Loading...
HomeMy WebLinkAboutEmergency Sewer Repair - Brick Elliptical 48” x 54” Sewer W. Washington & Former Chapel – Selge Construction Co., Inc.  ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS December 14, 2021 Mr. Robert Kuhns Selge Construction Co., Inc. 2833 South 11TH St. Niles, MI 49120 aswinehart@selgeconstruction.com RE: Emergency Sewer Repair – Project No. 121-058 Dear Mr. Kuhns: At its December 14, 2021 meeting, the Board of Public Works approved the above referenced memo for the emergency repair of the brick elliptical 48” x 54” sewer at W. Washington and the former Chapel Lane, Project No. 121-058 in the amount of $98,386. Enclosed please find a copy of the memo for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, /s/ Laura Hensley/Acting Clerk Enclosures S:\Public Works\Projects\Projects by Year\2021 Projects\121-058 Emergency Sewer Repair - W Washington & Chapel Ln\1 - Admin\1 - BPW Documents\20211102_121-058 Emergency Sewer Repair Washington & Chapel_Memo to BPW.doc Page 1 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Board of Public Works FROM: Sue Ellen Doudrick, PE SUBJECT: 121-058 Emergency Sewer Repair West Washington and Chapel Lane DATE: November 22, 2021 On 8/11/2021 a sinkhole formed in West Washington Street near Chapel Lane in front of the Civil Rights Heritage Center and Notre Dame Center of the Arts and Culture. The sewer is a brick elliptical sewer 54” x 48” tall. The sinkhole was 15’ wide, 3’ long. Due to the size and depth (18’ deep to sewer invert) of the sewer along with the complexity of work, a contractor was needed to assist with the work. Selge Construction and Culy Contracting were contacted and were both interested in performing work. Selge met onsite on 8/11. Culy Contracting could not make it onsite and needed to look more into the data to see if they could perform the work; they also indicated they could not provide an estimate or mobilize until the following week 8/17 or 8/18. Selge indicated they could mobilize to the site on 8/12/21 and estimated $50k for a doghouse manhole install. Selge was selected for the work. Description of work: Selge mobilized to site on 8/11/21. The work included excavation and installation of a stacked trench box on 8/13/21. The box was challenging to install due to the water line parallel to the sewer and exposed in the sinkhole. The team began making preparations for the doghouse install on 8/17/21. The work included new doghouse manhole install, water line replacement, storm lead replacement, and determining limits of sewer repair, followed by backfill and pavement and surface restoration. Work was completed around 8/21. The Sewer Department coordinated and provided traffic control to save on costs and coordinated getting the sewer cleaned by National Power Rodding. Sewer Department and Engineering coordinated with adjacent businesses to locate clean outs and performed dye testing to make sure no backups were occurring. Water works was onsite several times to verify no water leaks leading to the sewer failure. It was determined that the storm leads at nearly 45 degree angles jetting into the sewer likely caused the failure due to the turbulence of flow during the heavy rain events in June thru August of 2021. The business management staff at both the Civil Rights Heritage Center, Notre Dame Center of the Arts and Culture, and the property owner/manager of the apartments directly in front of the work area were extremely patient with the contractors and City as well as understanding of the disruption of access and service. Due to the pandemic, there was not much required access to each of the businesses. Pictures of the project are as follows: S:\Public Works\Projects\Projects by Year\2021 Projects\121-058 Emergency Sewer Repair - W Washington & Chapel Ln\1 - Admin\1 - BPW Documents\20211102_121-058 Emergency Sewer Repair Washington & Chapel_Memo to BPW.doc Page 2 1. 8/11/2021: sinkhole with water line shown 2. 8/13/2021: Full road closure on Washington; ready for excavation and trench box install; steel beam used to hold water line in place. 3. 8/13/21: Trench box mobilization; tight fit due to above and below grade utilities S:\Public Works\Projects\Projects by Year\2021 Projects\121-058 Emergency Sewer Repair - W Washington & Chapel Ln\1 - Admin\1 - BPW Documents\20211102_121-058 Emergency Sewer Repair Washington & Chapel_Memo to BPW.doc Page 3 4. 8/17/21: Crew making a plan for how to cut out top of brick sewer without bottom and sides of pipe caving in and washing away the base of the new doghouse manhole; sewer lateral from the south was coming in and had to be protected as well. 5. 8/18/21: crew installed base of doghouse manhole 6. 8/18/21: Base of doghouse installed S:\Public Works\Projects\Projects by Year\2021 Projects\121-058 Emergency Sewer Repair - W Washington & Chapel Ln\1 - Admin\1 - BPW Documents\20211102_121-058 Emergency Sewer Repair Washington & Chapel_Memo to BPW.doc Page 4 7.8/19/2021: installation was a success Contractor estimated the work to be $50,000, which was based on install of doghouse manhole. The final cost of the work was $98,386 out of the following account 641-06-602-509-439001. The estimate was exceeded due to: a.Water line repair; b.Storm lead repairs; c.Pavement patch was full width across the street; d.Challenges due to difficulty digging around the existing utilities (water and laterals). December 14, 2021 From:Michael Schmidt To:Laura Hensley Subject:RE: DFO Question? Date:Thursday, December 2, 2021 8:53:15 AM Attachments:image001.png Good question. Those PO’s were issued as a result of emergency situations which bypasses the traditional workflow. However, with emergency public work projects, the Board does need to retroactively approve the transaction. Thus, you will not see these come through workflow in the traditional sense. Sue Ellen should provide you with the necessary paperwork to have these items on the BPW agenda. Does that make sense? From: Laura Hensley <lhensley@southbendin.gov> Sent: Thursday, December 2, 2021 8:34 AM To: Michael Schmidt <mschmidt@southbendin.gov> Subject: DFO Question? Good morning, Michael, I am new to this process and, am just wondering if since these have a PW-RQ code, should I assume, these will be routing to my queue? I have them both scheduled to be on the next agenda on December 14, 2021. Please advise? A. Emergency Sewer Repair – Selge Construction Co., Inc. 1. Description: Emergency Repair of Brick Elliptical 48” x 54” Sewer at W. Washington and Former Chapel Lane Project No. 121-058 2. Amount: $98,386 3. Funding: PO-0011161 B. Emergency Sewer Repair – Selge Construction Co., Inc. 1. Description: Emergency Repair of an 18” Sewer at Dubail Ave. under Bowman Creek 2. Amount: $38,969.85 3. Funding: PO-0011385 Thanks so much and hope you’re having a great day! Laura Hensley Administrative Assistant Department of Public Works (574) 235-5927 lhensley@southbendin.gov City of South Bend 227 W. Jefferson Blvd., Ste. 1316 South Bend, IN 46601 Excellence | Accountability | Innovation | Inclusion | Empowerment BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 11/22/2021 Name Sue Ellen Doudrick Department DPW BPW Date 12/14/2021 Phone Extension 5922 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. __ PCA Chg. Order, No. 3 Traffic Control Resolution Other: Emergency Repair Memo Ease./Encroach Required Information Company or Vendor Name Selge New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name W Washington & Chapel Lane – Emergency Sewer Repair Project Number 121-058 Funding Source Sewer Utilities Account No. 641-06-602-509-439001 Amount $98,386 Terms of Contract Lump Sum Purpose/Description Emergency Repair of a brick elliptical 48” x 54” sewer in W. Washington and former Chapel Lane (near the Civil Rights Heritage Center and Notre Dame Center of the Arts and Culture properties) For Change Orders Only Amount of Increase Decrease ($) Previous Amount Current Percent of Change: Increase Decrease % (%) New Amount Total Percent of Change: Increase Decrease % (%) Time Extension Amount: 0 New Completion Date: -