HomeMy WebLinkAboutOpening of Quotes - Laurel Woods Drainage Improvements Proj No. 121-007 - Selge Construction Co., Inc.BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 6/25/2021 Name Becca Plantz Department Public Works BPW Date 7/13/2021 Phone Extension 5998 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name Michael Patton BPW Attorney Attorney Name Clara McDaniels Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Laurel Woods Drainage Improvements Project Number 121-007 Funding Source Stormwater Capital - Sewers Account No. PR-00010221 Amount Terms of Contract Unit Prices & Lump Sum Purpose/Description Maintenance to stormwater infrastructure in the Laurel Woods neighborhood. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: Version 2/14/2020 Page - 1 Public Works Quote CONTRACT DOCUMENTS AND SPECIFICATIONS for LAUREL WOODS MAINTENANCE PROJECT Project No. 121-007 Prepared for City of South Bend, Indiana Board of Public Works By David L. McCormick, PE, D.WRE Registered Professional Engineer State of Indiana No. 19800330 McCormick Engineering, LLC 234 N. Ironwood Dr South Bend, IN 46615 (574) 232-6800 FOR QUOTES DUE: July 13, 2021 Version 2/14/2020 Page - 2 Public Works Quote LAUREL WOODS MAINTENANCE PROJECT Project No. 121-007 TABLE OF CONTENTS Page No. Certification Sheet 1 Table of Contents 2 Special Provisions 3 - 17 Contractor’s Quote for Public Work 18 Equal Employment Opportunity Provisions Diversity Utilization 19-21 Minority and Women Business Enterprise Inclusion Program Plan 22 Non-Collusion Affidavit 23 -25 Quote/Proposal Sheet 26 MWBE Inclusion Forms 27-30 Excavation Permit Request Form 31-32 Traffic Control and Occupancy Request Form 33-34 Supplemental Information – Geotechnical Report Construction Plans (13 Sheets – 11x17 format) Version 2/14/2020 Page - 3 Public Works Quote SCOPE OF WORK CITY OF SOUTH BEND PROJECT NAME: Laurel Woods Maintenance Project PROJECT NO. 121-007 QUOTES DUE July 13, 2021 I. PROJECT DESCRIPTION A. The project includes the furnishing of all equipment, material, insurance, and labor for the cleaning of storm sewers, pond maintenance and associated work near Laurel Woods subdivision within the City of South Bend, IN. II. PREVAILING SPECIFCIATIONS AND CONSTRUCTION STANDARDS AND SPECIFICATIONS A. The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and CONSTRUCTION STANDARDS AND SPECIFICATIONS, most recent version, are to be used on this project. B. Each Quote provider is specifically instructed to become completely familiar with the most recent version of the PREVAILING SPECIFICATIONS and the CONSTRUCTION STANDARDS AND SPECIFICATIONS prior to submitting a quote. C. Wherever the PREVAILING SPECIFICATIONS refer to “State Specifications,” it shall mean the 2020 INDOT Standard Specifications for the letting effective after September 1, 2019. D. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS. E. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS, the SPECIAL PROVISIONS will govern. III. TERM “OR EQUAL” A. Prevailing Specifications: None B. Additions 1. Where the term "or equal" is used in these specifications, the Quote provider deviating from specified item shall file with his/her/its Quote a letter fully explaining and justifying his/her/its proposed article or equal. The City of South Bend shall be the sole judge in determining if the “or equal” offered meets the specification. IV. TAX EXEMPT A. Prevailing Specifications: None B. Additions 1. Materials and properties purchased under contract with the Owner that becomes a permanent part of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax). The exemption number will be furnished to the Contractor upon award. V. INDEMNIFICATION A. Prevailing Specifications: None B. Additions 1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents, officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees, and other expenses, arising from or out of the negligent performance of this Contract by Contractor, or because of arising out of any defect in the goods, materials or equipment supplied by the Quote provider. Version 2/14/2020 Page - 4 Public Works Quote VI. INSURANCE A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 103 B. Additions: 1. All Contractors and subcontractors doing business with the City of South Bend shall present a Certificate of Insurance showing coverage in the following minimum amount: a. General Liability: Premises-Completed Operations or Products, Bodily Injury and Property Damage Combined Single Limit - $5,000,000. b. There shall be no exclusion for explosion, collapse or underground hazard. c. Workmen’s Compensation: Statutory State of Indiana Employer's Liability - $100,000. d. Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000. e. The City of South Bend shall be named as additional insured on the Certificate of Insurance. VII. CONTROL OF WORK A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 105 B. Additions: 1. The complete responsibility for this project lies with the Director of Public Works of the City of South Bend, Indiana acting through his authorized representatives. 2. Construction Engineering - The Contractor shall provide all the necessary, qualified personnel, equipment and supplies to perform all work required under this item. There will be no direct payment for this item. 3. The contractor is responsible to maintain the site which includes but is not limited to; dust control, site security, erosion control, and protecting adjacent properties. 4. Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No work shall be permitted on weekends, Holidays, or after hours unless approved by the City of South Bend Department of Public Works. 5. Access to all properties, driveways and Public streets shall be maintained at all times throughout the Work. VIII. LEGAL RELATIONS A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 107 B. Additions: 1. The Owner, where mentioned in these documents, is the City of South Bend. The Engineer, where mentioned in these documents, is McCormick Engineering, LLC. 2. The Contractor shall apply for and obtain any and all required permits for the work from local, state, and federal agencies and shall comply with permit requirements, including the St. Joseph County / City of South Bend Building Department. 3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor shall provide the Owner with proof that the Contractor is duly licensed, qualified and registered with the Secretary of State of Indiana to engage in business within the State of Indiana. 4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner reserves the right to immediately terminate the public work project awarded should the Contractor be found to be in violation of any provision of Indiana Code 5-16-13 and such violation shall result in the forfeiture of Contractor’s performance bond to the Owner. Version 2/14/2020 Page - 5 Public Works Quote IX. PROSECUTION AND PROGRESS A. Prevailing Specifications: 2020, INDOT Standard Specifications Sec. 108 B. Additions: 1. The City, Engineer, and Contractor will hold a pre-construction meeting following award of the contract. The date of the Notice to Proceed (NTP) will be agreed at that meeting. 2. The project will have a completion date of 45 calendar days from the mutually agreed NTP. The Contractor shall not propose a date for the NTP that would result in a completion date past October 25, 2021. 3. The contract time will start when the Notice to Proceed is delivered and signed. 4. Contractor shall provide a schedule to the Owner prior to beginning any work on the site. 5. No work shall begin on the site prior to receipt of the NTP by the Contractor. X. CHANGE OF CONTRACT TIME A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 108 B. Additions 1. The Contract Time may only be changed by Change Order. Any Claim for an extension in the Contract Time shall be based on written notice delivered to the Department of Public Works within seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent of the claim with supporting data shall be delivered within fourteen (14) calendar days after such occurrence unless an official of the Public Works Department allows an additional period of time to ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost to delays beyond the control of the Contractor if a claim is made in accordance with this provision. Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God. 2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An extension is granted for weather conditions significantly more severe than normal if the Contractor demonstrates to the satisfaction of the City that the delay in the progress of the work was due to such weather. The basis to define normal weather will be the data compiled by the United States Department of Commerce, National Oceanic and Atmospheric Administration (NOAA). 3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including fault or negligence of Contractor’s subcontractors, caused the delay, or for which any remedies are provided under any other provision of this agreement. 4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of any rights or remedies existing under this contract at law or in equity. XI. DEFAULT AND TERMINATION A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 108 B. Additions: 1. Events of Default shall include Contractor’s failure to perform any of its obligations under this contract including failure to commence work at the time specified, failure to perform the work in accordance with these specifications, unauthorized discontinuation of the work, failure to carry out the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or regulations, and failure to comply with any other term of this contract. 2. If an Event of Default occurs, the City shall provide Contractor written notice and may permit Contractor ten (10) calendar days after the date of the notice to cure the default. If the default is not cured within the ten (10) day cure period, the City may at any time thereafter terminate this contract in which case the termination shall be final and effective. 3. Upon an Event of Default, the City may invoke the following remedies in addition to those remedies provided under separate provisions of this contract, the right of set-off against any payments due or to become due to the Contractor against the retainage, the right to take over and complete the Work. If the City notifies Contractor that City is invoking its right to complete the Work, all rights that the Contractor has in order under Contractor’s subcontracts are assigned to the City, subject to the City’s right to take assignment of all or only selected subcontracts at the City’s discretion. The sole Version 2/14/2020 Page - 6 Public Works Quote obligation accepted by the City under such subcontracts is to pay for Work satisfactorily performed after the date of the assignment. In the event a conditional assignment has not been executed, the Contractor shall execute or cause to be executed any assignment, agreement, or other document that may be necessary in the sole opinion of legal counsel to the City’s Board of Public Works to evidence compliance with this provision. The Contractor shall promptly deliver such documents upon the City’s request. In the case of such assignment, unless otherwise agreed in writing, The Contractor remains liable to subcontractors for any payment already involved, and for any claim, suit or cause of action based upon or resulting from any error, omission, negligence or other breach of contract by the Contractor, its officers, employees, or agents arising prior to the date of assignment to the City. XII. LIQUIDATED DAMAGES A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 108 B. Additions: 1. The contractor shall proceed with the work at such rate of progress to insure full completion within the Contract Time. It is expressly understood and agreed, by and between the Contractor and the Owner, that the Contract Time for completion of the work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the work, and excludes the time for unavoidable delays which were beyond the control and without the fault of the Contractor. 2. If the Contractor shall fail to complete the work within the Contract Time, or extension of time granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages a sum of five hundred dollars ($500.00) for each calendar day that the Contractor shall remain in default after the time of completion stipulated in the Contract Documents. 3. The Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the work is due to the following and the Contractor has promptly given written notice of such delay to the Owner and Engineer/Architect. a. To any preference, priority, or allocation order duly issued by the Owner. b. To unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God, acts of public enemy, acts of the Owner, acts of another Contractor in the performance of a Contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather. XIII. RETAINAGE AND FINAL PAYMENT A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 109 B. Additions: 1. Payments will be made every thirty (30) calendar days 2. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of payments throughout the duration of the project. 3. Before final payment and retainage are released, the Contractor must satisfy the following: a. All parts and labor meet requirements stated in the specifications. b. Provide copies of test reports or cut sheets on all materials supplied. c. Provide As-Built drawings in accordance with the City of South Bend Prevailing Specifications for Public Works. d. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final Waiver of Lien. Version 2/14/2020 Page - 7 Public Works Quote XIV. WARRANTY A. Prevailing Specifications: None B. Additions 1. All Parts shall include the following: a. Performance specifications b. Bill of Materials c. Warranties on all parts d. Installation and safety requirements XV. OTHER UTILITIES A. Prevailing Specifications: None B. Additions: 1. The Contractor shall verify the locations of all utilities by contacting Indiana811 by calling 811 (in Indiana) or 1-800-382-5544 (outside of Indiana), or via www.indiana811.org, at least two (2) working days, not counting Saturdays, Sundays or federal and state holidays before proceeding with construction. It shall also be the Contractor’s responsibility to contact any other utility that is not contacted by Indiana811 and verify the utility locations. 2. The Contractor shall be responsible for working with the other utilities, i.e., gas, electric, telephone, etc. in order to assure that all utilities that need to be replaced or relocated can be done with a minimum disturbance to service. The Contractor shall also be responsible for coordinating schedules with the various utilities such that they can proceed with their relocation work as efficiently as possible. 3. If the odor of natural gas is detected in a work area at any time during the course of work, the Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also immediately notify the residents of adjacent properties. The Contractor shall advise the residents to evacuate their homes immediately if the odor is present within the dwelling. 4. Restoration of sprinkler systems damaged by the Contractor's operations shall be repaired by the Contractor at no additional cost to the City or the Owner of the system. XVI. MAINTENANCE OF TRAFFIC A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 105, 801, and City Construction Specification 1-8.1 B. Additions: 1. Maintenance of traffic during construction shall conform to the “Indiana Manual on Uniform Traffic Control Devices” and the City of South Bend Design and Construction Standards. 2. The attached “Traffic Closure Request” form is to be used for any lane restrictions or closures and required to be filled out and sent to the Department of Public Works. 3. The Contractor shall arrange and prosecute the work specified for this contract in such a manner that traffic on existing streets is unrestricted throughout the Project. The Engineer shall approve the method of traffic control. No construction equipment, vehicles, materials, supplies or temporary facilities shall be left unattended in the right-of-way of any street or left parked overnight without proper marking and lighting. 4. A maximum of one lane shall be closed during daylight work hours, with appropriate traffic control measures as described above. Two-way traffic must be maintained when Contractor personnel are not active or present at the site. 5. After the award of the contract and before beginning the work, the Contractor shall submit his proposed schedule of operations for the review of the Engineer. The schedule of operations as reviewed by the Engineer shall be maintained at all times. 6. This Pay Item shall include all labor, materials for the temporary installation and removal of all road closure assemblies, barricades and other signs as needed to provide adequate traffic control. 7. Payment will be made under: Version 2/14/2020 Page - 8 Public Works Quote Pay Item Pay Unit Maintenance of Traffic LS XVII. DESCRIPTION OF WORK A. Prevailing Specifications: None B. Additions 1. Work to be performed shall include furnishing all labor, services, materials, insurance and equipment to clean storm sewers, perform pond maintenance and associated work near Laurel Woods subdivision within the City of South Bend. 2. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and their property from damage caused by the Contractor’s operations. XVIII. PLANS A. Prevailing Specifications: City of South Bend CONSTRUCTION STANDARDS AND SPECIFICATIONS B. Additions: 1. The plans consist of 13 Sheets. 2. The work shall conform to the plans. 3. The drawings are schematic in nature. 4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. 5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. XIX. M/WBE-DBE GOALS A. Prevailing Specifications: City of South Bend Ordinance No. 10693-19, Minority and Women Business Enterprise Inclusion Program Plan B. Additions: 1. The M/WBE Goals for this Project are: a. MBE 1.4%. b. WBE 4.3%. 2. Complete FORM MWBE-1.0 MWBE Utilization Plan and submit with Contractor’s Quote for Public Work. 3. Complete FORM MWBE-2.0 Evidence of Good Faith Efforts and submit with Contractor’s Quote for Public Work. 4. Complete FORM MWBE-2.1 MWBE Contacted and submit with Contractor’s Quote for Public Work. XX. ELECTRONIC DATA A. Prevailing Specifications: City of South Bend Design and Construction Standards B. Additions: 1. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor that may be relied upon are limited to the printed copies (also known as hard copies). Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the Contractor’s sole risk. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. 2. When transferring documents in electronic media format, neither the City nor the Engineer make any representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used in the data creation. Version 2/14/2020 Page - 9 Public Works Quote XXI. SCOPE OF WORK A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 104.02 B. Additions: 1. The Bidder shall verify existing site conditions prior to Bid/Quote submission to preclude a stoppage of work due to “Differing Site Conditions”. 2. The Contractor shall take special care to protect existing facilities adjacent to the limits of the active work areas shown on the Plans. Any scope required to repair existing curb, sidewalk, pavement, or other items not indicated for removal on the Plans that are damaged by the Contractor shall be repaired by the Contractor but shall be considered incidental to the work and not paid for directly. XXII. PRECONSTRUCTION CONFERENCE A. Prevailing Specifications: None B. Additions: 1. After quote award and prior to the initiation of work at the site, the Contractor and Owner shall hold a Preconstruction Conference. 2. In addition to any other documentation required by the Owner, the selected Contractor shall submit the following information to the City prior to the Preconstruction Conference: a. Prior to the start of any Work under this project, Contractor shall make available to Owner all equipment that is to be utilized in the execution of this contract. Owner will hold a preconstruction conference at which the sequence of work, methods, inspection, and monitoring requirements and debris disposal shall be discussed. b. Designated personnel shall be field certified NASSCO (National Association of Sewer Service Companies) technicians certified by passing the three-day Pipeline Assessment and Certification Program. Contractor shall submit documentation of certifications of all staff to be assigned to the project. c. A description of the method used to prevent passage of debris to downstream sewers. d. A description of the method of disposal of sewer pipe cleaning debris. e. Equipment storage location for off-hours and weekends. f. Construction dewatering process, equipment and plan g. Documentation on any chemicals anticipated to be used on the project, including at a minimum, material safety data sheets. h. Phone numbers of the personnel used for emergency and off-hours inquiries or calls. XXIII. MOBILIZATION AND DEMOBILIZATION A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 110 B. Additions: 1. Payment will be made under: Pay Item Pay Unit Mobilization and Demobilization LS XXIV. CLEARING OPERATIONS A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 201 B. Additions: 1. “Clearing and Grubbing” shall consist of clearing, grubbing, removing and disposing of all vegetation, debris and other man-made materials required to perform the work indicated in the Plans and Contract Documents, but not specifically paid for otherwise. 2. This Pay Item shall include the removal of all trees and grinding of stumps within the perimeter of the existing fenced pond area which are not otherwise designated on the Plans to be preserved. 3. Disposal of debris resulting from clearing or removal operations shall be at an off-site area, provided by the Contractor and approved by the Owner. No debris shall be left overnight. Version 2/14/2020 Page - 10 Public Works Quote 4. The Contractor shall take diligent care to protect the public, the workers, streets, sidewalks, and adjacent public and private property from the hazards of any tree removal and stump removal operations. 5. Payment will be made under: Pay Item Pay Unit Clearing and Grubbing LS XXV. EARTHWORK A. Prevailing Specifications: 2020, INDOT Standard Specification Section 203, City Std. Spec. Section 7 B. Additions: 1. This Pay Item shall include the earthwork needed to excavate, haul and dispose of all material not being removed under some other Pay Item which is encountered within the limits of the work to complete the Project to the proposed finished grades indicated on the Plans. 2. Excavation and disposal of silt and debris deposited in the work area shall not be measured directly but shall be included in the unclassified excavation Pay Item. 3. All material excavated within the perimeter of the fence surrounding the existing pond shall be considered unclassified excavation, without consideration of material consistency or water content. 4. Proposed grades shown on the Plans within the fenced pond area are to be verified by the Contractor as finished grades after the sewer cleaning operation and topsoil placement is complete. The fenced pond area may be used as a temporary area of debris collection from sewer cleaning operations, but the addition of water or debris to the pond area shall not entitle the Contractor to additional payment for earthwork operations. 5. Payment will be made under: Pay Item Pay Unit Excavation, Unclassified LS XXVI. STORMWATER MANAGEMENT A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 205, City Std. Spec. Section 7, City Std Drawings 7-1 and 7-7. B. Additions: 1. Erosion Control Blanket (ECB) shall be provided at the locations shown on the Plans after the finished grade has been topsoiled and seeded. 2. ECB shall be North American Green (NAG) SC-150, or approved equivalent. 3. ECB shall be securely anchored to the ground using staples or Engineer approved equivalent method at intervals as recommended by the manufacturer. 4. Cost of all labor and materials, including required ECB anchoring mechanisms shall be included in the cost of the respective Pay Items. 5. Geotextile fabric below the Temporary Construction Entrance shall not be measured or paid for directly but shall be included in the cost of the No. 2 Stone. 6. A 10-foot width shall be allowed for the project. 7. Payment will be made under: Pay Item Pay Unit Temporary Construction Entrance, No. 2 Stone TON Erosion Control Blanket SYS Version 2/14/2020 Page - 11 Public Works Quote XXVII. FENCES A. Prevailing Specifications: 603 B. Additions: 1. This Pay Item shall include all labor and materials to remove portions of existing chain link fence section and posts to provide access to existing pond area to be excavated and the resetting and restoration of the fence along the current alignment. 2. Existing fence section is approximately six-foot of chain link fabric, with three additional strands of barbed wire above the fabric. 3. Replacement fabric and posts shall match the existing fence material as close as practical. Barbed wire sections removed for project access shall be neatly terminated at the nearest existing post outside of the limits to be reset and not replaced within the limits of fence to be reset. 4. Payment will be made under: Pay Item Pay Unit Fence, Chain Link, Reset LFT XXVIII. SEEDING A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 621, 914.01, 914.03, 914.04 B. Additions: 1. Fertilizer shall be applied at a rate of 800 pounds per acre. Fertilizer shall not be paid for separately, but shall be considered incidental to the seeding operations on the Project. 2. Permanent seeding shall be INDOT seed mixture, Type U. 3. Topsoil shall be placed below the areas to be seeded and shall consist of natural loam, sandy loam, silty loam, silty clay loam, or clay loam humus-bearing soils adapted to the sustenance of plant life and such topsoil shall be neither excessively acidic nor excessively alkaline in accordance with INDOT Standard Specification 914.01. Topsoil shall be screened such that 100 percent of the topsoil passes the one 1” sieve and 95 percent passes the No. 10 (2.00 mm) sieve. Topsoil shall be a minimum of 6” deep. Topsoil shall not be compacted by heavy equipment. 4. Topsoil obtained from within the limits of construction shall not be paid for directly but shall be considered incidental to the project. Topsoil obtained from outside the project limits which has been tested and documented shall be paid for on a volumetric basis. 5. Payment will be made under: Pay Item Pay Unit Permanent Seeding, Type U SYS Topsoil CYS XXIX. CASTING REPLACEMENT A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 720 B. Additions: 1. This Pay Item shall include the removal and disposal of existing castings shown on the Plans to be replaced, as well as the materials and labor for the new replacement casting. 2. Identifying marks were not observed on the existing casting. The approximate equivalent grate casting may be R-2561-A, by Neenah Foundry. 3. The Contractor shall verify the dimensions of the existing casting prior to removal, ordering or fabrication of the replacement casting. The new casting shall be of equal or greater materials than the existing casting and shall be of the same existing dimensions confirmed by the Contractor. 4. The Contractor shall submit a Shop Drawing of the proposed replacement casting for the project. 5. The Owner does not object to the reuse of the existing frame, if a suitable replacement grate can be utilized that conforms to the dimensions of the existing frame. Otherwise, the Contractor shall Version 2/14/2020 Page - 12 Public Works Quote replace both the frame and grate as part of the casting replacement, including incidental work to remove and replace the existing frame. 6. Payment will be made under: Pay Item Pay Unit Casting, Replace EACH XXX. STORM DRAIN CLEANING AND INSPECTION A. Prevailing Specifications: None B. Additions: 1. The work shall include all labor, tools, equipment, and related items as may be required for the complete cleaning or cleaning and internal inspection and television monitoring (including bypass plumbing, drain dewatering and associated work) of the storm drain and inlet/manhole structures and removing and disposing of all deposits cleaned from the drains. 2. All storm drains shall be thoroughly cleaned and allow for unrestricted inspection by closed circuit television. All storm drains will be cleared prior to television inspection. If the television inspection shows drains were improperly cleaned, the Engineer will direct the appropriate cleaning and re- cleaning. Re-cleaning shall be done at no additional cost. 3. Equipment a. Cleaning shall be accomplished by means of water jetting or other approved methods. The equipment utilized shall be capable of removing all sand, dirt, rocks and other debris, including potential roots, from the drain line to allow internal inspection of all internal surfaces. The equipment used shall suit the conditions and size of the sewer to be cleaned. The equipment used shall include the use of a movable dam type and be constructed in such a way that a portion of the dam may be collapsed at any time during the cleaning operation to protect against flooding of the sewer. The movable dam shall be equal in diameter to the pipe being cleaned and shall provide a flexible scraper around the outer periphery to insure removal of grease. If sewer cleaning balls or other equipment, which cannot be collapsed, is used, special precautions to prevent flooding of the sewers and public or private property shall be taken. b. The camera and recording equipment shall be specifically designed for continuous viewing and recording of detailed images of the interior wall of pipes and transitions of the specified size ranges. The equipment shall include sufficient lighting to view the entire periphery of the pipe. The equipment shall have appropriate attachments to maintain a position in the center of the pipe and an electronic counter to continuously record the location of the equipment in the pipe. A copy of the video inspection shall be submitted to the Owner. c. Cleaning shall be performed within the seventy-two (72) hour period immediately before closed circuit television inspection. 4. Sewer Cleaning Operation a. The Contractor shall thoroughly clean all sewer segments designated for cleaning in the project plans. Cleaning includes the removal of all debris in the sewer including, but not limited to, items such as silt, sand, tree roots, rocks, bricks, pieces of pipe, buildups on the pipe walls, grit, sludge, and slime and all other foreign material in the sewer pipe. A clean pipe segment is generally defined as a pipe that has approximately 95 percent of the debris removed for the full length of pipe. The Contractor shall provide adequate documentation that the pipe segments have been thoroughly cleaned. The Owner will make the final decision as to whether a pipe has been thoroughly cleaned according to these Specifications. b. The Contractor shall clean the sewers by moving debris within the pipe from the upstream manhole to downstream manhole in a given sewer segment. Debris from the cleaning operation shall be collected at the downstream manhole with the use of the vacuum unit on the cleaning equipment. The Contractor shall not pass debris to the next downstream sewer segment. Under no circumstances shall the Contractor allow debris to flow downstream into the receiving channel at the outlet of the sewer system. c. If cleaning of an entire section of sewer from manhole to manhole cannot be successfully performed from upstream manhole; the equipment shall be set up on the opposing end and the sewer shall be cleaned again from this “reverse set-up” configuration. 5. Water. Version 2/14/2020 Page - 13 Public Works Quote a. Any and all Owner water used by Contractor shall be from a metered supply with an approved backflow device to protect the water supply. Water used to clean the sewer lines may be obtained from South Bend Water Works. The Contractor should contact South Bend Water Works to determine if there will be any charges for using their water. If there are charges from South Bend Water Works, the Contractor shall pay all costs associated with coordinating and obtaining water for the sewer cleaning operations. All metered water supply shall be paid for to OWNER through the regular billing system. b. It shall be Contractor’s responsibility to obtain approval from the South Bend Water Works to use Owner’s fire hydrants. c. Contractor shall be responsible for preventing contamination of the potable water system. d. Contractor when drawing water from any public hydrant shall use a backflow preventer and/or an eighteen (18) inch air gap, or other City-approved back-flow device. e. Contractor shall remove the water meter(s)/piping etc. from all fire hydrants at the end of each working day. f. Any costs of water shall be considered incidental to the Contract. 6. Disposal of Materials a. All materials removed from the sewer lines during cleaning operations shall be trapped and removed from the system at the downstream manhole of the section being cleaned. Passing of debris from upstream manhole section to beyond downstream manhole section will not be allowed. All materials shall be disposed of in compliance with all applicable laws and regulations. b. A suitable dam or weir shall be placed in the downstream manhole to trap all such materials. Passing material from manhole section to manhole section, which could cause line stoppages, accumulations of sand in wet wells, or damage pumping equipment, shall not be permitted. c. All solids or semi-solids resulting from the cleaning operations shall be removed from the site at the end of each workday, hauled to and disposed of in a properly licensed sanitary landfill. Contractor will pay all landfill-tipping fees, if applicable, as an incidental cost to the Work. d. Under no circumstances shall sewage or solids removed in the cleaning process be dumped onto streets or into ditches, catch basins, storm drains, sanitary sewer manholes, cleanouts, or dumps. e. The Contractor shall keep haul route and work area (s) neat and clean and reasonably free of odor, and shall bear all responsibility for the cleanup of any spill which occurs during the transport of cleaning/surface preparation by-products and the cleanup of any such material which is authorized by or pursuant to this Contract and in accord with applicable law and regulations. The Contractor shall immediately clean up any such spill, or waste. If the Contractor fails to clean up such spill, or waste immediately, the Owner shall have the right to clean up or arrange for its cleanup and shall charge to the Contractor all costs, including administrative costs and overhead, incurred by the Owner in connection with such cleanup. The Owner shall also charge to the Contractor any costs incurred or penalties imposed on the City as a result of any spill, dump or discard. Under no circumstances is this material to be discharged into the waterways or any place other than where authorized to do so by the appropriate authority. f. The general requirements for vehicles hauling such waste material are as follows: Transport vehicles must be of type(s) approved for this application by the jurisdictions involved. General requirements are that the vehicles have watertight bodies, that they be properly equipped and fitted with seals and covers to prohibit material spillage or drainage, and that they be cleaned as often as is necessary to prevent deposit of material on roadways. Vehicles must be loaded within legal weight limits and operated safely within all traffic speed regulations. g. The routes used by the Contractor for the conveyance of this material on a regular basis shall be subject to approval by the governing authority having jurisdiction over such routes. 7. Sewer Inspection and Televising a. The Contractor shall furnish all equipment for video recording. b. All inspections shall follow the Pipeline Assessment and Certification Program (PACP) protocol, as established by the National Association of Sewer Service Companies (NASSCO). c. The inspection will be done one (1) reach at a time. The reach being inspected will be suitably isolated from the remainder of the sewer system by restricting all upstream and groundwater flows to allow maximum exposure of the pipe being inspected. Version 2/14/2020 Page - 14 Public Works Quote d. Should the Contractor’s internal inspection equipment become immobilized within a storm drain, said equipment shall be removed from the line. If excavation is required to retrieve the Contractor’s equipment, the excavation shall be accomplished by the Contractor at his expense. Following removal of the equipment, the Contractor shall restore the storm drain and the site to conditions consistent with new pipe work in accordance with City specifications at no additional cost to the Owner. e. The Contractor shall provide the City with an exported file with the television data on an external hard drive with a USB 2.0 connection, at the preference of the Owner. All hard drives submitted shall become property of the City. Each video shall be named according to the “Pipeline ID” format. The video shall document in a clear and continuous manner the condition of the sewer segment from the upstream manhole to the downstream manhole. No interruptions or missing segments shall be allowed unless noted in writing by the Engineer. The City will reject any video that has foggy or static conditions on it. f. The date of the television inspection and the distance that the camera has traveled through a particular storm drain reach shall be continuously displayed on the recording. All recordings obtained during the work shall be turned over to the Engineer and shall become the property of the Owner. All costs for recordings shall be included in the Unit Prices for the Work. If the recording is not complete or the quality is not satisfactory, the storm drain shall be reinspected at the Contractor’s expense. g. The television video supplied by the Contractor shall be compatible with existing replay equipment owned by the City. h. Recordings and inspection reports shall be submitted to the City Engineer within seven (7) days of inspection. 8. Coordination with Televising Operations a. The Contractor is allowed to operate televising equipment simultaneously with the cleaning equipment to check on the progress of the current cleaning operation in a sewer segment. However, in these situations, the use of televising equipment shall be incidental to the sewer cleaning operation and will not be measured or paid for. 9. Acceptance of Cleaning Operation a. Acceptance of storm sewer line cleaning shall be made upon the successful completion of the television inspection and shall be to the satisfaction of the Engineer. If television inspection shows the cleaning to be unsatisfactory, the Contractor shall be required to reclean and reinspect the storm sewer line until the cleaning is shown to be satisfactory. If there are areas where television inspection is not able to be performed, the Engineer may require the Contractor to pull a double squeegee (with each squeegee the same diameter as the storm sewer) through each manhole section as evidence of adequate cleaning. b. In addition, on all storm sewer lines which have sags or dips, to an extent that the television camera lens becomes submerged for three (3) or more lineal feet during the television inspection, the Contractor shall pull double squeegee and/or sponges through the line in order to remove the water from the dips or sags. Water removal through squeegees and/or sponges shall be performed until the television camera lens will no longer be submerged. This requirement may be waived by the Engineer if the water in which the camera lens is submerged, is clear enough to allow the identification of pipe defects, cracks, holes and location of service taps. c. The basis for non-acceptance by the Engineer shall be any evidence of poor cleaning observed on the video tape recording that prevents the proper internal inspection of the drain reach. No additional payment shall be made for the re-cleaning of drain reaches to an acceptable condition regardless of the number of times re-cleaning may be required. All measurements for payment shall be based upon the linear feet of pipe cleaning and television inspection. 10. Damaged Pipe Sections a. The Owner anticipates the possibility that some sewers will have broken or collapsed sections that prevent cleaning and televising equipment access. When these sections are encountered, the Owner will make a decision whether to delete the entire section from the Contract or obtain quotes for a dig repair with the current or other Contractor. b. If the decision involves a dig repair, the sewer cleaning crew may clean and televise another sewer segment indicated on the plans. Once the dig repair has been completed, the sewer cleaning Contractor will return to the repaired sewer section and complete the cleaning and televising operations. Version 2/14/2020 Page - 15 Public Works Quote c. The Owner has the authority to delete a sewer segment from the project if the sewer is in such condition that normal cleaning would damage the pipe. d. The Contractor shall only use equipment correctly sized for the diameter of the sewer segment being cleaned, and shall have on the project an adequate number of consumable parts with the appropriate diameters to minimize disruptions related to replacement of worn or broken equipment. 11. Manhole & Inlet Cleaning a. All manholes and inlets encountered shall be thoroughly cleaned of all foreign materials, obstacles, and buildups. This shall include, but is not limited, to removing grit, sand, silt, leaves, debris, rocks, bricks, sticks, and sludge from the manhole or inlet. b. The intent of the project is to clean the manholes and inlets simultaneously with the storm sewer cleaning and televising operation. c. This work is considered incidental to the cleaning of the storm sewers. It will not be paid for on a separate basis. 12. Storm Drain Dewatering a. When sewer flow depth is greater than 25 percent, flow depth must be decreased by plugging and/or bypass pumping. Plugs shall be designed to pass any desired portion of sewage flow. If bypass pumping is required for sewer cleaning operations, Contractor shall provide all necessary equipment, manpower, and expertise. Contractor is responsible for all damage to public or private property resulting from these operations. Bypass pumping shall require proper filtration prior to discharge release. b. For systems with submerged or partially submerged outfall(s) the Contractor shall plug the system, where and as needed, to allow the cleaning or cleaning and Television Inspection to proceed. c. During the television inspection process, every effort shall be exerted to obtain a full view of the pipe interior. For instances where the camera lens becomes submerged or where a large portion of the pipe shall contain water, and these conditions persist for significant portions of the sewer being inspected, the Contractor shall dewater the pipe. d. Dewatering can be accomplished with a pump and discharge hose or by the nozzle of a hydraulic high-pressure jet machine. If the jet machine is used, it shall precede the television camera through the sewer pipe. The nozzle of the jet machine shall work in conjunction with the television camera’s motion and be positioned so that several feet of pipe length can be viewed by the camera. The dewatering procedure shall move standing or ponded water through the storm drain to a point within the storm drain downstream of the reach being inspected. e. Due to anticipated high ground water elevations, it is anticipated that the groundwater water levels at the existing pond area will need to be depressed in addition to the normal dewatering measures associated with sewer cleaning outlined above. f. Dewatering of pipes are considered part of the Construction Dewatering Pay Item. 13. Project Cleanup a. The Contractor shall leave all cleaning and televising sites neat and clean. The Contractor shall not allow trash and debris to accumulate during the cleaning and televising period and shall remove all trash and debris before final acceptance will be granted. b. Unless otherwise approved, the Contractor will not be allowed to store equipment or materials or debris on the City right-of-way, City property, or on private property. c. Above ground surfaces along the line of the maintenance work shall be restored to conditions equal to or better than those found at the start of the work. d. Project cleanup shall not be measured for payment. Cleanup shall be considered incidental and included in the respective contract unit prices. 14. Payment a. Contractor’s compensation for sewer cleaning will be calculated together with storm sewer inspection and televising by multiplying the number of linear feet of storm sewer cleaned and televised times the unit price per linear foot for Clean Storm Sewer and Televise Storm Sewer and shall be based on diameter of the pipe as indicated in the quote. All of the Contractor’s costs for labor, equipment, materials and incidentals necessary for this work shall be considered included by the Contractor in said proposed unit prices. The cost of the sewer televising work shall include all information supplied to the City such as external hard drives, hardcopy reports, electronic files, time spent converting data formats and other Version 2/14/2020 Page - 16 Public Works Quote reporting information shall be included in the cost of Sewer Televising and no additional compensation will be allowed. b. Payment will be made under: Pay Item Pay Unit Clean Storm Sewer, 12”-24” Dia LFT Televise Storm Sewer, 12”-24” Dia LFT XXXI. CONSTRUCTION DEWATERING A. Prevailing Specifications: None B. Additions: 1. The work consists of providing all labor, equipment, including pumps, and materials necessary to dewater the site to maintain suitable working conditions. 2. The Contractor shall design, install, and maintain a construction dewatering system with adequate pumping capacity to lower and maintain a maximum free water surface elevation of 693.0 ft across the existing fenced pond area, on the same vertical datum benchmarks shown on the Plans. This measurement shall be the standard measurement for suitable Construction Dewatering conditions at the existing detention pond area. 3. The equipment used to dewater the pond area shall include the use of a movable dam downstream of the existing detention pond and shall be constructed in such a way that a portion of the dam may be collapsed at any time during the cleaning operation to protect against flooding of the sewer. If sewer cleaning balls or other equipment, which cannot be collapsed, is used, special precautions to prevent flooding of the sewers and public or private property shall be taken. The use of a suitable temporary dam within the storm sewer downstream of the existing pond is intended to prevent backflow of groundwater and Kiefer Ditch into the pond area during dewatering operations. 4. Construction dewatering measures shall be in place and active during all sewer cleaning and video operations, and during all earthwork operations within the existing pond area. 5. Adequate construction dewatering operations shall be in place during the project punch list walkthrough with the Owner. 6. By submitting a Bid/Quote, the Contractor is certifying that high groundwater elevations, on the order of elevation 695.0 feet, are an anticipated component of the project which have been considered in the Construction Dewatering component of the Bid/Quote. As shown on the Plans, this groundwater elevation may be above the crown of certain pipes within the Work area and above the ground surface within the existing fenced pond area. 7. All work required for maintaining the project work site in suitable working conditions is included in this Pay Item. 8. Dewatering measures for pipe cleaning operations, such as removal of water and debris from storm lines is to be included in this Pay Item. 9. The acceptable outlet for the Construction Dewatering process from the pond is shown on the Plans. The outlet for temporary pipe dewatering operations is the back to the pond or directly to a vacuum truck operated by the Contractor. 10. The dewatering Plan to be submitted by the Contractor shall include and indicate the use of water filtering and stabilized outlets as part of this Pay Item. Direct release of dewatering discharge lines without the use of a filter is prohibited. 11. Release of discharge from the Construction Dewatering process at the acceptable outlet shall be accomplished by the Contractor at a rate that limits erosion by the use of a stabilized outlet, such as temporary rock filter berm downstream of the filter bags. 12. The Contractor shall construct a rock filter berm near the outlet, as a secondary containment Best Management Practice. The approximate height of the rock filter berm shall be approximately one-foot high by four feet wide by 20 feet long. 13. Filter bags shall be placed on a relatively flat surface behind/upstream of the secondary containment BMP. Version 2/14/2020 Page - 17 Public Works Quote 14. The Contractor shall place the filter bags in a location where it can be removed efficiently without causing damage or losing sediment but no closer than 20 feet from the edge of pavement along Auten Road. 15. Filter bags are to be replaced when they become laden with sediment, or exhibit leakage or other failure. 16. The Owner has performed geotechnical soil borings within the general vicinity of the Project for purposes other than the current work. 17. Any geotechnical soil boring results provided on the Plans, and the associated geotechnical report, are provided to the Contractor for information only as a general indication groundwater levels at those boring locations and the types of soils anticipated to be encountered in the area during Construction Dewatering activities. 18. It is anticipated that a gravity pump system will be installed by the Contractor. Other pumping configurations, such as a wellpoint system, are allowed on the project. The Contractor is notified that the soil boring logs indicate the presence of silt and clay layers at depths that might impact the design and implementation of the dewatering system. 19. The Contractor is encouraged to perform independent field investigations of the existing conditions at the pond area to assess the method and level of effort associated with Construction Dewatering prior to providing a quote or bid. The Contractor shall coordinate with the Owner to access the existing pond area if such independent field investigations are desired. 20. Payment will be made under: Pay Item Pay Unit Construction Dewatering LS Version 2/14/2020 Page - 18 Public Works Quote CITY OF SOUTH BEND, INDIANA CONTRACTOR’S QUOTE FOR PUBLIC WORK PROJECT NAME: Laurel Woods Maintenance Project PROJECT NO. 121-007 QUOTES DUE July 13, 2021 (Must be completed for all quotes. Please type or print) Date: Firm: Address: City/State/Zip: Telephone Number: ( ) Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: the City of South Bend, Indiana, in accordance with plans and specifications prepared by: The City of South Bend, Department of Public Works and dated for the sum of (enter the Total Quote as shown on the Proposal) ($ ) (Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. ACCEPTANCE The above quote is accepted this day of 20 Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Joseph R. Molnar, Member Gary A. Gilot, Member Jordan V. Gathers, Member Murray L. Miller, Member Attest: Anne Fuchs, Clerk By (Signature) (Printed Name of Person Signing) Version 2/14/2020 Page - 19 Public Works Quote CITY OF SOUTH BEND EQUAL EMPLOYMENT OPPORTUNITY CONTRACTING PROVISIONS DIVERSITY UTILIZATION It is the policy of the City of South Bend to provide equal employment and business opportunity for all persons, partnerships, companies, and corporations in accordance with the rules, regulations and guidelines of the applicable federal, state and local laws. This policy of equal employment and business opportunity shall apply to every contractor or subcontractor bidding or holding a public contract with the City of South Bend. In furtherance of this policy, the following Equal Opportunity Clauses are hereby made a part of every construction contract entered into by the City of South Bend and all subcontractors entered into pursuant to any such contract and the bidder hereby certifies that it/he/she will abide by these provisions. The contractor will not discriminate against any applicant or employee because of race, color, religion, sex, national origin, or handicap. The contractor will take affirmative action to ensure that all applicants or employees are treated fairly and equitably. Such action shall include but not be limited to the following: hiring, up-grading, demotion or transfer, recruitment, advertising, lay-offs or termination, rates of pay or other forms of compensation and selection for training including apprenticeship programs. The contractor shall agree to post in conspicuous places available to employees and applicants, notices to be provided setting forth the provisions of the Non-Discrimination Clause. The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. The contractor will send to each labor union or representative of workers with which it/he/she has a bargaining agreement or other contract or understanding, a notice to be provided, advising the labor union or worker's representatives of the contractor's commitment under this section, and shall post copies of the notices in conspicuous places available to applicants and employees. The contractor will comply with all provisions of Executive Order 11246 (as amended by 11375) and of the rules, regulations and relevant orders of the Department of Labor. Subpart B -- Contractors' Agreements Sec. 202. Except in contracts exempted in accordance with Section 204 of this Order, all Government contracting agencies shall include in every Government contract hereinafter entered into the following provisions: "During the performance of this contract, the contractor agrees as follows:" "(1) The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated equally during employment, without regard to their race, color, religion, sex or national origin. Such action will include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause." "(2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex or national origin." Version 2/14/2020 Page - 20 Public Works Quote "(3) The contractor will send to each labor union or representative of workers with which it/he/she has a collective bargaining agreement or other contract of understanding, a notice, to be provided by the agency contracting officer, advising the labor union or workers' representative of the contractor's commitments under Section 202 of Executive Order No. 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants for employment." "(4) The contractor will comply with all provisions of Executive Order No. 11246 of September 24, 1965, and of the rules and regulations, and relevant orders of the Secretary of Labor." "(5) The contractor will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders." "(6) In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of such rules, regulations, or orders, in this contract may be cancelled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts in accordance with procedures authorized in Executive Order No. 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked* as provided in Executive Order No 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law." "(7) The contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions including sanctions for noncompliance: Provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency the contractor may request the United States to enter into such litigation to protect the interests of the United States." The applicant further agrees that it will be bound by the above equal opportunity clause with respect to its own employment practices when it participates in federally assisted construction work: Provided, that if the applicant so participating is a State or local government, the above equal opportunity clause is not applicable to any agency, instrumentality or subdivision of such government which does not participate in work on or under the contract. The applicant agrees that it will assist and cooperate actively with the administering agency and the Secretary of Labor in obtaining the compliance of contractors and subcontractors with the equal opportunity clause and the rules, regulations, and relevant orders of the Secretary of Labor, that it will furnish the administering agency and the Secretary of Labor such information as they may require for the supervision of such compliance, and that it will otherwise assist the administering agency in the discharge of the agency's primary responsibility for securing compliance. The applicant further agrees that it will refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965, with a contractor debarred from, or who has not demonstrated eligibility for, Government contracts and federally assisted construction contracts pursuant to the Executive Order and will carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon contractors and subcontractors by the administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the applicant agrees that if it fails or refuses to comply with these undertakings, the administering agency Version 2/14/2020 Page - 21 Public Works Quote may take any or all of the following actions: Cancel, terminate, or suspend in whole or in part this grant (contract, loan, insurance, guarantee); refrain from extending any further assistance to the applicant under the program with respect to which the failure or refund occurred until satisfactory assurance of future compliance has been received from such applicant; and refer the case to the Department of Justice for appropriate legal proceedings. * Corrected to read "invoked". In the original text the word "involved" was printed in error. Version 2/14/2020 Page - 22 Public Works Quote MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN The City of South Bend, Indiana has shown its commitment to addressing Minority and Women’s Business Enterprise (“MWBE”) participation in public contracting through the adoption of the City of South Bend Ordinance No. 10693-19. Persons, partnerships, corporations, associations, or joint ventures awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age or disability that does not affect that person’s ability to perform work. Minority and Women’s Business Enterprises (MWBEs) are described in the Ordinance. A list of MWBEs (both certified and non-certified) can be found on the Indiana Department of Administration website: http://www.in.gov/idoa/. Documentation shall be provided with the bid that states the MWBEs that will be contracted, the dollar amount of the work that will be performed by the MWBEs on the project and the percentage of the dollar amount as it relates to the total bid amount by using Form MWBE-1.0, MWBE Utilization Plan. The City, its agencies, boards, or commissions requires the Contractor’s good faith efforts to obtain participation by those Contractors classified as MWBEs. Failure to provide ALL the required evidence of good faith efforts with the bid will be grounds for rejecting a bid as non-responsive. Bidders shall demonstrate good faith efforts to have active participation from MWBEs on this Project and supply written documentation evidencing such efforts by using Form MWBE-2.0, Evidence of Good Faith Efforts and Form MWBE-2.1, MWBEs Contacted. Such documentation shall include, but is not limited to, the following items: a. A listing of all MWBEs contacted including: (1) the name and address of the MWBE; (2) the date of contact; (3) the type of contact (i.e., phone call, written solicitation, etc.); (4) the nature or type services or goods requested; and (5) the result of the contact. b. Written evidence of outreach and copies of email exchanges inviting and receiving bids, quotes or other responses from MWBEs or other documentation of efforts to encourage and secure competitive responses from MWBE and local businesses to be included in the benefits of building this Project. c. Written documentation of letters of introduction, invitations to forging majority/minority strategic alliances for capacity building, including but not limited to, mentoring, extensions of assistance on payroll, insurance, bonding, line of credit, technical skills or business skills. All bidders are actively encouraged to reach out to the MWBEs in St. Joseph County, Indiana, other local Indiana counties, and Berrien County, Michigan to utilize a good faith effort to forge constructive and lasting business partnerships. Notwithstanding the foregoing, the award and performance of all City contracts shall comply with applicable federal, state, and local laws. The City reserves the right to request verification of goal implementation throughout the course of the project. Version 2/14/2020 Page - 23 Public Works Quote When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF ___________ ) ) SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, “Iran” means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time-to-time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time-to-time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized Version 2/14/2020 Page - 24 Public Works Quote alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor’s newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor’s documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor’s good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business (“MBE”) or as a Women’s Business Enterprise (“WBE”) as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City’s MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16- 8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel Version 2/14/2020 Page - 25 Public Works Quote products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. *** I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this day of , 20__ Contractor/Bidder (Firm) Signature of Contractor/Bidder or Its Agent Printed Name and Title Subscribed and sworn to before me this day of , 20 My Commission Expires Notary Public County of Residence Version 2/14/2020 Page - 26 Public Works Quote QUOTE/PROPOSAL CITY OF SOUTH BEND PROJECT NAME Laurel Woods Maintenance Project PROJECT NO. 121-007 QUOTES DUE July 13, 2021 Item No. Description Quantity Unit Unit Price Total Amount 1 Mobilization and Demobilization 1 LS $ 2 Clearing and Grubbing 1 LS $ 3 Excavation, Unclassified 1 LS $ 4 Temporary Construction Entrance, No. 2 Stone 50 TON $ 5 Erosion Control Blanket 650 SYS $ 6 Fence, Chain Link, Reset 30 LFT $ 7 Seed Mixture, Type U 650 SYS $ 8 Topsoil 110 CYS $ 9 Casting, Replace 1 EACH $ 10 Clean Storm Sewer, 12"-24" Dia. 760 LFT $ 11 Televise Sewer, 12"-24" Dia. 760 LFT $ 12 Construction Dewatering 1 LS $ 13 Maintenance of Traffic 1 LS $ Total Amount of Quote $ Firm: Address: City/State/Zip: Telephone Number: ( ) Fax Number: ( ) By (Signature) (Printed Name of Person Signing) CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MWBE-1.0 MWBE UTILIZATION PLAN Version 2/14/2020 Page - 27 Public Works Quote This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MWBE participation. It is the bidder’s sole responsibility to verify whether any listed minority or woman business meets the MWBE qualifications. Project Number: 121-007 Project Name: Laurel Woods Maintenance Project Bidder: Total Bid Amount: MWBE Goal: 5.7% Page_______of___ ____ Name & Address of MWBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MWBE Component Percentage of Total Bid/Proposal Submitted by: Print Name Signature Date CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 2/14/2020 Page - 28 Public Works Quote This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 121-007 Date: Project Name: Laurel Woods Maintenance Project Bidder: Contact Person: Telephone: Address: City: State: Zip: Email: To determine whether a bidder has demonstrated good faith efforts to reach the MWBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MWBE LIST(S): The bidder reviewed 1) the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non- certified) found at: http://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MWBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MWBE participation in the awarded contract. I affirm that I reviewed the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration’s certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MWBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all MWBEs in the scopes of work of the contract. I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform MWBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MWBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MWBEs of subcontracting opportunities and allowed sufficient time for MWBEs to participate effectively. I affirm that I followed up on initial solicitations with interested MWBEs. I affirm that I negotiated with interested MWBEs in good faith, including providing such MWBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested MWBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 2/14/2020 Page - 29 Public Works Quote I affirm that I have made good faith efforts to assist interested MWBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MWBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MWBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MWBE-2.1 MWBE CONTACTED Version 2/14/2020 Page - 30 Public Works Quote This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MWBEs. It is the bidder’s sole responsibility to verify whether any listed minority or woman business meets the MWBE qualifications. Attach additional pages if necessary. PAGE_______OF________ Project Number: 121-007 MWBE Participation Goal 5.7% Project Name: Laurel Woods Maintenance Project Bidder: By: (Signature) (Title) (Date) MWBE Firm Owner or Contact at MWBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MWBE FIRM: MWBE Firm Owner or Contact at MWBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MWBE FIRM: Instructions: 1) Print Clearly 2) Complete All Sections Submit: 1) This Form In Person 2) Or Email To: rowpermitsoffice@southbendin.gov 3)Upon Permit approval: Sign issued permit and Return **Contractor is responsible for associating their company Project # with CSB Permit # for invoicing** Incomplete Submittals Cannot Be Processed Applicant (Contractor/Company Name) Contact Name Email Phone Number Street Address | Location of Work Electric FiberCable Water In Street Sanitary Sewer GasType of Work Outside curb, but in treelawn/sidewalk Right of Way Date | Duration of project (eg: 2/1/18, 2 hrs) City of South Bend Public Works Engineering Division 227 W. Jefferson, County City Building 1316 South Bend, IN 46601-1830 Phone: 574.235.9254 Excavation Permit Request Excavation in ROW without a permit will result in stop work order and/or delays in permitting. Emergency excavations must be phoned into the Permit Office no later than NOON the following day. Date Submitted: Comments | Description of Work Cut Location Boring# Cuts Other _______________ Trenching (open) # FeetType of Cut Manhole repair v 4.3.19 Applicant Signature Date THIS EXCAVATION PERMIT REQUEST IS NON-TRANSFERABLE AND A SIGNATURE SUBJECTS THE NAMED CONTRACTOR/PERMITTEE TO ALL APPLICABLE RULES, DUTIES AND OBLIGATIONS IMPOSED BY THE CITY OF SOUTH BEND MUNICIPAL CODE AND TO ALL REGULATIONS IMPOSED BY THE SOUTH BEND BOARD OF PUBLIC WORKS. EXCELLENCE | ACCOUNTABILITY | INNOVATION | INCLUSION | EMPOWERMENT 1316 County-City Building | 227 W. Jefferson Blvd. | South Bend, Indiana 46601 | 574.235.9251. | www.southbendin.gov List All Other Contractors (Contractor/Company Name) 1st Subcontractor Contact Name Email Phone Number (Contractor/Company Name) 2nd Subcontractor Contact Name Email Phone Number (Contractor/Company Name) 3rd Subcontractor Contact Name Email Phone Number (Contractor/Company Name) 4th Subcontractor Contact Name Email Phone Number Excavation Permit Request EXCELLENCE | ACCOUNTABILITY | INNOVATION | INCLUSION | EMPOWERMENT 1316 County-City Building | 227 W. Jefferson Blvd. | South Bend, Indiana 46601 | 574.235.9251. | www.southbendin.gov Version 3.3 [1/11/2019] **SUBMIT 5 WORKING DAYS MINIMUM PRIOR TO PROJECT START DATE Parking Lane Travel Lane Full Road Closure Alley Submission Date: Applicant/Company: Email Address: Phone #: Project STREET ADDRESS (eg: 110 W. Smith RD.): Project Location (Block limits/Streets From and To): **Requested Start & End Dates:Requested Start & End Times: Contractor Performing Work: On-Site Contact: Phone #: Reason for Closure: Affected Customers:ATTACH THE FOLLOWING ITEMS: 1. Traffic Control Plan 2.Detour Plan 3. Barricades, Signs, or Flashers Placement ENGINEERING OFFICE USE ONLY: Approved Approved as Noted Revise Not Approved Comments: ____________________________________________________________________________ _________________________________________________________________________________________ City of South Bend/Engineering Division Authorized Signature Date: SOUTH BEND,INDIANA 46601 TDD 574/ 235-5567 Reason for Closure: City of South Bend Public Works Engineering Division 227 W. Jefferson, County City Building 1316 South Bend, IN 46601-1830 PLAN YOUR START DATE ACCORDINGLY TO AVOID DELAYS Complete 1 - 5 Incomplete submittals cannot be processed; All submittals require occupancy bond and insurance (Refer to MUTCD for Traffic Control Device Requirements) See reverse for Checklist Failure to use traffic control for traffic restrictions or closures will result in stop work orders and/or delay in permitting. Office Cell Name: Office Cell Excavation/Boring? > Requires Excavation Form Sidewalk? > Requires Sidewalk permit New Approach? > Curb Cut application 1 2 3 4 5 Affected Customers: ~ Contractors are responsible for resolving safety issues and access concerns with affected customers ~ Phone: 574.235.9251 TRAFFIC CONTROL AND OCCUPANCY REQUEST Sidewalk THIS OCCUPANCY PERMIT REQUEST IS NON-TRANSFERABLE AND A SIGNATURE SUBJECTS THE NAMED CONTRACTOR/PERMITTEE TO ALL APPLICABLE RULES, DUTIES AND OBLIGATIONS IMPOSED BY THE CITY OF SOUTH BEND MUNICIPAL CODE AND TO ALL REGULATIONS IMPOSED BY THE SOUTH BEND BOARD OF PUBLIC WORKS. Applicant Signature _______________________________ Date ________________ **Occupancy beyond 90 days requires completion of Long Term Occupancy Request Application. Email: rowpermitsoffice@southbendin.gov Treelawn TRAFFIC CONTROL CHECKLIST PURPOSE: SAFETY FOR MOTORISTS, BICYCLISTS, PEDESTRIANS, WORKERS, EMERGENCY AND ENFORCEMENT PERSONNEL AND EQUIPMENT •Submit Traffic Control with any Occupancy Request in the City of South Bend. •Maps shall follow MUTCD Traffic Control Device guidelines, but do not submit MUTCD examples as your traffic control. INCLUDE THE FOLLOWING: Street map showing CURRENT street status ~ Can show aerial or streets only Street names Striping and sidewalks North Arrow Location of Activity Area and placement of vehicles and equipment in the work space Location of manholes or other facilities within work space Barricades, signs and/or flasher placement Taper distance/Advanced warning signage Traffic detour plan Examples of simple traffic control: North North LAUREL WOODS MAINTENANCE PROJECT CITY PROJECT NUMBER XXX-XXXXX SUPPLEMENTAL INFORMATION – GEOTECHNICAL REPORT PREPARED BY October 7, 2020 Project No. 4974-352-19-00 MCCORMICK ENGINEERING, LLC LAUREL WOOD DRAINAGE LINDENWOOD DRIVE WEST AND AUTEN ROAD SOUTH BEND, INDIANA Prepared For: McCormick Engineering, LLC 234 N. Ironwood Drive South Bend, IN 46615 7121 Grape Road • Granger, Indiana 46530 • 574.271.3447 • wcgrp.com • Offices Nationwide October 7, 2020 Project No. 4974-352-19-00 Mr. David McCormick, P.E., D.WRE McCormick Engineering, LLC 234 N. Ironwood Drive South Bend, IN 46615 Re: Geotechnical Evaluation Laurel Woods Drainage Lindenwood Drive West and Auten Road South Bend, Indiana Dear Mr. McCormick: In compliance with your request, Weaver Consultants Group, LLC (WCG) has completed the subsurface exploration at the site of the above-referenced project. The purpose of this study was to explore the stratification and engineering properties of the subsurface soils and to provide recommendations for construction of a new storm sewer system. In the body of this report, we present a summary of our findings, an interpreta tion of the subsurface conditions, our design recommendations, and construction considerations . The soil boring logs are presented in the Boring Logs Appendix. The methods for field and laboratory operations are presented in the Field Exploration Appendix. General Qualifications and Contractual Considerations are presented in the Qualifications Appendix. Thank you for selecting our firm to assist with this phase of the project. Please call us if there are any questions concerning this report. Sincerely, Weaver Consultants Group, LLC Kenneth P. Miller, P.E. Steve Schubert, P.E. Senior Project Director Geotechnical Engineering Manager October 7, 2020 i TABLE OF CONTENTS 1 EXECUTIVE SUMMARY ..................................................................................... 1 2 PROJECT INFORMATION ................................................................................. 2 2.1 Project Description and Location .............................................................. 2 2.2 Site Description ........................................................................................ 2 3 SUBSURFACE CONDITIONS ............................................................................ 3 3.1 Subsurface Conditions ............................................................................. 3 3.2 Groundwater Conditions .......................................................................... 4 4 DESIGN RECOMMENDATIONS ......................................................................... 5 4.1 Basis ........................................................................................................ 5 4.2 Storm Sewer Recommendations .............................................................. 5 4.3 Structure Foundation Considerations ....................................................... 6 4.4 Dry Wells ................................................................................................. 6 4.5 Pavement Considerations ........................................................................ 7 5 CONSTRUCTION CONSIDERATIONS ............................................................... 8 5.1 Site Preparation ....................................................................................... 8 5.2 Utility/Storm Water Structure Excavations ................................................ 8 5.3 Structural Fill ............................................................................................ 8 5.4 Fill Placement Control .............................................................................. 8 5.5 Construction Observations ....................................................................... 8 5.6 Groundwater Concerns ............................................................................ 9 5.7 Excavation Slope Stability ........................................................................ 9 5.8 Limitations................................................................................................ 9 FIGURES Figure 1: Site Location Plan Figure 2: Boring Location Plan APPENDICES Appendix A - Boring Logs Boring Logs: B-1 through B-4 Particle Size Distribution Report (2) Appendix B - Field Exploration Log of Soil Boring - General Notes Unified Soil Classification System Field Exploration Procedures Boring Log Preparation & Laboratory Testing Procedures Appendix C - Qualifications General Qualifications Contractual Considerations Weaver Consultants Group 1 1 EXECUTIVE SUMMARY We understand that the city of South Bend is considering the construction of a new storm water drain beginning near the intersection of Lindenwood Drive West and Laurel Wood Drive North and ending at Laurel Road and Auten Road in South Bend, Indiana. The new storm sewer pipe is anticipated to be established at a maximum depth of about 5 feet below the existing ground surface. Other details of the storm sewer such as the pipe diameter and outlet structure are unknown. Given the type of project, we anticipate that the sewer will be constructed using cut and cover techniques. In addition, dry wells are being considered for infiltration of storm water collected from the drainage area. No details of dry wells are known at this time. In general, the subsurface soil profile consisted of granular-type soil to a depth of about 5½ to 11 feet below the ground surface and underlain by silt to a depth of about 9 to 22 feet where sandy lean clay was encountered to the terminal depth of the borings. Given that the storm sewer pipe and associated structures are not anticipated to increase the stresses in the soil above that from the existing structure and overburden, bearing capacity is not a concern. However, to provide adequate support for the proposed sewer elements and maintain line and grade, proper subgrade preparation is critical. For proper preparation of the subgrade, we recommend a program of compaction once the subgrade has been established. Given the presence of existing utilities below the subgrade, we recommend that extreme caution be used in the compaction process in these areas. If dry wells are considered, it is likely the depth of the dry well will be limited to the rather high groundwater level and the presence of more cohesive soil and silt, both of which will restrict infiltration. Once the sewer elements have been set, we recommend that the backfill be placed in an engineering manner in thin lifts and compaction test control. We also anticipated that the road will be re-established at the approximate same line and grade as the existing with a minimum acceptable pavement section. A detailed discussion of design parameters and construction considerations is included in subsequent sections of this report. Weaver Consultants Group 2 2 PROJECT INFORMATION 2.1 Project Description and Location We understand that the city of South Bend is considering the construction of a new storm water drain beginning near the intersection of Lindenwood Drive West and Laurel Wood Drive North and ending at Laurel Drive and Auten Road in South Bend, Indiana. The location of the project is shown on a Site Location Plan (Figure 1) in the Appendices. The new storm sewer pipe is anticipated to be established at a maximum depth of about 5 feet below the existing ground surface. Other details of the storm sewer such as the pipe diameter and outlet structure are unknown. Given the type of project, we anticipate that the sewer will be constructed using cut and cover techniques. We also understand that dry wells are being considered to manage the collected runoff. Details such as size, location and dep th of the dry wells is unknown. For design of the proposed storm sewer, a subsurface exploration program consisting of four test borings was performed. The number, depth and general locations of the soil borings were chosen by Weaver Consultants Group (WCG) based on the project plan provided by McCormick Engineering, LLC. The boring plan was to perform the borings to a depth of 15 feet below the existing ground surface. However, due to the subsurface conditions, two of the four boring were extended to a deep as 25 feet below the ground surface (bgs). The borings were located, in the field, by a representative of WCG referencing existing site features. The approximate locations of the borings are provided on a Boring Location Plan (Figure 2) in the Appendices. 2.2 Site Description The road and ground surface along the planned alignment are relatively flat. A ditch which increases in depth from east to west is located along the south side of Auten Road. At the time of our field activities, there was no water in the ditch. Based on the utility location markings provided by others, numerous below grade utilities including a high-pressure gas main, fiber optic lines, water mains, and others exist along the alignment. Weaver Consultants Group 3 3 SUBSURFACE CONDITIONS 3.1 Subsurface Conditions Our interpretation of the subsurface conditions is based four test borings. The following discussion is general; for more specific information, refer to the boring logs presented in the boring logs in Appendix A. Surface conditions: The surface conditions along the storm sewer alignment consisted of a variety of conditions including asphaltic paved roads and grass covered areas. At three of the boring locations topsoil depths ranged from 6 to 10 inches. At the location of Boring B -3, road gravel was encountered to a depth of about 8 inches. Subsurface Conditions: In general, below the surficial materials, the subsurface soil profile consisted of granular-type soil to a depth of about 5½ to 11 feet bgs and underlain by silt to a depth of about 9 to 22 feet where sandy lean clay was encountered to the terminal depth of the borings. The upper approximately 11 feet of the granular soil was fill consisting of clayey sand with varying amounts of gravel (SC). Below the fill was naturally occurring fine sand (SP). At a depth of about 13 feet, an approximately 5-foot thick stratum of sandy clay (CL) was encountered. The underlying clay stratum was a poorly-graded sand with a trace of gravel (SP) to the maximum depth explored. The underlying soil layers in the borings are described in more detail below. • Granular soils (SP, SP-SM, SP-SC, SC) – Below the surface materials, granular soils consisting of fine to coarse sand with a trace to little gravel (SP), fine to coarse sand with silt (SP-SM), clayey fine to coarse sand (SC), and fine to coarse sand with clay (SP-SC) were encountered to depths ranging from 5½ to 11½ feet bgs. The relative density of the granular soil was very loose to medium dense with Standard Penetration Test (SPT) N- values ranging from 0 to 14 blows per foot (bpf), generally decreasing with depth. • Silt (ML), and Clayey Silt (CL-ML) – Below the granular soils, silt (ML) was encountered to the terminal depth of the borings or 9 to 22 feet bgs. The silt was typically no t cohesive and contained random amounts of gravel. The relative density of the silt was loose to medium dense with Standard Penetration Test (SPT) N-values ranging from 5 and 13 bpf, typically in the 5 to 8 bpf range. At locations within the silt stratum, thin layers of clayey silt (CL-ML) was encountered. Where encountered, the consistency of the clayey silt was very stiff with a hand penetrometer reading of 2.7, and a moisture content of about 29 percent. • Sandy Clay (CL) – At the deeper boring locations, a stratum of sandy clay with a trace of gravel was encountered to the terminal depth of the borings. The consistency of the clay Weaver Consultants Group 4 was stiff to very stiff based on hand penetrometer readings ranging from 1.4 to 3 tons per square feet (tsf), and moisture contents ranging from 10 to 13 percent. 3.2 Groundwater Conditions Groundwater level observations noted during and after completion of the drilling operations are recorded on the boring logs. Based on these observations, groundwater was encountered at depths about 5 to 5½ feet bgs. Given the presence of near surface granular soil underlain by less permeable silt, it is our opinion that the groundwater is perched on the silt stratum. Sand deposits are relatively pervious, and water can drain into the borehole somewhat quickly and come to an equilibrium position. However, fluctuations in the water table should be anticipated througho ut the year with variations in precipitation and other environmental or physical factors. Seasonal fluctuations in the groundwater level should be expected due to variations in precipitation, evaporation and surface water runoff. Weaver Consultants Group 5 4 DESIGN RECOMMENDATIONS 4.1 Basis Our recommendations for the proposed storm sewer are based on data presented in this report, which includes four test borings along the proposed alignment. Subsurface variations can exist at a site which may not be indicated by such a dispersed and limited boring program, particularly given the presence of existing below-grade utilities and expected associated fill soil. If such variations or unexpected conditions are encountered during construction, or if the project information discussed herein is incorrect or changed, we should be informed immediately since the validity of our recommendations may be affected. 4.2 Storm Sewer Recommendations Prior to excavating trenches for piping in those areas where cut-and-cover techniques will be used, we recommend that all underground utilities within the project limits be relocated or temporarily removed where necessary. Following relocation/removal of utilities, excavation for the piping may then proceed. Based on our observations of the subsurface conditions, we anticipate that excavations for the system will typically expose very loose to medium dense granular-type soils. Considering the granular nature of the soils, it is our opinion that the excavated granular soils may be re-used as backfill. Granular soils (i.e., soils containing less than 12 percent fines) which meet the requirements discussed in Section 5.3 are considered conducive for pipe support and fill placement. To reduce the risk of settlement of the backfill, we recommend that the bedding material and soils used for structural backfill surrounding the pipe be mechanically compacted to a minimum of 95 percent of the standard Proctor density (ASTM D 698). Where the storm sewer is beneath roadways, we recommend the fill be compacted to 98 percent of Standard Proctor density. Additionally, periodic field density tests performed by WCG are recommended during fill placement to determine the adequacy of compactive effort. Considering we anticipate that granular-type soil will be encountered at the pipe inverts, a separate bedding material may not be required. The borings did note the occasional presence of cobbles near the probable sewer depths. Cobbles should be relocated away from the installed sewer as to not create hard points on the pipe. Granular backfill placed around the pipe in uniform layers, not exceeding 6 in. in loose lift thickness, is recommended. We also recommend that the backfill be placed and hand compacted in layers simultaneously on each side of the pipe. In our opinion, compaction equipment should operate parallel to the axis of the pipe and over-compaction may cause movement of the pipe prior to being seated. Therefore, caution should be exercised during this initial phase of pipe placement. Note that the pipe manufacturer may provide backfill requirements/procedures pertaining to their particular pipe. If this is the case, then the manufacturer's specifications should be adopted. Weaver Consultants Group 6 4.3 Structure Foundation Considerations In general, the soil conditions, as previously described, appear to be adequate for the support of manhole or outlet structures. An exception to this is in the vicinity of Boring B-1 where the granular soils beneath a depth of about 5 feet are very loose. For structures in this area, we recommend the very loose soil be removed to a depth of 2 feet below the structure bottom and replace with compacted coarse aggregate meeting the general gradation requirements for Indiana Department of Transportation (INDOT) No. 8 coarse aggregate. Based on these conditions, we recommend that the base be proportioned using a net allowable soil bearing pressure of 2,000 psf. In our opinion, the subgrade should be compacted to densify the soils loosened by the excavation process to minimize the risk of excessive settlement. Since groundwater is likely to be below the base of the structures, the effects of buoyancy are not likely to be a consideration. 4.4 Dry Wells We understand that dry wells are being considered to provide infiltration of the collected runoff into the below grade stratum. Groundwater was generally encountered at a depth of about 5 feet below the ground surface. The soil profile above the groundwater was somewhat mixed with fine to coarse sand and fine to coarse sand with silt. These soils are generally conducive to infiltration of water. Below the water table the soil profile was even more mixed with some locations having sand (SP), silty sand (SM) and clayey sand (SC) underlain by silt (ML). The silty sand, clayey sand, and silt are far less permeable than the sand soils and infiltration will within these zones will be slow and limited. In addition to the infiltration issue, excavation below the groundwater level will require dewatering and shoring to prevent soil collapse of the excavation sidewalls. Two soil particle size distribution tests were performed on representative samples of the sand (SP) type soil. Results of these test were used to estimate the soil infiltration rate. The estimated infiltration rates based on the Hazen Formula are presented in Table 1. Table 1 – Summary of Infiltration Estimates Location Depth (ft.) Infiltration Rate (in./hr.) Correction Factor Design Rate (in./hr.) Soil Classification (USCS) B-1 8½ - 10 100 3 33 SAND with SILT, some gravel (SP-SM) B-4 3½ - 5 44 3 15 SAND with SILT, little gravel (SP-SM) Based on the results of our laboratory analysis, the soils classified as sand can be considered to have a design infiltration in excess of 10 inches/hour or the maximum limit provided by local code. Weaver Consultants Group 7 4.5 Pavement Considerations The pavement subgrade is anticipated to consist of “B” Borrow type soil or crushed stone placed to improve the subgrade conditions or structure backfill placed during backfill of the sewer. Provided the subgrade is prepared in accordance with the recommendations provided herein, these conditions are anticipated to be suitable for support of the pavement. We recommend the following parameters be considered for pavement design, if necessary. As we anticipate a minimum of 2 feet of soil will require improvement, we have recommended a Type I subgrade treatment in accordance with INDOT Standard Specifications Section 207.04. Table 2 below provides a summary of the pavement design parameters. Table 2: Summary of Pavement Design Parameters Mr for Improved Subgrade 7,500 psi Mr for Natural Subgrade 5,000 psi Subgrade Material Sand (A-1-b) Depth to Water Greater than 5 feet Subgrade Treatment* Type I * Per Indiana Department of Transportation Standard Specifications 207.04. Weaver Consultants Group 8 5 CONSTRUCTION CONSIDERATIONS 5.1 Site Preparation The construction of the sewer is substantially an excavation type project. No placement of fill for support of the structure is anticipated for the project. Site preparation is essentially excavation to the sewer invert. Once the new structure subgrade has been established, we recommend the subgrade soils be densified via several passes of a high-energy vibratory compactor. Where the subgrade crosses existing utilities, consideration of the use of light-weight compactor so as not to damage the utility. Where backfill is required around the new pipe and structures, we recommend that it consist of granular structural fill. The structural fill should meet the requirements of Section 5.3 and be placed in accordance with Section 5.4. 5.2 Utility/Storm Water Structure Excavations Excavations should be sloped, shielded or shored in accordance with the current Occupational Safety and Health Administration (OSHA) requirements (see Section 5.7). Once the necessary subgrade level is reached, no addition subgrade preparation is recommended. 5.3 Structural Fill Structural fill, defined as any fill which will support structural loads, should be free of organic material, have a plasticity index of less than 25 percent, a maximum particle size of no more than 3 in., and a maximum dry density in excess of 100 pounds per cubic foot [pcf, as determined by the standard Proctor compaction test (ASTM D698)]. In addition, structural fill should not be frost susceptible. The structural fill should be compacted to at least 9 8 percent of its maximum standard Proctor dry density (ASTM D698) under the foundations and roadways. The near surface soils are considered suitable for use as structural fill. 5.4 Fill Placement Control To achieve the recommended compaction of structural fill, we recommend that the fill be placed and compacted in layers not exceeding 8 inches in loose lift thickness. To observe compliance with the recommended density standards, we recommend that in -place density tests be performed at a frequency of at least one test for every 100 square feet of pipe length per each lift of compacted fill placed in the proposed construction areas. 5.5 Construction Observations We recommend that all pavement and structure subgrades be observed by a qualified Geotechnical Engineer or his representative prior to placement. These observations are to evaluate that the exposed soils are consistent with those encountered in the borings and to check that the materials are of uniform consistency and adequate density. Weaver Consultants Group 9 5.6 Groundwater Concerns Depending on the depth of the sewer and structures, dewatering may be required to remove and replace very loose soil conditions or improve subgrades prior to placement of pipe . However, whenever a rain event occurs during construction, water flow in the creek can be expected and construction activities should be managed to account for these events and protect completed work. If minor dewatering is required in silty areas, it can be accomplished by pumping from sumps installed at the bottoms of the excavations. 5.7 Excavation Slope Stability Our exploration did not include a detailed analysis of slope stability for any temporary excavation condition. Based on the soil conditions encountered at the boring locations, temporary shallow construction excavations are expected to expose fine sandy soils. For such conditions, it is our opinion that shallow temporary excavations can be cut with side slopes of 1.5H:1V. However, current OSHA standards must be met and may be more restrictive. Hence, if safe side slopes cannot be maintained due to loose granular soil conditions, then the excavation sides should be flattened, shielded or shored in accordance with current OSHA standards. The Contractor is solely responsible for constructing and maintaining stable excavations. Additionally, soil should not be stockpiled immediately adjacent to the top of the excavation. 5.8 Limitations WCG has prepared this report in accordance with generally accepted geotechnical engineerin g practices to aid in the evaluation of the site subsurface soils. No other warranty, expressed or implied, is made. The scope of this report is limited to the specific project and location described herein, and our description of this project represents our understanding of the project. The geotechnical engineering analysis and foundation recommendations presented herein were developed based on the information obtained during the subsurface investigation. It should be noted that the borehole data reflects the subsurface conditions only at the specific locations designated on the borehole logs, and that soil and groundwater conditions could vary widely throughout the site. If variations do appear during construction activities, it may become necessary to re-evaluate the recommendations of this report. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of any additional service, please do not hesitate to contact us. Weaver Consultants Group FIGURES FIGURE 1: SITE LOCATION PLAN FIGURE 2: BORING LOCATION PLAN Weaver Consultants Group APPENDICIES Weaver Consultants Group APPENDIX A BORING LOGS PARTICLE SIZE DISTRIBUTION REPORT 0.5 5.5 11.5 15.0 **C.I. = 8 feet at completion Dark brown, silty sand (TOPSOIL: SM) Medium dense to loose, moist ot wet, brown, FINE TO COARSE SAND, trace gravel (SP) Very loose, wet, brown and gray, FINE TO COARSE SAND, trace gravel (SP) Loose to medium dense, gray, SILT (ML) Boring Terminated at 15 ft 9/7/6 (13) 3/2/2 (4) 1/0/0 (0) 1/0/1 (1) 3/3/2 (5) 3/5/6 (11) 1 2 3 4 5 6 Hrs. A.D.* NOTES: ft At Completion** ft At Laurel Woods Drainage Lindenwood Drive West and Auten Road South Bend, Indiana McCormick Engineering, LLC 5.5 6 --- --- ft While Drilling 1. Weather: Partly Sunny, 55-58°F 2. Used automatic hammer 3. Backfilled with bentonite chips PROJECT: ft At WATER LEVEL DATANE = Not Encountered CLIENT: 234 N. Ironwood Dr. South Bend, Indiana 46615 Hrs. A.D.*** 9/28/2020 9/28/2020 K. Miller M. Clark Probe 6620 DT Drive Casing Started: Completed: Geologist: Driller: Drilling Equip.: Drilling Method: = No Recovery = Split-Spoon Sample = Geoprobe = Vane Shear Test = Grab Sample = Shelby Tube LEGEND = Auger = Core SampleLOI (%)Elevations (ft)RecoveryNumberTypeMoistureContent %BORING AND SAMPLING NOTES Strata Depth (ft)SymbolStandardPenetrationTest-Blows/6"(#)= "N" Value Qp (tsf)SOIL DESCRIPTION, CLASSIFICATION and USCS or AASHTO GROUP SYMBOL Depth (ft)DATUM: SURFACE ELEVATION (ft) +/-: File No.: 4974-352-19-00 Weaver Consultants Group Sheet 1 of 1 5 10 15 20 25 LOG OF SOIL BORING NO.: B-1 7121 Grape Road, Granger, IN 46530 574-271-3447(Phone)/574-271-3343(Fax) Location: See Boring Location Plan WEAVER BLOCK LOG 4974-352-19-00_LAUREL WOODS DRAINAGE.GPJ 9/30/20 0.8 5.5 8.0 12.5 22.0 25.0 **C.I. = 5 feet at completion Dark brown, silty sand (TOPSOIL: SM) Medium dense to loose, FINE TO COARSE SAND with SILT, trace gravel (SP-SM) Medium dense, wet, brown and gray, CLAYEY FINE TO COARSE SAND, some gravel and cobbles (SC) Medium dense to loose, wet, gray, SILT (ML) Stiff, gray, CLAYEY SILT with loose SILT seams (CL-ML / ML) Very stiff, gray, SANDY LEAN CLAY, trace gravel and cobbles (CL) Boring Terminated at 25 ft 8/8/6 (14) 5/2/2 (4) 1/4/8 (12) 5/6/7 (13) 4/4/4 (8) 2/2/4 (6) 3/3/4 (7) 3/6/7 (13) 28.6 10.1 1 2 3 4 5 6 7 8 2.7 1.9 Hrs. A.D.* NOTES: ft At Completion** ft At Laurel Woods Drainage Lindenwood Drive West and Auten Road South Bend, Indiana McCormick Engineering, LLC 5.5 D --- --- ft While Drilling 1. Weather: Partly Sunny, 55-58°F 2. Used automatic hammer 3. Backfilled with bentonite chips PROJECT: ft At WATER LEVEL DATANE = Not Encountered CLIENT: 234 N. Ironwood Dr. South Bend, Indiana 46615 Hrs. A.D.*** 9/28/2020 9/28/2020 K. Miller M. Clark Probe 6620 DT Drive Casing Started: Completed: Geologist: Driller: Drilling Equip.: Drilling Method: = No Recovery = Split-Spoon Sample = Geoprobe = Vane Shear Test = Grab Sample = Shelby Tube LEGEND = Auger = Core SampleLOI (%)Elevations (ft)RecoveryNumberTypeMoistureContent %BORING AND SAMPLING NOTES Strata Depth (ft)SymbolStandardPenetrationTest-Blows/6"(#)= "N" Value Qp (tsf)SOIL DESCRIPTION, CLASSIFICATION and USCS or AASHTO GROUP SYMBOL Depth (ft)DATUM: SURFACE ELEVATION (ft) +/-: File No.: 4974-352-19-00 Weaver Consultants Group Sheet 1 of 1 5 10 15 20 25 LOG OF SOIL BORING NO.: B-2 7121 Grape Road, Granger, IN 46530 574-271-3447(Phone)/574-271-3343(Fax) Location: See Boring Location Plan WEAVER BLOCK LOG 4974-352-19-00_LAUREL WOODS DRAINAGE.GPJ 9/30/20 0.7 5.5 9.0 15.0 Moist, brown, SAND AND GRAVEL (GP) Medium dense to loose, FINE TO COARSE SAND with SILT, trace gravel (SP-SM) Stiff, gray, layered brown SAND with Gravel, and gray SILT with Gravel (SP-SM / ML) Very stiff, gray, SANDY LEAN CLAY, trace gravel and cobbles (CL) Boring Terminated at 15 ft 7/7/2 (9) 4/4/4 (8) 3/3/3 (6) 5/4/4 (8) 4/6/7 (13) 8/8/7 (15) 12.4 12.4 1 2 3 4 5 6 3.0 2.6 Hrs. A.D.* NOTES: ft At Completion** ft At Laurel Woods Drainage Lindenwood Drive West and Auten Road South Bend, Indiana McCormick Engineering, LLC 5 ft While Drilling 1. Weather: Partly Sunny, 55-58°F 2. Used automatic hammer 3. Backfilled with bentonite chips PROJECT: ft At WATER LEVEL DATANE = Not Encountered CLIENT: 234 N. Ironwood Dr. South Bend, Indiana 46615 Hrs. A.D.*** 9/28/2020 9/28/2020 K. Miller J. Smith Probe 6620 DT Drive Casing Started: Completed: Geologist: Driller: Drilling Equip.: Drilling Method: = No Recovery = Split-Spoon Sample = Geoprobe = Vane Shear Test = Grab Sample = Shelby Tube LEGEND = Auger = Core SampleLOI (%)Elevations (ft)RecoveryNumberTypeMoistureContent %BORING AND SAMPLING NOTES Strata Depth (ft)SymbolStandardPenetrationTest-Blows/6"(#)= "N" Value Qp (tsf)SOIL DESCRIPTION, CLASSIFICATION and USCS or AASHTO GROUP SYMBOL Depth (ft)DATUM: SURFACE ELEVATION (ft) +/-: File No.: 4974-352-19-00 Weaver Consultants Group Sheet 1 of 1 5 10 15 20 25 LOG OF SOIL BORING NO.: B-3 7121 Grape Road, Granger, IN 46530 574-271-3447(Phone)/574-271-3343(Fax) Location: See Boring Location Plan WEAVER BLOCK LOG 4974-352-19-00_LAUREL WOODS DRAINAGE.GPJ 9/30/20 0.5 3.0 5.5 7.0 17.0 20.0 **C.I. = 4 ft at completion Dark brown, silty sand (TOPSOIL: SM) Medium dense to loose, FINE TO COARSE SAND, little gravel (SP) Medium dense, wet, brown and gray, FINE TO COARSE SAND, little gravel, with cobbles (SP) Medium dense, wet, brown, FINE TO COARSE SAND, little gravel (SP) Stiff, gray, layered brown SAND with Gravel, and gray SILT with Gravel (SP-SM/ML) Very stiff, gray, SANDY LEAN CLAY, trace gravel and cobbles (CL) Boring Terminated at 20 ft 5/4/2 (6) 2/1/1 (2) 6/7/6 (13) 4/4/7 (11) 2/3/5 (8) 5/3/3 (6) 5/5/6 (11)10.4 1 2 3 4 5 6 7 1.4 Hrs. A.D.* NOTES: ft At Completion** ft At Laurel Woods Drainage Lindenwood Drive West and Auten Road South Bend, Indiana McCormick Engineering, LLC 5.5 D --- --- ft While Drilling 1. Weather: Partly Sunny, 55-58°F 2. Used automatic hammer 3. Backfilled with bentonite chips PROJECT: ft At WATER LEVEL DATANE = Not Encountered CLIENT: 234 N. Ironwood Dr. South Bend, Indiana 46615 Hrs. A.D.*** 9/28/2020 9/28/2020 K. Miller M. Clark Probe 6620 DT Drive Casing Started: Completed: Geologist: Driller: Drilling Equip.: Drilling Method: = No Recovery = Split-Spoon Sample = Geoprobe = Vane Shear Test = Grab Sample = Shelby Tube LEGEND = Auger = Core SampleLOI (%)Elevations (ft)RecoveryNumberTypeMoistureContent %BORING AND SAMPLING NOTES Strata Depth (ft)SymbolStandardPenetrationTest-Blows/6"(#)= "N" Value Qp (tsf)SOIL DESCRIPTION, CLASSIFICATION and USCS or AASHTO GROUP SYMBOL Depth (ft)DATUM: SURFACE ELEVATION (ft) +/-: File No.: 4974-352-19-00 Weaver Consultants Group Sheet 1 of 1 5 10 15 20 25 LOG OF SOIL BORING NO.: B-4 7121 Grape Road, Granger, IN 46530 574-271-3447(Phone)/574-271-3343(Fax) Location: See Boring Location Plan WEAVER BLOCK LOG 4974-352-19-00_LAUREL WOODS DRAINAGE.GPJ 9/30/20 Tested By: JJW Weaver Consultants Group Granger, Indiana 9/30/2020 (no specification provided) PL=LL=PI= D90=D85=D60= D50=D30=D15= D10=Cu=Cc= USCS=AASHTO= * Poorly Graded SAND 1" 3/4" 1/2" 3/8" #4 #8 #16 #30 #50 #100 #200 100.0 100.0 100.0 99.5 95.4 87.3 74.1 52.2 14.2 2.9 2.4 2.8595 2.0458 0.7179 0.5750 0.4075 0.3058 0.2655 2.70 0.87 SP McCormick Engineering, LLC Laurel Wood Drainage 4974-352-19-00 Material Description Atterberg Limits Coefficients Classification Remarks Source of Sample: Boring 1 Depth: 8.5-10 Sample Number: 4 Date: Client: Project: Project No:Figure SIEVE PERCENT SPEC. *PASS? SIZE FINER PERCENT (X=NO)PERCENT FINER0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0.0 0.0 4.6 10.8 52.1 30.1 2.46 in.3 in.2 in.1½ in.1 in.¾ in.½ in.3/8 in.#4#10#20#30#40#60#100#140#200Particle Size Distribution Report ASTM C 136 Tested By: JJW Weaver Consultants Group Granger, Indiana 9/30/2020 (no specification provided) PL=LL=PI= D90=D85=D60= D50=D30=D15= D10=Cu=Cc= USCS=AASHTO= * Poorly Graded SAND 1" 3/4" 1/2" 3/8" #4 #8 #16 #30 #50 #100 #200 100.0 100.0 94.6 92.1 83.6 71.7 58.6 40.1 15.3 9.0 4.9 7.6661 5.2012 1.2612 0.8236 0.4622 0.2956 0.1968 6.41 0.86 SP McCormick Engineering, LLC Laurel Wood Drainage 4974-352-19-00 Material Description Atterberg Limits Coefficients Classification Remarks Source of Sample: Boring 4 Depth: 3.5-5 Sample Number: 2 Date: Client: Project: Project No:Figure SIEVE PERCENT SPEC. *PASS? SIZE FINER PERCENT (X=NO)PERCENT FINER0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0.0 0.0 16.4 14.8 42.1 21.8 4.96 in.3 in.2 in.1½ in.1 in.¾ in.½ in.3/8 in.#4#10#20#30#40#60#100#140#200Particle Size Distribution Report ASTM C 136 Weaver Consultants Group APPENDIX B LOG OF SOIL BORING – GENERAL NOTES UNIFIED SOIL CLASSIFICATION SYSTEM FIELD EXPLORATION BORING LOG PREPARATION LABORATORY TESTING PROCEDURES W.O.H. <2 3 - 4 5 - 8 9 - 15 16 - 30 > 30 A.D. -PMT - BA -QC - CFA - RC - C.I. - CS - RQD - DP - SPT - GP - SS - HA - Over 8 inches HSA -ST - 8 inches to 3 inches HPR - 3 inches to # 4 sieve (4.75 mm)MR - #4 sieve to #200 sieve (0.075 mm)NR -WOH - Passing #200 sieve to 0.005 mm DD -MD - LL -pH - PL -Plastic Limit (%)PID -Photoionization Detector (ppm) PI -Plasticity Index (%)LOI - MC - P200 -QP - QU - BF - D@C.I. - D -NE - RELATIVE DENSITYSPT "N" VALUE* Moist Density (pcf) LOG OF SOIL BORING - GENERAL NOTES After Drilling Extremely Dense>60 DRILLING AND SAMPLING Continuous Flight Auger Cave-In Depth Loss-on-Ignition, Organic Content (%) Very Loose<3<4 Automatic HammerSafety Hammer Medium Dense Dense Hand Auger 1⅜-in. I.D. Split-Spoon Sample (2-in. O.D.) Rock Quality Designation >80 *Number of blows per foot required to drive a 2-in. O.D. split-spoon sampler using a 140-lb. weight falling freely for 30 in., except where otherwise noted. Continuous Sampling 3 - 7 8 - 21 22 - 35 Very Dense36 - 60 ABBREVIATIONS Loose 10 - 29 30 - 50 51 - 80 Dry at Cave-In DepthBackfilled Calibrated Hand Penetrometer Reading (tsf) Organic SAND or SILT Name Organic Content (% by dry weight) OH Not Encountered 5 to 30% Organics either visible or inferred ORGANIC CLASSIFICATION BY LOSS-ON-IGNITION 1 Dry Percentage of Soil Particles, by dry weight, Passing a No. 200 U.S. Standard Sieve FINE GRAINED PEAT (amor- phous) Category OL WATER LEVEL MEASUREMENTS Name Group Symbols No Recovery SIZE RANGE Hollow Probe Rod Mud Rotary Streaked Unconfined Compressive Strength (tsf) Moisture Content (%) Geoprobe Hollow Stem Auger Standard Penetration Test ORGANIC MATTER Light Dark GRADATION DESCRIPTION AND TERMINOLOGY Gravel Cobbles Direct Push Depend upon inorganic fraction Organic Content (% by dry weight)Group Symbols Less than 5% Organics combined visible and inferred 1U.S. Navy, (May 1982), Naval Facilities Engineering Command, Design Manual DM 7.1, "Soil Mechanics," Dept. of Navy, Alexandria, VA. 30 to 75% Organics either visible or inferred FIBROUS PEAT (woody, mats, etc.) SOIL FRACTION add slightly Organic In order to provide uniformity throughout our projects, the following system has been adopted to describe each soil sample. Rock, shale and other materials will be described in detail as encountered. CONSISTENCY OF COHESIVE SOILS RELATIVE DENSITY OF GRANULAR SOILS 4 - 9Very Soft CONSISTENCYUNCONFINED COMPRESSIVE STRENGTH, Qu (TSF)"N" VALUE Soft Medium Stiff Stiff GROUNDWATER LEVELS Water levels are those observed when borings were drilled, or as noted. Porosity of soil strata, variations of rainfall, site topography, etc., may cause changes in these levels. Blue Black ORGANIC SOILS Clayey ORGANIC SILT75 to 100 % Organics either visible or inferred PT HIGHLY ORGANIC SOILS Sandy Peat SLIGHTLY ORGANIC SOILS Category DESCRIPTION OF COMPONENT ALSO PRESENT IN SAMPLE PERCENT BY DRY WEIGHT Trace PT Silty Peat Brown Gray Smaller than 0.005 mm COMPONENTS Silt Sand Boulders Clay Soil Alkalinity/AcidityLiquid Limit % Very Hard Bucket Auger (3¼-in. O.D.), except where noted Mottled 3-in. O.D. Thin-Walled Shelby Tube Sample, except where noted Dry Density (pcf) COLOR - AS DETERMINED ON THE FRESH, MOIST SAMPLES PREDOMINATE COLORS Weight of Hammer LABORATORY TESTS < 0.25 0.25 - 0.49 0.50 - 0.99 1.00 - 1.99 Very Stiff Hard 2.00 - 3.99 4.00 - 8.00 > 8.00 Rock Core with diamond bit NX size, except where noted Static Cone Penetrometer Reading (tsf) Pressuremeter Test MODIFYING ADJECTIVES Vari-colored SHADES Yellow Red Little Some And 1 - 9 10 - 19 20 - 34 35 - 50 Classification on basis of percentage of fines by dry wt. Well-graded gravels and gravel-sand mixtures, GRAVELS Clean little or no fines < 5% passing Gravels Poorly-graded #200 sieve = 50% or gravels and GW, GP, COARSE-more gravel-sand mixtures,SW, SP of coarse little or no fines fraction Silty gravels, retained gravel-sand-silt > 12% passing SOILS on #4 Gravels mixtures #200 sieve = sieve w/fines Clayey gravels and GM, GC, gravel-sand-clay SM, SC mixtures More than Well-graded sands 50% retained and gravelly sands,5% to 12% on No. 200 SANDS Clean little or no fines passing sieve Sands Poorly-graded sands #200 sieve = More than and gravelly sands,Borderline 50%little or no fines Classifications of coarse Silty sands and requiring use of fraction sand-silt dual symbols passes Sands mixtures #4 sieve w/fines Clayey sands and sand-clay mixtures Inorganic silts, very fine sands, rock flour, silty or clayey fine sands Inorganic clays of low to medium plasticity, gravelly FINE-clays, sandy clays silty clays, lean clays Organic silts and organic silty clays SOILS of low plasticity Inorganic silts, micaceous or diatomaceous fine 50% or more sands or silts, passes elastic silts No. 200 Inorganic clays of sieve high plasticity Fat clays Organic clays of medium to high plasticity Peat, Muck and other highly organic soils than 50% HIGHLY ORGANIC SOILS ML CL UNIFIED SOIL CLASSIFICATION SYSTEM SILTS & CLAYS SILTS & CLAYS Liquid Limit GM CH OH SW SP Atterberg limits plot below "A" line and placticity index less than 4 Atterberg limits plot above "A" line and plasticity index greather than 7 Atterberg limits plot below "A" line and placticity index less than 4 Atterberg limits plot above "A" line and plasticity index greather than 7 GRAINED GC Not meeting both criteria for GW Not meeting both criteria for SW Atterberg limits plotting in hatched area are borderline classificaiton requireing use of dual symbols SM Plasticity Chart Major Divisions Group Symbol Typical Names Laboratory Classification Criteria Atterberg limits plotting in hatched area are borderline classification requiring use of dual symbols GP GW PT GRAINED SC OL MH Limit 50% or less Liquid greater 𝐶𝑡=𝐶60 𝐶10 𝐺𝑟𝑎𝑎𝑡ℎ𝑎𝑟𝑇ℎ𝑎𝑛6;𝑎𝑛𝑎𝐶𝑎=𝐶30 2 𝐶10 𝑤𝐶60 𝑎𝑎𝑡𝑤𝑎𝑎𝑛1 𝑎𝑛𝑎3 𝐶𝑡=𝐶60 𝐶10 𝐺𝑟𝑎𝑎𝑡𝑎𝑟𝑇ℎ𝑎𝑛4;𝑎𝑛𝑎𝐶𝑎=𝐶30 2 𝐶10 𝑤𝐶60 𝑎𝑎𝑡𝑤𝑎𝑎𝑛1 𝑎𝑛𝑎3 FIELD EXPLORATION PROCEDURES  Standard Penetration Test Soil Borings  General  We wish to point out that the soils actually recovered from our borings for observation and  testing represent a very small percentage of the site soils.  Our records depict subsurface  conditions only at specific locations and at the particular time when drilling.  Soil conditions at  other locations may differ from conditions occurring at these boring locations.  The passage of  time may result in a change in the subsurface soil and groundwater conditions at the boring  locations.  The interface between differing subsurface materials on the logs and profiles  represent approximate boundaries.  The transition between materials may be gradual.  Also,  thin strata that occur between sample depths may be present, but remain undetected by  routine sampling procedures.  Drilling Procedures  Soil borings were performed at the approximate locations shown on the attached boring plan.   The soil borings were advanced by mechanically twisting a continuous steel‐flight, hollow‐stem  auger into the soil.  The inside diameter (I.D.) of the hollow‐stem auger is typically 3‐¼ in.  (sometimes a 6‐in. I.D. auger is used, particularly when installing 4‐in. diameter monitoring  wells).  The auger is turned into the ground, which displaces the soil upwards as it advances.  Once the  desired sample depth is achieved, the advancement of the hollow‐stem auger is stopped.  The  hollow‐stem is then cleaned of any soil and the sampling tools are inserted, and the sampling is  performed.  When drilling below the water table in pervious soils, a head of water is maintained  in the hollow‐stem, to prevent a "quick" condition at the auger tip.  Penetration Testing and Split‐Barrel Sampling  Standard Penetration Testing and split‐barrel sampling are normally conducted in the borings to  provide relative density information and soil samples for visual classification and laboratory  testing.  The standard split‐barrel (commonly called split‐spoon) sampler is a 2‐in. O.D.,  1.375‐in. I.D., typically 18 to 24 in. long and is connected to an AW or N size drilling rod.  The  sampler is then driven into the soil with a force of a 140 lb. hammer free‐falling a distance of 30  in.  The number of hammer blows required to drive the sampler into the soil is recorded for  each 6‐in. interval.  The sampler is typically driven a total of 18 in., and the last two 6‐in.  interval blow counts are added together and commonly referred to as the "N" value, blow  count or penetration resistance.  Representative samples are placed in airtight glass jars and  returned to our laboratory for further observation and testing.  Descriptions of the spilt‐barrel  samples and the penetration resistances are shown on the boring logs.  Shelby Tube Sampling Procedure  In the Shelby tube sampling procedure, a thin‐walled steel seamless tube with a sharp cutting  edge is pushed hydraulically into the soil and a relatively undisturbed sample is obtained.  This  procedure is generally employed in cohesive soils.  The tubes are carefully handled in the field  to avoid excessive disturbance and are returned to the laboratory for extrusion and further  analysis and testing.  Calibrated Pocket Penetrometer Testing  The strength of cohesive soils does not correlate as well as granular materials with the Standard  Penetration Testing described above.  Typically, we test split‐barrel samples of cohesive soils  with a calibrated pocket penetrometer in the field.  This test involves pushing a spring‐loaded  piston, 0.25‐in. in diameter, into the sample and measuring the spring deflection, which has  been correlated to shear strength.  This test is used as a rough approximation method only.   More refined results require undisturbed Shelby tube sampling and laboratory unconfined  compressive strength testing.  Water Level Readings  When the drilling crew notices groundwater or significant variations in soil moisture, they are  recorded on the boring logs.  Generally, the level of water at the time of drilling is measured  and recorded.  The readings may indicate the approximate level of the hydrostatic water table  at the time of our drilling activities.  Where low permeability soils are encountered, the water seeps into the borings at a slow rate,  and it is generally not possible to establish accurate groundwater level readings in an open  borehole during the drilling operations.  If water‐drilling methods are used, a local groundwater  "mound" could be created, taking several days to dissipate.  Also, the groundwater level  typically fluctuates on a long‐term or seasonal basis, due to variations in precipitation, surface  run‐off, evaporation, etc.  When these long‐term readings are required, piezometers or  monitoring wells are necessary to maintain an open hole.  Boring Log Preparation  The subsurface conditions encountered during drilling are reported on a field log recorded by  the chief driller.  The driller's field record contains information concerning the boring method,  samples attempted and recovered, indications of the presence of various materials such as  coarse gravel, cobbles, etc., and observations between samples.  Therefore, these records  contain both factual and interpretive information.  The field logs are on file in our office.  The soil samples, plus the field logs, are reviewed by a geotechnical engineer, geologist, or  geotechnician.  The engineer/geologist/geotechnician then classifies the soil in general  accordance with the Unified Soil Classification System and prepares the final boring logs, which  are the basis for our evaluations and recommendations.  The group symbol for each soil type is  indicated in parentheses following the soil descriptions on the boring logs.  The final boring logs  represent our interpretation of the contents of the field logs based on the results of the  engineering review and laboratory testing of the field samples.  The final boring logs are  included in this section.  K:\Wbgm\Appendices for Geo. Rpts\Field Exploration Appendix\Lab\Lab Testing Proced+Grain-size_MC_Qp.doc_09/24/20 11:41 AM LABORATORY TESTING PROCEDURES Representative soil samples were selected and tested in our laboratory in order to check field classifications and to evaluate pertinent engineering properties. The laboratory testing program included visual classification of all samples and hand penetrometer tests on all cohesive samples. In the hand penetrometer test, the unconfined compressive strength of a cohesive soil is estimated by measuring the resistance of the soil sample to penetration by a small spring calibrated cylinder. Any additional tests are described below or on the following sheet(s). Appropriate data obtained from laboratory tests are also included on the respective boring logs. A geotechnical engineer classified each soil sample on the basis of texture and plasticity in accordance with the Unified Soil Classification System (ASTM D 2487 and/or ASTM D 2488). The group symbol for each soil type is indicated in parentheses following the soil descriptions on the boring logs. A brief explanation of the Unified System is included with this report. Data obtained from the field logs and appropriate laboratory tests have been shown on the boring logs. The procedures used in preparing the final boring logs are described on the sheet entitled “Field Exploration Procedures.” It should be noted that the geotechnical engineer grouped the various soil types into the major zones noted on the boring logs. The stratification lines designating the interfaces between earthen materials shown on the boring logs and profiles are approximate; in-situ, the transitions may be gradual. All samples will be retained in our Granger, Indiana laboratory for a period of thirty (30) days after which they will be discarded unless other instructions as to their dispos al are received. Grain Size Tests Grain-size tests are performed to determine the soil classification and the grain-size distribution. The soil samples are prepared for testing according to ASTM D 421 (dry preparation) or ASTM D 2217 (wet preparation). The grain-size distribution of soils coarser than a No. 200 U.S. Standard sieve (0.074 mm opening) is determined by passing the samples through a standard set of nested sieves. Materials passing the No. 200 U.S. Standard sieve are either suspended in water and the grain-size distribution calculated in accordance with ASTM D 422, or are washed over the No. 200 sieve in accordance with ASTM D 1140. K:\Wbgm\Appendices for Geo. Rpts\Field Exploration Appendix\Lab\Lab Testing Proced+Grain-size_MC_Qp.doc_09/24/20 11:41 AM Moisture Content Tests Moisture content tests were performed on selected soil samples. The moisture content has a significant effect on the strength, compressibility and general behavior of the soil. Calibrated Pocket (Hand) Penetrometer Testing This test involves pushing a spring-loaded piston, 0.25-in. in diameter, into the sample and measuring the spring deflection, which has been correlated to shear strength. This test is used as a rough approximation method only. More refined results require undisturbed Shelby tube sampling and laboratory unconfined compressive strength testing. Weaver Consultants Group APPENDIX C GENERAL QUALIFICATION CONTRACTURAL CONSIDERATIONS K:\Wbgm\Appendices for Geo. Rpts\Qualifications Apendix\Genqualw.doc  09/30/15 9:35 AM  GENERAL QUALIFICATIONS  This report has been prepared at the request of our client for his use on this project.  The work,  including the field work, laboratory testing, and engineering analysis, was performed in  accordance with generally accepted Geotechnical Engineering practices.  For this study, we  were not retained to address environmental or land use restriction concerns.  This warranty is  in lieu of all other warranties either expressed or implied.  This report may not contain sufficient information for purposes of other parties or other uses.   Should there be any sufficient differences in structural arrangement, loading or location of the  structure, our analysis should be reviewed.  The analysis, conclusions, and recommendations contained in our report are based on site  conditions as they existed at the time of our exploration and further assume that the borings  are representative of the subsurface conditions throughout the site.  If during construction, different subsurface conditions from those encountered during our  exploration are observed or appear to be present beneath excavations, we must be advised  promptly so that we can review these conditions and reconsider our recommendations where  necessary.  If there is a substantial lapse of time between the submission of our report and the start of  work at the site, or if conditions have changed due to natural causes or construction operations  at or adjacent to the site, we urge that our report be reviewed to determine the applicability of  the conclusions and recommendations considering the changed conditions and time lapse.  We urge that we be retained to review those portions of the plans and specifications that  pertain to earthwork and foundations to determine whether they are consistent with our  recommendations.  In addition, we are available to observe construction, particularly the  compaction of structural backfill and preparation of the foundations, and such other field  observations as may be necessary.  In order to fairly consider changed or unexpected conditions that might arise during  construction, we recommend the following verbiage to be included in the project contract.  K:\Wbgm\Appendices for Geo. Rpts\Qualifications Apendix\Genqualw.doc  09/30/15 9:35 AM  STANDARD CLAUSE FOR UNANTICIPATED SUBSURFACE CONDITIONS  The owner has had a subsurface exploration performed by a Geotechnical consultant, the  results of which are contained in the consultant’s report.  The consultant’s report presents his  conclusions on the subsurface conditions based on his interpretation of the data obtained in  the exploration.  The contractor acknowledges that he has reviewed the consultant’s report and  any addenda thereto, and that his bid for earthwork operations is based on the subsurface  conditions as described in that report.  It is recognized that a subsurface exploration may not  disclose all conditions as they actually exist and further, conditions may change, particularly  groundwater conditions, between the time of a subsurface exploration and the time of  earthwork operations.  In recognition of these facts, this clause is entered in the contract to  provide a means of equitable additional compensation for the contractor if adverse  unanticipated conditions are encountered and to provide a means of rebate to the owner if the  conditions are more favorable than anticipated.  Should the contractor encounter conditions that are different than those anticipated by the  Geotechnical consultant’s report at any time during construction operations, he shall  immediately (within 24 hours) bring this fact to the owner’s attention.  If the owner’s  representative on the construction site observes subsurface conditions which are different than  those anticipated by the consultant’s report, he shall immediately (within 24 hours) bring this  fact to the contractor’s attention.  Once a fact of unanticipated conditions has been brought to  the attention of either the owner or the contractor, and the consultant has concurred,  immediate negotiations will be undertaken between the owner and the contractor to arrive at  a change in contract price for additional work or reduction in work.  The contractor agrees that  the following unit prices would apply for additional or reduced work under the contract.  For  changed conditions in which unit prices are not provided, the additional work shall be paid for  on a time and material basis.  R GEISTERE DNo. 19800330 STATE OF DN I AINAPROFES S I ONAL ENGINEERKC IMROCCM OEL DIV ADPROJECT TRAFFICSEWERWATER STREET OTHER PLANS PREPARED BY:PLANS PREPARED FOR: DEPARTMENT OF PUBLIC WORKS CITY OF SOUTH BEND, INDIANA APPROVED BY BOARD OF PUBLIC WORKS DATE TABLE OF CONTENTS RECOMMENDED BY PUBLIC WORKS DEPARTMENT STAFF DATE SPECIFICATIONS, LATEST EDITION, TO BE USED WITH THESE PLANS CITY OF SOUTH BEND, INDIANA PREVAILING CONSTRUCTION STANDARDS & South Bend, IN 46601 1316 County-City Building Department of Public Works City of South Bend, Indiana F: (574) 232-6868 P: (574) 232-6800 South Bend, IN 46615 234 N. Ironwood Drive McCormick Engineering, LLC JOSEPH R. MOLNAR JORDAN V. GATHERS MURRAY MILLER GARY A. GILOT ELIZABETH A. MARADIK REVISIONS McCormick Engineering MEMBER MEMBER MEMBER MEMBER PRESIDENT TOY VILLA KARA M. BOYLES, PH.D, P.E. REBECCA PLANTZ, EI CONSTRUCTION CITY ENGINEER ADMINISTRATION AND DESIGN PROFESSIONAL ENGINEER No. 19800330 DAVID L. McCORMICK DATE N N.T.S. Project Location Traffic Control Signage Details13. Traffic Control Plan12. Dewatering Plan11. Restoration Plan10. Pond Grading Plan9. Sewer and Pond Cleaning Plan8. Soil Borings7. Existing Conditions6. Existing Conditions5. Access Control Plan4. Survey Control Plan3. General Plan2. Cover Sheet1. 5/18/2021 PROJECT NAME City Project No. 121-007 MAINTENANCE PROJECT LAUREL WOODS I-80 I-80 CITY LIMITSCITY LIMITSS T. J OS E P H VAL L E Y P KWYU.S. 31WESTERN AVEU.S. 20/LI NCOLNW AYMICHIGAN STMAIN STIRELAND RD LINCOLNWAY PRAIRE AVE MIAMI STIRONWOOD DRJOHNSON RD JACKSON RD KERN RD P ORT AGE AVESB AVE/S.R. 23 MAYFLOWER RDLOGAN STEDDY STEWING ST SAMPLE ST U.S. 20/McKINLEY AVE OLIVE STJEFFERSON BLVD TWYCKENHAM DRST. JOSEPH RIVERAUTEN RD LAUREL RD T 0 HORIZONTAL SCALE IN FEET 400 200 General Notes Control of Site information. proposed excavation. Visit Indiana811.org for more contact to reach member utilities to notify them of your start of their project. Indiana 811 offers a one-point must call at least two (2) full working days prior to the engaged in excavation using mechanized equipment Indiana State Law (IC8-1-26) requires that anyone 2. work. utilities prior to any and all construction or fabrication verify the exact locations of all existing underground ground evidence was observed. The Contractor shall is no above ground evidence or for which no above additional existing underground utilities for which there not all inclusive or necessarily reliable. There may be information is provided as general information but is marks made upon the ground by others). This utility (including but not limited to: manholes, inlets, poles and plans are based upon above ground evidence The location of any underground utilities shown on the 1. Ph: 574-235-9254 Attn: Liz Horvath South Bend, IN 46601 227 W. Jefferson Blvd., Ste. 1316 City of South Bend Engineering Department SANITARY & WATER: email: bdunlop@aep.com Ph: 614-552-1893 Attn: Barbara Dunlop Gahanna, OH 43230 700 Morrison Rd American Electric Power - Transmission Ph: 574-236-1658 Attn: Antonio Macias South Bend, IN 46628 2929 Lathrop St American Electric Power - Distribution ELECTRIC: email: pmgriffin@nisource.com Ph: 574-800-6132 Attn: Phillip Griffin South Bend, IN 46601 1039 Pennsylvania NIPSCO GAS: Utility Contacts thoroughfares and adjacent property. traffic and pedestrians where his operations abut public The Contractor shall provide for the safe and orderly passage of 5. damage of equipment or materials will be granted to the Contractor. No additional payment or time extension requested due to such the Contractor which are stored or stockpiled on the project site. resulting to the equipment or construction materials possessed by The Owner is not responsible for any damage, flood or otherwise, 4. barricades, flagmen, etc. at all times of construction operations. The Contractor shall provide appropriate signage, traffic control, 3. Representatives access to the site at all times. The Contractor shall allow the Owner, Engineer or Owner's 2. to the contract. deemed necessary by the Contractor or Owner shall be incidental against dumping. The cost of any additional security measures of and during working hours. This includes securing the site site against unauthorized entrance by persons and vehicles outside It shall be the Contractor's responsibility to secure the construction 1. Express, UPS, etc.) and emergency access to residents at all times during the project. Contractor to accomodate trash pick up, deliveries of mail and packages (USPS, Federal 19. repaired. resulting from construction activities not scheduled for removal shall be replaced or and excess material from the site. Damaged trees, shrubs and other landscape features Throughout construction, the Contractor shall collect and remove all construction debris 18. considered a part of this Contract. or accessories necessary to complete this work may not be specifically noted but are referenced on the Plans, are all to be considered as part of this Contract. Incidental items Standard Specifications, Construction Plans and subsequent details, including details 17. placing of material on private property of another requires written authorization. silt fence. Stockpile locations are to be evaluated an secured by the Contractor. The create a nuisance or potential erosion hazard. All stockpiles of soil shall be protected by Disposal of and stockpiling of excess material shall be done in such a way that will not 16. cause for additional compensation or a change in the scope of work. adjustments (approved by the Engineer) prior to demolition. Such variation shall not be responsibility to verify such dimension and details in the field and make necessary measurements and are subject to nominal variations. It shall be the Contractor's Existing dimensions and details relative to existing structures have been taken from field 15. removal, relocation, or replacement. pavements, roadways, structures, utilities, and underground facilities not designated for property at the site or adjacent thereto, including houses, trees, shrubs, lawns, walks, safety and necessary precautions for the safety of all employees, equipment, or other The Contractor shall be solely responsible for initiating, maintaining, and supervising all 14. provided in in the Contract Documents. during construction shall be replaced by the Contractor at their expense, unless otherwise All signs, fences, and delineators damaged by the Contractor or their Subcontractor 13. all conflicts prior to start of construction. telephone, pipelines, etc.) and structures in advance of construction and shall eliminate The contractor shall locate or have located all existing underground utilities (electric, 12. contractor's expense. not in conformance with the specifications is subject to removal and replacement at the Any work performed without the approval of the City engineer and/or all work and material 11. The Owner shall be notified 24 hours prior to starting each phase of construction.10. specifications and standard details. All construction shall be in accordance with the most current adopted City of South Bend 9. latest edition and the City of South Bend Department of Public Works Standards. Contract Documents and applicable sections of the INDOT Standard Specifications, All excavation, backfilling, grading and compaction shall be in conformance with the 8. the field prior to bidding, construction, and ordering of materials. It is the responsibility of the Contractor