Loading...
HomeMy WebLinkAboutChange Order No 1 & PCA - Charles Martin Parking Lot Proj No. 120-051R - Rieth-Riley Construction Co., Inc.  ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS August 10, 2021 Mr. Ruben Alvarado Rieth-Riley Construction Co., Inc. 25200 State Road 23 South Bend, IN 46614 ralvarado@rieth-riley.com RE: Change Order No. 1 (Final)/Project Completion Affidavit Charles Martin Parking Lot – Project No. 120-051R Dear Mr. Alvarado: At its August 10, 2021 meeting, the Board of Public Works approved the Final Change Order for this project, for an increase of $10,999.03. The final contract amount is $50,395.03. In addition, the Project Completion Affidavit for this project was approved in the amount of $50,395.03. Copies of the Change Order and Project Completion Affidavit are enclosed for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, /s/ Anne Fuchs Anne Fuchs, Clerk Enclosures AF/lh INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Anne Fuchs, Clerk Board of Public Works FROM: Zach Hurst, Project Engineer SUBJECT: Change Order and Closeout Paperwork 120-051R Charles Martin Parking Lot DATE: July 15, 2021 The enclosed documentation contains necessary paperwork for closeout of the subject project, including a Project Completion Affidavit and a Waiver of Lien. The amount of the change order exceeds the 20% limit as set by Indiana State Code. The change order (final) is explained below. During the milling of the parking lot, it was discovered that several ‘soft’ areas of asphalt existed under the parking lot, essentially having been worn down to fine graded soil beneath. Extra asphalt was required to bridge over or fill these softer areas. While a quantity of approximately 20 tons was included in the original contract to account for areas like this, the total over-run was 40 tons, or roughly one extra truckload of asphalt. Also during the milling operation, it was discovered the eastern drywell, outside the rear entrance to the building, had failed and required full replacement. This required a new precast concrete structure, and a separate pipe crew for the contractor to install. Neither of the adjustments required to the contract could have been reasonably foreseen. August 10, 2021 DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Project Number: _______________ Project Name: __________________________ Change Order #: ____ DATE INITIATED:BPW DATE: Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Attachments: (List documents support change required) Amount of Increase / Decrease: $____________________Categories (Pick One): Scope of Work Differing Site Conditions, Changed Conditions Conflicted Specifications and Drawings Failed Materials Error Omission Final Quantity Adjustment _______________________ Previously approved Change Order(s): $___________________ Current Percent of Change: ____________________ % New Total Amount: $____________________ Total Percent of Change: ____________________ % Funding Secured From: __________________________ (filled out by PM) RECOMMENDED BY: (Signature)(Date)Project Inspector (Print Name) APPROVED BY: (Signature)(Date)Engineering Project Manager (Print Name) From:Drew Snodderly To:Zach Hurst; Jamie Czarnecki Cc:Jason Robbins; Joe Wolf III Subject:Charles Martin Parking Lot 120-051R - Drywell Price and Scheduling Date:Friday, June 18, 2021 4:04:06 PM Attachments:image001.jpg image002.jpg Zach, Our Change Order price for replacing the drywell at the Charles Martin Parking Lot Project No. 120- 051R is $8,220.00 (1 LSUM). That price includes removal of the existing drywell, and installation of one new 1,200 Gallon Drywell. We have anticipated re-using the existing frame and grate casting for the new drywell and have therefore not included the cost of a new frame and grate in this price. Please also note that any tie-ins to equalizer and/or downspout drainage pipes that may flow to the existing drywell have not been included in this price as we were not able to see any such pipes during our field inspection of the existing drywell and therefore did not anticipate needing to perform any such work. As we discussed over the phone, we have scheduling availability to install this drywell tomorrow on Saturday 6/19/2021 provided that we have the City’s approval of this additional cost to the project and the City’s authorization to work on this specific Saturday. Please reply back to this e-mail at your earliest convenience to either approve or deny this change order pricing and scheduling request. Thank you, Drew D  Snodderly This e-mail and any attachments thereto, are intended only for use by the addressee(s) named herein and may contain legally privileged and/or confidential information. If you are not the intended recipient of this e-mail (or the person responsible for delivering this document to the intended recipient), you are hereby notified that any dissemination, distribution, printing or copying of this e-mail, and any attachment thereto, is strictly prohibited. If you have received this e-mail in error, please respond to the individual sending the message, and permanently delete the original and any copy of any e-mail and printout thereof. ­­     From: Zach Hurst <zhurst@southbendin.gov>  Sent: Tuesday, June 15, 2021 2:23 PM To: Drew Snodderly <dsnodderly@rieth-riley.com>; Jamie Czarnecki <jczarnecki@rieth-riley.com> Subject: RE: Charles Martin Parking Lot HMA Mix Design Submittal August 10, 2021 Rieth Riley Construction Co., Inc. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 07/30/2021 Name Zach Hurst Department DPW BPW Date 08/10/2021 Phone Extension 3057 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. 1 PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Rieth-Riley Construction Co., Inc. New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Charles Martin Parking Lot Project Number 120-051R Funding Source RWDA TIF Account No. PR-00003785 Amount $10,999.03 Change Order; $50,395.03 Final Contract Amount Terms of Contract Purpose/Description Change order and completion affidavit for subject project. CO covers over- runs in asphalt and drywell replacement. For Change Orders Only Amount of Increase Decrease $ 10,999.03 ($ ) Previous Amount $ 39,396.00 Current Percent of Change: Increase Decrease 27.9% ( %) New Amount $ 50,395.03 Total Percent of Change: Increase Decrease 27.9% ( %) Time Extension Amount: New Completion Date: