Loading...
HomeMy WebLinkAboutChange Order No 1 - WWTP Masonry Improvements Gallery Bldgs. 1-4 Proj No. 120-036 - Slatile Roofing & Sheet Metal Co., Inc.  ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS October 12, 2021 Mr. Gerald Longerot Slatile Roofing & Sheet Metal Co., Inc. 1703 S. Ironwood Dr. South Bend, IN 46613 michael.albert@slatile.com RE: Change Order No. 1 – Wastewater Treatment Plant Masonry Improvements Gallery Buildings 1-4 – Project No. 120-036 Dear Mr. Longerot: At its October 12, 2021 meeting, the Board of Public Works approved the above referenced Change Order for an increase of $20,486 and an additional one hundred and fifty (150) days, bringing the revised contract amount to $440,704 with a new completion date of October 12, 2021. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, /s/ Anne Fuchs Anne Fuchs, Clerk Enclosures AF/lh INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works Clara McDaniels, Assistant City Attorney Public Works Anne Fuchs, Clerk FROM: Jacob M. Klosinski, P.E., Assistant City Engineer SUBJECT: 120-036 WWTP Masonry Improvements Gallery Buildings 1-4 (PROJ00000217; PO-00005683) Agenda Request – Change Order No. 1 DATE: October 5, 2021 The Division of Engineering and Division of Utilities recommend the Board of Public Works approve Change Order No. 1 for Project No. 120-036 WWTP Masonry Improvements Gallery Buildings 1-4 in the amount of $20,486.00 and a 150-day time extension. Slatile Roofing and Sheet Metal has submitted Change Order No. 1 which includes the replacement of damaged and heavily corroded steel lintels (unforeseen condition) at Gallery Buildings No. 1, 2, and 4; removal of embedded electrical conduits and wiring at Gallery Building No. 2; and demolition of abandoned boiler piping at Gallery No. 4. The 150-day time extension accounts for the adjustment in time for a delayed start for the grouting work since the project was awarded late in 2020 and the work could not begin until late winter / early spring 2021 due to temperature constraints on the grout product. There were also materials procurement delays that impacted schedule due to steel supply fabrication schedules. The funding source for the change order shall be Account 642-06-605-514-442005. For questions regarding the subject agenda request, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. 10-04-2021October 12, 2021 City of South Bend Department of Administration & Finance Change Order Request Form Multiple PO lines: PO Number PO-0005683 Line Number 1 Original Dollar Amount $420,218.00 New Dollar Amount (For liquidation request, enter $0)$440,704.00 Reason Code (if changed) Financial Dimensions (fund-dept- division-subdivision-main account)641-06-605-514-436001 (Original PO); 642-06-605-514-442005 (Change Order No 1) Project Code (if applicable)PROJ00000217 Description of change (include budget impact) 120-036 WWTP Masonry Improvements Gallery Buildings 1-4 Replace lintels at Gallery Buildings 1, 2, and 4. Remove embedded electrical conduits at Aeration Gallery 2. Remove abandoned boiler piping at Gallery 4. Total increase for Change Order No. 1 is $20,486.00. PO Number Line Number Original Dollar Amount New Dollar Amount (For liquidation request, enter $0) Reason Code (if changed) Financial Dimensions (fund-dept- division-subdivision-main account) Project Code (if applicable) Changing the line amount: You can only change a line amount if it has NOT been invoiced against. • If the line has NOT been invoiced – reduce the line amount to equal what it should be. • If the line has been invoiced – cancel the delivery remainder and finalize the individual line, then add a new line for the amount that should be remaining. If you have changes to more than two lines on the same PO, fill out a separate section for each line affected by the change order. PO CHANGE FORM for PO-0005683 1 of 10 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 10-04-2021 Name: Jacob M. Klosinski, P.E.Department of Public Works – Engineering Division BPW Date: 10-12-2021 Phone Extension: 9496 Required Prior to Submittal to Board BPW Attorney X Attorney Name Clara McDaniels Dept. Attorney Attorney Name Clara McDaniels Purchasing Michael Schmidt Check the Appropriate Item Type –Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 001 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Slatile Roofing and Sheet Metal, Inc. (South Bend, Indiana) New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name WWTP Masonry Improvements Gallery Buildings 1-4 Project Number 120-036 Funding Source 641-06-605-514-436001 (Original PO); 642-06-605-514-442005 (CO#1) Account No. PO # 0005683 Amount See Below Terms of Contract Purpose/Description Change Order No. 1 addresses additional scope of work for replacing lintels, removing embedded conduits, and removing abandoned boiler piping. See summary below and Memorandum for details. For Change Orders Only Amount of Increase Decrease $ 20,486.00 ($ ) Previous Amount $ 420,218.00 Current Percent of Change: Increase Decrease +4.875% (%) New Amount $ 440,704.00 Total Percent of Change: Increase Decrease +4.875% (%) Time Extension Amount: 150 days (Delayed start of work due to Winter Weather; unforeseen conditions and material supply delays) New Completion Date: October 12, 2021