Loading...
HomeMy WebLinkAboutNo. 3098 Approving and authorizing the execution of an amendment to the addendum to the Master Agency Agreement (Main-Lafayette Connector Design Project - Supplement #7) 2749-10, 2838-11, 2873-11, 2953-11, 2954-11, 3023-12, 3058-12, 3098-12 RESOLUTION NO. 3098 RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION APPROVING AND AUTHORIZING THE EXECUTION OF AN AMENDMENT TO THE ADDENDUM TO THE MASTER AGENCY AGREEMENT (Main-Lafayette Connector Design Project- Supplement#7) 2749-10, 2838-11, 2873-11, 2953-11, 2954-11, 3023-12,3058-12, 3098-12 WHEREAS, effective January 1, 2012, the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission") and the South Bend Board of Public Works (the "BPW") entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2012; and WHEREAS, effective January 1, 2012, the Commission and the BPW entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for the limited purpose of contracting for and managing the completion of existing Projects; and WHEREAS, pursuant to the Master Agency Agreement, the Commission added the Main-Lafayette Connector Design Project to the Master Agency Agreement by way of an Addendum on August 23, 2010; and WHEREAS, the Commission amended the Addendum with Supplement #1 by way of Resolution 2838 on January 21, 2011; and WHEREAS, the Commission amended the Addendum with Supplement #2 by way of Resolution 2873 on May 10, 2011; and WHEREAS, the Commission amended the Addendum with Supplement #3 by way of Resolution 2953 on November 8, 2011; and WHEREAS, the Commission amended the Addendum with Supplement #4 by way of Resolution 2954 on November 8, 2011; and WHEREAS, the Commission amended the Addendum with Supplement #5 by way of Resolution 3023 on April 24, 2012; and WHEREAS, the Commission amended the Addendum with Supplement #6 by way of Resolution 3058 on July 26, 2012; and WHEREAS, the Commission desires to amend the Addendum by way of this Amendment. NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment Commission as follows: Section 1. The Commission hereby approves the Amendment to the Addendum to the Master Agency Agreement (Main-Lafayette Connector Design Project - Supplement #7) and hereby authorizes its execution in substantially the form attached hereto with such changes as the Commission may deem necessary or appropriate upon the advice of counsel, said execution thereof to be conclusive evidence of the Commission's approval of such changes. The Clerk is hereby directed to file a copy of this Amendment to the Addendum with the BPW. Section 2. This Resolution shall be in full force and effect after its adoption by the Commission. Section 3. Commission staff members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. ADOPTED at a meeting of the South Bend Redevelopment Commission held on December 13 2012, at 9:30 a.m., in Room 1308, County-City Building, South Bend, Indiana 46601. Resolution No. 3098 CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPM (1 . South Bend Red•'elo' ent Commission ATTEST: i� �'�7e47 South Bend Redevelo ent Commission Resolution No. 3098 AMENDMENT TO THE ADDENDUM TO THE MASTER AGENCY AGREEMENT (Main-Lafayette Connector Design Project- Supplement#7) 2749-10, 2838-11, 2873-11, 2953-11,2954-11,3023-12,3058-12,3098-12 This Amendment to the Addendum to the Master Agency Agreement (this "Amendment"), made and entered into as of the 20th day of December, 2012, by and between the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission") and the City of South Bend, Indiana, a municipal corporation duly organized and existing pursuant to the laws of the State of Indiana, acting by and through its Board of Public Works (the "BPW") for purposes of the Commission designating the BPW to act as the Commission's agent to undertake the Main-Lafayette Connector Design Project- Supplement #7 (the "Project"). WHEREAS, effective January 1, 2012, the Commission and the BPW entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2012; and WHEREAS, effective January 1, 2012, the Commission and the BPW entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for the limited purpose of contracting for and managing the completion of existing Projects; and WHEREAS, pursuant to the Master Agency Agreement, the Commission added the Main-Lafayette Connector Design Project to the Master Agency Agreement by way of an Addendum on August 23, 2010; and WHEREAS, the Addendum was amended by both the BPW and the Commission by Supplement#1 during February 2011; and WHEREAS, the Addendum was amended by both the BPW and the Commission by Supplement#2 during May 2011; and WHEREAS, the Addendum was amended by both the BPW and the Commission by Supplement#3 during November 2011; and WHEREAS, the Addendum was amended by both the BPW and the Commission by Supplement#4 during November 2011; and WHEREAS, the Addendum was amended by both the BPW and the Commission by Supplement#5 during April 2012; and WHEREAS, the Addendum was amended by both the BPW and the Commission by Supplement#6 during July/August 2012; and WHEREAS, the Commission desires to amend the Addendum by way of this Amendment. NOW, THEREFORE, in consideration of the mutual covenants and promises contained herein, and for other good and valuable consideration, the receipt of which is hereby acknowledged, the BPW and the Commission agree as follows: 1. The Commission hereby empowers and appoints the BPW, pursuant to the Master Agency Agreement, to act as the Commission's agent for the limited purpose of contracting for and managing the completion of the Project, the scope of said Project being originally described in "Exhibit A", amended by Supplement #1 as described in "Exhibit B", amended by Supplement #2 as described in "Exhibit C", amended by Supplement #3 as described in "Exhibit D", amended by Supplement #4 as described in "Exhibit E", amended by Supplement #5 as described in "Exhibit F", amended by Supplement #6 as described in "Exhibit G", and now amended as described in "Exhibit H", attached hereto and made a part hereof. 2. All of the terms and conditions of the Master Agency Agreement shall control this appointment and this Addendum shall be attached to the Master Agency Agreement. 3. Commission staff members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. IN WITNESS WHEREOF, the undersigned execute this Addendum to Master Agency Agreement to be effective as of the date first written above. (Signature Page Follows) CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT South Bend Redevelopment Commission ATTEST: South Bend Redevelopment Commission CITY OF SOUTH BEND,INDIANA BOARD OF PUBLIC WORKS Gary Gilot, President Don Inks, Member Kathryn Roos, Member Mark Neal, Member Michael Mecham, Member ATTEST: Linda Martin, Clerk Exhibit"A" MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT See attached Proposal from Lawson-Fisher Associates P.C. dated August 9, 2010 Approved by the Board of Public Works on August 23, 2010 1316 COUNTY-CITY BUILDING ■■���`= /% d, PHOxa574/235.9251 227 W.JEFFERSON BOULEVARD �� 'c!s � � FAZ 574/295.9777 SOUTH BEND, INDIANA 4 6601.1830 �� TDD 574/235-5567 • Crrr of Sow-H BEND STEPHEN j. Luaclor, MAYOR BOARD OF PUBLIC WORKS August 30,2010 Mr. Gregory Holden &Mr. Paul Hummel Lawson-Fisher Associates 525 West Washington Avenue South Bend,Indiana 46601 RE: Professional Services Proposal - Main/Lafayette Corridor Design Project No. 110-058 Dear Mr. Holden & Mr. Hummel: The Board of Public Works, at its meeting held on August 23, 2010, approved the above referenced Professional Services Proposal in the amount of 5436,000.00, Enclosed is a copy of the Professional Services Proposal for your records. if you have any questions,please contact me at(574)235-9251. Sincerely, 4--L)/)/? )3(Lt Linda M. Martin, Clerk Enclosure c: Bill Scballiol, CED Michael Johnston, LFA Exhibit `B" MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT #1 See attached Proposal from Lawson-Fisher Associates P.C. dated January 4, 2011 Approved by the Board of Public Works on February 14, 2011 Exhibit"C" MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT- SUPPLEMENT#2 See attached Proposal from Lawson-Fisher Associates P.C. dated March 15, 2011 Approved by the Board of Public Works on May 9, 2011 1316 COUNTY, $UILDiNC 227 W.J E F F E R S O N Sammie. ` \ r -; Now 5741235-9251 SourH BviD,INDIANA 46601.1530 ���' % '� FAN 574/235 9171 • 2865 CITY OF SOUTH BEND STEPHEN J.LUECKE, MAYOR BOARD OF PUBLIC WORKS February 14,2011 Mr. Paul Hummel Lawson-Fisher Associates,PC 525 West Washington Avenue South Bend, Indiana 4660] RE: Professional Services Proposal—Main-Lafayette Connector Design -project No. 11 . 058 0 Dear Mr, Hummel: The Board of Public Works, at its meeting held on February 14, above referenced Professional Services Proposal in the amount of S439,000.00.011, approved the Enclosed please find a copy of the Professional Services Proposal for Your records, If you have any questions,please contact me at(574)235-9251. Sincerely, Linda M.Martin, Clerk Enclosure c: Bill Schalliol, CED Michael Johnston, LFA Beth Leonard, CED Judy Love, CED GARY A.GILOT,I'.E. r)ntdu Exhibit "C" MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT #2 See attached Proposal from Lawson-Fisher Associates P.C. dated March 15, 2011 Approved by the Board of Public Works on May 9, 2011 Exhibit"D" MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT #3 See attached Proposal from Lawson-Fisher Associates P.C. dated October 12, 2011 Approved by the Board of Public Works on November 21, 2011 1316 COUNTY-CT'BvicDINc _ 2271X?J Boui-ev ao u o�\ d`= �'HON�57-0/235 9253 SOUTH BEND,INDIANA 46601.1830 �� A 7�.v 574/235-977! CrrY OF SOUTH BEND STEPHEN J. LUECKE, MAYOR BOARD OF PUBLIC WORKS November 21, 2011 Mr. Michael Johnston Lawson-Fisher Associates 525 West Washington Street South Bend, Indiana 46601 RE: Professional Services Proposal Supplement No. 3 Main-Lafayette Corridor Design Project Dear Mr.Johnston: The Board of Public Works, at its meeting held on November 21, 2011, approved the above referenced Professional Services Proposal Supplement No, 3 in the amount of $260,320.00. Enclosed is a copy of the Professional Services Proposal Supplement No. 3 for your records. Enclosed please find the City's Employment Eligibility Verification form required State for your signature. Please return the fully executed form as soon as . Add by the enclosed please find the City's Minority and Women Business En possible. e Diversity Development. Enterprise Diversity If you have any questions,please contact me at(574)235-9251. Sincerely, CH- Linda .Martin,Clerk Enclosure c: Bill Schalliol,CED Beth Leonard, CED Judy Love,CED LM:jc Exhibit "E" MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT#4 See attached Budget Table prepared by Lawson-Fisher Associates P.C. Approved by the Board of Public Works on November 21, 2011 MAIN-LAFAYETTE CONNECTOR INFORMATION Parcel Number Owner Name Business Name T-YPe o! Calculated Ac uitition Area irk) TEMPORARY PARCELS Jerome A.Osborn RESIDENCE(JUNK YARD) David L Bolinger TEMP 32,347 "`' .' RESIDENCE TEMP .;546 • United States of America US P051 OFFICE 19,363 8&N finerprises MOTION INDUSTRIES,INC TEMP 81.080 TEMP 44,930 . 394 H.S.Ahman,Inc. H.S.ALTMAN,INC.i0t. Richard and Ka thleen Anagnos TEMP 50,105 INDUSTRIAL DOOR •.,.. Wcndy's of Fart Wayne,Inc TEMP 48,575• Y WENDY'S RESTAURANT 442,: Denny O.&Nancy L.Weber RESIDENCE TEMP 76,771 TEMP 8,141 PERMANENT(ONLY) PARCELS .,.•✓ '.,. lack E.Ellis et al.,As Trustees REPUBLSCAN HEADQUARTERS SIC -1.4. ly..,., WMCR Holding Compan ,LLC KENTUCKY FRIED CHICKEN PARTIAL 14,675 PARTIAL 34,67fi PERMANENT & TEMP PARCELS 475 South Bend-Palls[reek Development UT IRELAND """- COMMONS PARTIAL 556. - LOCK JOINT TUBE INC. LOCK JOINT TUBE,INC 679,55 CBI Buildings,LLC PARTIAL 147,975 C&B OPTICAL ONF, -021 Ric A.&Janet A.De Buysser RESIDENCE PARTIAL 47,929 ;420 Ric &Janet De Buysser RESIDENCE PARTIAL 39,038 C-B Realty,UP PARTIAL 39,479 ':; t VACANT PARTIAL C-B Realty,UP VACANT 0.TIAL 7,646 i PARTIAL c.-.,''''At M.Kay CARL KAY MEMORIALS 8,123 .• 374.. South Gateway Properties,LEE SEARS HARDWARE PARTIAL 31,022 -00$ PARTIAL 45,022 '33 Part Icia Moore Propertles,LLC SCOOTER WAREHOUSE PARTIAL 004 Halle Properties,LLC DISCOUNT TIRE 30,5)0 .1303. Jeffrey L.Nickerson PARTlAI 40.347 • HONKERS FAMILY RESTAURANT PART 002 Frick Limited Liability Company DAIRY QUEEN PARTIAL 50,121 PARTIAL . :40–' PWS Investment Property,LLC PRECISION WALL SYSTEMS PARTIAL 137,916 6 ..'.QDl.' Richards Restaurants,Inc. R&8 CAR COMPANY 85,42 PARTIAL 88,427 ' TIC Showplace 1 thou 5 and 7 thru 19,LLC AMC SHOWPLACE SOUTH SEND 16 PARTIAL �� HERAEU_KUl2FR,INC. HERAEUS KUIZFR,INC 707,425 :440 Maryann Sherman RESIDENCE PARTIAL 227,3[33 PARTIAL Nancy Jo Pinney&Kaylyn Kramer RESIDENCE PARTIAL 11,13 1,134 441 Terry L. Diane K.Ladson 6 & RESIDENCE PARTIAL TOTAL TAKE PARCELS 1.036 434.. Ralph F &Sharon 5 Mink RESIDENCE TOTAL 377 Robert 5.and Mary L.Rajski PREMIER COLLEGE OF COSMETOLOGY 1 6,7 6 3 419 Ric A.&lanai A De Buysser TL7TAl 32,334 VACANT TOTAL NON ACQUISITION PARCELS �96 (AGGREEMENT) 364 Caroline Partners,LLC,et al. VACANT 349 Caroline Partners,LLC PARTIAL 137,632 VACANT PARTIAL 436 Caroline Partners,LLC VACANT 16,355 433 CITY' VACANT PARTIAL 25,104 431 Caroline Partners,LLC VACANT PARTIAL NONE 16,599 429 CITY VACANT NONE 1NE 11,531 428 CITY VACANT 8,511 427 CRY NONE 23,646 VACANT �——NE 17,605 NON ACQUISITION PARCELS(MISC) 365 Hein Pau,Andrew RESIDENCE ^– 443 City of South Bend Park Dept NONE 0 OBRIfN PARK NONE' 447 kogte Marsha Ann RESIDENCE 366,631 NONE 0 A'cT � GROUP I VE 5975,000.00 .. 6 &i.t:,, GROUP 2 $75,000.00 ;.. .. a:« 'c u,.,. GROUP 3 AC7PVE $45,060.77 GROUP 4 5105,006,00 ACTIVE GROUP 5 52S,000.00 GROUP 6 CITY/CAROLINE SWAP TOTAL Group 1 limo Group 5 51.725!Wry: Exhibit"F" MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT -SUPPLEMENT#5 See attached Budget Table prepared by Lawson-Fisher Associates P.C. with construction estimate for project at $4.5 Million Dollar amount Approved by the Board of Public Works on May 15, 2012 ENGINEER'S ESTIMATE CITY OF SOUTH BEND April 17,2012 Project Name:Main Slreet/Lafavette Boatyard Connecter Project No.:,710-058 For Bids Due:5,as BASE BID ITEM NO, DESCRIPTION QTY UNIT �� UNIT PRICE TOTAL AMOUNT 1 DEWATERING AND PROTECTION OF EXISTING STRUCTURES 1 LS S5,000.00 S5,000.00 2 CONSTRUCTION ENGINEERING 1 LS $34,000.00 S94,000•00 3 CPM SCHEDULE 1 LS $1,250.00 $1,250.00 4 CPM SCHEDULE,MONTHLY UPDATE 13 $200.00 $2,600.00 5 MOBILIZATION AND DEMOBILIZATION 1 LS $233,000.00 5233,000.00 6 CLEARING RIGHT-OF-WAY 1 LS MR5140,000.00 $140,000.00 PIPE,REMOVE EXISTING STORM SEWER 73 LFT $15.00 31,095.00 8 PIPE,REMOVE EXISTING WATER MAIN 10 LFT 515.00 $150.00 9 STRUCTURE REMOVE,EXISTING STORM MANHOLE 15 EACH 31.000,00 S15,000.00 10 STRUCTURE REMOVE,EXISTING SANITARY MANHOLE 2 EACH 51,200.00 $2,400.00 11 REMOVE,EXISTING CAP,6-INCHES 2 EACH $300.00 S800.00 12 REMOVE,EXISTING CAP,8-INCHES 1 EACH $350.00 S350.00 IIIIIIREMOVE,EXISTING CAP,10-INCHES 1 EACH $500.00 S500.00 =REMOVE,EXISTING FIRE HYDRANT 2 EACH $1,000.00 52,040.00 15 ABANDON,EXISTING STORM SEWER 589 . LFT $20.00 $11,784.40 16 ABANDON,EXISTING SANITARY SEWER 680 LFT $20.00 513,600.00 17 ABANDON,EXISTING SANITARY MANHOLE 2 31,000.00 42,400.00 18 ABANDON,EXISTING WATER MAIN 485 LFT $15.00 57,275.00 19 PAVEMENT REMOVAL 100 SYS 115.00 $1,500.00 20 COMMON EXCAVATION 35,611 CY$ $8.00 $284,888.00 ®TEMPORARY EROSION AND SEDIMENT CONTROL 1 LS " 337,000.00 22 COMPACTED AGGREGATE BASE,NO.53,EASE 9,130 TON 321 OD 5191,730.00 23 COMPACTED AGGREGATE BASE,NO.73,BASE 20 TON $21.00 5420.00 24 MILLING,ASPHALT, 1-1/2 INCH 176 SYS $4.00 $704.00 25 HMA SURFACE,TYPE B 1,390 TON 568,00 $94,520.00 11111HMA INTERMEDIATE,TYPE B 2,280 TON 564.00 27 HMA BASE,TYPE B Si45,924.00 7,290 TON 553.00 28 HMA PATCHING,TYPE B 5386,370.00 260 TON 5100.00 29 ASPHALT FOR TACK COAT S26,000.Op 19.5 SYS 51.00 $180 30 PLAIN CEMENT CONCRETE PAVEMENT PATCH,8-INCHES SYS $45.00 54,140.000 Lawson-Fisher Associates P.C. ENGINEER'S ESTIMATE CITY OF SOUTH BEND April 17,2012 Project Name :Main Street/Lafavette Boulevard Connector Project No.:110-058 For Bids Due:5(B12012 BASE BID ITEM NO. DESCRIPTION OTY, UNIT UNIT PRICE TOTAL AMOUNT 31 TEMPORARY FENCE 115 LFT $30.00 53,450.00 32 SIDEWALK,CONCRETE.4-INCH 5,301 SYS $30.00 $159,030.00 33 CURB RAMP,CONCRETE 292 SYS $100.00 $29,200.00 34 CURB,CONCRETE LF7 $14.50 $8,528.00 35 COMBINED CONCRETE CURB AND GUTTER,TYPE B LFT 516.00 $150,112.00 MECOMBINED CONCRETE CURB AND GUTTER,TYPE A 50 LFT 318.00 $800.00 37 HMA FOR APPROACHES,TYPE B 3,640 TON $75,00 $273,000.00 38 PCCP FOR APPROACHES,6-INCH 2,217 SYS $32.00 $70,844.00 WMPCCP FOR APPROACHES,8-INCH 2,139 SYS $43.00 $97,977.00 40 PAVERS,RESET 33 SYS $70.00 $2,310.00 41 MOBILIZATION AND DEMOBILIZATION FOR SEEDING 2 EACH $470.00 $940.00 42 TOPSOIL 3,510 CYS $30.00 3105,300 00 FERTILIZER 2.12 TON 31,400,00 $2,888.00 44 MULCHED SEEDING, U 25,596 SYS 51.50 538,394.00 45 WATER 230 KCAL S1.20 $276.00 46 SODDING,NURSERY 4,424 SYS $3.50 $15,484.00 47 FIELD OFFICE,A 18 MO _ $1,900.00 s34.200,00 AS MONUMENTS—TYPE B 13 ' EACH $585.00 57,805.00 49 MONUMENTS—TYPE C 3 EACH $450.00 S1,350.00 50 ADJUST WATER SERVICE LINE,RESIDENTIAL 2 EA $1,500.00 $3,000.00 51 ADJUST WATER SERVICE LINE,RESIDENTIAL.WITH RETAP AT MAIN 2 EA $2,500.00 $5,000.00 52 CAP EXISTING WATER SERVICE LINE 2 lini $250,00 $500.00 WATER LINE RELOCATION UNDER PROPOSED UTILITY LINE,8- 53 INCH 2 EA 35000 00 310,000.00 =WATER MAIN,PIPE,D.I.,6-INCH 518 LFT $50.00 $25,900.00 85 WATER MAIN,PIPE,D.I.,8-INCH 1,774 LFT $65.00 5116,310.00 56 WATER MAIN,PIPE,D.I., 10-!NCH 294 LFT S75,00 3 22,060.00 57 GATE VALVE 8 BOX,6-INCH 2 EACH S1,250.00 $2,500.00 58 GATE VALVE 8 BOX,8-INCH 5 EACH $1,600.00 18,000.00 59 GATE VALVE 8 BOX. 10-INCH 3 EACH 32,000,o0 $6,000.00 60 INSERTVALVE,8-INCH 1 EACH $4,500.00 E4,500.00 PrniPN cuc AI,. en.nn, .,, ENGINEER'S ESTIMATE CITY OF SOUTH BEND April 17,2012 Project Name:Main Street/Ltfavette Boulevard Connector Project No.:110-056 For Bids Due:5122!2012 BASE BID ITEM NO. DESCRIPTION • QTY TOTAL AMOUNT =TAPPING SLEEVE,6-INCH ' EACH 51,500.00 NICE $1,500.00 TAPPING SLEEVE.8.1NCH EACH $2,000.00 54,000.00 63 TAPPING SLEEVE,10-INCH X 8-INCH EACH $2,250.00 52,250.00 � 64 TAPPING VALVE,6-INCH EACH $1500.00 $1,500.00 65 TAPPING VALVE,8-INCH EACH $2,250.00 $5,750.00 WATER MAIN CROSSOVER,6-INCH EACH $4,000.00 54.000.00 67 WATER MAIN CROSSOVER,8-INCH EACH $5,000,00 s10,000.0o WATER MAIN CROSSOVER,10-INCH 2 EACH $6,500.00 313,000.00 69 FIRE HYDRANT ASSEMBLY 6 EACH 54,500,00 $27,000. 70 COMPRESSION COUPLING,10-INCH EACH $1,900.00 $3,800,00 CAP,6-INCH EACH 6200.00 $600.00 72 CAP,6-INCH EACH 3250.00 $1,250.00 73 CAP, 10-INCH 1 EACH 0300.00 3300 74 REDUCER,8-INCH X 6-INCH 00 2 EACH $400.00 75 REDUCER, 10-INCH X 8-INCH E80D. 0 1 EACH $500.00 =TEE,6-INCH $500.00 1 EACH 3400.00 $400,00 77 TEE,&INCH X 6-INCH 3 EACH 5800.00 $2,400.00 78 TEE, 10-INCH X 6-INCH 2 Call $900.00 $1,800.00 79 TEE, 10-INCH ? EACH 31,000.00 S1,000,00 80 CROSS,8-INCH 1 EACH 51,250.00 $1.250.00 81 11 Y.DEG BEND,6-INCH 1 EACH 5460.00 $450.00 82 11 Y DEG BEND,8-INCH 7 EACH $550.00 53,850.00 83 45 DEG BEND,&INCH 4 EACH 5450.00 51,80000 84 45 DEG BEND,8-INCH EACH $550.00 $550.00 85 45 DEG BEND, 10-INCH EACH $750.00 $1,500.00 86 90 DEG BEND,8-INCH EACH $600.00 $600.00 87 NEW WATER SERVICE, 1-INCH EACH $1,500.00 $7,500.00 88 CAP,EXISTING WATER SERVICE EACH $250.00 $1,250.00 89 PROJECT INFORMATION SIGN EA $1,000.00 32,000.00 90 STORM PIPE,0.1.,10-INCH LET $50.00 $1,200.00 Lawson-Fier Associates P.C. ENGINEER'S ESTIMATE CITY OF SOUTH BEND April 17,2012 Project Name:J Ian Strmt/Lafax Soul M r� Project No.:11 . ecto, For Bids Due:Maw BASE BID • ITEM NO. DESCRIPTION QTY. uNrr 121 CONTROL STRUCTURE,60 INCH TOTAL AMOUNT 1 EACH $8,000.00 $8,000.00 IIMIINLET,J-10,MOD 38 EACH $5,202.00 $202,878.00 INLET, M-10,MOD 24 EACH $3,200.00 $76,800.00 124 INLET CASTING,TYPE 2 1 EACH $2,000.00 125 INLET CASTING,NEENAH R-3067-C,TYPE I GRATE $2,000.00 EACH $500.00 126 STRUCTURE,ADJUST CASTING TO GRADE $500.00 17 EACH $250.00 =CAST IN PLACE RETAINING WALL 54.250.00 63.5 SYS $400.00 =MODULAR CONCRETE BLOCK RETAINING WALL 18 525.400.00 .5 SYS 5450.00 129 TEMPORARY PANEL SIGN SUPPORTS $8,325.00 108 LET $10.00 $1,080.00 130 STANDARD BARRICADE,TYPE Ill-A 144 LET $10.00 $1;440.00 131 STANDARD BARRICADE,TYPE Ill-B 360 LFT $15.00 55,400 00 132 CONSTRUCTION SIGN,TYPE A 22 EACH $120.00 52,640.00 133 CONSTRUCTION SIGN,TYPE B 1 EACH $100.00 $100.00 134 DETOUR ROUTE MARKER ASSEMBLIES 43 an $65.00 $2,795.00 IIIIIROAD CLOSURE SIGN ASSEMBLIES EACH $260.00 $2,250.00 =FLASHING ARROW BOARD EACH $540.00 5500.00 137 TEMPORARY PANEL SIGN $15.00 34,260.00 138 MAINTENANCE OF TRAFFIC $ .000,00 $50,000.00 138 TRAFFIC SiGNAL EQUIPMENT,REMOVE 1 LS $5,000.00 $5.000.00 140 MISCELLANEOUS EQUIPMENT FOR TRAFFIC SIGNALS LS 51,000,00 $1,000.00 =TRAFFIC SIGNAL HEAD 3 FACE,12 IN,RED,AMBER,GREEN 18 EACH S900.00 $16,200.00 11111 TRAFFIC SIGNAL HEAD,3 FACE, 12 IN,RED,AMBER ARROW, GREEN ARROW EACH $950.00 $1,900.00 IIIITRAFFIC SIGNAL HEAD,5 FACE,12 IN RED,AMBER,GREEN, AMBER ARROW,GREEN ARROW EACH $1,400,00 $5,600.00 PEDESTRIAN SIGNAL HEAD WITH INTERNATIONAL SYMBOLS,18",COUNTDOWN EACH $850.00 =SIGNAL SERVICE $18,700.00 EACH 5800.00 =POWER SUPPLY, UNINTERRUPTIBLE $2,70.0 EACH $7,500.00 147 THERMAL VIDEO DETECTOR SYSTEM $22.500.00 e $7,000.00 148 PEDESTRIAN PUSH BUTTON AND SIGN 18 1B EACH $175.00 11:11 $3,150,00 TYPE 1 CONTROLLER AND CABINET,MENU DRIVEN, 12 PHASE TS2, 1 EACH $25,000.00 325,000.00 ggecf File No..207024.40 ENGINEER'S ESTIMATE CITY OF SOUTH BEND April 17,2012 Project Name :Main Sjreet/Lafavette Boulevard Connector Project No.:110458 For Blds Due:5/221201Z BASE BID ITEM NO. DESCRIPTION QTY. UNIT UNIT PRICE TOTAL AMOUNT 150 CONTROLLER AND CABINET,MENU DRIVEN, 12 PHASE 7S2, EACH TYPE 1,WITH LIGHTING $30,000.00 560,000.00 SIGNAL AND LIGHTING COMBINATION CANTILEVER 151 STRUCTURE,40 FT.SIGNAL ARM.20 FT.LUMINAIRE ARM 35 FT. 1 EACH $6,400.00 $6,400 00 152 SIGNAL CANTILEVER STRUCTURE,MAST ARMS 40 FT AND 40 1 EACH FT $8,000.00 $8,000.00 =SIGNAL CANTILEVER STRUCTURE,40 FT SIGNAL ARM 3 EACH $2,500.00 57,500.00 154 SIGNAL CANTILEVER STRUCTURE,35 FT SIGNAL ARM 1 EACH 52,000.00 $2,000.00 155 SIGNAL SUPPORT FOUNDATION,36 IN X 36 1N X 96 IN 6 EACH $1,500.00 $9,000.00 =STEEL STRAIN POLE FOUNDATION,36 IN X 144 IN 4 EACH $2,500,00 $10,000.00 157 CONTROLLER CABINET FOUNDATION,P1 3 EACH $500.00 $1,500.00 158 I(AN'DHOLE,SIGNAL 16 EACH $500.00 $8,000.00 159 INTERCONNECT CABLE,FIBER OPTIC 383 LFT $2.00 S756.00 160 THERMAL VIDEO DETECTOR CABLE 1,310 LFT $1.00 $1,310.00 161 SIGNAL CABLE.3C/8GA 175 LFT $3.50 $612.50 162 SIGNAL CABLE,3C/14GA 100 LFT $2.00 $200.00 163 SIGNAL CABLE,5C/14GA 3,000 LFT $1.75 $5,250.00 En SIGNAL CABLE,7C/14GA 1,410 LFT $1.75 $2,467.50 IIM SIGNAL CABLE,2C/16GA 120 LFT $2.00 $240.00 166 LOOP DETECTOR AMPLIFIER,DELAY,2-CHANNEL 2 EACH w $800.00 $1,600.00 167 SAW CUT FOR ROADWAY LOOP SEALANT ' 324 LFT $8.00 $2,592.00 168 SIGNAL DETECTOR HOUSING 2 En $650.00 $1,300.00 169 SIGNAL CABLE,ROADWAY LOOP,1C/14GA 1,015 LFT $1.00 $1,015.00 170 DISCONNECT HANGER 4 EACH 5350.00 $1,400,00 171 SPAN,CATENARY AND TETHER 4 EACH $1,750.00 $7,000.00 172 SIGNAL STRAIN POLE,STEEL,36 FT 4 EACH 34,950.00 $19,800.00 LIGHTING SERVICE FOR TRAFFIC SIGNAL MOUNTED 173 LUMINAIRES 1 EACH $400,00 $400.00 LUMINAIRE,TRAFFIC SIGNAL MOUNTED,HIGH PRESSURE •174 SODIUM,400 WATT 5 EACH $800.00 $4,000.00 LIGHTING CABLE FOR TRAFFIC SIGNAL MOUNTED 175 LUMINAIRES,3C110 685 LFT 51.50 51,027.50 CABLE-DUCT MARKER 4 EACH 3100.00 $400.00 177 LIGHTING HANDHOLE B EACH $550.00 $4,400.00 RoiecI Fj'e No.minpL!