HomeMy WebLinkAboutMOU - Reimbursement Related to Howard St. & Corby Blvd. Streetscape Improvements - KRG Eddy St. Land III, LLC
ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR MURRAY L. MILLER
1316 COUNTY-CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/ 235-9251
FAX 574/ 235-9171
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
May 11, 2021
Mr. Tony Halsey
KRG Eddy Street Land III, LLC
30 S. Meridian St., Suite 1100
Indianapolis, IN 46204
thalsey@kiterealty.com
RE: Memorandum of Understanding
Dear Mr. Halsey:
At its May 11, 2021 meeting, the Board of Public Works approved the above referenced
Memorandum of Understanding for reimbursement related to Howard St. & Corby Blvd.
Streetscape Improvements in the amount of $71,221.46.
Enclosed please find a copy of the memorandum for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-9251.
Sincerely,
/s/ Anne Fuchs
Anne Fuchs, Clerk
Enclosures
AF/lh
MEMORANDUM OF UNDERSTANDING
FOR REIMBURSEMENT
This Memorandum of Understanding for Reimbursement (the “Agreement”) is made by
and between the City of South Bend, Indiana, acting by and through its Board of Public Works
(collectively, the “City”), and KRG Eddy Street Land III, LLC, an Indiana limited liability
company (hereinafter, “KRG”), to be effective as of the date same is fully executed by both
parties (the “Effective Date”).
WHEREAS, since 2016, KRG has developed certain land along Eddy Street from
Angela Boulevard to Corby Street in South Bend, Indiana (the “Project”); and
WHEREAS, a portion of KRG’s Project included installation of public utilities including
but not limited to water main, hydrants and valves, water services, sanitary sewer and structures,
and sewer laterals along Howard Street from State Route 23 to Frances Street, for which KRG has
engaged or will engage the services of an underground utilities installation contractor; and
WHEREAS, to install the public utilities, KRG’s contractor made an approximately fifteen
(15) foot wide excavation in the east bound lanes of Howard Street; and
WHEREAS, the City made plans retroactively to mill and resurface the pavement and
install traffic calming improvements along Howard Street as part of a City project in order to
accommodate increased vehicular, bicycle, and pedestrian traffic as a result of the developments
by KRG; and
WHEREAS, KRG had knowledge of the City's planned improvements related to Howard
Street, and the City proposed to perform the pavement replacement and traffic improvements with
KRG reimbursing the City for the costs incurred by the City for pavement replacement and other
work required to complete that portion of the Project.
2
NOW THEREFORE, in consideration of the mutual promises, covenants and agreements
contained herein and other good and valuable consideration, the receipt and sufficiency of which
is hereby acknowledged, the parties hereto intending to be legally bound hereby covenant and
agree as follows:
1. The City agrees to perform or cause to be performed certain work in Howard Street,
including but not limited to pavement replacement, curb removal and installation between State
Route 23 and the Eddy Street intersection, loops and detector installation, pavement striping and
markings, lighting and electrical conduit installation, and tree installation on Howard Street in the
locations depicted on drawings set forth as Exhibit A, which are incorporated herein by reference
and attachment (the "Howard Street Project").
2. The parties acknowledge that the City awarded a bid for the Howard Street
Project on May 11, 2021, to lowest responsible and responsive bidder (the "Contractor") in the
amount of $574,000 (the "Contract Amount"), as set forth more specifically in Exhibit B, which
is attached hereto and incorporated herein by reference. KRG agrees to reimburse the City in the
amount of $71,221.46 for certain work contained within the Howard Street Project, as detailed
on Exhibit C, within sixty-five (65) days from the effective date of this Agreement. The City
shall require the Contractor to provide a performance bond for One Hundred Twenty-five
Percent (125%) of the Contract Amount. The City shall hold such performance bond until it
accepts a completion affidavit and receives a three (3)-year maintenance bond with a value of
Ten Percent (10%) of the final contract value and a lien waiver. Further, following the payment
of such reimbursement by KRG, the City shall cause any necessary repairs to be made to the
Howard Street Project promptly following KRG’s written notice of the need for such repairs.
3
3. The parties agree and stipulate that each party shall bear its own costs, expenses
and attorneys’ fees in relation to this Agreement.
4. This Agreement, including all exhibits, schedules and attachments, contains the
entire agreement between the parties and no representations, warranties or covenants not contained
or provided for herein shall be binding upon any party.
5. This Agreement shall be governed by the laws of the State of Indiana.
6. This Agreement is and shall be deemed jointly drafted and written by all parties to
it and shall not be construed or interpreted against the party originating or preparing it.
7. This Agreement shall be binding upon the parties hereto, their administrators,
executors, heirs and assigns.
8. If any part, term or provision of this Agreement shall be deemed to be prohibited,
invalid, or unenforceable by any applicable law, such a provision shall be replaced by a provision
which comes as close as possible to the intended result of the invalid provision, and the economic
purpose thereof, and which it is valid and enforceable. The invalidity of any part, term, provision
of this Agreement shall not invalidate or affect the remaining parts, terms or provisions hereof and
all such remaining parts, terms and provisions shall remain in full force and effect.
9. This Agreement may be executed in any number of identical counterparts, all of
which, when taken together, shall constitute the same instrument. A copy of the executed
Agreement (in electronic form or otherwise) shall be deemed an original for all relevant purposes.
The exchange of copies of the executed Agreement by electronic mail or by any other electronic
means intended to preserve the original graphic and pictorial appearance of a document shall
constitute effective execution and delivery of this Agreement. Signatures of any parties hereto
transmitted electronically shall be deemed to be their original signatures for all purposes.
4
10. Each party represents the requisite authority to enter into this Agreement and fulfill
the obligations herein.
[Signatures on following page]
May 11, 2021
6
Exhibit A
Improvements Exhibit
PROJECT:DATE:SHEET NO.ACI JOB #DRAWN BY:DESIGNED BY:PM REVIEW:SEAL:SIGNATURE:SCALE:HORZ:VERT:SHEET TITLE:ofQA/QC REVIEW:DATE:315 W. Jefferson Blvd.
South Bend, IN 46601
T 574.232.8700
F 574.251.4440
abonmarche.com
ABONMARCHE
COPYRIGHT 2021 - ABONMARCHE CONSULTANTS, INC.Engineering · Architecture·Land Surveying
Benton Harbor Portage
Ft. Wayne South Bend
Goshen South Haven
Hobart Valparaiso
Lafayette
HOWARD STREET AND
CORBY BOULEVARD
STREETSCAPE IMPROVEMENTS
PROJECT NO. 120-024
PLAN VIEW
HOWARD STREETPWCAKCAKRTN1-15-20201"=20'VERT20-05283411C
H
ADA.KNIPR DEREPSIGE
RNo. 10300102STATE OFTENIG
N
EL ANOINSSOFENIDIAAER
DNPROJECT:DATE:SHEET NO.ACI JOB #DRAWN BY:DESIGNED BY:PM REVIEW:SEAL:SIGNATURE:SCALE:HORZ:VERT:SHEET TITLE:ofQA/QC REVIEW:DATE:315 W. Jefferson Blvd.
South Bend, IN 46601
T 574.232.8700
F 574.251.4440
abonmarche.com
ABONMARCHE
COPYRIGHT 2021 - ABONMARCHE CONSULTANTS, INC.Engineering · Architecture·Land Surveying
Benton Harbor Portage
Ft. Wayne South Bend
Goshen South Haven
Hobart Valparaiso
Lafayette
HOWARD STREET AND
CORBY BOULEVARD
STREETSCAPE IMPROVEMENTS
PROJECT NO. 120-024
GRADING DETAILS
EDDY STREET AND
HOWARD STREETPWCAKCAKRTN1-15-20201"=20'20-05283414C
H
ADA.KNIPR DEREPSIGE
RNo. 10300102STATE OFTENIG
N
EL ANOINSSOFENIDIAAER
PROJECT:DATE:SHEET NO.ACI JOB #DRAWN BY:DESIGNED BY:PM REVIEW:SEAL:SIGNATURE:SCALE:HORZ:VERT:SHEET TITLE:ofQA/QC REVIEW:DATE:315 W. Jefferson Blvd.
South Bend, IN 46601
T 574.232.8700
F 574.251.4440
abonmarche.com
ABONMARCHE
COPYRIGHT 2021 - ABONMARCHE CONSULTANTS, INC.Engineering · Architecture·Land Surveying
Benton Harbor Portage
Ft. Wayne South Bend
Goshen South Haven
Hobart Valparaiso
Lafayette
HOWARD STREET AND
CORBY BOULEVARD
STREETSCAPE IMPROVEMENTS
PROJECT NO. 120-024
GRADING DETAILS
CORBY BOULEVARD
AND SOUTH BEND AVENUEPWCAKCAKRTN1-15-20201" =10'VERT20-05283415C
H
ADA.KNIPR DEREPSIGE
RNo. 10300102STATE OFTENIG
N
EL ANOINSSOFENIDIAAER
PROJECT:DATE:SHEET NO.ACI JOB #DRAWN BY:DESIGNED BY:PM REVIEW:SEAL:SIGNATURE:SCALE:HORZ:VERT:SHEET TITLE:ofQA/QC REVIEW:DATE:315 W. Jefferson Blvd.
South Bend, IN 46601
T 574.232.8700
F 574.251.4440
abonmarche.com
ABONMARCHE
COPYRIGHT 2021 - ABONMARCHE CONSULTANTS, INC.Engineering · Architecture·Land Surveying
Benton Harbor Portage
Ft. Wayne South Bend
Goshen South Haven
Hobart Valparaiso
Lafayette
HOWARD STREET AND
CORBY BOULEVARD
STREETSCAPE IMPROVEMENTS
PROJECT NO. 120-024
SIDEWALK JOINTING PLANPWCAKCAKRTN1-15-20201"=10'VERT20-05283419C
H
ADA.KNIPR DEREPSIGE
RNo. 10300102STATE OFTENIG
N
EL ANOINSSOFENIDIAAER
PROJECT:DATE:SHEET NO.ACI JOB #DRAWN BY:DESIGNED BY:PM REVIEW:SEAL:SIGNATURE:SCALE:HORZ:VERT:SHEET TITLE:ofQA/QC REVIEW:DATE:315 W. Jefferson Blvd.
South Bend, IN 46601
T 574.232.8700
F 574.251.4440
abonmarche.com
ABONMARCHE
COPYRIGHT 2021 - ABONMARCHE CONSULTANTS, INC.Engineering · Architecture·Land Surveying
Benton Harbor Portage
Ft. Wayne South Bend
Goshen South Haven
Hobart Valparaiso
Lafayette
HOWARD STREET AND
CORBY BOULEVARD
STREETSCAPE IMPROVEMENTS
PROJECT NO. 120-024
LANDSCAPE PLANPWCAKCAKRTN1-15-20201"=20'VERT20-05283426C
H
ADA.KNIPR DEREPSIGE
RNo. 10300102STATE OFTENIG
N
EL ANOINSSOFENIDIAAER
7
Exhibit B
Howard St. and Corby Blvd Streetscape Improvements Bid Form
8
Exhibit C
Reimbursement Exhibit
Eddy and Howard Intersection Improvements
Reimbursement Exhibit
Description Qty Unit Unit Price Cost
1 Compacted Aggregate, No. 53 61 TON 27.00$ 1,647.00$
2 HMA Surface 55 TON 81.00$ 4,455.00$
3 Concrete curb and gutter 258 LFT 35.00$ 9,030.00$
4 Concrete Sidewalk, 4"142 SYD 43.00$ 6,106.00$
5 Concrete Curb Ramp 30 SYD 91.00$ 2,730.00$
6 Concrete Driveway Approach, 8"156 SYD 65.00$ 10,140.00$
7 Tree, 2"13 EA 490.00$ 6,370.00$
8 Bollards 12 EA 2,400.00$ 28,800.00$
9 Line, Yellow, Solid, Thermoplastic 4", Grooved 1184 LFT 3.00$ 3,552.00$
10 Line, White, Solid, Thermoplastic, 4", Grooved 150 LFT 4.00$ 600.00$
11 Line, White, Solid, Thermoplastic, 6"116 LFT 6.00$ 696.00$
12 Transverse, Line, Thermoplastic, White, 24" Stop Bar 27 LFT 10.00$ 270.00$
13 Transverse, Line, Thermoplastic, White, 24" Cross Hatch 87 LFT 10.00$ 870.00$
14 Lane Indication Arrow 2 EA 150.00$ 300.00$
15 Signal Detector Housing 2 EA 900.00$ 1,800.00$
16 Conduit, PVC, 2" Schedule 80 92 LFT 11.00$ 1,012.00$
17 Saw Cut for Roadway Loop Detector and Sealant 340 LFT 10.00$ 3,400.00$
18 Signal Cable Roadway Loop Copper, 1c/14 Ga 1110 LFT 0.55$ 610.50$
Subtotal 82,388.50$
Description Qty Unit Unit Price Cost
1 HMA Intermediate 57.44 TONS 91.00$ 5,227.04$
2 HMA Base 49.5 TONS 93.00$ 4,603.50$
3 Compacted Agg, No. 53 49.5 TONS 27.00$ 1,336.50$
Subtotal 11,167.04$
Kite Reimbursement less COSB Contribution Total 71,221.46$
Kite Reimbursement to COSB
COSB Contribution for Sewer Alignment Shift in Howard St.
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 5/5/2021 Department Engineering
Name Kyle Silveus Phone Extension
BPW Date 5/11/2021 Phone Extension -
Review and Approval Required Prior to Submittal to Board Diversity Compliance
and Inclusion Officer Officer Name BPW Attorney Attorney Name Clara McDaniels, Sandi Kennedy
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. Resolution
Chg. Order, No. Traffic Control Ease./Encroach
Other: MOU Agreement Ease./Encroach
Required Information
Company or Vendor Name KRG Eddy Street Land III, LLC
New Vendor Yes If Yes, Approved by Purchasing
No C
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name Howard St. and Corby Boulevard Streetscape Improvements
Project Number 120-024
Funding Source N/A
Account No. N/A
Amount $71,221.46
Terms of Contract N/A
Purpose/Description Memorandum of Understanding for Reimbursement related to Streetscape
Improvements along Howard St. and Corby Boulevard.
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date: