HomeMy WebLinkAboutOpening of Bids - Ignition Park EV Charging Lot Proj No. 120-044R - The Robert Henry Corp.Q'.
t-
i 2
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name Ignition Park: EV Charging Park
Project No. 120-044R
For Bids Due April 13, 2021 at 9:OOam Local Time
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
X or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
X executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
X Certification of use of United States Steel Products or Foundry Products.
Proof of MWBE Utilization Plan [MWBE-1.0]. If minimum participation goal is not met, also
provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MWBE Contacted Form
X [MWBE-2.1].
X Acknowledge Receipt of 1 Addendum(s) included with the bid.
X All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
X printed or typed underneath signature.
X This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: The Robert Henry Corporation Date: April 13, 2021
By Authorized Representative:
Signature:
Print Name & Title: Brian S. Henry, President
Version 01/13/2021 Contractor's Bid for Public Works -1
V�
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name Ignition Park: EV Charging Park
Project No. 1204)44R
For Bids Due April 13, 2021 at 9:00am Local Time
Date:
Address:
PART I
(Must be oompleted for all bids. Please type or print)
April 13, 2021 Bidder (Firm): The Robert Henry Corporation_
404 S. Frances St
Citytstate zip: South Bend, IN 46617 Telephone Number: (574 ) 232-2091
Agent of Bidder (if Applicable): John Callan
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of.
Ignition Park: EV Charging Park - Project No. 120-044R
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
Jones Petrie Rafinski
and dated April 13, 2021 for the sum of (enter the Total Bid as shown on the Proposal)
Four Hundred Seven Thousand, Five Hundred Nineteen Dollars ($ 407,519.00 I
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a separate aft. +chment.
By
gnahire)
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Gary A. Gilot, Member
Murray Miller, Member
Brian S. Henrv. President _
(Printed Name of Pelson Signing)
ACCEPTANCE
day of
Joseph R. Molnar, Member
Jordan V. Gathers, Member
Attest: Anne Fuchs, Clerk
Version 01/13/2021 Contractor's Bid for Public Works - 2
20
PART II
(For projects of $100,000 or more - IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE f Please see attached.
1 Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE I Please see attached.
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 01/13/2021 Contractor's Bid for Public Works - 3
When the prospective Contractor is unable to certify to any of the state► vents below, it shall attach an explanation to this Affa&&
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Indiana )
) SS:
St. Joseph COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
Version 01/13/2021 Contractor's Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of employment, or any matter directly or indirectly related to employment because
of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual
orientation or disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise C WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to afrMWBE;
however, they may not unlawfully discriminate against said MBE/WBE. A finding of noncompliance or a
discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one
(1) year from the date of such determination, and such determination may also be grounds for terminating
the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
1, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1).1 hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
may result in forfeiture of contractual payments.
Version 01/13/2021 Contractor's Bid for Public Works - 5
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 13th day of April _ 20 21
Subscribed and sworn to before me this 13th
My Commission Expires 3h & 2,3
County of Residence
The Robert Henry Corporation
Contractor/Bidder (Firm)
&2--
Signature-Of Contractor/B' der or Its Agent
Brian S. Henry, President
Printed Name and Title
day of6ui
April 20 21
C LL
Notary Public
St.
CAROL B. DOYLE
: SEALS° Notary Public
* St. Joseph County, State of Indian8
iAW' Commission Expires March 18, 2023
Version 01/13/2021 Contractor's Bid for Public Works - 6
� c
BID/PROPOSAL t >'
CITY OF SOUTH BEND
Project Name: Ignition Park: EV Charging Park
Project Number: 120-WR
For Bids Due: April 13, 2021 at 9:00am Local Time
Contractor Name: The Robert Henry Corporation
BASE BID
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
MOBILIZATION AND DEMOBILIZATION
1
LSUM
55,629
55,629
2
CONCRETE CURB & GUTTER REMOVAL
175
LFT
26.93
4,713
3
EARTHWORK
1775
CYD
14.91
26,466
4
COMMON EXCAVATION
720
CYD
19.17
13,803
5
HMA INTERMEDIATE, TYPE B
280
TON
76.68
21,471
6
HMA SURFACE, TYPE B
140
TON
133.13
18,638
7
COMPATCTED AGGREGATE, No. 53
550
CYD
44.20
24,309
8
PCCP FOR APPROACH, REINFORCED
120
SYD
51.69
6,203
9
SIDEWALK, CONCRETE, 4"
715
SYD
41.54
29,701
10
CURB RAMP, CONCRETE
16
SYD
75.75
1,212
11
CONCRETE CURB
1100
LFT
24.49
26,939
12
CURBTURNOUT
7
EA
444.57
3,112
13
CONCRETE PARKING STOP
15
EA
79.87
1,198
14
STORM SEWER PIPE,12 IN
80
LFT
53.25
4,260
15
STORM CASTING REPLACEMENT
1
EA
2,663
2,663
16
TESCO CABINET, FOUNDATION, WIRING,
ETC
1
EA
24,166
24,166
17
ELECTRICAL SERVICE CONNECTION
1
LSUM '1,065
1,065
18
LIGHT STANDARD, TYPE A
1
EA
5,634
5,634
19
LIGHT STANDARD, TYPE B
1
EA
4,686
4,686
20
LIGHT POLE FO U NDATION q
2
EA
905.50
1,811
21
EV CHARGING FOUNDATION (18"x18"X18")
7
EA
203
1,421
22
LIGHTING CONDUIT, PVC, SCH 80,3 IN
270
LFT
13.31
3,594
23
LIGHTING CONDUIT, PVC, SCH 80,3 IN,
DIRECTION DRILL
50
LFT
29.82
1,491
24
EV CHARGING CONDUIT, PVC SCH 40,3 IN
375
LFT
13.31
4,992
25
LIGHTING WIRING
360
LFT
3.73
1,342
26
ELECTRIC PULL BOX
5
EA
1,065
5,325
27
THERMOPLASTIC LINE, SOLID, WHITE, 6 IN
110
LFT
6.39
703
28 THERMOPLASTIC LINE, SOLID, YELLOW, 4 IN
530
LFT
1.14
605
Version 01/13/2021 Contractor's Bid for Public Works - 7
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name:
Ignition Park: EV Charging Park
Project Number.
120-044R
For Bids Due:
April 13, 2021 at 9:00am Local Time
Contractor Name:
The Robert Henry Corporation
BASE 131D
29
THERMOPLASTIC LINE, SOLID, BLUE, 4 IN
125
LFT
1.06
133
30
PAVEMENT MESSAGE HC MARKING, BLUE
1
EA
27
27
31
HANDICAP SIGNPOST
1
EA
266
266
32
ELEC VEHICLE SIGN/POST
4
EA
346
1,384
33
STOP SIGNPOST
OVERSTORY TREE, 21/2 IN CALIPER
2
EA
282
564
34
12
EA
612.42
7,349
35
HYDROMULCH, SEEDING AND TOPSOIL
1750
SYD
12.97
22,701
36
SWALE SEED MIX AND TOPSOIL
725
SYD
5.56
4,030
37
TEMPORARY EROSION CONTROL MEASURES
1
LSUM
9,053
9,053
BASE BID TOTAL 342,659
ALTERNATE #1
Item
Description
Quantity
Unit
Unit Price
Total Amount
No.
1
CONCRETE SEAT WALL
80
LFT
207
16,560
ALTERNATE 01 TOTAL 16,560
ALTERNATE N2
Item
Description
Quantity
Unit
Unit Price
Total Amount
No.
2
PICNICTABLES
2
EA
2,381
4,762
ALTERNATE 03
Item Description
No.
3 anvu inN/cH,
STRUCTURE
ALTERNATE 92 TOTAL 4,762
Quantity Unit Unit Price Total Amount
2 EA 21,769 i43,538
ALTERNATE #3 TOTAL 43,538
Bidder (Firm): The Robert Henry Corporation
Address: 404 S. Frances St.
City/State/Zip: South Bend, IN 46617 Telephone Number: , 574 } 232-2091
By 0 �� �"_
(Signature)
Brian S. Henry, President
(Printed Name of Person Signing)
Version 01/13/2021 Contractor's Bid for Public Works - 8
BID/PROPOSAL w a
CITY OF SOUTH BEND
Project Name: Ignition Park: EV Charging Park
Project Number: 120-044R
For Bids Due: April 13, 2021 at 9:OOam Local Time
Contractor Name: The Robert Henry Corporation
Version 01/13/2021 Contractor's Bid for Public Works - 9
a 'fir
JZ
CITY OF SOUTH BEND,.
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MWBE4.0
MWBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is
the bidder's sole responsibility to verify whether any listed minority or woman business meets the MBE qualifications.
Project Number. 120-044R _ Project Name: Ignition Park: Ell Charring Park
Bidder: The Robert HenryCorporation Total Bid Amount: $ 413,317.00 MBE Goal: 2.4%
Page 1 of 1
Name & Address of MBE
Primary Contact Person
hone
(Namelrel p )
Scope of Work to be Performed
(Attach scope/schedule H you need additional space)
Dollar Amount of MBE
Component
Percentage
of Total
Bid/Proposal
No MBE organizations have
responded at this time.
Submitted by: Brian S. Henry, President April 13, 2021
Print Name Signature Date
Version 01/1312021 Contractor's Bid for Public Works -10
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MWBE-1.0
- MWBE UTILIZATION PLAN—
Thiscompleted form should be supplied with Bids that pertain to City of South Bend Public Works Projects Involving WBE participation. It is
the bidder's sole responsibility to verify whether any listed minority or woman business meets the WBE qualifications.
Project Number: 1204044R Project Name: 1-; ninon Park: EV Char ig na_Park
Bidder: The Robert Henry Corporation Total Bid Amount: $ 413,317.00 WBE Goal: 4.2%
Name 8 Address of WBE Primary Contact Person
(Name/Telephone)
M. J. Schuetz Insurance Services Jenni Waggoner
Circle Tower Building 317-548-3932
55 Monument Circle, Ste, 600
Indianapolis, IN 46204
Ritschard Bros,, Inc.
Circle Tower Building
55 Monument Circle, Ste. 500
Indianapolis, IN 46204
State Barricading
24963 US Highway 20 South
South Bend, IN 46628
Don Ritschard
574-288-4777
Page 1 of 1
Scope of Work to be Performed Dollar Amount of WBE Percentage
(Attach scope/schedule if you need additional space) Component of Total
Bld1Proal
Bonds $ 4,000.00 0.98%
Eartwork Site Utilities $ 92,910.00 22.8%
Mary Michalski Street Barricading
574-287-2078
Submitted by: Brian S. Henry, President _ April 13, 2021
Print Name Signature' Date
Version 01113/2021 Contractor's Bid for Public Works -11
iTR
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
r!�
FORM MWBE-2.0 •- ,,,�
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MWBE participation.
Project Number: 120-044R Date: April 13, 2021
Project Name: Ignition Park: EV Charging Park
Bidder: The Robert Henry Corporation
Contact Person: John Callan Telephone: 574-232-2091
Address: 404 S. Frances St.
City: South Bend State: Indiana Zip: 46617
Email: jcallan@roberthenrycorp.com
To determine whether a bidder has demonstrated good faith efforts to reach the MWBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below
EVIDENCE OF GOOD FAITH EFFORTS
MWBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business
Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana
Department of Administration list of Minority and Women Owned Businesses (both certified and non -
certified) found at: hft :/Iwww.in. ov/idoa/.
GOOD FAITH EFFORTS TO OBTAIN MWBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain MWBE
participation in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by MWBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate MWBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all MWBEs in the scopes of work of the contract.
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
MWBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed MWBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform MWBEs of subcontracting opportunities and allowed
sufficient time for MWBEs to participate effectively.
-
V
I affirm that I followed up on initial solicitations with interested MWBEs.
I affirm that I negotiated with interested MWBEs in good faith, including providing such
MWBEs with adequate information about the plans, specifications and other requirements
of the subcontract.
]
I affirm that I have made good faith efforts to assist interested MWBEs in obtaining
�'
I
bonding, lines of credit, or insurance as required by the City or the bidder, where
appropriate.
Version 01/13/2021 Contractor's Bid for Public Works -12
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MWBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
I affirm that I have made good faith efforts to assist interested MWBEs in obtaining
necessary equipment, supplies, materials, or related assistances or services, where
appropriate.
I affirm that I did not reject any MWBEs as unqualified without sound business reasons
based on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each MWBE that has bid
on the subcontracting opportunity:
1. Name, address, and telephone number,
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MWBE was unqualified to perform the job.
'Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Anv
omissions snau De consiaerea grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 01/13/2021 Contractor's Bid for Public Works - 13
TFI
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MWBE-2.1.
MWBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It Is the bidder's sole responsibility to verify whether any listed
minority or woman business meets the MBE qualifications. Attach additional pages if necessary.
PAGE_ _OF 1
Project Number: 1204044R MBE Participation Goal 2.4%
Project Name: Ignition Park: EV Charging Park _
Bidder: The Robert Henry Corporation
By: � Brian S. Henry, President April 13, 2021
(Signature) (Title) (Date)
MBE Firm DRC Corporation
Owner or Contact at MBE Firm Donald Chambers
Telephone: 574-233-1904 Fax: 866-596-0986 Email: biddre@sbcglobal.net
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Sheet Metal
RESULTS OF CONTACT WITH THE MBE FIRM:
Not bidding, per email.
MBE Firm
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
Version 01/13/2021 Contractor's Bid for Public Works - 14
Tfl
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN v ,
FORM MWBE-2.1
MWBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed
minority or woman business meets the WBE qualifications. Attach additional pages if necessary.
PAGE, 1 OF 2
Project Number: 1204044R WBE Participation Goal 4.2%
Project Name: Ignition Park: EV Chaging Park
Bidder: The Robert Henry Corporation
By: Brian S. Henry, President April 13, 2021
(Signature) (Title) (Date)
WBE Firm M.J. Schuetz Insurance Services, Inc.
Owner or Contact at WBE Firm Jenni Waggoner
Telephone: 317-548-3932 Fax: 317-639-6910 Email: jaggoner@mjsis.com
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Bonds
RESULTS OF CONTACT WITH THE WBE FIRM:
Submitted a bid.
WBE: Firm Ritschard Bros., Inc.
Owner or Contact at WBE Firm Donald Ritschard
Telephone: 574-2884777 Fax: Email: ritl204@datacruz.com
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Earthwork Site Utilities
RESULTS OF CONTACT WITH THE WBE FIRM:
Submitted a bid.
Version 01/13/2021 Contractor's Bid for Public Works -15
TH
CITY OF SOUTH BEND '
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN `
FORM MWBE-2.1
MWBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It Is the bidder's sole responsibility to verify whether any listed
minority or woman business meets the WBE qualifications. Attach additional pages if necessary.
PAGE, 2 OF_ 2
Project Number: 120-044R WBE Participation Goal _ 4.2%
Project Name: Ignition Park: EV Charging Park
Bidder: The Robert Henry Corporation
By:
Brian S. Henry, President April 13, 2021
u nie)
WBE Firm Dudack Roofing & Sheet Metal, Inc.
Owner or Contact at WBE Firm Katy Dudek
Telephone: 574-234-7912 Fax: 574-234-2471
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Sheet Metal Installation
RESULTS OF CONTACT WITH THE WBE FIRM:
Awaiting Response
WBE Firm State Barricading
Owner or Contact at WBE Firm Mary Michalski
Telephone: 574-287-2078 Fax: 574-287-2744
TYPE OF WORK SOLICITED FOR THIS PROJECT -
Street Barricading
RESULTS OF CONTACT WITH THE WBE FIRM:
Submitted A Bid
(Date)
Email: katy@dudeckroofing.com
Email: statebarricade1@aol.com
Version 01/13/2021 Contractor's Bid for Public Works - 15
John Callan
From:
John Callan
Sent:
Monday, April 12, 2021 8:25 AM
To:
Don Chambers
Subject:
RE: Invitation To Bid - REBID of South Bend Ignition Park EV Charging Park
Thanks for your consideration, Don!
John A. Callan, Project Manager
THE ROBERT HENRY CORPORATION
574-232-2091, FX 574-232-3979
From: Don Chambers <biddre@sbcgloba1.net>
Sent: Monday, April 12, 20214:01 AM
To: John Callan <jca Ila n@roberthenrycorp.com>
Subject: Re: Invitation To Bid - REBID of South Bend Ignition Park EV Charging Park
Good morning John,
Thanks for the invite to bid. At this time. DRC will not bid this project.
