Loading...
HomeMy WebLinkAboutTitle Sheet - Coal Line Trail, Phase II Proj No. 1401811BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date September 22, 2021 Department Public Works Name Kyle Silveus Division/Bureau Engineering BPW Date September 28, 2021 Phone Extension 9083 Required Prior to Submittal to Board Legal Attorney Name: Clara McDaniels Controller Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing Michael Schmidt Check the Appropriate Item Type – Required for All Submissions Agreement Contract Proposal Addendum Professional Services Resolution Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Change Order No. C/O & PCA No. PCA Ease/Encroach. Traffic Control: Other: Required Information Company or Vendor Name N/A New Vendor Yes No If Yes, Approved by Purchasing MBE/WBE Contractor MBE WBE MBE/WBE Contractor Requested No Yes Name of Company Project Name Coal Line Trail Phase 2 Project Number ENG: 115-064 DES No: 1401811 Funding Source N/A Account No. N/A Amount N/A Terms of Contract Purpose/Description N/A Multi-Use Path from Riverside Dr. to SR 933 and railroad bridge rehabilitation across the St. Joe River. This project will be bid by INDOT in January, 2021 Required Contractor’s Certification Forms Attached (Non- Collusion, Non-Discrimination, Non-Debarment, E-Verify, Iran, etc.) Required For Change Orders Only Amount of Increase Decrease $ $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: % Dispersal After Approval Copy Original Kyle Silveus Chris Dressel Scale 1" = 1,000'PROJECTDESIGNATIONCONTRACTBRIDGE FILEINDIANA DEPARTMENT OF TRANSPORTATIONSTANDARD SPECIFICATIONS DATED 2022TO BE USED WITH THESE PLANSINDIANA DEPARTMENTOF TRANSPORTATIONSHARED USE PATH PLANSBridge Length:Trail Length (PII):Net Length:Maximum Grade:0.062 MI.0.678 MI.0.740 MI.5.60 %PROJECT LOCATION MAPCITY OF SOUTH BEND THE SCOPE OF THE PROJECT IS THE EXPANSION OF AN URBAN TRAIL ALONG AN ABANDONED RAILROAD CORRIDOR.PHASE II – RIVERSIDE DRIVE TO EAST BANK TRAIL (APPROX. 3,500’)THIS PROJECT IS LOCATED IN SECTIONS 35 AND 36, TOWNSHIP 38 NORTH, RANGE 2 EAST, & IN SECTIONS 1 & 2,TOWNSHIP 37 NORTH, RANGE 2 EAST, , PORTAGE TOWNSHIP, CITY OF SOUTH BEND, ST. JOSEPH COUNTY, INDIANA.T 38 NT 37 NP.O.T. 42+42.15 "PR-CLT 2"End Project 1401811WILBER ST.DIAMOND AVE.W. ANGELA BLVD.LINCOLN WAY W.PORTAGE AVE.N. MICHIGAN ST.36353412T 38 NT 37 N86°15'47" WLATITUDE:41°41'38" NLONGITUDE:PROJECT LOCATION SHOWN BY3PHASE IIKIN DESIGNATION NUMBERSROADWAYRIVERSIDE DR.P.O.T.10+00.00 "PR-CLT 2"Begin Project 14018111401811Coal Line Trail Phase IIBRIDGEBridge Over St. Joseph RiverPROJECT NO. 1401811 (PHASE II) P.E., R/W1401811KYLE W. SILVEUS, P.E.TOY VILLAJORDAN V. GATHERSJOSEPH R. MOLNARANNE FUCHSMURRAY L. MILLERCITY OF SOUTH BENDAPPROVED BY BOARD OF PUBLIC WORKSDATECITY ENGINEERCONSTRUCTIONAPPROVED BY CITY