HomeMy WebLinkAboutOpening of Bids - 2021 Asphalt Materials Bid Proj No. 121-026 - Rieth Riley Construction,�; f1f1}pty.
CITY OF SOUTH BEND, INDIANA T 65
.Dya
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS.
Project Name 2021 Asphalt Material Bid
Project No. 121-026
For Bids Due April 13, 2021, 9:00 a.m., Local Time
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
X or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
X executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
X Certification of use of United States Steel Products or Foundry Products.
Proof of MWBE Utilization Plan [MWBE-1.0]. If minimum participation goal is not met, also
provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MWBE Contacted Form
[MWBE-2.1].
X Acknowledge Receipt of 1 Addendum(s) included with the bid.
X All required additional information is included with the bid.
X Proposal statements and other affidavits all signed by the proper party with name either
printed or typed underneath signature.
X This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relievethebidder of the need to read and comply with the specifications.
Bidder: Rieth-Riley Construction Co., Inc. Date: April 13, 2021
By Authorized Representative:
Signature: 1011— c.0
Print Name & Title'J. Eric
ional VP Northern Indiana
Version 01/13/2021 Contractor's Bid for Public Works - 1
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name 2021 Asphalt Material Bid
Project No. 121-026
For Bids Due April 13, 2021, 9:00 a.m., Local Time
PART
(Must be completed for all bids. Please type or print)
Date: April 13, 2021 Bidder (Firm): Rieth-Riley Construction Co., Inc.
Address: 25200 State Road 23
City/State/Zip: South Bend, In. 46614 Telephone Number: ( 574 ) 288-8321
Agent of Bidder (if Applicable): J. Eric Engleking
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
2021 Asphalt Material Bid Project No. 121-026
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
Scott Kreeger
nd dated n/a for the sum of (enter. the Total Bid as shown on the Proposal)
to NI�Ilinn ur�Cwn rP �neTir,o p� p
v2 ur r Y1pI ($
(Enter sum of Total Base B'd plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a wvze en#.
By
(si nature)
J. Eri , Regional VIP Northern Indiana
(Printed Name of Person Signing)
ACCEPTANCE
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Gary A. Gilot, Member
day of
Joseph R. Molnar, Member
Jordan V. Gathers, Member
Attest: Anne Fuchs, Clerk
20
Version 01/13/2021 Contractor's Bid for Public Works - 2
SEE ATTACHED 00FORM
PART 11 (Forprojectsof$10O,OOOnrmore _|C384_12_4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section eoneeded.
SECTION EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach m listing of public vvorhm projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION 11 PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach anexplanation ofyour plan orlayout for performing proposed work. (Examples could
include a narrative of when you could begin vvork, complete the project, number of workers,
etc. and any other information which you believe would enable the (|Uv of South Bend to
consider your b|d.\
2. Attach a listing of the names and addresses of all subcontractors (Le, persons or firms outside
your own firm who have performed part of the vvodd that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require o
bond. However, if you are unable to currently provide a UxUng' please understand a UuUnQ
must beprovided prior tocontract approval. Until the completion ofthe proposed project, you
are under continuing obligation to |nnnnad|ate|y notify the City ofSouth Bend in the event that
you subsequently determine that you will use asubcontractor onthe proposed project.
4.Attach elisting of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all nneteda|e vvh|oh substantiate the
prices used in pnapednQ your proposal? If not, attach on explanation for the rationale used
which would corroborate the prices listed.
SECTION III FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute ahoU thereby be rendered invalid. The financial
statement provided hereunder to the (]Ux of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version0/13/2021 Contractor's Bid for Public Works 'o
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Indiana )
St. Joseph SS;
COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor fiuther says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
Version 01/13/2021 Contractor's Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of employment, or any matter directly or indirectly related to employment because
of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual
orientation or disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to airMWBE;
however, they may not unlawfully discriminate against said MBE/WBE. A finding of noncompliance or a
discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one
(1) year from the date of such determination, and such determination may also be grounds for terminating
the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
may result in forfeiture of contractual payments.
Version 01/13/2021 Contractor's Bid for Public Works - 5
I hereby affinn under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 13th day of April , 2021
Rieth-Riley Construction Co., Inc.
Contractor )
Signal: tractor/Bidder or Its Agent
Eric Engleking, Regional VP Northern Indiana
Printed Name and Title
Subscribed and sworn to before me this 13th day of April , 20 21
My Commission Expires 4/18/23
County of Residence
Notary Public Dawn E. Armstrong
LaPorte
Version 01/13/2021 Contractor's Bid for Public Works - 6
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: 2021 Asphalt Material Bid
Project Number: 121-026
For Bids Due: April 13, 2021, 9:00 a.m., Local Time
Contractor Name: Rieth—Riley Construction Co., Inc.
RASF Rin - ARPHAI T MATFRIAI R
Item
No.
Description
Quantity
Unit
Unit Price
Total
A-1
HMA Surface Type B,
9.5mm, PG 64-28P
5000
TON
��, w
$ 0o
AWIDOD,
A-2
HMA Surface Type B,
9.5mm, PG 70-22P
17500
TON
6�.oc
00
$ (� r
I Vim'
A-3
HMA Binder 11
22500
TON
� Lo 16
$ 1,C)S1eq6 D0
r
A-4
HMA Base 5D
3000
TON
��� cc)
$ I ®S VCO, co
A-5
CMA Patch AE-300P
500
TON
11 ®®
I
$ `� �O� q OD
�
A-6
High Performance Cold Mix
150
EA
DO
$ 1 DO
A-7
Driver and Truck
600
PER HR
$ D� Y
TOTAL
00
$
Bidder (Firm):
Rieth-Riley Construction Co., Inc.
Address: 25200 State Road 23
City/State/Zip: South Bend, In. Telephone Number: ( 574) 288-8321
46614—
Y
(Signature)
r--
(Printed Name of Person Signing
Version 01/13/2021 Contractor's Bid for Public Works - 7
No. 1282
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
Hartford, Connecticut 06183
KNOW ALL MEN BY THESE PRESENTS,
That we, RIETH-BILEY QQNSTRUCIlObi QQ.. INC. as Principal, hereinafter called
the Principal, and TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, of Hartford, Connecticut, a
corporation duly organized under the laws of the State of Connecticut, as Surety, hereinafter called the Surety, are held
and firmly bound unto City of South Bend, Indiana
as Obligee, hereinafter called the Obligee, in the sum of
Five Percent (50) of total bid Dollars
5% of bid ), for the payment of which sum well and truly to be made, the said Principal and the said
Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these
presents.
WHEREAS, the Principal has submitted a bid for 2021 Asphalt Materials
Project No. 121-026
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with
the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or
Contract Documents with good and sufficient surety for the faithful performance of such, or in the event of the failure of
the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference
not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee
may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null
and void, otherwise to remain in full force and effect.
Signed and sealed this 13th day of April
2021
RIETH-RIL CTION CO., INC.
Witness Deen E. Armstr(Ag (Principal} (Sea[)
T
J. 0-'Agi%king, Regional VP Northern
Indiana
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
Witnirs C Christopher T. Moser
Sandra M. Nowak, Attorney -in -Fact
Travelers Casualty and Surety Company of America
Travelers Casualty and Surety Company
TRAVELERS J St. Paul Fire and Marine Insurance Company
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St.
Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the
"Companies"), and that the Companies do hereby make, constitute and appoint Sandra M. Nowak of Chicago
Illinois , their true and lawful Attorney -in -Fact to sign, execute, seal and acknowledge any and all bonds, recognizances,
conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the
fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any
actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 3rd day of February,
2017.
� �[Y Aye
tom.CONN.' XX
-W
State of Connecticut
City of Hartford ss.
M
By:
Robert L. Raney, Se for Vice President
On this the 3rd day of February, 2017, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of
Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, and
that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations
by himself as a duly authorized officer.
In Witness Whereof, I hereunto set my hand and official seal.
My Commission expires the 30th day of June, 2021
Marie C. Tetreault, Notary Public
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and
Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, which resolutions are now in
full force and effect, reading as follows:
RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any
Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and
Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with
the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a
bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke
the power given him or her; and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice
President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation
is in writing and a copy thereof is filed in the office of the Secretary; and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional
undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior
Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant
Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by
one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more
Company officers pursuant to a written delegation of authority; and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice
President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power
of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only
of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing
such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile
signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached.
I, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety
Company, and St. Paul Fire and Marine Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of the Power of
Attorney executed by said Companie , which remains in full force and effect.
Dated this 12 day of l�lp , 'P�
tiM►S�AET O� T� OVA sG
HARTFiSf3D, a HARTFORD,
�CONN.
Kevin E. Hughes, Assistant Secretary
To verify the autbenficity of this Power of Attorney, please call us at 1-800-421-3880.
Please refer to the above- amed Attorney -in -Fact and the details of the bond to which the power is attached.
CONTRACTOR'S BID FOR PUBLIC WORK - FORM 96
N; �a State Form 52414 (R2 / 2-13) / Form 96 (Revised 2013)
Prescribed by State Board of Accounts
.T :
.�.
PART I
(To be completed for all bids. Please type or print)
Date (month, day, year): April 13, 2021
1. Governmental Unit (Owner): City of South Bend, Indiana
2. County: St. Joseph
3. Bidder (Firm): Rieth-Riley Construction Co., Inc.
Address: 25200 State Road 23
City/State/ZlPcode: South Bend, IN 46614
4. Telephone Number: 574-288-8321
5. Agent of Bidder (if applicable): J. Eric Engleking
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete
the public works project of 2021 Asphalt Material Bid Project No. 121-026
(Governmental Unit) in accordance with plans and specifications prepared by Scott Kreeger
see itemized proposal
and dated n/a for the sum of
$ see itemized proposal
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the
notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the
notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as
that shown in the original contract if accepted by the governmental unit. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a separate attachment.
The contractor and his subcontractors, if any, shall not discriminate against or intimidate any employee,
or applicant for employment, to be employed in the performance of this contract, with respect to any matter
directly or indirectly related to employment because of race, religion, color, sex, national origin or ancestry.
Breach of this covenant may be regarded as a material breach of the contract.
CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS
(If applicable)
I, the undersigned bidder or agent as a contractor on a public works project, understand my statutory
obligation to use steel products made in the United States (I.C. 5-16-8-2). 1 hereby certify that I and all
subcontractors employed by me for this project will use U.S. steel products on this project if awarded. I
understand that violations hereunder may result in forfeiture of contractual payments.
The above bid is accepted this
following conditions:
Contracting Authority Members:
ACCEPTANCE
day of
PART II
(For projects of $150, 000 or more — /C 36-1-12-4)
Governmental Unit: City of South Bend, Indiana
Bidder (Firm)
Rieth-Riley Construction Co., Inc.
Date (month, day, year)
April 13, 2021
, subject to the
These statements to be submitted under oath by each bidder with and as a part of his bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
What public works projects has your organization completed for the period of one (1) year prior to the
date of the current bid?
