HomeMy WebLinkAboutNo. 3098 Approving and authorizing the execution of an amendment to the addendum to the Master Agency Agreement (Main-Lafayette Connector Design Project - Supplement #7) 2749-10, 2838-11, 2873-11, 2953-11, 2954-11, 3023-12, 3058-12, 3098-12 RESOLUTION NO. 3098
RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION
APPROVING AND AUTHORIZING THE EXECUTION OF AN AMENDMENT
TO THE ADDENDUM TO THE MASTER AGENCY AGREEMENT
(Main-Lafayette Connector Design Project- Supplement#7)
2749-10, 2838-11, 2873-11, 2953-11, 2954-11, 3023-12,3058-12, 3098-12
WHEREAS, effective January 1, 2012, the South Bend Department of
Redevelopment, acting by and through its Redevelopment Commission (the
"Commission") and the South Bend Board of Public Works (the "BPW") entered into a
Master Agency Agreement which authorized the BPW to act as agent for and on behalf
of the Commission for certain projects during 2012; and
WHEREAS, effective January 1, 2012, the Commission and the BPW entered
into a Master Agency Agreement which authorized the BPW to act as agent for and on
behalf of the Commission for the limited purpose of contracting for and managing the
completion of existing Projects; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission added
the Main-Lafayette Connector Design Project to the Master Agency Agreement by way
of an Addendum on August 23, 2010; and
WHEREAS, the Commission amended the Addendum with Supplement #1 by
way of Resolution 2838 on January 21, 2011; and
WHEREAS, the Commission amended the Addendum with Supplement #2 by
way of Resolution 2873 on May 10, 2011; and
WHEREAS, the Commission amended the Addendum with Supplement #3 by
way of Resolution 2953 on November 8, 2011; and
WHEREAS, the Commission amended the Addendum with Supplement #4 by
way of Resolution 2954 on November 8, 2011; and
WHEREAS, the Commission amended the Addendum with Supplement #5 by
way of Resolution 3023 on April 24, 2012; and
WHEREAS, the Commission amended the Addendum with Supplement #6 by
way of Resolution 3058 on July 26, 2012; and
WHEREAS, the Commission desires to amend the Addendum by way of this
Amendment.
NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment
Commission as follows:
Section 1. The Commission hereby approves the Amendment to the
Addendum to the Master Agency Agreement (Main-Lafayette Connector Design Project -
Supplement #7) and hereby authorizes its execution in substantially the form attached
hereto with such changes as the Commission may deem necessary or appropriate upon
the advice of counsel, said execution thereof to be conclusive evidence of the
Commission's approval of such changes. The Clerk is hereby directed to file a copy of
this Amendment to the Addendum with the BPW.
Section 2. This Resolution shall be in full force and effect after its adoption
by the Commission.
Section 3. Commission staff members are authorized to execute on behalf of
the Commission any documents necessary to carry out the intent of this resolution.
ADOPTED at a meeting of the South Bend Redevelopment Commission held on
December 13 2012, at 9:30 a.m., in Room 1308, County-City Building, South Bend,
Indiana 46601.
Resolution No. 3098
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPM (1 .
South Bend Red•'elo' ent Commission
ATTEST:
i� �'�7e47
South Bend Redevelo ent Commission
Resolution No. 3098
AMENDMENT TO THE ADDENDUM TO THE
MASTER AGENCY AGREEMENT
(Main-Lafayette Connector Design Project- Supplement#7)
2749-10, 2838-11, 2873-11, 2953-11,2954-11,3023-12,3058-12,3098-12
This Amendment to the Addendum to the Master Agency Agreement (this
"Amendment"), made and entered into as of the 20th day of December, 2012, by and
between the South Bend Department of Redevelopment, acting by and through its
Redevelopment Commission (the "Commission") and the City of South Bend, Indiana, a
municipal corporation duly organized and existing pursuant to the laws of the State of
Indiana, acting by and through its Board of Public Works (the "BPW") for purposes of
the Commission designating the BPW to act as the Commission's agent to undertake the
Main-Lafayette Connector Design Project- Supplement #7 (the "Project").
WHEREAS, effective January 1, 2012, the Commission and the BPW entered
into a Master Agency Agreement which authorized the BPW to act as agent for and on
behalf of the Commission for certain projects during 2012; and
WHEREAS, effective January 1, 2012, the Commission and the BPW entered
into a Master Agency Agreement which authorized the BPW to act as agent for and on
behalf of the Commission for the limited purpose of contracting for and managing the
completion of existing Projects; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission added
the Main-Lafayette Connector Design Project to the Master Agency Agreement by way
of an Addendum on August 23, 2010; and
WHEREAS, the Addendum was amended by both the BPW and the Commission
by Supplement#1 during February 2011; and
WHEREAS, the Addendum was amended by both the BPW and the Commission
by Supplement#2 during May 2011; and
WHEREAS, the Addendum was amended by both the BPW and the Commission
by Supplement#3 during November 2011; and
WHEREAS, the Addendum was amended by both the BPW and the Commission
by Supplement#4 during November 2011; and
WHEREAS, the Addendum was amended by both the BPW and the Commission
by Supplement#5 during April 2012; and
WHEREAS, the Addendum was amended by both the BPW and the Commission
by Supplement#6 during July/August 2012; and
WHEREAS, the Commission desires to amend the Addendum by way of this
Amendment.
NOW, THEREFORE, in consideration of the mutual covenants and promises
contained herein, and for other good and valuable consideration, the receipt of which is
hereby acknowledged, the BPW and the Commission agree as follows:
1. The Commission hereby empowers and appoints the BPW, pursuant to the
Master Agency Agreement, to act as the Commission's agent for the limited purpose of
contracting for and managing the completion of the Project, the scope of said Project
being originally described in "Exhibit A", amended by Supplement #1 as described in
"Exhibit B", amended by Supplement #2 as described in "Exhibit C", amended by
Supplement #3 as described in "Exhibit D", amended by Supplement #4 as described in
"Exhibit E", amended by Supplement #5 as described in "Exhibit F", amended by
Supplement #6 as described in "Exhibit G", and now amended as described in "Exhibit
H", attached hereto and made a part hereof.
2. All of the terms and conditions of the Master Agency Agreement shall
control this appointment and this Addendum shall be attached to the Master Agency
Agreement.
3. Commission staff members are authorized to execute on behalf of the
Commission any documents necessary to carry out the intent of this resolution.
