Loading...
HomeMy WebLinkAboutOpening of Proposals - Olive St. Pavement Reconstruction, Phase II Proj No. 114-064 - HWC EngineeringAUTHORIZED NEGOTIATOR James Rice, PE Partner Director, Transportation Engineering jrice@hwcengineering.com (317) 981-1241 - Office CITY OF SOUTH BEND Inspection of Olive Street Phase 2 Road Improvements at Railroad Crossing (Des # 1902178) LAPORTE DISTRICT WHY THE HWC TEAM? We know roads. The HWC team is experienced in all aspects of road improvement projects from design to inspection, having worked on projects throughout Indiana, including several roadway projects within Laporte District. HWC continually manages these projects to completion with their clients best interests in mind from budget to constructibility. HWC is committed to continuing to showcase their inspection talents and lead the Olive Street Phase II project to success. Our current success on Phase I of Olive exemplifies this commitment. EXPERIENCED & SUCCESSFUL PROJECT SUPERVISOR Chris Holth has more than 29 years of experience managing construction projects in Indiana both as a consultant and as a contractor. The projects he has overseen range in construction cost from $250 thousand to $10 million. Most of these projects have been with LPA clients like the City of South Bend. The quality of Mr. Holth’s performance on these projects has led to his clients requesting he oversee future work with them further exemplifying the extent of his abilities. He has received performance scores on multiple past projects from INDOT in the +2, “Exceeds Expectations” category. Mr. Holth is currently managing Olive Street Phase I, his second project in South Bend which was awarded to HWC based on his performance on a previous project. Managing this current phase of Olive Street makes him intimately familiar with the Olive Street corridor. Mr. Holth has and will continue to meet and even exceed the expectations set forth by the City of South Bend. PARTNERSHIP & UNDERSTANDING As stated above, Mr. Holth has been a part of construction as both a contractor and construction inspector. This gives him a unique perspective on multiple aspects of the projects he oversees as well as a better understanding of how to communicate and partner with the Contractor. This impressive level of communication promotes smooth and timely resolutions to issues that may occur during construction. Mr. Holth in turn also has the experience and skillset required to propose a variety of constructibility and cost saving options to his clients. COMMITMENT TO SOUTH BEND When selecting a firm for construction inspection, the South Bend engineering team will need to consider several different attributes of the firm you choose to help ensure you receive the best finished product possible. Is the firm familiar with our city standards and staff? Does the inspection firm have any past relationships with the design firm? Does the firm have a relationship with the potential contractors that will bid this project? Do we have any past history with the individual proposed to lead this project and what results did that person produce? HWC Engineering and Mr. Holth can answer yes to all of these questions. In the last three years, he has helped manage Western Avenue Streetscape Phase III and Olive Street Reconstruction Phase I. Why risk selecting a firm that MAY deliver results when you already know HWC and Chris Holth WILL deliver results. RESPONSIBLE OFFICE 135 N. Pennsylvania Street Suite 2800 Indianapolis, Indiana 46204 South Bend TEAM PROJECT APPROACH RELEVANT EXPERIENCE 2HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW FIRM OVERVIEW DYNAMIC • 27 full- and part-time inspectors located in 16 Counties throughout Indiana • Lead projects from ground breaking to ribbon cutting EXPERIENCED • Extensive experience with INDOT and LPA procedures • Team members regularly attend municipal training and INDOT trainingAs an INDOT-certified engineering firm, our professionals are fully prepared to assist your community with every facet of transportation project delivery, from concept development through planning, design, and construction inspection. With a reputation for completing projects on time and within budget, our INDOT-certified, solutions-driven staff is prepared to guide your project from the preconstruction stages through project completion. CONSTRUCTION INSPECTION CONSTRUCTION ENGINEERING • Construction observation services for roadway, trail, & bridge projects OUR INSPECTION STAFF IS SPECIFIC SERVICES PLANNING, STUDIES, FUNDING • Transportation planning • Traffic studies • Environmental studies • Funding assistance (federal-aid highway funding for LPA projects) DESIGN • Bridge design • Road design (rural systems) • Street design (urban systems) • Highway design (arterial systems) • Signalization • Intersection upgrades & roundabouts • Old Salem Road - Utica, IN • Olive Street Reconstruction Phase I - South Bend, IN • Lafayette Avenue Reconstruction - Terre Haute, IN • SR 42 Reconstruction - Mooresville, IN • US 31 and Mallory Road - Franklin, IN • Wheeling Avenue Reconstruction - Muncie, IN • Bloomfield Avenue Improvements - Bloomington, IN • Allisonville Road Reconstruction - Fishers, IN • Western Avenue Streetscape Phase III, South Bend, IN • Heavy Haul Road Reconstruction - Jeffersonville, IN • US 41 Resurfacing Project - Fowler, IN • Union Street Reconstruction - Winchester, IN • SR 159 Resurfacing - Terre Haute, IN • King Street Reconstruction - Franklin, IN • SR 256 Reconstruction - Austin, IN • Burkart Boulevard Bypass - Seymour, IN • US 31 Resurfacing Project - Franklin, IN • Sign Replacement - Scott County, IN TRANSPORTATION INNOVATIVE • Field equipment and software upgrades ensure up-to-date industry technology • Several team members have INDOT Stormwater Level 1 Certifications and two have CESSWI Designations • 10 Hour and 30 Hour OSHA Training Certifications • National Highway Institute MOT Training and OSHA Fall Protection Training • Drone Pilot Licenses to take real-time photos on select projects Our INDOT & Local Road Inspection Projects Include: TEAM PROJECT APPROACH RELEVANT EXPERIENCE 3HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW CITY OF SOUTH BEND ASSISTANT CITY ENGINEER Leslie Biek, PE PROJECT TEAM 90% HWC ENGINEERING 13.1 Construction Inspection 10% MCCORMICK ENGINEERING, LLC (DBE) 13.1 Construction Inspection MCCORMICK ENGINEERING, LLC HWC ENGINEERING JON DAY Inspection Services Manager HWC ENGINEERING CHRIS HOLTH Project Supervisor HWC ENGINEERING TRACY MCCORMICK, PE Construction Inspector MCCORMICK ENGINEERING TEAM PROJECT APPROACH RELEVANT EXPERIENCE 4HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW Chris Holth PROJECT SUPERVISOR PROJECT TEAM CERTIFICATIONS: INDOT Certifications • Bridge Construction & Deck Repair • Construction Procedures I & II • Earthwork • Hot Mix Asphalt • Concrete Paving • QC/QA Superstructure • Quality Assurance • SiteManager • Stormwater Level I ACI Grade I Field Testing Technician HMA Field Supervisor Certification PROJECT EXPERIENCE: INDOT/LPA PROJECTS (FEDERAL AID) • Olive Street Reconstruction Phase I - South Bend, IN • Striping Project - Logansport, IN • 169th Street Reconstruction, Phases II, III, & IV - Hammond, IN* • Coolspring Avenue Reconstruction - Michigan City, IN* • Gary Marina, Phases I & II - Gary, IN* • Interurban Trail - Delphi, IN • Main Street Streetscape - Delphi, IN • Michigan Boulevard Pipe Lining - Michigan City, IN* • Prairie Street Bridge & Road Reconstruction - Elkhart, IN* • Washington Street Trail - Delphi, IN • Whiting Lakefront, Phase II - Whiting, IN* LOCALLY FUNDED PROJECTS • Carroll County 100 N 625 W Reconstruction - Delphi, IN • Western Avenue Streetscape Phase III - South Bend, IN • 2017 Bridge Rehabilitations - White County, IN • Monroe Street Water Replacement - Rochester, IN • 5th District Lighting Construction - Hammond, IN • Lake County Bridge #240 Reconstruction - Hammond, IN • Hoosier Lift Station & Ponds - White County, IN • Combined Sewer Overflow Long Term Control Plan - Royal Center, IN • King Street Reconstruction - Franklin, IN • White County Bridge #104 - Remington, IN • White County CR 1100W - Wolcott, IN • Lake County Bridge #1147 Reconstruction - Range Line, IN QUALIFICATIONS: Mr. Holth has more than 29 years of experience in the construction industry. He has 12 years of contractor experience as a Project Superintendent, QC/QA Administrator, Plant Manager, and Estimator, and 17 years of consulting experience as an Inspector and Project Supervisor. Mr. Holth’s experience includes working for local clients, INDOT, and FHWA. This experience enables him to schedule, estimate, resolve conflicts, complete testing, and provide inspection services for road, bridge, water, and sewer projects. Mr. Holth’s experience provides unmatched qualifications when working as a Project Supervisor on any given project. *Previous Employer MR. HOLTH will be able to commit 100% to this project. OF HIS TIME TEAM PROJECT APPROACH RELEVANT EXPERIENCE 5HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW PROJECT TEAM Tracy McCormick, PE CONSTRUCTION INSPECTOR *Previous Employer Jon Day INSPECTION SERVICES MANAGER QUALIFICATIONS Mr. Day manages a group of 27 part- and full-time inspectors. In this role, Mr. Day sets up and assists in inspection contract budgets, staffs all field inspection projects, ensures all staff members complete project paperwork and communicates all relevant project information to the client in an accurate and timely manner. With more than 16 years of experience, Mr. Day is skilled at evaluating problems and recommending solutions to all project challenges. Mr. Day maintains his INDOT certifications and assists with field inspection duties as needed. RELEVANT EXPERIENCE • Pearl Street Reconstruction - Greenwood, IN • Olio Road & 146th Street Reconstruction - Noblesville, IN • DPW Resurfacing in Marion County Area #3 - Indianapolis, IN • DPW Winthrop Avenue - Indianapolis, IN • DPW Curb & Sidewalk - Indianapolis, IN • King Street Reconstruction - Franklin, IN • Breakwater Apartment Complex - New Albany, IN • Martin Street Reconstruction - Muncie, IN • Allisonville Road Reconstruction - Fishers, IN • Kitselman Trail & Bridge Phase I - Muncie, IN • Bridge #193 - Vigo County, IN QUALIFICATIONS Ms. McCormick, PE has more than 25 years of engineering experience within planning, design and construction observation of civil engineering projects. Ms. McCormick is client focused, self-directed and results oriented. She is the co- founder of McCormick Engineering, LLC, a firm recognized by the State of Indiana as a Women’s Business Enterprise (WBE) and Disadvantaged Business Enterprise (DBE). RELEVANT EXPERIENCE • Olive and Sample Roadway Reconstruction Phase I - South Bend, IN • Gumwood Road Reconstruction Phase I & II - St. Joseph County, IN • Cleveland and Ash Roundabout - St. Joseph County, IN • Michigan Boulevard Reconstruction Project - Michigan City, IN • 169th Street Reconstruction - Hammond, IN • 45th Avenue Reconstruction - Lake County, IN • Edison Road - South Bend, IN • Old US 30 - Kosciusko County, IN • County Road 400N/Vale Park Road at State Road 49 - Valparaiso, IN • Cleveland Road - St. Joseph County, IN • Kercher Road - Goshen, IN • McKinley Road and Ash Road - St. Joseph County, IN TEAM PROJECT APPROACH RELEVANT EXPERIENCE 6HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW PRE-CONSTRUCTION MAY 2022 FINAL RECORDS WINTER 2022-2023 CONSTRUCTION SUMMER/FALL 2022 BID MARCH 2022 INSPECTION OF OLIVE STREET PHASE 2 ROAD IMPROVEMENTS AT RAILROAD CROSSING (DES # 1902178) LAPORTE DISTRICT PROJECT UNDERSTANDING This project includes construction of a three-lane road with a 10’ multi-use path which crosses a set of existing railroad tracks. The section of roadway being constructed is on Olive Street at the Norfolk Southern Railroad Crossing located between Tucker Drive and Indiana Court. The project is located in South Bend, IN. As shown on previous pages, Mr. Holth has inspected a variety of projects including both roadway reconstruction and trail/path projects. He has also overseen reconstruction of a prior section of Olive Street so he is well versed with this roadway segment and any potential issues that may arise in this area. This previous knowledge will help HWC streamline any field issues for Phase II construction. His prior career as a contractor also provides him a better understanding of the entirety of the project including how each component is constructed. Mr. Holth has become a recognizable and trusted partner to the City of South Bend. He understands and strives to exceed the expectations that your City sets forth and is prepared to grow his successful resume of work in South Bend. PROJECT APPROACH HWC’s project approach is focused on continuing to grow the confidence the City of South Bend has in our firm by assigning a familiar and proven Project Supervisor, Chris Holth. The level of accomplishment and success of not just our firm, but also of Mr. Holth, will help to execute this project on time, on budget, and always with the safety of the traveling public in mind. Mr. Holth prides himself on a high level of attention to detail and derives from his past construction experience an unmatched level of understanding of each aspect of a construction project. Each project has its unique components but HWC has a step above the competition with an inspection team with experience in not only construction inspection, but also with team members certified in both utility and railroad coordination. With this project directly affected by a railroad crossing, this certification and expertise will bring added value to our inspection team for this project. Our team also possesses knowledge and course certifications in stormwater level 1 and 2, maintenance of traffic, OSHA 10 and 30 hour, multiple asphalt courses, and is both equipped and well versed in all testing methods applicable to this type of project. Mr. Holth specifically has managed almost all of his resume of work within the LaPorte District and has developed a powerful working relationship with this entity that is continually strengthened by his exemplary performance. HWC builds on this level of trust and familiarity to assure that Mr. Holth will continue to oversee that projects are constructed in a manner that yields a quality, lasting product. TEAM PROJECT APPROACH RELEVANT EXPERIENCE 7HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW HWC and Mr. Holth will assure that the contractor implements and maintains the proper maintenance of traffic components to setup a successful detour for Olive Street. He is already familiar with the vehicular and pedestrian traffic needs of this location from his past experience working in South Bend especially his experience overseeing the reconstruction of a prior section of Olive Street. Mr. Holth can apply the lessons learned from the other section of Olive Street to assure the maintenance of traffic applicable to this current section goes smoothly. He will hold a pre-closure meeting with the Contractor, INDOT, and City of South Bend representatives to ensure that detour routes address the needs of the traveling public and local industrial park and does not conflict with adjacent projects. He also has experience in communicating with home and business owners to make sure that their concerns are heard and access issues addressed. Again, his current familiarity with these businesses give Mr. Holth an advantage over our competitors for MOT coordination for this project. The Importance of Railroad Coordination Although this project encompasses a smaller footprint than Phase I construction of Olive Street, it will entail the same level of detail and coordination due to the railroad crossing within the project limits. This unique aspect to this project will dictate the overall success or failure of the Olive Street corridor reconstruction. Mr. Holth’s 29 years of experience will help him with railroad coordination. On top of this, one of our inspection team members recently attained their railroad coordination certification from INDOT. As we all know, successful coordination with a railroad can make or break the construction schedule on these type of projects. Mr. Holth’s relationship with the design team will be a key dynamic to ensuring success on railroad coordination. Having already built a trusting relationship through their coordination on Phase I project issues will carry itself forward to Phase II construction. Maintenance of Traffic (MOT) TEAM PROJECT APPROACH RELEVANT EXPERIENCE 8HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW PROJECT UNDERSTANDING & APPROACH Several different skill sets are required to successfully manage and inspect an INDOT project. Materials need to be tested and certifications obtained. Weekly erosion control reports, contractor payrolls, and traffic reports need reviewed for accuracy and compliance. But, ultimately, job success usually comes down to one word; MONEY. Budget control is imperative to success and INDOT makes it a focal point on their performance scoring. We coach our teams to constantly check and identify value engineering opportunities in both their inspection and construction budgets. Specific to the two projects managed by Mr. Holth in 2020, he has exemplified this goal. For his bridge project in Lake County, the contractor finished under budget by 3% and Mr. Holth gave $12,000 of our original inspection fee back to the client. On his White County road project, the contractor completed the project 1% under the construction bid amount even with almost $100,000 in change order costs. Mr. Holth gave $2,000 of our original inspection fee back to the client. HWC doesn’t have to sell Mr. Holth’s abilities; rather, all you need to do is ask his former clients and they will gladly share their praise on Mr. Holth’s budget control and overall inspection skill set. CONSTRUCTION & INSPECTION BUDGET EMPHASIS EXPERIENCED PARTNERSHIP HWC and McCormick Engineering have a long-standing working relationship which provides a cohesive team and also a varied level of experience to handle any field issues that may come up. To this point, our firms are currently partnered together on the Olive Street Phase I construction inspection contract. We are a firm believer that this continued partnership carries forward to the benefit of our clients. Our teams familiarity and experience not only on a variety of different projects, but specifically in South Bend has also helped to build rapport with local utility companies and the contractors who execute this work. The proposed team of inspection firms are well versed in roadway construction and understand the specific needs of this project. They are prepared and capable to identify and solve issues during construction but also to review and find any potential issues with the contract documents and plans. This assures constructibility concerns are addressed throughout the project. The level of attention to detail our team offers enables them to easily and quickly diagnose issues during each stage of construction to make sure that Olive Street will be built to the expectations of South Bend and yield lasting, quality results. INDUSTRY INNOVATION HWC strives to provide our customers with a continually-growing level of innovation within the industry. We accomplish this through advancements in technology and regular training opportunities for our staff to broaden their diverse range of skill sets. Our personnel have obtained training in OSHA, Stormwater Management Level 1 and 2, National Highway Institute MOT training, HMA seminars, and utility and railroad coordination certifications just to name a few. HWC also owns our own testing equipment, and all of our inspection staff stay up to date on applicable INDOT testing proficiencies. We regularly add to our inventory of equipment to make sure our staff has up to date and reliable devices to fulfill our project needs. Not only does HWC maintain equipment for testing, we are also branching into new forms of inspection that can be offered to our clients. HWC currently