Contract Amount
Class of Work
Completion
Date
Name and Address of Owner
4,067,386.00
HVY HWY
2020
INDOT, Indianapolis, IN
2,057,783.00
HVY HWY
2020
INDOT, Indianapolis, IN
1,825,000.00
HVY HWY
2020
INDOT, Indianapolis, IN
4,089,000.00
HVY HWY
2020
INDOT, Indianapolis, IN
2. What public works projects are now in process of construction by your organization?
Contract Amount
Class of Work
Expected
Completion
Date
Name and Address of Owner
9,467,606.00
HVY HWY
2021
Douglas Rd, South Bend, IN
16,312,999.00
HVY HWY
2021
U.S. 31, South Bend, IN
4,940,623.00
HVY HWY
2021
1 Elkhart County
12,285,464.00
HVY HWY
2021
SB Regional Airport, South Bend, IN
3. Have you ever failed to complete any work awarded to you? No If so, where and why?
4. List references from private firms for which you have performed work.
AM General - Mishawaka, IN 574-284-2728
Navistar - South Bend, IN 574-654-2400
ITR Concessons LLC 574-674-5836
University of Notre Dame 574-631-7356
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Explain your plan or layout for performing proposed work. (Examples could include a narrative of when
you could begin work, complete the project, number of workers, etc. and any other information which you
believe would enable the governmental unit to consider your bid.)
"According to plan specifications"
2. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm
who have performed part of the work) that you have used on public works projects during the past five (5)
years along with a brief description of the work done by each subcontractor.
Roadsafe Traffic Systems - 3519 Harding St., Indianapolis, IN Traffic Maint/Markings
V&R Trucking - 1845 North Elmer Street, South Bend, IN Trucking
Hawk Enterprises - 1850 E North St., Crown Point, IN Electrical/Signage
Slussers Green Thumb - PO Box 33, Logansport, IN Landscaping/Erosion Control
C-Tech Corporation - 5300 W. 100 North, Boggstown, IN Guard rail/Fencing
3. If you intend to sublet any portion of the work, state the name and address of each subcontractor,
equipment to be used by the subcontractor, and whether you will require a bond. However, if you are
unable to currently provide a listing, please understand a listing must be provided prior to contract
approval. Until the completion of the proposed project, you are under a continuing obligation to
immediately notify the governmental unit in the event that you subsequently determine that you will use a
subcontractor on the proposed project.
"Subcontractor list will be provided upon award"
4. What equipment do you have available to use for the proposed project? Any equipment to be used by
subcontractors may also be required to be listed by the governmental unit.
"As required"
5. Have you entered into contracts or received offers for all materials which substantiate the prices used in
preparing your proposal? If not, please explain the rationale used which would corroborate the prices
listed.
"As necessary"
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial
statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to
the governing body awarding the contract must be specific enough in detail so that said governing body can make
a proper determination of the bidder's capability for completing the project if awarded.
SECTION IV CONTRACTOR'S NON — COLLUSION AFFIDAVIT
The undersigned bidder or agent, being duly sworn on oath, says that he has not, nor has any other
member, representative, or agent of the firm, company, corporation or partnership represented by him, entered
into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such
letting nor to prevent any person from bidding nor to include anyone to refrain from bidding, and that this bid is
made without reference to any other bid and without any agreement, understanding or combination with any other
person in reference to such bidding.
He further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale.
SECTION V OATH AND AFFIRMATION
I HEREBY AFFIRM UNDER THE PENALTIES FOR PERJURY THAT THE FACTS AND INFORMATION
CONTAINED IN THE FOREGOING BID FOR PUBLIC WORKS ARE TRUE AND CORRECT.
Dated at South Bend, IN this 13th
day of April , 2021
Rieth-Riley Con�,q- o., Inc.
of Oi
Eric E�king, Regional Vice President Northern Indiana
(Title of Person Signing)
ACKNOWLEDGEMENT
STATE OF INDIANA
COUNTY OF St. Joseph ss
}
Before me, a Notary Public, personally appeared the above -named
J. Eric Engleking and
swore that the statements contained in the foregoing document are true and correct.
Subscribed and sworn to before me this 13th day of April 2021
Notary Pubric
My Commission Expires: 4/18/23
County of Residence: LaPorte
®! o
♦ `gATEd�°°s DAWN E. ARMSTRONC
NorAR�: :Notary Public, State of Indiana
LaPorte
ate. ;*c
�. SEAL ,. =
County
Commission # 665596
MY Commission Expires
April 18, 2023
Part of State Form 52414 (R2 / 2-13) / Form 96 (Revised 2013)
i
Rieth-Riley Construction Co., Inc.
(Contractor)
25200 State Road 23
(Address)
South Bend, IN 46614
FOR
PUBLIC WORKS PROJECTS
OF
City of South Bend, Indiana
2021 Asphalt Material Bid
Project No. 121-026
Filed March 13 2021
Action taken
1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/ 235-9251
FAx 574/ 235-9171
TDD 574/ 235-5567
CITY OF SOUTH BEND TAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
Date: April 7, 2021
To: All Planholders
From Anne Fuchs, Clerk, Board of Public Works
Subject Addendum Number: 1
Project Name: 2021 Asphalt Material Bid
Project No.: 121-026
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received:
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum by
faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company: (� . �/li
YZ�'1 c..
Authorized Signature:
Date: y /O /2/
r.nN-QTn'nr.TinN
100 % Quality
100% Employee Owned • Over 100 Years
CERTIFICATE OF AUTHORITY
KNOW ALL MEN BY THESE PRESENTS, that the undersigned President of Rieth-Riley Construction Co., Inc., a corporation duly organized and existing
under the laws of the State of Indiana, hereby represents and confirms that J. Eric Engleking, Regional VP Northern IN, has full power and authority to
make, execute, seal, if required by law, and deliver for and on its behalf, and as its act and deed any and all bids, proposals or contracts, said bids,
proposals or contracts not to exceed $10,000,000.00which bids, proposals or contracts call for work, services, or materials to be furnished by Rieth-Riley
Construction Co., Inc., whether such bids, proposals or contracts are being submitted to an individual or entity, public or private, and to bind Rieth-Riley
Construction Co., Inc. thereby as fully and to the same extent as if such bids, proposals or contracts were signed by an Executive Officer of Rieth-Riley
Construction Co., Inc., and sealed, if required by law, and attested by one of such officers, and hereby ratifies and confirms all that the above named
designee may do in pursuance hereof.
The authority granted to the above named designee is pursuant to Section 6.03 of the Restated By -Laws of Rieth-Riley Construction Co., Inc., as amended;
which Restated By -Laws were effective February 9, 2010, and which Restated By -Laws, as amended, and the authority granted to the above named
designee continue in full force and effect.
This Certificate of Authority is issued, signed. and sealed, if required by law, by facsimile under and by authority of the following standing resolutions
adopted by the Board of Directors of Rieth-Riley Construction Co., Inc., at a meeting held on the 16th day of February, 1996, at which a quorum was
present, and which resolutions have not been amended or repealed and continue in full force and effect:
"Resolved that for purposes of clarification and in furtherance of the intent of Section 6.03 of the By -Laws of the Company the authority
granted in Section 6.03 shall extend to the making, execution, sealing, if required by law, and delivery on behalf of the Company of
all documents required as part of any bid, proposal or contract, which is for work, services or materials to be furnished by Company
and which is being submitted to an individual or entity, public or private."
"Resolved that in carrying out the provisions of Section 6.03 of the By -Laws of the Company the signatures of such directors and
officers and, if required by law, the seal of the Company may be affixed to any such Certificate of Authority or any certificate relating
thereto by facsimile, and any such Certificate of Authority or certificate bearing such facsimile signatures or facsimile seal shall be
valid and binding upon the Company and any such Certificate of Authority so executed and certified by facsimile signature and
facsimile seal shall be valid and binding upon the Company, with respect to any bid, proposal or contract to which it is attached."
IN WITNESS WHEREOF, Rieth-Riley Construction Co., Inc., has caused these presents to be signed by its President and its corporate seal to be hereto
affixed, this 8th day of June, 2018.
C-04snw�
RIETH-RILEY CONSTRUCTION CO., INC.
SEAL
A. Keith Rose, President
STATE OF INDIANA )
)SS:
COUNTY OF ELKHART )
On this 81th day of June, 2018, before me personally came A. Keith Rose, to me known, who, being by me sworn, did depose and say: that he is President
of Rieth-Riley Construction Co., Inc., the corporation described in and which executed the above instrument; that he knows the seal of said corporation;
that the seal affixed to the said instrument is such corporate seal; and that he executed the said instrument on behalf of the corporation by authority of his
office pursuant to corporation's Restated By -Laws and standing resolutions.
My Commission Expires: March 16, 2024tYPU�
Z SEAL n ��.
IA Ronya Phillips, Notary Public
Residing in Elkhart County, Indiana
I, Robert L. Konopinski, do hereby certify that I am the duly appointed and acting Secretary of Rieth-Riley Construction Co., Inc., a corporation duly
organized, validly existing and in good standing under the laws of the State of Indiana; that the foregoing Certificate of Authority has neither been amended
or rescinded and remains in full force and effect; and furthermore, that the Restated By -Laws and standing resolutions of the corporation, as referred to
and set forth in this Certificate of Authority, continue in full force and effect.
i d Ind Sealed at th orporate Office of Rieth-Riley Construction Co., Inc., in the City of Goshen, State of Indiana. Dated this) day of
C , 20
�(,
EAL t Robert L. Konopinski, Secretary
P.O. Box 477.3626 Elkhart Rd. • Goshen, iN 46527 Phone: (574) 875-5183 - www.rieth-riley.com
CERTIFICATE OF QUALIFICATION
to provide
CONSTRUCTION SERVICES
for
PUBLIC WORKS PROJECTS
to the
STATE OF INDIANA =
This Certification Board, having duly considered application for qualification in terms of apparent experience and financial
resources; and under the applicable Indiana Code 4-13.6-4 and adopted rules of this Board, hereby issues a
Certificate of Qualification to provide construction services to the State of Indiana for Public Works Projects to;
R1ETH RILEY CONSTRUCTION CO INC
3626 ELKHART RD
PO BOX.477
GOSHEN IN 46527-0477
Phone 574-875-5183
Fax 574-875-8405
Company Official
KEITH ROSE
for the twenty-seven month period stated -herein, unless revoked by this Board for cause,
and in the classifications of services stated below. This certificate supersedes any previous certificate.
1611.01 Concrete Construction of Roads & Curbing
1611.02 Asphalt Construction of Roads and Parking Lots
1622.01 Gen Contr-brdgs,vdcts,elvd hwys,rlwy,tnls
1623.03 Sewers and/or Water Lines
1794.01 Earthmoving and Land Clearing
1794.02 Excavation
1795.02 Demolition of Pavements and Roads
CERTIFICATION DATE 2/24/2020 EXPIRATION DATE 5/24/2022
THIS CERTIFICATE ISSUED BY THE STATE OF INDIANA, PUBLIC WORKS DIVISION CERTIFICATION BOARD,
402 WEST WASHINGTON STREET, ROOM W467, INDIANAPOLIS, INDIANA46204,
ALSO ACTS AS THE OFFICIAL NOTICE OF EXPIRATION.
Tracy L. Cross, Executive Secretary
Certification Board
DAPW PQ2 State Form 3983R Rev. 07/06
NOTE: Rieth-Riley is currently in the process of prequalification renewal. New certificate can be furnished when received from INDOT.
larrtYfuttte of (�uttlifutttiutc
is.su
,J+n�ittattt 0r{raut�ttrait
INDIANAAOLIS, IN .0ct6er 23,:269
TO
FJETF1 RILEY CQNSTRVCTIQN.
-
6084EN * '
. . JN
h8s'A*ed_-Wifh1h8 Opparlimprit-8 -C"ontraclor'SSfeiterhont of &p'brl e "d .. Financial Coffditioo'as
...q.QQ :arid Ir
is 'afiff na u fed to. bid t anyDepartmeni of fransporta
[0.1og in,'. Classes of Work and Within1ho- classification
mffOtion� f Obbh
as listed
bel6W, fprp.�id as- h:': - "O"o-mPl,e..Od. Wor bh hand sources es not exceed the Aggregate
n peri 'd' t P u*n'*' ik froffi all u 6 `--do'
rc
amount, Clqsslfi.q�*Tio ou - '
tr t6.� Statement i:0fer.en.q0Si �y.nqme. of sym,b6'1 are in accordance
Wth'the 'd6finitio*n8 in n .
dh s n Firidncia .. o'n tio s ..c.e'ftipfi.cnac'.tpo'-supersedes.any certificate
.0
6f Ek�&16 tj ai, ri. Tl�!
prevlouslylssuod,- but is subject to revision or'r'pvpdatibn. according to tlleki\�Afa d wh
en men.dhbhge�s
'inthe. -fi.hiancial :hditibn. th6'6*bhtra.6ti
QQ contracting firpi -or--6thbr'fac6'j`d'8tifj such tevis[ on or revocation,
Valid August 27,.2019 11ird Afly 3L 2020
AGGREGATE * ...... ............ ........ ........ ........ t .. ....... . ..... S MLIMITEb
-CLFAN/SEAL-CRAC.KS/J`OINTS:.PCCP/ifiNAA'PVIvIT ....... ................................ .................................. 110,00-6,00
................. ....... ..... .. 1 ............................. I .....................
ED
-.0) 0 SEWER: AND. PIPE CLEANING AND LJNN6 ..................... ........
............ ..................... ......... ............00
3 ROL 'iV A IOVAL .. .........
.0 .18 TRAFFIC"CONT -:SNOW 6-ND. ICE RE&' ...... $10,000,000
'0319 0 'UNDERSEAL.
...... ......
............... .......
A! Q,000 000
-A(A) 00I� g4TE PAVEMENT: GENERAL
..........
....... ...... WNLII�jn
Eta
B�(A) MP� t PVKt.`W/NDOT CEATIF!Eb':RvL A
HAL. _PLAN ............. ................ .......... A$ UN-1,11MITED
C(A) :HEAVY GRADING ..................
................ ...... .......................
TED
D(A) HIGI-AVAY OR RAILROAD BRIDGE OVER WATER-,; ........... ............ ..; .............................. ....
SURL1214ITED
D(B) HIGHWAY OR RAILAPAO BRIDGE OVER MG]J-WAY ....... .........................................
D(C) MlY iQR OT�C
R1KAC*Pk -tN .........................................
................ ................. $UMWITED
6VPRLAYBc k1TNOkBRIDGE REPAIR ................... ; ............ ......... .............. t10,000;000
E(E) 'SNIALL STRUCTURES AND.I)RA1NAGE.1TE.Iv1s,.. .... ...... ...... ...... ..... $10004,060
E(F) SURFACE. MASONRY AND M[SC CONCRETE ... ...
. ..
................................................................................ E(F) PEEP SEWER: AND/OR EXCAVATION .......... ...........................................
. $UNLalrrED
..........
E(R) AS.Pl4ALt'PAVENIEi4iMiLLING......,
......... I ...... 6 ........................................ ....................... ; ........ WNLIMITED
E(T) DEMOLITION............................................................
. -_LR%\MINf1TED
...... ...... .................. $
State Form 20508 (R315-05)
October 16, 2020
CERTIFIED HOT MIX ASPHALT PRODUCERS
Specification Reference: 401, 402 & 410 SM Producer/Supplier Type: Certified HMA
Producer
ITM 583 SM Material Code: 401M34500 to 41OM34600
Source Producer Name
Code Location Comments
3334 NIBLOCK EXCAVATING INC
BRISTOL, IN
3296 NIBLOCK EXCAVATING INC
KIMMEL, IN
3546 DAVE O'MARA CONTRACTORS INC
BRAZIL , - IN
3393 DAVE O'MARA CONTRACTORS INC
FLATROCK, IN
3377 DAVE O'MARA CONTRACTORS INC
HAYDEN, IN ---------------------------------------- A
3192 DAVE O'MARA CONTRACTORS INC
LEXINGTON, IN
3344 DAVE O'MARA CONTRACTORS INC
NEW POINT, IN
3326 DAVE O'MARA CONTRACTORS INC
VERSA.ILLES, IN
3402 OWENSBORO PAVING (I)
OWENSBORO, KY - (PLANT #1)---------------------------A
3533 OWENSBORO PAVING (1)
OWENSBORO, KY - (PLANT #2)
3137 PHEND & BROWN INC
DISKO, IN --------------------------------------------A
3171 PHEND & BROWN INC
LEESBURG, IN -----------------------------------------A
3395 RIETH-RILEY CONSTRUCTION CO INC
DANVILLE , IN
3173 RIETH-RILEY CONSTRUCTION CO INC
ELKHART, IN ------------------------------------------A
3353 RIETH-RILEY CONSTRUCTION CO INC
GARY, IN ---------------------------------------------A
3330 RIETH-RILEY CONSTRUCTION CO INC
INDIANAPOLIS , IN - KY AVE "B"------------------------A
5 of
Comments
A = Water Inj ection System Installed
B = In -Line Blending System Installed
October 16, 2020
CERTIFIED HOT MIX ASPHALT PRODUCERS
Specification Reference: 401, 402 & 410 SM Producer/Supplier Type: Certified HMA
Producer
ITM *583 SM Material Code: 401M34500 to 41OM34600
Source Producer Name
Code Location Comments
3184 RIETH-RILEY CONSTRUCTION ..CO INC
INDIANAPOLIS, IN - KY AVE "A"
3316 RIETH-RILEY CONSTRUCTION CO INC
INDIANAPOLIS, IN - 96TH ST---------------------------A
3386 RIETH-RILEY CONSTRUCTION CO INC
LAFAYETTE, IN ----------------------------------------A
3365 RIETH-RILEY CONSTRUCTION CO INC
LAPORTE, IN ------=------------------------------------A
3300 RIETH-RILEY CONSTRUCTION CO INC
NOBLESVILLE, IN - (RIVER AVE)------------------------A
3290 RIETH-RILEY CONSTRUCTION CO INC
SOUTH BEND, IN --------------------------------------A
3379 RIETH-RILEY CONSTRUCTION CO INC
VALPARAISO, IN ---------------------------------------A
3511 RIETH-RILEY CONSTRUCTION CO INC
WINAMAC, IN
3378 JH RUDOLPH & CO INC
ENGLISH, IN -------------------------------------------A
3308 JH RUDOLPH & CO INC
EVANSVILLE , IN
3288 TEMPLE & TEMPLE PAVING
SALEM, IN
3154
TRI-COUNTY ASPHALT
OTWELL , IN
3534
VALLEY ASPHALT CORP
CLEVES , OH
3510
VALLEY ASPHALT CORP (I)
ROSS,` OH
3392
WABASH VALLEY ASPHALT CO INC
CLOVERDALE , IN
3350 WABASH VALLEY ASPHALT CO INC
TERRE. HAUTE, IN --------------------------------------A
6of7
Comments
A = Water Inj eefion System Installed
B = In -Lune Blending System Installed
1
1865
OTY of Sow BEND JAw,s MuELxy, MAYOR
DEPARTMENT OF [aC WORKS
ERtc Ho vA
November 23, 2020
Ms. Dawn Armstrong
Rieth-Riley Construction Co., Inc.
dannstrong@rieth-riley: com
RE: Pre -Qualification Verification
Dear Ms. Armstrong:
This letter serves as verification of Pre -Qualification status of your company for bidding with the
City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date
of this letter. Thereafter you are required to re -submit a complete application for continuation of
pre -qualification status prior to December 31 for the upcoming calendar year.
A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted
to the City of South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist
and attachments.
If you have any further questions regarding this matter, please call this office at (574) 235-9251.
Sincerely,
Liz Horvath, Permit Manager
Entity Type: Domestic For -Profit Corporation Business Status: Active
Creation Date: 08/08/1952 Inactive Date:
Principal Office Address: 3626 Elkhart Road, POST OFFICE BOX Expiration Date: Perpetual
477, GOSHEN, IN, 46527 - 0477, USA
Jurisdiction of Formation: Indiana
Business Entity Report Due 08/31/2020
Date:
Years Due:
RA
Title
Name
Address
Vice President
BRIAN A. INNIGER
3626 ELKHAR ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA
Director
RONALD G. POPE
1124 BARON. DRIVE, MYRTLE BEACH, SC, 29577, USA
Vice President
Eugene E. Yarkie
3626 Elkhart Road, Goshen, IN, 46527 - 0477, USA
Vice President
Paul J. Tate
1751 W. Minnesota Street, Indianapolis, IN, 46221, USA
Director
Robert L. McConnick
3205 Wakefield Drive, Goshen, IN, 46528, USA
Director
WILLIAM P. JOHNSON
6310 TRUSDALE AVENUE, SYRACUSE, IN, 46567, USA
Director
Jack K. Matthys
57457 Pine Road, South Bend, IN, 46619, USA
Director
William J. Schmuhl, Jr.
1421 Honan Drive, South Bend, IN, 46614, USA
President
A. KEITH ROSE
3626 ELKHART ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA
Secretary
ROBERT L. KONOPINSKI
3626 ELKHART ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA
Type: Individual
Name: ROBERT L. KONOPINSKI
Address: 3626 ELKHART RD., GOSHEN, IN, 46526, USA
oNs-T.RucTioN,..Ca,.,. lNc,,
'i00/' Quality • y00°!a Emp(ayee Owned � fiver 1pD Years
r
0
Cr
Cement Masons
(D
rt
--I
N
c/)
N
O
(D
0
O
o
D
o
0
o
Wrn
r
-h
w
(D
n
0)w
n
v
UO
O
v
�
0
0)
co
" O
v�N
�-
N
>
rno
�
•11rn^
C
N
CO
N
(D
N
NO
_
O
p
O
�
D
*
oDD
DDD
CD
r
rn(0
(
(
nD
j'
W
0
N)
a)
nN
90-
0)
D
0
00
00
Can
0
rn
0
00
U1
0
P
0
P
o
P
a
W
o
W
0
07
0
CY)
0
O
0
0)
0
C)
0
.IA
(n
O
O
O
O
O
O
O
O
O
O
O
O
>D
\
\
\
m
00
00
00
-4
N
00
0o
Cn
cn
M
(31
CO
O
\
O
\
O
1
O
w
O
Ln
O
cn
O
cn
0
0-1
0
w
0
cn
O
cn
O
co
m
D
w
w
w
\
w
\
w
\
w
\
W
\
w
\
w
\
w
\
W
\
w
D °
\
N
Np
m
m
Z
w
w
w
N
1J
w
w
OD
00
00
00
..�
C�
Z
;u �p
Z
Z
Z
Z_
W
D
((DD
D
(n
C�
D
= (D
=��
(D
n
D
D?�
D
D
D
D
z
-
z
z
-<
n x
cn
cn
0
0
0
rn-
�,
R,
�,
o
,
i
y
rn
Cl)
0 0
_I �- = 0 Co 2
N O Sv
r `c' D
N
to
'�'
oo
0 U)
c- r
v v
o0
0o
W
Z r-
W
Cn
"a(rtD
"p
(D U (D
(D O- N n w
v,
O �_ �'
(rtD
c
O �
. 0
(D
Q
C
C
Q
(D
(D
rt
(n
n O O 00 O
CD n S31
C
'=� (n
_L
C
C
O
n
C 0�� (D Q
N O rt
'_v
fl.cc
(On (D
-a
90 0
(D
co
(a
C O
90
O.
m
V
o
o _ _
(D = =
O �,
cD
Z (D
C- ((DD
cD
o
<
c�
(D 0
-� �M =r
-++
rN
=
O
�r
-a r
(D
Q
o
�'
(D
(D
_
m
o m v
-0
?
o cD
C o
m z
v
D
o (n Q
cc)
=O
c
-uU
"�
o
�-I
C
��
Q
E a
�
O
��
(n�
�
O Sp
mm
o
�sv 2� C��
flQi�
E�
in'
s `< o' �_ D
v -0
-�
0 Z
-v
(on
90
(n �� O (D
�
p C
N
c (D
C
r+
�
_
(n E3
Ort
O
�_
_
C
CN C O
�3
go (D
T
C
�
C7
`G
m
O C- (D
a w c._,
,C,
w
r
(D
(D S 3 w 0 a
_
cD
Cl)
r+
(D
N
0perating Engineers
L
O
z
O
N
n
s
W
O
'-'
O
n
O
n
0)v
c
O'
n
EY
00
Or
O
v
O.
:3
CTi
3
O
CD
O
0)
C)
O
�
C)
CD
'J
C)
O
00
,1)
O
00
C)
O
'J
O
O
O
O
O
P
O^^
O
N
O^
O
O^^
O
O
O
O
O
O
O
C)
O
O
O
CO3�
C)
W
C)W
C)
C)
W
W
W
W
W
W
W
W
W
W
W
W
W
t�
N
N
N
N
N
W
N
W
N
N
N
N
11
N
N
N
N
K-)
N
-J
N
N
D
0)
n
(DD
n
D
D
�Q
D
CD
co
CD
CDo
CD
oo
m
-7o
D
-1
O
nr r- r-tn DO r+5-°E7'_ `�U)pc'-nn=-a•►� = s) = Z�j D z;� �4 c-�
�,
_ � "afD o o n e c °o �' W�nn ncn n cn C
(D (D a <O (D CD O (D O�rt CDX go (D 90 CD
0 D 0� D CDCO�L-� _ CD � ocon� ET v�o _a.
CCD Q (D o �• c" CD x _ C- cD cr �' cn r- -a cn
CD 04 _ _Cl) o � v N
n � � " 2) � _o � G) � � �_ c o _2 m Cn � m r �
N 3 1 90 �• (Q N CD (D can CD ;� � N• (D v r (Q W (a CD
O ((nn = (D < v a Co 0)" O cr E G S v CDCD (D
0 (n �• 2) -1 Q 00 Q O O �• ?o Ql �G O (D TI O
o � Inc' cn cD = r O Cl) .. c T
90 x mow v--���� r ovv w CDzC-
CD a
c o 0 CD v O r"' Opt rn 90
CD �- o cCDn c� o o o �; O S?� -�
Q (D (D (n h O cn N
Affachri�i�f" �+ vJ
CnNs rwir TinN
700 / Quality • 1 0 % Employee Owned * Over 100 Years
RE: City of South Bend, IN Contractor's Bid for Public Work: Pre -qualification Checklist
Prequalif!cation Checklist
b) Attachment
0 V. Rieth-Riley Construction Co., Inc. is a 100% union contractor, and recruits through union hall
apprenticeship programs which are registered through the United States Department of
Labor Office of Apprenticeship. All employees who are hired will be classified as an
employee or as a subcontractor will be classified as a independent contractor. .
Respe fully,
Ruben Alvarado, Sales Manager
25200 S.R. 23 - South Bend, IN 46614 H) Phone: (574) 29R-A.12f • www rlath-rifa►r rnm
AML
lult
t W,.� R
of 1p Program
,trtifiratt lof RICq appirtutfd!6b
N
J.A.-T.C.
P:LASTERERS'&.-.C�E�MENT'MA-'SO� SLOCAL-692'
IND
MERRILLVOLL. * IANA
EN* '
FO'R'THE TRADE C-LASSI'FICATIONs..�-..,CEM '' TVA§bM�MASMERER.
.6yslem
in. ,gCCOP6fdZ2,C_e.UV,%
&ctT2li7ryo a46- 7 p--
M"- 199:5
Revised'
N -()950OG2
GI
Is
041
INTP RNATIOX&L UNION -OF H LIM S
LbtAL UNION NO, 'IbO, 1 50S, I 50A, I 50C,'I SORA, 1 SODiA SOG)- I som
AFT-1141AT50 WITH TIA E AND BUILDING TRADES DEPARTMENT
j*ES M. .-SWEENEY
�R rsmtNT-45LAiNt6S MANAGER
Date: 3-6-2019
TO . Wbomiti4qco.nc-ern:,
i700 482-0890 - FAX (700) 482-7 165
qUET ROAD
Co r Hess individuals, businesses; "61id"COhribithitle§ — n4had private dAd.. " bH6 sb6lbr, alike.
PU_
f�p- -.1d 94' y 9 of t�j�inp�5 with tontractotg w 8!�pp04 Wo t.a recognize d .. MQ
Pg
Mv,.�
e ghtheir participation in U-ifited States Depaftment of Labor (V8D0)-.,appr-qye.
d t hi .,ffi6 r TA �t, ..Young
entices hi 91 that::.the; ices. p prog prove,
people- -of Indi�p4'h4ve the oppQrtunit develop a.pq e s I. set, #1# .romAhj�: wi jli. i.
y
throojiov thPwprograms Pardd. in -hffidiindu�he-aim'ng providedby- these -
-
addresses og con -0- -Pq00s, A01ne5s' M., li- h"'d t:of
a quality skilled craft workforce that meets :their needs w.lieffier the projects are iniblio . .or pn
:in nature.
To Via .6nd please be -advised ihAtReith - Riley Cons'tru6fion- Co.-: Im s - signatory to a
;co ledflyd bat&-ir"g agrbexrzent CBA iA6e
Vf"h 'be.latbihojiA Un i'" I ion, a Op&Afi `-E-qA-rs'L6'C'dt
t J at ng
-above"Ieferen afe i& Lojo�! 1�01
1h 150 "This CBA,'TP *cod empl s U.S00
1P.
approved -apprenticeship hh.d`skit f
Sincerely;.
.Repw
q*us. ps.pntafiv
TOE L66M 15-0
INDIANA . LAB ORERST'I4INIIVC ,fi.R FIST T ' UND
P O Box 758 Bedl'ard, Indiana 47421-
(812) 279 9751.,
November 18, 202Q:
Sean Coakley, Dizectoz
FAX. (812) 2-79 5545'
To Whom ItMay Concern:
This letter is to 'confirm that "Rieth Riley Construction"` 'rs a ;:signatory coritractox xn good
standing with the Indiana Laborers' Tralnzng Trust Fund_
Is approve. by; the U S Veterans Administration to'
its program A copy of our approval letters are attached
agreement°: stating the ratios of Journey worl�ers to
cefor every dive '(5) Journey workers and: thereafter may
r..every (3) Journey workers.:
W.W) w indianalaborer�straining o �g
Jeremy $xe eT:
F
re* z tic hfip. Cooed a or
fh�`Ana LL x e Tr:�g'Trust' Fux� Appxenticeslvp
439 Patton. dill Rd.
4
edford, IN 47421
i
Deax Jeremy Bxe�er,: .
This approval zs made ursuan to and uh erravYs�gns of Txt1e 3 8,
P
e�£ective date of Jfa�.ivary 8, �U19.
If you have: any questions, :please contact me at 317:2323916;
Eric'Holcomb, Governor.
........................
James: M. Brown,. Director
Januaxy 9, 2019
Phone:(317) 234 6062 TOIL Free (800)400 4520 Fax (3-17) `234 874i
I
Eric Holcomb, Gouernor
James M. Npw.h, Director
January 9 201'9
Deax.:Jexey Bew�ir
If you need any assistance or have any questions regarding this technical visit please contact me.
clirectl at t i ffin v ox r317) 232 3:91 b. Thank.yau for the couxtesy extendd dya.in.crQedui�ng m
b _l
visit The :education and, firaining opportunities that your oxganYzation continues to pro��de vetexar
and their dependents are appreciated.:
..:....:..
Ph6ne_(317)-234 6062 Toll Free (800) 400=4520 Rbc (3'17).234 874.4
I Al
EOFINDIANA
DEPARTMENT OF VETERANS AFFAIRS
STATE APPROVING AGENCY_ :.
402 WEST WASHINGTON STREET ROOM W469
I_NDIANAPOLIS, INDIANA 46204-2738;
ET►c Holcomb; Governor
James M Brown, or.
20 0,
Active Duty 1 0. 15
6.83,
0%
Dkease .58
Inactive.. 2. 0129 %
Med, SU8pW 4 :0'.58 6/0
0
.Suspended - :0.73 0/o
W.01-un-tary withdraw 25 3,63 %b
.............. . .................. ...
:Total Indentured,- .1688
Aci
Active Duty
31
:0..34. O/o
Deceased
3
D .34
MAW*
I fi a Ct. i Vle
1.14 %
V., —jT—"r,"'l
----------
.0.46%
y au Vj g'
�iMOP
"
R
Suspended
8
;0.92 %
Nk
"461
Vo 16 61:a'ry with draw
.32.
Total Indentured
' rinted: WddnesdaY, Ma'y 13...2020
9 oF.2.
Apprentice Status deport y Indenture Dade
Apprentices Indentured Be.:iween-l/i12.OA And:;'6/13/2020
Apprentice Program IN2�
Year :Apprentice Status Apprentices Percentage
A[-i5� ��
7/
AdV. .-tip., Ouen yMpn86=0/
Deceased
r
�
j{ rya
` i'f+�s' k-t''t/``'L'.n� t .�y, j r r �,� i ]�.t�. 6 , it , .>i } _ S•
.i 'r t 11
c ,� 1 �fy .. nn;.,
Joumeyman
13
3
✓•'1�1rI�4 {"i✓��i`.lih � f}5a ?f i�a2� j-�� 4 � F.�
i -. , �r�
}� r i� F ..1i �� �1.:
Reirisate.
