Loading...
HomeMy WebLinkAboutEmergency Sewer Repair - 18” Sewer at Dubail Ave. under Bowman Creek – Selge Construction Co., Inc.  ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS December 14, 2021 Mr. Robert Kuhns Selge Construction Co., Inc. 2833 South 11TH St. Niles, MI 49120 aswinehart@selgeconstruction.com RE: Emergency Sewer Repair – Project No. 121-060 Dear Mr. Kuhns: At its December 14, 2021 meeting, the Board of Public Works approved the above referenced memo for the emergency repair of an 18” sewer at Dubail Ave. under Bowman Creek in the amount of $38,969.85. Enclosed please find a copy of the memo for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, /s/ Laura Hensley/Acting Clerk Enclosures S:\Public Works\Projects\Projects by Year\2021 Projects\121-060 Dubail Sewer and Structure Emergency Repairs\1 - Admin\1 - BPW Documents\20211123_121-060 Emergency Sewer Repair Dubail and Bowman Creek_Memo to BPW.doc Page 1 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Board of Public Works FROM: Sue Ellen Doudrick, PE SUBJECT: 121-060 Emergency Sewer Repair E Dubail and Bowman Creek DATE: November 23, 2021 On Saturday 8/21/2021, Sewer Department received a call from 211 from the SBPD that there was a large sinkhole near 817 E Dubail Street. The issue was in Bowman Creek. Upon inspection the creek was flowing fully into the sinkhole within the creek under the structure. Due to the vicinity of the hole being near the recently lined 72” sewer, the project contractor, Inland Waters Pollution Control (IPR), was immediately contacted to be onsite to inspect the sewer. Wastewater Crew was contacted to remove the EmNet Sensor equipment from the manhole in Dubail directly adjacent to the creek. Upon review of data, an 18” sewer crossed under the creek and tapped the manhole in Dubail east of the creek. On Sunday 8/22/21, IPR mobilized to the site and inspected the sewer on Dubail from Hight Street to the manhole east of Bowman Creek. The sewer was backed up with sand and water and a full video inspection could not be performed. IPR inspected the manhole east of the sinkhole in the creek and inspected the 72” sewer. IPR confirmed that all flow from Bowman Creek was flowing into the manhole thru the 18” sewer. They also inspected the sewer from Dubail to Indiana Avenue. Upon this inspection, they discovered the liner in the sewer upstream of Indiana had failed and was blocking flow. On Monday 8/23/21, the EmNet flow sensor data was retrieved and during previous rain events in August water levels in the manhole surcharged to 17 feet and 21 feet on three occassions. At these surcharged levels the pipe going under the creek would have been completed submerged due to the surcharged manhole. It is likely that the pipe became pressurized due to the full flow condition and water level head conditions. On Monday 8/23/21, two Contractors were contacted to meet onsite: Selge Construction and GE Marshall. Both met immediately and were present at the same time and walked the site with us. The scope of the discussion was to bypass Bowman Creek within the structure and around the sinkhole, mobilize equipment into Bowman Creek and perform a repair of the sewer without impacting the structure. There were many unknowns, but the goal was to stop all flow from Bowman from getting into the combined sewer before the forecasted rains. On 8/23/21, Selge confirmed availability to perform work starting on 8/23 with a manhole entry and mobilization starting 8/24. Selge provided a cost of $100k and indicated there could be a couple problems to repair and suggested the higher cost would be if we had to open cut the road next to the culvert bridge structure. They indicated if no open cutting was required the cost may be around $50k. Selge was selected due to the urgency of the matter and due to rain being S:\Public Works\Projects\Projects by Year\2021 Projects\121-060 Dubail Sewer and Structure Emergency Repairs\1 - Admin\1 - BPW Documents\20211123_121-060 Emergency Sewer Repair Dubail and Bowman Creek_Memo to BPW.doc Page 2 forecasted. Description of work: Selge mobilized to site on 8/23/21 and had tree limb trimming around the culvert area for equipment access. On 8/24/21 thru 8/25/21, crews setup a check dam in Bowman Creek and bypassed flow thru culvert, excavated down to pipe and replaced. Pipe backfill and removal of equipment occurred on 8/26. Rushed to get out of creek on 8/26 with rains on the way. Pictures of the project are as follows: 1. 8/21/2021: Site visit with Adam Shipley; sinkhole 2. 8/21/2021: Site visit with Adam Shipley; sinkhole 3. 8/22/21: Picture of the top of the 72” liner; bottom of liner can opened upward and the bottom of the pipe’s liner is what you see lifted in the bottom half of the picture. S:\Public Works\Projects\Projects by Year\2021 Projects\121-060 Dubail Sewer and Structure Emergency Repairs\1 - Admin\1 - BPW Documents\20211123_121-060 Emergency Sewer Repair Dubail and Bowman Creek_Memo to BPW.doc Page 3 4. 8/23/21: Daycare closed due to staff quitting. Assistants attended the meeting with contractors and City staff. Attendees: Adrien Doudrick, Larry Parker, Melvin Smith, Dave Freet, Craig from GE Marshall, and a neighbor’s cat. 5. 8/24/21: Selge onsite with bypass setup and replacing 18” sewer 6. 8/24/21: Selge onsite with bypass setup and replacing 18” sewer S:\Public Works\Projects\Projects by Year\2021 Projects\121-060 Dubail Sewer and Structure Emergency Repairs\1 - Admin\1 - BPW Documents\20211123_121-060 Emergency Sewer Repair Dubail and Bowman Creek_Memo to BPW.doc Page 4 7.8/24/21: CIPP liner cut out of manhole @ Indiana; the impression on the back of the liner are brick, this gives an idea of how large the liner is that was removed by IPR Contractor estimated the work to be $50,000 to 100,000, accessing Bowman Creek, performing sewer repair at sinkhole and bypassing Bowman Creek above grade; any additional work including open cut of the street would be on the higher end of the estimate range. The final cost of the work was $38,969.85 out of the following account 641-06-602-509-439001. The estimate was not exceeded as a point repair was possible within the structure and bypass within the creek and around the sinkhole was possible. The Selge Crew mobilized quickly and executed the plan very well. Job well done. Separately, the Engineering Team is working with IPR to resolve the failed liner and impacts from the failed liner such as sewer cleaning, sewer backups, and this sewer failure. December 14, 2021 From:Michael Schmidt To:Laura Hensley Subject:RE: DFO Question? Date:Thursday, December 2, 2021 8:53:15 AM Attachments:image001.png Good question. Those PO’s were issued as a result of emergency situations which bypasses the traditional workflow. However, with emergency public work projects, the Board does need to retroactively approve the transaction. Thus, you will not see these come through workflow in the traditional sense. Sue Ellen should provide you with the necessary paperwork to have these items on the BPW agenda. Does that make sense? From: Laura Hensley <lhensley@southbendin.gov> Sent: Thursday, December 2, 2021 8:34 AM To: Michael Schmidt <mschmidt@southbendin.gov> Subject: DFO Question? Good morning, Michael, I am new to this process and, am just wondering if since these have a PW-RQ code, should I assume, these will be routing to my queue? I have them both scheduled to be on the next agenda on December 14, 2021. Please advise? A. Emergency Sewer Repair – Selge Construction Co., Inc. 1. Description: Emergency Repair of Brick Elliptical 48” x 54” Sewer at W. Washington and Former Chapel Lane Project No. 121-058 2. Amount: $98,386 3. Funding: PO-0011161 B. Emergency Sewer Repair – Selge Construction Co., Inc. 1. Description: Emergency Repair of an 18” Sewer at Dubail Ave. under Bowman Creek 2. Amount: $38,969.85 3. Funding: PO-0011385 Thanks so much and hope you’re having a great day! Laura Hensley Administrative Assistant Department of Public Works (574) 235-5927 lhensley@southbendin.gov City of South Bend 227 W. Jefferson Blvd., Ste. 1316 South Bend, IN 46601 Excellence | Accountability | Innovation | Inclusion | Empowerment BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 11/23/2021 Name Sue Ellen Doudrick Department DPW BPW Date 12/14/2021 Phone Extension 5922 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. __ PCA Chg. Order, No. Traffic Control Resolution Other: Emergency Repair Memo Ease./Encroach Required Information Company or Vendor Name Selge New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name W Washington & Chapel Lane – Emergency Sewer Repair Project Number 121-060 Funding Source Sewer Utilities Account No. 641-06-602-509-439001 Amount $38,969.85 Terms of Contract Lump Sum Purpose/Description Emergency Repair of an 18” sewer in Dubail Avenue under Bowman Creek For Change Orders Only Amount of Increase Decrease ($) Previous Amount Current Percent of Change: Increase Decrease % (%) New Amount Total Percent of Change: Increase Decrease % (%) Time Extension Amount: 0 New Completion Date: -