Loading...
HomeMy WebLinkAboutAward Quote - CSO 18 Backwater Valve Replacement Proj No. 120-017 - Selge Construction Co., Inc.  ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS October 12, 2021 Mr. Robert Kuhns Selge Construction Co., Inc. 2833 South 11TH St. Niles, MI 49120 aswinehart@selgeconstruction.com RE: Quotation Award – CSO 18 Backwater Valve Replacement – Project No. 120-017 Dear Mr. Kuhns: At its October 12, 2021 meeting, the Board of Public Works awarded the above referenced quotation to you in the amount of $124,980. Please forward the following documents in one submittal by October 26, 2021 to my attention for Board of Public Works approval at lhensley@southbendin.gov : 1) One (1) signed original of the Contract (enclosed); and 2) Certificate of Insurance naming the City of South Bend as an additional insured. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, /s/ Anne Fuchs Anne Fuchs, Clerk Enclosures AF/lh   ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS October 12, 2021 Mr. Matthew D. Cain HRP Construction Inc. 5777 Cleveland Rd., PO Box 266 South Bend, IN 46624-0266 cindyv@hrpconstruction.com; mattc@hrpconstruction.com RE: Quotation Award – CSO 18 Backwater Valve Replacement – Project No. 120-017 Dear Mr. Cain: At its October 12, 2021 meeting, the Board of Public Works awarded the above referenced quotation to Selge Construction Co., Inc. in the amount of $124,980. We thank you for quoting and hope you will quote with us again in the future. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, /s/ Anne Fuchs Anne Fuchs, Clerk AF/lh   ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS October 12, 2021 Mr. Richard Parcheta Grand River Construction, Inc. 5025 40th. Ave. Hudsonville, MI 49426 RParcheta@grandriverconstruction.com RE: Quotation Award – CSO 18 Backwater Valve Replacement – Project No. 120-017 Dear Mr. Parcheta: At its October 12, 2021 meeting, the Board of Public Works awarded the above referenced quotation to Selge Construction Co., Inc. in the amount of $124,980. We thank you for quoting and hope you will quote with us again in the future. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, /s/ Anne Fuchs Anne Fuchs, Clerk AF/lh INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works Clara McDaniels, Assistant City Attorney Public Works Anne Fuchs, Clerk FROM: Jacob M. Klosinski, P.E., Assistant City Engineer SUBJECT: 120-017 CSO 18 Backwater Valve Replacement (PROJ00000217; PR-00003823) Agenda Request – Quote Award DATE: October 6, 2021 On September 14, 2021, the Board of Public Works opened and read quotations for the subject project. Division of Engineering, Division of Utilities, and Office of Diversity and Inclusion reviewed the documents and finds the information correct and complete. Below is the bid summary. Base Quotations ranked as follows based on price: QUOTATIONS CONTRACTOR BASE BID MBE GOAL 1.18% WBE GOAL 4.29% SELGE CONSTRUCTION COMPANY, INC. (Niles, Michigan) $124,980.00 0.16% $210.00 48.22% $60,273.00 HRP CONSTRUCTION, INC. (South Bend, Indiana) $148,000.00 1.18% $1,746.40 24.32 $35,997.00 GRAND RIVER CONSTRUCTION (Grandville, Michigan) $164,500.00 0.52% $850.00 36.47% $59,995.00 MBE-WBE Good Faith Efforts were reviewed for all bidders. It was determined after extensive review by Engineering and the Office of Diversity and Inclusion that good faith efforts were met by all contractors that submitted bids. Award to the lowest, responsive, responsible bidder will not meet the MBE goal, but good faith efforts were met. Limited scope of work for MBE and WBE companies for this project is a challenge. WBE well exceeds the goal due to the equipment costs for the project are nearly half of the project cost. The lowest price was provided which is both within the Division of Utilities project budget and lower than the Engineer’s Estimate. The Division of Engineering, Division of Utilities and Office of Diversity and Inclusion agree that the lowest bidder, Selge Construction Company, Inc., met good faith efforts based on our audit of the documentation and correspondence with MBE and WBE companies during quote review. The Division of Engineering recommends the award of