HomeMy WebLinkAboutIndustrial Wastewater Discharge Permit Renewal - Honeywell International, Inc. - TABLEDBOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 7/26/2021
Name Serena Lozano-Shane Department UTILITIES
BPW Date 8/10/2021 Phone Extension 5798
Review and Approval Required Prior to Submittal to Board Diversity Compliance
and Inclusion Officer Officer Name BPW Attorney Attorney Name
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
x Other: Industrial Discharge Permit Modification Ease./Encroach
Required Information
Company or Vendor Name
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description _______________________________________________________________
_______________________________________________________________
___________________________________________________
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date:
City of South Bend
Department of Public Works
Industrial Pretreatment Program
Remediation Site – Permit No. 004
In accordance with all the terms of Chapter 17 of the City of South Bend’s Municipal Code, and with any applicable
provisions of federal or state law and regulations, permission is hereby granted to:
Honeywell International, Inc.
3502 Westmoor Street
South Bend, IN 46628
for the contribution of wastewater into the City of South Bend Publicly Owned Treatment Works.
This permit is granted in accordance with the application filed on 14 January, 2020.
Effective on: 14 April, 2020
Expires on the: 13 April, 2025
Revised on: August 10, 2021
Any violation of the terms and conditions of this permit shall be deemed a violation of the City of South Bend Municipal
Code and will subject the permittee to the sanctions set out in section 17-11 through 17-13 of the Municipal Code.
The permittee shall file an application for a renewal permit, a minimum of 90 days prior to the expiration date.
Approved By: Board of Public Works
_________________
Elizabeth A. Maradik, President
_________________
Gary A. Gilot, Member
_________________
Jordan V. Gathers, Member
_________________
Josheph Molnar, Member
_________________
Murray Miller, Member
_________________
Attest: Anne Fuchs, Clerk
Honeywell Groundwater Remediation Industrial Wastewater Discharge Permit page 4 of 39
The following parameters shall be monitored at sample site 003C00175 with the methods and at the frequency stated
below:
Parameter Sampling Frequency Sampling Type
Flow, Monthly (gal) Monthly Continuously
Total Oil and Grease (mg/L) SemiAnnual Grab
Oil and Grease TPH (mg/L) SemiAnnual Grab
pH (SU) SemiAnnual Grab
Ammonia, nitrogen (mg/L) Once per Permit Cycle Composite
Arsenic (mg/L) Once per Permit Cycle Composite
BOD5 (mg/L) Once per Permit Cycle Composite
Cadmium (mg/L) Once per Permit Cycle Composite
Chromium (mg/L) Once per Permit Cycle Composite
Closed Cup Flashpoint (Degrees F) Once per Permit Cycle Grab
Copper (mg/L) Once per Permit Cycle Composite
Cyanide (mg/L) Once per Permit Cycle Grab
Lead (mg/L) Once per Permit Cycle Composite
Mercury (mg/L) Once per Permit Cycle Grab
Nickel (mg/L) Once per Permit Cycle Composite
Organic Priority Pollutants (ug/L) Once per Permit Cycle Grab
Phosphorus (mg/L) Once per Permit Cycle Composite
Silver (mg/L) Once per Permit Cycle Composite
TSS (mg/L) Once per Permit Cycle Composite
Zinc (mg/L) Once per Permit Cycle Composite
A. Monitoring Definitions
1. Composite – Samples are obtained through flow-proportional sampling technique over a 24-hour
period or for the duration of discharge within the 24-hour sampling period, including multiple
batches of wastewater. If the permittee demonstrates that time-proportional sampling is accurate
or as representative as flow-proportional sampling, then a time-proportional sample may be
collected.
a. If the permittee chooses to demonstrate that time-proportional sampling is accurate or as
representative as flow-proportional sampling, the permittee must submit a request, which
includes the certification statement found in Part III (A) (4) signed by the Authorized
Representative [see Part IV (B) (15)], within 120 days of the effective date of this permit