HomeMy WebLinkAboutSBStat 2021 - Q3 Neighborhoods-1SBStat | Neighborhood Stat
2 0 2 1 Q u a r t e r 3 O c t o b e r 7 t h , 2 0 2 1
C i t y o f S o u t h B e n d
SBStat 2021
Ground rules for SB Stat Meetings
1. No stupid questions
Use this space to ask and address difficult questions safely
2. Data-driven decision making
Strive to make decisions based on whatever most recent data is available
3. Relentless follow-up
Identify clear action items and owners after each meeting
4. A bias towards action
Continuously seek to improve: our data, our ways of working, etc.
SBStat 2021
Today’s Agenda
I. Project updates from previous Stat meeting
II. Deep-dive analysis & discussion
-Neighborhood Maps
-Sidewalk Condition Data-Tax Abatement
III. Taking action
-Identifying clear action items and owners
IV. Celebrating our values
SBStat 2021
Highlights from this past quarter
Project updates from previous Stat meetings
SBStat 2021
Project Brief Description Status
2021 Infrastructure Planning &
Management An overview of 2021 infrastructure projects and goals
Rebuilding our Streets Plan –
Strategic Communications
Communicating progress towards goals established in
the City’s Rebuilding Our Streets plan
Neighborhood Map A map that breaks the city down by neighborhood for
internal data analysis and operations planning
Tax Abatement Analysis Measure and understand the impact of historical,
commercial tax abatements in South Bend
Neighborhood Stat Portfolio Summary
Status of SBStat projects in the queue for 2021
Legend Project on schedule Project delayed Project cancelled Project under consideration
SBStat 2021
CITY OF SOUTH BEND, IN
Rebuilding Our Streets –2021
•Street Paving
•46.81 lane miles completed
•17 streets scheduled for
milling/paving next week
•Cracksealing
•47.02 lane miles completed
•Microsurfacing –completed
•31st, 32nd, Bertrand, Clover, Roger, Ryer and Springbrook streets
•Brick Spot Repair
•Jefferson Boulevard, Laurel, Maple, Pine and Wayne streets
•Total lane miles completed: 95.4
71%
of Planned Work
is Complete
CITY OF SOUTH BEND, IN
Rebuilding Our Streets –2022
•Total lane miles of streets to be
addressed in 2022: 120
•Includes: Paving, Brick street repair, crack
sealing, microsurfacing, reconstruction, etc.
•2022 Budget
•MVH: $1.9 Million
•LRS: $1.6 Million
•Major Moves: $800,000
•Community Crossings: $1,000,000
•Federal Aid: $500,000
•Strategic Capital: $3,000,000
•Total: $8.8 Million
CITY OF SOUTH BEND, IN
Curb & Sidewalk Council Allocation
Program
•Reconstruction of residential
curbs and sidewalks selected
by council members
•138 Properties addressed in
2021
•2022 Budget: $700,000
CITY OF SOUTH BEND, IN
Curb & Sidewalk Reimbursement Program
•Annual program for property owners
to receive partial reimbursement for
curb and sidewalk reconstruction.
•2021 application opened mid-April.
Program was full by end of June.
•40 properties participated in 2021.
•2022 Budget: $150,000
CITY OF SOUTH BEND, IN
Safe Routes to School (SRTS)
•Replaces sidewalks and curb ramps
along walking routes to schools.
•Design Phase –2022
•Muessel Elementary & Holy Cross
School
•Construction planned for 2024
•Our Lady of Hungary
•Construction planned for 2025
•Federal Aid Project (80/20)
CITY OF SOUTH BEND, IN
School Zone Flashing Beacons
•Installation of 100 school zone flashing beacons at 30
school properties within city limits.
•Includes the removal of existing school signage and
installation of new flashing beacons with the
capability of remote programming
•Construction Phase –Spring 2022
•Federal Aid Project (80/20)
CITY OF SOUTH BEND, IN
Light Up South Bend
•Two components to Light Up SB Program:
•Neighborhood Streetlight addition (by AEP)
•Lamppost lighting cost share program
•Neighborhood Street lights
•65 Streetlights to be added in Districts 2, 4, 5 in
2021
•Lamppost Lighting Program
•88 lampposts installed for 2021
program
•2022 Budget: $260,000
CITY OF SOUTH BEND, IN
Traffic Calming
•Permanent Speed Humps –Summer 2022
Installation
•College Street
•Johnson Street
•Lindsey Avenue
•Speed Radar Feedback Signs
•Indiana Ave. between Main & Olive
streets
•Ewing Ave. between Main & Olive streets
•McKinley Ave. between Manchester &
Ironwood drives
•Spring 2022 Installation
CITY OF SOUTH BEND, IN
Traffic Calming
•Rubber Speed Humps
•Cost of rubber versus concrete is
significantly less.
•Piloting lower cost rubber speed
humps/speed cushions in 2021.
•2022 Budget Request: $300,000
CITY OF SOUTH BEND, IN
Other Neighborhood Infrastructure
•American Rescue Plan (ARP): $2.5
Million
•Curbs and Sidewalks
•$750K for 1.5x current allocation
•$1.5M to double current allocation
•Traffic Calming
•$15K per permanent speed hump
•150 current requests
•Assuming 2 speed humps per
request -$4.5M
•Lighting
CITY OF SOUTH BEND, IN
Stormwater Projects
•Various Professional Services
•Study and design efforts for stormwater
drainage issues
•Survey, land and easements acquisition services
•DSSMR -Federal Energy Regulatory
Commission yearly requirements
•Miscellaneous Drainage Repairs
•Catch basin repairs, basin investigations, storm
sewer/culvert cleaning
•2022 Budget: $1 Million
SBStat 2021
Deep-dive analysis & discussion
•Neighborhood Maps
•Sidewalk data overview and next steps
•Tax Abatement
SBStat 2021
Neighborhood Maps
BACKGROUND /
CONTEXT
AVAILABLE DATA &
ANALYSIS
OPTIONS TO IMPROVE
PERFORMANCE
SBStat 2021
Background and Context
•A dynamic internal data tool for staff that can create reports
•Improve targeting for local programs and policies, ensuring wereach the residents we target
•An open data tool for neighborhoods to monitor and stay informed on changes happening at a street level
SBStat 2021
Interactive ArcGIS Tool
SBStat 2021
Improvements and Use Cases
Improvements
•Automated updates that are linked to Cityworks data (i.e. sidewalk and curb improvement data and infrastructure projects)
•Neighborhood boundaries labeled for tailored reporting
Future Use Cases
•Measuring areas with less walkability and their effect on food and transportation access
•Street level data of underserved areas
SBStat 2021
How it could work
EEE and I&T would team up:
•EEE works with neighborhood associations to pick boundaries + metrics/issues they care about most. I&T works with EEE to make a tailored template.
•I&T runs 2 static reports run in Spring and Fall for that geography and publishes them.
•EEE can leverage the live map for events/meetings outside of the 2 static reports
•Ex: Show the neighborhood association when they are picking metrics, bring up the map during planning sessions
•I&T will train EEE and give them access to the maps, work to maintain and add to them
SBStat 2021
Proposed Roles & Responsibilities
City Team Responsibilities
Applications Team (I&T)
Maintaining the system of record,
ensuring data integrity and adequate
system performance. Work to add
data.
Business Analytics Team (I&T)
Designing neighborhood-level
reports and analysis for DCI staff.
Work to add data.
Engagement & Economic
Empowerment Team (DCI)
Using reports to share information
with residents and co-create future
reports based on neighborhood
goals, interests.
Proposed Process Map
Neighborhood Maps Reporting
Neighborhood MapDisparate Data Sources
(CRM, GIS)
Neighborhood Reports
(Descriptive Statistics &
Analytics)
Resident Engagement & Co-creation
Applications Team (I&T)Business
Analytics Team
Engagement & Economic Empowerment Team
SBStat 2021
Static Report-Lasalle Park
Click to add text
SBStat 2021
Sidewalk Data
•Historical Data
•Current State
•Options for Next Steps
SBStat 2021
Past sidewalk condition assessmentsBackground
•In 2015, interns walked the streets of South Bend and rated the quality of existing sidewalks around the city
•Districts 2, 3, and 6 had the highest concentration of sidewalks rated as “poor” or “bad”
•Rating System
•Good -nothing wrong with sidewalk
•Fair -aesthetic problem (deterioration, small cracks, etc.)
•Poor -not ADA compliant (vertical faults, fixed by grinding down)
•Bad -needs to be replaced (big cracks or gaps)
2015 Sidewalk Assessment
SBStat 2021
2015 Sidewalk Assessment Background
•Stored in ArcGIS, geolocated
•Assessed at block level
•Percent good, fair, poor, bad
•Types of deficiencies captured
•Vertical/horizontal fault, ponding, etc.
SBStat 2021
Sidewalk Data
Current state and potential improvements
Current State
•Address-level location of improvements made
•Ability to overlay with past historical sidewalk condition
•Broken down by funding source, internal vs. contractor, etc.
Potential Improvements
•Consider adding data fields on:
•condition assessment
•Street type (residential v. non-residential)
•Connectivity score (connection to pedestrian networks, proximity to transportation, food)
SBStat 2021
Discussion questions before closing out the topic
1.What type of sidewalk data would you like to see on the neighborhood map?
2.How often should the City conduct comprehensive assessments of sidewalk condition? Is there support/interest in doing this next year?
3.Are there any policy changes re: sidewalks that we want to consider or discuss going into an assessment?
4.Are there any research questions you have on sidewalks in South Bend?
SBStat 2021
Tax Abatement Impact
•Background / Methodology
•Available data & analysis
•Options to improve performance
SBStat 2021
Tax Abatement-Project Review
Background
•Property tax abatement is a tool used by local governments to attract and retain businesses in a defined economic zone
•The analysis looks to measure and understand the impact of historical, commercial tax abatements in South Bend
Methodology
•The analysis compared changes in Assessed Value of Completed Commercial Abatements from 2012-2020. 52 abatements were completed during this period.
SBStat 2021
SBStat 2021
Results of Analysis
•Tax abatements completed between 2012-2020 generated $75M+ in improved value and $2.25M+ in new tax revenue
•TIF Zone-SB German-009showed the greatest increase in improved value of $22,284,900.00. While TIF Zone-SB Portage 026decreased in improved valueby ($1,119,500.00)
•Tax Abatements when used as a tool for attracting new business, show greater increases in Assessed Value over time based on changes in improved value of vacant lots.
Property Type Change in Improved Value End Taxable Revenue Count Percent of Revenue
All $ 75,658,200 $ 2,269,746 52 -
Vacant Lots $ 50,087,800 $ 1,502,634 19 66%
Non-vacant Lots $ 25,570,400 $767,112 33 33%
TIF $ 67,793,700 $ 2,033,811 43 90%
Non-TIF $7,865,300 $235,929 9 10%
Vacant in TIF $ 43,835,200 $ 1,315,056 16 58%
SBStat 2021
Discussion Questions
•Any follow-up questions? Would it be worth time/effort to do a more robust analysis?
•Has Council seen this? Any issue/questions? Are there other effective ways we should communicate this data to council?
•How often should we assess tax abatement performance? How often should we update this analysis?
SBStat 2021
Celebrating our values
This section highlights exemplary work happening in the City to improve performance that may otherwise go unnoticed
SBStat 2021
Celebrating our Values
SBStat | Neighborhood Stat
2 0 2 1 Q u a r t e r 3 O c t o b e r 7 t h , 2 0 2 1
C i t y o f S o u t h B e n d
SBStat 2021
Appendix
2015 Sidewalk Assessment
In 2015, interns walked the streets of South Bend and rated the quality of existing sidewalks around the
city.
•Districts 2, 3, and 6 have the highest concentration of sidewalks rated as “poor” or “bad”
‒Results from the 2018 Community Survey indicate that residents in these districts are most dissatisfied with
the condition of their sidewalks
•If the City of South Bend wanted to repair all sidewalks (not including curbs) that are below a “good” rating, it
would cost over $100M
‒1.8M linear feet * $60 = ~$108M
Miles % of City
Good 357 51.1%
Fair 220 31.5%
Poor 90 13%
Bad 31 4.5%
Total 698
District Total
Miles
Miles
Poor % Poor Miles
Bad % Bad Total Poor
/ Bad
1 107 11 10%7 6%16%
2 138 19 14%10 7%21%
3 125 22 17%15 12%29%
4 129 12 9%3 2%11%
5 103 12 11%6 6%17%
6 96 15 16%11 11%27%
Rating System
⚫Good = nothing wrong with sidewalk
⚫Fair = aesthetic problem
(deterioration, small cracks, etc.)
⚫Poor = not ADA compliant
(vertical faults, fixed by grinding down)
⚫Bad = needs to be replaced
(big cracks or gaps)
Rating System -Bad
CRITERIA EXAMPLE RATING
Horizontal Fault
horizontal gaps or
openings of 2” or
greater
Bad
Cross-Slope
greater than a 1 in 12
cross-slope on
sidewalk
Bad
Cracking
not traversable by a
wheelchair
Bad
Rating System –Poor
CRITERIA EXAMPLE RATING
Vertical Fault
Vertical offsets in the
sidewalk
Poor
Rating System -Fair
CRITERIA EXAMPLE RATING
Spalling
surface deterioration of ¼”
or greater
Fair
Obstructions
any obstructions restricting
operating width to less than
36”, enough space for a
wheelchair to pass
Fair
Cracking
four or more surface cracks
in a sidewalk panel
Fair
Ponding
standing water, or evidence
of standing water on
sidewalk
Fair
Cleanliness
excessive debris or poor
cleanliness on sidewalk
Fair
Length (Miles)Percent of City
Good 357 51.1%
Fair 220 31.5%
Poor 90 13%
Bad 31 4.5%
Total 698
Assessment Data