the the contract for Project No. 120-017 CSO 18 Backwater Valve Replacement to Selge Construction Company, Inc. for the Total Base Bid of $124,980.00. Funding: Sewage Works Building Repair and Maintenance Account 641-06-605-514-439001. For questions regarding the subject agenda request, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. October 12, 2021 BOARD OF PUBLIC WORKS CITY OF SOUTH BEND, INDIANA PUBLIC WORKS CONTRACT This Agreement is made and entered into this 12th Day of October, 2021, by and between Selge Construction Co., Inc., 2833 S. 11th. St., Niles, MI 49120 (the “Contractor”), and the Board of Public Works (the "Board"). The Contractor covenants and agrees to make the following improvement, as fully set out in the Request for Quotations, Standard Specifications, Special Provisions, Plans, and Bid Proposals, all of which are set forth as a part of this Contract, for: PROJECT NO. 120-017 DESCRIPTION: CSO 18 BACKWATER VALVE REPLACEMENT COMPLETION DATE: SEE SPECIFICATIONS AMOUNT: $124,980 FUNDING: PR-00010974 The unit prices for this improvement were those prices as received and accepted by the Board on the 14th Day of September, 2021. The Contractor further agrees to notify the assigned Engineer when this improvement is completed. This notification shall be in the form of a Project Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractor’s final estimate will be presented to the Board for final Payment with one (1) copy of the Project Completion Affidavit and one (1) copy of a Waiver of Lien. Each of the Parties, by signing below, represents and warrants to the other Party that he/she/it has the authority to bind the named person or entity to this Agreement. BOARD OF PUBLIC WORKS SELGE CONSTRUCTION CO., INC. President Member Printed Name Member Member Signature Member Attest: Anne Fuchs, Clerk October 12, 2021 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 09-10-2021 Name: Jacob M. Klosinski, P.E.Department of Public Works – Engineering Division BPW Date: 09-14-2021 Phone Extension:Ext. 9496 Required Prior to Submittal to Board BPW Attorney X Attorney Name Clara McDaniels Dept. Attorney Attorney Name Clara McDaniels Purchasing Michael Schmidt Check the Appropriate Item Type –Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name CSO 18 Backwater Valve Replacement Project Number 120-017 Funding Source 641-06-605-514-439001 Account No. PR #00010974 /PO #TBD Amount Refer to Purchase Requisition, Price will be based on awarded quotation Terms of Contract Lump Sum, Unit Price Special Contract Provisions Purpose/Description Division of Engineering and Division of Utilities submits a request to Open Quotations for the subject project for the replacement of the CSO 18 Backwater Valve Replacement project at the 09/14/2021 Regular Meeting. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % (%) New Amount $ Total Percent of Change: Increase Decrease % (%) Time Extension Amount: New Completion Date: BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 10-06-2021 Name: Jacob M. Klosinski, P.E.Department of Public Works – Engineering Division BPW Date: 10-12-2021 Phone Extension:Ext. 9496 Required Prior to Submittal to Board BPW Attorney X Attorney Name Clara McDaniels Dept. Attorney Attorney Name Clara McDaniels Purchasing Michael Schmidt Check the Appropriate Item Type –Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Selge Construction Company, Inc. (Niles, Michigan) New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name CSO 18 Backwater Valve Replacement Project Number 120-017 Funding Source 641-06-605-514-439001 Account No. PR #00010974 /PO #TBD Amount 124,980.00 Terms of Contract Lump Sum, Unit Price Special Contract Provisions Purpose/Description Division of Engineering and Division of Utilities recommend the award of the subject project to Selge Construction Company, Inc. as the lowest, responsive responsible bidder. Refer to Memorandum for a description of Quote results. Low bidder did not meet MBE goal but did meet good faith efforts. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % (%) New Amount $ Total Percent of Change: Increase Decrease % (%) Time Extension Amount: New Completion Date: