HomeMy WebLinkAboutOpening of Bids - Traffic Signal Detection Improvements Proj No. 120-046 - Martell ElectricMartell Electric, LLC
X
Jones Petrie Rafinski
Page 1 of 2
MARTELL QUOTE No.:
43-1021
RE: CITY OF SOUTH BEND
DESCRIPTION
FAX: (574) 271-5400
UNIT
COST TOTAL COST
4601 Cleveland Road
ITEM NO.QTY
DATE 10/26/21
TRAFFIC SIGNAL DETECTION
IMPROVEMENTS 120-046
South Bend, IN 46628
TO:
PHONE: (574) 271-5000
UNIT
1 1 LSM CONSTRUCTION ENGINEERING 976.00 976.00
2 1 LSM MAINTAINING TRAFFIC 585.00 585.00
3 1 LSM MOBILIZATION AND DEMOBILIZATION 488.00 488.00
4 1 LSM REMOVE FLIR DETECTION 1,974.00 1,974.00
5 1 LSM HEMISPHERICAL CAMERA DETECTION SYSTEM 22,257.00 22,257.00
6 4 EA REMOVE PED PUSH BUTTON SYSTEM ASSEMBLY 152.00 608.00
7 4 EA PED PUSH BUTTON ASSEMBLY 541.00 2,164.00
8 1 LSM TRAFFIC SIGNAL CABLE 2,561.00 2,561.00
DIVISION 1: HICKORY RD. AT CATALPA DR.TOTAL:31,613.00
DIVISION 2: HICKORY RD. AT MIRACLE LN.
1 1 LSM CONSTRUCTION ENGINEERING 976.00 976.00
2 1 LSM MAINTAINING TRAFFIC 1,171.00 1,171.00
3 1 LSM MOBILIZATION AND DEMOBILIZATION 488.00 488.00
4 1 LSM REMOVE SERVICE POINT 838.00 838.00
5 1 LSM 20' ALUMINUM MAST ARM 2,514.00 2,514.00
6 1 LSM HEMISPHERICAL CAMERA DETECTION SYSTEM 22,257.00 22,257.00
7 8 EA REMOVE PED PUSH BUTTON SYSTEM ASSEMBLY 152.00 1,216.00
8 8 EA PED PUSH BUTTON ASSEMBLY 498.00 3,984.00
9 1 LSM TRAFFIC SIGNAL CABLE 3,781.00 3,781.00
10 1 EA SERVICE POINT-SINGLE METER, CABINET & FOUNDATION 8,481.00 8,481.00
DIVISION 2: HICKORY RD. AT MIRACLE LN.TOTAL:45,706.00
DIVISION 3: IRONWOOD DR. AT E. CALVERT ST.
1 1 LSM CONSTRUCTION ENGINEERING 976.00 976.00
2 1 LSM MAINTAINING TRAFFIC 585.00 585.00
3 1 LSM MOBILIZATION AND DEMOBILIZATION 488.00 488.00
4 1 LSM REMOVE FLIR DETECTION 3,460.00 3,460.00
5 1 LSM HEMISPHERICAL CAMERA DETECTION SYSTEM 22,257.00 22,257.00
6 8 EA REMOVE PED PUSH BUTTON SYSTEM ASSEMBLY 152.00 1,216.00
7 8 EA PED PUSH BUTTON ASSEMBLY 498.00 3,984.00
8 2 EA REMOVE 3-SECTION SIGNAL HEAD 396.00 792.00
9 2 EA 4-SECTION SIGNAL HEAD W/SIGN 1,342.00 2,684.00
10 1 LSM TRAFFIC SIGNAL CABLE 4,364.00 4,364.00
DIVISION 3: IRONWOOD DR. AT E. CALVERT ST.TOTAL:40,806.00
DIVISION 4: IRONWOOD DR. AT EWING AVE.
1 1 LSM CONSTRUCTION ENGINEERING 976.00 976.00
2 1 LSM MAINTAINING TRAFFIC 780.00 780.00
3 1 LSM MOBILIZATION AND DEMOBILIZATION 488.00 488.00
4 1 LSM REMOVE FLIR DETECTION 3,460.00 3,460.00
5 1 LSM HEMISPHERICAL CAMERA DETECTION SYSTEM 22,257.00 22,257.00
6 1 LSM TRAFFIC SIGNAL CABLE 2,182.00 2,182.00
DIVISION 4: IRONWOOD DR. AT EWING AVE.TOTAL:30,143.00
DIVISION 5: E. IRELAND RD. AT ST. JOSEPH ST.
1 1 LSM CONSTRUCTION ENGINEERING 976.00 976.00
2 1 LSM MAINTAINING TRAFFIC 488.00 488.00
3 1 LSM MOBILIZATION AND DEMOBILIZATION 390.00 390.00
4 1 LSM REPLACE ROADWAY LOOPS, 3 EA & DETECTOR HOUSING 2,660.00 2,660.00
5 1 EA SIGNAL PEDESTAL ON TYPE "A" FOUNDATION 5,320.00 5,320.00
6 2 EA PED PUSH BUTTON ASSEMBLY 1,115.00 2,230.00
7 1 LSM TRAFFIC SIGNAL CABLE 3,597.00 3,597.00
8 1 LSM REMOVE SERVICE POINT 838.00 838.00
9 1 EA SERVICE POINT-SINGLE METER, CABINET & FOUNDATION 8,481.00 8,481.00
Page 2 of 2
MARTELL QUOTE No.:
43-1021
RE: CITY OF SOUTH BEND
DESCRIPTION
FAX: (574) 271-5400
UNIT
COST TOTAL COST
4601 Cleveland Road
ITEM NO.QTY
DATE 10/26/21
TRAFFIC SIGNAL DETECTION
IMPROVEMENTS 120-046
South Bend, IN 46628
TO:
PHONE: (574) 271-5000
UNIT
DIVISION 5: E IRELAND RD. AT ST. JOSEPH ST. TOTAL:24,980.00
NOTES:
1 THIS QUOTE INCLUDES REVISIONS/ADDENDA 1.
2 THIS QUOTE DOES NOT INCLUDE ELECTRICAL UTILITY CHARGES
OF ANY TYPE.
3 THIS QUOTE IS BASED ON STRAIGHT TIME LABOR RATES UNLESS
OTHERWISE DEFINED IN SPECIFICATIONS
4 THIS QUOTE IS CONTINGENT UPON MARTELL ELECTRIC GETTING
ADEQUATE TIME TO COMPLETE OUR WORK.
5 THE ABOVE ITEMS ARE QUOTED AS A COMPLETE PACKAGE. NO
ITEM MAY BE DELETED WITHOUT PRIOR APPROVAL.
6 EXISTING UNDERGROUND CONDUIT TO BE REUSED. IF EXISTING
CONDUIT IS FOUND TO BE UNUSABLE, A PRICE PER FOOT TO
INSTALL WILL BE PROVIDED.
7 EXISTING SIGNAL CABINET LOCATED AT IRONWOOD DR. &
CALVERT ST. IS ONLY A 12 BAY TYPE 1 CABINET WITH PEDS.
THIS CABINET AND CONTROLLER WILL NEED TO BE UPGRADED
AND IS NOT INCLUDED IN THIS QUOTE.
8 7.6% WBE AND 1.9% MBE ARE COVERED IN THIS QUOTE THRU
MATERIAL HANDLING AND SUBCONTRACTOR WORK.
TOTAL 173,248.00