HomeMy WebLinkAboutSewer Service Agreement & Title Sheet - Extends 200 Ft. of Public Sanitary Sewer Main – South Bend Heritage Foundation, Inc.
ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR MURRAY L. MILLER
1316 COUNTY-CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/ 235-9251
FAX 574/ 235-9171
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
July 13, 2021
Mr. Marco Mariani
South Bend Heritage Foundation, Inc.
803 Lincoln Way West
South Bend, IN 46616
marcomariani@sbheritage.org
RE: Sewer Service Agreement
Dear Mr. Mariani:
At its July 13, 2021 meeting, the Board of Public Works approved the above referenced
agreement to extend 200 feet of public sanitary sewer main at Hope Ave. to Victoria Ave. to
provide municipal connection for twenty-two (22) permanent supportive housing units.
Enclosed please find a copy of the agreement for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-9251.
Sincerely,
/s/ Anne Fuchs
Anne Fuchs, Clerk
Enclosures
AF/lh
EXHIBIT A
DEDICATED IMPROVEMENTS
CITY OF SOUTH BEND, INDIANADEPARTMENT OF PUBLIC WORKSPROJECTSEWER WATERTRAFFICSTREETOTHERAPPROVED BY BOARD OF PUBLIC WORKSAPPROVED BY PUBLIC WORKS STAFFHOPE AVENUESEWER EXTENSIONCITY PROJECT NUMBER DP20-054SEWER EXTENSION TO SERVE NEW HOPE AVENUE BUILDING DEVELOPMENTCITY OF SOUTH BEND, INDIANA PREVAILING SPECIFICATIONS LATEST EDITION,TO BE USED WITH THESE PLANS.PROJECTLOCATIONREGISTEREDSTATE OFBRADLEY A.WHITE7/1/20217/1/202107/02/2021
EXHIBIT B
ENGINEER’S ESTIMATE
EXHIBIT B
ENGINEER’S ESTIMATE
Kyle,
I have evaluated the sewer extension to determine an estimated cost. This cost includes the
scope associated with completing the sewer extension along Hope Avenue as indicated on sheet
C1.2. This scope includes (but is not limited to):
• A/E and survey elevations
• Excavation of the street
• Extension of the sewer line as indicated on the drawing
• Installation of new manholes
• Repair and pave the street in accordance with City of South Bend Construction Standards
and Specifications
• Street closure permit and barricades
The total estimated cost for the work is Fifty Five Thousand Dollars ($55,000.00).
As such, a bond of Sixty Eight Thousand Seven Hundred Fifty Dollars ($68,750.00) is required
to satisfy the 125% performance bond requirement.
Sincerely,
Alliance Architects,
Bradley A. White, P.E.
Project Engineer
EXHIBIT C
PERFORMANCE BOND
IN5606556
South Bend Heritage Foundation
South Bend Indiana
Indiana
City of South Bend
Five Thousand Dollars $5,000.00
Site Improvement Contractor - Compliance Only
2nd
July 2021 2nd July
2022
2nd July 21
South Bend Heritage Foundation
Nicole L Bicknell Attorney-in-Fact
Sixty Eight Thousand Seven Hundred Fifty Dollars
Merchants Bonding Company (Mutual)
Jennifer L. Kasznia Attorney-in-Fact
7th
POWER OF ATTORNEY
MERCHANTS BONDING COMPANY (MUTUAL)
MERCHANTS NATIONAL BONDING, INC.
President
Notary Public
Secretary
Nicole L BicknellJennifer L. Kasznia
7th
7th
7th
EXHIBIT D
SYSTEM DEVELOPMENT CHARGE
Estimate Provided On:4/13/2021
Estimate Provided By:C. Brach
Values Unit Type
Multi-Family Dwelling # of Unit Types 22 units
Estimated Flow (gpd) for Multi-Family Dwelling 310 per unit
Estimated Total Flow for Multi-Family Dwelling 6820 gpd
Estimated Total Flow for SBH PSH Hope Ave 6820 gpd
ERU calculation 22.000 ERU
ERU rounddown 22 ERU
Sewer SDC Calculation ($1145 per ERU)
Water SDC Calculation ($475 per ERU)
Estimated Amount Due for SBH PSH Hope Ave
Estimated 10% Discounted Total (Payment in full)
Estimate for System Development Charges
SBH PSH Hope Ave
South Bend, IN
(1) For purposes of this section "ERU" shall be defined as an equivalent residential unit which means a single family
residence. For purposes of customers that are not single family residences, one (1) ERU shall equal estimated wastewater
flows of three hundred ten (310) gallons per day. No customer will be less than one (1) ERU. There will be no partial ERU's.
The City shall round down to the closest applicable ERU calculation at all times.
(3) System development charges per ERU shall also be collected from existing customers undertaking activities
producing a permanent increase in wastewater flow of greater than three hundred ten (310) gallons per day. This
subsection shall not apply to an existing customer who has, by contract, purchased reserved capacity from the City so
long as the customer's flows remain within the reserved capacity. A permanent increase shall be deemed to have
occurred when the average flow rate for six (6) consecutive months exceeds the current flow rate by at least three
hundred ten (310) gallons per day.
Per the Ordinance of the Common Council of the City of South Bend, System Development Charges are summarized
below from Sections 17-79 and 17-80:
(2) Except as provided in Subsections (5) and (6) of this section, for every new connection to the South Bend Municipal
Sewer Works, a system development charge of one thousand one hundred forty-five dollars ($1,145.00) shall be
collected per ERU and additional portion thereof to be connected. All charges shall be billed by the City at the time the
application for service is filed.
Sec. 17-79. - System Development Charge for Wastewater inside and outside City limits.
(4) For multifamily structures (e.g., apartments, condominiums, mobile home communities), each individual unit shall be
one (1) ERU. For all other types of structures, the ERU calculation shall be based upon the ratio of Average Daily Flow as
computed pursuant to 327 IAC 3-6-11 in relationship to three hundred ten (310) gallons per day. For structures not listed in
327 IAC 3-6-11, the ERU shall be calculated as the relationship between the Average Daily Flow reported in the sewer
capacity certification for the structure and three hundred then (310) gallons per day.
35,640.00$
32,076.00$
**Estimate is based on projected uses and calculations provided by owner/consultant**
25,190.00$
10,450.00$
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 7/7/2021 Department Engineering
Name Kyle Silveus Phone Extension
BPW Date 7/13/2021 Phone Extension -
Review and Approval Required Prior to Submittal to Board Diversity Compliance
and Inclusion Officer Officer Name BPW Attorney Attorney Name Clara McDaniels
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. Resolution
Chg. Order, No. Traffic Control Ease./Encroach
Other: Sanitary Sewer
Extension Agreement
Ease./Encroach
Required Information
Company or Vendor Name South Bend Heritage Foundation
New Vendor Yes If Yes, Approved by Purchasing
No Completed E
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name Hope Ave. Sewer Extension Agreement
Project Number DP20-054
Funding Source N/A
Account No. N/A
Amount N/A
Terms of Contract N/A
Purpose/Description This is an agreement for the public sewer extension to serve the New Hope
Ave. building development. The project extends 200’ of public sanitary
sewer main in Hope Ave., from a sewer main in Victoria Ave. The
extension provides municipal collection for 22, permanent supportive
housing units.
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)