HomeMy WebLinkAbout08/1904 Board of Public Works Minutes2.
The Board met in regular session at 10 A. M. Mr. McInerny absent.
Petition filed for opening of South Lafayette street from Calvert street to
Indiana avenue.
Petition filed for Pipe Sewer on South Fellow street from Monroe
street to Sample treet.
gecpvi lee7�,
Acting President.
SPECIAL SESSION TUESDAY EVENING AT 7:15 P. M.
The Board met in special session at 7:15 P. M. Mr. McInerny absent.
Hearing given on the following Declaratory resolutions for the following street
improvements. Pipe Sewer on Birdsell street, Pipe Sewer on 0`sborne street, Pipe
sewer on Marrie.tta Street all under improvement resolutions nos.197, 196, 195 resp.
The engir_eer filed his estimated cost of the improvement as follows:--
Marietta street Pipe Sewer.............$2300.00
Osborne street 1000.00
B irdsell street 2100.00
In the above matter no remonstrators appeared and no remonstrances were filed.
The Board find in each and every case in the said improvements that the benefits to the
property and to the city of South Bend are equal to the estimated cost of the
improvements t.nd that said Eeclaratory resolutions are hereby in all things ratified,
confirmed and approved.
In the matter of the Pipe Sewer in Cushing Addition same was held over until
the 9rth day of August at 7:15 P. M. as there was a remonstrance filed against, the
Cleveland avenue Pipe Sewer.
ci"7'K.t r Cat st '
Acting President.
PW
The Board met in regular session at 10 A. M. Mr. McInerny absent.
The street commissioner was instructed to clean out the gutters on W. Jefferson
street. West of Chestnut street.
Bids were opened and referred to engineer for tabulation for the following
Pipe Sewers B irdsell street, Osborne street and Marietta street.
Bids recei ved for the Cushing addition Sewer, same were held over and kept
on file until August lOt)�., 1904.
r
cic�11<i scar
Acting President.
The Board met in regular session at 10 A
Plat of Mayers Addition filed and referred to
M. Al1 menbers present.
Engineer.
Plat of Stull's 4th and 5th additions filed and referred to Engineer.
Contracts were awarded for the following ?ipe Sewers;
B irdsell street Pipe Sewer L. ',H. Webster.
Marietta street Pipe Sewer L. H. Webster
Osborne, street Pipe Sewer L.H. Webster.
Engineer reported grade on Oak Parr Court and Vassar avenue. Same was approved.
IMPROVE yENT RLSOLUTI ON NO. 208.
Resolved by the Board of Pub lic Works of the City of South Bend, Indiana: That
an improvement be made of the kind, size, location and terminal points as follows:
Brick paving the a-1.1ey between Michigan street and St. Joseph street, running North
and South from Wayne street to the Brick pavement on the second alley south of Wayne St.
Said improvement shall be known and designated as the "Alley pavement between Michigan
and St. Joseph Street" and shall be constructed according to the plan s and specificat-
ions prepared by the City Civil Engineer, filed herewith. Notice of this and proposals
for bids for the execution o , the eb ove work shall be published on the 8th day of
August and on the 15 day of August 1904, in the South Bend Daily Times and the South
Bend Daily Tribune. This Board will give a hearing on this resolution at its office in
the City Hall on the 23 day of August 1904, at 7:15 P. M. and will received b ids up to
10 A. M. on the 24th day of August 1904.
Adopted this 5th day of August, 1904.
BOARD OF PUBLIC WORKS.
IMPROVEMENT MSOLUTION NO. 209.
Resolved b y t he B oard of Pub lie Works of the City of South B end, Indiana: That
an improvement be made of the kind, size, location and terminal points as follows:
Brick paving Napier street from Chapin street to Walnut street excepting Laurel street
already improved. Said improvement shall be known and designated as the "Napier Street
Brick Pavement " and shall be constructed according to the plans and specifications
prepared by the City Civil Engineer, filed bzrewith. N<;tice of this resolution and
proposals for bids for the execution of the above work shell be published on the 8th
day of August and on the 15th day of August 1904, in the South Bend Daily Times and
the South Bend Daily Tribune. This Board will Jive a hearing on this resolution at its
o.�fice in the City Hall on the 23 day of August 1904, at 7:15 p. m. and will receive
bids up to 10 a. m. on the 24t h day of August 1904.
