Loading...
HomeMy WebLinkAboutOpening of Bids - Traffic Signal Detection Improvements Proj No. 120-046 - Martell ElectricMartell Electric, LLC X Jones Petrie Rafinski Page 1 of 2 MARTELL QUOTE No.: 43-1021 RE: CITY OF SOUTH BEND DESCRIPTION FAX: (574) 271-5400 UNIT COST TOTAL COST 4601 Cleveland Road ITEM NO.QTY DATE 10/26/21 TRAFFIC SIGNAL DETECTION IMPROVEMENTS 120-046 South Bend, IN 46628 TO: PHONE: (574) 271-5000 UNIT 1 1 LSM CONSTRUCTION ENGINEERING 976.00 976.00 2 1 LSM MAINTAINING TRAFFIC 585.00 585.00 3 1 LSM MOBILIZATION AND DEMOBILIZATION 488.00 488.00 4 1 LSM REMOVE FLIR DETECTION 1,974.00 1,974.00 5 1 LSM HEMISPHERICAL CAMERA DETECTION SYSTEM 22,257.00 22,257.00 6 4 EA REMOVE PED PUSH BUTTON SYSTEM ASSEMBLY 152.00 608.00 7 4 EA PED PUSH BUTTON ASSEMBLY 541.00 2,164.00 8 1 LSM TRAFFIC SIGNAL CABLE 2,561.00 2,561.00 DIVISION 1: HICKORY RD. AT CATALPA DR.TOTAL:31,613.00 DIVISION 2: HICKORY RD. AT MIRACLE LN. 1 1 LSM CONSTRUCTION ENGINEERING 976.00 976.00 2 1 LSM MAINTAINING TRAFFIC 1,171.00 1,171.00 3 1 LSM MOBILIZATION AND DEMOBILIZATION 488.00 488.00 4 1 LSM REMOVE SERVICE POINT 838.00 838.00 5 1 LSM 20' ALUMINUM MAST ARM 2,514.00 2,514.00 6 1 LSM HEMISPHERICAL CAMERA DETECTION SYSTEM 22,257.00 22,257.00 7 8 EA REMOVE PED PUSH BUTTON SYSTEM ASSEMBLY 152.00 1,216.00 8 8 EA PED PUSH BUTTON ASSEMBLY 498.00 3,984.00 9 1 LSM TRAFFIC SIGNAL CABLE 3,781.00 3,781.00 10 1 EA SERVICE POINT-SINGLE METER, CABINET & FOUNDATION 8,481.00 8,481.00 DIVISION 2: HICKORY RD. AT MIRACLE LN.TOTAL:45,706.00 DIVISION 3: IRONWOOD DR. AT E. CALVERT ST. 1 1 LSM CONSTRUCTION ENGINEERING 976.00 976.00 2 1 LSM MAINTAINING TRAFFIC 585.00 585.00 3 1 LSM MOBILIZATION AND DEMOBILIZATION 488.00 488.00 4 1 LSM REMOVE FLIR DETECTION 3,460.00 3,460.00 5 1 LSM HEMISPHERICAL CAMERA DETECTION SYSTEM 22,257.00 22,257.00 6 8 EA REMOVE PED PUSH BUTTON SYSTEM ASSEMBLY 152.00 1,216.00 7 8 EA PED PUSH BUTTON ASSEMBLY 498.00 3,984.00 8 2 EA REMOVE 3-SECTION SIGNAL HEAD 396.00 792.00 9 2 EA 4-SECTION SIGNAL HEAD W/SIGN 1,342.00 2,684.00 10 1 LSM TRAFFIC SIGNAL CABLE 4,364.00 4,364.00 DIVISION 3: IRONWOOD DR. AT E. CALVERT ST.TOTAL:40,806.00 DIVISION 4: IRONWOOD DR. AT EWING AVE. 1 1 LSM CONSTRUCTION ENGINEERING 976.00 976.00 2 1 LSM MAINTAINING TRAFFIC 780.00 780.00 3 1 LSM MOBILIZATION AND DEMOBILIZATION 488.00 488.00 4 1 LSM REMOVE FLIR DETECTION 3,460.00 3,460.00 5 1 LSM HEMISPHERICAL CAMERA DETECTION SYSTEM 22,257.00 22,257.00 6 1 LSM TRAFFIC SIGNAL CABLE 2,182.00 2,182.00 DIVISION 4: IRONWOOD DR. AT EWING AVE.TOTAL:30,143.00 DIVISION 5: E. IRELAND RD. AT ST. JOSEPH ST. 1 1 LSM CONSTRUCTION ENGINEERING 976.00 976.00 2 1 LSM MAINTAINING TRAFFIC 488.00 488.00 3 1 LSM MOBILIZATION AND DEMOBILIZATION 390.00 390.00 4 1 LSM REPLACE ROADWAY LOOPS, 3 EA & DETECTOR HOUSING 2,660.00 2,660.00 5 1 EA SIGNAL PEDESTAL ON TYPE "A" FOUNDATION 5,320.00 5,320.00 6 2 EA PED PUSH BUTTON ASSEMBLY 1,115.00 2,230.00 7 1 LSM TRAFFIC SIGNAL CABLE 3,597.00 3,597.00 8 1 LSM REMOVE SERVICE POINT 838.00 838.00 9 1 EA SERVICE POINT-SINGLE METER, CABINET & FOUNDATION 8,481.00 8,481.00 Page 2 of 2 MARTELL QUOTE No.: 43-1021 RE: CITY OF SOUTH BEND DESCRIPTION FAX: (574) 271-5400 UNIT COST TOTAL COST 4601 Cleveland Road ITEM NO.QTY DATE 10/26/21 TRAFFIC SIGNAL DETECTION IMPROVEMENTS 120-046 South Bend, IN 46628 TO: PHONE: (574) 271-5000 UNIT DIVISION 5: E IRELAND RD. AT ST. JOSEPH ST. TOTAL:24,980.00 NOTES: 1 THIS QUOTE INCLUDES REVISIONS/ADDENDA 1. 2 THIS QUOTE DOES NOT INCLUDE ELECTRICAL UTILITY CHARGES OF ANY TYPE. 3 THIS QUOTE IS BASED ON STRAIGHT TIME LABOR RATES UNLESS OTHERWISE DEFINED IN SPECIFICATIONS 4 THIS QUOTE IS CONTINGENT UPON MARTELL ELECTRIC GETTING ADEQUATE TIME TO COMPLETE OUR WORK. 5 THE ABOVE ITEMS ARE QUOTED AS A COMPLETE PACKAGE. NO ITEM MAY BE DELETED WITHOUT PRIOR APPROVAL. 6 EXISTING UNDERGROUND CONDUIT TO BE REUSED. IF EXISTING CONDUIT IS FOUND TO BE UNUSABLE, A PRICE PER FOOT TO INSTALL WILL BE PROVIDED. 7 EXISTING SIGNAL CABINET LOCATED AT IRONWOOD DR. & CALVERT ST. IS ONLY A 12 BAY TYPE 1 CABINET WITH PEDS. THIS CABINET AND CONTROLLER WILL NEED TO BE UPGRADED AND IS NOT INCLUDED IN THIS QUOTE. 8 7.6% WBE AND 1.9% MBE ARE COVERED IN THIS QUOTE THRU MATERIAL HANDLING AND SUBCONTRACTOR WORK. TOTAL 173,248.00