IN WITNESS WHEREOF, the undersigned execute this Addendum to Master
Agency Agreement to be effective as of the date first written above.
(Signature Page Follows)
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPMENT
South Bend Redevelopment Commission
ATTEST:
South Bend Redevelopment Commission
CITY OF SOUTH BEND,INDIANA
BOARD OF PUBLIC WORKS
Gary Gilot, President
Don Inks, Member
Kathryn Roos, Member
Mark Neal, Member
Michael Mecham, Member
ATTEST:
Linda Martin, Clerk
Exhibit"A"
MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT
See attached Proposal from Lawson-Fisher Associates P.C. dated August 9, 2010
Approved by the Board of Public Works on August 23, 2010
1316 COUNTY-CITY BUILDING
■■���`= /% d, PHOxa574/235.9251
227 W.JEFFERSON BOULEVARD �� 'c!s �
� FAZ 574/295.9777
SOUTH BEND, INDIANA 4 6601.1830
�� TDD 574/235-5567
•
Crrr of Sow-H BEND STEPHEN j. Luaclor, MAYOR
BOARD OF PUBLIC WORKS
August 30,2010
Mr. Gregory Holden &Mr. Paul Hummel
Lawson-Fisher Associates
525 West Washington Avenue
South Bend,Indiana 46601
RE: Professional Services Proposal - Main/Lafayette Corridor Design
Project No. 110-058
Dear Mr. Holden & Mr. Hummel:
The Board of Public Works, at its meeting held on August 23, 2010, approved the above
referenced Professional Services Proposal in the amount of 5436,000.00,
Enclosed is a copy of the Professional Services Proposal for your records.
if you have any questions,please contact me at(574)235-9251.
Sincerely,
4--L)/)/? )3(Lt
Linda M. Martin, Clerk
Enclosure
c: Bill Scballiol, CED
Michael Johnston, LFA
Exhibit `B"
MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT #1
See attached Proposal from Lawson-Fisher Associates P.C. dated January 4, 2011
Approved by the Board of Public Works on February 14, 2011
Exhibit"C"
MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT- SUPPLEMENT#2
See attached Proposal from Lawson-Fisher Associates P.C. dated March 15, 2011
Approved by the Board of Public Works on May 9, 2011
1316 COUNTY, $UILDiNC
227 W.J E F F E R S O N Sammie. ` \ r -; Now 5741235-9251
SourH BviD,INDIANA 46601.1530 ���' % '� FAN 574/235 9171
•
2865
CITY OF SOUTH BEND STEPHEN J.LUECKE, MAYOR
BOARD OF PUBLIC WORKS
February 14,2011
Mr. Paul Hummel
Lawson-Fisher Associates,PC
525 West Washington Avenue
South Bend, Indiana 4660]
RE: Professional Services Proposal—Main-Lafayette Connector Design -project No. 11 .
058 0
Dear Mr, Hummel:
The Board of Public Works, at its meeting held on February 14,
above referenced Professional Services Proposal in the amount of S439,000.00.011, approved the
Enclosed please find a copy of the Professional Services Proposal for Your records,
If you have any questions,please contact me at(574)235-9251.
Sincerely,
Linda M.Martin, Clerk
Enclosure
c: Bill Schalliol, CED
Michael Johnston, LFA
Beth Leonard, CED
Judy Love, CED
GARY A.GILOT,I'.E. r)ntdu
Exhibit "C"
MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT #2
See attached Proposal from Lawson-Fisher Associates P.C. dated March 15, 2011
Approved by the Board of Public Works on May 9, 2011
Exhibit"D"
MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT #3
See attached Proposal from Lawson-Fisher Associates P.C. dated October 12, 2011
Approved by the Board of Public Works on November 21, 2011
1316 COUNTY-CT'BvicDINc _
2271X?J Boui-ev ao u o�\ d`= �'HON�57-0/235 9253
SOUTH BEND,INDIANA 46601.1830 �� A 7�.v 574/235-977!
CrrY OF SOUTH BEND STEPHEN J. LUECKE, MAYOR
BOARD OF PUBLIC WORKS
November 21, 2011
Mr. Michael Johnston
Lawson-Fisher Associates
525 West Washington Street
South Bend, Indiana 46601
RE: Professional Services Proposal Supplement No. 3
Main-Lafayette Corridor Design Project
Dear Mr.Johnston:
The Board of Public Works, at its meeting held on November 21, 2011, approved the
above referenced Professional Services Proposal Supplement No, 3 in the amount of
$260,320.00.
Enclosed is a copy of the Professional Services Proposal Supplement No. 3 for your
records.
Enclosed please find the City's Employment Eligibility Verification form required
State for your signature. Please return the fully executed form as soon as . Add by the
enclosed please find the City's Minority and Women Business En possible. e Diversity
Development. Enterprise Diversity
If you have any questions,please contact me at(574)235-9251.
Sincerely,
CH-
Linda .Martin,Clerk
Enclosure
c: Bill Schalliol,CED
Beth Leonard, CED
Judy Love,CED
LM:jc
Exhibit "E"
MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT#4
See attached Budget Table prepared by Lawson-Fisher Associates P.C.
Approved by the Board of Public Works on November 21, 2011
MAIN-LAFAYETTE CONNECTOR INFORMATION
Parcel
Number Owner Name
Business Name T-YPe o!
Calculated
Ac uitition Area irk)
TEMPORARY PARCELS
Jerome A.Osborn RESIDENCE(JUNK YARD)
David L Bolinger TEMP 32,347
"`' .' RESIDENCE TEMP
.;546 • United States of America US P051 OFFICE 19,363
8&N finerprises MOTION INDUSTRIES,INC TEMP 81.080
TEMP 44,930
. 394 H.S.Ahman,Inc. H.S.ALTMAN,INC.i0t. Richard and Ka thleen Anagnos TEMP 50,105
INDUSTRIAL DOOR
•.,.. Wcndy's of Fart Wayne,Inc TEMP 48,575•
Y WENDY'S RESTAURANT
442,: Denny O.&Nancy L.Weber RESIDENCE TEMP 76,771
TEMP 8,141
PERMANENT(ONLY) PARCELS
.,.•✓ '.,. lack E.Ellis et al.,As Trustees REPUBLSCAN HEADQUARTERS SIC
-1.4.
ly..,., WMCR Holding Compan ,LLC KENTUCKY FRIED CHICKEN PARTIAL 14,675
PARTIAL 34,67fi
PERMANENT & TEMP PARCELS
475 South Bend-Palls[reek Development UT IRELAND """-
COMMONS PARTIAL
556. - LOCK JOINT TUBE INC. LOCK JOINT TUBE,INC 679,55
CBI Buildings,LLC PARTIAL 147,975
C&B OPTICAL ONF,
-021 Ric A.&Janet A.De Buysser RESIDENCE PARTIAL 47,929
;420 Ric &Janet De Buysser RESIDENCE PARTIAL 39,038
C-B Realty,UP PARTIAL 39,479
':; t VACANT PARTIAL C-B Realty,UP VACANT 0.TIAL 7,646
i PARTIAL
c.-.,''''At M.Kay CARL KAY MEMORIALS 8,123
.• 374.. South Gateway Properties,LEE SEARS HARDWARE PARTIAL 31,022
-00$ PARTIAL 45,022
'33 Part Icia Moore Propertles,LLC SCOOTER WAREHOUSE PARTIAL
004 Halle Properties,LLC DISCOUNT TIRE 30,5)0
.1303. Jeffrey L.Nickerson PARTlAI 40.347
• HONKERS FAMILY RESTAURANT PART
002 Frick Limited Liability Company DAIRY QUEEN PARTIAL 50,121
PARTIAL
. :40–' PWS Investment Property,LLC PRECISION WALL SYSTEMS PARTIAL 137,916 6
..'.QDl.' Richards Restaurants,Inc. R&8 CAR COMPANY 85,42
PARTIAL 88,427
' TIC Showplace 1 thou 5 and 7 thru 19,LLC AMC SHOWPLACE SOUTH SEND 16 PARTIAL
�� HERAEU_KUl2FR,INC. HERAEUS KUIZFR,INC 707,425
:440 Maryann Sherman
RESIDENCE PARTIAL 227,3[33
PARTIAL Nancy Jo Pinney&Kaylyn Kramer RESIDENCE PARTIAL 11,13 1,134
441 Terry L. Diane K.Ladson 6
&
RESIDENCE PARTIAL
TOTAL TAKE PARCELS 1.036
434.. Ralph F &Sharon 5 Mink RESIDENCE TOTAL
377 Robert 5.and Mary L.Rajski PREMIER COLLEGE OF COSMETOLOGY 1 6,7 6 3
419 Ric A.&lanai A De Buysser TL7TAl 32,334
VACANT TOTAL
NON ACQUISITION PARCELS �96
(AGGREEMENT)
364 Caroline Partners,LLC,et al. VACANT
349 Caroline Partners,LLC PARTIAL 137,632
VACANT PARTIAL
436 Caroline Partners,LLC VACANT 16,355
433 CITY' VACANT PARTIAL 25,104
431 Caroline Partners,LLC VACANT PARTIAL NONE 16,599
429 CITY VACANT NONE 1NE 11,531
428 CITY VACANT 8,511
427 CRY NONE 23,646
VACANT
�——NE 17,605
NON ACQUISITION PARCELS(MISC)
365 Hein Pau,Andrew RESIDENCE ^–
443 City of South Bend Park Dept NONE 0
OBRIfN PARK NONE'
447 kogte Marsha Ann RESIDENCE 366,631
NONE 0
A'cT � GROUP I
VE 5975,000.00
..
6 &i.t:,, GROUP 2 $75,000.00
;.. .. a:« 'c u,.,. GROUP 3
AC7PVE $45,060.77
GROUP 4 5105,006,00
ACTIVE GROUP 5 52S,000.00
GROUP 6 CITY/CAROLINE SWAP
TOTAL Group 1 limo Group 5 51.725!Wry:
Exhibit"F"
MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT -SUPPLEMENT#5
See attached Budget Table prepared by Lawson-Fisher Associates P.C. with construction
estimate for project at $4.5 Million Dollar amount
Approved by the Board of Public Works on May 15, 2012
ENGINEER'S ESTIMATE
CITY OF SOUTH BEND
April 17,2012
Project Name:Main Slreet/Lafavette Boatyard Connecter
Project No.:,710-058
For Bids Due:5,as
BASE BID
ITEM NO, DESCRIPTION QTY UNIT ��
UNIT PRICE TOTAL AMOUNT
1 DEWATERING AND PROTECTION OF EXISTING STRUCTURES 1 LS
S5,000.00 S5,000.00
2 CONSTRUCTION ENGINEERING 1 LS
$34,000.00 S94,000•00
3 CPM SCHEDULE 1 LS
$1,250.00 $1,250.00
4 CPM SCHEDULE,MONTHLY UPDATE 13
$200.00 $2,600.00
5 MOBILIZATION AND DEMOBILIZATION 1 LS
$233,000.00 5233,000.00
6 CLEARING RIGHT-OF-WAY 1 LS
MR5140,000.00 $140,000.00
PIPE,REMOVE EXISTING STORM SEWER 73 LFT
$15.00 31,095.00
8 PIPE,REMOVE EXISTING WATER MAIN 10 LFT
515.00 $150.00
9 STRUCTURE REMOVE,EXISTING STORM MANHOLE 15 EACH
31.000,00 S15,000.00
10 STRUCTURE REMOVE,EXISTING SANITARY MANHOLE 2 EACH
51,200.00 $2,400.00
11 REMOVE,EXISTING CAP,6-INCHES 2 EACH
$300.00 S800.00
12 REMOVE,EXISTING CAP,8-INCHES 1 EACH
$350.00 S350.00
IIIIIIREMOVE,EXISTING CAP,10-INCHES 1 EACH
$500.00 S500.00
=REMOVE,EXISTING FIRE HYDRANT 2 EACH
$1,000.00 52,040.00
15 ABANDON,EXISTING STORM SEWER 589 . LFT
$20.00 $11,784.40
16 ABANDON,EXISTING SANITARY SEWER 680 LFT
$20.00 513,600.00
17 ABANDON,EXISTING SANITARY MANHOLE 2
31,000.00 42,400.00
18 ABANDON,EXISTING WATER MAIN 485 LFT
$15.00 57,275.00
19 PAVEMENT REMOVAL
100 SYS 115.00
$1,500.00
20 COMMON EXCAVATION 35,611 CY$
$8.00 $284,888.00
®TEMPORARY EROSION AND SEDIMENT CONTROL 1 LS
" 337,000.00
22 COMPACTED AGGREGATE BASE,NO.53,EASE 9,130 TON 321 OD
5191,730.00
23 COMPACTED AGGREGATE BASE,NO.73,BASE 20 TON
$21.00 5420.00
24 MILLING,ASPHALT, 1-1/2 INCH 176 SYS
$4.00 $704.00
25 HMA SURFACE,TYPE B 1,390 TON 568,00
$94,520.00
11111HMA INTERMEDIATE,TYPE B
2,280 TON 564.00
27 HMA BASE,TYPE B Si45,924.00
7,290 TON 553.00
28 HMA PATCHING,TYPE B 5386,370.00
260 TON 5100.00
29 ASPHALT FOR TACK COAT S26,000.Op
19.5 SYS 51.00
$180
30 PLAIN CEMENT CONCRETE PAVEMENT PATCH,8-INCHES SYS $45.00
54,140.000
Lawson-Fisher Associates P.C.
ENGINEER'S ESTIMATE
CITY OF SOUTH BEND
April 17,2012
Project Name :Main Street/Lafavette Boulevard Connector
Project No.:110-058
For Bids Due:5(B12012
BASE BID
ITEM NO. DESCRIPTION OTY, UNIT UNIT PRICE TOTAL AMOUNT
31 TEMPORARY FENCE 115 LFT $30.00
53,450.00
32 SIDEWALK,CONCRETE.4-INCH 5,301 SYS $30.00
$159,030.00
33 CURB RAMP,CONCRETE 292 SYS
$100.00 $29,200.00
34 CURB,CONCRETE LF7
$14.50 $8,528.00
35 COMBINED CONCRETE CURB AND GUTTER,TYPE B LFT 516.00 $150,112.00
MECOMBINED CONCRETE CURB AND GUTTER,TYPE A 50 LFT 318.00
$800.00
37 HMA FOR APPROACHES,TYPE B 3,640 TON $75,00 $273,000.00
38 PCCP FOR APPROACHES,6-INCH 2,217 SYS $32.00
$70,844.00
WMPCCP FOR APPROACHES,8-INCH 2,139 SYS $43.00
$97,977.00
40 PAVERS,RESET 33 SYS
$70.00 $2,310.00
41 MOBILIZATION AND DEMOBILIZATION FOR SEEDING 2 EACH $470.00
$940.00
42 TOPSOIL 3,510 CYS
$30.00 3105,300 00
FERTILIZER 2.12 TON
31,400,00 $2,888.00
44 MULCHED SEEDING, U 25,596 SYS 51.50 538,394.00
45 WATER 230 KCAL
S1.20 $276.00
46 SODDING,NURSERY 4,424 SYS $3.50 $15,484.00
47 FIELD OFFICE,A 18 MO
_ $1,900.00 s34.200,00
AS MONUMENTS—TYPE B 13 ' EACH
$585.00 57,805.00
49 MONUMENTS—TYPE C 3 EACH
$450.00 S1,350.00
50 ADJUST WATER SERVICE LINE,RESIDENTIAL 2 EA
$1,500.00 $3,000.00
51 ADJUST WATER SERVICE LINE,RESIDENTIAL.WITH RETAP AT
MAIN 2 EA $2,500.00 $5,000.00
52 CAP EXISTING WATER SERVICE LINE 2 lini $250,00 $500.00
WATER LINE RELOCATION UNDER PROPOSED UTILITY LINE,8-
53 INCH 2 EA 35000 00 310,000.00
=WATER MAIN,PIPE,D.I.,6-INCH 518 LFT
$50.00 $25,900.00
85 WATER MAIN,PIPE,D.I.,8-INCH 1,774 LFT
$65.00 5116,310.00
56 WATER MAIN,PIPE,D.I., 10-!NCH 294 LFT
S75,00 3 22,060.00
57 GATE VALVE 8 BOX,6-INCH 2 EACH
S1,250.00 $2,500.00
58 GATE VALVE 8 BOX,8-INCH 5 EACH
$1,600.00 18,000.00
59 GATE VALVE 8 BOX. 10-INCH 3 EACH
32,000,o0 $6,000.00
60 INSERTVALVE,8-INCH 1 EACH $4,500.00
E4,500.00
PrniPN cuc AI,. en.nn, .,,
ENGINEER'S ESTIMATE
CITY OF SOUTH BEND
April 17,2012
Project Name:Main Street/Ltfavette Boulevard Connector
Project No.:110-056
For Bids Due:5122!2012
BASE BID
ITEM NO. DESCRIPTION • QTY
TOTAL AMOUNT
=TAPPING SLEEVE,6-INCH
' EACH 51,500.00
NICE $1,500.00
TAPPING SLEEVE.8.1NCH EACH
$2,000.00 54,000.00
63 TAPPING SLEEVE,10-INCH X 8-INCH
EACH $2,250.00 52,250.00 �
64 TAPPING VALVE,6-INCH
EACH $1500.00 $1,500.00
65 TAPPING VALVE,8-INCH EACH
$2,250.00 $5,750.00
WATER MAIN CROSSOVER,6-INCH EACH
$4,000.00 54.000.00
67 WATER MAIN CROSSOVER,8-INCH EACH
$5,000,00 s10,000.0o
WATER MAIN CROSSOVER,10-INCH 2 EACH $6,500.00
313,000.00
69 FIRE HYDRANT ASSEMBLY 6 EACH
54,500,00 $27,000.
70 COMPRESSION COUPLING,10-INCH EACH
$1,900.00 $3,800,00
CAP,6-INCH EACH
6200.00 $600.00
72 CAP,6-INCH
EACH 3250.00 $1,250.00
73 CAP, 10-INCH
1 EACH 0300.00
3300
74 REDUCER,8-INCH X 6-INCH 00
2 EACH $400.00
75 REDUCER, 10-INCH X 8-INCH E80D. 0
1 EACH $500.00
=TEE,6-INCH $500.00
1 EACH 3400.00 $400,00
77 TEE,&INCH X 6-INCH 3 EACH
5800.00 $2,400.00
78 TEE, 10-INCH X 6-INCH 2 Call
$900.00 $1,800.00
79 TEE, 10-INCH
? EACH 31,000.00 S1,000,00
80 CROSS,8-INCH 1 EACH
51,250.00 $1.250.00
81 11 Y.DEG BEND,6-INCH 1 EACH
5460.00 $450.00
82 11 Y DEG BEND,8-INCH 7 EACH
$550.00 53,850.00
83 45 DEG BEND,&INCH 4 EACH
5450.00 51,80000
84 45 DEG BEND,8-INCH EACH
$550.00 $550.00
85 45 DEG BEND, 10-INCH EACH
$750.00 $1,500.00
86 90 DEG BEND,8-INCH EACH
$600.00 $600.00
87 NEW WATER SERVICE, 1-INCH EACH
$1,500.00 $7,500.00
88 CAP,EXISTING WATER SERVICE EACH
$250.00 $1,250.00
89 PROJECT INFORMATION SIGN EA
$1,000.00 32,000.00
90 STORM PIPE,0.1.,10-INCH
LET
$50.00 $1,200.00
Lawson-Fier Associates P.C.
