HomeMy WebLinkAboutOpening of Proposals - Coal Line Trail Phase II Proj No. 115-064 - Lochmueller Group, Inc.CLIENT: PROJECT 1 CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II) 1 Dear Members of the Selectfon Committee, For over 40 years, Lochmueller Group, Inc. (Lochmueller) has worked hard to earn a reputatfon with local agencies as a trusted partner. We are deeply rooted in public service and bring the perspectfve of an “Owner” in everything we do. Our goal is to help you provide the best value to our community, and we are well -suited to represent the City of South Bend as an extension of your team in the field. Lochmueller’s constructfon inspectfon approach has proven successful with the City of South Bend, as witnessed on the Two-Way Street Conversion; Corby Boulevard, Ironwood Drive, and Rockne Drive Intersectfon Improvement; and Seitz Park projects. PROVEN APPROACH & CUSTOMER SERVICE Our team has: » Proven tfme & tfme again our forward thinking results in proactfve measures mitfgatfng or avoiding potentfal issues before they affect the schedule » Extensive knowledge successfully inspectfng trail projects built on abandoned railroads Communicatfon is key – we will ensure the City is well-informed on a daily basis EXPERIENCED LEADERSHIP & TEAMWORK Marc Oakley and Nick Smith have the leadership to manage the project and demonstrated success in the quality of their work. Both are dedicated to client responsiveness and committed to thoroughness. With Dave Barich and Dale Wills as mentors and offering field support, our team has 69 years of combined experience successfully managing LPA and INDOT projects. With the additfons of Marc, Nick, and Dave, our inspectfon team’s capabilitfes and capacity contfnues to grow and offers exceptfonal constructfon knowledge, unique resources, and passion to carry-on our traditfonal approach. Our team brings the decision -making skills, organizatfon, experience, and leadership you expect from Lochmueller and trust we will deliver. Marc and his team are fully prepared to work with you to complete the project within the defined contract tfmelines and stay within the proposed budget. Selectfng Lochmueller provides the City with comprehensive support; strong technical skills; years of experience delivering successful, federally -funded LPA projects; and a successful approach to constructfon inspectfon. We are committed to the City of South Bend. South Bend is our community and the success and completfon of your project is our highest priority. Respectiully submitted, Jessica Clark, PE Dave Barich, PE, PS Client Service Manager Constructfon Manager RESPONSIBLE OFFICE Lochmueller Group, Inc. 112 W. Jefferson Boulevard, Suite 500 South Bend, Indiana 46601 AUTHORIZED NEGOTIATOR Susan Al-Abbas, PE salabbas@lochgroup.com Cell: 574.386.3529 PROPOSED TEAM 13.1 Constructfon Inspectfon Lochmueller Group, Inc.: 97% McCormick Engineering, LLC: 3% - DBE COAL LINE TRAIL (PHASE II) CITY OF SOUTH BEND October 26, 2021 CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II) 2 WE UNDERSTAND YOUR PROJECT The 3,200-foot-long improvement connects with the Riverside Trail on the west side of the St. Joseph River, traverses east on the former railroad bridge over the river, and constructs a new 10 to 12-foot, HMA shared-use path along the old rail corridor to the north of Angela Boulevard toward SR 933, where it completes the linkage with East Bank Trail. The abandoned railroad bridge rehabilitatfon replaces the rail tfes with a concrete deck, uses pneumatfcally-placed mortar and injected epoxy to address the pier deterioratfon (spalls and cracking), improves the scour protectfon using Class I riprap, reconstructs the beam seats, installs elastomeric bearings, partfally removes and embeds new reinforcing steel, and replaces end bents, and cleaning and paintfng the structural steel to restore the structure ’s useful life and strengthen the platiorm carrying the trail over the river. PROJECT APPROACH PROPOSED NEW TRAIL EAST BANK TRAIL RIVERSIDE TRAIL Riverwalk Trail Connection Monitor work around 60 kV AEP buried line Debris at Pier #7 & waterway MOT is necessary to channelize any traffic away from on-going construction East Bank Trail Connection CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II) 3 PROJECT APPROACH KEY CHALLENGES & SUCCESS STRATEGIES - SCHEDULE & CONSTRUCTABILITY PROJECT ELEMENTS Many factors lead to constructing a successful multi-use path. Knowing what to look for before an operation begins enables our team to deliver quality and avoid potential delays and increased costs. Our team reviewed the project documents and outlined the majo r project elements that will be most critical for a successful project: TECHNICAL EXPERTISE & UNDERSTANDING CHALLENGE: Complete trail before Notre Dame football games start in Fall of 2022. UNDERSTANDING: With the proximity to the University of Notre Dame du Lac, it is recommended to begin any traffic restrictions after the last day of spring graduation on May 5, 2022 and end any restrictions one to two weeks before the first day of classes on August 22, 2022. STRATEGY: Marc and his team will hold the contractor accountable for the schedule, budget, and work quality. Their daily and consistent communication will keep the contractor progressing. CHALLENGE: IDNR Permit Restriction #3, #6, and #23 raises constructability red flags. UNDERSTANDING: The permit restricts work in the waterway March 15 – June 15, July 15 – November 30, and the use of cofferdams, causeways, etc.; the contractor must expect to request waivers and plan ahead to complete the project on time. STRATEGY: If the City’s design team has not already initiated these discussions, Marc and his team will meet with DNR on-site to facilitate the modification request, open the communication lines, and coordinate between the City, designer, and IDNR. CHALLENGE: Four-to-six-month lead time for the elastomeric bearing pads. UNDERSTANDING: INDOT Area Engineer typically adjusts the contract completion time to account for this expected delay. Based on the current schedule, the bearing assemblies would be available in July. STRATEGY: Our team will discuss potential schedule stumbling blocks up front or before the pre-construction meeting. Recognizing these hurdles and how they impact the construction sequence is a critical attribute our team possesses. We will work to ensure these elements are moving as required. PIERS & ABUTMENTS » Verify removal areas & sound concrete » Verify new reinforcing steel – place horizontal bars on the inside or outside of the vertical bars » Verify epoxy-injected crack repair & shot-crete locations above the ordinary high water mark DECK CONSTRUCTION – DECK POUR DRY RUN » Verify reinforcement placement is according to plans » Hold dry run with finish machine – verifies deck depth & checks reinforcing steel cover depth is greater, but not significantly more than minimum » Verify pour sequence – ensures proper beam deflection PEDESTRIAN RAIL, LIGHTING, SIGNAGE, & AMENITIES » Verify connection details & conduit placement » Verify placement & foundation construction » Coordinate on delivery of stored materials & amenities TRAIL & APPROACHES » Verify subgrade meets required compaction testing » Check grades, speed table & curb ramps – promotes ADA compliance & smooth approach transition » Verify trail & project drainage patterns » Regularly inspect & verify proper function of SWPPP erosion & sediment control measures UTILITY COORDINATION » Monitor work around 60kV AEP line, buried 42" below proposed trail grade, running along the north side of the trail » Aware of two water service lines crossing the trail near the east end of the project for the old St. Joseph High School building » Ensure the contractor’s actfvitfes does not disturb the existfng 24” RCP sanitary line running along the alley & crossing under the path around STA 27+00 We also recommend the special provisions include language highlighting the environmental restrictions and necessary path to request a time and methods waiver, thus protecting the City against contractor claims for additional compensation related to building cofferdams or utilizing a causeway. It is clear this work is necessary to perform the scour protection measures and the costs should be included in the submitted bid versus requesting a change order after the fact. Attention to the permit restrictions at the time of bidding will save the City money and mitigate avoidable schedule delays. Our team will coordinate with the contractor to expedite their contract documentation and ensure sub‐contractor approval is in time to perform tree clearing prior to April 1. CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II) 4 SUCCESSFUL PROJECT DELIVERY FOR THE BEST OUTCOME Our experienced team has consistently delivered LPA and INDOT projects for over 30 years and fully understands the skills needed to deliver the scope of work. The key to our success is: COMMUNICATION & PROJECT PARTNERS Marc understands the importance of engaging the local partners, contractor, utilities, and the public. By keeping open lines of communication and accessible, Marc will keep the City of South Bend and project stakeholders fully informed and, most importantly, up to date on project progress, schedule, key dates, and project milestones. OUR SUCCESS IS REPEATEDLY ACHIEVED BY » Pre-Construction Kick-Off Meeting – fostering critical project interactions & setting the tone for on-going communication » Regular Progress Meetings with the City, contractor, subcontractors, utilities, stakeholders, & permitting representatives – emphasizing project schedule, budget, work quality, & coordination » Reviewing schedules for work completed, remaining work, schedule look ahead, material procurement needs, show drawing reviews, permits, coordination, & potential delays » Emphasizing contractor accountability to support & maintain budget & schedule » Documenting budget changes & forecasting anticipated final budget » Addressing & documenting work quality concerns or issues for corrective actions » Author & distribute meeting minutes » Reviewing & documenting permitting coordination requirements » Facilitating one-on-one meetings with all stakeholders as necessary » Responding quickly to any questions that arise » Keeping project status reports » Responding immediately to calls & messages » Being available 24/7 PROJECT APPROACH Communication Coordination Proactive Construction Inspection Approach » Comprehensive project knowledge » Thorough documentatfon » Proactfve solutfons = cost containment Marc will oversee day-to-day construction issues and direct the activities of the inspection team. His team will also review plans, specifications, and construction methods with the Contractor, provide supervision and administration of field work, and offer guidance and technical expertise to ensure the project is constructed according to plans, within budget, and on schedule. The installatfon of the riprap will be no small task. Normally riprap is installed so the top of the riprap is level with the existfng riverbed, as proposed at Piers 2, 3, 6, and 7. This will require excavatfon of approximately 3‐feet. It appears Piers 3 and 6 are completely submerged and 2 and 5 are at least partfally submerged. The contractor will need to safely access Piers 4 and 5 to dump the riprap per the plans. CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II) 5 OUR TEAM’S CONSTRUCTION INSPECTION DELIVERY SERVICES Our team understands the constructfon inspectfon services required that will ensure your project is built in accordance with contract documents, uses quality materials, and reinforces top-level workmanship. We implement a well-defined process that consistently delivers quality projects. Our approach includes the following items: PROJECT APPROACH PLANS THAT WORK Our experience has shown us that a complete understanding of the contract documents delivers the best possible project. We accomplish this by completfng the following reviews prior to constructfon: » Compare plan documents, special provisions vs. item list, & plans vs. field conditfons » Review project commitments » Check quantfty calculatfons vs. pay item list » Understand right-of-way documents, specifically cost-to-cure items to avoid misunderstandings » Verify utflity agreements vs. special provision tfme-line requirements » Understand permits & environmental requirements STAYING ON TRACK - MAINTAINING THE SCHEDULE & MITIGATING POTENTIAL ISSUES » Antfcipate potentfal delays & offer solutfons to mitfgate impacts » Remain ready & willing to address any & all issues quickly & efficiently » Have the right staff available to provide the right solutfon the first tfme » Maintain scheduled project meetfngs ORGANIZED SET UP » Pre-constructfon meetfng » Files » Each pay item » Correspondence » Requests for informatfon » Change orders & pay requests » Weekly reports & project pictures » Meetfng minutes » Sign & barricade reports » Payrolls » Testfng frequency & items » Certfficatfons & material tfckets » Failed materials » Submissions to INDOT lab DOCUMENTATION » Final Record - INDOT forms & item documentatfon » SiteManager - Daily & weekly reports, diaries, material record informatfon, pay requests, & change orders » Monitor erosion control plan » Manage failed materials » Maintain as-built mark-up throughout constructfon » Closely monitor project schedule » Schedule & coordinate preliminary & final close out » Log complaints, accidents, & calls - follow-up resolutfon » Monitor closely the contractor schedule » Ensure subcontractor approvals » Complete the final constructfon record in accordance with INDOT requirements & within INDOT’s required tfmeline of 45 days after contractor’s last day of work TIMELY COMMUNICATION » Work with the City to provide a professional & positfve experience for impacted residents & businesses » Going above and beyond what is required to ensure public satfsfactfon » Address owner’s concerns & questfons quickly, & stay within the planned budget ADHERING TO INDOT REQUIREMENTS » Our team has constructed & inspected INDOT & LPA projects for over 35 years, giving them a high level of knowledge & familiarity with INDOT’s policies, procedures, & expectatfons » We are well respected by INDOT’s LaPorte District which leads to an effectfve liaison with INDOT for the City of South Bend » Our team will make sure that all INDOT requirements are met while stfll meetfng the City’s expectatfons; this is your project & we strive to be an extension of your team Based on the antfcipated lead tfme and permit restrictfons, we recommend phasing constructfon: » Start trail constructfon on or after May 16, 2022 with completfon 1-2 weeks before the first day of classes on August 22, 2022. » Bridge constructfon could begin April 1, 2022. Due to lead tfmes and cleaning/paintfng of the beams, we antfcipate completfng constructfon around October 2022. CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II) 6 MARC OAKLEY RESIDENT PROJECT REPRESENTATIVE KYLE SILVEUS, PE CITY OF SOUTH BEND DALE WILLS FIELD SERVICE MANAGER Nick Smith Tracy McCormick, PE INSPECTION SUPPORT ROAD DESIGN Brian Arterbery, PE BRIDGE DESIGN Michael Vereb, PE TRAIL DESIGN Jocelyn Hinshaw, PLA, LEED AP UTILITY COORDINATION + ADA COMPLIANCE Barbie Swihart Stutzman, PE SUPPORT STAFF PROVEN LEADERSHIP Our team will be led by Marc Oakley, Nick Smith, Dale Wills, Dave Barich, and Jessica Clark. Together, they have over and completed numerous projects ranging from small structure replacements to multfmillion -dollar road projects. They will draw on their experience to antfcipate and address issues before they become problems. We assembled an outstanding team with extensive technical expertfse and experience on numerous trail projects including: » Adams Trail » Eel River Run Trail » LaSalle Trail » Nickel Plate Trail » Panhandle Pathway » Plymouth South Gateway CAPACITY Lochmueller has over 30 RPRs on staff. We will provide local, experienced professionals available who are dedicated to meetfng the schedule or, if desired, acceleratfng it. In additfon to Marc, we antfcipate assistance from Nick Smith. We also included McCormick Engineering to add capacity and depth to our team and fulfill the DBE requirements. SERVICE We have one focus - OUR CLIENTS. With every project, our goal is to deliver your project by: » Proactfvely detectfng & resolving any potentfal conflicts & design issues so the project will stay on schedule » Keeping the public informed about the constructfon schedule & addressing concerns in a tfmely manner Our INDOT-Certffied technicians have the available equipment and knowledge to make sure all materials and work will comply with the latest INDOT Frequency of Sampling and Testfng Manual. 93 YEARS EXPERIENCE » On-Site Inspectfon » SiteManager Responsibilitfes » Material Records/Testfng » Progress Meetfngs » Utflity Coordinatfon » Pay Applicatfons, Estfmates & Change Orders » As-Builts » Erosion Control Monitoring » Public Notfces » Final Constructfon Records PROJECT TEAM DAVE BARICH, PE, PS CONSTRUCTION MANAGER JESSICA CLARK, PE CLIENT SERVICE MANAGER CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II) 7 MARC OAKLEY | RESIDENT PROJECT REPRESENTATIVE BS, Civil Engineering, Purdue University| INDOT PE/S | INDOT Final Constructfon Record | INDOT SiteManager | INDOT Technician Marc is a Civil Engineer with five years of experience in constructfon inspectfon. Prior to joining Lochmueller, Marc served as Project Engineer/Supervisor where his responsibilitfes included conductfng constructfon inspectfon services for INDOT, USDA, ITRCC, and LPAs; providing supervision for various public agencies to ensure project constructfon conformed to plans and specificatfons; documentfng quantftfes for payment and record purposes; performing onsite and offsite material testfng in accordance with specificatfon requirements; and coordinatfng with both clients and contractors to resolve any onsite issues during ongoing constructfon. Marc will lead the inspection process to successfully deliver the project. He will be a direct point of contact, responsible for relaying project updates and relaying information, overseeing contract administration, and managing the process. RELEVANT EXPERIENCE Underwood Road Bridge Replacement for St. Joseph County » Project Engineer/Supervisor for the constructfon of a 58-foot single span composite prestressed concrete spread box beam bridge over Pine Creek & reconstructfon of 200-foot of adjacent HMA roadway » Project included constructfon of steel pipe piling, end bents, wingwall, deck & approach slabs as well as installatfon of helical wall anchor tfebacks & scour protectfon » Constructfon Cost: $580,000 Merrifield Park for City of Mishawaka » District Constructfon Technician for the constructfon of 0.5 miles of a multf -use path, 1,100 LFT of riverbank stabilizatfon, park comfort statfon, & lightfng » Park amenitfes also included signage, pavement markings, pavilions, benches, & patfos » Constructfon Cost: $2.95 million Lincoln Safe Routes to School for City of South Bend » Project Engineer/Supervisor for the constructfon of 4700 LFT of sidewalk replacement, 195 curb ramps, & 30 adjacent approaches » Pedestrian travel routes also included pavement markings & landscaping » Provided the City with a change order proposal for the full depth HMA patching item adjacent to all curb ramps which provided cost savings that were implemented into additfonal sidewalk replacement in the immediate block surrounding Lincoln Elementary School » Constructfon Cost: $684,000 Harrison Safe Routes to School for City of South Bend » Project Engineer/Supervisor for the constructfon of 3.4 miles of sidewalk replacement, 130 curb ramps, & 137 adjacent approaches along nine city streets surrounding Harrison Primary Center » Pedestrian travel routes also included pavement markings, landscaping, and the additfon of solar powered flashing school speed limit beacon assemblies » Constructfon Cost: $1 million Coquillard Safe Routes to School for City of South Bend » Project Engineer/Supervisor for the constructfon of 3,800 LFT of sidewalk replacement & 172 curb ramps in the surrounding areas near Coquillard Elementary School & Kennedy Academy » Pedestrian travel routes also included pavement markings & landscaping » Constructfon Cost: $500,000 PROJECT TEAM CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II) 8 DALE WILLS | FIELD SERVICES MANAGER BS, Civil Engineering, Purdue University| INDOT Stormwater Inspectfon Manager | INDOT PE/S | INDOT Final Constructfon Record | INDOT SiteManager | INDOT Technician | OSHA Constructfon Safety & Health | OSHA Confined Space, Trenching, & Excavatfon For nearly 40 years, Dale has provided design assistance and constructfon inspectfon services for federal-aid LPA projects. His experience includes estfmatfng, scheduling, managing, surveying, and inspectfng projects related to water, wastewater, stormwater drainage, buildings, and transportatfon. Dale’s experience also includes the contractor side, which is valuable in reconciling disputes and addressing discrepancies in the plans/specificatfons before constructfon. Dale will ensure all resources are provided and assist if any issues arise. RELEVANT TRAIL EXPERIENCE Nickel Plate Trail & Pedestrian Bridge for the City of Peru » Project Supervisor for the constructfon of 17,100 feet of 12 -foot-wide asphalt trail on the abandoned Nickel Plate rail corridor & renovatfon of a 600 -foot-long railroad bridge for pedestrian & bike traffic over the Wabash River » Bridge included a new cast-in-place concrete bridge deck with railing & landscaping » Trail amenitfes also included signage, pavement markings, hand railing, & benches » Constructfon Cost: $4 million (Trail), $901,019 (Bridge) (Federal-Aid LPA) Panhandle Pathway Trail for Pulaski & Cass Counties » Project Supervisor for the constructfon of a 14.25-mile project that included a 10-foot-wide asphalt trail with 2-foot-wide shoulders along an abandoned railroad » Project crossed 24 county roadways, 11 culverts/small structures, & three bridges » Trail amenitfes included signage, pavement markings, hand railing, & benches » Constructfon Cost: $2 million (Federal-Aid LPA) Eel River Trail & Pedestrian Bridge for the City of Logansport » Project Engineer for the constructfon of a new multf-use trail & pedestrian bridge over the Eel River, please see page 12 for more information » Constructfon Cost: $953,811 (Trail), $760,657 (Bridge) (Federal-Aid LPA) Corby Boulevard, Ironwood Drive, & Rockne Drive Improvement for the City of South Bend » Resident Project Representatfve for an intersectfon reconstructfon project that includes asphalt pavement; new traffic signal and decoratfve lightfng; & new storm sewer, retentfon basin, sidewalks, & concrete drives » Constructfon Cost: $3 million Two-Way Street Conversion for the City of South Bend » Project Inspector for the constructfon of this 4-mile one-way to two-way conversion » Project included asphalt paving, three new roundabouts equipped with pedestrian -friendly crossways & flashing lights, 28 traffic signal upgrades, installatfon of 120 street lights, drainage improvements including new concrete curbs & sidewalks » Constructfon Cost: $20 million Cleveland Road Reconstruction from Riverside Drive to SR 933 for St. Joseph County » Resident Project Representatfve for reconstructfon of the roadway & two bridges , please see page 11 for more information » Constructfon Cost: $8.3 million (Federal-Aid LPA) Twyckenham Bridge over St. Joseph River for St. Joseph County » Project Engineer for the