Don
Donald R. Chambers, Project Manager DRC Corporation 2214 Huron Street South Bend, IN 46619 574-233-1904
On Friday, April 9, 2021, 08:52:18 AM EDT, John Callan < callan roberthenr cor .com> wrote:
You are invited to submit a Bid for your portion of the work for the above referenced Project. Please see the attached
Invitation To Bid which contains instructions for obtaining the Bid Documents for this Project. Kindly send your request for
the Bid Documents to BidDocRe uest.nccmail.com and you will receive a return email from our Van Nussbaum with
links to download the Bid Docs at no cost. Please advise us if you are a MBE or WBE. Kindly contact us with any
questions.
Thank you for your interest!
John A. Callan, Project Manager
THE ROBERT HENRY CORPORATION
574-232-2091, FX 574-232-3979
-s,'s t%.n pw* SGiev— xWg-4- AP/
Prescribed by State Board of Accounts General Form No. 99P (Rev. 2009A)
GovernmentalUnit To.................................................................................... Dr.
THE ROBERT HENRY CORPORATION South Bend Tribune
635 S. Lafayette Blvd., Ste.138
............................................County, Indiana South Bend, Indiana 46601
Tax I D# #83-2810977
PUBLISHER'S CLAIM
LINE COUNT Ad #i'9'55140
Display Master (Must not exceed two actual lines, neither of which shall total more than foui.solid: lines of type
in which the body of the advertisement is set) -- number of equivalent ...................................
Head- Number of lines ...................................
Body -- Number of lines ...................................
Body -- Number of lines ...................... I ..... I......
Total number of lines in notice 10
COMPUTATION OF CHARGES
10 lines, 1 cplumris wide equals. 10 equivalent lines at 1.68 cants per line
Additional charges for notices containing rule or tabular work
(50 per cent of above amount) ...................................
Charge for extra proofs of publication
($1.00 for each proof in excess of two) .__...... $0 00...............
TOTAL AMOUNT OF CLAIM $16.80
DATA FOR COMPUTING COST
Width of single column in picas 9.4ems Size of 8 point
Number of Insertions 1
Pursuant to the provisions and penalties of IC 5-11-10-1, 1 hereby certify that the foregoing account is just
and correct, that the amount claimed is legally due, after allowing all just credits, and that no part of the same has
been paid.
I also certify that the printed matter attached hereto is a true copy, of the same column width and type size,
which was duly published in said paper 1 time(s). The dates of publication being as follows: ,
04108/21. Ji CHERYL JUNE MOREY
Notary Public - Seal
St Joseph County - State of Indiana
Commission Number 693302
7 i !i¢y Commission Expires Dec 21, 2024
Jane Morey. Notary Puyb�
-- Resident of St. Joseph Couni�
Alan Achkar, Executive Editor Commission Number: 693302
My Commission expires December 21, 2024
South Bend Tribune
635 S. Lafayette Blvd., Ste. 138
South Bend, IN 46601
ON ACCT OF APPROPRIATION FOR
$16.80
Appropriation No. Tax ID# 83-2810977
That it is duly authenticated as required by law.
That it is based upon statutory authority.
That it is apparently
correct
incorrect
ALLOWED I certify that the within claim is true and correct; that
IN THE SUM OF $16.80 the services there in itemized and for which charge is
made were ordered by me and were necessary to the
public business
es I . -
'*Woe- cooAp'-04
- _
File Message Help QI�Tell me what you .vant to do
raIgnore III F� `— e Meeting Move to, ? 3 To Manager
p�� P' Rules -
LJ
O �p
L�
(U
i "'
Q Find
/��t\
a
0 Team Email Done
IN OneNote
Related
/--1
Ill
v
Delete Archive Reply Reply Forward _
Junk - �0 More - �j Reply & Delete Create Nen
Move
Assi n Mark Cate orize
Follow
Read
Translate
Zoom Save Insights
All _
_ Actions
Policy - Unread -
y
U p -
j� Select -
Aloud
-
to FSI
Delete Respond Quick Steps r
Move
Tags
r
Editing
Speech
language
Zoom Foundation
FW: Invitation To Bid - REBID of South Bend Ignition Park EV Charging Park
John Callan
+D Reply *) ReplyAll Forward
To John Callan (icallan(proberthenrycorp.com)
Fri 4"gi2021 P::2 AM
Scc James Michalski; biddreOsbcglobal.net; Katy@dudeckroofing,ccm
`Y TRHC Invitationto Bid -REBID of 5B Ignition Park EV Charging Park4-6.pdf
18 K8
You are invited to submit a Bid for your portion of the work for the above referenced Project. Please seethe attached Invitation To Bid which contains Instructions for obtaining the Bid Documents for this Project. Kindly send your
request for the Bid Documents to BIdDocilimuest.rhcMgmall and you will receive a return email from our Van Nussbaum with links to download the Bid Dons at no cost. Please advise us If you area MBE or WBE. Kindly contact us
with any questions.
Thank you for your interest
John A. Callan, Project Manager
THE ROBERT HENRY CORPORATION
574-232-2091,FX 574-232-3979
�' ' ,- '„� ,rs CS h ii� ant 4 9.11 AM
f�,
THE R OBER T HENR Y CORPORA TION
Building and Utility Contractors
PART II — SECTION I — EXPERIENCE QUESTIONNAIRE
1. Please seethe attached "List of Projects" for projects our organization has completed for the
period of one (1) year.
2. Please seethe attached "List of Projects" for projects currently in process of construction by our
organization
3. Our organization has never failed to complete work awarded to us.
4. References from private firms for which you have performed work:
NAME
COMPANY
PHONE
Mr. Pat Kelly
Gurley Leep
(574) 272-2002
Mr. Steve Sewell
Siemens Healthcare
(346) 213-8149
Ms. Nicole Read
St. Joseph Regional Medical Center
(574) 335-3901
PART II — SECTION II — PLAN AND EQUIPMENT QUESTIONNAIRE
1. A detailed quantity survey has been made from the contract plans and specifications. Sufficient
manpower is available to begin work 10 days to 2 weeks after Notice of Award. We anticipate
completion per plans and specifications.