ENGINEER'S ESTIMATE
CITY OF SOUTH BEND
April 17,2012
Project Name:J Ian Strmt/Lafax Soul M r�
Project No.:11 . ecto,
For Bids Due:Maw
BASE BID •
ITEM NO. DESCRIPTION
QTY. uNrr
121 CONTROL STRUCTURE,60 INCH TOTAL AMOUNT
1 EACH
$8,000.00 $8,000.00
IIMIINLET,J-10,MOD 38 EACH
$5,202.00 $202,878.00
INLET, M-10,MOD 24 EACH
$3,200.00 $76,800.00
124 INLET CASTING,TYPE 2
1 EACH $2,000.00
125 INLET CASTING,NEENAH R-3067-C,TYPE I GRATE $2,000.00
EACH $500.00
126 STRUCTURE,ADJUST CASTING TO GRADE $500.00
17 EACH $250.00
=CAST IN PLACE RETAINING WALL 54.250.00
63.5 SYS $400.00
=MODULAR CONCRETE BLOCK RETAINING WALL 18 525.400.00
.5 SYS 5450.00
129 TEMPORARY PANEL SIGN SUPPORTS $8,325.00
108 LET
$10.00 $1,080.00
130 STANDARD BARRICADE,TYPE Ill-A 144 LET
$10.00 $1;440.00
131 STANDARD BARRICADE,TYPE Ill-B 360 LFT
$15.00 55,400 00
132 CONSTRUCTION SIGN,TYPE A 22 EACH
$120.00 52,640.00
133 CONSTRUCTION SIGN,TYPE B 1 EACH
$100.00 $100.00
134 DETOUR ROUTE MARKER ASSEMBLIES 43 an
$65.00 $2,795.00
IIIIIROAD CLOSURE SIGN ASSEMBLIES EACH
$260.00 $2,250.00
=FLASHING ARROW BOARD EACH
$540.00 5500.00
137 TEMPORARY PANEL SIGN
$15.00 34,260.00
138 MAINTENANCE OF TRAFFIC
$ .000,00 $50,000.00
138 TRAFFIC SiGNAL EQUIPMENT,REMOVE 1 LS
$5,000.00 $5.000.00
140 MISCELLANEOUS EQUIPMENT FOR TRAFFIC SIGNALS
LS 51,000,00 $1,000.00
=TRAFFIC SIGNAL HEAD 3 FACE,12 IN,RED,AMBER,GREEN 18 EACH
S900.00 $16,200.00
11111 TRAFFIC SIGNAL HEAD,3 FACE, 12 IN,RED,AMBER ARROW,
GREEN ARROW EACH
$950.00 $1,900.00
IIIITRAFFIC SIGNAL HEAD,5 FACE,12 IN RED,AMBER,GREEN,
AMBER ARROW,GREEN ARROW EACH $1,400,00
$5,600.00
PEDESTRIAN SIGNAL HEAD WITH INTERNATIONAL
SYMBOLS,18",COUNTDOWN EACH $850.00
=SIGNAL SERVICE $18,700.00
EACH 5800.00
=POWER SUPPLY, UNINTERRUPTIBLE $2,70.0
EACH $7,500.00
147 THERMAL VIDEO DETECTOR SYSTEM $22.500.00
e $7,000.00
148 PEDESTRIAN PUSH BUTTON AND SIGN 18 1B EACH $175.00
11:11 $3,150,00
TYPE 1 CONTROLLER AND CABINET,MENU DRIVEN, 12 PHASE TS2,
1 EACH $25,000.00
325,000.00
ggecf File No..207024.40
ENGINEER'S ESTIMATE
CITY OF SOUTH BEND
April 17,2012
Project Name :Main Sjreet/Lafavette Boulevard Connector
Project No.:110458
For Blds Due:5/221201Z
BASE BID
ITEM NO. DESCRIPTION QTY. UNIT UNIT PRICE TOTAL AMOUNT
150 CONTROLLER AND CABINET,MENU DRIVEN, 12 PHASE 7S2, EACH
TYPE 1,WITH LIGHTING $30,000.00
560,000.00
SIGNAL AND LIGHTING COMBINATION CANTILEVER
151 STRUCTURE,40 FT.SIGNAL ARM.20 FT.LUMINAIRE ARM 35 FT. 1 EACH $6,400.00
$6,400 00
152 SIGNAL CANTILEVER STRUCTURE,MAST ARMS 40 FT AND 40 1 EACH
FT $8,000.00 $8,000.00
=SIGNAL CANTILEVER STRUCTURE,40 FT SIGNAL ARM 3 EACH $2,500.00
57,500.00
154 SIGNAL CANTILEVER STRUCTURE,35 FT SIGNAL ARM 1 EACH 52,000.00 $2,000.00
155 SIGNAL SUPPORT FOUNDATION,36 IN X 36 1N X 96 IN 6 EACH $1,500.00
$9,000.00
=STEEL STRAIN POLE FOUNDATION,36 IN X 144 IN 4 EACH $2,500,00 $10,000.00
157 CONTROLLER CABINET FOUNDATION,P1 3 EACH $500.00
$1,500.00
158 I(AN'DHOLE,SIGNAL 16 EACH
$500.00 $8,000.00
159 INTERCONNECT CABLE,FIBER OPTIC 383 LFT
$2.00 S756.00
160 THERMAL VIDEO DETECTOR CABLE 1,310 LFT $1.00 $1,310.00
161 SIGNAL CABLE.3C/8GA 175 LFT
$3.50 $612.50
162 SIGNAL CABLE,3C/14GA 100 LFT
$2.00 $200.00
163 SIGNAL CABLE,5C/14GA 3,000 LFT
$1.75 $5,250.00
En SIGNAL CABLE,7C/14GA 1,410 LFT
$1.75 $2,467.50
IIM SIGNAL CABLE,2C/16GA 120 LFT
$2.00 $240.00
166 LOOP DETECTOR AMPLIFIER,DELAY,2-CHANNEL 2 EACH w $800.00 $1,600.00
167 SAW CUT FOR ROADWAY LOOP SEALANT ' 324 LFT
$8.00 $2,592.00
168 SIGNAL DETECTOR HOUSING 2 En $650.00 $1,300.00
169 SIGNAL CABLE,ROADWAY LOOP,1C/14GA 1,015 LFT $1.00 $1,015.00
170 DISCONNECT HANGER 4 EACH
5350.00 $1,400,00
171 SPAN,CATENARY AND TETHER 4 EACH
$1,750.00 $7,000.00
172 SIGNAL STRAIN POLE,STEEL,36 FT 4 EACH
34,950.00 $19,800.00
LIGHTING SERVICE FOR TRAFFIC SIGNAL MOUNTED
173 LUMINAIRES 1 EACH $400,00 $400.00
LUMINAIRE,TRAFFIC SIGNAL MOUNTED,HIGH PRESSURE
•174 SODIUM,400 WATT 5 EACH
$800.00 $4,000.00
LIGHTING CABLE FOR TRAFFIC SIGNAL MOUNTED
175 LUMINAIRES,3C110 685 LFT
51.50 51,027.50
CABLE-DUCT MARKER 4 EACH
3100.00 $400.00
177 LIGHTING HANDHOLE B EACH
$550.00 $4,400.00
RoiecI Fj'e No.minpL!/1
ENGINEER'S ESTIMATE
CITY OF SOUTH BEND
AprIl 17,2012
Project Name ;Main$tree3/lafayefte Soulev t Conn*MoC
Project No.:110.058
For Blds Due:5/22/2012
BASE BID
ITEM NO. DESCRIPTION QTY. UNIT �_
UNIT PRICE TOTAL AMOUNT
=LIGHTING FOUNDATION
37 EACH
In
SERVICE POINT $600.00 $28,600.00
EACH $3,500.00
180 STREET LIGHT $3,500.00
EACH $2,500.00
$102,500.00
181 WIRE#4 7,456 LFT
_ $9.00 $67,104.00
182 WIRE# 10 5,417 LFT
51.00 $5,417.00
183 CONDUIT,STEEL,GALVANIZED,2 IN 2,978 LFT
$13.00 $38,714,00
184 LINE,THERMOPLASTIC,SOLID,WHITE,6-INCH 2,590
$0.60 $1,554.00
=LINE,THERMOPLASTIC,SOLID,WHITE,4-INCH MN LFT
$0.60 $1,38900
186 LINE,THERMOPLASTIC,SOLID,YELLOW,4-INCH 11,870 LFT
$0.60 $7,122.00
187 LINE,THERMOPLASTIC,BROKEN,YELLOW,4-INCH 955 LFT
$0.60 $573.00
188 TRANSVERSE MARKING,THERMOPLASTIC,SOLID,WHITE,
STOP LINE,24-INCH 610 LFT 55.50
$3,355.00
189 TRANSVERSE MARKING,THERMOPLASTIC,SOLID,YELLOW,
CROSS HATCH,8-INCH LFT
$3.00 $1.125.00
190 LINE REMOVE 200 LFT
$2.00 $400.00
191 PAVEMENT MESSAGE MARKING,THERMOPLASTIC,WHITE,
ARROW 40 EACH $80.00
$3,200.00
IIIIPAVEMENT MESSAGE MARKING,THERMOPLASTIC,WHITE,
TURN ARROW 10 111111 $80.00
$800.00
193 PAVEMENT MESSAGE MARKING,THERMOPLASTIC,WHITE,
WORD,"ONLY" 30 $80.00
$2,400.00
194 VIDEO RECORD
1 LS 52,000.00
$2,000.00
195 SIGN POST,SQUARE,1 REINFORCED ANCHOR BASE 240 LFT
$8.00 $1,920.00 I
SIGN,SHEET,ENCAPSULATED LENS W/LEGEND,0.080 IN.
THICKNESS SFT
$13.00
$884,00
197 SIGN,SHEET,ENCAPSULATED LENS W/LEGEND,0.100 IN.
THICKNESS SFT $15.00
$2,340.00
198 SIGN,SHEET,ENCAPSULATED LENS W/LEGEND,0.125 IN. SFT
$21.00 $4,851.00
199 HOUSES AND BUILDINGS,PARCEL 369,REMOVE LS $20,900.00
$20,000.00
200 HOUSES AND BUILDINGS,PARCEL 350,REMOVE LS $20,990.00
"""' 320,000.00
201 HOUSES AND BUILDINGS,PARCEL 430,REMOVE LS $20,070,00
$20,000.00
202 HOUSES AND BUILDINGS,PARCEL 420,REMOVE . 1 LS $20,000.00
$20,000.00
203 HOUSES AND BUILDINGS, PARCEL 377,REMOVE 1 LS 520,000,00
$20,000.00
TOTAL $4,559,256.00
e s• a erAssouates .
Prge:t File No.2010244n
__
.,. _.. .. .: CMPPEWA Athr.
1; ; ? ,\,:, s':',Ns`Z\o‘.',5ss.N , I
i :\kkk,•;,,,,., -•,..:,;:;. * , flit" Bli_________Ef_jaiii______, [
.. L.L.i 1
A 1 , illMlr :'...` MU:1`1%.*
S 1 ,i ii11111 , : / .1-____ ' Li I i I
;-i.jK.n....... • .7-:\•%'•- :!...,mAyik.Aii.....,4.4. ,..,-..--,',i "k \
1'IIC:1Z\\N\. \\\%.%\\'\':\\7.,,.: t.'"1:7rETALA#1.70Af::.1,:.;i:. ;,..;1\::._1_;.,.,..., ' I
:at 64. 47..._ i: A. _
.____ ,74:... ...:4.....„.:.s.::!,.::::::-.: i
,-. .\\`‘ N
'ix" ...,7:::::'•::-.::,:..::::.11 II
•
.
A' N \\‘''. ...N\. \4IIM Allihree..- j i -1---:7' 1
WALTER Si
''5 's. \\\ ‘ 1 a I I I I In i .L.L_i_
�
. i Z i i t61 /, i
,., s.--...1\ '' . .. ' 0 I 1 a 1 ____ ,.. ., e,..„,,,,P.44; 2012
at..„. !,-. ic,,,,,,a,,,,:rt,:.5,,,,,..:4....,A20,740/Tro Ron.or_fmr
gc; li ..... ,
Ir.; ! LFAIrAyak, i!MAIN ST./LAFAYETTE BLVD. CONNECTOR;''''' '''''
ANTICIPATED
- i LA_w_595:::20..u..5N T...-;4.1.is.S:EHI_____A;E;71.LIAIN.N25330S;1_,A00-7,41.4:1A.IA.6A174EEGNS.6u.o.PE.:C.: ::- - - ..*.-. .. . ... ________..., . __ , . ::r4n'VII/12...... ... _. 1._... .
J111■1•1ffiguarbr. -111,
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPME
Marcia I. Jon-' ,` President
South Bend Redevelopment Commission
ATTEST:
Do -1d Alford, . , Secretary
South Bend Redevelopment Commission
CITY OF SOUTH BEND,INDIANA
BOARD OF PUBLIC WORKS
:fir -
GardGilot,Prudent
)
D.n Inks,. ember
Kathryn Roos, Member
ATTEST:
- da Martin, C1e�rk
11
Exhibit "G"
MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT#6
See attached quote request to advertise for the demolition of three structures located
within the project area. Quotes are to be received by the Board of Public Works on
August 9, 2012.
Structures for Demolition are as follows:
4101 South Main Street (DeBuysser Parcel —residential structures)
4219 South Main Street (Mink Parcel —residential structures)
4043 South Michigan Street (Premier College of Cosmetology—commercial structure)
INVITATION TO QUOTERS
Notice is hereby given that the City of South Bend, Indiana, Board of Public Works will receive
sealed quotes at the office of the Board of Public Works, County City Building Room 1316, 227
W. Jefferson St., South Bend, Indiana, 46601 until the hour of 10:30 a.m., on Thursday,
August 9, 2012 for the following:
Demolition of:
Former Debuysser Property, Parcel 420, 4101 S. Main St.
Former Premier College of Cosmetology, Parcel 377, 4043 S. Michigan St.
Former Mink Property, Parcel 430, 4219 S. Main St.
For Project No. 110-058A
Work to be performed shall include furnishing all labor, services, materials, insurance and
equipment for the demolition and environmental abatement of buildings on the aforementioned
properties, all more particularly described in the following documents contained in this invitation.
The Contract Documents are on file and available for public inspection during regular working
hours at the Department of Public Works (1316 County-City Building, South Bend, Indiana), and
at the offices of Lawson-Fisher Associates, P.C., 525 West Washington Avenue, South Bend,
Indiana 46601, phone (574) 234-3167
Quotes must be on the City of South Bend Contractor's Quote for Public Work form.
Each quoter or contractor (hereinafter the contractor) must fully comply with either the
Contractor's Non-Collusion Affidavit and Common Construction Wage Scale of these bid
conditions as to each construction trade it intends to use on this construction contract and all
other construction work (both federal and non-federal) in the St. Joseph County area during the
performance of this contract or subcontract. The contractor commits itself to the goals for
minority manpower utilization in either the Contractor's Non-Collusion Affidavit and Common
Construction Wage Scale, as applicable, and all other requirements, terms and conditions of
these quote conditions by submitting a properly sealed quote.
Work under this project is subject to a Common Wage Determination as established in
accordance with IC 5-16-7-4.
The Contractor shall appoint a company executive to assume the responsibility for the
implementation of the requirements, terms and conditions of the quote conditions.
A Mandatory Pre-Quote Conference will be held on Wednesday, Ju, y 25_, 2012 at 10:30
a.m. at the former Premier Coflege of Cosmetology, 4043 S. Michigan Street. Each quoter is
required to visit the project site and become familiar with the job conditions prior to making a
quote. Any questions regarding bidding conditions must be addressed to the Owner in writing
no later than Friday, August 3, 2012.
The Board reserves the right to reject any or all quotes or to accept a full or partial award of the
quote or quotes which, in its judgment, will be to the best interests of the City of South Bend.
Board of Public Works
Linda M. Martin, Clerk
Exhibit "H"
MAIN-LAFAYETTE CONNECTOR DESIGN PROJECT - S UPPLEMENT #7
See attached Supplement Agreement #4 from Lawson-Fisher Associates P.C. dated
September 25, 2012
L FATAVA GREGORY L.HOLDEN,P.E.
PAULA.HUMMEL,P.E.
PIPER C.TITTLE,P.E.
MICHAEL J.GUZIK,P.E.
LAWSON-FISHER ASSOCIATES P.C. 9022.14
THOMAS S.SHARP,P.E.
THERESA E.HARRISON,P.E.
JON E.RIEMKE,P.E.
JEFFREY L.McKEAN,P.E.
RANDOLPH J.LINDLEY,P.E.
CHRISTOPHER J.JETER,P.E.
DENNIS A.ZEBELL,P.E.
BENJAMIN P.HOLDEN,P.E.
DAN G.DELGADO,P.E.
December 6, 2012 MICHAEL F.JOHNSTON,P.E.
JEFFREY M.BYRD,P.E.
JARED M.HUSS,P.E.
SKY K.MEDORS,P.E.
GINA A.WEILBAKER,P.E.
Mr. Bill Schalliol AARON W.BLANK,P.L.S.,P.E.
Community & Economic Development Specialist
City of South Bend
227 West Jefferson Boulevard, Suite 1200S
South Bend, Indiana 46601
RE: South Main Street to Lafayette Boulevard
Connector and Development Area
Supplemental Agreement#4
Additional Scope of Work
Dear Mr. Schalliol:
Lawson-Fisher Associates P.C. (LFA) is pleased to submit this proposal to provide
Professional Engineering Services to the City of South Bend (City) for the Main Street to
Lafayette Boulevard Connector and Street Improvements.
The proposal includes the following documents:
• Scope of Additional Services, Appendix A
• Manhour Justification. Appendix B
The proposal was prepared at your request on the basis of our meetings on May 21,
2012, September 20, 2012 and more recently on November 20, 2012. It includes work items
and work effort not envisioned or included in our original proposal.
We propose this Scope of Services be performed on an hourly basis for a budgetary fee
of $147,000.00. Payments to LFA will be in accordance with Attachment "A" in our original
contract.
Please indicate your acceptance of this proposal by signing in the space provided below
and returning one copy to our office.
Thank you for the opportunity to provide additional Professional Engineering Services to
the City of South Bend.
