Loading...
HomeMy WebLinkAboutOpening of Proposals - Coal Line Trail Phase II Proj No. 115-064 - HWC EngineeringAUTHORIZED NEGOTIATOR/OFFICER James Rice, PE Partner Director, Transportation Engineering jrice@hwcengineering.com (317) 981-1241 - Office Coal Line Trail (Phase II) from Riverside Dr. to SR 933 (Des # 1401811) | LAPORTE DISTRICT It’s Simple, We’re Indiana’s Trail Experts HWC has had the opportunity to manage over 20 different INDOT LPA trail specific projects in the last five years. This doesn’t even include the several dozen LPA roadway projects that had multi-use trails as part of their overall project construction. We consider trail inspection to be a niche in the construction industry and HWC is a market leader in this niche. As you’ll see on future pages, HWC has inspected trails of all different dynamics and looks forward to continuing our proud trail inspection record with the City of South Bend. When selecting a firm for construction inspection, the South Bend engineering team will need to consider several different attributes of the firm you choose to help ensure you receive the best finished product possible. Is the firm familiar with your City standards and staff? Does the inspection firm have any past relationships with the design firm? Does the firm have a relationship with the potential contractors that will bid this project? Do you have any history with the individual proposed to lead this project and what results did that person produce? HWC and Mr. Holth can answer yes to all of these questions. In the last three years, he has helped manage the Western Avenue Streetscape Phase III and Olive Street Reconstruction Phase I projects. Why risk selecting a construction inspection consultant that MAY deliver the expected results when you can trust that HWC and Mr. Holth WILL deliver the expected results? RESPONSIBLE OFFICE 135 N. Pennsylvania Street Suite 2800 Indianapolis, Indiana 46204 As stated above, Mr. Holth has been a part of the construction industry as both a contractor and construction inspector. This gives him a unique perspective on multiple aspects of the projects he oversees as well as a better understanding of how to communicate and partner with the contractor. This impressive level of communication promotes smooth and timely resolutions to issues that may occur during construction. He also has the experience and skill set required to propose a variety of constructibility and cost saving options to his clients. WHY THE HWC TEAM? CITY OF SOUTH BEND EXPERIENCED & SUCCESSFUL PROJECT SUPERVISOR Mr. Chris Holth has more than 29 years of experience managing construction projects in Indiana both as a consultant and as a contractor. The projects he has overseen range in construction cost from $250,000 to $10 million. Most of these projects have been with LPA clients like the City of South Bend. The quality of Mr. Holth’s performance on these projects has led to his clients requesting he oversee future work with them further exemplifying the extent of his abilities. He has received performance scores on multiple past projects from INDOT in the +2, “Exceeds Expectations” category. He is currently managing Olive Street Phase I, his second project in South Bend awarded to HWC based on his performance on the Western Avenue project. Mr. Holth has and will continue to meet and exceed the expectations set forth by the City of South Bend. $250,000 TO $10 MILLION Overseen Construction Costs EXCEEDS EXPECTATIONS Performance Scores 29 YEARS Of Experience PARTNERSHIP & UNDERSTANDING OUR COMMITMENT TO SOUTH BEND CONTRACTOR + INSPECTOR Unique Perspective On Projects TEAM PROJECT APPROACH RELEVANT EXPERIENCE 2HWC ENGINEERING | CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II)FIRM OVERVIEW FIRM OVERVIEW DYNAMIC • 26 full- and part-time inspectors located in 16 Counties throughout Indiana • Lead projects from ground breaking to ribbon cutting As an INDOT-certified engineering firm, our professionals are fully prepared to assist your community with every facet of transportation project delivery, from concept development through planning, design, and construction inspection. With a reputation for completing projects on time and within budget, our INDOT-certified, solutions-driven staff is prepared to guide your project from the pre- construction stages through project completion. CONSTRUCTION INSPECTION CONSTRUCTION ENGINEERING • Construction observation services for roadway, trail, & bridge projects PLANNING, STUDIES, FUNDING • Transportation planning • Traffic studies • Environmental studies DESIGN • Bridge design • Road design (rural systems) • Street design (urban systems) • Highway design (arterial systems) • Signalization • Intersection upgrades & roundabouts TRANSPORTATION INNOVATIVE • Field equipment and software upgrades ensure up-to-date industry technology • Several team members have INDOT Stormwater Level 1 Certifications and two have CESSWI Designations • 10 Hour and 30 Hour OSHA Training Certifications • National Highway Institute MOT Training and OSHA Fall Protection Training • Drone Pilot Licenses to take real-time photos on select projects SPECIFIC SERVICES Our Trail & Pedestrian Improvement Inspection Projects Include: • Fitzgerald Trail - New Castle, IN • Pedestrian System Improvements - Spencer, IN • Safe Routes to School - Clinton, IN • Kitselman Trail Phase I - Muncie, IN • Kitselman Trail Phase II - Muncie, IN • Adams Street Sidewalk & Intersection Improvements - Bloomington, IN • Bloomfield Avenue Improvements - Bloomington, IN • Creekside Corporate Park - Zionsville, IN • Muscatatuck Trail - North Vernon, IN • Toyota Trail - Princeton, IN • Heritage Trail Phase I - Princeton, IN • Heritage Trail Phase II - Princeton, IN • Midland Trace Trail - Noblesville, IN • Main Street Streetscape Phases I, II, & III - Lafayette, IN • Flat Rock Trail - Rushville, IN • Sugar Creek Trail - Crawfordsville, IN • Downtown Loop Trail - Crawfordsville, IN • Washington Street Trail - Delphi, IN • Interurban Trail - Delphi, IN • New Park Loop Trail - Remington, IN OUR INSPECTION STAFF IS • Funding assistance (federal- aid highway funding for LPA projects) EXPERIENCED • Extensive experience with INDOT and LPA procedures • Team members regularly attend municipal training and INDOT training TEAM PROJECT APPROACH RELEVANT EXPERIENCE 3HWC ENGINEERING | CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II)FIRM OVERVIEW 95% HWC ENGINEERING 13.1 Construction Inspection 5% MCCORMICK ENGINEERING, LLC (DBE) 13.1 Construction Inspection PROJECT TEAM ASSISTANT CITY ENGINEER | KYLE SILVEUS, PE CHRIS HOLTH Project Supervisor HWC ENGINEERING TRACY MCCORMICK, PE Construction Inspector MCCORMICK ENGINEERING KRISTAL GARCIA Construction Inspector HWC ENGINEERING CITY OF SOUTH BEND JON DAY Inspection Services Manager HWC ENGINEERING TEAM PROJECT APPROACH RELEVANT EXPERIENCE 4HWC ENGINEERING | CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II)FIRM OVERVIEW Chris Holth PROJECT SUPERVISOR PROJECT TEAM CERTIFICATIONS: INDOT CERTIFICATIONS • Bridge Construction & Deck Repair • Construction Procedures I & II • Earthwork • Hot Mix Asphalt • Concrete Paving • QC/QA Superstructure • Quality Assurance • SiteManager • Stormwater Level I ACI Grade I Field Testing Technician HMA Field Supervisor Certification INDOT/LPA PROJECTS (FEDERAL AID) • Olive Street Reconstruction Phase I - South Bend, IN • Striping Project - Logansport, IN • 169th Street Reconstruction, Phases II, III, & IV - Hammond, IN* • Coolspring Avenue Reconstruction - Michigan City, IN* • Gary Marina, Phases I & II - Gary, IN* • Interurban Trail - Delphi, IN • Main Street Streetscape - Delphi, IN • Michigan Boulevard Pipe Lining - Michigan City, IN* • Prairie Street Bridge & Road Reconstruction - Elkhart, IN* • Washington Street Trail - Delphi, IN • Whiting Lakefront, Phase II - Whiting, IN* LOCALLY FUNDED PROJECTS • Western Avenue Streetscape Phase III - South Bend, IN • Carroll County 100 N 625 W Reconstruction - Delphi, IN • 2017 Bridge Rehabilitations - White County, IN • 5th District Lighting Construction - Hammond, IN • Lake County Bridge #240 Reconstruction - Hammond, IN • Hoosier Lift Station & Ponds - White County, IN • King Street Reconstruction - Franklin, IN • White County Bridge #104 - Remington, IN • White County CR 1100 W - Wolcott, IN • Lake County Bridge #1147 Reconstruction - Range Line, IN • Monroe Street Water Replacement - Rochester, IN • Combined Sewer Overflow Long Term Control Plan - Royal Center, IN QUALIFICATIONS: Mr. Holth has more than 29 years of experience in the construction industry. He has 12 years of contractor experience as a Project Superintendent, QC/QA Administrator, Plant Manager, and Estimator, and 17 years of consulting experience as an Inspector and Project Supervisor. Mr. Holth’s experience includes working for local clients, INDOT, and FHWA. This experience enables him to schedule, estimate, resolve conflicts, complete testing, and provide inspection services for road, bridge, water, and sewer projects. His experience provides unmatched qualifications when working as a Project Supervisor on any given project. *Previous Employer MR. HOLTH will be able to commit 75% to this project. OF HIS TIME PROJECT EXPERIENCE TEAM PROJECT APPROACH RELEVANT EXPERIENCE 5HWC ENGINEERING | CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II)FIRM OVERVIEW PROJECT TEAM Tracy McCormick, PE CONSTRUCTION INSPECTOR Kristal Garcia CONSTRUCTION INSPECTOR Jon Day INSPECTION SERVICES MANAGER QUALIFICATIONS Mr. Day manages a group of 26 part- and full-time inspectors. In this role, Mr. Day sets up and assists in inspection contract budgets, staffs all field inspection projects, ensures all staff members complete project paperwork, and communicates all relevant project information to the client in an accurate and timely manner. With more than 16 years of experience, He is skilled at evaluating problems and recommending solutions to all project challenges. Mr. Day maintains his INDOT certifications and assists with field inspection duties as needed. RELEVANT EXPERIENCE • Pearl Street Reconstruction - Greenwood, IN • Olio Road & 146th Street Reconstruction - Noblesville, IN • DPW Resurfacing in Marion County Area #3 - Indianapolis, IN • DPW Winthrop Avenue - Indianapolis, IN • DPW Curb & Sidewalk - Indianapolis, IN • King Street Reconstruction - Franklin, IN • Breakwater Apartment Complex - New Albany, IN • Martin Street Reconstruction - Muncie, IN • Allisonville Road Reconstruction - Fishers, IN • Kitselman Trail & Bridge Phase I - Muncie, IN • Bridge #193 - Vigo County, IN QUALIFICATIONS Ms. Garcia has three years of construction inspection experience primarily focusing on INDOT LPA and INDOT on-call projects. She has spent the entirety of the 2020 and 2021 construction seasons performing inspection and assistant PE/ PS duties in Seymour District and Greenfield District on these on-call assignments. She has learned the INDOT SiteManager program and is skilled at entering construction daily reports and material records in the program. Throughout her career, she has expanded her knowledge in HMA paving, storm sewer, earthwork operations, and concrete sidewalk installation. Ms. Garcia is an INDOT-certified construction inspector and fully certified in INDOT Independent Assurance Testing. She has completed her INDOT Level I Stormwater certification and her 10 Hour OSHA certification. RELEVANT EXPERIENCE • Allisonville Road Reconstruction - Fishers, IN • Hoyt Avenue Reconstruction - Muncie, IN • Kitselman Trail Phase II - Muncie, IN • DPW RS-18-004 Resurfacing - Marion County, IN • Concord Road - Crawfordsville, IN • US 31 Asphalt Resurfacing - Franklin & Edinburgh, IN • SR 9, SR 109, & SR 234 Bridge Deck Overlays - Madison & Hancock Counties, IN • Market Street Reconstruction - Indianapolis, IN QUALIFICATIONS Ms. McCormick, PE has more than 25 years of engineering experience within planning, design, and construction observation of civil engineering projects. She is client focused, self-directed, and results oriented and is the co- founder of McCormick Engineering, LLC, a firm recognized by the State of Indiana as a Women’s Business Enterprise (WBE) and Disadvantaged Business Enterprise (DBE). RELEVANT EXPERIENCE • Olive & Sample Roadway Reconstruction Phase I - South Bend, IN • Edison Road - South Bend, IN • Gumwood Road Reconstruction Phase I & II - St. Joseph County, IN • Cleveland & Ash Roundabout - St. Joseph County, IN • Michigan Boulevard Reconstruction Project - Michigan City, IN • 169th Street Reconstruction - Hammond, IN • 45th Avenue Reconstruction - Lake County, IN • Old US 30 - Kosciusko County, IN • County Road 400N/Vale Park Road at SR 49 - Valparaiso, IN • Cleveland Road - St. Joseph County, IN • Kercher Road - Goshen, IN • McKinley Road & Ash Road - St. Joseph County, IN TEAM PROJECT APPROACH RELEVANT EXPERIENCE 6HWC ENGINEERING | CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II)FIRM OVERVIEW Project Understanding This project is the cornerstone piece to connect the existing Riverside Trail to the East Bank Trail northwest of downtown South Bend. To complete this project, the proposed construction will include a new HMA path and rehabilitation of the existing railroad bridge crossing the Saint Joseph River. Over half of a mile of new trail will be constructed. The 12’ wide HMA trail will follow the existing railroad corridor north of Angela Boulevard. Along the proposed route, new decorative concrete will be installed at each trail connection location, new lighting will help illuminate the trail for nighttime safety, decorative railing will be installed at various locations, and a storm sewer system will be installed to alleviate adjacent drainage issues. The bridge portion of the project will include reconstruction and rehabilitation of the existing seven span 327’ long railroad bridge currently crossing the river. The existing bridge substructure will be patched and repaired with pneumatically