Dear City of South Bend,
USI Consultants, Inc. (USI) is pleased to submit our letter
of interest and offer professional construction inspection
services to the City of South Bend for Contract R-43125 –
Olive Street Phase II Road Improvements at RR Xing (Des.
#1920178) in the LaPorte District.
OUR TEAM IS ALL IN
USI’s Construction Project Supervisor, Justin Sherman, will
lead the charge! Justin has 13 years of experience working
with the INDOT LaPorte District and federal aid projects, as
well as many other locally funded projects within the City
of South Bend.
Mark Whitten will accompany Justin, acting as lead
inspector. Both Justin and Mark’s history with Phase
I of this project will be invaluable in the construction
of Phase II. Since they have witnessed the utility and
constructability concerns in Phase I, they can help to
resolve these issues early on, which will reduce added
costs, keeping the project on time. Their combined history
of successful projects in the City of South Bend and INDOT
district is irreplaceable. However, should a situation call
for additional resources, USI has other experienced team
members ready and available at our nearby LaPorte office.
COMMUNICATION
USI promises to reply to you within 24 hours to ensure a
rapid response to any of your questions or concerns. Justin
has a vast range of experience when dealing with property
owners and concerned citizens who are not always on-
board with the project. He will always remain professional
and represent the interests of the City of South Bend.
Justin will stay in direct contact with you by providing
weekly updates on the projects progress. Please know, the
USI team will respond quickly and efficiently to whatever
variables come our way.
SIMILAR PROJECT EXPERIENCE
We have been the construction management and
inspection consultant for countless road improvement
projects. Whether a large or small project, we are
always 100% committed to ensuring each project success!
UTILITY RELOCATION EXPERIENCE
Most federally funded projects in Indiana involve extensive
utility challenges, which Justin and Mark had to face with
Olive Street Phase I and are fully equipped to handle in
Phase II. Their experience with the Norfolk Southern
Railroad and the staff members of the utilities will benefit
the City and allow them to deliver a quality project on
time. If additional support is needed, our lead Utility/
RR Coordinator, Natalie Parks, PE, is available to assist.
Together, they can work with the City of South Bend to
make sure any utility obstacles are addressed before they
become an issue. USI has no doubt that coordination with
Norfolk Southern will be critical in keeping the project
on-schedule.
City of South Bend… the USI team has your back.
We pledge to provide you with a genuinely talented,
committed, forthright group of individuals – eager to serve,
honored to assist, and fully prepared to work with the
City as your very own construction management team.
Please take a moment to review this proposal and call any
one of us if you have questions regarding our proposed
construction services.
Sincerely,
Philip D. Beer II, PE, PS, FACEC
President
Scott Dick
Project Manager
Scott Dicksdick@usiconsultants.com
Project Manager
Justin Shermanjsherman@usiconsultants.com
Project Supervisor
Mark Whitten mwhitten@usiconsultants.com
Lead Inspector
Tracy McCormick, PEtracy@mccormickeng.com
McCormick - Inspector
City of South Bend
USI LAPORTE OFFICE
824 Lincolnway
LaPorte, IN
219.369.6545
MCCORMICK OFFICE
234 N. Ironwood Dr.
South Bend, IN
574.232.6800
Each member of our team has
passed all six areas of the Certified
Technician Program (CTP).
TEAM INFORMATION
USI Consultants | 90%
13.1
McCormick Engineering | DBE | 10%
13.1, Materials Testing
2 City of South Bend| Inspection of Olive Street Phase 2 Road Improvements at RR Xing | R-43125 | Des. #1920178
Team Leadership
Scott brings 28 years experience of
Construction Management and Inspection
services in Indiana. His demand for
quality workmanship is evident in projects
completed for our clients throughout those
years! Scott serves as USI’s Construction Services Department
Manager and makes sure ALL projects are constructed in
accordance with the plans, project scope, and specifications.
Applying a “hands-on” approach in all responsibilities, Scott
ensures all decisions and communications are clear between
the owner/client and provides the information necessary for
decisions to be made in a timely fashion. As conclusions and
assessments based on in-field conditions arise, he coordinates
all the information with the USI team.
Scott Dick | Project Manager
Project Experience
• Various INDOT and LPA Projects Completed 1991 – 2021
State Highways, City Streets, County Bridges, Drainage
Projects, Sanitary Sewer Projects, and Subdivisions From
$500,000 to $20,000,000
• Montgomery County Bridge #126 – CR 275 W over
Rattlesnake Creek (B-34162)
Role: Project Manager | Year: 2017 | Cost: $700,000
• Strawtown/Kowteewi Park Twin Truss Bridge
Reconstruction
Role: Project Manager | Year: 2017 | Cost: $2,500,000
CERTIFICATIONS
• INDOT Certified Technician, All Disciplines
• INDOT Storm Water Management (Level 1)
• INDOT SiteManager
Justin has over 13 years of construction management
and inspection experience. He has been a Project
Supervisor on numerous INDOT/LPA projects. His
attention to detail and overall expertise helps ensure
the project runs seamlessly and efficiently. This also helps
him communicate thoroughly to the owner/client on all construction
related activities. He has been a valued asset to the City of South Bend
in the past on some very sensitive projects, resolving a variety of issues,
all while being mindful of the construction budget and the project
completion times.
As Project Supervisor, his duties will include complete contract
administration, from the start to the end of the project. His
responsibilities include oversight of all on-site work, as well as completing
the necessary paperwork and on-site testing.
Justin Sherman | Project Supervisor CERTIFICATIONS
• INDOT Certified Technician,
All Disciplines
• INDOT SiteManager
• INDOT Storm Water
Management (Level 1)
• INDOT Certified Utility
Coordinator
• IWEA Water and Sewage
Construction Inspection
• NICET - Highway Construct.
Level 3 & Soils Level 1
Project Experience
• Olive Street Reconstruction, Phase I – from
Prairie Ave to Tucker Dr. – South Bend, IN
Role: Lead Inspector | Cost: $3,340,000
• Johnson Road and CR 400N Intersection
Improvement – LaPorte County, IN
Role: Project Supervisor | Cost: $1,170,000
• Edison Rd. Added Center Turn Lane from
Ironwood Rd. to Gordon Dr. - South Bend, IN*
Role: Project Supervisor | Cost: $365,000
• Lasalle School Area Storm Sewer Separation -
South Bend, IN*
Role: Project Supervisor | Cost: $1,700,000
• Ignition Park Infrastructure Division B – South
Bend, IN*
Role: Project Supervisor | Cost: $950,000
• Bartlett Street Reconstruction – South Bend, IN*
Role: Project Supervisor | Cost: $2,600,000
• Hively Avenue Reconstruction, SR 19 to Benham
Avenue, Construction Inspection - Elkhart, IN*
Role: Construction Inspector | Cost: $7,383,000
*Projects completed with previous employer.
3 City of South Bend| Inspection of Olive Street Phase 2 Road Improvements at RR Xing | R-43125 | Des. #1920178
Key Staff
Mark has 9 years of construction
management and inspection experience,
most of which were with INDOT LaPorte
District as a Construction Project Supervisor.
Mark applies his experience to supervise construction of various project types. He
adheres to all INDOT and client protocol so projects are completed on-time and within the budget.
He pays excellent attention to plan details in order to see that the project follows the specifications
and planned design exactly. Mark uses his communication and time-management skills along with
his in-field decision making skills to ensure the client is satisfied with all project outcomes. His onsite
experience of Olive Street Phase I will greatly help in eliminating conflict on Olive Street Phase II.