to verify all dimensions and conditions that exist in 7. final and conclusive. meaning of the Construction Plans or Specifications, the decision of the Engineer shall be risk and expense. In the event of any doubt or questions arising with respect to the true secure such instruction, the Contractor will be considered to have proceeded at his own proceeding with any part of the work affected by omissions or discrepancies. Failing to details, the Contractor shall secure written instruction from the Engineer prior to Contractor shall assume full responsibility. In the event of disagreement and/or special immediately report the same to the Engineer before doing any work, otherwise the discrepancies with what is shown on the Construction Plans, Contractor must conditions affecting the work with the actual conditions at the job site. If there are Prior to commencement of construction, the Contractor shall verify all dimensions and 6. installation. Submittals shall be in accordance with the Contract Documents. project components shall be submitted to the City for review prior to implementation or All required shop drawings or product certification information for constructed or supplied 5. with the Indiana Manual of Uniform Traffic Control Devices (MUTCD), latest edition. with INDOT Standard Specifications. Traffic control shall be maintained in accordance all phases of construction. Barricades and warning signs shall be provided in accordance signs, traffic control devices and warning devices to inform and protect the public during The Contractor shall be responsible for the installation and maintenance of adequate 4. additional compensation will be allowed. the contract for payment, the work shall be considered incidental to the contract and no Whenever the performance of work is indicated on the plans, and no item is included in 3. size drawings. Do not scale dimensions for construction. Scale, if shown, applies only to ANSI B (11x17) 2. The Contractor shall limit work to the hours and days allowed by the Contract Documents.1. Survey Feature Legend email: jason.gilpin@zayo.com Ph: 260-570-5677 Attn: Jason Gilpin Ft. Wayne, IN 46808 1710 Directors Row Zayo Group Ph: 574-234-6590 Attn: Mary Jan Hedman South Bend, IN 46601 121 S Michigan St ChoiceLight email: Jay_Castello@cable.comcast.com Ph: 574-252-2561 Attn: Jay Castello Mishawaka, IN 46545 1920 E. McKinley Highway Comcast Ph: 219-972-5687 Attn: Rich Schulte South Bend, IN 46601 307 S Main St AT&T Indiana COMMUNICATIONS 2 T C S ST C GM G EM E E E T T FO WM W STOP ARV RP FO Project Location General PlanUtility Notes CHECKEDCALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC Laurel Woods Maintenance ProjectMcCormickEngineeringNKiefer Ditch Kiefer Ditch Laurel RdAuten Rd Auten Rd Lindenwood Dr S Hamlin CtOakland AveW Laurelwod CtLi nde nwood Dr WBirchwood LnAshwood CtAsbury CtGatehouse DrLaurelwood Dr Merrill Ct Sprucewood Ln Ambleside Dr Clean Out Misc. Manhole Sanitary Manhole Catch Basin Dry Well Inlet Grate Storm Manhole Gas Meter Gas Valve Electric Transformer Cable Pedestal Electric Meter Electric Manhole Electric Pedestal Guy Anchors Light Pole Power Pole Telephone Handhole Telephone Manhole Telephone Pedestal Yard Light Water Meter Water Manhole Water Valve Satellite Dish Flag Pole Mailbox Misc. Feature Post Sign Stop Sign Ornamental Tree Shrub Stump Tree (25"& Up) Tree (13"-24") Tree (6"-12") Tree (Up to 6") Fire Hydrant Rocks/Boulders Chain Link Type Fence Wood Fence Telephone Line Water Line Cable TV Line Electric Line Overhead Line Gas Line Storm Line Sanitary Line Force Main Gas Marker Telephone Marker Fiber Optic Marker Legend Harrison Monument Electric Marker Double Post Sign Treeline Brushline Bollard Fiber Optic Line Air Conditioner Unit Yard Drain Roof Drain Air Release Valve Str. Curb Stop Control Point Fiber Optic Manhole 1 0' Utilit y, Dr ai n a g e & No n Ac c e s s Es mt. (pe r pl at) 10' Utility, Drainage & Non Access Esmt. (per plat)10' Utilit y a nd Dr ai na ge Es mt. (per p l at ) 1 0' Utilit y a nd Dr a i nage Es mt. (pe r pl a t )50' Wide AMOCO Pipeline EsmtDR 8012661(Drawn per plat)'50.00RP RP RP RP RP RP RP RP RP RP (NAVD88) Bolt on Hydrant South Flange "x" Set on Top Elev 699.83 TBM NO. 2 (NAVD88) Pole #J138/277 Face of Light Benchtie in SE Elev 698.85 TBM NO. 3 (NAVD88) Pole #J138/341 Utility West Face of Benchtie in Elev 699.39 TBM NO. 1 2010132530. 2010132668, 2010132744, 2010132650, 2010132479, 2010132565, and 2010132971, 2010132841, 2010132858, 2010132710, 2010132631, for this project: Dig" 811, utility locating service. The following ticket number(s) were assigned Utility locates were requested on October 13, 2020 utilizing the "Call Before You 2. should occur without notification of appropriate agencies and utility companies. based on record information provided by the utility company. No excavation evidence of above ground features, locations marked in the field by others or Locations of existing underground utilities shown on this drawing are based on 1. Utility Notes NAVD88 datum. Basis of Elevation is GPS derived utilizing the INCORS Network, 4. System, East Zone, GPS derived utilizing the INCORS Network. Horizontal datum is based upon the Indiana State Plane Coordinate 3. property lines shown are apparent. based on limited field evidence and limited research. All right-of-way and This is not a boundary survey. Right-of-way lines and property lines are 2. in October, 2020. This topographic survey was performed by Jones Petrie Rafinski, (JPR) 1. Topographic Survey Notes B-3 Soil Boring B-4 Soil Boring B-2 Soil Boring B-1 Soil Boring Control Cap 3/8" Rebar w/ Z:695.71 E:164644.5871 N:2365895.3006 Pnt. No. 1 Control Cap 3/8" Rebar w/ Z:697.18 E:164811.2834 N:2365941.6654 Pnt. No. 3 Control Cap 3/8" Rebar w/ Z:699.50 E:164966.5579 N:2365925.5327 Pnt. No. 4 Control Cap 3/8" Rebar w/ E:165250.1916 N:2366174.4567 Pnt. No. 9 Control Cap 3/8" Rebar w/ E:165220.8652 N:2366320.9792 Pnt. No. 8 Control Cap 3/8" Rebar w/ E:165315.5877 N:2366537.7567 Pnt. No. 11 Control Cap 3/8" Rebar w/ E:165341.7967 N:2366649.3504 Pnt. No. 7 Control Cap 3/8" Rebar w/ Z:696.53 E:164698.4419 N:2366995.1922 Pnt. No. 2 Control Cap 3/8" Rebar w/ E:165059.6780 N:2367029.1051 Pnt. No. 5 Control Cap 3/8" Rebar w/ E:165104.5282 N:2366758.2050 Pnt. No. 6 Auten RoadLindenwood Drive WMer r i l l Ct Laurel RoadLaurel Road Laurelwood DriveLindenwood Drive S Lindenwood Drive SBirchwood Lane Lot 4 Lot 3 Lot 2 Lot 1 Lot 5 Lot 6 Lot 7A Lot 7B Lot 22 Lot 23 Lot 66 Lot 65 Lot 64 Lot 63 Lot 61 Lot 11 Lot 10 Lot 9 Lot 12 Lot 13 Lot 14 Lot 67 Lot 68 Lot 69 Lot 8 Laurelwood Dr NRP RPSTOP RPSTOP RPRPRPRPRPRPRP HORIZONTALSCALE IN FEETCHECKED0 CALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC Laurel Woods Maintenance ProjectMcCormickEngineering3Survey Control Plan10050N 1 0' Utilit y, Dr ai n a g e & No n Ac c e s s Es mt. (pe r pl at) 10' Utility, Drainage & Non Access Esmt. (per plat)10' Utilit y a nd Dr ai na ge Es mt. (per p l at )50' Wide AMOCO Pipeline EsmtDR 8012661(Drawn per plat)'50.00 Auten RoadLindenwood Drive WMer r i l l Ct Laurel RoadLaurel Road Laurelwood DriveLindenwood Drive S Lindenwood Drive SBirchwood Lane Lot 4 Lot 3 Lot 2 Lot 1 Lot 5 Lot 6 Lot 7A Lot 7B Lot 22 Lot 23 Lot 66 Lot 65 Lot 64 Lot 63 Lot 61 Lot 11 Lot 10 Lot 9 Lot 12 Lot 13 Lot 14 Lot 67 Lot 68 Lot 69 Lot 8 Laurelwood Dr NHORIZONTALSCALE IN FEETCHECKED0 CALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC Laurel Woods Maintenance ProjectMcCormickEngineering4Access Control Plan10050Kiefer Ditch Kiefer Ditch Legend Construction Dewatering and Site Access Extended Construction Limits for Maintenance Work Limits for Sewer Cleaning and Pond Overall Limits of Construction (Typ) Sewer and Pond Cleaning Area (Typ) Access/Dewatering Area (Typ) Access/Dewatering Area (Typ) Access/Dewatering Area (Typ)N Conc RP RP RP RP HORIZONTALSCALE IN FEETCHECKED0 CALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC Laurel Woods Maintenance ProjectMcCormickEngineeringA pprox. St orm Li ne Locati onCo nc.Co n c.Co n c. G at eConc.Co nc. Wooded Area Wooded Area Grass Grass Grass GrassGrass Grass Exst. Bldg. Exst. Bldg. Exst. Bldg.She dShe dShe dShe dShedExst. Pond Grass Top/Water 693.15 Top/Sediment 691.44 Sump 691.37 Inv 691.49 - 24" CMP N Inv 691.25 - 24" RCP S * Rim 694.64 "H" Inlet Grate #232 SQURE CUT OUT IN PIPE Inv 692.54 - 24" CMP N/S Rim 694.61 "G1" Inlet Grate #1730 Top/Water 693.32 Top/Sediment 692.97 Sump 692.47 Inv 692.53 - 15" RCP W Inv 692.51 - 15" RCP E * Inv 692.43 - 24" RCP N * Inv 692.52 - 24" CMP S Rim 694.97 "G" Inlet Grate #231 Rim 696.63 Beehive #1670 "F1" No Top/Water Top/Sediment 694.9 Inv 693.4 "F"24" RCP No Top/Water 8/15/2019 Buried in Sediment "E" Approx. End of Pipe TOP OF DEBRIS 696.4 FULL OF DEBRIS Rim 698.87 San. Manhole #227 Top/Water 695.01 Sump 693.59 Inv 693.67 - 15"? RCP NE Inv 693.50 - 12"? RCP W Inv 693.39 - 18"? RCP S Rim 696.67 "D" Iron Grate #226 Inv 691.92 - 4" PVC E Inv 691.01 - 8" PVC N Inv 691.02 - 8" PVC SW Inv 691.04 - 8" PVC W Rim 696.71 San. Manhole #1328 determine pipe size Str. full of water, Unable to Top/Sediment 693.95 Top/Water 694.94 Sump 693.71 Rim 695.74 "C" Catch Basin #224 determine pipe size Str. full of water, Unable to Top/Water 695.02 Sump 693.58 Inv 693.68 Rim 696.04 "C1N" Catch Basin #225 TOP 688.14 - 8" PVC E Inv 687.20 - 10" PVC S Inv 687.18 - 8" PVC NW Inv 689.91 - 8" PVC E Rim 696.59 San. Manhole #2061 determine pipe size Str. full of water, Unable to Top/Water 694.95 Sump 693.71 Inv 693.68 Rim 695.87 "B" Catch Basin #223 Lindenwood Drive S Lindenwood Drive SBirchwood Lane Lot 66 Lot 65 Lot 64 Lot 63 Lot 67 Lot 68 Lot 69 Lot 8 Laurelwood Dr NTSTRPSTRPTTTTTETRPGMSGMTTEMGMEMGMGMGMRP5Existing Conditions4020NMatch Line (See Plan Sheet 6)Limits of Construction (Typ) HORIZONTALSCALE IN FEETCHECKED0 CALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC Laurel Woods Maintenance ProjectMcCormickEngineering10' Utilit y, Dr a i na g e & Non Ac c e s s Es mt. (pe r p l a t )10' Ut ilit y a nd Dr ai nage Es mt. (pe r pl at )10' Ut ilit y and Dr a i nage Es mt. (per pl at )50' Wide AMOCO Pipeline EsmtDR 8012661(Drawn per plat)'50.00RP RP Conc. Conc. Conc. Conc. Sign Sign Sign Gravel Gravel Grass Wooded Area Grass Grass Grass Grass Exst.Bldg.GravelGrass Grass Grass Approximte Location of Forcemaindetermine pipe size Str. full of water, Unable to Top/Sediment 693.95 Top/Water 694.94 Sump 693.71 Rim 695.74 "C" Catch Basin #224 determine pipe size Str. full of water, Unable to Top/Water 695.02 Sump 693.58 Inv 693.68 Rim 696.04 "C1N" Catch Basin #225 TOP 688.14 - 8" PVC E Inv 687.20 - 10" PVC S Inv 687.18 - 8" PVC NW Inv 689.91 - 8" PVC E Rim 696.59 San. Manhole #2061 determine pipe size Str. full of water, Unable to Top/Water 694.95 Sump 693.71 Inv 693.68 Rim 695.87 "B" Catch Basin #223 No Top/Water Top/Sediment 696.3 Inv 696.0 "A1" 24" CMP Sump 694.11 Rim 697.11 #1072 ARV Manhole Sump 694.15 Rim 697.15 #1073 ARV Manhole No Top/Water Top/Sediment 696.6 Inv 695.1 "A" 24" CMP Lindenwood Drive WMer r i l l Ct Lot 3 Lot 2 Lot 1 Lot 5 Lot 6 Lot 7A Lot 7B Lot 10 Lot 9 Lot 69 Lot 8 Laurelwood Dr NSGTARVGGARVRPRPGTEMTCEM6Existing Conditions4020NAut en RoadMatch Line (See Plan Sheet 5)B-4 Soil Boring B-2 Soil Boring Limits of Construction (Typ)Auten Road CHECKEDCALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC Laurel Woods Maintenance ProjectMcCormickEngineering7 Soil Borings RP RP RP RP Lindenwood Drive S Lindenwood Drive SLaurelwood Dr NTSTRPSTRPTTTTTETRPGMSGMTTEMGMEMGMGMGMRPHORIZONTALSCALE IN FEETCHECKED0 CALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC Laurel Woods Maintenance ProjectMcCormickEngineering8Storm Sewer and Pond Cleaning Plan4020N760Total length of Storm Drain Cleaning 4024HG1 524G1G 29024GF1 1024F1F 19018ED 15512DC 3012CC1N 4012CB Cleaned (LFT) Length to be Approx. Sewer (inches) Approx. Dia/Size Structure Downstream Structure Upstream Storm Drain Cleaning Table Str H Str G Str G1 Str B Str C1N Str C Str D Str E Str F Str F1 Limits of Sewer/Pond Maintenance (Typ) Water Hydrant RP RP Lot 68 Lot 69 TTTRPGMSGMTTEMGMGMRP695 691 696 698698 696697698699699 6 9 9699699698697696695695698 697696 6 9 9 698 6986 9 9 697HORIZONTALSCALE IN FEETCHECKED0 CALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC Laurel Woods Maintenance ProjectMcCormickEngineering92010 Pond Grading Plan165257.918E 2366482.439N 165261.932E 2366499.878N 165277.136E 2366498.131N 165261.716E 2366479.972N 165277.188E 2366489.611N Pr. Elev 691.0 Pr. Elev 691.0 Pr. Elev 691.0 Pr. Elev 691.0 Pr. Elev 691.0 165269.352E 2366502.850N Pr. Elev 691.0 NGenerla Plan) Secure the work area throughout the Project (See Control of Site note on 8. permanent seeding Revegetate fenced pond area with topsoil, erosion control blanket and 7. beehive casting of similar style, size, material and workmanship Remove and replace existing damaged beehive casting at Str F1 with new 6. (note: Proposed side slopes are 2.5 (Horizontal) to 1 (Vertical), Typ. Excavate pond area to a minimum elevation of 691, as shown 5. Initiate Construction Dewatering activities4. Determine and expose locations of buried pipe outlet "E" and inlet "F"3. trees noted on this Sheet to be preserved Clear the fenced pond area of vegetation and obstructions, except for large 2. as needed to access and perform the work Remove and reset existing fence along north boundary of existing pond area 1. Pond Maintenance Notes: and proposed surface grades. Computer modeling indicates approximately 160 cubic yards of cut between existing Note: Str F Str E Str F1 removed and replaced (Typ) Ex. Beehive Casting to be Ex. Contour (Typ) Pr. Contour (Typ) Pr. Limits of Construction (Typ) Ex Fence (Typ) Six-inch depth of No. 2 Stone over geotextile (Typ) Temporary Construction Entrance, 10' wide, Ex. Hydrant (Typ) Remove Ex. Tree (14" DBH) Preserve Ex. Tree (14" DBH) Preserve Ex. Tree (18" DBH) at Temporary Construction Entrance (Typ) Contractor to Protect Ex. Curb RP RP Lot 68 Lot 69 TTTRPGMSGMTTEMGMGMRPHORIZONTALSCALE IN FEETCHECKED0 CALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC Laurel Woods Maintenance ProjectMcCormickEngineeringRestoration Plan201010Co n c.Co n c.Co n c.Co n c. Wooded Area Wooded Area Grass Grass Grass Exst. Bldg.She dShe dShe dShe dExst. Pond Grass Nor permanent seeding. do not receive topsoil, erosion control blanket submerged on a regular basis in the future and contour elevation 693 are anticipated to be seeding. Areas of basin at or below proposed topsoil, erosion control blanket and permanent Side slopes of regraded basin to receive 6" Note: Ex. Fence as needed for access (Typ) Remove and Reset up to 30 lft Proposed Limits of Construction (Typ) Str F1 Str F Str E Approx. 650 SYS Seeding, Type U, with Erosion Control Blanket (Typ) 10' Utilit y, Dr ai na g e & No n Ac c e s s Es mt. (pe r pl a t ) 10' Utility, Drainage & Non Access Esmt. (per plat)10' Ut ilit y a nd Dr ai nage Es mt. (pe r pl at )10' Utilit y a nd Dr a i na ge Es mt. (pe r pl a t )50' Wide AMOCO Pipeline EsmtDR 8012661(Drawn per plat)'50.00RP RP RP RP RP RP RP RP RP Auten RoadLindenwood Drive WMer r i l l Ct Laurel RoadLaurel Road Laurelwood DriveLindenwood Drive S Lindenwood Drive SBirchwood Lane Laurelwood Dr NSSSTRPSTOPGSTSTRPSTOPSGTARVGGARVCSTRPRPTRPTTRPGGMTTTETRPGMSGMTTEMGMEMGMTGMGMRPRPEMTCEMHORIZONTALSCALE IN FEETCHECKED0 CALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC Laurel Woods Maintenance ProjectMcCormickEngineering118040Dewatering PlanNKiefer Ditch Kiefer Ditch Str H Str G Str G1 Str F1 Str F Str E Str D Str C Str C1N Str B Crossing Closures (Typ) See Traffic Control Plan for Street Crossing Closures (Typ) See Traffic Control Plan for Street Dewatering Sump Hole Construction Dewatering Pump Secondry Containment Filter Bag on Leveling Pad with Filter Fabric Construction Dewatering Outlet (Typ) Approx 830 lft Construction Dewatering Discharge Line (Typ) Approx 30 lft Pump Intake Line (Typ) the Project. Public Streets outside active working hours each day throughout Dewatering Discharge Line and ramps shall be removed from 6. edition, for all proposed traffic control measures The Contractor shall fully comply with the Indiana MUTCD, latest 5. extent of both ends of any proposed roadway closures. Contractor shall provide lighted Barricades along the full roadway 4. throughout the Project. storm sewer system downstream of existing Str H is prohibited Discharging of Construction Dewatering activites to the exisitng 3. exisitng pond will also be required. Additional pumping from the sewer cleaning activities to the the intrusion of groundwater and surface waters from Kiefer Ditch. within the existing sewer system throughout the project to reduce will require the installation of temporary plugs at various locations In addtion to the discharge line shown, Construction Dewatering 2. Dewatering operation of all equipment needed to provide Construction Contractor is soley responsible for assessing, supplying and 1. Construction Dewatering Notes: Soil Boring B-1 Soil Boring B-2 Soil Boring B-3 Soil Boring B-4 Route Marker Notes Temporary Traffic Detour 12 Limits of Construction (Typ)Traffic Control Planlight, Type A Low intensity construction warning Direction of Traffic Type III-A Barricade Construction Sign and Supports Legendthroughout construction. access to their properties residents within Construction Limits Contractor responsible for providing 3. fabrication and spacing distances Comply with MUTCD for sign 2. Sheet. see Traffic Control Details Plan For detour route marker assemblies, 1. XW20-3 XW20-3 XW20-3 XW20-2 XW20-2 XW20-2 A B B D R3-1 R3-2B D B B A C R11-2 R11-2 R11-2 R11-2 Type III-A Barricades Type III-A Barricades 200100HORIZONTALSCALE IN FEETCHECKED0 CALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC Laurel Woods Maintenance ProjectMcCormickEngineeringN Kiefer Ditch Kiefer Ditch Laurel RdAuten Rd Auten Rd Lindenwood Dr S Hamlin CtLindenwood Dr SLi ndenwood Dr WBirchwood LnAshwood CtAsbury CtGatehouse DrLaurelwood Dr Merrill Ct Sprucewood Ln Ambleside Dr Laurelwood Dr N W Laurelwod CtLindenwood Dr SAmbleside Dr Miller Ct Laurelwood Dr N 13Traffic Control Signage DetailsEND XM 4-6 D-3 A DETOUR XM 4-8 M3-1 (North) or M3-3 (South) M5-1 (L or R) ROUTE MARKER ASSEMBLY ADVANCE TURN DETOUR D-3 XM 4-8 M6-1 (L or R) DETOUR ROUTE MARKER ASSEMBLY DIRECTIONAL DETOUR B D-3 XM 4-8DETOUR MARKER ASSEMBLY END DETOUR ROUTED ROUTE MARKER ASSEMBLY CONFIRMING DETOURC D-3 XM 4-8 M6-1 DETOUR South LINDENWOOD DR W R11-2 XW20-2 XW20-3 AHEAD CLOSED ROAD AHEAD DETOUR CLOSED ROAD 500 FT CLOSED ROAD 1000 FT CLOSED ROAD XW20-3-500FT XW20-3-1000FT END CONSTRUCTION XG20-2 M3-1 (North) or M3-3 (South) M3-1 (North) or M3-3 (South) M3-1 (North) or M3-3 (South) LINDENWOOD DR W LINDENWOOD DR W LINDENWOOD DR W R3-1 R3-2 South South South CHECKEDCALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC Laurel Woods Maintenance ProjectMcCormickEngineering