placed mortar. All existing railroad rails and ties will be removed and then a new 8“ reinforced concrete deck will be placed. The existing beams will be cleaned and painted, and decorative pedestrian railing and lighting will be placed along both sides of the bridge to complete the conversion from the existing railroad bridge to a new, pedestrian-friendly structure. HWC’s project approach is focused on continuing to grow the confidence the City of South Bend has in our firm by assigning a familiar and proven Project Supervisor, Mr. Chris Holth. The level of accomplishment and success of not just our firm, but also of Mr. Holth, will help to execute this project on time, on budget, and always with the safety of the traveling public in mind. He prides himself on a high-level of attention to detail and derives from his past construction experience an unmatched level of understanding of each aspect of a construction project. Each project has its unique components, but HWC has a step above the competition with an inspection team with experience in not only construction inspection, but also with team members certified in both utility and railroad coordination. PROJECT APPROACH OUR APPROACH BID JANUARY 2022 PRE-CONSTRUCTION MARCH 2022 CONSTRUCTION SPRING/SUMMER 2022 FINAL RECORDS WINTER 2022/2023 Our team also possesses knowledge and course certifications in: HWC takes pride in our staff’s skill sets intentionally continues to bolster those skill sets by consistently sending our team members to various continuing education courses. This helps ensure our team has the most up-to-date certifications while advancing our knowledge on new construction practices and testing methods. Our team prides itself on its versatility with the ability to inspect any type of project including road and bridge construction, storm water and sanitary system installation, multi-use/decorative trail projects, and pool and water park projects. Whatever our client’s inspection needs, HWC has the certified professionals to get the job done and we will hit the ground running on this Coal Line Trail Phase II project. Our team is equipped and well versed in all testing methods applicable to this project. Stormwater Level 1 & 2 Maintenance of Traffic OSHA 10 & 30 hour Multiple Asphalt Courses TEAM PROJECT APPROACH RELEVANT EXPERIENCE 7HWC ENGINEERING | CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II)FIRM OVERVIEW HWC knows trail projects. Our extensive past experience in this type of work provides our staff a level of knowledge unmatched by the competition in this area of work. Not only do we surpass other firms in general knowledge, but also in the quantity of trail projects that we have been awarded. Our team is well versed in soil sampling/moisture testing, soil compaction testing (Dynamic Cone Penetrometer), compaction testing for aggregate (Lightweight Deflectometer), concrete testing (air, slump, and yield), and diagnosing and performing undercuts, etc. It takes a great level of expertise when diagnosing problem areas with existing soil conditions and knowing how to correctly remedy those issues. HWC will ensure the contractor is repairing all the necessary areas of the subgrade in its entirety prior to placing compacted aggregate and HMA for the trail. This level of accurate testing couldn’t be possible without the right equipment. HWC has invested over $25,000 in new field equipment purchases in the last three years to better serve our clients. HWC has even purchased a drone to provide a unique perspective of projects often not seen from the ground level. We have two FAA licensed remote pilots on staff that will be on site periodically throughout construction operations to take aerial photos of the project. This will enable South Bend to have a snapshot of construction activities throughout the duration of the project. PROJECT APPROACH MATERIAL & TESTING EQUIPMENT One of the more overlooked aspects of urban trail construction is pedestrian maintenance of traffic (MOT). With the vast footprint that the Coal Line Trail project will cover, it is critical that the contractor and consultant work together to implement an accurate and timely pedestrian detour route. HWC recognizes that a design firm attempts to foresee pedestrian issues with their detour routes, but that real time MOT changes may be needed to further guide and protect walkers and bikers in this area. Being the connection piece between two existing trails, natural curiosity from those utilizing these trails will prompt them to try and enter our construction zone. HWC will monitor the detour route daily to ensure all signs are standing, visible, and in compliance with current INDOT and MUTCD standards. THE IMPORTANCE OF PEDESTRIANMOTMOT TEAM PROJECT APPROACH RELEVANT EXPERIENCE 8HWC ENGINEERING | CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II)FIRM OVERVIEW PROJECT UNDERSTANDING & APPROACH As you are aware, HWC has had the opportunity to inspect two recent projects with the City of South Bend, including Western Avenue Phase III Streetscape and Olive Street Reconstruction Phase I. We are also currently assisting the City with design of the next phase of Western Avenue. HWC continues to pride ourselves on keeping all of our current clients as repeat clients. Mr. Holth has exemplified this statement by his success on his last two South Bend inspection projects. We did not take any past opportunities for granted and we look forward to again showcasing our team’s talents to South Bend on the Coal Line Trail Phase II project and helping your community implement their Citywide pedestrian improvement plan. HWC will continue to build these relationships and maintain the level of trust we have earned with South Bend through our impressive level of communication. Whether this is through regular daily interactions, bi-weekly progress meetings, or our weekly reports, Mr. Holth will assure that South Bend is up-to-date and well informed on project progress, any potential issues that may arise, as well as construction or value engineering options throughout construction. A CONTINUED RELATIONSHIP EXPERIENCED PARTNERSHIP HWC and McCormick Engineering have a long-standing working relationship which provides a cohesive team and also a varied level of experience to handle any field issues that may arise. To this point, our firms are currently partnered together on the Olive Street Phase I construction inspection contract. We are a firm believer that this continued partnership carries forward to the benefit of our clients. Our team’s familiarity and experience specifically in South Bend has also helped to build rapport with local utility companies and the contractors who execute this work. Our proposed inspection team is well versed in trail and bridge construction and understands the specific needs of this project. They are prepared and ready to identify and solve issues during construction, but also to review and find any potential issues with the contract documents and plans. This assures constructibility concerns are addressed throughout the project. The level of attention to detail our team offers enables them to easily and quickly diagnose issues during each stage of construction to make sure that this project will be built to the expectations of South Bend and yield lasting, quality results. 26 CERTIFIED INSPECTORS OVER THE PAST SIX YEARS OUR DOUBLEDCONSTRUCTION INSPECTION TEAM HAS HWC has made several strategic hires over the last five years to help grow and maintain a diverse and experienced PE/PS staff. As a result of this strategy, nine of our key Senior Inspector staff have over 25 years of construction experience. This list includes Mr. Holth. We also have an additional level of seven staff members that possess 10 or more years of construction inspection experience. In total, this means over 2/3 of our entire inspection staff has a minimum of 10 years of direct inspection experience. Our PE/PS core team members are skilled in foreseeing and diagnosing problems before they occur in the field. By using various techniques learned over the years, our team is confident it can overcome any challenge that occurs during the course of any construction project. Being able to stay on top of project related issues, such as subgrade issues, errors/omissions in the contract documents, unforeseen conditions, etc., will help ensure South Bend gets a lasting finished product of which they can be proud. Our past history with the City has proven our ability within this realm. Several different skill sets are required to successfully manage and inspect an INDOT project. Materials need to be tested and certifications obtained. Weekly erosion control reports, contractor payrolls, and traffic reports need reviewed for accuracy and compliance. But, ultimately, job success usually comes down to one word: MONEY. Budget control is imperative to success and INDOT makes it a focal point on their performance scoring. We coach our teams to constantly check and identify value engineering opportunities in both their inspection and construction budgets. Specific to the two projects managed by Mr. Holth in 2020, he has exemplified this goal. For his bridge project in Lake County, the contractor finished under budget by 3% and Mr. Holth gave $12,000 of our original inspection fee back to the client. On his White County road project, the contractor completed the project 1% under the construction bid amount even with almost $100,000 in change order costs. Mr. Holth gave $2,000 of our original inspection fee back to the client. HWC doesn’t have to sell Mr. Holth’s abilities. This is evident in his resume of projects and industry reputation. His former clients will gladly share their praise on Mr. Holth’s budget control and overall inspection skill set. DIAGNOSING & SOLVING PROBLEMS CONSTRUCTION & INSPECTION BUDGET EMPHASIS$ THIS CORE TEAM HAS BEEN PART OF NUMEROUS LARGE PROFILE PROJECTS RANGING IN SIZE UP TO $40 MILLION TEAM PROJECT APPROACH RELEVANT EXPERIENCE 9HWC ENGINEERING | CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II)FIRM OVERVIEW HWC was responsible for the full-time inspection of the construction of Phase I of the Kitselman Trail and Bridge over the White River in Muncie, Indiana. Project elements included construction of pedestrian trail bridge end bents, piers, floodwall, and slab spans with recessed decorative lighting over the White River. Other project work included a newly paved trail connection to the Cardinal Greenway and partial trail construction for future development to access the Kitselman Pure Energy Park. This project was funded by INDOT and City of Muncie and the project cost was approximately $1.1 million. HWC provided project management, project engineering, survey, and construction inspection services for the Creekside Corporate Park project in Zionsville, Indiana. Creekside is a conservation office park that includes corporate headquarters and office buildings built alongside beautiful ravines and woodlands. The development includes several amenities in the open space areas, including trails and a fitness pocket park. The trail system includes nearly 3,750’ of paths and six pedestrian bridges within the natural open space, in addition to a pathway system along all of the roadways. This project was fully funded by the Zionsville Redevelopment Commission and the project cost was $4.1 million. Creekside Corporate Park RELEVANT EXPERIENCE: HWC Kitselman Trail Enhancement, Bike, & Pedestrian Facilities MUNCIE, IN ZIONSVILLE, IN TEAM PROJECT APPROACH RELEVANT EXPERIENCE 10HWC ENGINEERING | CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II)FIRM OVERVIEW HWC provided full-time inspection on this INDOT on-call project. There were two bridges reconstructed within this one contract. Work elements encompassed within the first bridge structure included removal of the existing bridge deck as well as driving piling and pouring concrete for the construction of new bents and piers. This 301’ bridge was built in two different phases with one half built at a time. New beams, reinforcing steel, and concrete were placed for phase 1 at 301’ 6” by 12’ 6’ and for phase 2 at 301’ 6” by 23’ 10”. This first bridge structure also included constructing new concrete bridge approaches, roadway subgrade construction, placing asphalt and pavement markings for both ends of the project, and placing seed and planting trees along the roadway. The second structure in this contract had the shell piling repainted and the original bridge deck was patched. A thin deck overlay was then placed atop the bridge deck. This combined project was completed in June of 2020 at a cost of $4.44 million for both structures. HWC provided design, project management and inspection services for the Bridge #516 Replacement project in Muncie, Indiana. Although the project was originally scoped as a bridge rehabilitation, a full replacement was found to be the most cost effective, long-term solution due to the extensive necessary sub-structure repair work. The existing four-span bridge was replaced with a three-span, 320-foot-long bridge carrying four lanes of Tillotson Avenue over the White River. Annual average daily traffic is more than 14,000 cars per day. The design accounted for and incorporated the four utilities attached to the bridge. The bridge was reconstructed with a full road closure rather than phased construction to provide cost savings to the County and reduce detours and delays to the traveling public. Impact to the adjoining neighborhood park was avoided, eliminating the need for a CE-4 document and reducing the project cost. Bridge Replacement on SR 46 over Killion Ditch RELEVANT EXPERIENCE: HWC BOWLING GREEN, IN DELAWARE COUNTY, IN Bridge #516 Replacement TEAM PROJECT APPROACH RELEVANT EXPERIENCE 11HWC ENGINEERING | CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II)FIRM OVERVIEW HWC provided full-time inspection for the Bloomfield Avenue/2nd Street Trail and Signal project. The scope of the project included filling in existing gaps in multi-use path along the north side of 2nd Street between Adams Street and Patterson Drive and to address existing deficiencies at the signalized intersection of 2nd Street and Patterson Drive; and Bloomfield Road & Landmark Avenue. The constructed path was 10’ wide with a 2-5’ buffer. At the intersections of 2nd Street & Patterson Drive and Bloomfield Road/2nd & Landmark Avenue, new signals were installed that included new signal heads, pedestrian signal indication, pedestrian push-button crosswalks, and Public Right-of-Way Accessibility compliant curb ramps. The project was funded by INDOT and the City of Bloomington. The project was completed in 2019 with a cost of $1.533 million. HWC was responsible for the full-time inspection of the Morgan Street Streetscape and the Flatrock Trail projects in Rushville, Indiana. These projects included a new terrain HMA trail along with a widened sidewalk for enhanced pedestrian travel. The projects ran from the Rushville City library in downtown Rushville to Riverside Park, nestled along the Flatrock River. The projects included several new structural and decorative enhancements. Structural enhancements included storm sewer, concrete curb, HMA for the new trail, new concrete sidewalk, and new PCCP for drives. Decorative enhancements included traffic signage, enhanced pedestrian lighting through the corridor, historical markers and signs, decorative thermoplastic crosswalks, farmers market wayward striping, new benches, bicycle racks, trash receptacles, and decorative etched pavers throughout the walkways. Decorative elements also included new limestone seat walls, landscape beds, granite pavers, and a new amphitheater area with terraced limestone seat walls. This project was funded with INDOT LPA funds and by the City of Rushville. The total cost was $1.8 million and was completed in November of 2020. Morgan Street Streetscape & Flatrock TrailBloomfield Avenue Intersection Improvements RELEVANT EXPERIENCE: HWC BLOOMINGTON, IN RUSHVILLE, IN TEAM PROJECT APPROACH RELEVANT EXPERIENCE 12HWC ENGINEERING | CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II)FIRM OVERVIEW This was a cooperative project with the Parks & Recreation Department to continue the construction of LaSalle Trail which ended at Darden Road. McCormick provided subconsultant observation services for trail construction from Darden Road to Auten Road. Services included measurement of placed concrete, signage, sod, and other items as included on Daily Work Reports. Construction began and was completed in 2017. RELEVANT EXPERIENCE: HWC & MCCORMICK ENGINEERING ST. JOSEPH COUNTY, IN LaSalle Trail Phase 2 HWC provided full-time inspection services for the Sugar Creek Trail project in Crawfordsville, Indiana. Project additions included an MSE wall structure spanning 223’ over an unnamed tributary that outlets into Sugar Creek and an 8’ wide HMA bike trail approximately 1,878’ in length from Schenck Road to the existing trailhead by the Animal Welfare League. The project also included installing 48” RCP in the MSE wall to divert the water for the unnamed tributary to Little Honey Creek. MSE wall envelope was backfilled entirely with #8 stone to ensure the MSE wall joints did not leak from typical structure backfill material. The $670,000 project was funded by INDOT and the City of Crawfordsville. Sugar Creek Trail CRAWFORDSVILLE, IN Standard RFP Form Ver. 3-01-2021 (Rev. 06/27/18) Des. #: 1401811 Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE) I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f). I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confirm that the firms listed below are currently certified DBEs: INDOT: https://entapps.indot.in.gov/DBELocator/ KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx I certify that I have contacted the certified DBE’s listed below, and if my company becomes the CONSULTANT, these DBEs have tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division. I.DBE Subconsultants to be applied toward DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* 3% % % % II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* % % % of negotiation of contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these or other certified and approved DBE firms. McCormick Engineering, LLC 13.1 Estimated Total Percentage Credited toward DBE Goal: 3% Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal: 2% Company Name: Hannum, Wagle and Cline Engineering (HWC Engineering) Signature: Jim Rice Date: 10/26/2021 ∗ It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result 2% 13.1McCormick Engineering, LLC