HomeMy WebLinkAboutDecember Public Works IPC ReportDecember Public Works Report to the IPCB
12/1/2021
A. Closed Out 2021 Construction Projects:
1) 3400 Block S. Michigan Streetscape Improvements 120 -062
i. Total Contract Amount: $222,079.50 (Milestone)
ii. Goals: 2.6% M, 6.0% W
1. MBE: C. Lee Construction Services $8,720.00 (2.6%)
a. $6339.26
2. WBE: Hawk Enterprises $23,766.00 (7.09%)
a. $1,489.12
3. WBE: State Barricading $4,736.50 (1.41%)
a. $4,037.50
iii. PCA on 10/12/2021
iv. On 11/30, Kim Brewster, Account Manager for Milestone North, confirmed
the remaining payments would be entered into the system this week.
2) Former Salvation Army Building Roof Restoration and Replacement 119 -084B
i. Total contract amount: $440,100 (Midland Engineering)
1. Contract awarded prior to M/WBE split
ii. Goals: 2.7% MWBE (prior to M and W split)
1. MWBE: JMH Roofing $13,203 (3%)
a. Paid in full.
iii. PCA on 11/9/2021
B. Current Construction Projects:
1) Biosolids Trucking
i. Total Contract Amount: ~$130,000 (Trucks R Us)
ii. Goals: 6.4% MBE, 10.5% WBE
1. MBE: Kennedy Expressline, Inc. - 10% commitment
a. Approx. 16% MBE
2. WBE: None identified in Bid/Quote
2) Contractor Paving Round 1 121-016
i. Total contract amount: $992,863.43 (Rieth Riley)
ii. Goals: 4.2% M, 6.0%W
1. MBE: V&R Trucking $42,200 (4.25%)
a. $29,361.25
2. WBE: CE Hughes Milling $47,584.30 (4.792%)
a. $46,617.24
3. WBE: Traffic Control Specialists $12,192.60 (1.228%)
a. $13,111.21
3) LWW and Olive Streetscape 119-108
i. Total contract amount: $1,740,871.20 (Rieth-Riley)
ii. Goals: 2.43%M, 4.94%W
1. MBE: V&R Trucking $45,000.00 (2.58%)
2. WBE: Hawk Enterprises $552,448.00 (31.73%)
a. $856.00
4) 2021 CCG Round 1 121-014
i. Total contract amount: $1,299,800 (Milestone)
ii. Goals: 4.1% M, 6.0%W
1. MBE: C. Lee Constr. Services $28,600 (2.2%)
a. $58,979
2. MBE: V&R Trucking $24,800 (1.9%)
3. WBE: Traffic Control Specialists $13,046.20 (1.0%)
4. WBE: V&R Trucking $18,000 (1.38%)
5. WBE: Hawk Enterprises $6,110 (0.47%)
6. WBE: BUC Construction Supply $23,125 (1.78%)
a. $25,250
5) 2021 Curb and Sidewalk 121-001
i. Total contract amount: $447,571.94 (Rieth-Riley)
ii. Goals: 3.7% M, 5.5% W
1. MBE: V&R Trucking $16,570.00 (3.7%)
2. WBE: Slusser’ Green Thumb $44,249.72 (9.88%)
iii. $9,193.00
6) Road Rehab 121-008
i. Total contract amount: $1,997,416.06 (Rieth Riley)
ii. Goals: 3.2% M, 5.6%W
1. MBE: V&R Trucking $63,958 (3.2%)
2. WBE: V&R Trucking $65,992 (3.3%)
3. WBE: State Barricading $16,738 (0.84%)
4. WBE: CE Huges Milling $29,165.20 (1.46%)
iii. $7,957.00
7) Contractor Paving Round 2 121-031
i. Total contract amount: $1,150.184.60 (Rieth Riley)
ii. Goals: 4.0% M, 6.0%W
1. MBE: V&R Trucking $47,000 (4.08%)
2. WBE: CE Hughes Milling $58,756 (5.1%)
3. WBE: Montgomery Trucking $12,000 (1.04%)
iii. $13,185.00
8) Mayflower and Sample Intersection 120-052R
i. Total contract amount: $347,636.15 (Milestone)
ii. Goals: 2.3% M, 4.9%W
1. MBE V&R Trucking $4,000 (1.15%)
2. MBE: C. Lee Constr. Services $4,000 (1.15%)
3. WBE: Traffic Control Specialists $25,462.85 (7.32%)
9) 905/907/909 Michigan Demolition 120-063R
i. Total contract amount: $188,000 (Green Demolition)
ii. Goals: 1.4% M, 4.7% W
1. MBE: Kennedy Expressline $3,760 (2%)
2. WBE: SAN Corporation $9,400 (5%)
iii. First Pay App being processed
10) Southeast Neighborhood Center (United Way) 119-093
i. Total contract amount: $1,168,005 (Robert Henry Corp)
ii. Goals: 2.6% M, 5.1% W
1. MBE: C. Lee Constr. Services $2,000 (0.175%)
2. MBE: 1st Class Logistics $30,000 (2.62%)
3. WBE: MJ Schuetz Insurance $9,648 (0.84%)
4. WBE: Ritschard Bros. $451,316 (36.26%)
iii. First Pay App being processed
11) Dubail Streetscape Project 120-009
i. Total contract amount: $1,604,331.47 (Rieth Riley)
ii. Goals: 5.5%W and 3.1%M
1. MBE: V&R Trucking $56,151.60 (3.5%)
2. WBE: Slusser's Green Thumb, Inc. $113,061 (7.0%)
iii. First Pay App being processed
12) Laurel Woods Drainage Maintenance 121-007R
i. Total Contract Amount: $125,142 (Selge)
ii. Goals: 4.3%W and 1.4%M
1. MBE: V&R Trucking $2,000 (1.6%)
2. WBE: State Barricading $3,726 (2.98%)
3. WBE: Slusser’s Green Thumb $2,844 (2.27%)
4. WBE: BUC Construction Supply $295 (0.24%)
13) Contractor Paving Round 3 121-049
i. Rieth Riley $1,197,324.40
ii. MWBE Goals: 4.1%M and 6.0%W
1. MBE: V&R Trucking $10,000 (0.84%)
2. MBE: 1st Class Logistics $40,000 (3.34%)
3. WBE: State Barricading $11,158 (0.93%)
4. WBE: Montgomery Trucking $60,700 (5.07%)
14) 2021 Small Drainage 121-006A
i. Division 1 (Kaley) – 5.4%W and 3.2%M
1. MBE: 1st Class Logistics $2,700.00 (3.2%)
2. WBE: Slusser’s $6,665.50 (8%)
3. WBE: State Barricading $2,020.00 (3%)
ii. Planned for Fall 2021; mill and pave in Spring 2022
iii. Division 2 (Marion) – 5.1%W and 2.7%M
1. MBE: 1st Class Logistics $4,900.00 (3.1%)
2. WBE: Slusser’s $4,882.50 (3.1%)
3. WBE: State Barricading $7,160.00 (4.5%)
iv. Planned for Spring 2022
15) 100 S Michigan Tree Grates 121-037
i. Total contract amount: (The Robert Henry Corporation)
ii. Goals: 3.7% W, 1.6% M
1. MBE: 1st Class Logistics LLC, $2,464.00 (3.25%)
2. WBE: Ritschard Bros Inc, $24,450.00
3. WBE: State Barricading $1,965.00
16) SBPD Roof Rehabilitation 119-080
i. Total contract amount: $1,268,400 (Midland Engineering)
ii. Goals: 2.1%W and 0.6%M
1. MBE: JMH Roofing Company $7,611.00 (0.6%)
2. WBE: JMH Roofing Company $26,637.00 (2.1%)
17) CSO 18 Backwater Valve Quote
i. Total contract amount: (Selge)
ii. Goals: 4.3%W and 1.2%M
1. Low bidder, made GFE, met WBE not MBE goals
18) VPA Athletic Court Renovations, Phase I 121-033
i. Total contract amount: $97,474.84 (Milestone)
ii. Spring 2022 construction (basketball courts)
iii. MWBE Goals: 2.6% M, 5%M
1. MBE: V&R Trucking $1,275.00 (1.35%)
2. MBE: C. Lee Trucking $1,275.00 (1.35%)
