Loading...
HomeMy WebLinkAbout952 Riverside Drive_AA 2021-0927AMichele Gelfman, President HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY CERTIFICATE OF APPROPRIATENESS The Historic Preservation Commission of South Bend and St. Joseph County has approved the following work: Removal of rear treated-lumber deck/porch. PEACOCK & CO., INC., Contractor for the following location: 952 RIVERSIDE DR South Bend, IN, 46616 Riverside Drive Application No. 2021-0927A in the County of St. Joseph; State of Indiana; which is: Located in a Local Historic District A Local Historic Landmark and found this application to be appropriate according to the Standards pertaining to Local Historic Landmarks and/or Local Historic Districts. Regulations pertaining to the Historic Preservation Commission are found in Chapter 21 (Zoning), South Bend Municipal Code and Chapter 26 of the St. Joseph County Code. The issuance of this certificate does NOT in any manner, release the recipient from the responsibility of complying with the requirements of the zoning ordinances, building codes, safety codes, ADA or other requirements of the City of South Bend, the County of St. Joseph, the State of Indiana, or the United States Federal Government. This certificate is good for one year from the date of issuance and is effective from the date entered herein. Plans are on file and open for public inspection at the office of the Historic Preservation Commission of South Bend and St. Joseph County, 227 West Jefferson Blvd., Suite 1400 S, South Bend, Indiana, during normal business hours. THIS CERTIFICATE IS NOT TRANSFERABLE NAME OF APPLICANT:Don Howard CERTIFICATE ISSUED BY: Adam Toering Historic Preservation Administrator POST IN A CONSPICUOUS PLACE ON THE STREET SIDE OF THE PROJECT UNTIL COMPLETION OF ALL WORK. Phone: (574) 235-9371 E-mail: SBSJCHPC@southbendin.gov ADAM TOERING Historic Preservation Administrator 9/27/2021DATE CERTIFICATE TAKES FORCE:9/27/2022DATE CERTIFICATE EXPIRES: Ord No. 7469-85 Riverside Drive ADMINISTRATIVE APPROVAL 1 Adam Toering From:Karen Landry < Sent:Friday, September 17, 2021 3:26 PM To:Adam Toering Subject:COA Application Attachments:COA-Application SJC 2021 952 RIVERSIDE DR DECK REMOVAL 9.17.21 (1).pdf Follow Up Flag:Follow up Flag Status:Flagged Please find attached our COA application for the removal of a deck. Our permit will not include replacement‐ removal of  the deck only.  It's a 16x12 deck behind the  home   2   ‐‐   Karen Landry  Production Coordinator  Peacock & Company, Inc.  1147 Mishawaka Avenue  South Bend, IN 46615            5068 12'16' 2' House not drawn to scale 30" Diameter (TREE) 2' from house 4' off ground at house grade slopes towards river Joist Direction Deck Boards Frame the opening at the tree to allow for joists to be removed in future and for deck boards to be cut. Don't crowd the tree with the framing, We need to have supported decking to tree with minimal gaps in the meantime. Howard Deck New composite decking New railing Framing complications Tree complication (don't remove) 4"x4" surface mounted (not through to ground) 4"x4" surface mounted (not through to ground) SHEET: SCALE: DATE:DRAWN BY: Nick DonovanDESIGNER/SALESndonovan@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-1 8/6/2021Howard DeckDon and Margo Howard952 Riverside Dr.South Bend, IN 466161/4"=1'0" 1 Adam Toering From:Karen Landry < Sent:Friday, September 24, 2021 4:58 PM To:Adam Toering Subject:952 Riverside Drive Attachments:Howard Deck - Layout (2).pdf Follow Up Flag:Follow up Flag Status:Flagged Adam,  I spoke with my coworker/designer about the future of this project.   He has advised that this current project is step one of three.  1. Peacock is  removing the existing deck as it is unsafe. We will nail a 2x4 across the existing patio door for safety.  2. 3D will be installing "giant screw anchors" which in our trade are called Helical piers for a new foundation. Totally  separate work from Peacock.  3. Peacock will propose a new deck (drawing attached).    We are hoping to complete this work yet this fall.    2   3