December 14, 2021
Mr. Robert Kuhns
Selge Construction Co., Inc.
2833 South 11TH St.
Niles, MI 49120
aswinehart@selgeconstruction.com
RE: Emergency Sewer Repair – Project No. 121-060
Dear Mr. Kuhns:
At its December 14, 2021 meeting, the Board of Public Works approved the above
referenced memo for the emergency repair of an 18” sewer at Dubail Ave. under Bowman
Creek in the amount of $38,969.85.
Enclosed please find a copy of the memo for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-9251.
Sincerely,
/s/ Laura Hensley/Acting
Clerk
Enclosures
S:\Public Works\Projects\Projects by Year\2021 Projects\121-060 Dubail Sewer and Structure Emergency Repairs\1 - Admin\1 - BPW
Documents\20211123_121-060 Emergency Sewer Repair Dubail and Bowman Creek_Memo to BPW.doc Page 1
INTER-OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
TO: Board of Public Works
FROM: Sue Ellen Doudrick, PE
SUBJECT: 121-060 Emergency Sewer Repair E Dubail and Bowman Creek
DATE: November 23, 2021
On Saturday 8/21/2021, Sewer Department received a call from 211 from the SBPD that there
was a large sinkhole near 817 E Dubail Street. The issue was in Bowman Creek. Upon
inspection the creek was flowing fully into the sinkhole within the creek under the structure. Due
to the vicinity of the hole being near the recently lined 72” sewer, the project contractor, Inland
Waters Pollution Control (IPR), was immediately contacted to be onsite to inspect the sewer.
Wastewater Crew was contacted to remove the EmNet Sensor equipment from the manhole in
Dubail directly adjacent to the creek. Upon review of data, an 18” sewer crossed under the
creek and tapped the manhole in Dubail east of the creek.
On Sunday 8/22/21, IPR mobilized to the site and inspected the sewer on Dubail from Hight
Street to the manhole east of Bowman Creek. The sewer was backed up with sand and water
and a full video inspection could not be performed. IPR inspected the manhole east of the
sinkhole in the creek and inspected the 72” sewer. IPR confirmed that all flow from Bowman
Creek was flowing into the manhole thru the 18” sewer. They also inspected the sewer from
Dubail to Indiana Avenue. Upon this inspection, they discovered the liner in the sewer upstream
of Indiana had failed and was blocking flow.
On Monday 8/23/21, the EmNet flow sensor data was retrieved and during previous rain events
in August water levels in the manhole surcharged to 17 feet and 21 feet on three occassions. At
these surcharged levels the pipe going under the creek would have been completed submerged
due to the surcharged manhole. It is likely that the pipe became pressurized due to the full flow
condition and water level head conditions.
On Monday 8/23/21, two Contractors were contacted to meet onsite: Selge Construction and
GE Marshall. Both met immediately and were present at the same time and walked the site with
us. The scope of the discussion was to bypass Bowman Creek within the structure and around
the sinkhole, mobilize equipment into Bowman Creek and perform a repair of the sewer without
impacting the structure. There were many unknowns, but the goal was to stop all flow from
Bowman from getting into the combined sewer before the forecasted rains.
On 8/23/21, Selge confirmed availability to perform work starting on 8/23 with a manhole entry
and mobilization starting 8/24. Selge provided a cost of $100k and indicated there could be a
couple problems to repair and suggested the higher cost would be if we had to open cut the
road next to the culvert bridge structure. They indicated if no open cutting was required the cost
may be around $50k. Selge was selected due to the urgency of the matter and due to rain being
S:\Public Works\Projects\Projects by Year\2021 Projects\121-060 Dubail Sewer and Structure Emergency Repairs\1 - Admin\1 - BPW
Documents\20211123_121-060 Emergency Sewer Repair Dubail and Bowman Creek_Memo to BPW.doc Page 2
forecasted.
Description of work:
Selge mobilized to site on 8/23/21 and had tree limb trimming around the culvert area for
equipment access. On 8/24/21 thru 8/25/21, crews setup a check dam in Bowman Creek and
bypassed flow thru culvert, excavated down to pipe and replaced. Pipe backfill and removal of
equipment occurred on 8/26. Rushed to get out of creek on 8/26 with rains on the way.
Pictures of the project are as follows:
1. 8/21/2021: Site visit with Adam
Shipley; sinkhole
2. 8/21/2021: Site visit with Adam
Shipley; sinkhole
3. 8/22/21: Picture of the top of the 72”
liner; bottom of liner can opened
upward and the bottom of the pipe’s
liner is what you see lifted in the
bottom half of the picture.
S:\Public Works\Projects\Projects by Year\2021 Projects\121-060 Dubail Sewer and Structure Emergency Repairs\1 - Admin\1 - BPW
Documents\20211123_121-060 Emergency Sewer Repair Dubail and Bowman Creek_Memo to BPW.doc Page 3
4. 8/23/21: Daycare closed due to staff
quitting. Assistants attended the
meeting with contractors and City
staff. Attendees: Adrien Doudrick,
Larry Parker, Melvin Smith, Dave
Freet, Craig from GE Marshall, and
a neighbor’s cat.
5. 8/24/21: Selge onsite with bypass
setup and replacing 18” sewer
6. 8/24/21: Selge onsite with bypass
setup and replacing 18” sewer
S:\Public Works\Projects\Projects by Year\2021 Projects\121-060 Dubail Sewer and Structure Emergency Repairs\1 - Admin\1 - BPW
Documents\20211123_121-060 Emergency Sewer Repair Dubail and Bowman Creek_Memo to BPW.doc Page 4
7.8/24/21: CIPP liner cut out of
manhole @ Indiana; the impression
on the back of the liner are brick,
this gives an idea of how large the
liner is that was removed by IPR
Contractor estimated the work to be $50,000 to 100,000, accessing Bowman Creek, performing
sewer repair at sinkhole and bypassing Bowman Creek above grade; any additional work
including open cut of the street would be on the higher end of the estimate range. The final cost
of the work was $38,969.85 out of the following account 641-06-602-509-439001. The estimate
was not exceeded as a point repair was possible within the structure and bypass within the
creek and around the sinkhole was possible. The Selge Crew mobilized quickly and executed
the plan very well. Job well done.
Separately, the Engineering Team is working with IPR to resolve the failed liner and impacts
from the failed liner such as sewer cleaning, sewer backups, and this sewer failure.
December 14, 2021
From:Michael Schmidt
To:Laura Hensley
Subject:RE: DFO Question?
Date:Thursday, December 2, 2021 8:53:15 AM
Attachments:image001.png
Good question. Those PO’s were issued as a result of emergency situations which bypasses the
traditional workflow. However, with emergency public work projects, the Board does need to
retroactively approve the transaction. Thus, you will not see these come through workflow in the
traditional sense. Sue Ellen should provide you with the necessary paperwork to have these items
on the BPW agenda.
Does that make sense?
From: Laura Hensley <lhensley@southbendin.gov>
Sent: Thursday, December 2, 2021 8:34 AM
To: Michael Schmidt <mschmidt@southbendin.gov>
Subject: DFO Question?
Good morning, Michael,
I am new to this process and, am just wondering if since these have a PW-RQ code, should I assume,
these will be routing to my queue? I have them both scheduled to be on the next agenda on
December 14, 2021. Please advise?
A. Emergency Sewer Repair – Selge Construction Co., Inc.
1. Description: Emergency Repair of Brick Elliptical 48” x 54” Sewer at W. Washington
and Former Chapel Lane Project No. 121-058
2. Amount: $98,386
3. Funding: PO-0011161
B. Emergency Sewer Repair – Selge Construction Co., Inc.
1. Description: Emergency Repair of an 18” Sewer at Dubail Ave. under Bowman Creek
2. Amount: $38,969.85
3. Funding: PO-0011385
Thanks so much and hope you’re having a great day!
Laura Hensley
Administrative Assistant
Department of Public Works
(574) 235-5927
lhensley@southbendin.gov
City of South Bend
227 W. Jefferson Blvd., Ste. 1316
South Bend, IN 46601
Excellence | Accountability | Innovation | Inclusion | Empowerment
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 11/23/2021
Name Sue Ellen Doudrick Department DPW
BPW Date 12/14/2021 Phone Extension 5922
Review and Approval Required Prior to Submittal to Board Diversity Compliance
and Inclusion Officer Officer Name BPW Attorney Attorney Name
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title
Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. __ PCA
Chg. Order, No. Traffic Control Resolution
Other: Emergency Repair
Memo
Ease./Encroach
Required Information
Company or Vendor Name Selge
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name W Washington & Chapel Lane – Emergency Sewer Repair
Project Number 121-060
Funding Source Sewer Utilities
Account No. 641-06-602-509-439001
Amount $38,969.85
Terms of Contract Lump Sum
Purpose/Description Emergency Repair of an 18” sewer in Dubail Avenue under Bowman Creek
For Change Orders Only
Amount of
Increase
Decrease
($)
Previous Amount
Current Percent of Change:
Increase
Decrease
%
(%)
New Amount
Total Percent of Change:
Increase
Decrease
%
(%)
Time Extension Amount: 0
New Completion Date: -