rehabilitatfon of this historic, 4 -span, concrete arch bridge » Work included removal of the existfng deck, overlay, curb, sidewalk, edge beam & railing & replacement with a new 8" concrete deck, curb & sidewalk, & Texas railing » Constructfon Cost: $4.8 million (Federal-Aid LPA) PROJECT TEAM CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II) 9 PROJECT TEAM NICK SMITH INSPECTOR BS, Constructfon Engineering & Management Technology, Purdue University | INDOT Certffied Technician (Exempt) | INDOT SiteManager | 10 – Hour OSHA Certffied Nick recently joined Lochmueller and will serve as our Inspector. With seven years of experience, he has served as the lead constructfon project manager for INDOT on multfple contracts. Nick’s responsibilitfes include inspectfng projects to monitor progress and adherence to design specificatfons, managing field personnel, soils and concrete testfng, preparing estfmates, verifying quantftfes, and completfng final constructfon records utflizing INDOT SiteManager. Nick will assist Marc in the field with inspection services. RELEVANT INDOT PROJECT EXPERIENCE I-94 over US 20 & East Branch of Trail Creek, LaPorte County for INDOT, LaPorte District » Lead Constructfon Project Manager for bridge deck overlay » Contract included milling the old bridge deck/RCBA & hydro demolitfon, placing latex modified overlay on bridge & RCBA, adding cofferdams around encased piles to perform patching & fiber wrapping of the reinforced concrete pile encasement, repairing the slopewall with flowable fill, filling eroded areas of slopewall with geotextfles & revetment riprap, & HMA wedge & level to transitfon from RCBA to existfng HMA » Constructfon Cost: $1.67 million US 20 & SR 2 Interchange, LaPorte County » INDOT Constructfon Project Manager for new bridge & dog-bone interchange » Contract included over 5,300 LFT of various sized pipe installatfon, 43 structures, pipe cleaning, new pile driving, & approximately 110,000 cubic yards of earthmoving » Constructfon Cost: 9.25 million US 20 over Indiana Toll Road, LaPorte County » INDOT Constructfon Project Manager for a bridge deck replacement » Contract included the State’s first implementatfon of Transparent Deck Pans » Constructfon Cost: $2.5 million DAVE BARICH, PE, PS CONSTRUCTION MANAGER BS, Civil Engineering & Land Survey Engineering, Purdue University | Professional Engineer: IN | Professional Surveyor: IN | INDOT PE/PS & Area Engineer | INDOT SiteManager | INDOT Certffied Technician Dave recently joined Lochmueller after working as both a Project Engineer and an Area Engineer at INDOT. He has more than 18 years’ experience in design, land surveying, and oversight of INDOT and LPA contracts with constructfon responsibilitfes in contractor management, MOT coordinatfon, standards and specificatfons review and implementatfon, and project close out. He is very familiar with keeping all stakeholders involved and up to date on constructfon schedules and tfmeframes. Dave’s experience in project coordination and bridge construction, particularly with the work that will be completed in and near the waterway, will be important and invaluable on this contract. JESSICA CLARK, PE CLIENT SERVICE MANAGER BS, Civil Engineering, Purdue University | Professional Engineer: IN Jessica joined Lochmueller after working for St. Joseph County Department of Infrastructure, Planning & Growth – Division of Public Works for over 24 years. Her experience includes 13 years as County Engineer demonstrates Jessica’s ability to manage program budgets and effectfvely communicate project solutfons as she facilitated over 38 Local Federal Aid projects, including 12 trail projects spanning over 10 miles at a constructfon cost of approximately $8.5 million. Jessica will oversee the team to ensure the project meets the City of South Bend goals, satisfies INDOT requirements, and maintains the budget and schedule. RELEVANT TRAIL EXPERIENCE Adams Trail, Phase I & II for St. Joseph County & Friends of Granger Paths » As County Engineer, secured funding, administered, & managed project planning, budget, & design to construct a 2.6‐mile‐long, 10‐foot‐wide multf‐use path connectfng area neighborhoods with a park, library, & elementary schools » Constructfon Cost: $1.6 million (Federal‐Aid LPA) LaSalle Trail, Phase I, II, & III for St. Joseph County » As County Engineer, secured funding, administered, & managed project planning, budget, & design to construct a 2.8‐mile‐long, 10‐foot‐wide multf‐use path » Constructfon Cost: $1.8 million (Federal‐Aid LPA) CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II) 10 PROJECT TEAM BRIAN ARTERBERY, PE ROAD DESIGN BS, Civil Engineering, Purdue University | Professional Engineer: IN, IL, MI, KY, MO