2. A list of subcontractors will be provided within 24 hours of Notice of Award.
3. A list of subcontractors will be provided within 24 hours of Notice of Award. It is not anticipated
that a bond will be required from subcontractors.
4. All required equipment will be provided for this project.
5. Yes
404 South Frances Street • P.O. Box 1407 • South Bend, Indiana 46624
www.roberthenrycorp.com • Tel. 574-232-2091 • Fax 574-232-3979
THE ROBERT HENRY CORPORATION
FINANCIAL REPORT
(Reviewed)
December 31, 2020 and 2019
Davis d Woj tysiak, LLC
-� CERTIFIED PUBLIC ACCOUNTANTS
INDEPENDENT ACCOUNTANTS' REVIEW REPORT
To the Board of Directors and Stockholders
The Robert Henry Corporation
South Bend, Indiana
We have reviewed the accompanying financial statements of The Robert Henry Corporation (an S
corporation), which comprise the balance sheets as of December 31, 2020 and 2019, and the related
statements of income and other comprehensive income, stockholders' equity and cash flows for the years
then ended, and the related notes to the financial statements. A review includes primarily applying
analytical procedures to management's financial data and making inquiries of Company management. A
review is substantially less in scope than an audit, the objective of which is the expression of an opinion
regarding the financial statements as a whole. Accordingly, we do not express such an opinion.
Management's Responsibility for the Financial Statements
Management is responsible for the preparation and fair presentation of the financial statements in
accordance with accounting principles generally accepted in the United States of America; this includes
the design, implementation, and maintenance of internal control relevant to the preparation and fair
presentation of the financial statements that are free from material misstatement whether due to fraud or
error.
Accountants' Responsibility
Our responsibility is to conduct the review engagement in accordance with Statements on Standards for
Accounting and Review Services promulgated by the Accounting and Review Services Committee of the
AICPA. Those standards require us to perform procedures to obtain limited assurance as a basis for
reporting whether we are aware of any material modifications that should be made to the financial
statements for them to be in accordance with accounting principles generally accepted in the United
States of America. We believe that the results of our procedures provide a reasonable basis for our
conclusion.
Accountants' Conclusion
Based on our reviews, we are not aware of any material modifications that should be made to the
accompanying financial statements in order for them to be in accordance with accounting principles
generally accepted in the United States of America.
Supplementary Information
The supplementary information included in the accompanying Schedules I and It and Comparative
Financial Statistics is presented for purposes of additional analysis and is not a required part of the basic
financial statements. Such information is the responsibility of management and was derived from, and
relates directly to, the underlying accounting and other records used to prepare the financial statements.
The supplementary information has been subjected to the review procedures applied in our review of the
basic financial statements. We are not aware of any material modifications that should be made to the
supplementary information. We have not audited the supplementary information and do not express an
opinion on such information.
r
.f�,,�, LLC
Davis & Wojtysiak, LLC
South Bend, Indiana
March 8, 2021
1.
1316 COUNTY-CrrY BUILDING f- / �, x PHONE 574/ 235-9251
227 W.JEFFERSON BOULEVARD u d Fax 574/235-9171
SOUTH BEND, INDIANA 46601-1830 w WACF. a , TDD 574/ 235-5567
1865 -_•
CITY OF Sotim BEND JAME'S MUELLER, MAYOR
BOARD OF PUBLIC WORKS
Date: Aril 9, 2021
To: All Planholders
From Anne Fuchs, Clerk, Board of Public Works
Subject Addendum Number: 1
Project Name: Ignition Park: EV Cha!ying Park
Project No.: 120-044R
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received: April 9, 2021
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company: The Robert Henry Corporation
A"t--4Authori
zed Signature:
Brian S. Henry, President
Date: April 9, 2021
Document A310TM - 2010
Conforms with The American Institute of Architects AIA Document 310
Bid Bond
CONTRACTOR: SURETY:
(Name, legal status and address) (Name, legal status and principal place of business)
The Robert Henry Corporation Fidelity and Deposit Company of Maryland
404 S Frances St, PO Box 1407 1299 Zurich Way, 5th Floor This document has important
South Bend, IN 46624-1407 Schaumburg, IL 60196-1056 legal consequences.
Consultation with an attorney is
Mailing Address for Notices encouraged with respect to its
OWNER' completion or modification.
(Name, legal status and address)
City of South Bend Any singular reference to
ty Contractor, Surety, Owner or
227 West Jefferson Boulevard other party shall be considered
South Bend, IN 46601 plural where applicable.
BOND AMOUNT: ***Five Percent (5%) of the Accompanying Bid`
PROJECT:
(Name, location or address, and Project number, if any)
REBID of South Bend Ignition Park EV Charging Park, Franklin at Garst Streets, South Bend, IN
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind
themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this
Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period
as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with
the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in
the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt
payment of labor and material funished in the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of
this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another
parry to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The
Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the
bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for
acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond
sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be
Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in
this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such
statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed
as a statutory bond and not as a common law bond.
Signed and sealed this 13th day of April
-(Ld'6-64-
(Witness)
(Witness)
, 2021
The Robert Henry Corporation
(Principal) (Seal)
('Title) &c-AA $.VjeAfk� 1 c iaeA+
Fidelit:, ,i nd Deposit Company of Maryland
(Surer
(Title) Carolyn J. 16honeir, ywin-Fact
a U'41P0QPog9mc�
- � AL -)
m
%may iem� QsO��c
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New
York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY
AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by
Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which
are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate,
constitute, and appoint, Vickie L. WOLCOTT, David A. LINTHICUM, Carolyn J. WAGGONER, Michael K.