Mark Whitten | Lead Inspector CERTIFICATIONS
• INDOT Certified Technician,
All Disciplines
Project Experience
• City of South Bend, Olive St from S of
Delaware to RR S of Tucker Drive
Project Inspector for roadway reconstruction
• I-94 Bridge Deck Sealing
Project Inspector for bridge painting/deck
sealing
• Marshall County Bridge #73 Replacement
Will perform inspection oversight for bridge
replacement over Yellow River
• US 35/SR 39 LaPorte, Asphalt Resurface
Role: Lead Supervisor | Year: 2020
• US20/SR 2 Rolling Prairie, New Interchange/
Bridge
Role: Supervisor | Year: 2019
• US 6/US 421 San Pierre/Wanatah/Westville/
Valparaiso, Asphalt Resurface/Intersection
Improvement
Role: Supervisor | Year: 2019
• US 20/SR 2 LaPorte/Michigan City Intersection
Improvement
Role: Lead Supervisor | Year: 2018
• US 31/SR 23 Plymouth/Ober, Asphalt
Resurface
Role: Lead Supervisor | Year: 2018
• IDIQ Bridge Maintenance Repair, INDOT
LaPorte District Wide
Role: Lead Supervisor | Year: 2017
• IDIQ Road Maintenance Repair, INDOT LaPorte
District Wide
Role: Lead Supervisor | Year: 2017
• US 421/US 6 Intersection Westville, Concrete
Pavement Restoration
Role: Lead Supervisor | Year: 2017
Some projects completed with previous employer.
McCormick Engineering, LLC, a certified
Indiana WBE and DBE firm, was established
in South Bend, Indiana in 2008 with one goal
in mind: to provide outstanding customer
service to the public sector. They are a civil
engineering consulting firm who is passionate
about helping clients provide an improved quality of life to the
general public through public works projects.
Engineer experienced in the planning,
design and construction observation of civil
engineering projects. Co-founder of McCormick
Engineering, LLC. Tracy is heavily experienced
with Phase I of the Olive Street project as she
worked as a Project Inspector.
Through years of experience, Natalie has come
to know all standards and best practices of
utility coordination, but she has also been
an influence on the development of such
standards. Natalie will benefit USI’s clients thanks
to her extensive knowledge with utilities, and her well-developed
relationships with Indiana’s utility providers.
Tracy McCormick, PE | Inspector
Natalie Parks, PE | Utility & RR Coordinator
CERTIFICATIONS
• Professional Engineer
• INDOT Certified Technician, All Disciplines
• INDOT Certified SiteManager
• INDOT Stormwater Certification
4 City of South Bend| Inspection of Olive Street Phase 2 Road Improvements at RR Xing | R-43125 | Des. #1920178
Construction Approach
This project will involve the improvement of Olive Street between
Indiana Court and Tucker Drive. This will tie the Olive Street Phase I
project in with the Sample Street and Olive Street project that was
previously completed. There will be a road closure on Olive Street,
creating a detour route on Sample Street and SR 23. While the road
is closed, a new storm sewer, 10” PCCP, drive approaches, sidewalks,
railroad pedestrian crossing, and multi-purpose pathway will be
completed. Due to constructability concerns in Phase I, changes were
made, helping drive a redesign for the Phase II storm sewer. This was
because of several elevation conflicts with the existing watermain.
If lead water service lines are encountered in Phase II, USI will work
with the City to replace them with copper service lines. Lead Inspector
Mark Whitten’s knowledge of construction activities and changes on
Phase I will be invaluable in construction of Phase II, which will allow
for a seamless transition.
Utility Coordination
Some of the utilities were relocated in the 1st phase of the Olive
Street project. However, Comcast, AT&T, and AEP will still need to
be relocated in Phase II. USI will review all of the utility work plans,
timeframes, and potential conflicts before the pre-construction
meeting, bringing any issues to the construction group as soon as
possible. USI will then work with the utilities to get the relocation
efforts completed in a timely manner. Extensive railroad coordination
will need to start early and will commence throughout the project. USI
will make sure the contractor submits all right-of-entry and insurance
paperwork for Norfolk Southern in a timely manner. USI’s INDOT
Certified Utility and Railroad Coordinator, Natalie Parks, PE, will be
available to assist with utility and railroad coordination efforts prior
to and during construction. USI will also work with the contractor to
utilize phasing of the work to help minimize the railroad flagman’s
time, thus, reducing the final cost of the contract. USI’s goal is to help
finish the project on time and under budget.