Brian’s 28 years of experience with segmented, large-scale transportatfon projects have made him an expert at schedules and budgets. He has extensive experience designing and managing a variety of projects including, urban and rural highways, trails and paths, maintenance of traffic, intersectfons and roundabouts, traffic signals, water distributfon, sanitary sewer, and stormwater drainage. Brian will serve as a technical resource for any road -related questions that arise during construction. RELEVANT TRAIL EXPERIENCE CR 17 at US 33 Multi-Use Path for Elkhart County » Project Manager & Certffying Engineer for the constructfon of a new multf-use path along CR 17 from Rieth Boulevard, across US 33 & the NS Railroad tracks to CR 45 » Constructfon Cost: $2.2 million Cleveland Road Reconstruction from Riverside Drive to SR 933 for St. Joseph County » Project Manager & Lead Design Engineer for design & right-of- way acquisitfon services for the roadway reconstructfon of the 4 -lane sectfon, please see page 11 for more information » Constructfon Cost: $8.3 million (Federal-Aid LPA) Ninth Street Trail for the City of Goshen » QA/QC for the constructfon of an 8-foot, multf-use path on Ninth Street » Project includes new curb ramps, utflity coordinatfon, public involvement, & railroad coordinatfon » Path was designed to minimize impacts to existfng propertfes. » Constructfon Cost: $1.3 million Dunes-Kankakee Trail for Porter County » Project Engineer for this 0.3-mile segment of trail to connect the Dunes Natfonal Lakeshore Visitors Center to the US 20/ SR 49 interchange » Project included access to an existfng pedestrian way; a 10-foot-wide, asphalt, multf-use path; signage; natfve landscape; & reinforced soil slopes » Constructfon Cost: $485,455 MICHAEL VEREB, PE BRIDGE DESIGN MS & BS, Civil Engineering, Purdue University | Professional Engineer: IN, OH, KY Michael is a Senior Project Manager with 22 years of experience providing bridge design and bridge inspectfon services. He has developed more than 120 bridge projects as a project engineer and project manager, including new bridges, bridge replacements, and bridge rehabilitatfon projects on local roadways, state routes, interstate highways, and railroads. Michael will serve as a technical resource for any bridge -related questions that arise during construction. RELEVANT BRIDGE EXPERIENCE CR 17 at US 33 Multi-Use Path for Elkhart County » Project Manager for a new pedestrian bridge carrying a new multf‐use trail over US 33 & NS Railroad, adjacent to the existfng CR 17 bridge » Structure alternates included a two-span, contfnuous, composite, steel plate girders, & single-span & two‐span prefabricated trusses » Constructfon Cost: $2.2 million Roxana Trail Assessment for the City of East Chicago » Project Manager responsible for a cost analysis for a pedestrian bridge that was part of the trail » Dutfes also included reviewing site constraints to determine an appropriate structure type Leeper Park Michigan Street (SR 933) over St. Joseph River, St. Joseph County for INDOT, LaPorte District » Project Manager for the rehabilitatfon of the three-span earth-filled reinforced concrete arch Select Historic Bridge » Rehabilitatfon alternatfves are currently in development & are subject to evaluatfon for feasibility and prudence in accordance with the Historic Bridge Programmatfc Agreement between INDOT & FHWA Logan Street over St. Joseph River for St. Joseph County » Project Engineer for bridge rehabilitatfon including cast-in- place concrete spandrel walls & sheet pile retaining walls » The bridge is a historic 4-span 464-ft.-long earth-filled reinforced concrete arch bridge » Constructfon Cost: $4.5 million CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II) 11 CLEVELAND ROAD RECONSTRUCTION | ST. JOSEPH COUNTY Client Contact: Sky Medors, PE, CFM, 574.235.9042 | Constructfon Cost: $8.3 million |Team: Susan Al-Abbas, Jessica Clark, Dale Wills, Scott Bockover Lochmueller performed constructfon inspectfon services for this 4 -lane corridor reconstructfon project, from Riverside Drive to SR 933. This project consists of a total reconstructfon of 5,500 feet of roadway, including replacement of the deteriorated concrete pavem ent and curb, additfon of a multf-use path, pedestrian-actfvated crossing signal, and lightfng. The project also included the rehabilitatfon of Cleveland Road over St. Joseph River (St. Joseph Bridge 212) and safety upgrades to Cleveland Road over Juday Creek (St. Joseph Bridge 007). ROADWAY ELEMENTS Roadway elements consisted of removing one mile of concrete pavement and replacing it with new storm sewers, subgrade treatment, and QC/QA PCCP pavement. New lightfng, signage, center median wall, curbs, drives, guardrail, and a 10-foot-wide multf-use path were also constructed. An added right-turn lane and traffic signal modificatfons were done at the Cleveland Road and SR 933 intersectfon. BRIDGE ELEMENTS Bridge 212, Cleveland Road over St. Joseph River, is a 4 -span, contfnuous steel plate girder. Bridge work consists of: » Removing & replacing the deck, approaches, & mudwalls » Making structural steel repairs & modificatfons » Widening the bridge deck to allow for the additfon of a 10-foot-wide multf-use path » Installing new bridge rails & lightfng Bridge 007, Cleveland Road over Juday Creek, is a single- span, cast-in-place reinforced concrete box structure. Improvements include: » Performing safety upgrades to address nonstandard sidewalks & railings » Widening the bridge approaches » Replacing the bridge rails » Constructfng a new sidewalk for the 10-foot-wide multfuse path MAINTENANCE OF TRAFFIC A four-phase maintenance of traffic operatfon/sequencing included temporary modificatfon of traffic signals at SR 933/Cleveland Road and Riverside Drive/Cleveland Road. EXPERIENCE CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II) 12 SUCCESS STORY: EEL RIVER TRAIL & BRIDGE CONSTRUCTION Client Contact: Mercedes Brugh, 812.272.7417 | Constructfon Cost: $1.7 million |Team: Susan Al-Abbas, Dale Wills PROJECT DESCRIPTION The Eel River Trail is a 1-mile-long trail constructed through downtown Logansport that included a 3 -span bridge over the Eel River. As any project in an urban area, the project had challenges. Dale was able to work with the contractor, City, and other stakeholders to foresee potentfal problems and adjust schedules and the order of work to eliminate or mitfgate them. They completed the project on-time and within budget. PROJECT WORK INCLUDED » Constructfon of 1-mile multf-use trail » Constructfon of a 3-span Bridge over the Eel River » Landscaping along the trail and at two adjacent parks » Installatfon of storm sewers KEY CHALLENGES & SUCCESS STRATEGIES Managing the Critical Path On this project, managing the critfcal path meant dealing with a difficult Contractor. Dale notfced early on that the Contrac tor was not stfcking to the schedule and causing delays to the tfmeline. Dale stepped up to the plate and forced accountability from the Contractor for the schedule, budget, and his work quality. He worked with the City, INDOT, and Contractor to address the Contractor ’s issues and concerns to move the project along. It was Dale’s daily and persistent communicatfon with the Contractor that led the job to be completed within budget and on schedule. Understanding the Project’s Impacts When Dale notfced drainage issues along the trail, he worked with the Contractor and City to include adjustments to the grade of the trail and milling and resurfacing of the adjacent roadway to provide better overall drainage. Coordination with Utilities to Ensure Smooth Relocations Dale adjusted the alignment of the trail in the field to reduce the impact to utflitfes and obstructfons, to ensure the proje ct contfnued successfully. Maintaining Traffic to Minimize Disruption to Local Residents & Business Owners By only closing lanes when absolutely necessary, Dale was able to was able to minimize impacts to the travelling public. “Next time we need an inspector, please assign Dale Wills. Great job on our Eel River Run Trail and Cole Bridge projects.” Mercedes Brugh, Deputy Mayor Standard RFP Form Ver. 3-01-2021 6 (Rev. 06/27/18) Des. #: 1401811 Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE) I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f). I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confirm that the firms listed below are currently certified DBEs: INDOT: https://entapps.indot.in.gov/DBELocator/ KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx I certify that I have contacted the certified DBE’s listed below, and if my company becomes the CONSULTANT, these DBEs have tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division. I.DBE Subconsultants to be applied toward DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* % % % % II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* % % % % Estimated Total Percentage Credited toward DBE Goal:___________ Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal:__________ Company Name: ____________________________________________________________________ Signature: ___________________________________________ Date: ________________________ ∗ It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result of negotiation of contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these or other certified and approved DBE firms. McCormick Engineering, LLC 13.1 3 3% Lochmueller Group, Inc. 10/26/2021