CORCORAN, Stella M. MILLI, Pamela D. CHRISTIANSON and Tiffany T. WILLIAMS, all of Indianapolis, Indiana,
EACH, its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and
deed: any and all bonds and undertaldngs, and the execution of such bonds or undertakings in pursuance of these presents, shall be as
binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the
regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly
elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the
regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their
own proper persons.
The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of
the By -Laws of said Companies, and is now in force.
IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said
ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and
FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 11 th day of July, A.D. 2019.
ttas P
ZER-b
t: Sam
rAL
ATTEST:
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
By. Robert D. Murray
Vice President
By. Dawn E. Brown
Secretary
State of Maryland
County of Baltimore
On this 11 th day of July, A.D. 2019, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D.
Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally ]mown to be the individuals and officers described in and who
executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of
the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and
the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written.
�5
-
Constance A. Dunn, Notary Public
r,/k� �f�;.•
�
filed.
My Commission Expires: July 9, 2023
It
EXTRACT FROM BY-LAWS OF THE COMPANIES
"Article V, Section 8, Attom ,.s-in-Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President
may, by written instrument under the attested corporate seal, appoint attomeys-in-fact with authority to execute bonds, policies,
recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such
attomey-in-fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any
time."
CERTIFICATE
I, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN
CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the
foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of
the By -Laws of the Companies is still in force.
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998.
RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary
and the Seal of the Company may be affixed by facsimile on any Power of Attorney ... Any such Power or any certificate thereof bearing such
facsimile signature and seal shall be valid and binding on the Company."
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of
May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a
meeting duly called and held on the 1 Oth day of May, 1990.
RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature
of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a
certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect
as though manually affixed.
IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies,
this 13th day of April _ , 2021 .
Brian M. Hodges, Vice President
TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRIPTION
OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT
INFORMATION TO:
Zurich Surety Claims
1299 Zurich Way
Schaumburg, IL 60196-1056
ww
800-626-4577
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name Ignition Park: EV Charging Park
Project No. 120-044R
For Bids Due April 13, 2021 at 9:00am Local Time — electronic bids should be
submitted to b wbids southbendin. ov
Contractor Name: The Robert Henry Corporation
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section 11 acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 315t for the upcoming calendar year, or within twelve (12) months of obtaining pre -
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 01/13/2021 General Conditions - 6
POST BID SUBMISSIONS:
Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty
thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder and all subcontractors on a public works project are required to submit
certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis,
submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall
identify the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 01/13/2021 General Conditions - 7
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
(i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
(ii) X By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachments:
(i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) X Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
(iii) X List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
(iv) X For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
Version 01/13/2021 General Conditions - 8
II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) _ By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) _ By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachments:
(i) _
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
List identifying all former business names.
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
(iv) _
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v) _
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
(vi) _
For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
(vii) _
Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(viii) _
Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
Version 01/13/2021 General Conditions - 9
(ix) _ Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) _ List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date: April 13, 2021
(Sign Here) I
Brian S. Henry
(Print Name Here)
The Robert Henry Corporation
(Name of Company)
404 S. Frances St.
(Address of Company)
South Bend
(City)
Indiana
(State)
574-232-2091
(Telephone Number)
Version 01/13/2021 General Conditions -10
CITY OF SOUTH BEND JAWS MUELLER, MAYOR
DEPARTMENT OF PUBLIC WORKS
ERIC HORVATH, DIRECTOR
November 5, 2020
Mr. John Callan
The Robert Henry Corporation
j callanQrobertheMcorp. com
RE: Pre -Qualification Verification
Dear MT. Callan:
This letter serves as verification of Pre -Qualification status of your company for bidding with the
City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date
of this letter. Thereafter you are required to re -submit a complete application for continuation of
pre -qualification status prior to December 31 for the upcoming calendar year.
A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted
to the City of South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist
and attachments.
If you have any further questions regarding this matter, please call this office at (574) 235-9251.
Sincerely,
Liz Horvath, Permit Manager
BUSINESS INFORMATION f
CONNIE LAWSON
INDIANA SECRETARY OF STATE
M8/2021 10:50 AM
VIA
Business Name: THE ROBERT HENRY CORPORATION Business ID: 197408-008
Entity Type: Domestic For -Profit Corporation Business Status: Active
Creation Date: 08/0111974 Inactive Date:
Principal Office Address: U04 S Frances Street South Bend, IN, 46624, Expiration Date: Perpetual
Business Entity Report Due 08/31/2022
Jurisdiction of Formation: Indiana Date:
Years Due:
P
Title Name Address
President STEPHEN R HENRY 33055 LAKE FOREST COURT, Niles, MI, 49120, USA
A1;tuFlnCdrmst�� _ �_".�._.�. . s,, i �.a,. ;�� � i_---- -- - - • -
Type: Individual
Name: STEPHEN HENRY
Address: 404 S FRANCES ST, SOUTH BEND, IN, 46617 •- 0000, USA
THE R OBER T HENRY CORPORATION
Building and Utility Contractors
April 13, 2021
To whom it may concern:
Per the Pre -Qualified Bidder Checklist (b) (ii), The Robert Henry Corporation has the staffing
capabilities, including the labor resources, necessary to complete the project on time. We will
utilize workers from the local union hall or from our existing workforce.