has two inspection staff members that are drone certified and can utilize this innovative technology to provide you with before, during, and after construction pictures and video, if requested. This will allow you to clearly see each step of the project you are investing in and how you have improved your City’s infrastructure. $A CONTINUED RELATIONSHIP As you are aware, HWC has had the opportunity to inspect two recent projects with the City of South Bend, including Western Avenue Phase III Streetscape and Olive Street Reconstruction Phase I. We are also currently assisting the city with design of the next phase of Western Avenue. HWC continues to pride ourselves on keeping all of our current clients as repeat clients. Mr. Holth has exemplified this statement by his success on his last two South Bend inspection projects. Over the past six years our construction inspection team has doubled in size to 27 certified inspectors. We did not take any past opportunities for granted and we look forward to again showcasing our team’s talents to South Bend on Olive Street Phase II and helping your community achieve their long term infrastructure goals. HWC will continue to build these relationships and maintain the level of trust we have earned with South Bend through our impressive level of communication. Whether this is through regular daily interactions, bi-weekly progress meetings or our weekly reports, Mr. Holth will assure that South Bend is up to date and well informed on not only the progress of the Olive Street Phase II project, but also any potential issues that may arise as well as construction or value engineering options throughout construction. TEAM PROJECT APPROACH RELEVANT EXPERIENCE 9HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW RELEVANT EXPERIENCE: HWC HWC is responsible for full time inspection of the reconstruction of Olive Street in South Bend, IN. The project includes the removal of the existing roadway and reconstructing it with QC/QA concrete due to the extensive truck traffic. This project includes excavation for roadways, subgrade treatment, QC/QA PCCP paving, QC/QA asphalt paving, storm sewer, sanitary sewer reconnections, water main service reconnections, lighting, striping and signage. This project also includes tie-in approaches to State Road 23. This LPA project is being funded by the City of South Bend and INDOT. Project cost is anticipated to be $3.5 million. The project is expected to be substantially complete in October of 2021. Chris Holth is managing this project for HWC. HWC was responsible for full time construction inspection of a streetscape along Western Avenue in South Bend. Scope included earthwork, asphalt and concrete pavement, sidewalks, permeable pavers, storm sewer separation, water main, landscaping and lighting. A new 12” water main was installed with new service lines to businesses in this area. A new storm sewer was installed to separate it from the existing combined sanitary sewer. Beautification was added by installing decorative lighting, permeable paver parking areas and walk areas and planting trees and shrubs. Benches and bike racks were also added throughout the site. This project was completed in November 2019 at a cost of $2.6 million. Chris Holth managed this project for HWC. Western Avenue Streetscape Phase III South Bend, IN Olive Street Phase I South Bend, IN TEAM PROJECT APPROACH RELEVANT EXPERIENCE 10HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW RELEVANT EXPERIENCE: HWC HWC was responsible for full time inspection of the Lafayette Avenue project in Terre Haute, Indiana. This project includes reconstruction of Lafayette Ave and portions of 25th Street between Fort Harrison Road to Haythorne Avenue, approximately 1.1 miles. The project included the relocation of the centerline of the existing roadway, installation of a new Storm Sewer system with detention pond, installation of concrete curb and gutter, concrete sidewalks, ADA ramps, concrete approaches, and a center turn lane. A new traffic signal was installed at the 25th Street and Lafayette Avenue intersection, and new traffic signal loops were sawed in at Fort Harrison Road and Haythorne Avenue. The existing railroad crossing was widened and updated from a two lane signalized crossing to a wider crossing with signalized lights and gates with a center curb island. Coordination between the Indiana Railroad and their Subcontractor RJ Cormann for the closure of Lafayette Avenue and Detour Route was essential for a smooth transition during construction. This LPA project was funded by the City of Terre Haute and INDOT. Project cost was $7.99 million. HWC was responsible for full time inspection of the reconstruction of MLK Jr. Boulevard in Anderson, Indiana. The scope of this project included the reconstruction of MLK Jr. Boulevard and corresponding intersections at 67th Street and 73rd Street. In several sections of the project, existing PCCP was removed and replaced. In other areas, full depth PCCP patching was performed. These areas were