' 96 %
Total Indentured _ . _
y Ix _ 2 1t
P Tr. �FixAM �
ai 1 T
S/_}^:
� � itt'',,: } ,S"��
i.,d_..:....<
� T Ai�i Y't ✓�. ��4:
n 14.E
F�einst tee
a
6 igiow
qt
Total, Indentured
Printed. Wedhosday, .May 113 2020 ;Pale 2 of 2
2020 New Apprentice Sfiatus b Indenture Date:
Apprentices IndenturedITetween 1/1/2020 And 20.
Year Ap rentice Status Ap rentices Percents e. .
20�.0
p f
n
AdV, td Journeyman
-0
/l,�PP to z'
Med.Susp.
5
0.91%
Reinstate
•tom+ Q/'��_I{ ��t} -1
t t f
y�l 4>'. � f i }� Si�)���4
1
Terminated
Vo�unt�t�'�w�dravy
/�{�
Total Indentured 546
Pnnted .Thursday, September 171 2020 Page tof 1
CnN.qrR►ir, TwN
100 Quality a 100 Employee Owned
DRUG AND ALCOHOL TESTING POLICY
C V(;
Over 100 Years
0.0 DEFINITIONS. In addition to the definitions below, the definitions found in 49 CFR Part 40 and 49 CFR Parts 382
and 383, as amended, shall apply to this Drug and Alcohol Testing Policy. Contact the Human Resource
Department, if you have any questions pertaining to the regulations.
0.1 The terms "Company," "Rieth-Riley" or "Employer" as used herein refer to Rieth-Riley Construction Co., Inc.
and its wholly owned subsidiaries.
0.2 Company Official / Management means officer, department manager, group or area manager, office manager,
project manager, supervisor or foreman.
0.3 CBA means Collective Bargaining Agreement.
0.4 CDL means Commercial Driver's License.
0.5 CMV means Commercial Motor Vehicle.
0.6 DER means Designated Employer Representative.
0.7 DOT means the Department of Transportation
0.8 EAP means Employee Assistance Program.
0.9 EAP Administrator refers to the Human Resource Department (also known as the "I3RD").
0.10ESOP means an employee who is a participant in the Rieth-Riley Construction Co., Inc. Employees' Stock
Ownership Plan and Trust.
O.11Lej�al Drug means drugs prescribed by a licensed medical practitioner and over-the-counter drugs which have
been legally obtained and are being used solely for the purpose and quantity for which they were prescribed or
manufactured; however, marijuana and its active chemical ingredient, Tetrahydrocannabinol (THC), are explicitly
excepted from any list of legal or acceptable drugs whether medical or recreational and despite any state law to the
contrary, and shall be regarded as an illegal and prohibited substance and Schedule I drug by Rieth-Riley. To be clear,
the Company does not accommodate or allow for the medical or recreational use of marijuana on or off duty.
0.12MRO means Medical Review Officer.
0.13Prohibited Use means the usage of any drug which:
• Is not legally obtainable;
• May be legally obtainable, but has not been legally obtained;
• May have been legally obtained, but is being used in a manner, or for a purpose, other than as prescribed or
intended; or
• May be legally obtained and/or legally possessed and used but is prohibited from being in one's system;
possessed or used while on the job; or brought onto Company property or a job site under Rieth-Riley's Drug &
Alcohol Policy, the DOT's regulations, and/or a union employee's collective bargaining agreement.
0.14 SAP means Substance Abuse Professional.
0.15 Scope of Employment means whenever an employee is engaged in activities that are related to his/her work or
that are logically and naturally connected with it. This includes, but is not limited to, activities while on Rieth-Riley's
property, while on a construction job site, while driving to and from Rieth-Riley offices, job sites, or other job related
locations, while attending business -related activities or while operating a vehicle or machine leased or owned by Rieth-
Riley.
0.16Screenine Test (initial test) means in alcohol testing: a procedure to determine if an employee has a prohibited
concentration of alcohol in his or her system. In controlled substance testing. a screen to eliminate `negative' urine
specimens from further consideration. Note: This definition is distinct in meaning from Rieth-Riley's Post Event:
Drug and Alcohol Screening Policy.
0.17 THC an acronym for Tetrahydrocannabinol, the psychoactive chemical ingredient in marijuana.
0.18Under The Influence means the physical and/or mental impairment resulting from the consumption, ingestion,
injection or any of er means of intake, of drugs or alcoholic beverages into the body. For purposes of this policy, a
confirmed positive drug or alcohol test establishes use and that an employee is "under the influence."
WHAT DRUG AND ALCOHOL TESTING POLICY APPLIES:
1.0 IF THE EMPLOYEE IS NON -UNION, then Rieth-Riley's Drug and Alcohol Testing Policy applies.
2.0 IF THE EMPLOYEE IS UNION, THEN:
2.1 If there is a drug and alcohol testing policy that is part of the CBA, then that policy applies.
2.2 If the union employee has a CDL and is authorized to drive a Rieth-Riley CMV, then Rieth-Riley's policy will
govern over any CBA drug and alcohol policy that is inconsistent with the Federal Motor Carrier Safety
regulations dealing with drug and alcohol testing involving CDLs.
2.3 If neither 2.1 nor 2.2 apply, then Rieth-Riley's policy applies, but only with respect to post -accident and
reasonable suspicion testing. Rieth-Riley cannot test a union employee on a random basis without a CBA drug
r..f)N'_AZTJ?11r.rWN
100 Quality
and alcohol testing -provision.
100% Employee Owned
Over 100 Years
3.0 CONSULT THE CBA to determine if the CBA contams specific drug and- alcohol testing provisions."With
respect to Operating Engineers, unless specifically noted, the provisions apply to all union employees in the
geographical area, including plant and shop employees.
4.0 RIETH-RILEY'S POLICY -
4.1 Employees are an extremely valuable resource for Rieth-Riley's business, and their employment, and their
health and safety is a serious concern of the Company. To this end, Rieth-Riley is committed to provide and maintain
a drug free, alcohol free, safe and healthy work environment for our employees. Employees who abuse alcohol or
drugs are a danger to themselves and their coworkers and create potential liabilities for Rieth-Riley that are
unacceptable. Specifically, it is the policy of Rieth Riley that the use, sale, purchase, transfer, possession or presence
in one's system of any controlled substance inclu ing marijuana ( with the exception of medically prescribed drugs
other than marijuana) or the use or possession of alcohol by any employee while on Company premises or projects,
engaged in Company business, while'oferding Company vehicles and equipment, or performing any -work within the - -
employee's scope of employment, is strictly prohibited and could, depending on the circumstances, lead to
immediate termination. Additionally, it is also the policy of Rieth-Riley that the presence of alcohol in an employee's
system shall not be in a concentration of any measurable level, excepting however those union employees identified in
Sections 2.2 above and whom are subject to the U.S. Department of Transportation (49 CFR Part 40) and the Federal Motor
Carrier Safety Administration (49 CFRParts 382 and 383), as amended, as well as any other union employees subj ecthereunder
and all of whom shall not have the presence of alcohol in their system in a concentration 0.04 or greater, all while on
Company premises or projects, engaged in Company business, while operating Company vehicles and
equipment, or performing any work within the employee's scope of employment, and such behavior is strictly
prohibited and could, depending it the circumstances, lead to intntediate termination. Moreover; those
employees who are subject to the U.S. Department of Transportation and the Federal Allotor Carrier Safety
Administration Rules and Regulations will be removed from safety sensitive ditties for a minimum of twenty-four
(24) hours if the presence of alcohol in their system is in a concentration between 0.02 and 0.04.
4.2 This policy sets forth the procedures for the implementation of controlled substance and alcohol testing of
applicants who have been given a conditional offer of employment and current employees. The administrator
designated to monitor, facilitate, and answer questions pertaining to this policy and these procedures is the HRD, which
can be reached at (574) 875-5183.
. 4.3 This policy shall govern with respect to all Rieth-Riley employees, except with respect to union employees,
whose CBA contains a drug and alcohol testing policy, in which case, the terms of the CBA drug and
alcohol testing provision shall apply, to the extent not inconsistent with applicable law and/or regulations,
or as otherwise indicated herein.
4.4 This policy is based, in part, on regulations issued by the U.S. Department of Transportation (49 CFR Part 40)
and the Federal Plotor Carrier Safety Administration (49 CFR Parts 382 and 383), as amended and the relevant
portions of Indiana Code 4-13-18, et seq. as amended. A complete copy of this policy, including the applicable
CBA provisions that deal with drug and alcohol testing procedures and the foregoing regulations fnay be reviewed
upon request at the Rieth Riley Area Office.
4.5 Rieth-Riley requires pre -employment drug testing after a conditional job offer has been extended to an ESOP or
non -union job candidate. The Company also requires a drug and alcohol test for any applicant being considered for a
position which requires a CDL in order to drive a CNN. Any job candidate with a confirmed drug test failztre will not
be hired
4.6 It is possible that ESOP employees could be part of more than one (1) testing pool, e.g. random pool and DOT
pool. Each pool is managed separately and thus it is possible to be required to report for a random test more than once
in any given month. Additionally, because of the nature of random draws from pools, it is possible to be required to
test in consecutive months or frequently over the course of the year.
4.7 It is Rieth-Riley's intent that this policy will at all times be in complete compliance with applicable federal, state,
and local statutes, ordinances, regulations and laws.
4.8 Recognizing that there may be employees who have a drug or alcohol problem, Rieth-Riley wants to assist any
such employee in overcoming that problem and encourages employees to seek help through its EAP, which is
administered by the HRD. See Section 6.0 herein. In addition, the employee will be advised of any insurance that may
be provided by Rieth-Riley that covers drug treatment or rehabilitation programs. The Company encourages
employees to seek help before a violation of this or other workplace policy or rule occurs. -
4.9 Nothing in this policy restricts, limits, or changes the employment at -will relationship between Rieth-Riley
and the employee. Neither this policy nor any of its terms create or are intended to create a contract of
employment. Rieth-Riley reserves the sole right to change, amend or modify any term or provision of this
policy at any time without notice to the employee. This policy supersedes all prior policies and statements
relating to alcohol or drugs.
5.0 ALCOHOL AND DRUG TESTING PROCEDURES
w-M-ILEY CONSTRUCTION CD.. INC.
100%+qualify * 100% Employee Awned a Over 100 Years
5.1 Prohibited Conduct - The following shall be considered "prohibited conduct" for purposes of this policy:
5.1.1 No employee shall report, perform duties within the scope of his/her employment or remain at work
while under the influence of alcohol or drugs, nor may such employee possess, use, or distribute alcohol or
illegal drugs (including marijuana) while at work.
5.1.2 With respect to safety -sensitive functions, no employee shall report for duty or remain on duty requiring
the performance of safety -sensitive fiinctions while having an alcohol concentration greater than those limits
specified and as set forth in Section 4.1 herein. An employee is considered to be performing a safety -sensitive
f tnction if he/she is actually performing, ready to perform or immediately available to perform any of
the following functions:
A. All time spent at facility waiting to be dispatched;
B. All time inspecting, servicing or operating any CMV at any time;
C. All driving time or time spent at the driving controls of any CW in operation;
D. All time spent loading or unloading a vehicle, supervising, or assisting in the loading or unloading,
attending a vehicle being loaded or unloaded, including completion W any related paperwork; and
remaining in readiness to operate the vehicle;
E. All time performing those duties required of an employee involved in a vehicle accident, or
F. All time spent repairing, assisting, or attending to a disabled motor vehicle.
5.1.3 No employee shall be on duty or operate a CMV while the
employee possesses or is under the influence of alcohol.
5.1.4 No employee shall use alcohol while performing safety -sensitive functions.
5.1.5 No employee shall perform safety -sensitive functions within four (4) hours after using alcohol.
5.1.6 No employee required to take a- post -accident test shall use alcohol for eight (8) hours following the
accident or until he or she undergoes a post -accident test, whichever occurs first.
5.1.7 No employee shall refuse to submit to a post -accident, random, reasonable suspicion, return -to -dotty, dilute
or follow-up alcohol or drug test. If, however, an employee is screened per the terms of Rieth-Riley's Post Event
Drug and Alcohol Screening Policy and the result is negative, then the employee will not be required to submit
to the test prescribed hereunder post -accident.
5.2 Prescription Medication and/or Other Medication Use
5.2.1 An employee is prohibited from reporting for duty or remaining on duty when the employee uses or is
under the influence of any medication. As stated above, the use (on or off duty) of marijuana, even if for medical
purposes, is prohibited under Rieth-Riley's policy.
5.2.2 Any employee who is using a prescribed drug, or over-the-counter medication, which is known
or advertised as possibly affecting or impairing . judgment, coordination or other senses, (including
tD
dizziness or drowsiness), or which may adversely affect the employee's ability to perform work in a safe and
productive manner, must notify the Company prior to starting work or entering any Company premises. This
requirement does not apply if the medication use is pursuant to prescription or written instruction of a physician
(for over-the-counter medication) who has advised the employee that the substance will not adversely affect
their ability to safely perform their duties. The Company will engage in a fact -based individualized assessment
to determine if the employee can remain at work or on the Company premises and what work restrictions, if
any, are deemed necessarythat could allowthe employee to safely and effectively performbis or her work.
5.2.3 Ingestion of products that contain hemp will not be an acceptable explanation for testing positive
for manj uana.
5.2.4 The production of a state -issued medical marijuana card or similar certification will not be acceptable
explanation for testing positive for marijuana.
5.2.5 The use of products which contain cannabidiol (CBD) will not be an acceptable explanation for testing
positive for marijuana.
5.3 Refusal to Test Refusal to submit to the types of drug and alcohol tests employed by the Company will be
grounds for refusal to hire employee/applicant(s) and to discipline existing employee(s) up to and including
termination. A refusal to test would include any of the following situations:
5.3.1 Failing to appear for any test within a reasonable time after being directed to do so.
5.3.2 Failing to remain at the testing site until the testing process is completed.
5.3.3 Failure to provide a breath sample, saliva sample or urine sample as directed or in some isolated cases,
a sample as directed by the third -party service agent.
5.3.4 Failure to permit, if the situation requires, the observation or monitoring of providing a urine specimen.
5.3.5 Failure to provide a specimen, as directed, within required time frames may be considered a refusal. If an
employee cannot provide a sufficient quantity of Lime or breath, he/she will be directed to be evaluated by a
physician of the Company's choice. If the physician cannot find a legitimate medical explanation_for the inability
to provide a specimen, (either breath or urine), it will be considered a refusal to test.
5.3.6 Failure to undergo a medical examination or evaluation as directed by the MRO as part of the verification
process, or as directed by the DER as part of a "shy bladder" or "insufficient breath" situation.
r.nN_cTwir,Tw
100% Quality
100% Employee Owned Over 100 Years
5.3.7 Failing to take or declining to take a second test as required by this policy or DOT regulations.
_.5-.3.8._Failure to cooperate with Any_part of the testing process _and/or conduct that would obstruct the proper
administration of a test (e.g., refusing to empty pockets when so directed by the collector; behave "in -a
confrontational way that disrupts the collection process).
5.3.9 Refusing to sign Step 2 of the Alcohol Testing Form as found in Appendix 6 to 49CFR Part 40.
5.3.10 A report from the MRO that you have a verified adulterated or substituted test result.
5.3.11 For an observed collection, failure to follow the observer's instruction to raise your clothing above the
waist, lower clothing and underpants, and to turn around to permit the observer to determine if you have any type
of prosthetic or other device that could be used to interfere with the collection process.
5.3.12 Possess or wear a prosthetic or other device that could be used to interfere with the collectionprocess.
5.3.13 Admission to the collector or MRO by the employee that they adulterated or substituted their specimen.
5.4 Types of Tests There are seven (7) circumstances for drug and alcohol testing:
• Pre -employment testing;
-.Random testing;
• Post -accident testing - - - - - -
• Reasonable suspicion testing,
• Return -to -duty testing;
• Follow -tap testing; and
• Dilute retesting.
5.5 Pre -employment Testing After a job offer has been extended, all ESOP and non -union job applicants must
submit to a urine drug test. Applicants, ESOP, non -union and -union ion employees who are required to have or obtain a
CDL license in order to drive a CMV for Rieth-Riley must submit to a urine drug and alcohol test unless a qualifying
pre -employment exemption can be documented.
5.5.1 A qualifying pre -employment exemption will be granted if satisfactory documentation demonstrating
that he/she has participated in a controlled substances testing program within the last thirty (30) days and the
applicant, while participating in that program, was either tested in the last six (6) months or was subject
to a random testing program for the last twelve (12) month period.
5.6 Random TestinjZ
5.6.1 ESOP and Non -Union Employees Rieth-Riley conducts random drug testing with the assistance and
coordination of a third -party service agent. The random selection system provides an equal chance for each Area
employee to be selected each time random selection occurs. All employees are subject to annual random drug
testing; in addition, at least two percent (2%) of the employees subject to testing must be randomly tested each
month. Random selections will be reasonably spread throughout the year. Random selection, by its very nature,
may result in employees being selected for random testing more than once a calendar year. Once the MRO
advises the HRD of the names (ESOP and non -union employees) selected for the random test:
A. The HRD will notify the Office Manager and Group or Area Manager of the selection. Such notification
shall not occur more than hventy four 04) hours in advance of the scheduled date of testing.
B. The HRD will provide the names of the employees to be tested to the Office Manager and Group or
Area Manager
C. It is the Office lanagerand Group or Area Manager's responsibility to ensure that the employees
assigned to tlhe Area report to the collection site at the scheduled time.
D. The HRD must approve exceptions to the testing schedule.
E. The MRO will contact the t= with employee names not tested. If an employee does not go to the
HAD, such failure niay he considered a refusal to test and will he dealt with in accordance with
Paragraph 5.3.
5.6.2 CMV Drivers (Whether ESOP, Non -Union or Union)
Rieth-Riley conducts random drug and alcohol testing in accordance with the applicable regulations. Rieth-Riley
will submit the names of all employees who have a CDL and who drive a CMV as part of their job description
("CNN Drivers") to a random selection system. The random selection system provides an equal chance for each
employee to be selected each time random selection occurs. Random selections will be reasonably spread
throughout the year. Rieth-Riley will drug test, at a minimum, fifty percent (50%) of the average number of CMV
Drivers in each calendar year or at a rate established by the DOT for the given year. Rieth-Riley will select, at a
minimum, ten percent (10%) of the average number of CMV Drivers in each calendar year for random alcohol
testing, or at the rate established by the DOT for the given year. Random selection by its very nature may result
in employees being selected for random testing more than once a calendar year.
If a CMV Driver is selected at random, for either drug or alcohol testing, a Company official will notify the
employee. Once notified, the employee must proceed to the designated collection site immediately. If the
employee does not go to the collection site as soon as possible after notification, such conduct may he
considered a refusal to test rind will be dealt with in accordance with Paragraph 5.3.
5.6.3 Union Employees If Paragraph 5.6.2 is not applicable and there is no applicable CBAdrug and alcohol
`ILEY CONSTRUCTION CO., INC,
100 Quality & 100 Employee Owned a Over 100 Fears
testing provision, this policy as it relates to ESOP employees shall govern to the extent it is not inconsistent with
applicable law and/or regulations.
5.7 Post -Accident Testing For employees who are not CMV Drivers, or CMV Drivers who are involved in an
accident that did not involve a CMV, post -accident testing (drug and alcohol) will be required when management
judges an employee to have been the direct, or indirect, cause of an event that resulted in injury to a person or damage
to property, or if
an employee is required to receive offsite medical treatment, unless however it is determined by management under
Rieth-Riley's Post Event Drug and Alcohol Screening Policy that such testing is not required because the screening
result was negative. The third -party service agent will notify the HRD of the results. Employees who are CMV Drivers
must submit to a drug and alcohol test any time he or she is involved in an accident where 1) a fatality is involved; or
2) the employee receives a citation for a moving violation arising from the accident that involved:
Injury requiring medical treatment away from the scene; or
- One or more vehicles having to be towedfrom the scene.
5.7.1 Any time a post -accident drug or alcohol testis required, it. must be performed as soon as practical. If no
alcohol test can be made within eight (8) hours, attempts to perform an alcohol test shall cease. If no urine
collection can be obtained for the purpose of post -accident drug testing within thirty-two (32) hours, attempts
to make such collection shall cease. An employee is prohibited from consuming alcohol between the time of the
accident and the test.
5.7.2 In the event that federal, state, or local officials conduct breath or blood test for the use of alcohol and/or
urine tests for the use of controlled substances following an accident, employees must comply with law
enforcement personnel requests. Rieth-Riley may request testing documentation from such agencies and may ask
the employee to sign a release allowing it to obtain such test results.
5.7.3 For non-CMV Drivers, in the event an employee is so seriously injured that the employee cannot
provide a sample of urine, breath or saliva at the time of the accident, the employee must provide necessary
authorization for Rieth-Riley to obtain hospital records or other documents that would indicate the presence of
controlled substances or alcohol in the employee's system at the time of the accident.
5.8 Reasonable Suspicion Testing Reasonable suspicion for requiring an employee to submit to drug and/or alcohol
testing shall be deemed to exist when a trained supervisor or company official observes an employee manifesting
physical, behavioral, speech or performance symptoms or reactions commonly attributed to the use of or being under
the influence of controlled substances or alcohol. With respect to a CMV Driver, an alcohol test is authorized only
if the circumstances that gave rise to reasonable suspicion were observed when the CMV Driver is about to perform,
is performing or has just completed the performance of safety -sensitive functions.
5.8.1 Any trained supervisor or company official observing such conditions will take the following actions
immediately:
A. Contact your supervisor or DER.
B. Confront the employee involved and keep tinder direct observation until the situation is resolved.
C. Secure the DER's concurrence to observations. After discussing the circumstances with the DER,
arrangements will be made to observe or talk with the employee. If he/she believes, after observing or
talking to the employee, that the conduct or performance problem could be due to the illegal use of a
controlled substance and/or the use of alcoholl, the employee will be immediately required to submit to
a breath test or urinalysis. If the employee refuses to submit to testing for any reason, the employee will
then be informed that continued refusal will result in disqualification from performing his/her job and
possible disciplinary action tip to and including termination.
D. Employees will be asked to release any evidence relating to the observation for further testing. Failure
to comply may subject the employee to subsequent discipline orsuspension f-om driving or other deities.
All confiscated evidence will be receipted for with signatures of both the receiving supervisor, as well as
the provider
E. Within twenty four (24) hours or before the results of the controlled substance test and/or alcohol
test are
released, the DER shall document in writing the particular facts related to the employee's suspect
behavior or performance problems that led to the reasonable suspicion test; and shalt maintain this
documentation in appropriate DOT and/or non -DOT f les.
F. The DER shall remove or cause the removal of the employee from the, Company -owned
vehicle, equipment and/or property and ensure that the employee is transported to an appropriate
collection site and thereafter to the employee's residence or, where appropriate, to a place of lodging.
Under no circumstances will that employee be allowed to continue to operate or drive a Company vehicle
or piece of equipment until a confirmed negative test is received.
G. If an alcohol test cannot be administered within m.,o (2) hours after it is determined that reasonable
suspicion exists, Rieth-Riley will maintain a file stating the reasons for the delay. If the alcohol test is not
administered within eight (8) hours after it is determined that reasonable suspicion exists, then Rieth-Riley
will cease efforts to administer- the test and will record the reasons why the test was not administered.
r.nM_CTJ211P. TMAI
100% - Quality
100 Employee Owned
Over 100 Years
5.9 Return to Dutv Testing A return to duty test will be required for all employees who have violated this policy
(test positive or -refuse- to test). The employee may not return to duty until he or she passes (tests negative) a drug test
and/or tests below any measurable level for breath alcohol and the MRO, or SAP, and Rieth=Riley have determine-d - - - - that the employee may return to duty.
5.10 Follow-u Testinz Any employee who has returned to work following a violation of this policy will be
subject to fo ow -up testing. Rieth-Riley will require,_ at a minimum, six (6) folfow-up tests within the first twelve
(12J months following an employee's return to work. Frequency of testing thereafter will be based on the
recommendations of -the SAP. CMV Drivers will be tested in accordance with DOT regulations and the
recommendations of the SAP.
5.11 Dilute Retesting
5.11.1 If a pre -employment dilute drug test result, regulated (DOT) or non -regulated, is reported by the MRO,
it is required that all job candidates submit to another drug test as soon as the HRD can arrange it. A second dilute
will be considered a positive and the job candidate will not be hired.
5.11.2 If an employee submits to a non -regulated (DOT) drug test and it is reported by the MRO as a dilute test,
then it is required that the employee submit to another drug test as soon as the HRD cari arrange it. The employee -- - - - - - -
will be provided with a Dilute Form and the employee will be required to sign the form. A second dilute will
result in termination of employment.
5.11.3 If an employee submits to a regulated (DOT) drug test and it is reported by the MRO as a dilute test, the
results of the test will be the results of record. If negativeVut dilute, no further action will be required. If positive
but dilute, the test will be treated as a positive and all policy requirements for a positive test will be followed.
6.0 EMPLOYEE ASSISTANCE PROGRAM ("EAP")
6.1 Initial Evaluation
6.1.1 The SAP will provide a comprehensive face-to-face assessment and clinical evaluation and recommend a
course of education and/or treatment with which the employee must demonstrate successful compliance prior to
returning to DOT safety -sensitive duty.
6.1.2 Neither Rieth-Riley nor an employee may seek or rely upon a second SAP evaluation, if the employee
already has been evaluated by a qualified SAP.
6.1.3 No one may change the SAYS initial evaluation, except that the SAP who made the evaluation may modify
the evaluation based on new or additional information.
6.2 Referral The SAP will serve as a referral source to assist the employee's entry into an education and/or treatment
program.
6.3 Follow -Up Evaluation
6.3.1 The SAP will re-evaluate the employee to determine if the employee has successfully carried out the SAP's
education and/or treatment recommendations. In order to do so, the SAP must:
A. Confer with or obtain appropriate documentation from the appropriate education anti/or treatment
program professionals where the employee was referred; and
B. Conduct a face -to face clinical interview with the employee to determine if the employee demonstrates
successful compliance with the SAP s initial evaluation recommendations.
6.3.2 If the employee has demonstrated successful compliance, the SAP shall provide a written report directly
to the DER, highlighting the SAP's clinical determination that the employee has complied with the initial
evaluation recommendation.
6.3.3 If the employee has not demonstrated successful compliance with the SAP's recommendations, the SAP
will provide written notice directly to the DER. After receiving the SAP's written notice, Rieth-Riley will not
return the employee to the performance of safety -sensitive duties.
6.3.4 The SAP may conduct additional follow-up evaluations if Rieth-Riley determines that doing so is
consistent with the employee's progress as the SAP has reported it and with Rieth-Riley's policy and the CBAs
with the unions.
6.4 Additional Treatment, Aftercare or Support Group Services
6.4.1 If the SAP believes that ongoing services (in addition to follow-up tests) are needed to assist an employee
to maintain sobriety or abstinence from drug use after the employee resumes the performance of safety -sensitive
duties, the SAP must provide recommendations for these services in the follow-up evaluation report.
6A.2 As an employer receiving a recommendation for these services from a SAP, Rieth-Riley may, as part of a
return -to -duty agreement with the employee, require the employee to participate
in the recommended services. The SAP may monitor and document the employee's participation in the
recommended services. Rieth-Riley may make use of EAP services in assisting and monitoring employees'
compliance with SAP recommendations.
6.4.3 Employees are obligated to comply with SAP recommendations for these services.'If the employee fails or
refuses to comply, the employee maybe subject to disciplinary action up to and including termination.
7.0 DISCIPLINARY PROCEDURES
3RILEY CONSTRUCTION CO., INC.
100% Quality * 100% Employee Owned a Over 100 Years
7.1 Any employee testing positive for alcohol or who has a positive controlled substance test is considered to be in
violation of this policy, and is not qualified to drive a CMV, operate any equipment, perform any duties and will be
immediately removed from service and suspended, without pay, for a period of no less than thirty (30) days and will
be offered the opportunity to participate in the EAP as long as the positive test result is the first time. If a negative
return to duty drug test result is received from the MRO, Rieth-Riley will decide if continued employment of the
individual,is in the best interests of the company. If an employee either: a) provided a specimen that is determined
by the PIRO to be either adulterated or substituted; or b) previously tested positive, completed the EAP prescribed
by the counselor, and tests positive. a second time at any time in the fixture, then it will result in his/her immediate
termination with no opportunity for re -hire in the facture at any Rieth Riley location. If an employee has refused to
test, the employee will be considered in violation of this policy and will be dealt with in accordance with Paragraph
5.3.
7.2 To be able to be returned to a CDL position the employee must complete the steps outlined in Paragraphs 5.9
and 5.10 and Section 6.0.
8.0 VOLUNTARY DISCLOSURE
Rieth-Riley encourages employees to seek help if they feel they have a problem with drug or alcohol misuse
before it becomes a matter of discipline with the Company. Rieth-Riley will assist any employee in seeking
professional help to address their problem, who volntary discloses to the Company that he/she believes that he/she
has a drug and/ alcohol problem. This voluntary step of self -identification is the responsibility of the employee; and
with the exception of certain conditions, will alleviate the requirement for disciplinary action if brought to Rieth-Riley's
attention prior to any testing conducted by Rieth-Riley or violation of this policy. Upon disclosure of a problem
to Company personnel, the employee will be removed from all duties, including safety -sensitive duties- without pay
until completion of all steps outlined in Section 6.0 of this policy. The employee will be responsible for costs
associated with'this process in the same manner as any other employee. If the employee makes no commitment to
overcoming the problem and achieving a satisfactory level of performance, attendance, or behavior, then termination
of employment will result.
9.0 CONFIDENTIALITY AND RELEASE OF INFORMATION
9.1 Under no circumstances, unless required or authorized by law, will alcohol or drug testing information or results
for any employee or applicant be released without written request and/or authorization from the applicable employee.
9.2 However, Rieth-Riley may release information as follows:
9.2.1 Copies of the results of alcohol or drug testing to an identified person provided the employee has provided
written consent.
9.2.2 Copies of information requested by the Secretary of Transportation, any DOT agency, or any State or local
official with regulatory control over Rieth-Riley or any of its employees.
9.2.3 The results of post -accident testing when requested by the National Transportation Safety Board as part
of an accident investigation.
9.3 Employees are entitled, upon written request, to obtain copies of any records pertaining to their use of alcohol or
controlled substances, including any records pertaining to his or her alcohol or controlled substance tests.
9.4 The HRD will maintain a list of all former employees who have tested positive and refused to participate in any
EAP regimen of treatment or who have refused to take a test. Prior to hiring a person into a non -union or ESOP
position, that person's name must be checked against this list by contacting the HRD. If the person has refused
treatment or a test, they are not eligible for re -hire and a notation will be made in his/her personnel file identifying the
reason for the hiring prohibition.
(01/19)
RIETH-RILEY CONSTRUCTION CO., INC.
SAMPLE WORK -IN -PROGRESS
Proiect Name
RRJob # HIDE
Owner
Construction Manager
Title
Phone
Email
SCOPE OF WORK
Contract Amount
%Comp)
Proi Compl Date
SURETY
ITR Push II Road/Bridge 2019
3681010
ITR Concession Company, LLC
Brian Cherry
Infrastructure Manager
574-651-2464
bcherry@indianatollroad.org
Asphalt Overlay
$61,182,341
74%
May 2020
TRAVELER'S CASUALTY
Construction
AND SURETY
R-39093-A
3208260
INDOT
Ed Wilson
Project Supervisor
765-617-4357
slindway@indot.in.gov
Asphalt Pavement
$40,732,641
98%
June 2020
TRAVELER'S CASUALTY
1-69 Design Build
AND SURETY
IndyGo Red Line
3200735
Indianapolis Public Transportation Corp.
Sri Venugopalan, P.E.
Director of Engineering
317-614-9305
pspragg@indygo.net
Combined Job
$38,820,778
98%
July 2020
TRAVELER'S CASUALTY
& Construction
Without Asphalt
AND SURETY
16-ENG-05
3200713
City of Carmel
Tim Connaroe
Construction Manager
317.401-0263
tconarroe@structurepoint.com
Earthwork,
$31,090,668
78%
September 2020 TRAVELER'S CASUALTY
96th Street and Keystone
Asphalt, Concrete
AND SURETY
Const. inspection Section
R-39504-A
3208296
INDOT
Cory Mahan, P.E.