3. WBE: Slusser’s Green Thumb $4,294.84 (4.41%)
4. WBE: KB Enterprises $1,732.40 (1.78%)
19) Potawatomi Zoo Parking Lot Expansion 120-014
i. Total contract amount: $438,265.82 (Milestone)
ii. Goals (Base Bid): 2.5%M, 5.0%W
1. MBE: C. Lee Trucking $11,000 (2.5%)
2. WBE: State Barricading $19,017.45 (4.34%)
3. WBE: V&R Trucking $2,900 (0.67%)
C. Bid or Quote Phase:
1) North Pumping Station FDR (Quote)
i. No quotes received on 10/12; moved to open market
ii. Goals: 2.8%W and 0.7%M
2) Signal Detection Project (Bid) 120-046
i. JBL Signals and Lighting- $166,254.00
ii. Goals: 4.4% WBE, 1.4% MBE
1. MBE: JBL Signals and Lighting $132,754.00 (79.85%)
2. WBE: TC Electric $33,500.00 (20.14%)
3) Prairie Avenue Water Main at US 20 Bypass (Bid)
i. Low Bidder HRP
ii. Goals: 4.8%W and 2%M
1. $33,818 M (US Hydro Vac, V&R, C Lee)
2. $81,483 W (Slusser’s; TCS)
4) Riverside Drive Bank Stabilization (Bid) - Bid Open 11/23; Bid Award pending
budget availability
i. Initial review: Milestone Contractors North is the lowest bidder
ii. 0.8%W and 0.3%M goals
1. $2,700 - 0.33% M (C. Lee Construction); percentages are exceeded
2. $9,689 - 1.19% W (State Barricading & Slusser’s); percentages are
exceeded
5) 2021 Demolitions 121-036
i. 4 bids received on 11/23: Green Demolition, Indiana Earth, HRP
Construction, Ritschard Bros. - all 4 had complete, responsive MWBE forms
ii. Award to Green Demolition at 12/14 BPW ($377,220)
iii. Goals: 4.7%W, 1.4%M (NAICS 238910 Site Prep)
1. MBE: Trucks R Us/Kennedy Expressline $11,316.60 (3%)
2. WBE: SAN Corporation $18,861.00 (5%)
6) Airport Annexation Area Water Main Extension
i. Bids Opened 11/09/2021 - G.E. Marshall (Low Bid at $313,196.40)
ii. Award to G.E. Marshall on 12/14/2021.
iii. Goals: 1.55% MBE (Projected 2.97%), 4.45% WBE (Projected 18.80%)
1. MBE Participation: DLZ Industrial, LLC (Layout & As-Builts); C. Lee
Construction (Asphalt Trucking)
2. WBE Participation: Modern Edge (Mulched Seeding, Silt Fence); State
Barricading (Traffic Control); BUC Construction Supply (Water Main
Pipe, Fittings, and Materials)
7) Seitz Park Ph. 2 (Bid) - Bid Open 12/14
i. Base Bid: 3.7% W and 2.2% M
ii. Alternate 1: 5.4% W and 3.5% M
iii. Alternate 2: 3.5% W and 2.0% M
8) North Water Treatment Plant Improvements 119-011
i. No bids received, open market
ii. Div A-E & Alt 1-4: separate goals 1.2% MBE, 4.3% WBE
9) Morris Performing Arts Center – Main Level Slab Replacement 121-029A
i. Goals: 4.1% WBE, 1.8% MBE
10) Ward Bakery Exterior Renovations (ReBid) - 121-061R - Bid Open 12/14/21
i. Bid Package 1 (Masonry)
1. Goals - 0.3% MBE, 3.6% WBE
ii. Bid Package 2 (Doors/Windows)
1. Goals – 3.4% MBE, 4.5% WBE
D. Rejected Bids/Quotes
1) Salvation Army Roof - 2/9/2021
i. Low bid from Slatile rejected, project awarded to Midland as they met the
MWBE goal. This was the last project to go out using the combined MWBE
goal – all projects after were split into MBE and WBE.