Adopted this 5th day of August 1904.
BOARD OF PUBLIC WORKS.
VACATION RESOLUTION NO 32.
ResolveD by the Board of Public Works of the City of South Bend, Indiana: That
it is desirable to vacate the following: Beryl street from Leer street to Clyde street.
The purpose of this vacation is to relocate a thoroughfare parraliel to ::aid
Beryl street and in conformity' with adjacent streets.
The following property maybe in juroiusly of beneficially effected by such vacation
Lot 6 Yoders Survey .. ............................Louis Wurth
Lot 17 Yoders Survey ................... ......... Clyde Yoder.
Notice of this resolution a ha ll be publ i s he d on the 8 t h day of AuguS t and on the
15th day of August 1904 in the South Bend Daily Times.
This Board, at its office in the Citty Hall on the 20th day of August at 10 A. M.
will hear .and receive vemonstrances from all person interested in or affected b .�' these
proceedings.
Adopted this 5th day of August 1904.
BOARD 07 PUBLIC WORKS.
M
Friday August 5th 1904.
The Engineer filed aosessment rolls and final estimates for the following
improvements: Sewer and Water Connections on Vistula avenue and Ohio s
Sewer on 'N.Lafayette street, Sidewalks on N. Michigan street. treets Pipe
Resolved, tit notices as to the amounts of assessments be published for six
consecutive days in the South Bend Daily Times and South Bend Daily Tribune commenc-
ing on the 8th day of August 1904 stating that this Board wi 1 give a hearing on the
amount of such assessments at its office in the City Hall on the 16th day of August 1904 at 7:15 P. M.
Resolved further, that the entire work under tre above contract beaccepted and
approved and the final estimate thereon allowed. Notice of this resolution shall
be pub lis reed on the 8th day of August 1904 int he South Bend Daily Times and the
South Bend Daily Tribune sta.tin; that this Board will give a hearing upon the
acceptance of such work at its office in the City Hall on the 16th day of Aug. 1904.
-2 5
The Board met in regular session at 10 A. M. All meubers present.
Bond of L. H. Webster released on Marion Boulevard and Navarre street Pipe Seger.
Bond of Hoban & Roach released on Brick pavement on Thomas street and Brick
Pavement on West Division street.
IMPROVEMENT RESOLUTION NO. 210.
Resolved by the Board of Plb lic Works of the 'City of South Bend, Indiana: That
an improvement be rade of the kind, size, location and terminal points as follows: The
construction of Cement Cuzb ink and Sidewalks on Notre Dame avenue and -grading said
avenue from South Bend avenue to Napoleon street, excepting Corby street intersection
already graded. Said impoovement shall be known and designated as THE NOTRE DAME AVENUE
GRADE CUl$ & WALK. and shall be constructed according to the plans and specifications
prepared by the City Civil Engineer, filed herewith. Notice of this resolution and
proposals for bids for the execution of the above work sha 1 be published on the 8t h
day of August and on the 15t� day of,August 1904, in the South Bend Daily Times and
the South Bend Daily Tribune. This Board will give a hearing on this resolution at its
office in the City Hall on the 23 day of August 1904, at 7:15 p. M. and will receive
bids up to 10 a. m. on the 24t h day of August 1904.
Adopted this 6th day of August 1904.
BOARD 0 � PUBLIC WORKS.
IMPROVEY8NT RESOLUTION NO. 211.
Resolved by the Board of Public Works of the City of South Bend, Indiana: That
an improvement be made of the kind, .size, location and terminal points as follows: The
construction of Cement Sidewalks on East Madison street from Eddy street to. Arthur St.
Said improvement shall be known and designated as TIE EAST MIADISO2- STREET SIDEWALKS
and shall be constructed according to the plans and specifications prepared by the City
Civil Engineer filed herewith. Notice of this resolution and proposals forbids for the
execution of the above work shall be published on to 8th day of August and on the 15th
day of August 1904, in the Sout h B end Daily Times and t he Sout h B end Daily Trib une.
This Board wi 1 give a hearing on this resolution a� its office in the ;;ity F.allon
the 23rd day of August 1904, at 7:15 p. m. and will receive bids up to 10 a. m. on
the 24t h day of August 1904.
Adopted this 6th day of August 1904.
BOARD OF PUBLIC WORKS.
♦6
IMPROVEMENT RESOLUTION NO. 212.
Resolved b y the B oard of Pub lie Works of the City of South B end, Indiana: That
an improvement be made of the kind, size, location and terminal points ao follows:
Grading Carlisle street the full width of the street from Washington street to Linden
avenue and constructing cement sidewalks and curb ins on same. Said improvement shall
be Down and designated as THE CARLI SLE STREET GRADE CUIE & WALK and shall be const ?:•uctffj
according the the plans and specifications prepared by the City Civil Engineer, filed
herewith. Notice of t his resolution and proposals for bids for the execution of the
above work shall be published on the 8tr day of August and on the 15th day of August
1904, in the South Bend Daily Times and the South Bend Daily Tribune. This Board will
give a hearing on this resolution at its office in the City I -Tall on the 23rd day of Aug-
ust 1904, at 7:15 p. m. and will receive bids up to 10 a. m. on the 24 day of Aug. 1904.
Adopted this 6th day of August 1904.
BOARD Or PUBLIC FORKS.
The "Engineer reported Sewer and Water Connections on Napier street from
Chs:pin street to Walnut street.
President.
26
Tue s day August 9t h. 1904.
The Board met in regular session at 10 A. M. All menbers preseNt.
Bond of L. H. Webster on Marietta &Bronson street pipe sewer, Osborne street
Pipe LSewer and B irdsell street Pipe Sewer approved and contracts signed for same.
Petition filed for Grade, Curb & Walk on Chapin street from Calvert street to
Ewing avenue. Referred to engineer for specifications.
wal
Pre s
SPECIAL MEETING TUESDAY EVENING AUGUST 9TH. 1904 at 7.15 P. M.
The Board met in Special Session at 7:15 P. 14. All menbers present.
Hearing given on assessment rolls and final estimates for the following
improvements; -Grade Curb & Walk on Sherman avenue fron N. Line of Cushing Addition
to Portage,avenue. Cement walks on Notre Dame street from Jefferson street to Divis-
ion street under improvement resolutions nos. 175, 184 respectively.
No remonstrances were filed and no remonstrators appeared the board find that
the. property assesed is benefitted to the amount of assessment in said roll, andthe Board accordingly find that the assessment roll filed July 26th, 1904 and the
final estimate allowed July 26th, 1904, should be and the same is hereby in all
things ratified confirmed and approved.
Hearing on Istanfield street G rade, Curb & Walk from Corby street to Howard
street was held over to Saturday 1-Ugust 13th at 10 a. m.
Hearing given on the following Declaratory Resolutions for the following
improvements: Cushing Addition Pipe Sewer, Francis street Walks & Curb, Napier street
Pipe Sewer, Harris street Curbs, Sixth street Grade, Curb & Walk, N. Jackson streets
Walks, S. Jackson street Grae, Curb & Walk, Pulaski street Grade, Curb & Walk, Blaine
avenue Grade, Curb & Walk. All under improvement resolutions No. 198, 2022 207,
2002 2052 201, 2049 203, 206 respectively.
Engineer filed his estimated cost of the improvements as follows; -
Cushing Addition Pipe Sewer. .......$12,956.00
Francis street Walks & Curbs............ 358.40
Napier street Pipe Sewer ............... 714.00
Harris street Curbs..... ................ 576.00
Sixth street Grade, Curb & Walk..: ..... 1,109.40
N. Jackson street Walks..........: 370.40
S. Jackson street Grade, Curb & Walk... 1, 739.80
Pulaski street Grade,Curb & Walk ....... 12556.00
Blaine avenue ' Grade, Curb & Walk....... 587.44
In the above matter no remonstrators appeare d and no remonstrances were filed
TN.e Board therefore find in each and every case in said improvements that the
benefits -tao the property and to the City of South Bend are equal to the estimated
cost of the improvement and tiat said declaratory resolutions are hereby in all
things ratified, confirmed and approved.
Hearing on Lawrence street Grade, Cure_ & Walk and grablel roadway from Corby
street to Napoleon street under improvement resolution No. 199 was held over until
Saturday at 10 a. m. August 13th, 1904.
President.
2'
The Board r,et in regular session at 10 A. M. All members present.
Bids were opened and referred to Engineer for tabulation for the Following
ir-provements. Francis street Walks and Curbs, Napier street Pipe Sewer, Harris street
curbs, Sixth street Grade, Curb & Walks, N. Jackson street Walks, S. Jackson street
Grade, Curb & Walk, Pulaski street Grade, Curb & Walk and Blaine avenue Grade, Curb
& Walk.
Bids for Grade Curb Walk and gravel roadway on Lawrence street from Corby street
to Napoleon street were rejected.
Clerk was instructed to re —advertise forbids for EushiNg Addition Pipe Sewer.
Cushing Addition Sewer bids rejected owing to an irregularity in filing such b ids.
Resolved, that notices for proposals for the construction of such work be
published on the 12th day of August and on the 19th day- of August, 1904, in the
South Bend Daily Times and the South Bend Daily Tribune stating that this Board at
its office in the City Hall will receive bids up to 10 a. m. on the 24th day of
August, 1904. for the cunstruction of such work.
A-11.
President.
The Board met in regular session at 10 A. M, All menbers present.
Contractor were awarded for the following work.
Napier_
street
Pipe Sewer................Henri DeVos & Co. -
Harris
street
Curbs......................McSherry
& Baer
Frances
st ee t
Curbs & Walks ............
Paul J. Haas.
Pulaski
street
Grade, Cult & Walk .......
M. S.- Rogers.
Jackson
street
Grade, Curb & Walk .......
M. S. Rogers
Jackson
street
Walks....................Paul
J. Haas
Blaine
avenue
Grade, Curb & Walk........
Joe Swiatowy.
Sixth street
Grade, Curb & Walk.........
Joe Swi at owy.
Communications received from S)outh Bend Woolen Co and A. C. Staley Mfg Co
in answer to a communication recentsly sent regarding the throwing of ashes etc
into the river.
* I
Pre
29
The Board met in regular session at 10 A. M. Mr. Nicar absent.
Street. Commissioner instructed to roll E. Broadway street,
Stanfield street hearing on assessment roll for -Grade, Curo & Walk held over
until Tuesday August 16th, 1904 at 10 a. m.
Hearing on Lawrence street under improvement resolution no 199 continued until
Wednesday August 17th, 1904 at 1-0 a. m.
I, Margaret M._Stull of St Joseph County Indiana, state that I am the owner of the
of the tract of ground in the city of South Bend known as Stull's Fourth Addition
to said city of which a plat was approvedby the Board of Public Works on the 24th day
of July 1902; that said plat was never placed of record in the recorders office of
St. Joseph County, and that the same has been abondened and that the same will not
be placed of record; but that said ground is included in the plats known as Stull's
Fourth and Stull"s Fifth additions to said City a copy of each of which is herewith
submitted for the consideration of the Board-.
August 13t h, 1904.
Signed,
Margaret M. Stull.
WITNESS;
W. A. McInerny.
President.
W
Tuesday August 16th, 1904.
The Board met in regular session at 10 A. M. Mr. Nicar Absent.
B and of . Joe Swiatowy filed and approved on B lain avenue Grade, Curb & Wal k.
Contract Signed with Joe Swiatowy " " of " ►i " N
Bond of Joe Swiatowy filed and approved on Sixt H street Grade, Curb & Walk.
Contract signed with Joe Swiatowy for " " " to " "
Bond of Henri DeVos & Co filed and approved on Napier street Pipe Sewer.
Contract signed with Henri* DeVos & Co.:_- on Napier street Pipe Seger.
Engineer reported grade on Carlisle street. Same was approved.
Engineer filed assessment roll and final estimate for the following improvement
to -wit:
E. Madison. -,,street Trunk Sewer under improvement -resolution No. 182.
Resolved that notices 'as to the amount of assessments be published for six
consecutive days in the South Bend Daily Times and the SouthBend Daily Tribune
comnencfng on the 16th day of August 1904, stating that this Board will give a
hearing on the amount of such assessments at its office in the City Hall on the
23rd day of August 1904 at 7:15 P M.
Resolved further, that the entire work under thm eb ove contract be accepted
and approved and the final estimate thereon allowed. Notice of this resolution
shall be pub 1 is hed on the 16th dad* of August _1904, in the South -Tend Daily Times
and the South Bend Daily Tribune, stating that this Board will. give a hearing upon
the acceptance of such work at its office in the City Hall on the 23rd day of
August 1904 at 7:16 P. M.
Hearing given on assessment roll and final estimate for Grade, Curb & Walk
on Stanfield street under Improvement Resolution No 176.
No remonstrators appeared and no remonstrances were filed. The Board find
that the property assessed in said roll filed July 26th 1904 is benefitted in the
amount of assessments as shown on said roll and the Board of Public Works
find that the assessment rolls filed July 26th 1904 and the Final:estimate allowdd
July 26th 1904 should be and the same are hereby in all things ratified confirmed
and approved.
11
Pre b X UV.0 , .
Tuesday August lUth. 1904.
J JL.
SPECIAL SESS IORT TU- ,SLAY EVENING AUC-US T - 61' I. 1904, AT 7.15 P. M.
-l1- 5sesr -?N/-Rohs
Hearing gi®en,on N. Michigan street Walks and N. Lafayette street Pipe Sewer under
Improvement resolution Nos. 186, 188 respectively. Also Sewer and Water Connections
on Ohio street and Vistula avenue.
No remonstrators appeared and no remonstrances were, filed the Board find that the
property assessed in said rollo f ilea August 5t h, 1904 is bene fitted in the amount
of assessir-Oats as shown on said roll/,,and the Board of Ptah lic Works find that the
assessment rolls Filed August 5th, 1904 and the final estimate4allowed August 5th, 1904
should be and tine same are hereby in all things ratified-, confirived and approved.
president .
32
1904.
The Board met in regular ses3 ion at 10 A. 11. Mr. Nicer Absent.
Bond of 11. S. Rogers filed and approved on Pulaski Street Gra�.�_e Curb & %alk.
Contract signed for same.
Bond of, M. S. Rogers filed and approved on Jackson Street Grade, Curb & Walk.
Contract signed for same.
Bond of Paul J. Haas filed and approved on Frances street Walks & Curb.
Contract signed for same.
Bond of Paul J. Haas filed and approved on Jackson street Walks.
Contract signed for same.
'Petition filed for Grading and Curling on Vistula avenue from Kline street to
City Limits. Same was referred to Engineer for specifications.
r;
Lawrence street continued until Saturday AuguSt 20t at 10 A. M
z
President
6"SS) 6
The B oard met in re gular sess ion at 10 A. I M. Mr. Nicar ab sent.
Petition filed and re ferred to Engineer for specifications for uniform grade
and Curb on College street from Washington street to Linden avenue.
Bond of M. Sherry & Baer filed and approved on -Harris street Curb s .. Contract
signed for same. °
Plat of Mayfer's addition approved.
IMPROVEMENT PESOLUTION NO. 213.
Resolved by the Board of Public Work,; of t]e City of South Bend, Indiana.
That an improvement be made or the kind, size, location and terminal points as
follows: _Tine ;grading and curbing of Florence street from Wilbur street to Johnson
street.. Said improvement shall be Down and designatee as the FLORENCE STREET GRADE
AND CURB and shall be constructed according to the plans and specifications prepared
by the City Civil Engineer, fi.Led herewith. Notice of this resolution for the above wort
shall be pUblis bed on the 22nd day of August and on ,the 29t h day of August 1904,
in the South Bend Daily Times and the South Bend Daily Tribune. This Board will give
a hearing on this resolution at its office in the City Hall on the 6th day of
Se ptenb er 1904 at 7 :15 P. M.
Adopted this 19th day of August, 1904.
B OARD OF PUB LIC WORKS.
IMPROVE":"ENT R✓SOL•UTION NO. 214.
Resolved by the Board of Public Works of t Yn City of South Bend, Indiana That
-an improvement be made of the kind, size, loci_ tion- and terminal points as follows:
The Grading of Michigan avenue from Wilbur street to a point 120 feet west of
-Johnson street, the full width of the street, One Hundred (100) feet. Said imp-
rovement shall be known and designated as the MICBIGAN AVENUE GRADE and shall be
:_constructed according to the plans and specifications preparedby the City Civil
Engineer, filed herewith. Notice of this resolution for the above work shall be
published on the 22 day of August and on the 29th day of August 1904, in the South
Bend Daily Times and the South Bend -Daily Tribune. This Board will give a hearing on
this resolution at its office in the City Hall on the 6th day of Septenber, 1904
at 7:15 p. m.
Adopted this 19th day of August 1904.
BOARD OF PUBLIC WORKS.
Pres ident .
NMI
The Board met in regular session at 10 A. M. Capt . Nicar ab sent .
First hearing on Vacation resolution No. 32 adopted on the 5th day of August,
1904 vacating a part of Beyrl street described as follows; Beryl street from Leer
street to Clyde street.
No remonstrators appeared and no remonstrances were filed the Board there Pare
declare the above property vacated.
Hearing given: on the Grade, Curb & Gravel improvement on Lawrence street under
improvement resolution No. 199. No remonstrators appeared and no new remonstrances
were Filed. The Board find that the specifications for this improvement shouldbe
amended b y om .tLing the construction of cement walks on the East side of Lawrence
street North of Howard street, and on the West side of Lawrence street North of
St. Vincent street, and the Board find that the benefits to the property affected
and to the city of south Bend are equal to the cost of said improvement and that
said resolution as amended herein should be and the same is hereby confirmed.,
Resolved that notice of proposals forbids for the construction of the
improvement under resolution No. 199 as amended b e published in the South B end Daily
Times and the South Bend Daily Tribune on the 22"-day of August and on the 29th day
of August 1204, and that the bids be received up to 10 A. M. on the 2nd day of
September, 1904.
die
Kit
The Board of Public Works met in regular session at 10 A. M. Cat. Nicar absent.
Petition filed for clmnging of a private alley to a p-Lblie alley described as
follows;. 10 ft alley commencing on Napier street about 110 feet West of S. Laurel street
running S. to the intersection of Public alley running E. & W. between Napier street
and Division street.
I. I. & I. Ry Co -notified to place an all night lamp at the. Division street crossing
Engineer filed assessment rolls and final estimates or the followitn� iMpro -at
ments to -wit; Pipe Sewer on Osborne street, from Vistula avenue en o .
Grade,, < Curb & Walk on Leland avenue from lst angle in Leland ave
to Hudson avenue, Cement walk on E. Howard street from Leeper avenue to Lawrence street,
Grade, Curb & Walk'on S. Main street from Indiana 'avenue to Ewing avenue all under
Improver.,ent resolutions Nos. 183, 17 ,177 respectively.
Resolved that notices as 'to the amount of assessments be published Cor six
consecutive days in the South Bend Daily Times and the South Bend Daily Tribune
commencing on the 29th day of 'August 1904, stating that this Board will, give a -hearing
on the amount of such assessments at its office in the City Hall on the 6th day of
September 1904, at 7:15 P. M. "
Resolved further, that the entire work under 'the above contract, be accepted and app-
roved and the final estimate thereon allowed. Notice of this resolution s.ha;l be
published on the 29th day of August 1904, in the South Bend Daily Times and the South
Bend Daily Tribune, - stating that this Board will give a hearing upon the acceptance
of such work at its office in the City Hall on the 6th day of Septenber 1904 at 7:15 P.M.
CONDEMNATION RESOLUTION. no. 16.
Resolved by the Board of Pub lie Works of the City of South Bend, Indiana: That
the following described property -be appropriated for the use of said city:
Begin twenty two -and 1-2 (22 1-2) feet west o-f the intersection of the South
line of Jefferson street and the east line of Cherry street, thence west twenty-two
and 1-2 (22 1-2 Peet, thence south to the north line of the Lake Shore & Michigan
Sout Vern Railroad s Right of Way; thence South-easterly with the North line. of right of
way of said L. S. & M. S. R. R. to a point South of begining, thence North to place
of ber-rining.
The following
described
property maybe
injuriously
or beneficially affectedby
such appropriation.
Partof Lot
No. of
Lot. Name
of Addition.
Name of owner.
All
6
Kirb y'
s Sub Div of
B . 0.
L. 83
115.5 Thaddeus T. Burrow.
All
7
Do.
49.5
Thaddeus T. & Lula Burrow.
All
13
Do.
49.5
Charles E. & Cuba Burrow.
All
14
49.5
Wm-L. Kizer & Jacob Wolverton.
All
15
49.5
Do.
All
16
49.5
Do.
All
21
49.5
B en jamin F . Fish.
All
22
49.5
Do.
33 ft Off North s ide23
33.
Joseph B e jna
16.5ft,off S.Side
23
16.5
Frank & Frances Sieracki
16.5ft off N.Side
24
16.5
Do.
33 ft off S. Side
24
33
Joseph Kruszynski
33ft off N.Side
29
33
Anthony Stachowiak
16.5ft off S.Side
29
16.5
Frank & Josephine Jaworski
16.6 ft of N.Side
30
16.5
Do.
33 ft o� S.Side
30
33
Joseph & Anna Maciulski
All
31
49.5
Sherdan P. & F. C. Redding
All
32
49.5
Maryann Manuszak
All
37
49.5
Joseph & Elnora Aftowski
All
38
49.5
Lucy Szymanska
All
39
49.5
I gnacy L agoc ki
All
40
49.5
" "
Tuesday August 23rd. 1904.
Condemnation resolution N. 16 continued.
All of Bank Out lot 82 lying south of
the south line of Jefferson street and
North and Past of the L. &M. S. R. R2 amd
I. I . & I. R. R.
All
15
Harlin sub-div of
B-. 0. L. 82.
All
14
Do.
All
13
Dom
All
12
Do
All
11
Do
-Do
_All
10
All
9
Do.
All
1
Do.
All
11
Kl ingle & Mayrs Sub -
Div B.O.`L.82f8384
All
"
19 4
8 /
Do.
D9.
"
7
Do.
"
17
Do.
"
16
Do.
"
15
Do.
"
14
Do.
"
13
Do.
"
12
Do.
665 The Malleable Steel Range
Manufacturing Company.
36 Albert G. Harlin.
36
Do.
36
Do.
36
Do
36
Do
36
Do
36 _
Do
115
Do .
53.5 August & louise Cortier
33..33 Carl. & Angelia DeWitte
33.33 Marin & Eugenie Dho�ers
33.33 Joseph & Antoina Nowak
33.33 Thomas Grzesk
33.33
33.33 "Wladyslaus &Helena Kulwicki
33.33 Julius & Ida Van Holsb e-ke
33.33 Peter & Yary VanLucker
38.75 August & Celia Serjeant.
The purpose of such appropriation is to widen Cherry street to uniform width.
Notice of this resolution shall be published on the 25th clay of August and on the
1st day of Septenber 1904 in the South Bend Deily Times.
This Board at its o _ fi ce in the City Hall on the 13t h dgy of Septenb er 1904, at
7:15 P. M. will hear and receive remonstrances from all persons interested in or
affected b y thest proceedings.
Adopted. this 23rd day of August 1904.
BOARD Or PUBLIC WORKS.
PROS T.
S
27
SPECIAL SESSION TUESDAY VI 3RD 1904. AT 7:15 P. M.
The Board met in special session at 7:15 P. M. CaPt Nicar eb sent.
Hearing given on assessment roll for Trunk (Brick) Sewer on East Ma.dis6n street
under Improvement resolution No. 182.
No remonstrators appeared and no remonstrances were filed the Board find that the
property assessed in said roll filed august 16th,- 1904 is benefitted in the amount,
of assessments as shown, on said roll and the Board of Public Works find that the assessme
roll filed August 16th 1904 and the final estimate allowed August 16 1904 shouldbe
and the same is herelyy in all things ratified, confirmed and approved.
Hearing given on Declaratory resolution for the alley pavement between Michigan
street and St. „Joe street, Bric4 pavement on Napier street from Chapin street to
Walnut street, Grade, Cuxb & Walk on Notre Dame avenue, Cement walks on East Madison
street, Grade, Curb & Walk on Carlisle street from Washington street to Linden avenue.
all under improvement resolutions Nos. 208,209, 210, 2112 212 respectively.
Engineer filed his estimated cost of the improvements as follows; -
Carlisle street $12261.00
Madi sdn street 203.50
Notre Dame avenue 22704.00
Napier Street Brick 112295.00
Alley Brick pavement 912.00
In the above matter no remonstrators appeared an-1 no remonstrancesr were filed
The Board therefore find in each and every case in said improvements that the benefits
to the property and to the City of South B end are equal to the estimated cost of the
improvement -and that said declaratory resolutions are hereby in all things ratified,
confirmed and approved.
President.
SIM-
[►Z0
Wednesda.v August 24th. 1904.
The Board met in .regular session at 10 A. M. ° CApt . -Ni ear ab:sent.,
Bias were opened and referred to Engineer for tabulation for the following
work,
---
Gaa.de, Curb & Walk on Carlisle street, Grade, Cillb & Walk Notre Dame avenue
Sidewalks 9n E. Madison street, Brick, pavement on alleys between Michigan and St. Joe
street, Cushing addition Sewer System. Brick pavement on Napier street.
Grand Trunk Ry Co notified to. place an all night lamp at their crossing
over Colunbis street.
Remonstrance filed by Laura E. Harvey against opening .of 'alley from Sample
street to Ohio street
Plat of Stull' s 4t h and 5t h additions approved.
President.
5..
5M
The Board of Public Works met in regular session at 10 A. M. All members present.
Petition filed for Grade, Curb & Walk on Quincy street from Cottage Grove avenue
to Allen street. Referred to Engineer for specifications.
Petition filed for Grade, Curb & Walk on Franklin street, William street,
Taylor street and Scott street. From Indiana avenue to Blanche street, Cement walks
to be on the West side of said streets only.
Contracts were awarded for the following improvements, -
Cushing addition sewer ...........................H. DeVos & Co.
E. Madisonstreet Walks ........................... T. C. Barnes.
Carlisle street Grade, Curb & Walk................J. W. Donahue
Notre Dame avenue Grade, Curb & Walk ............. J. W. Donahue
Napier street Brick Pavement...Barr.Cla,y.......... Jar#es Nelson
Alley Brick Pavement. Barr Clay Block ............ DeFrees & Beyer.
Communication received from Edw. P. Dubail regarding the grading of an alley in
the South part of town. Referred to the Street Commissioner.
President.
I
0
The Board met in regular session at 10 A. M. All members present.
Bond of L. H. Webster on Michigan avenue Pipe Sewer released.
Bond of Hoban & Roach on East LaSalle avenue, Bridge and. Sycamore streets
Pipe.Sewer, released.
Permission granted the Per See Club to enclose a portion of N. St.Joseph
street during the pendency of the.Carnival begining September 5th provided the
consent of the abbutting property owners be secured.
President.
sd
The Board met in regular session at 10 a. m. all members present.
Bond of Henri DeVos & eo.filed and approved for the Cushing Addition Sewer System.
Contract signed with Henri DeVos & Co for Cushing Addition Sewer System.
Petition filed for establishment of a grade on an alley described as follows:
First alley N. of Madison street from St. Peter street to St. Louis street. Referred
to the Engineer.
Permission given Jacobson, Peterson & Co to construct a side track crossing an
alley lying between Linden avenue and Florence avenue at the I. I. & I. crossing.
President.
r
Wednesdav August 31st.'1904.
The Board met in regular session at 10 A. M. All members present.
Bond of James Nelson on Napier streetBrick Pavement filed and approved.
Contract signed with James Nelson for Napier street Brick Pavement.
Street Commissioner authorized to cut the approach at the North side of
Ewing avenue West of Main street and fill holes between Ewing avenue and Bowman Street
P-esident.