HomeMy WebLinkAboutAward Quote - Laurel Woods Drainage Improvements Proj No. 121-007R - Selge Construction Co., Inc.
ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR MURRAY L. MILLER
1316 COUNTY-CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/ 235-9251
FAX 574/ 235-9171
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
August 24, 2021
Mr. Robert Kuhns
Selge Construction Co., Inc.
2833 South 11TH St.
Niles, MI 49120
aswinehart@selgeconstruction.com
RE: Quotation Award – Laurel Woods Drainage Improvements – Project No. 121-007R
Dear Mr. Kuhns:
At its August 24, 2021 meeting, the Board of Public Works awarded the above referenced
quotation to you in the amount of $125,142.
Please forward the following documents in one submittal by September 14, 2021 to my
attention for Board of Public Works approval at lhensley@southbendin.gov :
1) One (1) signed original of the Contract (enclosed); and
2) Certificate of Insurance naming the City of South Bend as an additional insured.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
/s/ Anne Fuchs
Anne Fuchs, Clerk
Enclosures
AF/lh
INTER-OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
TO: Anne Fuchs, Clerk
Board of Public Works
FROM: Becca Plantz, Project Engineer
SUBJECT: Award Project No. 121-007R
Laurel Woods Maintenance Project
DATE: August 17, 2021
On August 10, 2021 the Board of Public Works opened quotes for the above project. I have
reviewed them and found them correct.
The quoters ranked as follows:
Quoter Total Quote
Amount
1. Selge Construction Co., Inc. $125,142.00
I recommend award of a contract for Laurel Woods Maintenance Project to the lowest
responsive / responsible quoter, Selge Construction Co., Inc. in the amount of $125,142.00.
Sufficient funds have been appropriated from PROJ 228, Storm Sewer Capital.
Please call with your questions (5998).
Enc. Quote Tabulation
QUOTE TABULATION
Laurel Woods Maintenance Project
Project No: 121-007R
For Quotes Due: 8/10/2021
Item No. Description Quantity Unit Unit Price Item Total
1 Mobilization & Demobilization 1 LS 5,400.00$ 5,400.00$
2 Clearing and Grubbing 1 LS 15,000.00$ 15,000.00$
3 Excavation, Unclassified 1 LS 65,500.00$ 65,500.00$
4 Temporary Construction Entrance, No. 2 Stone 50 TON 30.00$ 1,500.00$
5 Erosion Control Blanket 650 SYS 2.60$ 1,690.00$
6 Fence, Chain Link, Reset 30 LFT 85.00$ 2,550.00$
7 Seed Mixture, Type U 650 SYS 1.20$ 780.00$
8 Topsoil 110 CYS 25.00$ 2,750.00$
9 Casting, Replace 1 EACH 750.00$ 750.00$
10 Clean Storm Sewer, 12"-24" Dia. 760 LFT 11.25$ 8,550.00$
11 Televise Sewer, 12"-24" Dia. 760 LFT 2.20$ 1,672.00$
12 Construction Dewatering 1 LS 15,000.00$ 15,000.00$
13 Maintenance of Traffic 1 LS 4,000.00$ 4,000.00$
Total 125,142.00$
I hereby certify that the above truly and accurately represents quotes received for this project on DATE
Becca Plantz, Project Engineer
Non-Collusion Affadavit Y
Selge Construction Co,, Inc.
Page 1 of 1
24th.August 21
BOARD OF PUBLIC WORKS
CITY OF SOUTH BEND, INDIANA
PUBLIC WORKS CONTRACT
This Agreement is made and entered into this 24th Day of August, 2021, by and between Selge
Construction Co., Inc., 2833 S. 11th. St., Niles, MI 49120 (the “Contractor”), and the Board of
Public Works (the "Board").
The Contractor covenants and agrees to make the following improvement, as fully set out in the
Request for Quotations, Standard Specifications, Special Provisions, Plans, and Bid Proposals, all
of which are set forth as a part of this Contract, for:
PROJECT NO. 121-007R
DESCRIPTION: LAUREL WOODS DRAINAGE IMPROVEMENTS
COMPLETION DATE: SEE SPECIFICATIONS
AMOUNT: $125,142
FUNDING: PR-00010221
The unit prices for this improvement were those prices as received and accepted by the Board on
the 10th Day of August, 2021.
The Contractor further agrees to notify the assigned Engineer when this improvement is
completed. This notification shall be in the form of a Project Completion Affidavit, signed by the
Contractor. Upon final acceptance of the improvement by the Engineer, the Contractor’s final
estimate will be presented to the Board for final Payment with one (1) copy of the Project
Completion Affidavit and one (1) copy of a Waiver of Lien.
Each of the Parties, by signing below, represents and warrants to the other Party that he/she/it has
the authority to bind the named person or entity to this Agreement.
BOARD OF PUBLIC WORKS SELGE CONSTRUCTION CO.,
INC.
President Member Printed Name
Member Member Signature
Member Attest: Anne Fuchs, Clerk
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 8/4/2021
Name Becca Plantz Department Public Works
BPW Date 8/10/2021 Phone Extension 5998
Review and Approval Required Prior to Submittal to Board Diversity Compliance
and Inclusion Officer Officer Name Michael Patton BPW Attorney Attorney Name Clara McDaniels
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Ease./Encroach
Required Information
Company or Vendor Name
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name Laurel Woods Drainage Improvements
Project Number 121-007R
Funding Source Stormwater Capital - Sewers
Account No. PR-00010221
Amount
Terms of Contract Unit Prices & Lump Sum
Purpose/Description Maintenance to stormwater infrastructure in the Laurel Woods neighborhood.
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date:
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 8/18/2021
Name Becca Plantz Department Public Works
BPW Date 8/24/2021 Phone Extension 5998
Review and Approval Required Prior to Submittal to Board Diversity Compliance
and Inclusion Officer Officer Name Michael Patton BPW Attorney Attorney Name Clara McDaniels
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Ease./Encroach
Required Information
Company or Vendor Name Selge Construction Co., Inc.
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name Laurel Woods Drainage Improvements
Project Number 121-007R
Funding Source Stormwater Capital - Sewers
Account No. PR-00010221
Amount $125,142.00
Terms of Contract Unit Prices & Lump Sum
Purpose/Description Maintenance to stormwater infrastructure in the Laurel Woods neighborhood.
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date: