMORRIS78 1 CLOSET 100 F3 2 23 5LD2.12923000 0 0.03 3 0 0 23 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 9 WATT LED A19 LAMP LEAVE ALONEMORRIS79 1 CLOSET 100 C2 1 60 6LD2.11915000 0 0.05 5 0 0 60 WATT INCANDESCENT LAMPRETROFIT WITH (1) 9 WATT LED A19 LAMP LEAVE ALONEPage 4 of 14
Type Qty Watts KWH Use Type Qty Watts KWH UseKWH SavingTypeQtyBurnWH UH SavDemand kWkWhg Penalty Tling Savings kMPAC Room by Room ReportArea InformationLightingDescriptionBld Map Flr Description BurnExisting Fixture Proposed Fixture Occupancy SensorsExisting Fixture Proposed Fixture Proposed SensorSavingsMORRIS80 1 HALL SCONCES 8,760 F1 5 15 657LD15 6 241 416000 0 0.05 416‐78 15 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 5.5 WATT A19 LED LAMP LEAVE ALONEMORRIS81 1 HALL 8,760 F9 1 23 201LD61 16 140 61000 0 0.01 61‐11 23 WATT R40 CFL FLOOD LAMPRETROFIT WITH (1) 16 WATT LED PAR38 LAMP LEAVE ALONEMORRIS82 1 HALL 2,000 F9 22 23 1,012LD622 16 704 308000 0 0.15 308‐56 23 WATT R40 CFL FLOOD LAMPRETROFIT WITH (1) 16 WATT LED PAR38 LAMP LEAVE ALONEMORRIS83 1 REST ENTRANCES 2,000 F8 2 18 72LD52104032000 0 0.02 32‐11 18 WATT R30 CFL FLOOD LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEMORRIS84 1 REST 2,000 MR16 7 45 630LD97 8 112 518 O1P1##56 56 0.26 574‐10 11 45 WATT MR16 HALOGEN FLOOD LAMPRETROFIT WITH (1) 8 WATT LED MR16 LAMPOCCUPANCY SENSOR: (1) LINE VOLTAGE WALL MOUNTED MORRIS85 1REST2,000 C2 2 60 240LD22 9 36 204 O1P0##18 18 0.10 222‐44 60 WATT INCANDESCENT LAMPRETROFIT WITH (1) 9 WATT LED A19 LAMPCONTROLLED BY MAP 84.0MORRIS86 1MIRROR8,760 RC2 1 60 526LD21 9 79 447000 0 0.05 447‐79RECESS CAN: WITH (1) 60 WATT INCANDESCENT A LAMPRETROFIT WITH (1) 9 WATT LED A19 LAMP LEAVE ALONEMORRIS87 1CUST500 S1R 1 32 16LT1L.1114 7 9000 0 0.02 9 0 04' STRIP: WITH (1) 4' LINEAR 32 WATT T8 LAMP, (1) ELECTRONIC BALLASTRETROFIT WITH (1) LINEAR 4' 13 WATT LED T8 LAMP, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS88 1HALL8,760 RC2 2 60 1,051LD22 9 158 894000 0 0.10 894‐15 17RECESS CAN: WITH (1) 60 WATT INCANDESCENT A LAMPRETROFIT WITH (1) 9 WATT LED A19 LAMP LEAVE ALONEMORRIS89 1TASK500 MR16A 4 45 90LD154 8 16 74000 0 0.15 74‐11 45 WATT MR16 HALOGEN FLOOD LAMP, 120VRETROFIT WITH (1) 8 WATT LED 120V MR16 LAMPLEAVE ALONEMORRIS90 1 COAT ROOM 500 F9 2 23 23LD6.1216 16 7000 0 0.01 7 0 023 WATT R40 CFL FLOOD LAMPRETROFIT WITH (1) 16 WATT LED PAR38 LAMP LEAVE ALONEMORRIS91 1TICKETS2,500 F9 3 23 173LD63 16 120 53000 0 0.02 53‐11 23 WATT R40 CFL FLOOD LAMPRETROFIT WITH (1) 16 WATT LED PAR38 LAMP LEAVE ALONEMORRIS92 1TICKETS8,760 F8 5 18 788LD55 10 438 350000 0 0.04 350‐67 18 WATT R30 CFL FLOOD LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEMORRIS93 1 WINDOW LIGHTS 8,760 F9 6 23 1,209LD66 16 841 368 PC21##### ### 0.04 999‐17 1923 WATT R40 CFL FLOOD LAMPRETROFIT WITH (1) 16 WATT LED PAR38 LAMPINSTALL NEW PHOTOCENSORMORRIS94 1 OPEN OFFICE 2,500 T2RP 4 59 590LT2L4 27 270 320000 0 0.13 320‐562X4 TROFFER: WITH PARABOLIC LOUVER LENS, (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS95 1 HALL 2,500 F8 6 18 270LD56 10 150 120000 0 0.05 120‐22 18 WATT R30 CFL FLOOD LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEMORRIS96 1 OFFICES (3) 2,000 T2RP 6 59 708LT2L6 27 324 384 O13##### 81 0.19 465‐892X4 TROFFER: WITH PARABOLIC LOUVER LENS, (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTOCCUPANCY SENSOR: (1) LINE VOLTAGE WALL MOUNTED MORRIS97 1 CONF 2,000 T2RP 4 59 472LT2L4 27 216 256 O21##### ### 0.13 364‐672X4 TROFFER: WITH PARABOLIC LOUVER LENS, (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTOCCUPANCY SENSOR: (1) LOW VOLTAGE CEILING MOUNTEDMORRIS98 1 OPEN OFFICE 2,500 T2RP 4 59 590LT2L4 27 270 320 O2.11##### 68 0.13 388‐672X4 TROFFER: WITH PARABOLIC LOUVER LENS, (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTOCCUPANCY SENSOR: (1) LOW VOLTAGE CEILING MOUNTEDMORRIS99 1 OPEN OFFICE 2,500 F8 3 18 135LD53107560O2.10##56 19 0.02 79‐12 18 WATT R30 CFL FLOOD LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMPCONTROLLED BY MAP 98.0MORRIS100 1 OFFICE 2,000 T2R 2 59 236LT2L2 27 108 128 O11##81 27 0.06 155‐332X4 TROFFER: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTOCCUPANCY SENSOR: (1) LINE VOLTAGE WALL MOUNTED MORRIS101 1 OFFICE 2,000 T2R 2 59 236LT2L2 27 108 128 O21##81 27 0.06 155‐332X4 TROFFER: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTOCCUPANCY SENSOR: (1) LOW VOLTAGE CEILING MOUNTEDMORRIS102 THEATRE SEATING LIGHTS 1,000 J1 130 7 910LA130 7 910 0000 0 0.00 0 0 0INTEGRAL SEATING LIGHTING: WITH 7 WATT INCANDESCENT ROPE FIXTURELEAVE ALONE LEAVE ALONEPage 5 of 14
Type Qty Watts KWH Use Type Qty Watts KWH UseKWH SavingTypeQtyBurnWH UH SavDemand kWkWhg Penalty Tling Savings kMPAC Room by Room ReportArea InformationLightingDescriptionBld Map Flr Description BurnExisting Fixture Proposed Fixture Occupancy SensorsExisting Fixture Proposed Fixture Proposed SensorSavingsMORRIS103 THEATRE 2,000 SC9D 14 138 3,864LD16.114 13 364 3,500000 0 1.75 3,500‐58 68SCONCE: WITH (2) 69 WATT INCANDESCENT A LAMPS, DIMMINGRETROFIT WITH (2) 6.5 WATT LED FILAMENT A LAMPSLEAVE ALONEMORRIS104 THEATRE 2,000 CH9D 7 180 2,520LD17.37 20 273 2,247000 0 1.12 2,247‐37 43SURFACE CHANDILIER: WITH (3) 60 WATT INCANDESCENT A LAMPS, DIMMINGRETROFIT WITH (3) 6.5 WATT LED FILAMENT A LAMPSLEAVE ALONEMORRIS105 THEATRE 2,000 CH10D 7 360 5,040LD18.37 39 546 4,494000 0 2.25 4,494‐74 87CHANDILIER: WITH (6) 60 WATT INCANDESCENT A LAMPS, DIMMINGRETROFIT WITH (6) 6.5 WATT LED FILAMENT A LAMPSLEAVE ALONEMORRIS106 SIDE DECORATIVE 2,000 C8D 8 90 1,440LD6.48 16 256 1,184000 0 0.59 1,184‐20 23 90 WATT PAR38 HALOGEN FLOOD LAMP, DIMMINGRETROFIT WITH (1) 16 WATT LED PAR38 LAMP LEAVE ALONEMORRIS107STAIRS3,000 CH11D 23 180 12,420LD17.223 20 1,346 11,075000 0 3.69 11,075‐183 214SURFACE CHANDILIER: WITH (3) 60 WATT INCANDESCENT A LAMPS, DIMMINGRETROFIT WITH (3) 6.5 WATT LED FILAMENT A LAMPSLEAVE ALONEMORRIS108WALL STEP LIGHTS 3,000 WC9 52 30 4,680LD1952 5 702 3,978000 0 1.33 3,978‐66 77RECESS WALL: WITH (1) 30 WATT INCANDESCENT A15 LAMPRETROFIT WITH (1) 4.5 WATT LED A15 LAMP LEAVE ALONEMORRIS109QUARTZ WORK LIGHTS‐SIDE1,000 Q2 4 1,000 4,000LED7.44 109 436 3,564000 0 3.56 3,564‐59 69 FLOOD WITH (1) 1000 WATT QUARTZ LAMPFLOOD: NEW REPLACEMENT 109 WATT LED FIXTURELEAVE ALONEMORRIS110UARTZ WORK LIGHTS‐CENT1,000 Q2 8 1,000 8,000LED7.48 109 872 7,128000 0 7.13 7,128‐118 138 FLOOD WITH (1) 1000 WATT QUARTZ LAMPFLOOD: NEW REPLACEMENT 109 WATT LED FIXTURELEAVE ALONEMORRIS111 TOP OF SEATING 2,000 CH9D 7 180 2,520LD17.27 20 273 2,247000 0 1.12 2,247‐37 43SURFACE CHANDILIER: WITH (3) 60 WATT INCANDESCENT A LAMPS, DIMMINGRETROFIT WITH (3) 6.5 WATT LED FILAMENT A LAMPSLEAVE ALONEMORRIS112CENTER STAIRS 2,500 SC4D 2 69 345LD2.12 9 45 300000 0 0.12 300‐56SCONCE: WITH (1) 69 WATT INCANDESCENT A LAMP, DIMMINGRETROFIT WITH (1) 9 WATT LED A19 LAMP LEAVE ALONEMORRIS113CENTER STAIRS 2,500 RC10D 1 200 500LD6.11 16 40 460000 0 0.18 460‐89RECESS CAN: WITH (1) 200 WATT INCANDESCENT A21 LAMP, DIMMINGRETROFIT WITH (1) 16 WATT LED PAR38 LAMP LEAVE ALONEMORRIS114 STORAGE 100 SF2 1 18 2LT11.2110 1 1000 0 0.01 1 0 0WALL MOUNTED JELLY JAR: WITH (1) 18 WATT PL LAMP, (1) ELECTRONIC BALLASTRETROFIT WITH (1) 10 WATT LED PL LAMP, BYPASS BALLASTLEAVE ALONEMORRIS115 UPPER LOBBY STAIRS 3,000 SC4D 2 69 414LD2.12 9 54 360000 0 0.12 360‐67SCONCE: WITH (1) 69 WATT INCANDESCENT A LAMP, DIMMINGRETROFIT WITH (1) 9 WATT LED A19 LAMP LEAVE ALONEMORRIS116BACK STAIRS 3,000 SC5D 3 80 720LD203 9 81 639000 0 0.21 639‐11 12SCONCE: WITH (2) 40 WATT INCANDESCENT TORCH LAMPS, DIMMINGRETROFIT WITH (2) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEMORRIS117 WALL NICHE 3,000 C9 2 30 180LD12 6 33 147000 0 0.05 147‐23 30 WATT INCANDESCENT A15 LAMPRETROFIT WITH (1) 5.5 WATT A19 LED LAMP LEAVE ALONEMORRIS118 CHAIR STORAGE 100 C2 4 60 24LD4.2416 6 18000 0 0.18 18 0 0 60 WATT INCANDESCENT LAMPRETROFIT WITH (1) 16 WATT LED A21 LAMP LEAVE ALONEMORRIS119 P REST 500 SV7R 1 47 24LT7L.21241212000 0 0.02 12 0 03' VANITY: WITH (2) 3' LINEAR 25 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 3' 12 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS120 P STAIRS 500 SF2 1 18 9LT11.2110 5 4000 0 0.01 4 0 0WALL MOUNTED JELLY JAR: WITH (1) 18 WATT PL LAMP, (1) ELECTRONIC BALLASTRETROFIT WITH (1) 10 WATT LED PL LAMP, BYPASS BALLASTLEAVE ALONEMORRIS121 P ATTIC 500 SF2 79 18 711LT11.279 10 395 316000 0 0.63 316‐56WALL MOUNTED JELLY JAR: WITH (1) 18 WATT PL LAMP, (1) ELECTRONIC BALLASTRETROFIT WITH (1) 10 WATT LED PL LAMP, BYPASS BALLASTLEAVE ALONEMORRIS122 P PROJECTION ROOM 750 C7D 4 69 207LD3.24 12 36 171000 0 0.23 171‐33 69 WATT INCANDESCENT LAMP, DIMMINGRETROFIT WITH (1) 12 WATT LED A19 LAMP LEAVE ALONEMORRIS123 P THEATRE LIGHTING 2,500 C7D 780 69 134,550LD21.1780 7 12,675 121,875000 0 48.75 121,875‐2,018 2,358 69 WATT INCANDESCENT LAMP, DIMMINGRETROFIT WITH (1) 6.5 WATT LED FILAMENT A LAMPLEAVE ALONEMORRIS123 P THEATRE LIGHTING 2,500 C7D 90 69 15,525LD21.290 7 1,463 14,063000 0 5.63 14,063‐233 272 69 WATT INCANDESCENT LAMP, DIMMINGRETROFIT WITH (1) 6.5 WATT LED FILAMENT A LAMPLEAVE ALONEMORRIS124 P THEATRE LIGHTING 2,500 RC11D 9 300 6,750LED8.39 80 1,800 4,950000 0 1.98 4,950‐82 96RECESS CAN: WITH (1) 300 WATT PAR56 HALOGEN FLOOD LAMP, DIMMINGRECESS CAN: NEW REPLACEMENT 80 WATT LED FIXTURELEAVE ALONEPage 6 of 14