then milled 1.5” and 4.5” of new asphalt was installed. To help alleviate drainage issues along this corridor, the finished intersection elevations were raised 3”. Other project dynamics included removal and replacement of the existing concrete center curb, replacement of select sections of concrete curb and gutter, and installation of new signal detector housings and corresponding signal loops. Construction cost was $2.29 million and the project was completed in the summer of 2021. This project was fully funded by the City of Anderson. MLK Jr. Boulevard Reconstruction/Overlay Anderson, IN Lafayette Avenue Reconstruction Terre Haute, IN TEAM PROJECT APPROACH RELEVANT EXPERIENCE 11HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW RELEVANT EXPERIENCE: HWC HWC provided construction inspection services for the Allisonville Road Reconstruction from 126th Street to 131st Street project in Fishers, Indiana. The project turned a two-lane roadway into a four-lane roadway with added turn lanes at the two signalized intersections. The project included replacement of a three-sided structure over Shoemaker Ditch, full-depth pavement replacement with added curbs, drainage system and a multi-use path. The project also included intersection improvements with updated signals and pedestrian crossings and lighting additions throughout the corridor. This $9.2 million LPA project was funded by the City of Fishers and the Indiana Department of Transportation. This project was completed in September 2019. HWC was responsible for full-time inspection of the Wheeling Avenue project in Muncie, Indiana. This project included both resurfaced and fully reconstructed sections of roadway with widening. New signage and traffic signals were placed. New sidewalk and corresponding drive approaches, curb, and ADA ramps were installed on the east and west sides of Wheeling Avenue. New storm sewer pipe and structures were installed throughout project limits. The project was funded by INDOT and the City of Muncie. The project cost was $4.25 million. The project was completed in May 2021. Wheeling Avenue Reconstruction Muncie, IN Allisonville Rd Reconstruction from 126th St. to 131st St. Fishers, IN TEAM PROJECT APPROACH RELEVANT EXPERIENCE 12HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW RELEVANT EXPERIENCE: HWC HWC was responsible for the inspection for the construction of Phase IV of the King Street Rehabilitation project in Franklin, Indiana. This project was a portion of the overall Franklin Gateway corridor into downtown Franklin. This project included both full depth and partial depth PCCP patching. A fiberglass geogrid was then placed atop the concrete pavement and the entire corridor received three lifts of asphalt. Other project dynamics included new concrete curb and gutter, storm sewer, decorative lighting, striping, a new HMA trail, and several decorative trail nodes with unique aesthetic features. Limestone blocks, trees, sod and irrigation were added along the roadway to complete the overall look of the corridor. This LPA project was funded by the City of Franklin and INDOT, and the project cost was $4.53 million. McCormick provided subconsultant observation services for $5.6 million intersection improvement project. The project included concrete pavement sections, the addition of turn lanes, new storm sewers, and other drainage features, and upgraded signalization and lighting. They also observed daily construction activities for compliance with construction plans and technical specifications, prepared Daily Work Report in SiteManager to account for quantity and location of items placed, tested concrete and subgrade treatment, and attended bi-weekly progress meetings.. McKinley Road & Ash Road St. Joseph, IN King Street, Phase IV Road Rehabilitation Franklin, IN Standard RFP Form Ver. 3-01-2021 (Rev. 06/27/18) Des. #: 1902178 Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE) I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f). I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confirm that the firms listed below are currently certified DBEs: INDOT: https://entapps.indot.in.gov/DBELocator/ KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx I certify that I have contacted the certified DBE’s listed below, and if my company becomes the CONSULTANT, these DBEs have tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division. I.DBE Subconsultants to be applied toward DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* 3% % % % II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* % % % of negotiation of contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these or other certified and approved DBE firms. McCormick Engineering, LLC 13.1 Estimated Total Percentage Credited toward DBE Goal: 3% Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal: 7% Company Name: Hannum, Wagle and Cline Engineering (HWC Engineering) Signature: Jim Rice Date: 09/14/2021 ∗ It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result 7% 13.1McCormick Engineering, LLC