STAFFDATEPRESIDENTMEMBERMEMBERMEMBERCLERKMEMBERELIZABETH A. MARADIKKARA M. BOYLES, Ph.D., P.E.ADMINISTRATION & DESIGN (ERC)14 Digit HUC: 04050001240040GARY A. GILOTFile Name: p:\RD\C3D\16-406\Road\Dwg\Plans Phase 2\CLT2 - Title Sheet.dwg Plot Date: 9/15/2021 Plotted By: Clifton FergusonINDIANA DEPARTMENT OF TRANSPORTATIONDATEPHONE NUMBERFOR LETTING:APPROVEDCERTIFIED BY:PREPARED BY:PLANS8440 Allison Pointe Blvd.Suite 200Indianapolis, IN 46250Phone 317-895-2585www.ucindy.comSHEETSofCONTRACTBRIDGE FILEPROJECTDESIGNATIONSURVEY BOOK-1401811-R-380651541401811R-38065PART 1 OF 21401811R-380651401811DATEKYLE WE WE WE WE W. SILVEUS, P.E.9/17/2109/17/20219/17/2021September 28, 2021 P.O.T.42+42.15 "PR-CLT 2"End Project 1401811WILBER ST.DIAMOND AVE.W. ANGELA BLVD.LINCOLN WAY W.PORTAGE AVE.N. MICHIGAN ST.363534123RIVERSIDE DR.PHASE IIP.O.T.10+00.00 "PR-CLT 2"Begin Project 1401811Coal Line Trail overSt. Joseph RiverProject LocationSHEETSofCONTRACTBRIDGE FILEPROJECTDESIGNATIONSURVEY BOOK-1401811-R-380651391401811File Name: P:\RD\C3D\16-406\Bridge\Dwg\Plans\Title Sheet.dwg Plot Date: 9/15/2021 Plotted By: Chris DyerScale 1" = 1,000'PROJECTDESIGNATIONCONTRACTINDIANA DEPARTMENT OF TRANSPORTATIONDATEDATEPHONE NUMBERFOR LETTING:APPROVEDCERTIFIED BY:PREPARED BY:PLANSBRIDGE FILEINDIANA DEPARTMENT OF TRANSPORTATIONSTANDARD SPECIFICATIONS DATED 2022TO BE USED WITH THESE PLANSINDIANA DEPARTMENTOF TRANSPORTATIONBRIDGE REHABILITATION PLANS-1401811R-380651401811HUC 14:Bridge Length:Trail Length (Phase II):Net Length:Maximum Grade:040500012400400.062 MI.0.678 MI.0.740 MI.5.60 %PROJECT LOCATION MAPCITY OF SOUTH BENDBRIDGE REHABILITATION OF ABANDONED NORFOLK SOUTHERN RAILROAD BRIDGEOVER ST. JOSEPH RIVER, LOCATED IN SECTION 35, TOWNSHIP 38 NORTH, ANDSECTION 2, TOWNSHIP 37 NORTH, RANGE 2 EAST, PORTAGE TOWNSHIP, CITY OFSOUTH BEND, ST. JOSEPH COUNTY, INDIANA.T 38 NT 37 NT 38 NT 37 N86°15'47" WLATITUDE:41°41'38" NLONGITUDE:PROJECT LOCATION SHOWN BYKIN DESIGNATION NUMBERSROADWAY1401811Coal Line Trail Phase IIBRIDGEBridge Over St. Joseph River(PHASE II) P.E.FOR SPANS OVER 20 FEETPROJECT NO. 1401811COAL LINE TRAIL OVER ST. JOSEPH RIVERSTATIONSPAN AND SKEWOVERINDEXTYPESTRUCTURECOMBINATION:ROLLED STEEL &RIVETED PLATEGIRDERSCOAL LINE TRAIL7 SPANS:28'-8", 59'-11 5/8", 60'-4 3/4",43'-7 3/4", 49'-1 1/4", 49'-1", 39'-4 3/4"SKEW: 0°12+34.75"PR-CLT 2"1401811ST. JOSEPHRIVER8440 Allison Pointe Boulevard, Suite 200Indianapolis, IN 46250Phone 317-895-2585www.ucindy.comR 2 ER-38065PART 2 OF 2KYLE W. SILVEUS, P.E.TOY VILLAGARY A. GILOTJORDAN V. GATHERSJOSEPH R. MOLNARANNE FUCHSMURRAY L. MILLERCITY OF SOUTH BENDAPPROVED BY BOARD OF PUBLIC WORKSDATECITY ENGINEERCONSTRUCTIONAPPROVED BY CITY STAFFDATEPRESIDENTMEMBERMEMBERMEMBERCLERKMEMBERKARA M. BOYLES, Ph.D., P.E.ADMINISTRATION & DESIGN (ERC)ELIZABETH A. MARADIKKYLE WE WE WE WE . SILVEUS, P.E.9/17/2109/17/20219/17/2021September 28, 2021