Type Qty Watts KWH Use Type Qty Watts KWH UseKWH SavingTypeQtyBurnWH UH SavDemand kWkWhg Penalty Tling Savings kMPAC Room by Room ReportArea InformationLightingDescriptionBld Map Flr Description BurnExisting Fixture Proposed Fixture Occupancy SensorsExisting Fixture Proposed Fixture Proposed SensorSavingsMORRIS125 M RIGGING MEZZ 500 C7 20 69 690LD3.220 12 120 570000 0 1.14 570‐911 69 WATT INCANDESCENT LAMPRETROFIT WITH (1) 12 WATT LED A19 LAMP LEAVE ALONEMORRIS126 2 FILE STORAGES (2) 500 SF2 4 18 36LT11.24102016000 0 0.03 16 0 0WALL MOUNTED JELLY JAR: WITH (1) 18 WATT PL LAMP, (1) ELECTRONIC BALLASTRETROFIT WITH (1) 10 WATT LED PL LAMP, BYPASS BALLASTLEAVE ALONEMORRIS127 2 ELEV LOBBY 2,500 F2 4 18 180LD3.14 12 120 60000 0 0.02 60‐11 18 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 12 WATT LED A19 LAMP LEAVE ALONEMORRIS128 2 OFFICE 2,000 S2R 1 59 118LT2L.21275464000 0 0.03 64‐114' STRIP: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS129 2 ELEV LOBBY 2,500 F2 4 18 180LD3.14 12 120 60000 0 0.02 60‐11 18 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 12 WATT LED A19 LAMP LEAVE ALONEMORRIS130 2 LOBBY SCONCES 3,000 SC3D 5 120 1,800LD115 14 203 1,598000 0 0.53 1,598‐26 31SCONCE: WITH (3) 40 WATT INCANDESCENT TORCH LAMPS, DIMMINGRETROFIT WITH (3) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEMORRIS131 2 LOBBY CHANDILIER 3,000 CH12D 1 600 1,800LD22.11 92 276 1,524000 0 0.51 1,524‐25 29CHANDILIER: WITH (4) 150 WATT INCANDESCENT A21 LAMPS, DIMMINGRETROFIT WITH (4) 23 WATT LED A21 LAMPS LEAVE ALONEMORRIS132 2 POST TOP 3,000 PC7D 4 69 828LD21.24 7 78 750000 0 0.25 750‐12 15POST TP: WIH (1) 69 WATT INCANDESCENT ALAMP, DIMMINGRETROFIT WITH (1) 6.5 WATT LED FILAMENT A LAMPLEAVE ALONEMORRIS133 2 LOBBY 3,000 CH13D 2 240 1,440LD23.12 26 156 1,284000 0 0.43 1,284‐21 25CHANDILIER WITH (4) 60 WATT INCANDESENT A LAMPS, DIMMINGRETROFIT WITH (4) 6.5 WATT LED FILAMENT A LAMPSLEAVE ALONEMORRIS134 2 LOBBY 3,000 CH14D 3 480 4,320LD24.13 52 468 3,852000 0 1.28 3,852‐64 75CHANDILIER WITH (8) 60 WATT INCANDESENT A LAMPS, DIMMINGRETROFIT WITH (8) 6.5 WATT LED FILAMENT A LAMPSLEAVE ALONEMORRIS135 2 LOBBY 3,000 CH14D 1 480 1,440LD24.11 52 156 1,284000 0 0.43 1,284‐21 25CHANDILIER WITH (8) 60 WATT INCANDESENT A LAMPS, DIMMINGRETROFIT WITH (8) 6.5 WATT LED FILAMENT A LAMPSLEAVE ALONEMORRIS136 2 SITTING AREA 3,000 SC4D 4 69 828LD21.14 7 78 750000 0 0.25 750‐1215SCONCE: WITH (1) 69 WATT INCANDESCENT A LAMP, DIMMINGRETROFIT WITH (1) 6.5 WATT LED FILAMENT A LAMPLEAVE ALONEMORRIS137 2 WINDOW LIGHTS 3,000 C12 84 40 10,080LD25.484 5 1,134 8,946000 0 2.98 8,946‐148 17340 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPLEAVE ALONEMORRIS138 2REST8,760 F8 1 18 158LD51108870000 0 0.01 70‐11 18 WATT R30 CFL FLOOD LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEMORRIS139 2REST2,000 F8 3 18 108LD53106048O3.21##30 30 0.02 78‐12 18 WATT R30 CFL FLOOD LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMPOCCUPANCY SENSOR: (1) LINE VOLTAGE CEILING MOUNTEDMORRIS140 2REST2,000 C12 8 40 640LD14.18 5 72 568 O3.20##36 36 0.28 604‐10 1240 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPCONTROLLED BY MAP 139.0MORRIS141 2REST2,000 MR16 4 45 360LD94 8 64 296 O3.20##32 32 0.15 328‐56 45 WATT MR16 HALOGEN FLOOD LAMPRETROFIT WITH (1) 8 WATT LED MR16 LAMPCONTROLLED BY MAP 139.0MORRIS142 2CUSTS500 SF2 2 18 18LT11.2210 10 8000 0 0.02 8 0 0WALL MOUNTED JELLY JAR: WITH (1) 18 WATT PL LAMP, (1) ELECTRONIC BALLASTRETROFIT WITH (1) 10 WATT LED PL LAMP, BYPASS BALLASTLEAVE ALONEMORRIS143 2CUST500 I1R 2 59 59LT4LT.21532733000 0 0.07 33‐114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTTANDEM RETROFIT WITH (4) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEMORRIS144 2 REST 2,000 F8 1 18 36LD51102016O3.21##10 10 0.01 26 0 1 18 WATT R30 CFL FLOOD LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMPOCCUPANCY SENSOR: (1) LINE VOLTAGE CEILING MOUNTEDMORRIS145 2 REST 2,000 C12 6 40 480LD14.16 5 54 426 O3.20##27 27 0.21 453‐79 40 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPCONTROLLED BY MAP 144.0MORRIS146 2 REST 2,000 MR16 9 45 810LD99 8 144 666 O3.20##72 72 0.33 738‐12 14 45 WATT MR16 HALOGEN FLOOD LAMPRETROFIT WITH (1) 8 WATT LED MR16 LAMPCONTROLLED BY MAP 144.0MORRIS147 1 LOBBY 3,000 CH15D 2 900 5,400LD26.12 98 585 4,815000 0 1.61 4,815‐80 93CHANDILIER: WITH (15) 60 WATT INCANDESCENT A LAMPS, DIMMINGRETROFIT WITH (15) 6.5 WATT LED FILAMENT A LAMPSLEAVE ALONEPage 7 of 14
Type Qty Watts KWH Use Type Qty Watts KWH UseKWH SavingTypeQtyBurnWH UH SavDemand kWkWhg Penalty Tling Savings kMPAC Room by Room ReportArea InformationLightingDescriptionBld Map Flr Description BurnExisting Fixture Proposed Fixture Occupancy SensorsExisting Fixture Proposed Fixture Proposed SensorSavingsMORRIS148 1 LOBBY 3,000 CH20D 3 2,920 26,280LD27.13 329 2,957 23,324000 0 7.77 23,324‐386 451CHANDILIER: WITH (16) 40 WATT G40 LAMPS, (12) 40 WATT G25 LAMPS, (45) 40 WATT TORCH LAMPS, DIMMINGRETROFIT WITH (28) 4.5 WATT LED FILAMENT G25 LAMPS, (45) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEMORRIS149 1 LOBBY SCONCES 3,000 SC6D 8 200 4,800LD288 23 540 4,260000 0 1.42 4,260‐71 82SCONCE: WITH (5) 40 WATT INCANDESCENT TORCH LAMPS, DIMMINGRETROFIT WITH (5) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEMORRIS150 1 LOBBY ENTRANCE 3,000 C12 30 40 3,600LD25.230 5 405 3,195000 0 1.07 3,195‐53 62 40 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPLEAVE ALONEMORRIS151 1 LOBBY 4,000 RC7 5 69 1,380LD21.15 7 130 1,250000 0 0.31 1,250‐21 24RECESS CAN: WITH (1) 69 WATT INCANDESCENT A LAMPRETROFIT WITH (1) 6.5 WATT LED FILAMENT A LAMPLEAVE ALONEMORRIS152 1 LOBBY 4,000 MR16 4 45 720LD9.14 8 128 592000 0 0.15 592‐10 11 45 WATT MR16 HALOGEN FLOOD LAMPRETROFIT WITH (1) 8 WATT LED MR16 LAMP LEAVE ALONEMORRIS153 1 INTER LOBBY 3,000 CH13D 4 240 2,880LD23.14 26 312 2,568000 0 0.86 2,568‐43 50CHANDILIER WITH (4) 60 WATT INCANDESENT A LAMPS, DIMMINGRETROFIT WITH (4) 6.5 WATT LED FILAMENT A LAMPSLEAVE ALONEMORRIS154 1 INTER LOBBY 3,000 C2D 5 60 900LD21.15 7 98 803000 0 0.27 803‐13 16SURFACE FIXTURE: WITH (1) 60 WATT INCANDESCENT A LAMP, DIMMINGRETROFIT WITH (1) 6.5 WATT LED FILAMENT A LAMPLEAVE ALONEMORRIS155 1 INTER LOBBY 3,000 SC2D 2 80 480LD202 9 54 426000 0 0.14 426‐78SCONCE: WITH (2) 40 WATT INCANDESCENT TORCH LAMPS, DIMMINGRETROFIT WITH (2) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEMORRIS156STAIRS (2) 4,000 CH9D 3 180 2,160LD17.23 20 234 1,926000 0 0.48 1,926‐3237SURFACE CHANDILIER: WITH (3) 60 WATT INCANDESCENT A LAMPS, DIMMINGRETROFIT WITH (3) 6.5 WATT LED FILAMENT A LAMPSLEAVE ALONEMORRIS172EXITS8,760 X4 3 2 53X132 53 0000 0 0.00 0 0 0 EXIT SIGN WITH (1) 2 WATT LED LIGHT ENGINEEXIT SIGN: NEW REPLACEMENT FIXTURE WITH (1) 2 WATT LED LIGHT ENGINE, AND EMERGENCY BATTERY BACKUPLEAVE ALONEMORRIS173EMU000EM110000000 0 0.00 0 0 0REPLACE EMERGENCY BATTERY BACK-UP BALLASTLEAVE ALONEMORRIS174LENSES000LENS15000000 0 0.00 0 0 0NEW 2X4 LENSLEAVE ALONEMORRIS175LENSES000LENS55000000 0 0.00 0 0 0NEW 4' WRAP LENSLEAVE ALONEMORRIS200ETC PANEL MOD 000LA0P1100 0 0.000 0LEAVE ALONEETC PANEL MODIFICATIONS FOR LED DIMMINGPALAIS1 4ATTIC500 I1R 5 59 148LT2L.35276880000 0 0.16 80‐124' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS2 4 INTERSTITIAL 8,760 I1R 8 59 4,135LT2L.18 27 1,892 2,243000 0 0.26 2,243‐37 434' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS3 4 INTERSTITIAL 2,000 I1R 14 59 1,652LT2L.114 27 756 896000 0 0.45 896‐15 174' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS4 3 HALL 3,950 F2 2 18 142LD5.12107963000 0 0.02 63‐11 18 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEPALAIS5 3 CUST 500 I1R 1 59 30LT2L.11271416000 0 0.03 16 0 04' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS6 3 BALCONEY 3,950 CH1 1 320 1,264LD30.11 36 142 1,122000 0 0.28 1,122‐19 22CHANDILIER: WITH (8) 40 WATT INCANDESCENT TORCH LAMPSRETROFIT WITH (8) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEPALAIS7 3 BALCONEY 3,950 SC1 2 40 316LD312 5 36 280000 0 0.07 280‐55SCONCE: WITH (1) 40 WATT INCANDESCENT TORCH LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT TORCH LAMPLEAVE ALONEPALAIS8 3 LOBBY 3,950 CH1 2 320 2,528LD30.12 36 284 2,244000 0 0.57 2,244‐37 43CHANDILIER: WITH (8) 40 WATT INCANDESCENT TORCH LAMPSRETROFIT WITH (8) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEPALAIS9 3 LOBBY 3,950 F4 4 26 411LD5.14 10 158 253000 0 0.06 253‐45 26 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEPage 8 of 14
Type Qty Watts KWH Use Type Qty Watts KWH UseKWH SavingTypeQtyBurnWH UH SavDemand kWkWhg Penalty Tling Savings kMPAC Room by Room ReportArea InformationLightingDescriptionBld Map Flr Description BurnExisting Fixture Proposed Fixture Occupancy SensorsExisting Fixture Proposed Fixture Proposed SensorSavingsPALAIS10 3 REST 2,500 F2 1 18 45LD51102520O3.21##13 13 0.01 33‐11 18 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMPOCCUPANCY SENSOR: (1) LINE VOLTAGE CEILING MOUNTEDPALAIS11 3 REST 2,500 F4 2 26 130LD52105080O3.20##25 25 0.03 105‐22 26 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMPCONTROLLED BY MAP 10.0PALAIS12 3 REST 2,500 RC2 2 60 300LD52 10 50 250 O3.20##25 25 0.10 275‐55RECESS CAN: WITH (1) 60 WATT INCANDESCENT A LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMPCONTROLLED BY MAP 10.0PALAIS13 3 REST 2,500 C12 10 40 1,000LD14.110 5 113 888 O3.21##56 56 0.36 944‐16 18 40 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPOCCUPANCY SENSOR: (1) LINE VOLTAGE CEILING MOUNTEDPALAIS14 3 REST 2,500 MR16 10 45 1,125LD910 8 200 925 O3.20##### ### 0.37 1,025‐17 20 45 WATT MR16 HALOGEN FLOOD LAMPRETROFIT WITH (1) 8 WATT LED MR16 LAMPCONTROLLED BY MAP 13.0PALAIS15 3REST2,500 F2 8 18 360LD58 10 200 160 O3.21##### ### 0.06 260‐45 18 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMPOCCUPANCY SENSOR: (1) LINE VOLTAGE CEILING MOUNTEDPALAIS16 3REST2,500 MR16 4 45 450LD94 8 80 370 O3.20##40 40 0.15 410‐78 45 WATT MR16 HALOGEN FLOOD LAMPRETROFIT WITH (1) 8 WATT LED MR16 LAMPCONTROLLED BY MAP 15.0PALAIS17 3REST2,500 C12 4 40 400LD14.14 5 45 355 O3.21##23 23 0.14 378‐67 40 WATT INCANDESCENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPOCCUPANCY SENSOR: (1) LINE VOLTAGE CEILING MOUNTEDPALAIS18 3HALL3,950 F2 2 18 142LD52107963000 0 0.02 63‐11 18 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEPALAIS19 3 STAGING ROOM 500 T11RP 8 89 356A4T8 26 104 252000 0 0.50 252‐452X2 TROFFER: WITH PARABOLIC LOUVER LENS, (3) U‐BEND 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (1) 26 WATT LED 2x2 DOOR FRAME KITLEAVE ALONEPALAIS20 3 STAGING ROOM 500 T11RP 4 89 178A4T4 26 52 126000 0 0.25 126‐222X2 TROFFER: WITH PARABOLIC LOUVER LENS, (3) U‐BEND 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (1) 26 WATT LED 2x2 DOOR FRAME KITLEAVE ALONEPALAIS21 2 LOBBY 3,950 CH1 3 320 3,792LD30.13 36 427 3,365000 0 0.85 3,365‐56 65CHANDILIER: WITH (8) 40 WATT INCANDESCENT TORCH LAMPSRETROFIT WITH (8) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEPALAIS22STAIRS3,950 CH1 1 320 1,264LD30.21 36 142 1,122000 0 0.28 1,122‐19 22CHANDILIER: WITH (8) 40 WATT INCANDESCENT TORCH LAMPSRETROFIT WITH (8) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEPALAIS23 2SCONCES 3,950 SC2 4 80 1,264LD204 9 142 1,122000 0 0.28 1,122‐19 22SCONCE: WITH (2) 40 WATT INCANDESCENT TORCH LAMPSRETROFIT WITH (2) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEPALAIS24 2 KITCHEN ENTRANCE 3,500 C4 1 100 350LD51 10 35 315000 0 0.09 315‐5 6100 WATT INCANDESCENT LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEPALAIS25 2KITCHEN3,500 T1R 17 112 6,664LT2H17 46 2,737 3,927000 0 1.12 3,927‐65 762X4 TROFFER: WITH (4) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) HIGH POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS26 2 CUST 500 I1R 1 59 30LT2L.11271416000 0 0.03 16 0 04' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS27 2 HOODS 3,000 C4 7 100 2,100LD4.17 16 336 1,764000 0 0.59 1,764‐29 34 100 WATT INCANDESCENT LAMPRETROFIT WITH (1) 16 WATT LED A21 LAMP LEAVE ALONEPALAIS28 2 COOLER 3,000 LD2 2 10 60LA210 60 0000 0 0.00 0 0 0 10 WATT LED A LAMPLEAVE ALONE LEAVE ALONEPALAIS29 2 OFFICE 3,000 T1R 1 112 336LT2H.11 46 138 198000 0 0.07 198‐342X4 TROFFER: WITH (4) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) HIGH POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS30 2 HALL 3,950 C5 2 150 1,185LD52 10 79 1,106000 0 0.28 1,106‐18 21 150 WATT INCANDESCENT LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEPALAIS31 2 DISHWASH 3,500 T1R 6 112 2,352LT2H6 46 966 1,386 O21##### ### 0.40 1,869‐31 362X4 TROFFER: WITH (4) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) HIGH POWER ELECTRONIC BALLASTOCCUPANCY SENSOR: (1) LOW VOLTAGE CEILING MOUNTEDPALAIS32 2 STAGE/STORAGE 500 I1R 2 59 59LT2L.22272732000 0 0.06 32‐114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPage 9 of 14