2) Ignition Park EV Charger (120-044 & 120-044R) - 3/9/2021
i. Low bidder did not meet goals, nor GFE. Only a MBE was identified as a
subcontract and GFE was not filled out.
ii. Next low bidder was over budget for base bid and all alternates, would have
required rejection of alternates to award.
iii. Form MWBE-2.0 was updated shortly before the first bid and needed to be
updated for rebid. Having the old form included in bid specs necessitated a
rebid for fairness and clarity to bidders.
iv. All bids were rejected in original bid due to several math and MWBE-related
errors in contractors’ bids.
v. Project will not go forward.
3) Mayflower and Sample 120-052- 3/23/2021 and 6/22/2021
i. All three bids were rejected and the proj ect was re-bid. The two lowest
bidders (Milestone and JBL Signals & Lighting) did not meet MWBE goals and
could not prove a good faith effort was made. The third bid (Rieth Riley)
exceeded the budget.
ii. On the rebid, two bids were received (Milestone and Rieth Riley). JBL did not
submit. Both Milestone and Rieth Riley met the MWBE requirements and the
project was awarded to Milestone.
4) 905 Michigan - 4/14/2021 and 6/8/2021
i. All three bids rejected during first bid process. Low bid Green Demo had tried
to use Local 645 laborers as MBE. Green Demo was low bid during 2nd bid
round, and met both goals.
5) United Way - 5/11/2021 and 7/13/2021
i. Both bids rejected during first bid process - neither Robert Henry nor
Ziolkowski met goals.
ii. During rebid, low bid from Ziolkowski rejected as they did not meet MBE
goal. Robert Henry met both goals and was awarded the project.
6) 2021 Small Drainage – 8/24/2021 and 9/28/2021
i. Division 1 (Kaley) – 5.4%W and 3.2%M - HRP did not meet goals, Selge met
goals
ii. Division 2 (Marion) – 5.1%W and 2.7%M - Selge met goals
iii. Low bid for Div 1 was HRP, MBE 0.9%, GFE’s affirmed but not met after
further questions, award to Selge on 9/28
1. Questions re: GFE – template emails versus making a call to subs to
try to make the goals, appropriate selection of portion of scope for
MBE
7) Ward Bakery - 121-061 – 11/9/21
i. Bid Package 1 (Masonry)
1. Ziolkowski Construction (Low Bidder) was able to meet MBE/WBE
utilization goals (MET Construction, LLC – 7811 Teel Way Indianapolis,
IN 46256
a. MBE/WBE – 5.1% (Goal - 0.3% MBE, 3.6% WBE)
2. Slatile did not complete the correct MBE/WBE forms and did not
provide adequate MBE/WBE utilization
a. MBE - 2.8% (Goal - 0.3%), WBE – 3% (Goal-3.6%)
ii. Bid Package 2 (Doors/Windows)
1. R Yoder was not able to meet MBE/WBE goals
a. MBE- Reached out to one firm, unable to secure a bid
b. WBE- Reached out to two firms, unable to secure bid
iii. The bids were beyond the project budget. The base bids received were
$205,768 over the Architect’s estimate and $17,767 over the total TIF
allotment. The project scope and schedule will be adjusted and re-
advertised.