Sincerely,
Brian S. Henry
President
404 South Frances Street • P.O. Box 1407 • South Bend, Indiana 46624
www.roberthenrycorp.com • Tel. 574-232-2091 • Fax 574-232-3979
0
The Robert Henry Corporation
List of Projects
Job # Cus mer Name Job Name Desc. Comer Epletion Date Contract Amount
217927
Citv Of South Bend
Newman Center Site Development
Mar-18
$ 339,830
217955
St. Joseph Regional Medical Center
MIC Renovations
A r-18
$ 268,748
217947
The Salvation Army
Kroc Center Bathroom Reno
Jul-18
$ 353,706
1018016
St. Joseph Regional Medical Center
SJRMC Podiatry
Au -18
$ 53,073
1018001
American Electric Power
Renovation Elec Laydown Yard
Sep-18
$ 74,359
217917
St. Jose h Regional Medical Center
SJRMC - Univ Park Fam Medicine
Se -18
$ 55,114
217943
The Redmond Company
UFCU - Ireland Rd. - So. Bend
Oct-18
$ 158,478
217945
The Redmond Company
UFCU - Mishawaka, In.
Nov-18
$ 165 442
1018021
Appalachian Power Company
Buchanan Dam Repair
Nov-18
$ 163,900
1018010
Gurley Leep Automotive Group
Gurley Leep Mercedes-Benz
Jan-19
$ 337,136
1018004
Gurley Leep Automotive Group
Gurley Leep Volkswagen
Jan-19
$ 794,884
1018029
Vic Trippel Plumbing & Heating
Demising Wall - UP Mall Suite
Feb-19
$ 66,817
1018038
Plymouth Veterinary Clinic, LI
Renovations to Plymouth Vet
Mar-19
$ 109,381
1018012
University Of Notre Dame
Melander, Warren Center & G1&2
May-19
$ 2,369,700
217939
Menards
Menards Elkhart Fixturin
Jun-19
$ 863,985
217932
School City Of Mishawaka
Mishawaka H.S. Retaining Wall
Jun-19
$ 405,864
1019018
Jacob Sonner
Sonner - Retaining Wail
Jul-19
$ 60,950
1018032
St. Joseph Reg! nal Medical Center
SJRMC Family Medicine Faculty
Jul-19
$ 342,332
1019022
Gurley Leee Automotive Group
Collision Center Renovations
Jul-19
$ 91,750
1018024
City Of South Bend
SB VPA Maint. Storage Building__Jul-19
$ 388,984
1019017
Siemens Healthcare Diagnostics
Siemens -Safety Equipment
Aug-19
$ 65,066
1018023
Hasse Construction Co, Inc
Molded Products - So. Bend
Oct-19
$ 520,519
1019002
The Redmond Company
UFCU Bremen Hwy. Mishawaka, In
Dec-19
$ 97,501
1019001
The Redmond Company
UFCU Toscana Blvd. Granger, In
Dec-19
$ 101,189
1019050
St. Joseph Regional Medical Center
Suite 130 Physicians Lounge
Dec-19
$ 54,579
217928
Giibane Building Company
Siemens NICP Project
Jan-20
$ 2,444,647
1019051
American Electric Power
Twin Branch Dam Stabilzation
Feb-20
$ 302,000
1019008
Lewis Cass Intermediate School
North Pointe Envelope Sys im r
Feb-20
$ 1,302 640
1019010
Siemens Healthcare Diagnostics
Siemens Healthineers- Novus 2
Apr-20
$ 724,100
1020002
St. Joseph Regional Medical Center
Plymouth IT Rooms Renovations
Apr-20
$ 129,045
1019003
Lighthouse Point Condo Assoc
Li hthouse Point Tower Repairs
Ma -20
$ 3,372,565
1019029
Siemens Healthcare Diagnostics
Siemens-OCG Laboratory
Mav-20
$ 1,194 119
1019054
Siemens Healthcare Diagnostics
Siemens Minicare-Pre-Const.
May-20
$ 28,543
1019023
Washington Square Development
Liberty Tower Exterior Renovat
Jun-20
$ 134,337
1019041
Town Of Shipshewana
Shipshewana Public Restroom
Jun-20
$ 544,500
1020005
Michiana Area Construction Ind
MACIAF Interior Renovations
Jun-20
$ 66,944
1019039
ME Excavating, Inc.
Mishawaka Ironworks - Phase i
Jul-20
$ 724,113
1020001
Siemens Healthcare Diagnostics
Siemens -Project Moose-Minicare
Jul-20
$ 1,659,902
1020019
Trinity Health
Wellness & Weight Management
Jan-211
$ 742,988
1019052
St. Joseph County Parks Fndn
River Ramble Natural Pla scape
In Pro ress
$ 209,380
1020006
City Of Mishawaka
Beutter Park Founder's Circle
In Progress
$ 151,165
1020007
City Of Mishawaka
Central Park Picnic Plaza
In Pro ress
$ 380,977
1020008
St. Joseph Countz Public Library
SJCPL Structural Site Concrete
In Progress
$ 1,198,103
1020013
Elkhart Plastics Inc.
Elkhart Plastics Site Concrete
In Progress
$ 82,490
1020014
Siemens Healthcare Diagnostics
Siemens Concrete Paving
In ProgressProgressl
$ 110,650
1020022
Jefferson Center Water Main
Jefferson Centre Assoc. LLC
In Pro ress
$ 113,451
10210011
Holy Cross Parkway LiftStation
HRP Construction Inc
In ProgressProgressl
$ 51,841
1021 05LIvy
Tech S. Bend Testin Center
Ivy Tech Community College
In ProgressProgressi
$ 85,600
INDIANA/KENTUCKY/OHIO REGIONAL COUNCIL OF CARPENTERS
JOINT APPRENTICESHIP AND TRAINING FUND
711 GREENWOOD SPRINGS DRIVE
GREENWOOD, IN 46143
ADMINISTRATION OFFICE
711 Greenwood Springs Drive
Greenwood, IN 46143
Phone:317-807-1112
Fax:317-807-1115
Ashland Camp
574 Carpenters Way
October 30, 2020
Grayson, KY 41143
Phone: 606-029-1362
Fax: 606-929-5319
Indianapolis Campus
To Whom It May Concern:
711 Greenwood Springs Drive
Greenwood, IN 46143
Phone:317-907-1116
Fax: 317-807-1131
Please allow this letter to serve as verification that the Robert Henry
Corporation has been a good standing contributor/participant with the
Lafayette Campus
2953 South Creasy Lane
Indiana/Kentucky/Ohio Regional Council of Carpenters Joint Apprenticeship
Lafayette, IN 47905
and Training Fund for at least 3 consecutive years and is thereby authorized to
Phone: 765-447-5959
Fax: 765-447-7676
employ our apprentices.
Louisville Campos
Our ro ams re iistered with the United States De artment of Labor, Office
p g p
1245 Durrett Lane
Louisville, KY 40213
of Apprenticeship ind Training, and is also approved by the U.S. Veterans
Phone: 502-366.8668
Administration to participate in the GI Education benefits program. Enclosed
Fax:502-366-8678
are copies of those certificates.
Merrillville Campus
1565 East Court
Please feel free to contact our office With any additional Questions, at 317-
I 46410
Merrillville, IN
Phone:219-947-3348
807-1112.
Fax:219-947-1889
Muncie Campus
sincerely,
4121 East Centennial Avenue
Muncie, IN47303
Phone: 765-288-9015
rA6-
Fax:765-288-9298
Jerry N. Burke
Newburgh Campus
5400 Covert Conn
Director of Education
Newburgh, IN47630
1KORCC JATF
Phone:812-853-9312
Fax-. 812433-9316
Tlerre Haute Campus
3099 South 611 Street
7lerre Haute, IN 47802
Phone: 812-466-7899
Fax: 812466-9840
Warsaw Campus
1095 Mariners Drive
Warsaw, IN 46582
Phone: 574-267-5264
Fax:574-269-1464
Mates �Hepsrtmenr
O
1*4&VIII,
)Bureau ufi19pprrntirmhip and Training
&MAW of Rotmtion.
CENTRAL INDIANA CARPENTERS JOINT APPRENTICESHIP COMMITTEE
INDIANAPOLIS , IWIIIANA
for the trade classifications of CARPENTER, FLOOR COVERER and MILLWRIGHT
RegislereoF as par! of h6ealional.�jvpretrlicesiip Yrayram
in accordance wAA foie bwk slaao(ardjr o1 a)Dren%rce rip
esfa6,&A"W 6y Ae cSecrefary o'G'Qgor
September 4, 1941
D,r Rev. August 23, 1989
0 4 0 0 4 1 1 --
m rmwl. k.
Plasterers' & Cement Masons' ° -
Apprenticeship Coordinator Local Union #N2 Phone: (219) 787-7767
1064
EmaA: bkrisW6plcrnlocal692.org
�s -
ioNh
To Whom it May Concern: October 22, 2020
This letter is to certify The Robert Henry Corporation is and has been a signatory
contractor with OPCMIA Local 692 and has participated in the Plasterers &
Cement Masons Apprenticeship Training Program for many years. The Robert
Henry Corporation, is a valued Contractor in good standing with Local 692 and the
1ATC. All our apprentices are registered with the United States Department of
Labor.
I may be reached at (219) 707-7767 if additional information is needed.
Further, our organization's program is approved by the U.S. Veterans
Administration to participate in -the GI Education Benefit Program.
Thank you,
Brian Kristoff
Apprentice Coordinator
Plasterers & Cement Masons
9200 Louisiana. Street - Merrillville, Indiana 46410
WWW-PLCML0CAL692.0RG _400-
INDIANA LABORERS' TRAINING TR UST FUND
David A. Frye
Secretary -?treasurer
Jerry J. Bolk
Chris L Guerrero
Ricky Henson, Jr.
Ramon Mendoza, Jr.
Robert S Wright
P.O. Boa 758 - Bedford, Indiana 47421
(912)279-9751
October 22, 2020
To Whom It May Concern:
Sean Coakley, Director
John A Brown
Chairman
Kelly Abel
Michael Ferrara
Stan Meyer
Nick Timmerman
Jim Wiseman
FAX: (812) 279-SW
Toll Free (800) 742-4086
This letter is to confirm that "Henry Robert Corp" is a signatory contractor in good standing with
the Indiana Laborers' Training Trust Fund.
The above mentioned company is a participant in the Joint Apprenticeship and Training
Committee through this Union and has been an active participant in good standing for each of the
past five plus consecutive years, and is currently eligible to use our apprentices on a project.
Further, our organization's program is approved by the U.S. Veterans Administration to
participate in the GI educational benefits program. A copy of our approval letters are attached
along with the collective bargaining agreement stating the ratios of Journey workers to
Apprentices; which is one (1) Apprentice for every five (5) Journey workers and thereafter may
not employ more that (1) Apprentice for every (3) Journey workers.
sincerely,
Pk—,
Sean Coakley,
Director
SC:ap
www.indianalaborerstraining.org
t7tat
AO
CSO
wart, u of -^;j;jren#icjezlqiVdal wrowing
Caffulcutt Of It4tatratin
INDIANA LABORER'S TRAINING TRUST FUND
BEDFORD, INDIANA
for the trade classification of CONSTRUCTION CRAFT LABORER
.Weyislereor as pail of lie Xalional 2,pprenlice vAo J royram
in accoro(ance wills Z6e 6asic slanoraro( of apprenlicesj�ip
es1a6hY.4eor 6y llie c3ecrelary o� , 'a6or
December 14, 1995
2616
IN040-0528
Megls u� oc.•
6