___._.___._.__ ...�.... ...r....� . n,%aIru noun guru ARRA4 .A7n_94A_11I 7 .F7d_73R-1330(FAX)
1
-L FAVAVA
Mr. Bill Schalliol
December 6, 2012
Page 2
If you have any questions, comments, or desire additional information. please do not
hesitate to contact us.
Very truly yours,
LAWSON-FISHER ASSOCIATES P.C.
Michael F. Johnston, P.E.
Senior Civil Engineer
/
Paul A. Hummel, P.E.
Senior Vice President/Senior Civil Engineer
MFJ:PAH:/s
Encls.
c. Michael Mecham, P.E. City Engineer w/Encls.
ACCEPTED AND APPROVED this day of . 2012.
(Authorization is also Notice to Proceed)
CITY OF SOUTH BEND REDEVELOPMENT COMMISSION
L FAVAVA
APPENDIX A
SCOPE OF ADDITIONAL SERVICES
South Main Street to Lafayette Connector
Our Design Agreement was originally based upon our proposal dated August 9, 2010. with the
Agreement executed on August 23, 2010. Since that time the Agreement has been
supplemented on three times. It was modified two times to add (1) RIW acquisition services
and (2) relocation agent services. The third supplemental increase (Submitted on October 12,
201 1) covered the change in design from the construction of the first project of 3-Phases into
one project with revised alignments, and additional alignments and traffic signals replacing the
initially planned roundabout. At the time of the third Supplemental, increased design fees were
projected to carry the project through Construction Contract letting and begin construction.
However additional design and coordination tasks have been requested that are beyond the
vision available at that time.
It is noteworthy to mention that the existing agreement in-place at the time of the first planned
contract letting on May 29, 2012 would have substantially covered our increased design costs.
However a prudent decision made at that time (to delay the contract letting and construction
until 2013) by the City and its design team was instrumental in saving user costs and very likely
construction change orders due to wintering the project. This additional time resulted in several
additional survey, design and coordination tasks including plan revisions to facilitate and
accommodate RIW acquisition changes, additional street lighting, and a separate demolition
project. Collectively these actions will expedite and enable a smooth construction project.
In September 2012 we prepared and submitted Construction Documents a second time,
however funding changes delayed the project and a new Policy of Communication Outreach
was launched by the City which affects the project delivery by adding a new step and bid item.
We anticipate continued involvement with this initiative through the construction project to be
accomplished in 2013.
A significant amount of effort is being expended to develop Communication Outreach by making
design changes that improve the public's appreciation and acceptance of the project by listening
and reacting to individual property owners (both already acquired from and those yet to be
acquired). Meeting with and satisfying the individual property owners most directly impacted by
the project resulted in a higher satisfaction with the process, the project and the City overall.
The following items are requested as effort not envisioned in our October 2011 Supplemental
Request:
Additional Survey Items
• Additional field survey.
o Field layout of the proposed design to facilitate plan interpretation.
• Preparation of additional easements and parcel plat revisions.
• Supplemental title information requests.
December, 2012 Page 1 Project File No. 9022.14
L FAVAVA
Additional Design Tasks
• Design and plans for decorative City street lighting.
• Analysis, design and plans for an additional detention pond and outlet control
structure to serve the Caroline Properties (Gates) development.
• Water line extension added on East Barbie Street.
• Two additional plan revisions for the Carl Kay Parcel.
• Traffic analysis and multiple drive revisions for Lock Joint Tube.
Reversion back to previous designs caused by LJT building addition.
• Design of a construction access driveway for Heraeus Kulzer.
• Quotation project and documents for a separate demolition contract of three parcels.
• Additional survey and design work for West Chippewa (south side).
• 2nd Letting and Construction Documents (submitted on October 2, 2012).
• Wendy's drive revision.
• Additional plan work for Falls Creek irrigation and lighting.
• Preparation of 3`d Letting and Construction Documents.
Additional Coordination Tasks
• Prepare agreement/offer document for AMC Theatres & Caroline Partners.
• Extra meetings with Lock Joint Tube, South Gateway Properties, Pinney Drive quote.
• Coordination and completion of locating work on Ladson's septic tank.
• Assistance with AEP Transmission Relocation Agreement.
• Coordination with Falls Creek Development - additional site research.
• Preparation of Replat (legal descriptions, easements).
• Coordination, Specifications. Public Meeting and Sign Design for City's Project
Communication Outreach.
• Preparation of Miscellaneous Exhibits/Drawings for Property Acquisition.
December, 2012 Page 2 Project File No. 9022.14
C ni
ar N
d ',
e l
4 0
c 4`
8
F Hi ' I I x I I I I
Z
N w
Q D
9 Tr
N _ N " e 44 8248 _,_. 8ag 4 nc_ °-14 % g- _ 88 k o FaH 8
!.. - - ry w - 8
r:
_ , .DMNN -rY N 1, NN Its ��
s
v 4 www w
e 41"
_ - - ° 3 4:=M g N _ Pr-74_ 1 " " A 2 ' 4! 8 8 8 8
N a
F <� I ^ i s
W w.v,..v,.,
w
0 Y M N _ W i°° ol ° A ,O. - Sig n 8 8
P
uW c.�L
u Q Q E , !>a':: - w
ww w
O F O n ii g aHr ,° : 0 , a 1 . .. . " :47.. ..!, M _ 8 882 8
K zLLJ <� Y•:.
09p 4,'.
52 F . 71Yi r 1 ?y,:. N— e
aoWZ }. Yew 888 3
O V~U -
V a g S r `r N'' r - N
if•+ ,¢ l b w ... w
H'
li
O M
7
N Z y N
�`b
2 c
r ■„: e
o c 8 - a =, p X =
,. 'ra It ” . a O N f.. rn B 'e_— -
rn AT v ? a
` a
W c I -wV a . ' gg
W . 8 D U t "ek 42- . °ae •E a ==. 82E m who i w o
> .8 i s - M 1,2' . � =g g r•r. 4q m y `a.p d 2 i. ,a a a w
eEi E° W E7$68 °•� `e V 8 Ey' F' LL o` •F osz+,i Hio 5i 4 6<
m A. . g!4 ,,-.. q a e c. u u .a a w" V g 0. F
o . �` .w gm dC J3 o OF �a g� 9�8 RI m Z
z a b m '.`'. Z �'. w � tiS < `oS 2 ' U !iH,a 1I{III1 fjf•d ry 0 2 g 4d1�"u= q Ltb
x v, °< < <55
1