Aerial View of Each Project Phase
Tucker DriveTucker DriveOlive StreetOlive Street Olive StreetOlive Street
P
r
a
i
r
i
e
A
v
e
n
u
e
P
r
a
i
r
i
e
A
v
e
n
u
e
Ind
iana
Court
Ind
iana
Court
Looking North From Olive Street Phase I
Project Approach
Phase IPhase I
Phase IIPhase II
5 City of South Bend| Inspection of Olive Street Phase 2 Road Improvements at RR Xing | R-43125 | Des. #1920178
Accountability & Scheduling
• Regular stakeholder meetings throughout construction to address
questions
• Ability to address issues swiftly and respond to RFI’s in a timely
manner
• Daily agreement on work completed with the contractor’s field
personnel
• Complete final construction records in less than 45 days
Documentation
• Pre-construction photos and documentation of existing conditions
• Provide detailed project records using the SiteManager database
Communication
• Professionalism in dealing with INDOT, contractors, subcontractors,
utility representatives, and local residents
• Communication with area residents and businesses near the project
site for resolving possible issues that may arise (while keeping the City
of South Bend in the loop)
• Negotiations with contractors and subcontractors being firm, but fair
Project Understanding
• Complete, detailed understanding of the plans and specifications
• Review all maintenance-of-traffic and construction plans - providing
value engineering solutions so that the City of South Bend receives the
best financial investment
Project Management Philosophy & Key Elements Looking South at Olive Street Phase II
Norfolk Southern Railroad and Utilities
Project Approach
6 City of South Bend| Inspection of Olive Street Phase 2 Road Improvements at RR Xing | R-43125 | Des. #1920178
USI has the expertise to provide innovative solutions to any unique construction management and inspection project. We look at innovative approaches and the best possible way to
serve the public safely and efficiently, while doing so in the most cost-effective manner. Relevant to this RFP, USI has overseen the construction of other similar projects across Indiana.
Project Experience
This $1.17 million intersection improvement project was located at the intersection of Johnson Rd and
CR 400N within LaPorte County (R-35966). This project added turn lanes on both Johnson Road and CR
400N. Elements of this project included new storm sewer, new strain poles, new signals, new HMA,
new pavement markings, new signs and four added turn lanes. The added turn lanes were needed
due to the increased traffic on both roads. The turn arrows help to facilitate a safer turning movement
for the traveling public. The project ran into numerous utility conflict and some constructability
conflicts, but was still completed on time and under budget. Work was performed for LaPorte County
in conjunction with the Indiana Department of Transportation. Mr. Sherman’s responsibilities as the
project supervisor included inspecting and reporting quantities for all the contractor’s work throughout
the jobsite and documenting all events, visitors, and happenings. He also completed SiteManager
entries, including daily reports, completed material tests and entered material record information. He
also completed the Final Construction Record on time with minimal checks.Pre-ConstructionPre-Construction
Johnson Road and CR 400N Intersection Improvement
Construction Services Project Manager: Justin Sherman
Olive Street Reconstruction, Phase I – from Prairie Avenue to Tucker Drive
Assistant Project Supervisors: Justin Sherman and Mark Whitten
This $3.34 million intersection improvement project is located at on Olive Street between Prairie
Avenue (SR 23) and Indiana Court, within the City of South Bend (R-37495). This project added a
multi-use path and created a center turn lane. Elements of this project included the addition of a new
multi-use path, 5,000 lft of new storm sewer pipe with various types of storm drain structures, new
lighting, 15,600 sys of new 10” PCCP, 1,500 sys of new drive approaches, 7,600 lft of new pavement
markings, added parking lanes, and a new center turn lane. The added center turn lane was needed
due to the large amount of commercial traffic turning into the various commercial properties. The
project ran into numerous utility conflicts and some constructability conflicts, but were worked
through with the contractor, the designer, and the City. Work was performed for the City of South
Bend in conjunction with the Indiana Department of Transportation.
7 City of South Bend| Inspection of Olive Street Phase 2 Road Improvements at RR Xing | R-43125 | Des. #1920178
Project Experience
Intersection Improvement on Union Chapel Road from Greenfield Avenue to SR 32
Construction Services Project Manager: Scott Dick
This project included several phases of road, bridge, and trail construction on the east side of Noblesville
to provide an improved traffic and pedestrian thoroughfare. USI was responsible for the construction
management and inspection of phase 1, 2, and 5, as well as landscaping. Prior to the beginning of phases 3
and 4, USI was also responsible for the early action projects and the total construction cost was $12,600,000.
Phase 1 included the extension of Town & Country Boulevard to the new alignment at Union Chapel Road.
Three lanes of HMA pavement were constructed with storm sewer and a BMP structure, concrete curb and
gutter, earthwork, a multi-use trail, ADA ramps, and pavement markings.
Phase 2 included 4 lanes of HMA pavement with two roundabout intersections, mass earthwork, storm
sewers with two BMP structures, multi-use trails, decorative concrete, brick pavers, street lighting, pedestrian
crossing signs, and pavement markings. This phase included a large twin Conspan bridge structure, bridge
railing, concrete moment slabs, two Conspan pedestrian tunnels, cast-in-place concrete retaining walls, MSE
walls, timber handrails, and other pedestrian handrails. Clearing the right-of-way, building demolition, and
sanitary sewer were managed during the winter months ahead of the beginning of phase 3 and 4.
Phase 5 included the busy intersection of Union Chapel Road and Greenfield Avenue (SR 238). A roundabout
was constructed at this location along with street lights, pedestrian crossing signs, decorative concrete,
concrete curb gutter, ADA ramps, and brick pavers. The new roadway alignment included three lanes of
HMA pavement, earthwork, multi-use trails, and vegetated swales and detention ponds to meet storm water
quality detention requirements.
This project constructed 2 miles of new roadway. The roadway connects Michigan Road to the
new US 31 interchange being built at 7th Road, and then continues east, tying into Linden Road
at its east terminus. This project included the first roundabout in Marshall County. This project
was constructed through a wetland, and required that an adjacent wetland mitigation site be
constructed. Constructing this roadway through a wetland was difficult, and involved removal
of peat and 17,000 cubic yards of unsuitable soil. The construction of this new roadway was
coordinated with the opening of the new US 31 interchange serving northern Marshall County.
The three 7th Road projects were completed with a total cost of $6,000,000.00 in November 2015.
7th Road (Veterans Parkway) and Bridge #310 - Marshall County
Construction Services Project Manager: Scott Dick
(Rev. 03/28/2016)
Request for Proposal Number: ___________
RFP Item Description: ___________________________________
Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE)
I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business
Enterprises (DBEs) certified in the State of Indiana to participate as part of this proposal. I acknowledge that
this certification is to be made an integral part of this proposal. I understand and agree that the submission of a
blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE
website to confirm that the firms listed below are currently certified DBEs:
http://www.in.gov/indot/2732.htm.
I certify that I have contacted the certified DBEs listed below, and if my company becomes the
CONSULTANT, these DBEs have tentatively agreed to perform the services as indicated. I understand that
neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract award, any
change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must have
prior approval by INDOT’s Economic Opportunity Division.
I.DBE Subconsultants to be applied toward DBE goal for the RFP item:
II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item:
Certified DBE Name to DBE Service Planned Estimated Percentage to be Paid*
%
%
%
%
Estimated Total Percentage Credited toward DBE Goal: __________
Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal: ________
Company Name: _________________________________________________________________________
Signature: ____________________________________________ Date: _____________________________
*It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result of
negotiation of the contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these or other
certified and approved DBE firms.
Certified DBE Name to DBE Service Planned Estimated Percentage to be Paid*
%
%
%
%
Indiana DBE Certification Program
In accordance with 49 CFR Part 26 as published in the code of federal regulations, the Indiana
Department of Transportation acknowledges
McCormick Engineering, LLC
as a certfied DBE in the State of Indiana.
Date Issued:01/26/2017 No Change Affidavit Due:12/31/2021
(Reference the Indiana Department of Transportation's DBE Public Search at
http://www.in.gov/2674.htm for the most current information regarding this certification)
Elizabeth Kiefner Crawford, Director
Economic Opportunity Division
Derrick Casson, Certification Manager
Economic Opportunity Division