/1 ENGINEER'S ESTIMATE CITY OF SOUTH BEND AprIl 17,2012 Project Name ;Main$tree3/lafayefte Soulev t Conn*MoC Project No.:110.058 For Blds Due:5/22/2012 BASE BID ITEM NO. DESCRIPTION QTY. UNIT �_ UNIT PRICE TOTAL AMOUNT =LIGHTING FOUNDATION 37 EACH In SERVICE POINT $600.00 $28,600.00 EACH $3,500.00 180 STREET LIGHT $3,500.00 EACH $2,500.00 $102,500.00 181 WIRE#4 7,456 LFT _ $9.00 $67,104.00 182 WIRE# 10 5,417 LFT 51.00 $5,417.00 183 CONDUIT,STEEL,GALVANIZED,2 IN 2,978 LFT $13.00 $38,714,00 184 LINE,THERMOPLASTIC,SOLID,WHITE,6-INCH 2,590 $0.60 $1,554.00 =LINE,THERMOPLASTIC,SOLID,WHITE,4-INCH MN LFT $0.60 $1,38900 186 LINE,THERMOPLASTIC,SOLID,YELLOW,4-INCH 11,870 LFT $0.60 $7,122.00 187 LINE,THERMOPLASTIC,BROKEN,YELLOW,4-INCH 955 LFT $0.60 $573.00 188 TRANSVERSE MARKING,THERMOPLASTIC,SOLID,WHITE, STOP LINE,24-INCH 610 LFT 55.50 $3,355.00 189 TRANSVERSE MARKING,THERMOPLASTIC,SOLID,YELLOW, CROSS HATCH,8-INCH LFT $3.00 $1.125.00 190 LINE REMOVE 200 LFT $2.00 $400.00 191 PAVEMENT MESSAGE MARKING,THERMOPLASTIC,WHITE, ARROW 40 EACH $80.00 $3,200.00 IIIIPAVEMENT MESSAGE MARKING,THERMOPLASTIC,WHITE, TURN ARROW 10 111111 $80.00 $800.00 193 PAVEMENT MESSAGE MARKING,THERMOPLASTIC,WHITE, WORD,"ONLY" 30 $80.00 $2,400.00 194 VIDEO RECORD 1 LS 52,000.00 $2,000.00 195 SIGN POST,SQUARE,1 REINFORCED ANCHOR BASE 240 LFT $8.00 $1,920.00 I SIGN,SHEET,ENCAPSULATED LENS W/LEGEND,0.080 IN. THICKNESS SFT $13.00 $884,00 197 SIGN,SHEET,ENCAPSULATED LENS W/LEGEND,0.100 IN. THICKNESS SFT $15.00 $2,340.00 198 SIGN,SHEET,ENCAPSULATED LENS W/LEGEND,0.125 IN. SFT $21.00 $4,851.00 199 HOUSES AND BUILDINGS,PARCEL 369,REMOVE LS $20,900.00 $20,000.00 200 HOUSES AND BUILDINGS,PARCEL 350,REMOVE LS $20,990.00 """' 320,000.00 201 HOUSES AND BUILDINGS,PARCEL 430,REMOVE LS $20,070,00 $20,000.00 202 HOUSES AND BUILDINGS,PARCEL 420,REMOVE . 1 LS $20,000.00 $20,000.00 203 HOUSES AND BUILDINGS, PARCEL 377,REMOVE 1 LS 520,000,00 $20,000.00 TOTAL $4,559,256.00 e s• a erAssouates . Prge:t File No.2010244n __ .,. _.. .. .: CMPPEWA Athr. 1; ; ? ,\,:, s':',Ns`Z\o‘.',5ss.N , I i :\kkk,•;,,,,., -•,..:,;:;. * , flit" Bli_________Ef_jaiii______, [ .. L.L.i 1 A 1 , illMlr :'...` MU:1`1%.* S 1 ,i ii11111 , : / .1-____ ' Li I i I ;-i.jK.n....... • .7-:\•%'•- :!...,mAyik.Aii.....,4.4. ,..,-..--,',i "k \ 1'IIC:1Z\\N\. \\\%.%\\'\':\\7.,,.: t.'"1:7rETALA#1.70Af::.1,:.;i:. ;,..;1\::._1_;.,.,..., ' I :at 64. 47..._ i: A. _ .____ ,74:... ...:4.....„.:.s.::!,.::::::-.: i ,-. .\\`‘ N 'ix" ...,7:::::'•::-.::,:..::::.11 II • . A' N \\‘''. ...N\. \4IIM Allihree..- j i -1---:7' 1 WALTER Si ''5 's. \\\ ‘ 1 a I I I I In i .L.L_i_ � . i Z i i t61 /, i ,., s.--...1\ '' . .. ' 0 I 1 a 1 ____ ,.. ., e,..„,,,,P.44; 2012 at..„. !,-. ic,,,,,,a,,,,:rt,:.5,,,,,..:4....,A20,740/Tro Ron.or_fmr gc; li ..... , Ir.; ! LFAIrAyak, i!MAIN ST./LAFAYETTE BLVD. CONNECTOR;''''' ''''' ANTICIPATED - i LA_w_595:::20..u..5N T...-;4.1.is.S:EHI_____A;E;71.LIAIN.N25330S;1_,A00-7,41.4:1A.IA.6A174EEGNS.6u.o.PE.:C.: ::- - - ..*.-. .. . ... ________..., . __ , . ::r4n'VII/12...... ... _. 1._... . J111■1•1ffiguarbr. -111, CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPME Marcia I. Jon-' ,` President South Bend Redevelopment Commission ATTEST: Do -1d Alford, . , Secretary South Bend Redevelopment Commission CITY OF SOUTH BEND,INDIANA BOARD OF PUBLIC WORKS :fir - GardGilot,Prudent ) D.n Inks,. ember Kathryn Roos, Member ATTEST: - da Martin, C1e�rk 11 Exhibit "G" MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT#6 See attached quote request to advertise for the demolition of three structures located within the project area. Quotes are to be received by the Board of Public Works on August 9, 2012. Structures for Demolition are as follows: 4101 South Main Street (DeBuysser Parcel —residential structures) 4219 South Main Street (Mink Parcel —residential structures) 4043 South Michigan Street (Premier College of Cosmetology—commercial structure) INVITATION TO QUOTERS Notice is hereby given that the City of South Bend, Indiana, Board of Public Works will receive sealed quotes at the office of the Board of Public Works, County City Building Room 1316, 227 W. Jefferson St., South Bend, Indiana, 46601 until the hour of 10:30 a.m., on Thursday, August 9, 2012 for the following: Demolition of: Former Debuysser Property, Parcel 420, 4101 S. Main St. Former Premier College of Cosmetology, Parcel 377, 4043 S. Michigan St. Former Mink Property, Parcel 430, 4219 S. Main St. For Project No. 110-058A Work to be performed shall include furnishing all labor, services, materials, insurance and equipment for the demolition and environmental abatement of buildings on the aforementioned properties, all more particularly described in the following documents contained in this invitation. The Contract Documents are on file and available for public inspection during regular working hours at the Department of Public Works (1316 County-City Building, South Bend, Indiana), and at the offices of Lawson-Fisher Associates, P.C., 525 West Washington Avenue, South Bend, Indiana 46601, phone (574) 234-3167 Quotes must be on the City of South Bend Contractor's Quote for Public Work form. Each quoter or contractor (hereinafter the contractor) must fully comply with either the Contractor's Non-Collusion Affidavit and Common Construction Wage Scale of these bid conditions as to each construction trade it intends to use on this construction contract and all other construction work (both federal and non-federal) in the St. Joseph County area during the performance of this contract or subcontract. The contractor commits itself to the goals for minority manpower utilization in either the Contractor's Non-Collusion Affidavit and Common Construction Wage Scale, as applicable, and all other requirements, terms and conditions of these quote conditions by submitting a properly sealed quote. Work under this project is subject to a Common Wage Determination as established in accordance with IC 5-16-7-4. The Contractor shall appoint a company executive to assume the responsibility for the implementation of the requirements, terms and conditions of the quote conditions. A Mandatory Pre-Quote Conference will be held on Wednesday, Ju, y 25_, 2012 at 10:30 a.m. at the former Premier Coflege of Cosmetology, 4043 S. Michigan Street. Each quoter is required to visit the project site and become familiar with the job conditions prior to making a quote. Any questions regarding bidding conditions must be addressed to the Owner in writing no later than Friday, August 3, 2012. The Board reserves the right to reject any or all quotes or to accept a full or partial award of the quote or quotes which, in its judgment, will be to the best interests of the City of South Bend. Board of Public Works Linda M. Martin, Clerk Exhibit "H" MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT - S UPPLEMENT #7 See attached Supplement Agreement #4 from Lawson-Fisher Associates P.C. dated September 25, 2012 L FATAVA GREGORY L.HOLDEN,P.E. PAULA.HUMMEL,P.E. PIPER C.TITTLE,P.E. MICHAEL J.GUZIK,P.E. LAWSON-FISHER ASSOCIATES P.C. 9022.14 THOMAS S.SHARP,P.E. THERESA E.HARRISON,P.E. JON E.RIEMKE,P.E. JEFFREY L.McKEAN,P.E. RANDOLPH J.LINDLEY,P.E. CHRISTOPHER J.JETER,P.E. DENNIS A.ZEBELL,P.E. BENJAMIN P.HOLDEN,P.E. DAN G.DELGADO,P.E. December 6, 2012 MICHAEL F.JOHNSTON,P.E. JEFFREY M.BYRD,P.E. JARED M.HUSS,P.E. SKY K.MEDORS,P.E. GINA A.WEILBAKER,P.E. Mr. Bill Schalliol AARON W.BLANK,P.L.S.,P.E. Community & Economic Development Specialist City of South Bend 227 West Jefferson Boulevard, Suite 1200S South Bend, Indiana 46601 RE: South Main Street to Lafayette Boulevard Connector and Development Area Supplemental Agreement#4 Additional Scope of Work Dear Mr. Schalliol: Lawson-Fisher Associates P.C. (LFA) is pleased to submit this proposal to provide Professional Engineering Services to the City of South Bend (City) for the Main Street to Lafayette Boulevard Connector and Street Improvements. The proposal includes the following documents: • Scope of Additional Services, Appendix A • Manhour Justification. Appendix B The proposal was prepared at your request on the basis of our meetings on May 21, 2012, September 20, 2012 and more recently on November 20, 2012. It includes work items and work effort not envisioned or included in our original proposal. We propose this Scope of Services be performed on an hourly basis for a budgetary fee of $147,000.00. Payments to LFA will be in accordance with Attachment "A" in our original contract. Please indicate your acceptance of this proposal by signing in the space provided below and returning one copy to our office. Thank you for the opportunity to provide additional Professional Engineering Services to the City of South Bend. ___._.___._.__ ...�.... ...r....� . n,%aIru noun guru ARRA4 .A7n_94A_11I 7 .F7d_73R-1330(FAX) 1 -L FAVAVA Mr. Bill Schalliol December 6, 2012 Page 2 If you have any questions, comments, or desire additional information. please do not hesitate to contact us. Very truly yours, LAWSON-FISHER ASSOCIATES P.C. Michael F. Johnston, P.E. Senior Civil Engineer / Paul A. Hummel, P.E. Senior Vice President/Senior Civil Engineer MFJ:PAH:/s Encls. c. Michael Mecham, P.E. City Engineer w/Encls. ACCEPTED AND APPROVED this day of . 2012. (Authorization is also Notice to Proceed) CITY OF SOUTH BEND REDEVELOPMENT COMMISSION L FAVAVA APPENDIX A SCOPE OF ADDITIONAL SERVICES South Main Street to Lafayette Connector Our Design Agreement was originally based upon our proposal dated August 9, 2010. with the Agreement executed on August 23, 2010. Since that time the Agreement has been supplemented on three times. It was modified two times to add (1) RIW acquisition services and (2) relocation agent services. The third supplemental increase (Submitted on October 12, 201 1) covered the change in design from the construction of the first project of 3-Phases into one project with revised alignments, and additional alignments and traffic signals replacing the initially planned roundabout. At the time of the third Supplemental, increased design fees were projected to carry the project through Construction Contract letting and begin construction. However additional design and coordination tasks have been requested that are beyond the vision available at that time. It is noteworthy to mention that the existing agreement in-place at the time of the first planned contract letting on May 29, 2012 would have substantially covered our increased design costs. However a prudent decision made at that time (to delay the contract letting and construction until 2013) by the City and its design team was instrumental in saving user costs and very likely construction change orders due to wintering the project. This additional time resulted in several additional survey, design and coordination tasks including plan revisions to facilitate and accommodate RIW acquisition changes, additional street lighting, and a separate demolition project. Collectively these actions will expedite and enable a smooth construction project. In September 2012 we prepared and submitted Construction Documents a second time, however funding changes delayed the project and a new Policy of Communication Outreach was launched by the City which affects the project delivery by adding a new step and bid item. We anticipate continued involvement with this initiative through the construction project to be accomplished in 2013. A significant amount of effort is being expended to develop Communication Outreach by making design changes that improve the public's appreciation and acceptance of the project by listening and reacting to individual property owners (both already acquired from and those yet to be acquired). Meeting with and satisfying the individual property owners most directly impacted by the project resulted in a higher satisfaction with the process, the project and the City overall. The following items are requested as effort not envisioned in our October 2011 Supplemental Request: Additional Survey Items • Additional field survey. o Field layout of the proposed design to facilitate plan interpretation. • Preparation of additional easements and parcel plat revisions. • Supplemental title information requests. December, 2012 Page 1 Project File No. 9022.14 L FAVAVA Additional Design Tasks • Design and plans for decorative City street lighting. • Analysis, design and plans for an additional detention pond and outlet control structure to serve the Caroline Properties (Gates) development. • Water line extension added on East Barbie Street. • Two additional plan revisions for the Carl Kay Parcel. • Traffic analysis and multiple drive revisions for Lock Joint Tube. Reversion back to previous designs caused by LJT building addition. • Design of a construction access driveway for Heraeus Kulzer. • Quotation project and documents for a separate demolition contract of three parcels. • Additional survey and design work for West Chippewa (south side). • 2nd Letting and Construction Documents (submitted on October 2, 2012). • Wendy's drive revision. • Additional plan work for Falls Creek irrigation and lighting. • Preparation of 3`d Letting and Construction Documents. Additional Coordination Tasks • Prepare agreement/offer document for AMC Theatres & Caroline Partners. • Extra meetings with Lock Joint Tube, South Gateway Properties, Pinney Drive quote. • Coordination and completion of locating work on Ladson's septic tank. • Assistance with AEP Transmission Relocation Agreement. • Coordination with Falls Creek Development - additional site research. • Preparation of Replat (legal descriptions, easements). • Coordination, Specifications. Public Meeting and Sign Design for City's Project Communication Outreach. • Preparation of Miscellaneous Exhibits/Drawings for Property Acquisition. December, 2012 Page 2 Project File No. 9022.14 C ni ar N d ', e l 4 0 c 4` 8 F Hi ' I I x I I I I Z N w Q D 9 Tr N _ N " e 44 8248 _,_. 8ag 4 nc_ °-14 % g- _ 88 k o FaH 8 !.. - - ry w - 8 r: _ , .DMNN -rY N 1, NN Its �� s v 4 www w e 41" _ - - ° 3 4:=M g N _ Pr-74_ 1 " " A 2 ' 4! 8 8 8 8 N a F <� I ^ i s W w.v,..v,., w 0 Y M N _ W i°° ol ° A ,O. - Sig n 8 8 P uW c.�L u Q Q E , !>a':: - w ww w O F O n ii g aHr ,° : 0 , a 1 . .. . " :47.. ..!, M _ 8 882 8 K zLLJ <� Y•:. 09p 4,'. 52 F . 71Yi r 1 ?y,:. N— e aoWZ }. Yew 888 3 O V~U - V a g S r `r N'' r - N if•+ ,¢ l b w ... w H' li O M 7 N Z y N �`b 2 c r ■„: e o c 8 - a =, p X = ,. 'ra It ” . a O N f.. rn B 'e_— - rn AT v ? a ` a W c I -wV a . ' gg W . 8 D U t "ek 42- . °ae •E a ==. 82E m who i w o > .8 i s - M 1,2' . � =g g r•r. 4q m y `a.p d 2 i. ,a a a w eEi E° W E7$68 °•� `e V 8 Ey' F' LL o` •F osz+,i Hio 5i 4 6< m A. . g!4 ,,-.. q a e c. u u .a a w" V g 0. F o . �` .w gm dC J3 o OF �a g� 9�8 RI m Z z a b m '.`'. Z �'. w � tiS < `oS 2 ' U !iH,a 1I{III1 fjf•d ry 0 2 g 4d1�"u= q Ltb x v, °< < <55 1