HomeMy WebLinkAboutTitle Sheet - Coal Line Trail, Phase II Proj No. 1401811BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date September 22, 2021 Department Public Works
Name Kyle Silveus Division/Bureau Engineering
BPW Date September 28, 2021 Phone Extension 9083
Required Prior to Submittal to Board Legal Attorney Name: Clara McDaniels
Controller Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Purchasing Michael Schmidt
Check the Appropriate Item Type – Required for All Submissions
Agreement Contract Proposal Addendum
Professional Services Resolution
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award
Change Order No. C/O & PCA No. PCA
Ease/Encroach. Traffic Control:
Other:
Required Information
Company or Vendor Name N/A
New Vendor Yes No If Yes, Approved by Purchasing
MBE/WBE Contractor MBE WBE
MBE/WBE Contractor Requested No Yes Name of Company
Project Name Coal Line Trail Phase 2
Project Number ENG: 115-064 DES No: 1401811
Funding Source N/A
Account No. N/A
Amount N/A
Terms of Contract
Purpose/Description
N/A
Multi-Use Path from Riverside Dr. to SR 933 and railroad bridge
rehabilitation across the St. Joe River. This project will be bid by
INDOT in January, 2021
Required Contractor’s Certification Forms Attached (Non-
Collusion, Non-Discrimination, Non-Debarment, E-Verify, Iran, etc.)
Required For Change Orders Only
Amount of
Increase
Decrease
$
$
Previous Amount $
Current Percent of Change: %
New Amount $
Total Percent of Change: %
Dispersal After Approval
Copy Original
Kyle Silveus
Chris Dressel
Scale 1" = 1,000'PROJECTDESIGNATIONCONTRACTBRIDGE FILEINDIANA DEPARTMENT OF TRANSPORTATIONSTANDARD SPECIFICATIONS DATED 2022TO BE USED WITH THESE PLANSINDIANA DEPARTMENTOF TRANSPORTATIONSHARED USE PATH PLANSBridge Length:Trail Length (PII):Net Length:Maximum Grade:0.062 MI.0.678 MI.0.740 MI.5.60 %PROJECT LOCATION MAPCITY OF SOUTH BEND THE SCOPE OF THE PROJECT IS THE EXPANSION OF AN URBAN TRAIL ALONG AN ABANDONED RAILROAD CORRIDOR.PHASE II – RIVERSIDE DRIVE TO EAST BANK TRAIL (APPROX. 3,500’)THIS PROJECT IS LOCATED IN SECTIONS 35 AND 36, TOWNSHIP 38 NORTH, RANGE 2 EAST, & IN SECTIONS 1 & 2,TOWNSHIP 37 NORTH, RANGE 2 EAST, , PORTAGE TOWNSHIP, CITY OF SOUTH BEND, ST. JOSEPH COUNTY, INDIANA.T 38 NT 37 NP.O.T. 42+42.15 "PR-CLT 2"End Project 1401811WILBER ST.DIAMOND AVE.W. ANGELA BLVD.LINCOLN WAY W.PORTAGE AVE.N. MICHIGAN ST.36353412T 38 NT 37 N86°15'47" WLATITUDE:41°41'38" NLONGITUDE:PROJECT LOCATION SHOWN BY3PHASE IIKIN DESIGNATION NUMBERSROADWAYRIVERSIDE DR.P.O.T.10+00.00 "PR-CLT 2"Begin Project 14018111401811Coal Line Trail Phase IIBRIDGEBridge Over St. Joseph RiverPROJECT NO. 1401811 (PHASE II) P.E., R/W1401811KYLE W. SILVEUS, P.E.TOY VILLAJORDAN V. GATHERSJOSEPH R. MOLNARANNE FUCHSMURRAY L. MILLERCITY OF SOUTH BENDAPPROVED BY BOARD OF PUBLIC WORKSDATECITY ENGINEERCONSTRUCTIONAPPROVED BY CITY STAFFDATEPRESIDENTMEMBERMEMBERMEMBERCLERKMEMBERELIZABETH A. MARADIKKARA M. BOYLES, Ph.D., P.E.ADMINISTRATION & DESIGN (ERC)14 Digit HUC: 04050001240040GARY A. GILOTFile Name: p:\RD\C3D\16-406\Road\Dwg\Plans Phase 2\CLT2 - Title Sheet.dwg Plot Date: 9/15/2021 Plotted By: Clifton FergusonINDIANA DEPARTMENT OF TRANSPORTATIONDATEPHONE NUMBERFOR LETTING:APPROVEDCERTIFIED BY:PREPARED BY:PLANS8440 Allison Pointe Blvd.Suite 200Indianapolis, IN 46250Phone 317-895-2585www.ucindy.comSHEETSofCONTRACTBRIDGE FILEPROJECTDESIGNATIONSURVEY BOOK-1401811-R-380651541401811R-38065PART 1 OF 21401811R-380651401811DATEKYLE WE WE WE WE W. SILVEUS, P.E.9/17/2109/17/20219/17/2021September 28, 2021
P.O.T.42+42.15 "PR-CLT 2"End Project 1401811WILBER ST.DIAMOND AVE.W. ANGELA BLVD.LINCOLN WAY W.PORTAGE AVE.N. MICHIGAN ST.363534123RIVERSIDE DR.PHASE IIP.O.T.10+00.00 "PR-CLT 2"Begin Project 1401811Coal Line Trail overSt. Joseph RiverProject LocationSHEETSofCONTRACTBRIDGE FILEPROJECTDESIGNATIONSURVEY BOOK-1401811-R-380651391401811File Name: P:\RD\C3D\16-406\Bridge\Dwg\Plans\Title Sheet.dwg Plot Date: 9/15/2021 Plotted By: Chris DyerScale 1" = 1,000'PROJECTDESIGNATIONCONTRACTINDIANA DEPARTMENT OF TRANSPORTATIONDATEDATEPHONE NUMBERFOR LETTING:APPROVEDCERTIFIED BY:PREPARED BY:PLANSBRIDGE FILEINDIANA DEPARTMENT OF TRANSPORTATIONSTANDARD SPECIFICATIONS DATED 2022TO BE USED WITH THESE PLANSINDIANA DEPARTMENTOF TRANSPORTATIONBRIDGE REHABILITATION PLANS-1401811R-380651401811HUC 14:Bridge Length:Trail Length (Phase II):Net Length:Maximum Grade:040500012400400.062 MI.0.678 MI.0.740 MI.5.60 %PROJECT LOCATION MAPCITY OF SOUTH BENDBRIDGE REHABILITATION OF ABANDONED NORFOLK SOUTHERN RAILROAD BRIDGEOVER ST. JOSEPH RIVER, LOCATED IN SECTION 35, TOWNSHIP 38 NORTH, ANDSECTION 2, TOWNSHIP 37 NORTH, RANGE 2 EAST, PORTAGE TOWNSHIP, CITY OFSOUTH BEND, ST. JOSEPH COUNTY, INDIANA.T 38 NT 37 NT 38 NT 37 N86°15'47" WLATITUDE:41°41'38" NLONGITUDE:PROJECT LOCATION SHOWN BYKIN DESIGNATION NUMBERSROADWAY1401811Coal Line Trail Phase IIBRIDGEBridge Over St. Joseph River(PHASE II) P.E.FOR SPANS OVER 20 FEETPROJECT NO. 1401811COAL LINE TRAIL OVER ST. JOSEPH RIVERSTATIONSPAN AND SKEWOVERINDEXTYPESTRUCTURECOMBINATION:ROLLED STEEL &RIVETED PLATEGIRDERSCOAL LINE TRAIL7 SPANS:28'-8", 59'-11 5/8", 60'-4 3/4",43'-7 3/4", 49'-1 1/4", 49'-1", 39'-4 3/4"SKEW: 0°12+34.75"PR-CLT 2"1401811ST. JOSEPHRIVER8440 Allison Pointe Boulevard, Suite 200Indianapolis, IN 46250Phone 317-895-2585www.ucindy.comR 2 ER-38065PART 2 OF 2KYLE W. SILVEUS, P.E.TOY VILLAGARY A. GILOTJORDAN V. GATHERSJOSEPH R. MOLNARANNE FUCHSMURRAY L. MILLERCITY OF SOUTH BENDAPPROVED BY BOARD OF PUBLIC WORKSDATECITY ENGINEERCONSTRUCTIONAPPROVED BY CITY STAFFDATEPRESIDENTMEMBERMEMBERMEMBERCLERKMEMBERKARA M. BOYLES, Ph.D., P.E.ADMINISTRATION & DESIGN (ERC)ELIZABETH A. MARADIKKYLE WE WE WE WE . SILVEUS, P.E.9/17/2109/17/20219/17/2021September 28, 2021