Type Qty Watts KWH Use Type Qty Watts KWH UseKWH SavingTypeQtyBurnWH UH SavDemand kWkWhg Penalty Tling Savings kMPAC Room by Room ReportArea InformationLightingDescriptionBld Map Flr Description BurnExisting Fixture Proposed Fixture Occupancy SensorsExisting Fixture Proposed Fixture Proposed SensorSavingsPALAIS33 2 CHANDILIER 1,000 CH2D 1 1,280 1,280LD32.31 144 144 1,136000 0 1.14 1,136‐19 22CHANDILIER: WITH (32) 40 WATT INCANDESCENT TORCH LAMPS, DIMMINGRETROFIT WITH (32) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEPALAIS34 2 BALLROOM SERURITY 4,380 H3 4 460 8,059LED9.34 120 2,102 5,957000 0 1.36 5,957‐99 115RECESS CAN: WITH (1) 400 WATT MH LAMP, (1) MAGNETIC BALLASTRECESS CAN: NEW REPLACEMENT 120 WATT LED FIXTURELEAVE ALONEPALAIS35 2 BALLROOM 1,000 SC3D 17 120 2,040LD1117 14 230 1,811000 0 1.81 1,811‐30 35SCONCE: WITH (3) 40 WATT INCANDESCENT TORCH LAMPS, DIMMINGRETROFIT WITH (3) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEPALAIS36 2CORNICE 2,500 S2RD 84 59 12,390LB1D.242 50 5,250 7,140000 0 2.86 7,140‐118 1384' STRIP: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) DIMMING ELECTRONIC BALLASTRETROFIT: WITH 8' 50 WATT LED BOARD KIT AND EXTERNAL ELECTRONIC DRIVER, 0-10V LOW VOLTAGE DIMMING CONNECTED TO NEW LEAVE ALONEPALAIS37 2 CORNER WINDOWS 1,000 S12RD 6 118 708LB1D.36 50 300 408000 0 0.41 408‐784' STRIP: WITH (2) 4' LINEAR 54 WATT T5HO LAMPS, (1) DIMMING ELECTRONIC BALLASTRETROFIT: WITH 4' 50 WATT LED BOARD KIT AND EXTERNAL ELECTRONIC DRIVER, 0-10V LOW VOLTAGE DIMMING CONNECTED TO NEW LEAVE ALONEPALAIS38 STAIRS 6,000 SC1 2 40 480LD312 5 54 426000 0 0.07 426‐78SCONCE: WITH (1) 40 WATT INCANDESCENT TORCH LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT TORCH LAMPLEAVE ALONEPALAIS39 STAIRS 2,000 CH4 1 480 960LD12.21 54 108 852000 0 0.43 852‐1416CHANDILIER: WITH (12) 40 WATT INCANDESCENT TORCH LAMPSRETROFIT WITH (12) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEPALAIS40 1HALL3,950 SC1 4 40 632LD314 5 71 561000 0 0.14 561‐911SCONCE: WITH (1) 40 WATT INCANDESCENT TORCH LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT TORCH LAMPLEAVE ALONEPALAIS41 1HALL3,950 CH5 1 240 948LD331 27 107 841000 0 0.21 841‐14 16CHANDILIER: WITH (6) 40 WATT INCANDESCENT TORCH LAMPSRETROFIT WITH (6) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEPALAIS42 1HALL3,950 CH5 7 240 6,636LD337 27 747 5,889000 0 1.49 5,889‐97 114CHANDILIER: WITH (6) 40 WATT INCANDESCENT TORCH LAMPSRETROFIT WITH (6) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEPALAIS43 1HALL3,950 SC1 7 40 1,106LD3175 124 982000 0 0.25 982‐16 19SCONCE: WITH (1) 40 WATT INCANDESCENT TORCH LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT TORCH LAMPLEAVE ALONEPALAIS44 1 ENTRANCE 6,000 CH5 1 240 1,440LD331 27 162 1,278000 0 0.21 1,278‐21 25CHANDILIER: WITH (6) 40 WATT INCANDESCENT TORCH LAMPSRETROFIT WITH (6) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEPALAIS45 1HALL3,950 MR16A 4 45 711LD154 8 126 585000 0 0.15 585‐10 11 45 WATT MR16 HALOGEN FLOOD LAMP, 120VRETROFIT WITH (1) 8 WATT LED 120V MR16 LAMPLEAVE ALONEPALAIS46 1CUST500 W1R 1 59 30LT2L.11271416000 0 0.03 16 0 04' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS47 1 RECEIVING 8,760 T2R 1 59 517LT2L.11 27 237 280000 0 0.03 280‐552X4 TROFFER: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS48 1 RECEIVING 1,000 T2R 1 59 59LT2L.11272732000 0 0.03 32‐112X4 TROFFER: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS49 1 TRASH ROOM 500 W1R 1 59 30LT2L.11271416000 0 0.03 16 0 04' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS50 1 COAT ROOM 2,000 F9 2 23 92LD6.12166428000 0 0.01 28 0 1 23 WATT R40 CFL FLOOD LAMPRETROFIT WITH (1) 16 WATT LED PAR38 LAMP LEAVE ALONEPALAIS51 1 LINEN ROOM 2,000 F2 1 18 36LD5.11102016000 0 0.01 16 0 0 18 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEPALAIS52 1 LINEN ROOM 2,000 T2R 3 59 354LT2L.13 27 162 192000 0 0.10 192‐342X4 TROFFER: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS53 1 STAIRS 8,760 T2R 1 59 517LT2.31 32 280 237000 0 0.03 237‐452X4 TROFFER: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) NORMAL POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS54 1 STAIRS 8,760 W1R 1 59 517LT2L.11 27 237 280000 0 0.03 280‐554' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS55 1 STAIRS 500 T2R 1 59 30G1.310 0 30000 0 0.06 30 0 12X4 TROFFER: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTREMOVE EXISTING FIXTURE LEAVE ALONEPage 10 of 14
Type Qty Watts KWH Use Type Qty Watts KWH UseKWH SavingTypeQtyBurnWH UH SavDemand kWkWhg Penalty Tling Savings kMPAC Room by Room ReportArea InformationLightingDescriptionBld Map Flr Description BurnExisting Fixture Proposed Fixture Occupancy SensorsExisting Fixture Proposed Fixture Proposed SensorSavingsPALAIS56 1 STAIRS 500 T2R 2 59 59LT2L.12272732000 0 0.06 32‐112X4 TROFFER: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS57 1 OPEN OFFICE 8,760 CH6D 1 75 657LD111 14 118 539000 0 0.06 539‐910CHANDILIER: WITH (3) 25 WATT INCANDESCENT TORCH LAMPS, DIMMINGRETROFIT WITH (3) 4.5 WATT LED FILAMENT TORCH LAMPSLEAVE ALONEPALAIS58 1 OPEN OFFICE 2,500 F2 2 18 90LD52105040000 0 0.02 40‐11 18 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEPALAIS59 1 OPEN OFFICE 2,500 T2RP 4 59 590LT2L4 27 270 320000 0 0.13 320‐562X4 TROFFER: WITH PARABOLIC LOUVER LENS, (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS60 1 OPEN OFFICE 2,500 W1R 1 59 148LT2L1276880000 0 0.03 80‐124' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS61 1 REST 1,000 W1R 1 59 59LT2L.11272732000 0 0.03 32‐114' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS62 1 HALL 2,500 F2 5 18 225LD55 10 125 100000 0 0.04 100‐22 18 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEPALAIS63 1 OFFICES (3) 1,500 T2RP 6 59 531LT2L6 27 243 288 O13##### 61 0.19 349‐672X4 TROFFER: WITH PARABOLIC LOUVER LENS, (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTOCCUPANCY SENSOR: (1) LINE VOLTAGE WALL MOUNTED PALAIS64 1 COPY 2,500 T2RP 2 59 295LT2L2 27 135 160 O21##68 68 0.06 228‐442X4 TROFFER: WITH PARABOLIC LOUVER LENS, (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTOCCUPANCY SENSOR: (1) LOW VOLTAGE CEILING MOUNTEDPALAIS65 1 KITCHENETTE 2,500 F2 2 18 90LD52105040000 0 0.02 40‐11 18 WATT COMPACT FLUORESCENT LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEPALAIS66 1 STORAGE 200 W1R 1 59 12LT2L.1127 5 6000 0 0.03 6 0 04' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS67 1 HALL 8,760 W1R 1 59 517LT2L.11 27 237 280000 0 0.03 280‐554' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS68 1 CLOSET 100 S2R 1 59 6LT1L.1114 1 5000 0 0.05 5 0 04' STRIP: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (1) LINEAR 4' 13 WATT LED T8 LAMP, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS69 B HALLS 8,760 I1R 6 59 3,101LT2L.16 27 1,419 1,682000 0 0.19 1,682‐28 334' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS70 B HALLS 3,950 I1R 8 59 1,864LT2L.18 27 853 1,011000 0 0.26 1,011‐17 204' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS71 B PHONE ROOM 500 I1R 3 59 89LT2L.13274148000 0 0.10 48‐114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS72 B KITCHEN 2,000 T1R 14 112 3,136LT2H14 46 1,288 1,848000 0 0.92 1,848‐31 362X4 TROFFER: WITH (4) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) HIGH POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS73 B FOOD STORAGE 1,500 T2R 5 59 443LT2L5 27 203 240000 0 0.16 240‐452X4 TROFFER: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS74 B COOLERS 1,000 C2 4 60 240LD3.14 12 48 192000 0 0.19 192‐34 60 WATT INCANDESCENT LAMPRETROFIT WITH (1) 12 WATT LED A19 LAMP LEAVE ALONEPALAIS75 B CUST 500 T1R 1 112 56LT2.11321640000 0 0.08 40‐112X4 TROFFER: WITH (4) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) NORMAL POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS76 B RESTS 500 W1R 2 59 59LT2L.12272732000 0 0.06 32‐114' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS77 B ELEV MECH 100 I1 1 80 8LT2L.1127 3 5000 0 0.05 5 0 04' INDUSTRIAL: WITH (2) 4' LINEAR 34 WATT T12 LAMPS, (1) MAGNETIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS78 B STORAGE 500 T2R 3 59 89LT2L.13274148000 0 0.10 48‐112X4 TROFFER: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPage 11 of 14
Type Qty Watts KWH Use Type Qty Watts KWH UseKWH SavingTypeQtyBurnWH UH SavDemand kWkWhg Penalty Tling Savings kMPAC Room by Room ReportArea InformationLightingDescriptionBld Map Flr Description BurnExisting Fixture Proposed Fixture Occupancy SensorsExisting Fixture Proposed Fixture Proposed SensorSavingsPALAIS79 B MECH 100 W1R 1 59 6LT2L.1127 3 3000 0 0.03 3 0 04' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS80 B STORAGE 500 I1R 2 59 59LT2L.12272732000 0 0.06 32‐114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS81 B STORAGE 500 W1R 4 59 118LT2L.14275464000 0 0.13 64‐114' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS82 B TAPESTRY 1,000 C6 16 75 1,200LD516 10 160 1,040000 0 1.04 1,040‐17 20 75 WATT PAR30 HALOGEN LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEPALAIS83 B TAPESTRY 1,000 C2F 5 60 300LD345 5 23 278000 0 0.28 278‐55 60 WATT INCANDESCENT FILAMENT LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT ST19 LAMPLEAVE ALONEPALAIS84 B TAPESTRY‐OFFICE 1,000 W1R 4 59 236LT2L.14 27 108 128000 0 0.13 128‐224' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS85 STAIRS 2,000 C2 2 60 240LD12 6 22 218000 0 0.11 218‐44 60 WATT INCANDESCENT LAMPRETROFIT WITH (1) 5.5 WATT A19 LED LAMP LEAVE ALONEPALAIS86 1 TAPESTRY 2,920 C2F 20 60 3,504LD3420 5 263 3,241000 0 1.11 3,241‐54 63 60 WATT INCANDESCENT FILAMENT LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT ST19 LAMPLEAVE ALONEPALAIS87 1 TAPESTRY 2,920 C2GF 5 60 876LD25.25 5 66 810000 0 0.28 810‐13 16 60 WATT INCANDESCENT FILAMENT GLOBE LAMPRETROFIT WITH (1) 4.5 WATT LED FILAMENT G25 LAMPLEAVE ALONEPALAIS88 1 TAPESTRY 2,920 MR16 32 45 4,205LD9.132 8 748 3,457000 0 1.18 3,457‐57 67 45 WATT MR16 HALOGEN FLOOD LAMPRETROFIT WITH (1) 8 WATT LED MR16 LAMP LEAVE ALONEPALAIS89 1 TAPESTRY 2,920 C6 7 75 1,533LD5.17 10 204 1,329000 0 0.46 1,329‐22 26 75 WATT PAR30 HALOGEN LAMPRETROFIT WITH (1) 10 WATT LED PAR30 LAMP LEAVE ALONEPALAIS90 1 TAP‐RESTS 2,500 LD1 10 6 150LA10 6 150 00000 0.00 0 0 06 WATT LED A LAMPLEAVE ALONELEAVE ALONEPALAIS90 1 TAP‐RESTS 2,500 C1 3 40 300LD13 6 41 259000 0 0.10 259‐45 40 WATT INCANDESCENT LAMPRETROFIT WITH (1) 5.5 WATT A19 LED LAMP LEAVE ALONEPALAIS90 1 TAP‐KITCHEN 2,920 T5R 16 89 4,158LT2H16 46 2,149 2,009000 0 0.69 2,009‐33 392X4 TROFFER: WITH (3) LINEAR 4' 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) HIGH POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS90 1 TAP‐KITCHEN 2,920 RF7 3 52 456LT123 20 175 280000 0 0.10 280‐55RECESS CAN: WITH (2) 26 WATT PL LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) 10 WATT LED PL LAMPS, BYPASS BALLASTLEAVE ALONEPALAIS90 1 TAP‐COOLER 2,500 V1R 1 59 148LT2L.21276880000 0 0.03 80‐124' VAPOR TIGHT: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS91 1 TAP‐HOODS 2,500 C2 6 60 900LD3.16 12 180 720000 0 0.29 720‐12 14 60 WATT INCANDESCENT LAMPRETROFIT WITH (1) 12 WATT LED A19 LAMP LEAVE ALONEPALAIS91 B CUST OFFICE 1,000 I1R 2 59 118LT2L.12275464000 0 0.06 64‐114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS92 B STAIRS 8,760 I1R 2 59 1,034LT2L.22 27 473 561000 0 0.06 561‐9114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS93 B HALL 8,760 I1R 4 59 2,067LT2L.14 27 946 1,121000 0 0.13 1,121‐19 224' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS94 B HALL 3,950 I1R 11 59 2,564LT2L.111 27 1,173 1,390000 0 0.35 1,390‐23 274' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS95 B STORAGE/MECH 8,760 I1R 4 59 2,067LT2L.14 27 946 1,121000 0 0.13 1,121‐19 224' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS96 B STORAGE/MECH 500 I1R 6 59 177LT2L.16278196000 0 0.19 96‐224' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1)ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPage 12 of 14
Type Qty Watts KWH Use Type Qty Watts KWH UseKWH SavingTypeQtyBurnWH UH SavDemand kWkWhg Penalty Tling Savings kMPAC Room by Room ReportArea InformationLightingDescriptionBld Map Flr Description BurnExisting Fixture Proposed Fixture Occupancy SensorsExisting Fixture Proposed Fixture Proposed SensorSavingsPALAIS97 B STORAGE 8,760 I1R 2 59 1,034LT2L.22 27 473 561000 0 0.06 561‐9114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS98 B STORAGE 500 I1R 9 59 266LT2L.29 27 122 144000 0 0.29 144‐234' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS99 B MECH 500 I1R 4 59 118LT2L.24275464000 0 0.13 64‐114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS100 B CUST 500 I1R 1 59 30LT2L.11271416000 0 0.03 16 0 04' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS101 B STORAGE 1,000 T2R 3 59 177LT2L.13278196000 0 0.10 96‐222X4 TROFFER: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS102 B STORAGE 1,000 I1R 1 59 59LT2L.11272732000 0 0.03 32‐114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS103 B STORAGE 1,000 C4 2 100 200LD3.12 12 24 176000 0 0.18 176‐3 3 100 WATT INCANDESCENT LAMPRETROFIT WITH (1) 12 WATT LED A19 LAMP LEAVE ALONEPALAIS104 B BOILER ROOM 8,760 I1R 2 59 1,034LT2L.12 27 473 561000 0 0.06 561‐9114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS105 B BOILER ROOM 1,000 I1R 8 59 472LT2L.28 27 216 256000 0 0.26 256‐454' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS106 B ELECT 8,760 I1R 1 59 517LT2L.11 27 237 280000 0 0.03 280‐554' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS107 B ELECT 500 I1R 5 59 148LT2L.15276880000 0 0.16 80‐124' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS108 B STORGAE 500 I1R 3 59 89LT2L.13274148000 0 0.10 48‐114' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS109 B TUNNELS 100 SF2 2 18 4LT11.2210 2 2000 0 0.02 2 0 0WALL MOUNTED JELLY JAR: WITH (1) 18 WATT PL LAMP, (1) ELECTRONIC BALLASTRETROFIT WITH (1) 10 WATT LED PL LAMP, BYPASS BALLASTLEAVE ALONEPALAIS110 STAIRS 8,760 I1R 3 59 1,551LT2L.13 27 710 841000 0 0.10 841‐14 164' INDUSTRIAL: WITH (2) 4' LINEAR 32 WATT T8 LAMPS, (1) ELECTRONIC BALLASTRETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS111 STAIRS 8,760 W1R 3 59 1,551LT2L.13 27 710 841000 0 0.10 841‐14 164' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS112 1 HALL 2,000 W1R 2 59 236LT2L.12 27 108 128000 0 0.06 128‐224' WRAP: WITH (2) LINEAR 4' 32 WATT T8 LAMPS, (1) ELECTRONIC BALLAST RETROFIT WITH (2) LINEAR 4' 13 WATT LED T8 LAMPS, (1) LOW POWER ELECTRONIC BALLASTLEAVE ALONEPALAIS113 EXITS 8,760 X4 2 2 35X122 35 0000 0 0.00 0 0 0 EXIT SIGN WITH (1) 2 WATT LED LIGHT ENGINEEXIT SIGN: NEW REPLACEMENT FIXTURE WITH (1) 2 WATT LED LIGHT ENGINE, AND EMERGENCY BATTERY BACKUPLEAVE ALONEPALAIS115 EMU 0 0 0EM110000000 0 0.00 0 0 0REPLACE EMERGENCY BATTERY BACK-UP BALLASTLEAVE ALONEPALAIS116 LENSES 0 0 0LENS12000000 0 0.00 0 0 0NEW 2X4 LENS LEAVE ALONEPALAIS117 LENSES 0 0 0LENS22000000 0 0.00 0 0 0NEW 4' VAPOR TIGHT LENS LEAVE ALONEPALAIS118 LESNES 0 0 0LENS52000000 0 0.00 0 0 0NEW 4' WRAP LENS LEAVE ALONEPALAISEXT119 EXTERIOR 4,380 WP3 2 26 228LED192 18 158 70000 0 0.02 70‐11WALL PACK JELLY JAR: WITH (1) 26 WATT CFL LAMPWALL PACK: NEW REPLACEMENT 18 WATT LED FIXTURE, PHOTOCELLLEAVE ALONEPALAISEXT120 EXTERIOR 4,380 LD6 3 16 210LA3 16 210 0000 0 0.00 0 0 0 16 WATT PAR38 LED FLOOD LAMPLEAVE ALONE LEAVE ALONEPage 13 of 14
Type Qty Watts KWH Use Type Qty Watts KWH UseKWH SavingTypeQtyBurnWH UH SavDemand kWkWhg Penalty Tling Savings kMPAC Room by Room ReportArea InformationLightingDescriptionBld Map Flr Description BurnExisting Fixture Proposed Fixture Occupancy SensorsExisting Fixture Proposed Fixture Proposed SensorSavingsPALETC121 NEW DIMMING PANEL 0 0 0LA0P3100 0 0.00 0 0LEAVE ALONENEW ETC PANEL FOR PALAISTotal186.85###### ##### ######Page 14 of 14
APPENDIX 2: SAVINGS CALCULATIONS
ECM 1: Boiler & Pump Replacement
ECM 2: AHU-1 Replacement
ECM 3: RTU & MAU Replacement
ECM 4: Heatpump Controls Upgrades
ECM 5: New BAS for Complete Building Control
ECM 6: Plumbing Fixture Replacement
ECM 7: Roofing Replacement
ECM 8: Fire Alarm System Replacement
ScopeECM‐1ExistingSourceProposed Source NotesTotal Boiler Output33003300Boiler Efficiency75%assumed degredation 80%Submittals for average usageDelta T2020Flow Rate gpm5252Pump Motor HP1111Heating hours per year50885088September 30‐April 30Average Pump Speed100%100%Average Pump Load Factor100%100%Pump Efficiency80%assumed degredation 85% assumed new pumpElectric Savings, kWh3070.01Natural Gas Therms2204.80South Bend MPACReplace (3) 1100 MBH Burnham Boilers with new condensing boilers and pumpsBoiler ReplacementInputsSavings
ECM-1 Boiler Replacement
Inputs Existing Proposed
Heat Transfer: 500*gpm*delta T 520,000 520,000 BTU/h
Heating Output: Heat transfer* heating hours 2,645,760,000 2,645,760,000 BTU
Heating Input: Heat Output/Heating Efficiency 3,527,680,000 3,307,200,000 BTU
Heating Therms: Heating Input/100000 35,277 33,072
Total Energy Savings
Annual Energy Savings:2,205
Scope
ECM‐2
Pre Retrofit Source Post Retrofit Source
Supply Airflow, Cfm 47000 Model number 47000 Submittal
% Ventilation 20% Assumption 10%Submittal
Setback Ventilation 0%
Heating Setpoint 70 Assumption 70 Assumption
Average Heating Return Air Temperature 72 Assumption 72 Assumption
Heating Setpoint Setback Assumption 68 Assumption
Average Heating Return Air Temperature Setback Assumption 66 Assumption
Heating Hours Cutoff (Heating used below this tempera 70 Assumption 70 Assumption
Heating Efficiency 85% Assumption 90%
Cooling Hours Cutoff 72 75 Energy Code
Cooling Setpoint 72 75
Cooling Return Air Temp 74 77
Cooling Return Air Relative Humidity 60% Assumption 60%Assumption
Cooling Setpoint Setback 77
Cooling Return Air Temp Setback 79
Chiller Tonnage 135 Nameplate 160 Cutsheet
Chiller IPLV kW/ton 0.815 cutsheet with 10% derate for age 0.749 Cutsheet
CHW Pump Motor HP 0 None existing 2 Assumption
CW Pump Motor HP 0 None existing 2 Assumption
CHW Pump Load Factor 100%100%
CW Pump Load Factor 100%100%
Pump Efficiency 95%95%
Avg. Pump Speed 100%100%
Fan Horsepower 75 Assumption 75 Cutsheet
Average Fan Speed 100%100%
Average Fan Load Factor 100%100%
Average Fan Efficiency 86%Assumption 86%Assumption
Average Fan Speed‐Unoccupied 100%75%
Average Fan Load Factor‐Unoccupied 100%75%
Heat Recovery System Efficiency, Heating, % =60% Assumption
Heat Recovery System Efficiency, % =60% Assumption
ERV Hp 0.2 Assumption
ERV Avg Fan Speed 100% Assumption
ERV Load Factor 100.0% Assumption
ERV Fan Efficiency 86.0% Assumption
Natural gas Therms 6497.38
Electric Savings ‐53410.63
Savings
South Bend MPAC
Replace DX AHU‐1 with new unit and new VAV controls
AHU‐1 Upgrade
Inputs
AHU Fan Total
Pre Retrofit Operation
Fan Horsepower 75.0
Fan Hours 5,016
Avg. Fan Speed 100%
Fan Load Factor 100%
Fan Efficiency 86%
Average Fan Energy kW 65.06
kW = HP x 0.746 x Load Factor x (% Speed)^2.5 /Efficiency
(theoretical equation is speed^3, actual is closer to 2.5)
Fan Energy, kWh 326,331.63
Post Retrofit Operation-Occupied
Fan Horsepower 75.0
Fan Hours 5,016
Avg. Fan Speed 100%
Fan Load Factor 100%
Fan Efficiency 86%
Average Fan Energy kW 65.06
Fan Energy, kWh 326,331.63
Post Retrofit Operation-Unoccupied
Fan Horsepower 75.0
Fan Hours 3,331
Avg. Fan Speed 75%
Fan Load Factor 75%
Fan Efficiency 86%
Average Fan Energy kW 23.77
Fan Energy, kWh 79,175.48
Electric Savings, kWh (79,175)
Pre Retrofit Conditions
Mid‐pts DB (F) Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
99 98 to 100 8 46.7 0
97 96 to 98 4 46.9 0
95 94 to 96 5 44.2 0
93 92 to 94 6 43.3 0
91 90 to 92 8 41.7 0
89 88 to 90 24 38.3 0
87 86 to 88 49 37.7 0
85 84 to 86 53 36.7 0
83 82 to 84 63 34.8 0
81 80 to 82 92 33.5 0
79 78 to 80 106 31.9 0
77 76 to 78 64 31.4 0
75 74 to 76 173 30.1 0
73 72 to 74 166 30.3 0
71 70 to 72 218 30 0
69 68 to 70 273 28.5 71.4 0
67 66 to 68 185 26.8 71 0
65 64 to 66 175 25.7 70.6 0
63 62 to 64 166 24.5 70.2 0
61 60 to 62 146 23.7 69.8 17.43755
59 58 to 60 72 22.8 69.4 25.79802
57 56 to 58 129 21.4 69 77.03576
55 54 to 56 149 20.6 68.6 124.571
53 52 to 54 156 19.7 68.2 167.6872
51 50 to 52 180 19.1 67.8 236.4819
49 48 to 50 120 17.8 67.4 186.3191
47 46 to 48 107 16.8 67 191.6936
45 44 to 46 141 16 66.6 286.2864
43 42 to 44 168 15.2 66.2 381.2375
41 40 to 42 98 14.6 65.8 245.7978
39 38 to 40 130 13.6 65.4 357.1115
37 36 to 38 156 12.7 65 465.7976
35 34 to 36 201 12.2 64.6 648.1753
33 32 to 34 251 11.3 64.2 869.3695
31 30 to 32 195 10.5 63.8 721.9864
29 28 to 30 134 9.7 63.4 528.1429
27 26 to 28 146 8.9 63 610.3144
25 24 to 26 95 8.1 62.6 419.8151
23 22 to 24 41 7.6 62.2 190.977
21 20 to 22 56 7 61.8 274.2234
19 18 to 20 52 6.4 61.4 267.0573
17 16 to 18 39 5.7 61 209.6089
15 14 to 16 63 5.1 60.6 353.6479
13 12 to 14 41 4.4 60.2 239.9455
11 10 to 12 25 3.8 59.8 152.28
98 to 10 27 3.2 59.4 170.9119
76 to 8 18 2.6 59 118.2409
54 to 6 10 2.1 58.6 68.07812
32 to 4 15 1.6 58.2 105.7002
10 to 2 10 1 57.8 72.85553
‐1 ‐2 to 0 7 0.4 57.4 52.67096
0 0 0 0 57.6 0
0 0 0 0 57.6 0
Total 8837.256
Total
HeatingBin Data
Post Retrofit Conditions‐Occupied
Mid‐pts DB (F) Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
99 98 to 100 8 46.7 0
97 96 to 98 4 46.9 0
95 94 to 96 5 44.2 0
93 92 to 94 6 43.3 0
91 90 to 92 8 41.7 0
89 88 to 90 24 38.3 0
87 86 to 88 49 37.7 0
85 84 to 86 53 36.7 0
83 82 to 84 63 34.8 0
81 80 to 82 92 33.5 0
79 78 to 80 106 31.9 0
77 76 to 78 64 31.4 0
75 74 to 76 173 30.1 0
73 72 to 74 166 30.3 0
71 70 to 72 218 30 0
69 68 to 70 273 28.5 71.7 0
67 66 to 68 185 26.8 71.5 0
65 64 to 66 175 25.7 71.3 0
63 62 to 64 166 24.5 71.1 0
61 60 to 62 146 23.7 70.9 0
59 58 to 60 72 22.8 70.7 0
57 56 to 58 129 21.4 70.5 0
55 54 to 56 149 20.6 70.3 0
53 52 to 54 156 19.7 70.1 0
51 50 to 52 180 19.1 69.9 10.152
49 48 to 50 120 17.8 69.7 20.304
47 46 to 48 107 16.8 69.5 30.174
45 44 to 46 141 16 69.3 55.6668
43 42 to 44 168 15.2 69.1 85.2768
41 40 to 42 98 14.6 68.9 60.7992
39 38 to 40 130 13.6 68.7 95.316
37 36 to 38 156 12.7 68.5 131.976
35 34 to 36 201 12.2 68.3 192.7188
33 32 to 34 251 11.3 68.1 268.9716
31 30 to 32 195 10.5 67.9 230.958
29 28 to 30 134 9.7 67.7 173.8248
27 26 to 28 146 8.9 67.5 205.86
25 24 to 26 95 8.1 67.3 144.666
23 22 to 24 41 7.6 67.1 67.0596
21 20 to 22 56 7 66.9 97.9104
19 18 to 20 52 6.4 66.7 96.7824
17 16 to 18 39 5.7 66.5 76.986
15 14 to 16 63 5.1 66.3 131.4684
13 12 to 14 41 4.4 66.1 90.1836
11 10 to 12 25 3.8 65.9 57.81
98 to 10 27 3.2 65.7 65.4804
76 to 8 18 2.6 65.5 45.684
54 to 6 10 2.1 65.3 26.508
32 to 4 15 1.6 65.1 41.454
10 to 2 10 1 64.9 28.764
‐1 ‐2 to 0 7 0.4 64.7 20.9244
0 0 0 0 64.8 0
0 0 0 0 64.8 0
Total 2553.679
Total
Bin Data Heating
Post Retrofit Conditions‐Unoccupied
Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
93 92 to 94 4 41.2 0
91 90 to 92 18 41.9 0
89 88 to 90 23 40.1 0
87 86 to 88 28 38.7 0
85 84 to 86 36 36.4 0
83 82 to 84 66 35.2 0
81 80 to 82 69 34.9 0
79 78 to 80 106 33.7 0
77 76 to 78 63 32.8 0
75 74 to 76 120 32 0
73 72 to 74 136 32 0
71 70 to 72 153 30.6 0
69 68 to 70 203 29.5 66 228.984
67 66 to 68 111 27.7 66 125.208
65 64 to 66 91 26 66 102.648
63 62 to 64 122 24.7 66 137.616
61 60 to 62 104 23.6 66 117.312
59 58 to 60 73 22.3 66 82.344
57 56 to 58 133 22.2 66 150.024
55 54 to 56 94 20.7 66 106.032
53 52 to 54 90 19.9 66 101.52
51 50 to 52 155 18.5 66 174.84
49 48 to 50 116 17.8 66 130.848
47 46 to 48 107 17 66 120.696
45 44 to 46 113 15.9 66 127.464
43 42 to 44 88 15.2 66 99.264
41 40 to 42 81 14.2 66 91.368
39 38 to 40 112 13.7 66 126.336
37 36 to 38 79 12.6 66 89.112
35 34 to 36 103 12 66 116.184
33 32 to 34 215 11.2 66 242.52
31 30 to 32 157 10.4 66 177.096
29 28 to 30 113 9.7 66 127.464
27 26 to 28 72 9 66 81.216
25 24 to 26 73 8.4 66 82.344
23 22 to 24 40 7.6 66 45.12
21 20 to 22 64 6.9 66 72.192
19 18 to 20 77 6.3 66 86.856
17 16 to 18 31 5.7 66 34.968
15 14 to 16 35 5 66 39.48
13 12 to 14 17 4.3 66 19.176
11 10 to 12 12 3.8 66 13.536
98 to 10 11 3.2 66 12.408
76 to 8 5 2.5 66 5.64
54 to 6 1 2.1 66 1.128
32 to 4 8 1.5 66 9.024
10 to 2 3 0.9 66 3.384
‐1 ‐2 to 0 8 0.4 66 9.024
‐3 ‐4 to ‐2 1 ‐0.3 66 1.128
‐5 ‐6 to ‐4 1 ‐0.8 66 1.128
‐7 ‐8 to ‐6 3 ‐1.3 66 3.384
000 0 66 0
000 0 66 0
Total 3296.016
Total
Bin Data Heating
EXISTING CONDITIONS:
Chiller Tonnage = 135 tons
Chiller IPLV = 0.815 kW/ton
CHWP Motor Hp = 0 hp
CWP Motor Hp = 0 hp
Conversion Constant = 0.746 kW/hp
CHWP Load Factor = 100%
CWP Load Factor = 100%
Motor Efficiency = 95%
Speed % = 100%
Total Load CHWP CHWP CWP CWP Chiller Eff. Chiller Load Demand Elec. Required
Mid‐pts DB (F) Hrs % kW kWh kW kWh IPLV Tons kW kWh/yr
99 98 to 100 8 100.0%0.0 0 0.0 0 0.815 135 110 880
97 96 to 98 4 100.0%0.0 0 0.0 0 0.815 135 110 440
95 94 to 96 5 100.0%0.0 0 0.0 0 0.815 135 110 550
93 92 to 94 6 95.6%0.0 0 0.0 0 0.815 129 105 631
91 90 to 92 8 91.1%0.0 0 0.0 0 0.815 123 100 802
89 88 to 90 24 86.7%0.0 0 0.0 0 0.815 117 95 2,288
87 86 to 88 49 82.2%0.0 0 0.0 0 0.815 111 90 4,432
85 84 to 86 53 77.8%0.0 0 0.0 0 0.815 105 86 4,534
83 82 to 84 63 73.3%0.0 0 0.0 0 0.815 99 81 5,082
81 80 to 82 92 68.9%0.0 0 0.0 0 0.815 93 76 6,972
79 78 to 80 106 64.4%0.0 0 0.0 0 0.815 87 71 7,514
77 76 to 78 64 60.0%0.0 0 0.0 0 0.815 81 66 4,224
75 74 to 76 173 55.6%0.0 0 0.0 0 0.815 75 61 10,572
73 72 to 74 166 51.1%0.0 0 0.0 0 0.815 69 56 9,333
71 70 to 72 218 46.7%0.0 0 0.0 0 0.815 63 51 11,191
69 68 to 70 273 42.2%0.0 0 0.0 0 0.815 57 46 12,679
67 66 to 68 185 37.8%0.0 0 0.0 0 0.815 51 42 7,688
65 64 to 66 175 33.3%0.0 0 0.0 0 0.815 45 37 6,417
63 62 to 64 166 30.0%0.0 0 0.0 0 0.815 41 33 5,478
61 60 to 62 146 30.0%0.0 0 0.0 0 0.815 41 33 4,818
59 58 to 60 72 30.0%0.0 0 0.0 0 0.815 41 33 2,376
57 56 to 58 129 30.0%0.0 0 0.0 0 0.815 41 33 4,257
55 54 to 56 149 30.0%0.0 0 0.0 0 0.815 41 33 4,917
Totals 2,326 0 0 117,194
PROPOSED CONDITIONS: Occupied
Chiller Tonnage = 160 tons
Chiller IPLV = 0.749 kW/ton
CHWP Motor Hp = 2 hp
CWP Motor Hp = 2 hp
Conversion Constant = 0.746 kW/hp
CHWP Load Factor = 100%
CWP Load Factor = 100%
Motor Efficiency = 95%
Speed % = 100%
Total Load CHWP CHWP CWP CWP Chiller Eff. Chiller Load Demand Elec. Required
Mid‐pts DB (F) Hrs % kW kWh kW kWh IPLV Tons kW kWh/yr
99 98 to 100 8 100.0%1.6 13 1.6 13 0.749 160 120 959
97 96 to 98 4 100.0%1.6 6 1.6 6 0.749 160 120 479
95 94 to 96 5 100.0%1.6 8 1.6 8 0.749 160 120 599
93 92 to 94 6 95.6%1.6 9 1.6 9 0.749 153 115 687
91 90 to 92 8 91.1%1.6 13 1.6 13 0.749 146 109 874
89 88 to 90 24 86.7%1.6 38 1.6 38 0.749 139 104 2,493
87 86 to 88 49 82.2%1.6 77 1.6 77 0.749 132 99 4,829
85 84 to 86 53 77.8%1.6 84 1.6 84 0.749 124 93 4,940
83 82 to 84 63 73.3%1.6 99 1.6 99 0.749 117 88 5,537
81 80 to 82 92 68.9%1.6 145 1.6 145 0.749 110 83 7,596
79 78 to 80 106 64.4%1.6 167 1.6 167 0.749 103 77 8,187
77 76 to 78 64 60.0%1.6 101 1.6 101 0.749 96 72 4,602
Bin Temps
Bin Temps
75 74 to 76 173 55.6%1.6 273 1.6 273 0.749 89 67 11,519
73 72 to 74 166 51.1%1.6 262 1.6 262 0.749 82 61 10,169
71 70 to 72 218 46.7%1.6 344 1.6 344 0.749 75 56 12,193
69 68 to 70 273 42.2%1.6 431 1.6 431 0.749 68 51 13,815
67 66 to 68 185 37.8%1.6 292 1.6 292 0.749 60 45 8,376
65 64 to 66 175 33.3%1.6 276 1.6 276 0.749 53 40 6,991
63 62 to 64 166 30.0%1.6 262 1.6 262 0.749 48 36 5,969
61 60 to 62 146 30.0%1.6 231 1.6 231 0.749 48 36 5,249
59 58 to 60 72 30.0%1.6 114 1.6 114 0.749 48 36 2,589
57 56 to 58 129 30.0%1.6 204 1.6 204 0.749 48 36 4,638
55 54 to 56 149 30.0%1.6 235 1.6 235 0.749 48 36 5,357
Totals 2,326 3,672 3,672 127,688
PROPOSED CONDITIONS: UnOccupied
Chiller Tonnage = 160 tons
Chiller IPLV = 0.749 kW/ton
CHWP Motor Hp = 2 hp
CWP Motor Hp = 2 hp
Conversion Constant = 0.746 kW/hp
CHWP Load Factor = 100%
CWP Load Factor = 100%
Motor Efficiency = 95%
Speed % = 100%
Total Load CHWP CHWP CWP CWP Chiller Eff. Chiller Load Demand Elec. Required
Mid‐pts DB (F) Hrs % kW kWh kW kWh IPLV Tons kW kWh/yr
99 98 to 100 0 100.0%1.6 0 1.6 0 0.749 160 120 0
97 96 to 98 0 100.0%1.6 0 1.6 0 0.749 160 120 0
95 94 to 96 0 100.0%1.6 0 1.6 0 0.749 160 120 0
93 92 to 94 4 95.6%1.6 6 1.6 6 0.749 153 115 458
91 90 to 92 18 91.1%1.6 28 1.6 28 0.749 146 109 1,966
89 88 to 90 23 86.7%1.6 36 1.6 36 0.749 139 104 2,389
87 86 to 88 28 82.2%1.6 44 1.6 44 0.749 132 99 2,759
85 84 to 86 36 77.8%1.6 57 1.6 57 0.749 124 93 3,356
83 82 to 84 66 73.3%1.6 104 1.6 104 0.749 117 88 5,801
81 80 to 82 69 68.9%1.6 109 1.6 109 0.749 110 83 5,697
79 78 to 80 106 64.4%1.6 167 1.6 167 0.749 103 77 8,187
77 76 to 78 63 60.0%1.6 99 1.6 99 0.749 96 72 4,530
75 74 to 76 120 55.6%1.6 189 1.6 189 0.749 89 67 7,990
73 72 to 74 136 51.1%1.6 215 1.6 215 0.749 82 61 8,331
71 70 to 72 153 46.7%1.6 242 1.6 242 0.749 75 56 8,557
69 68 to 70 203 42.2%1.6 321 1.6 321 0.749 68 51 10,272
67 66 to 68 111 37.8%1.6 175 1.6 175 0.749 60 45 5,026
65 64 to 66 91 33.3%1.6 144 1.6 144 0.749 53 40 3,635
63 62 to 64 122 30.0%1.6 193 1.6 193 0.749 48 36 4,387
61 60 to 62 104 30.0%1.6 164 1.6 164 0.749 48 36 3,739
59 58 to 60 73 30.0%1.6 115 1.6 115 0.749 48 36 2,625
57 56 to 58 133 30.0%1.6 210 1.6 210 0.749 48 36 4,782
55 54 to 56 94 30.0%1.6 148 1.6 148 0.749 48 36 3,380
Totals 1,753 2,768 2,768 97,867
ANNUAL SAVINGS:
Chiller Savings =-108,361 kWh
Pump Motor Savings =-12,880 kWh
Bin Temps
South Bend MPAC
Replace AHU 1 DX RTU with chilled water RTU
Energy Recovery Wheel
Inputs Existing Proposed
A Winter Inside Temperature, °F =70.0 °F 70 °F
B Exhaust Air Temperature, °F =75.0 °F 75 °F
C Heat Recovery System Efficiency, Heating, % =0% 60%
D Summer Inside Temperature, =72.0 °F 75 °F
E Exhaust Air Temperature, °F =74.0 °F 77 °F
F Heat Recovery System Efficiency, % =0% 60%
J Heating Energy 8,837 Therms 5,850 Therms
K Cooling Energy 117,194 kWh 225,555 kWh
N Fan Energy kW 0.00 kWh 0.14 kWh
Savings Analysis
U Heating Natural Gas Saving :
= Heating Energy Needed * Recovery Efficiency 0 Therm 3,510 Therm
V Cooling Electrical Saving:
= Cooling Energy Needed * Recovery Efficiency 0 kWh 135,333 kWh
W ERV Fan Motor Operation Energy Usage:
= Fan kW * Total Run Hours 0 kWh 1,207 kWh
(ERV runs 350/22; energy saving penalty)
Total Electrical Saving 0 kWh 134,126 kWh
Total Natural Gas Saving 0 Therm 3,510 Therm
Total Electric Usage 117,194 91,429
Winter Heating
Summer Cooling
Operation
Scope
ECM‐3
Pre Retrofit Source Post Retrofit Source
Supply Airflow, Cfm 24000 Model number 24000 Submittal
% Ventilation 20% 10%
Submittal
Setback Ventilation 0%
Heating Setpoint 70 Assumption 70
Assumption
Average Heating Return Air Temperature 72 Assumption 72
Assumption
Heating Setpoint Setback 68 Assumption
Average Heating Return Air Temperature Setback 66 Assumption
Heating Hours Cutoff (Heating used below this tempera 70 Assumption 70 Assumption
Heating Efficiency 80% Assumption 80%Cutsheet
Cooling Leaving Air Temp 57 Assumption 57 Design
Cooling Leaving Air Relative Humidity 100% 100%
Cooling Leaving Air Temp Setback Assumption 59 Design
Cooling Efficiency kW/ton 1.14 cutsheet 0.99 IEER cutsheet
Cooling Hours Cutoff 72 75 Energy Code
Cooling Setpoint 72 75
Cooling Return Air Temp 74 77
Cooling Return Air Relative Humidity 60% Assumption 60%
Assumption
Cooling Setpoint Setback 77
Cooling Return Air Temp Setback 79
Fan Horsepower 15 Cutsheet 15 Cutsheet
Average Fan Speed 100% 75%
Average Fan Load Factor 100% 75%
Average Fan Efficiency 86%Assumption 93%Cutsheet
Natural gas Therms 1434.22
Electric Savings 15879.10
Savings
South Bend MPAC
Replace DX RTU‐2 with new unit and new VAV controls
RTU‐2 Upgrade
Inputs
AHU Fan Total
Pre Retrofit Operation
Fan Horsepower 15.0
Fan Hours 5,016
Avg. Fan Speed 100%
Fan Load Factor 100%
Fan Efficiency 86%
Average Fan Energy kW 13.01
kW = HP x 0.746 x Load Factor x (% Speed)^2.5 /Efficiency
(theoretical equation is speed^3, actual is closer to 2.5)
Fan Energy, kWh 65,266.33
Post Retrofit Operation
Fan Horsepower 15.0
Fan Hours 8,757
Avg. Fan Speed 75%
Fan Load Factor 75%
Fan Efficiency 93%
Average Fan Energy kW 4.40
Fan Energy, kWh 38,496.12
Electric Savings, kWh 26,770
Pre Retrofit Conditions
Mid‐pts DB (F) Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
Mixed Air
Enthalpy
Chilled Water
kWh
99 98 to 100 8 46.7 0 33.4128 695.2978286
97 96 to 98 4 46.9 0 33.4528 349.2946286
95 94 to 96 5 44.2 0 32.9128 408.8468571
93 92 to 94 6 43.3 0 32.7328 479.5076571
91 90 to 92 8 41.7 0 32.4128 613.0121143
89 88 to 90 24 38.3 0 31.7328 1671.173486
87 86 to 88 49 37.7 0 31.6128 3351.4992
85 84 to 86 53 36.7 0 31.4128 3516.0624
83 82 to 84 63 34.8 0 31.0328 3933.2304
81 80 to 82 92 33.5 0 30.7728 5497.730743
79 78 to 80 106 31.9 0 30.4528 5985.450514
77 76 to 78 64 31.4 0 30.3528 3548.028343
75 74 to 76 173 30.1 0 30.0928 9128.112686
73 72 to 74 166 30.3 0 30.1328 8827.064229
71 70 to 72 218 30 0
69 68 to 70 273 28.5 71.4 0
67 66 to 68 185 26.8 71 0
65 64 to 66 175 25.7 70.6 0
63 62 to 64 166 24.5 70.2 0
61 60 to 62 146 23.7 69.8 9.4608
59 58 to 60 72 22.8 69.4 13.9968
57 56 to 58 129 21.4 69 41.796
55 54 to 56 149 20.6 68.6 67.5864
53 52 to 54 156 19.7 68.2 90.9792
51 50 to 52 180 19.1 67.8 128.304
49 48 to 50 120 17.8 67.4 101.088
47 46 to 48 107 16.8 67 104.004
45 44 to 46 141 16 66.6 155.3256
43 42 to 44 168 15.2 66.2 206.8416
41 40 to 42 98 14.6 65.8 133.3584
39 38 to 40 130 13.6 65.4 193.752
37 36 to 38 156 12.7 65 252.72
35 34 to 36 201 12.2 64.6 351.6696
33 32 to 34 251 11.3 64.2 471.6792
31 30 to 32 195 10.5 63.8 391.716
29 28 to 30 134 9.7 63.4 286.5456
27 26 to 28 146 8.9 63 331.128
25 24 to 26 95 8.1 62.6 227.772
23 22 to 24 41 7.6 62.2 103.6152
21 20 to 22 56 7 61.8 148.7808
19 18 to 20 52 6.4 61.4 144.8928
17 16 to 18 39 5.7 61 113.724
15 14 to 16 63 5.1 60.6 191.8728
13 12 to 14 41 4.4 60.2 130.1832
11 10 to 12 25 3.8 59.8 82.62
98 to 10 27 3.2 59.4 92.7288
76 to 8 18 2.6 59 64.152
54 to 6 10 2.1 58.6 36.936
32 to 4 15 1.6 58.2 57.348
10 to 2 10 1 57.8 39.528
‐1 ‐2 to 0 7 0.4 57.4 28.5768
0 0 0 0 57.6 0
0 0 0 0 57.6 0
Total 4794.682 48004.31109
Total
Heating CoolingBin Data
Post Retrofit Conditions‐Occupied
Mid‐pts DB (F) Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
Mixed Air
Enthalpy
Chilled Water
kWh
99 98 to 100 8 46.7 0 33.605 617.0816529
97 96 to 98 4 46.9 0 33.625 309.254876
95 94 to 96 5 44.2 0 33.355 374.5190083
93 92 to 94 6 43.3 0 33.265 444.6029752
91 90 to 92 8 41.7 0 33.105 581.3791736
89 88 to 90 24 38.3 0 32.765 1671.304463
87 86 to 88 49 37.7 0 32.705 3386.005289
85 84 to 86 53 36.7 0 32.605 3615.108099
83 82 to 84 63 34.8 0 32.415 4190.364298
81 80 to 82 92 33.5 0 32.285 6012.511736
79 78 to 80 106 31.9 0 32.125 6776.080661
77 76 to 78 64 31.4 0 32.075 4062.656529
75 74 to 76 173 30.1 0
73 72 to 74 166 30.3 0
71 70 to 72 218 30 0
69 68 to 70 273 28.5 71.7 0
67 66 to 68 185 26.8 71.5 0
65 64 to 66 175 25.7 71.3 0
63 62 to 64 166 24.5 71.1 0
61 60 to 62 146 23.7 70.9 0
59 58 to 60 72 22.8 70.7 0
57 56 to 58 129 21.4 70.5 0
55 54 to 56 149 20.6 70.3 0
53 52 to 54 156 19.7 70.1 0
51 50 to 52 180 19.1 69.9 5.832
49 48 to 50 120 17.8 69.7 11.664
47 46 to 48 107 16.8 69.5 17.334
45 44 to 46 141 16 69.3 31.9788
43 42 to 44 168 15.2 69.1 48.9888
41 40 to 42 98 14.6 68.9 34.9272
39 38 to 40 130 13.6 68.7 54.756
37 36 to 38 156 12.7 68.5 75.816
35 34 to 36 201 12.2 68.3 110.7108
33 32 to 34 251 11.3 68.1 154.5156
31 30 to 32 195 10.5 67.9 132.678
29 28 to 30 134 9.7 67.7 99.8568
27 26 to 28 146 8.9 67.5 118.26
25 24 to 26 95 8.1 67.3 83.106
23 22 to 24 41 7.6 67.1 38.5236
21 20 to 22 56 7 66.9 56.2464
19 18 to 20 52 6.4 66.7 55.5984
17 16 to 18 39 5.7 66.5 44.226
15 14 to 16 63 5.1 66.3 75.5244
13 12 to 14 41 4.4 66.1 51.8076
11 10 to 12 25 3.8 65.9 33.21
98 to 10 27 3.2 65.7 37.6164
76 to 8 18 2.6 65.5 26.244
54 to 6 10 2.1 65.3 15.228
32 to 4 15 1.6 65.1 23.814
10 to 2 10 1 64.9 16.524
‐1 ‐2 to 0 7 0.4 64.7 12.0204
0 0 0 0 64.8 0
0 0 0 0 64.8 0
Total 1467.007 32040.86876
Total
Bin Data Heating Cooling
Post Retrofit Conditions‐Unoccupied
Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
Mixed Air
Enthalpy
Chilled Water
kWh
93 92 to 94 4 41.2 0 33.593 260.092562
91 90 to 92 18 41.9 0 33.593 1170.416529
89 88 to 90 23 40.1 0 33.593 1495.532231
87 86 to 88 28 38.7 0 33.593 1820.647934
85 84 to 86 36 36.4 0 33.593 2340.833058
83 82 to 84 66 35.2 0 33.593 4291.527273
81 80 to 82 69 34.9 0 33.593 4486.596694
79 78 to 80 106 33.7 0 33.593 6892.452893
77 76 to 78 63 32.8 0 33.593 4096.457851
75 74 to 76 120 32 0
73 72 to 74 136 32 0
71 70 to 72 153 30.6 0
69 68 to 70 203 29.5 66 131.544
67 66 to 68 111 27.7 66 71.928
65 64 to 66 91 26 66 58.968
63 62 to 64 122 24.7 66 79.056
61 60 to 62 104 23.6 66 67.392
59 58 to 60 73 22.3 66 47.304
57 56 to 58 133 22.2 66 86.184
55 54 to 56 94 20.7 66 60.912
53 52 to 54 90 19.9 66 58.32
51 50 to 52 155 18.5 66 100.44
49 48 to 50 116 17.8 66 75.168
47 46 to 48 107 17 66 69.336
45 44 to 46 113 15.9 66 73.224
43 42 to 44 88 15.2 66 57.024
41 40 to 42 81 14.2 66 52.488
39 38 to 40 112 13.7 66 72.576
37 36 to 38 79 12.6 66 51.192
35 34 to 36 103 12 66 66.744
33 32 to 34 215 11.2 66 139.32
31 30 to 32 157 10.4 66 101.736
29 28 to 30 113 9.7 66 73.224
27 26 to 28 72 9 66 46.656
25 24 to 26 73 8.4 66 47.304
23 22 to 24 40 7.6 66 25.92
21 20 to 22 64 6.9 66 41.472
19 18 to 20 77 6.3 66 49.896
17 16 to 18 31 5.7 66 20.088
15 14 to 16 35 5 66 22.68
13 12 to 14 17 4.3 66 11.016
11 10 to 12 12 3.8 66 7.776
98 to 10 11 3.2 66 7.128
76 to 8 5 2.5 66 3.24
54 to 6 1 2.1 66 0.648
32 to 4 8 1.5 66 5.184
10 to 2 3 0.9 66 1.944
‐1 ‐2 to 0 8 0.4 66 5.184
‐3 ‐4 to ‐2 1 ‐0.3 66 0.648
‐5 ‐6 to ‐4 1 ‐0.8 66 0.648
‐7 ‐8 to ‐6 3 ‐1.3 66 1.944
000 0 66 0
000 0 66 0
Total 1893.456 26854.55702
Total
Bin Data Heating Cooling
Scope
ECM‐3
Pre Retrofit Source Post Retrofit Source
Supply Airflow, Cfm 16000 Model number 16000 Submittal
% Ventilation 20% 10%
Submittal
Setback Ventilation 0%
Heating Setpoint 70 Assumption 70
Assumption
Average Heating Return Air Temperature 72 Assumption 72
Assumption
Heating Setpoint Setback 68 Assumption
Average Heating Return Air Temperature Setback 66 Assumption
Heating Hours Cutoff (Heating used below this tempera 70 Assumption 70 Assumption
Heating Efficiency 80% Assumption 80%Cutsheet
Cooling Leaving Air Temp 57 Assumption 57 Design
Cooling Leaving Air Relative Humidity 100% 100%
Cooling Leaving Air Temp Setback Assumption 59 Design
Cooling Efficiency kW/ton 1.09 cutsheet 1.00 IEER cutsheet
Cooling Hours Cutoff 72 75 Energy Code
Cooling Setpoint 72 75
Cooling Return Air Temp 74 77
Cooling Return Air Relative Humidity 60% Assumption 60%
Assumption
Cooling Setpoint Setback 77
Cooling Return Air Temp Setback 79
Fan Horsepower 8 Assumption 8 Cutsheet
Average Fan Speed 100% 75%
Average Fan Load Factor 100% 75%
Average Fan Efficiency 86%90%Cutsheet
Natural gas Therms 956.15
Electric Savings 4597.50
Savings
South Bend MPAC
Replace DX RTU‐4 with new unit and new VAV controls
RTU‐4 Upgrade
Inputs
AHU Fan Total
Pre Retrofit Operation
Fan Horsepower 8.0
Fan Hours 5,016
Avg. Fan Speed 100%
Fan Load Factor 100%
Fan Efficiency 86%
Average Fan Energy kW 6.94
kW = HP x 0.746 x Load Factor x (% Speed)^2.5 /Efficiency
(theoretical equation is speed^3, actual is closer to 2.5)
Fan Energy, kWh 34,808.71
Post Retrofit Operation
Fan Horsepower 8.0
Fan Hours 8,757
Avg. Fan Speed 75%
Fan Load Factor 75%
Fan Efficiency 90%
Average Fan Energy kW 2.42
Fan Energy, kWh 21,168.60
Electric Savings, kWh 13,640
Pre Retrofit Conditions
Mid‐pts DB (F) Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
Mixed Air
Enthalpy
Chilled Water
kWh
99 98 to 100 8 46.7 0 33.4128 442.4622545
97 96 to 98 4 46.9 0 33.4528 222.2784
95 94 to 96 5 44.2 0 32.9128 260.1752727
93 92 to 94 6 43.3 0 32.7328 305.1412364
91 90 to 92 8 41.7 0 32.4128 390.0986182
89 88 to 90 24 38.3 0 31.7328 1063.474036
87 86 to 88 49 37.7 0 31.6128 2132.772218
85 84 to 86 53 36.7 0 31.4128 2237.494255
83 82 to 84 63 34.8 0 31.0328 2502.9648
81 80 to 82 92 33.5 0 30.7728 3498.555927
79 78 to 80 106 31.9 0 30.4528 3808.923055
77 76 to 78 64 31.4 0 30.3528 2257.836218
75 74 to 76 173 30.1 0 30.0928 5808.798982
73 72 to 74 166 30.3 0 30.1328 5617.222691
71 70 to 72 218 30 0
69 68 to 70 273 28.5 71.4 0
67 66 to 68 185 26.8 71 0
65 64 to 66 175 25.7 70.6 0
63 62 to 64 166 24.5 70.2 0
61 60 to 62 146 23.7 69.8 6.3072
59 58 to 60 72 22.8 69.4 9.3312
57 56 to 58 129 21.4 69 27.864
55 54 to 56 149 20.6 68.6 45.0576
53 52 to 54 156 19.7 68.2 60.6528
51 50 to 52 180 19.1 67.8 85.536
49 48 to 50 120 17.8 67.4 67.392
47 46 to 48 107 16.8 67 69.336
45 44 to 46 141 16 66.6 103.5504
43 42 to 44 168 15.2 66.2 137.8944
41 40 to 42 98 14.6 65.8 88.9056
39 38 to 40 130 13.6 65.4 129.168
37 36 to 38 156 12.7 65 168.48
35 34 to 36 201 12.2 64.6 234.4464
33 32 to 34 251 11.3 64.2 314.4528
31 30 to 32 195 10.5 63.8 261.144
29 28 to 30 134 9.7 63.4 191.0304
27 26 to 28 146 8.9 63 220.752
25 24 to 26 95 8.1 62.6 151.848
23 22 to 24 41 7.6 62.2 69.0768
21 20 to 22 56 7 61.8 99.1872
19 18 to 20 52 6.4 61.4 96.5952
17 16 to 18 39 5.7 61 75.816
15 14 to 16 63 5.1 60.6 127.9152
13 12 to 14 41 4.4 60.2 86.7888
11 10 to 12 25 3.8 59.8 55.08
98 to 10 27 3.2 59.4 61.8192
76 to 8 18 2.6 59 42.768
54 to 6 10 2.1 58.6 24.624
32 to 4 15 1.6 58.2 38.232
10 to 2 10 1 57.8 26.352
‐1 ‐2 to 0 7 0.4 57.4 19.0512
0 0 0 0 57.6 0
0 0 0 0 57.6 0
Total 3196.454 30548.19796
Total
Heating CoolingBin Data
Post Retrofit Conditions‐Occupied
Mid‐pts DB (F) Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
Mixed Air
Enthalpy
Chilled Water
kWh
99 98 to 100 8 46.7 0 33.605 414.816
97 96 to 98 4 46.9 0 33.625 207.888
95 94 to 96 5 44.2 0 33.355 251.76
93 92 to 94 6 43.3 0 33.265 298.872
91 90 to 92 8 41.7 0 33.105 390.816
89 88 to 90 24 38.3 0 32.765 1123.488
87 86 to 88 49 37.7 0 32.705 2276.148
85 84 to 86 53 36.7 0 32.605 2430.156
83 82 to 84 63 34.8 0 32.415 2816.856
81 80 to 82 92 33.5 0 32.285 4041.744
79 78 to 80 106 31.9 0 32.125 4555.032
77 76 to 78 64 31.4 0 32.075 2731.008
75 74 to 76 173 30.1 0
73 72 to 74 166 30.3 0
71 70 to 72 218 30 0
69 68 to 70 273 28.5 71.7 0
67 66 to 68 185 26.8 71.5 0
65 64 to 66 175 25.7 71.3 0
63 62 to 64 166 24.5 71.1 0
61 60 to 62 146 23.7 70.9 0
59 58 to 60 72 22.8 70.7 0
57 56 to 58 129 21.4 70.5 0
55 54 to 56 149 20.6 70.3 0
53 52 to 54 156 19.7 70.1 0
51 50 to 52 180 19.1 69.9 3.888
49 48 to 50 120 17.8 69.7 7.776
47 46 to 48 107 16.8 69.5 11.556
45 44 to 46 141 16 69.3 21.3192
43 42 to 44 168 15.2 69.1 32.6592
41 40 to 42 98 14.6 68.9 23.2848
39 38 to 40 130 13.6 68.7 36.504
37 36 to 38 156 12.7 68.5 50.544
35 34 to 36 201 12.2 68.3 73.8072
33 32 to 34 251 11.3 68.1 103.0104
31 30 to 32 195 10.5 67.9 88.452
29 28 to 30 134 9.7 67.7 66.5712
27 26 to 28 146 8.9 67.5 78.84
25 24 to 26 95 8.1 67.3 55.404
23 22 to 24 41 7.6 67.1 25.6824
21 20 to 22 56 7 66.9 37.4976
19 18 to 20 52 6.4 66.7 37.0656
17 16 to 18 39 5.7 66.5 29.484
15 14 to 16 63 5.1 66.3 50.3496
13 12 to 14 41 4.4 66.1 34.5384
11 10 to 12 25 3.8 65.9 22.14
98 to 10 27 3.2 65.7 25.0776
76 to 8 18 2.6 65.5 17.496
54 to 6 10 2.1 65.3 10.152
32 to 4 15 1.6 65.1 15.876
10 to 2 10 1 64.9 11.016
‐1 ‐2 to 0 7 0.4 64.7 8.0136
0 0 0 0 64.8 0
0 0 0 0 64.8 0
Total 978.0048 21538.584
Total
Bin Data Heating Cooling
Post Retrofit Conditions‐Unoccupied
Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
Mixed Air
Enthalpy
Chilled Water
kWh
93 92 to 94 4 41.2 0 33.593 174.84
91 90 to 92 18 41.9 0 33.593 786.78
89 88 to 90 23 40.1 0 33.593 1005.33
87 86 to 88 28 38.7 0 33.593 1223.88
85 84 to 86 36 36.4 0 33.593 1573.56
83 82 to 84 66 35.2 0 33.593 2884.86
81 80 to 82 69 34.9 0 33.593 3015.99
79 78 to 80 106 33.7 0 33.593 4633.26
77 76 to 78 63 32.8 0 33.593 2753.73
75 74 to 76 120 32 0
73 72 to 74 136 32 0
71 70 to 72 153 30.6 0
69 68 to 70 203 29.5 66 87.696
67 66 to 68 111 27.7 66 47.952
65 64 to 66 91 26 66 39.312
63 62 to 64 122 24.7 66 52.704
61 60 to 62 104 23.6 66 44.928
59 58 to 60 73 22.3 66 31.536
57 56 to 58 133 22.2 66 57.456
55 54 to 56 94 20.7 66 40.608
53 52 to 54 90 19.9 66 38.88
51 50 to 52 155 18.5 66 66.96
49 48 to 50 116 17.8 66 50.112
47 46 to 48 107 17 66 46.224
45 44 to 46 113 15.9 66 48.816
43 42 to 44 88 15.2 66 38.016
41 40 to 42 81 14.2 66 34.992
39 38 to 40 112 13.7 66 48.384
37 36 to 38 79 12.6 66 34.128
35 34 to 36 103 12 66 44.496
33 32 to 34 215 11.2 66 92.88
31 30 to 32 157 10.4 66 67.824
29 28 to 30 113 9.7 66 48.816
27 26 to 28 72 9 66 31.104
25 24 to 26 73 8.4 66 31.536
23 22 to 24 40 7.6 66 17.28
21 20 to 22 64 6.9 66 27.648
19 18 to 20 77 6.3 66 33.264
17 16 to 18 31 5.7 66 13.392
15 14 to 16 35 5 66 15.12
13 12 to 14 17 4.3 66 7.344
11 10 to 12 12 3.8 66 5.184
98 to 10 11 3.2 66 4.752
76 to 8 5 2.5 66 2.16
54 to 6 1 2.1 66 0.432
32 to 4 8 1.5 66 3.456
10 to 2 3 0.9 66 1.296
‐1 ‐2 to 0 8 0.4 66 3.456
‐3 ‐4 to ‐2 1 ‐0.3 66 0.432
‐5 ‐6 to ‐4 1 ‐0.8 66 0.432
‐7 ‐8 to ‐6 3 ‐1.3 66 1.296
000 0 66 0
000 0 66 0
Total 1262.304 18052.23
Total
Bin Data Heating Cooling
Scope
ECM‐3
Pre Retrofit Source Post Retrofit Source
Supply Airflow, Cfm 4000 Model number 4000 Submittal
% Ventilation 20%10%Submittal
Setback Ventilation 0%
Heating Setpoint 70 Assumption 70 Assumption
Average Heating Return Air Temperature 72 Assumption 72 Assumption
Heating Setpoint Setback 68 Assumption
Average Heating Return Air Temperature Setback 66 Assumption
Heating Hours Cutoff (Heating used below this tempera 70 Assumption 70 Assumption
Heating Efficiency 80% Assumption 80%Cutsheet
Cooling Leaving Air Temp 57 Assumption 57 Design
Cooling Leaving Air Relative Humidity 100%100%
Cooling Leaving Air Temp Setback Assumption 59 Design
Cooling Efficiency kW/ton 1.09 cutsheet 0.86 IEER cutsheet
Cooling Hours Cutoff 72 75 Energy Code
Cooling Setpoint 72 75
Cooling Return Air Temp 74 77
Cooling Return Air Relative Humidity 60% Assumption 60%Assumption
Cooling Setpoint Setback 77
Cooling Return Air Temp Setback 79
Fan Horsepower 5 Cutsheet 5 Cutsheet
Average Fan Speed 100%75%
Average Fan Load Factor 100%75%
Average Fan Efficiency 86%90%Cutsheet
Natural gas Therms 730.82
Electric Savings 30293.70
Savings
South Bend MPAC
Replace DX RTU‐6 with new unit and new VAV controls
RTU‐6 Upgrade
Inputs
AHU Fan Total
Pre Retrofit Operation
Fan Horsepower 5.0
Fan Hours 8,757
Avg. Fan Speed 100%
Fan Load Factor 100%
Fan Efficiency 86%
Average Fan Energy kW 4.34
kW = HP x 0.746 x Load Factor x (% Speed)^2.5 /Efficiency
(theoretical equation is speed^3, actual is closer to 2.5)
Fan Energy, kWh 37,980.94
Post Retrofit Operation
Fan Horsepower 5.0
Fan Hours 8,741
Avg. Fan Speed 75%
Fan Load Factor 75%
Fan Efficiency 90%
Average Fan Energy kW 1.52
Fan Energy, kWh 13,309.49
Electric Savings, kWh 24,671
Pre Retrofit Conditions
Mid‐pts DB (F) Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
Mixed Air
Enthalpy
Chilled Water
kWh
99 98 to 100 8 46.7 0 33.4128 110.6155636
97 96 to 98 4 46.9 0 33.4528 55.5696
95 94 to 96 5 44.2 0 32.9128 65.04381818
93 92 to 94 10 42.5 0 32.5728 124.524
91 90 to 92 26 41.9 0 32.4528 318.6569455
89 88 to 90 47 39.2 0 31.9128 534.5028
87 86 to 88 77 38.1 0 31.6928 847.9548
85 84 to 86 89 36.6 0 31.3928 936.4126909
83 82 to 84 129 35 0 31.0728 1289.723236
81 80 to 82 161 34.1 0 30.8928 1562.232764
79 78 to 80 212 32.8 0 30.6328 1966.905164
77 76 to 78 127 32.1 0 30.4928 1149.192982
75 74 to 76 293 30.8 0 30.2328 2526.629564
73 72 to 74 302 31 0 30.2728 2624.006618
71 70 to 72 371 30.2 0
69 68 to 70 476 28.9 71.4 0
67 66 to 68 296 27.2 71 0
65 64 to 66 266 25.8 70.6 0
63 62 to 64 288 24.6 70.2 0
61 60 to 62 250 23.7 69.8 2.7
59 58 to 60 145 22.5 69.4 4.698
57 56 to 58 262 21.8 69 14.148
55 54 to 56 243 20.6 68.6 18.3708
53 52 to 54 246 19.8 68.2 23.9112
51 50 to 52 335 18.8 67.8 39.798
49 48 to 50 236 17.8 67.4 33.1344
47 46 to 48 214 16.9 67 34.668
45 44 to 46 254 16 66.6 46.6344
43 42 to 44 256 15.2 66.2 52.5312
41 40 to 42 179 14.4 65.8 40.5972
39 38 to 40 242 13.6 65.4 60.1128
37 36 to 38 235 12.7 65 63.45
35 34 to 36 304 12.1 64.6 88.6464
33 32 to 34 466 11.2 64.2 145.9512
31 30 to 32 352 10.5 63.8 117.8496
29 28 to 30 247 9.7 63.4 88.0308
27 26 to 28 218 8.9 63 82.404
25 24 to 26 168 8.3 62.6 67.1328
23 22 to 24 81 7.6 62.2 34.1172
21 20 to 22 120 7 61.8 53.136
19 18 to 20 129 6.3 61.4 59.9076
17 16 to 18 70 5.7 61 34.02
15 14 to 16 98 5 60.6 49.7448
13 12 to 14 58 4.4 60.2 30.6936
11 10 to 12 37 3.8 59.8 20.3796
98 to 10 38 3.2 59.4 21.7512
76 to 8 23 2.6 59 13.662
54 to 6 11 2.1 58.6 6.7716
32 to 4 23 1.5 58.2 14.6556
10 to 2 13 0.9 57.8 8.5644
‐1 ‐2 to 0 15 0.4 57.4 10.206
‐3 ‐4 to ‐21 ‐0.3 57 0.702
‐5 ‐6 to ‐41 ‐0.8 56.6 0.7236
Total 1383.804 14111.97055
Total
Heating CoolingBin Data
Post Retrofit Conditions‐Occupied
Mid‐pts DB (F) Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
Mixed Air
Enthalpy
Chilled Water
kWh
99 98 to 100 7 46.6 0 33.595 77.688
97 96 to 98 2 47.7 0 33.705 22.47942857
95 94 to 96 4 43.9 0 33.325 43.00457143
93 92 to 94 9 42.6 0 33.195 95.256
91 90 to 92 20 41.9 0 33.125 209.88
89 88 to 90 37 39 0 32.835 374.4822857
87 86 to 88 56 37.4 0 32.675 555.264
85 84 to 86 63 35.4 0 32.475 608.472
83 82 to 84 92 34.5 0 32.385 877.9165714
81 80 to 82 103 33.1 0 32.245 964.3448571
79 78 to 80 129 31.6 0 32.095 1182.893143
77 76 to 78 63 31.2 0 32.055 574.452
75 74 to 76 157 29.5 0
73 72 to 74 120 28.9 0
71 70 to 72 126 28.2 0
69 68 to 70 142 26.7 71.7 0
67 66 to 68 86 25.1 71.5 0
65 64 to 66 67 23.6 71.3 0
63 62 to 64 75 23.3 71.1 0
61 60 to 62 67 22 70.9 0
59 58 to 60 50 21.1 70.7 0
57 56 to 58 65 20.6 70.5 0
55 54 to 56 58 19.6 70.3 0
53 52 to 54 51 19.1 70.1 0
51 50 to 52 78 17.9 69.9 0.4212
49 48 to 50 71 17.1 69.7 1.1502
47 46 to 48 62 16.3 69.5 1.674
45 44 to 46 79 15.6 69.3 2.9862
43 42 to 44 91 15 69.1 4.4226
41 40 to 42 47 14.1 68.9 2.7918
39 38 to 40 86 13.4 68.7 6.0372
37 36 to 38 71 12.4 68.5 5.751
35 34 to 36 101 12 68.3 9.2718
33 32 to 34 132 11.1 68.1 13.5432
31 30 to 32 111 10.3 67.9 12.5874
29 28 to 30 68 9.5 67.7 8.4456
27 26 to 28 50 8.7 67.5 6.75
25 24 to 26 34 8.1 67.3 4.9572
23 22 to 24 20 7.4 67.1 3.132
21 20 to 22 41 6.9 66.9 6.8634
19 18 to 20 36 6.2 66.7 6.4152
17 16 to 18 24 5.6 66.5 4.536
15 14 to 16 28 4.9 66.3 5.5944
13 12 to 14 13 4.2 66.1 2.7378
11 10 to 12 7 3.7 65.9 1.5498
98 to 10 5 3.2 65.7 1.161
76 to 8 6 2.6 65.5 1.458
54 to 6 4 2 65.3 1.0152
32 to 4 4 1.5 65.1 1.0584
10 to 2 1 1 64.9 0.2754
‐1 ‐2 to 0 1 0.3 64.7 0.2862
0 0 0 0 64.8 0
0 0 0 0 64.8 0
Total 116.8722 5586.132857
Total
Bin Data Heating Cooling
Post Retrofit Conditions‐Unoccupied
Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
Mixed Air
Enthalpy
Chilled Water
kWh
99 98 to 100 1 47.4 0 33.593 9.366428571
97 96 to 98 2 46 0 33.593 18.73285714
95 94 to 96 1 45.5 0 33.593 9.366428571
93 92 to 94 1 41.6 0 33.593 9.366428571
91 90 to 92 6 41.8 0 33.593 56.19857143
89 88 to 90 10 40 0 33.593 93.66428571
87 86 to 88 21 40 0 33.593 196.695
85 84 to 86 26 39.5 0 33.593 243.5271429
83 82 to 84 37 36.2 0 33.593 346.5578571
81 80 to 82 58 36 0 33.593 543.2528571
79 78 to 80 83 34.7 0 33.593 777.4135714
77 76 to 78 64 33.1 0 33.593 599.4514286
75 74 to 76 136 32.4 0
73 72 to 74 182 32.5 0
71 70 to 72 245 31.3 0
69 68 to 70 334 29.9 66 36.072
67 66 to 68 210 28 66 22.68
65 64 to 66 199 26.5 66 21.492
63 62 to 64 213 25 66 23.004
61 60 to 62 183 24.3 66 19.764
59 58 to 60 95 23.3 66 10.26
57 56 to 58 197 22.2 66 21.276
55 54 to 56 185 20.9 66 19.98
53 52 to 54 195 19.9 66 21.06
51 50 to 52 257 19.1 66 27.756
49 48 to 50 165 18.1 66 17.82
47 46 to 48 152 17.2 66 16.416
45 44 to 46 175 16.1 66 18.9
43 42 to 44 165 15.3 66 17.82
41 40 to 42 132 14.5 66 14.256
39 38 to 40 156 13.8 66 16.848
37 36 to 38 164 12.8 66 17.712
35 34 to 36 203 12.2 66 21.924
33 32 to 34 334 11.3 66 36.072
31 30 to 32 241 10.6 66 26.028
29 28 to 30 179 9.8 66 19.332
27 26 to 28 168 9 66 18.144
25 24 to 26 134 8.3 66 14.472
23 22 to 24 61 7.7 66 6.588
21 20 to 22 79 7 66 8.532
19 18 to 20 93 6.4 66 10.044
17 16 to 18 46 5.7 66 4.968
15 14 to 16 70 5.1 66 7.56
13 12 to 14 45 4.4 66 4.86
11 10 to 12 30 3.8 66 3.24
98 to 10 33 3.2 66 3.564
76 to 8 17 2.6 66 1.836
54 to 6 7 2.1 66 0.756
32 to 4 19 1.5 66 2.052
10 to 2 12 0.9 66 1.296
‐1 ‐2 to 0 14 0.4 66 1.512
‐3 ‐4 to ‐2 1 ‐0.3 66 0.108
‐5 ‐6 to ‐4 1 ‐0.8 66 0.108
Total 536.112 2903.592857
Total
Bin Data Heating Cooling
Scope
ECM‐3
Pre Retrofit Source Post Retrofit Source
Supply Airflow, Cfm 6900 Model number 6900 Submittal
% Ventilation 20% 10%
Submittal
Setback Ventilation 0%
Heating Setpoint 70 Assumption 70
Assumption
Average Heating Return Air Temperature 72 Assumption 72
Assumption
Heating Setpoint Setback 68 Assumption
Average Heating Return Air Temperature Setback 66 Assumption
Heating Hours Cutoff (Heating used below this tempera 70 Assumption 70 Assumption
Heating Efficiency 80% Assumption 80%Cutsheet
Cooling Leaving Air Temp 57 Assumption 57 Design
Cooling Leaving Air Relative Humidity 100% 100%
Cooling Leaving Air Temp Setback Assumption 59 Design
Cooling Efficiency kW/ton 1.09 cutsheet 0.91 IEER cutsheet
Cooling Hours Cutoff 72 75 Energy Code
Cooling Setpoint 72 75
Cooling Return Air Temp 74 77
Cooling Return Air Relative Humidity 60% Assumption 60%
Assumption
Cooling Setpoint Setback 77
Cooling Return Air Temp Setback 79
Fan Horsepower 5 Cutsheet 5 Cutsheet
Average Fan Speed 100% 75%
Average Fan Load Factor 100% 75%
Average Fan Efficiency 86%90%Cutsheet
Natural gas Therms 1330.00
Electric Savings 33410.82
Savings
South Bend MPAC
Replace DX RTU‐7 with new unit and new VAV controls
RTU‐7 Upgrade
Inputs
AHU Fan Total
Pre Retrofit Operation
Fan Horsepower 5.0
Fan Hours 8,757
Avg. Fan Speed 100%
Fan Load Factor 100%
Fan Efficiency 86%
Average Fan Energy kW 4.34
kW = HP x 0.746 x Load Factor x (% Speed)^2.5 /Efficiency
(theoretical equation is speed^3, actual is closer to 2.5)
Fan Energy, kWh 37,980.94
Post Retrofit Operation
Fan Horsepower 5.0
Fan Hours 8,760
Avg. Fan Speed 75%
Fan Load Factor 75%
Fan Efficiency 90%
Average Fan Energy kW 1.52
Fan Energy, kWh 13,338.42
Electric Savings, kWh 24,643
Pre Retrofit Conditions
Mid‐pts DB (F) Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
Mixed Air
Enthalpy
Chilled Water
kWh
99 98 to 100 8 46.7 0 33.4128 190.8118473
97 96 to 98 4 46.9 0 33.4528 95.85756
95 94 to 96 5 44.2 0 32.9128 112.2005864
93 92 to 94 10 42.5 0 32.5728 214.8039
91 90 to 92 26 41.9 0 32.4528 549.6832309
89 88 to 90 47 39.2 0 31.9128 922.01733
87 86 to 88 77 38.1 0 31.6928 1462.72203
85 84 to 86 89 36.6 0 31.3928 1615.311892
83 82 to 84 129 35 0 31.0728 2224.772583
81 80 to 82 161 34.1 0 30.8928 2694.851517
79 78 to 80 212 32.8 0 30.6328 3392.911407
77 76 to 78 127 32.1 0 30.4928 1982.357894
75 74 to 76 293 30.8 0 30.2328 4358.435997
73 72 to 74 302 31 0 30.2728 4526.411416
71 70 to 72 371 30.2 0
69 68 to 70 476 28.9 71.4 0
67 66 to 68 296 27.2 71 0
65 64 to 66 266 25.8 70.6 0
63 62 to 64 288 24.6 70.2 0
61 60 to 62 250 23.7 69.8 4.6575
59 58 to 60 145 22.5 69.4 8.10405
57 56 to 58 262 21.8 69 24.4053
55 54 to 56 243 20.6 68.6 31.68963
53 52 to 54 246 19.8 68.2 41.24682
51 50 to 52 335 18.8 67.8 68.65155
49 48 to 50 236 17.8 67.4 57.15684
47 46 to 48 214 16.9 67 59.8023
45 44 to 46 254 16 66.6 80.44434
43 42 to 44 256 15.2 66.2 90.61632
41 40 to 42 179 14.4 65.8 70.03017
39 38 to 40 242 13.6 65.4 103.6946
37 36 to 38 235 12.7 65 109.4513
35 34 to 36 304 12.1 64.6 152.915
33 32 to 34 466 11.2 64.2 251.7658
31 30 to 32 352 10.5 63.8 203.2906
29 28 to 30 247 9.7 63.4 151.8531
27 26 to 28 218 8.9 63 142.1469
25 24 to 26 168 8.3 62.6 115.8041
23 22 to 24 81 7.6 62.2 58.85217
21 20 to 22 120 7 61.8 91.6596
19 18 to 20 129 6.3 61.4 103.3406
17 16 to 18 70 5.7 61 58.6845
15 14 to 16 98 5 60.6 85.80978
13 12 to 14 58 4.4 60.2 52.94646
11 10 to 12 37 3.8 59.8 35.15481
98 to 10 38 3.2 59.4 37.52082
76 to 8 23 2.6 59 23.56695
54 to 6 11 2.1 58.6 11.68101
32 to 4 23 1.5 58.2 25.28091
10 to 2 13 0.9 57.8 14.77359
‐1 ‐2 to 0 15 0.4 57.4 17.60535
‐3 ‐4 to ‐21 ‐0.3 57 1.21095
‐5 ‐6 to ‐41 ‐0.8 56.6 1.24821
Total 2387.062 24343.14919
Total
Heating CoolingBin Data
Post Retrofit Conditions‐Occupied
Mid‐pts DB (F) Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
Mixed Air
Enthalpy
Chilled Water
kWh
99 98 to 100 8 46.7 0 33.605 162.6267273
97 96 to 98 4 46.9 0 33.625 81.50154545
95 94 to 96 5 44.2 0 33.355 98.70136364
93 92 to 94 10 42.5 0 33.185 193.4038636
91 90 to 92 24 41.6 0 33.095 459.0883636
89 88 to 90 43 38.7 0 32.805 793.2004773
87 86 to 88 67 37.5 0 32.685 1217.00475
85 84 to 86 71 35.6 0 32.495 1257.929591
83 82 to 84 105 34.5 0 32.385 1833.149659
81 80 to 82 135 33.4 0 32.275 2321.975455
79 78 to 80 161 31.8 0 32.115 2708.576182
77 76 to 78 88 31.1 0 32.045 1465.974
75 74 to 76 201 29.6 0
73 72 to 74 157 29.3 0
71 70 to 72 180 28.5 0
69 68 to 70 184 27 71.7 0
67 66 to 68 122 25.9 71.5 0
65 64 to 66 89 24.2 71.3 0
63 62 to 64 100 23.4 71.1 0
61 60 to 62 100 22.4 70.9 0
59 58 to 60 68 21.7 70.7 0
57 56 to 58 109 21 70.5 0
55 54 to 56 96 20 70.3 0
53 52 to 54 88 19.1 70.1 0
51 50 to 52 110 18.2 69.9 1.02465
49 48 to 50 85 17.2 69.7 2.375325
47 46 to 48 85 16.3 69.5 3.958875
45 44 to 46 129 15.6 69.3 8.411445
43 42 to 44 130 15 69.1 10.89855
41 40 to 42 77 14.1 68.9 7.889805
39 38 to 40 111 13.3 68.7 13.44155
37 36 to 38 101 12.5 68.5 14.11223
35 34 to 36 145 12.1 68.3 22.96148
33 32 to 34 186 11.2 68.1 32.91921
31 30 to 32 142 10.3 67.9 27.77733
29 28 to 30 101 9.5 67.7 21.63875
27 26 to 28 96 8.8 67.5 22.356
25 24 to 26 51 8.1 67.3 12.82676
23 22 to 24 26 7.4 67.1 7.02351
21 20 to 22 45 6.9 66.9 12.99443
19 18 to 20 50 6.3 66.7 15.36975
17 16 to 18 22 5.6 66.5 7.17255
15 14 to 16 42 5 66.3 14.47551
13 12 to 14 25 4.3 66.1 9.082125
11 10 to 12 14 3.8 65.9 5.34681
98 to 10 14 3.2 65.7 5.60763
76 to 8 10 2.6 65.5 4.19175
54 to 6 0 0 65.3 0
32 to 4 3 1.4 65.1 1.369305
0 0 0 0 64.8 0
0 0 0 0 64.8 0
0 0 0 0 64.8 0
0 0 0 0 64.8 0
Total 285.2253 12593.13198
Total
Bin Data Heating Cooling
Post Retrofit Conditions‐Unoccupied
Hrs
h
(BTU/lb)
Mixed Air
Temp
Natural
Gas
Therms
Mixed Air
Enthalpy
Chilled Water
kWh
91 90 to 92 2 45 0 33.593 34.27261364
89 88 to 90 4 44.7 0 33.593 68.54522727
87 86 to 88 10 41.8 0 33.593 171.3630682
85 84 to 86 18 40.4 0 33.593 308.4535227
83 82 to 84 24 37.1 0 33.593 411.2713636
81 80 to 82 26 37.7 0 33.593 445.5439773
79 78 to 80 51 36.1 0 33.593 873.9516477
77 76 to 78 39 34.3 0 33.593 668.3159659
75 74 to 76 92 33.7 0
73 72 to 74 145 32.9 0
71 70 to 72 191 31.9 0
69 68 to 70 292 30.1 66 54.3996
67 66 to 68 174 28 66 32.4162
65 64 to 66 177 26.6 66 32.9751
63 62 to 64 188 25.2 66 35.0244
61 60 to 62 150 24.5 66 27.945
59 58 to 60 77 23.2 66 14.3451
57 56 to 58 153 22.4 66 28.5039
55 54 to 56 147 21 66 27.3861
53 52 to 54 158 20.1 66 29.4354
51 50 to 52 225 19.2 66 41.9175
49 48 to 50 151 18.1 66 28.1313
47 46 to 48 129 17.4 66 24.0327
45 44 to 46 125 16.3 66 23.2875
43 42 to 44 126 15.4 66 23.4738
41 40 to 42 102 14.6 66 19.0026
39 38 to 40 131 13.9 66 24.4053
37 36 to 38 134 12.9 66 24.9642
35 34 to 36 159 12.1 66 29.6217
33 32 to 34 280 11.3 66 52.164
31 30 to 32 210 10.5 66 39.123
29 28 to 30 146 9.8 66 27.1998
27 26 to 28 122 9.1 66 22.7286
25 24 to 26 117 8.3 66 21.7971
23 22 to 24 55 7.7 66 10.2465
21 20 to 22 75 7 66 13.9725
19 18 to 20 79 6.3 66 14.7177
17 16 to 18 48 5.7 66 8.9424
15 14 to 16 56 5.1 66 10.4328
13 12 to 14 33 4.5 66 6.1479
11 10 to 12 23 3.8 66 4.2849
98 to 10 24 3.2 66 4.4712
76 to 8 13 2.6 66 2.4219
54 to 6 11 2.1 66 2.0493
32 to 4 20 1.5 66 3.726
10 to 2 13 0.9 66 2.4219
‐1 ‐2 to 0 15 0.4 66 2.7945
‐3 ‐4 to ‐2 1 ‐0.3 66 0.1863
‐5 ‐6 to ‐4 1 ‐0.8 66 0.1863
‐7 ‐8 to ‐6 3 ‐1.3 66 0.5589
000 0 66 0
000 0 66 0
000 0 66 0
Total 771.8409 2981.717386
Total
Bin Data Heating Cooling
Scope
ECM‐4
Existing Source Proposed Source
Supply Airflow 27500 27500 Submittal
Ventilation CFM 0 0 Submittal
Heating Setpoint 70 70 Assumed
Heating unocccupied setback 68
Heating Efficiency COP 5.3 5.30 Assumed
Heat Loss in Space (degrees)22
Cooling Setpoint 72 75
Cooling unoccupied setback 77
Cooling Efficiency Heat pump (kW/ton)0.702 0.702 Submittal
Cooling efficiency chiller (kw/ton)0.923 assumed 10% degrade 0.857
Heat Pickup in Space (degrees)22
Electric Savings, kWh 593.05
Natural Gas Savings, Therms 32.73
Savings
Inputs
Heat Pump Ugrade
Replace chiller and schedule heat pumps back
South Bend MPAC
South Bend MPAC
ECM‐4 Replace chiller and schedule heat pumps back
Heating and Cooling Savings
Baseline AHU Operation
Supply Airflow, Cfm 27,500
Ventilation Cfm -
% Ventilation 0%
Average Mixed air temp 68.0
Setpoint 70.0
Average Heating Btuhs 59,400
Heating hours per year 6,899
Natural Gas Consumed, therms / Yr 773
Cooling return temp 77.0
Cooling setpoint 75.0
Average Cooling Btuhs 59,400
Cooling hours per year 895
Cooling Energy, kWh per year 7,198
Proposed AHU Operation Occupied
Supply Airflow, Cfm 27,500
Ventilation Cfm -
% Ventilation 0%
Average Mixed air temp 68.0
Setpoint 70.0
Average Heating Btuhs 59,400
Heating hours per year 2,756
Natural Gas Consumed, therms / Yr 309
Cooling return temp 77.0
Cooling setpoint 75.0
Average Cooling Btuhs 59,400
Cooling hours per year 721
Cooling Energy, kWh per year 5,564
Proposed AHU Operation unccupied
Supply Airflow, Cfm 27,500
Ventilation Cfm -
% Ventilation 0%
Average Mixed air temp 66.0
Setpoint 68.0
Average Heating Btuhs 59,400
Heating hours per year 3,851
Natural Gas Consumed, therms / Yr 432
Cooling return temp 79.0
Cooling setpoint 77.0
Average Cooling Btuhs 59,400
Cooling hours per year 135
Cooling Energy, kWh per year 1,042
Electric Savings, kWh 593
Natural Gas Savings, Therms 33