Manager
317-780-7262
cmahan@chacompanies.com
Asphalt Pavement
$29,814,167
1%
October 2021
TRAVELER'S CASUALTY
146th Street Over SR 37 N
AND SURETY
R-40511-B
3208295
INDOT
Elsidig Ibrahim
Project Engineer
(317)260-3992
eibrahim@indot.in.gov
Bridges
$28,086,000
0%
October 2020 TRAVELER'S CASUALTY
1-70 South Split to 465W
AND SURETY
R-33950
3649090
INDOT
Dave Barich
Area Engineer
219-809-8609
dbarich@indot.in.gov
Asphalt Pavement
$27,330,178
98%
June 2020
TRAVELER'S CASUALTY
1-94 & 1-65 Bundle
AND SURETY
R-39500-A
3208283
INDOT
Greg Peterson
Project Supervisor
(765)570-8003
gpeterson@indot.in.gov
Asphalt Pavement
$22,600,681
13%
June 2021
TRAVELER'S CASUALTY
126th Street & SR 37
AND SURETY
R-34439-A
3648097
INDOT
Martin Navarro
Construction
219-214-2934
mnavarro@indot.in.gov
Asphalt Pavement
$21,440,373
98%
June 2020
TRAVELER'S CASUALTY
US 30/ SR 53 Bundle
Project Manager
AND SURETY
R-41769-A
3208280
INDOT
Sean Hendrickson
Project Engineer
765-745-1731
shendrickson@indot.in.gov
Asphalt Pavement
$21,202,853
98%
May 2020
TRAVELER'S CASUALTY
1-465 Northwest
AND SURETY
State Street Overhead
3200609
Plenary Roads State Street, LLC
Simon Stachnik
Project Manager
303-905-1340
simon.stachnik@plenarygroup.com
Earthwork,
$47,201,460
95%
March 2021
TRAVELER'S CASUALTY
Asphalt, Concrete
AND SURETY
11111-115754
7118236
MDOT
Chris Jacobs
Project Engineer
269-849-1496
jacobsc@michigan.gov
Asphalt, Bituminous
$17,144,685
59%
June 2020
TRAVELER'S CASUALTY
1-96
Paving
AND SURETY
RIETH-RILEY CONSTRUCTION CO., INC.
SAMPLE WORK COMPLETED ,
CONSTRUCTION
COMPLETION
CONTRACT
PROJECT NAME
OWNER
RR JOB #
MANAGER
TITLE
PHONE
TYPE OF WORK
DATE
AMOUNT SURETY
80/90 PUSH
ITR CONCESSION COMPANY LLC
3681000
Brian Cherry
Infrastructure Manager
574-651-2464
ASPHALT OVERLAY
5/25/2018
$201,811,661 TRAVELER'S CASUALTY
CONSTRUCTION
AND SURETY
R-33950
INDOT
3648076
Patrick Patterson
Project Engineer
219-232-8543
BRIDGES
8/15/2018
$36,764,361 TRAVELER'S CASUALTY
1-94 & 1-65 BUNDLE
ASPHALT OVERLAY
AND SURETY
R-33860-A
INDOT
3208207
Gary Kreutzjans
Construction Engineer
812-54-3739
ASPHALT OVERLAY
6/30/2018
$28,592,864 TRAVELER'S CASUALTY
I-65 DESIGN BUILD
CONSTRUCTION
AND SURETY
R-33950
INDOT
3648090
Patrick Patterson
Project Engineer
219-232-8543
BRIDGES
8/31/2018
$27,045,625 TRAVELER'S CASUALTY
1-94 & 1-65 BUNDLE
ASPHALTOVERLAY
AND SURETY
IR-30143-A
INDOT
3618019
David Barich
Construction Engineer
219-362-6125
EARTHWORK,
12/17/2018
$25,602,940 TRAVELER'S CASUALTY
US 31, US 30 TO US 2
CONCRETE, ASPHALT
AND SURETY
IR-30132-A
INDOT
3618011
David Barich
Construction Engineer
219-362-6125
BRIDGES
12/16/2018
$28,775,479 TRAVELER'S CASUALTY
US 31 NORTH TO KERN ROAD
AND SURETY
R-34439-A
INDOT
3648097
Martin Navarro
Project Manager
219-713-3396
ASPHALT OVERLAY
8/15/2018
$21,671,535 TRAVELER'S CASUALTY
US 30/SR 53 BUNDLE
CONSTRUCTION
AND SURETY
29011-110485
MDOT
7408082
Jason Garza
Project Enginer
989-773-7756
ASPHALT OVERLAY
9/11/2018
$17,721,760 TRAVELER'S CASUALTY
US 127 ITHACA 2016
Mt Pleasant TSC
CONSTRUCTION
AND SURETY
Steve Sandefur-
GARY AIRFIELD PAVING PROJECT
GARY CHICAGO INTERNATIONAL AIRPORT
3640934
NCG
Construction & Field Service Mgr
317-258-1585
PCCP RUNWAY
1/28/2013
$12,190,296 TRAVELER'S CASUALTY
EXPANSION
AND SURETY
IR-35914-A
INDOT
3208224
Cliff Walker
Project Engineer
765-745-1759
EARTHWORK,
12/10/18
$10,381,780 TRAVELER'S CASUALTY
US 31 SR 28
CONCRETE, ASPHALT
AND SURETY
RIETH-RILEY CONSTRUCTION CO., INC.
SAMPLE WORK COMPLETED
CONSTRUCTION
% OF WORK
COMPLETION
CONTRACT
PROJECT NAME
OWNER
MANAGER
TITLE
PHONE
TYPE OF WORK
PERFORMED BY RR
DATE
AMOUNT SURETY
R-28973
INDOT
Gannon Carnes
Project Engineer
765-307-8434
Asphalt Pavement
70%
6/30/2018
$23,068,538 TRAVELER'S CASUALTY
1-65
AND SURETY
RS-39572
INDOT
Erik 5eef
Construction Manageer
765-361-5218
Concrete Pavement
83%
5/1/2019
$10,334,676 TRAVELER'S CASUALTY
US 52 South Budget
AND SURETY
R-41350-A
INDOT
Ling Gan
Project Engieeer
765-745-1717
Concrete Pavement
79%
12/12/2018
$9,158,700 TRAVELER'S CASUALTY
1-465
AND SURETY
Oscoda Wurtsmith Airport
Oscoda Wurtsmith Airport Authority
Jared Kowalewsky, PE
Project Manager
517-712-7433
Mill & Resurface
75%
2019
$6,098,556 TRAVELER'S CASUALTY
AND SURETY
39014-200633
MDOT
Chris Jacobs
Project Manager
269-849-1496
Asphalt/Bituminous
84%
7/17/2019
$5,847,382 TRAVELER'S CASUALTY
US-131 from Milham Rd to M-43
Paving
AND SURETY
R-37443-A
INDOT
Don Yost
Inspection Supervisor/
317-443-7241
Asphalt Pavement
85%
10/29/2019
$4,711,574 TRAVELER'S CASUALTY
276th Steet Recons
RQAW Consultants
AND SURETY
Elkhart County Highway
Elkhart County Highway Dept
Rick Easton
Technician - Engineering Section
574-534-9394
Asphalt Pavement
93%
11/1/2019
$4,259,982 TRAVELER'S CASUALTY
2019 Paving Program
AND SURETY
RS-41963-A
INDOT
Christien Reynolds
Area Engineer
219-325-7524
Asphalt Pavement
26%
10/1/2019
$3,738,878 TRAVELER'S CASUALTY
LaPorte Patch
AND SURETY
Duke Energy Plainfield
Terracon
Anthony Zink
Program Director
937-763-7078
Asphalt Pavement
83%
6/28/2019
$3,531,558 TRAVELER'S CASUALTY
AND SURETY
RS-39978
INDOT
Paul Balaba
Construction Manager
765-376-9130
Asphalt Pavement
86%
7/1/2019
$3,355,045 TRAVELER'S CASUALTY
SR 28 Clinton Budget
AND SURETY
RIETH-RILEY CONSTRUCTION CO., INC.
SAMPLE WORK COMPLETED
CONSTRUCTION
% WORK
COMPLETION
CONTRACT
PROJECT NAME
OWNER
MANAGER
TITLE
PHONE
TYPE OF WORK
PERFORMED BY RR
DATE
AMOUNT SURETY
R-28973
INDOT
Gannon Carnes
Project Engineer
765-307-8434
Asphalt Pavement
70%
6/30/2018
$23,068,538 TRAVELER'S CASUALTY
1-65
AND SURETY
RS-39572
INDOT
Erik Seef
Construction Manageer
765-361-5218
Concrete Pavement
83%
5/1/2019
$10,334,676 TRAVELER'S CASUALTY
US 52 South Budget
AND SURETY
R-41350-A
INDOT
Ling Gan
Project Engieeer
765-745-1717
Concrete Pavement
79%
12/12/2018
$9,158,700 TRAVELER'S CASUALTY
1-465
AND SURETY
Oscoda Wurtsmith Airport
Oscoda Wurtsmith Airport Authority
Jared Kowalewsky, PE
Project Manager
517-712-7433
Mill & Resurface
75%
2019
$6,098,556 TRAVELER'S CASUALTY
AND SURETY
39014-200633
MDOT
Chris Jacobs
Project Manager
269-849-1496
Asphalt/Bituminous
84%
7/17/2019
$5,847,382 TRAVELER'S CASUALTY
US-131 from Milham Rd to M-43
Paving
AND SURETY
R-37443-A
INDOT
Don Yost
Inspection Supervisor/
317-443-7241
Asphalt Pavement
85%
10/29/2019
$4,711,574 TRAVELER'S CASUALTY
276th Steet Recons
RQAW Consultants
AND SURETY
Elkhart County Highway
Elkhart County Highway Dept
Rick Easton
Technician - Engineering Section
574-534-9394
Asphalt Pavement
93%
11/1/2019
$4,259,982 TRAVELER'S CASUALTY
2019 Paving Program
AND SURETY
RS-41963-A
INDOT
Christien Reynolds
Area Engineer
219-325-7524
Asphalt Pavement
26%
10/1/2019
$3,738,878 TRAVELER'S CASUALTY
LaPorte Patch
AND SURETY
Duke Energy Plainfield
Terracon
Anthony Zink
Program Director
937-763-7078
Asphalt Pavement
83%
6/28/2019
$3,531,558 TRAVELER'S CASUALTY
AND SURETY
RS-39978
INDOT
Paul Balaba
Construction Manager
765-376-9130
Asphalt Pavement
86%
7/1/2019
$3,355,045 TRAVELER'S CASUALTY
SR 28 Clinton Budget
AND SURETY
RIETH-RILET CONSTRUCTION CO., INC.
SAMPLE WORK COMPLETED
CONSTRUCTION
% WORK
COMPLETION
CONTRACT
PROJECT NAME
OWNER
MANAGER
TITLE
PHONE
TYPE OF WORK
PERFORMED BY RR
DATE
AMOUNT SURETY
R-28973
INDOT
Gannon Carnes
Project Engineer
765-307-8434
Asphalt Pavement
70%
6/3012018
$23,068,538 TRAVELER'S CASUALTY
1-65
AND SURETY
RS-39572
INDOT
Erik Seef
Construction Manageer
765-361-5218
Concrete Pavement
83%
5/1/2019
$10,334,676 TRAVELER'S CASUALTY
US 52 South Budget
AND SURETY
R-41350-A
INDOT
Ling Gan
Project Engieeer
765-745-1717
Concrete Pavement
79%
12/12/2018
$9,158,700 TRAVELER'S CASUALTY
1-465
AND SURETY
Oscoda Wurtsmith Airport
Oscoda Wurtsmith Airport Authority
Jared Kowalewsky, PE
Project Manager
517-712-7433
Mill & Resurface
75%
2019
$6,098,556 TRAVELER'S CASUALTY
AND SURETY
39014-200633
MDOT
Chris Jacobs
Project Manager
269-849-1496
Asphalt/Bituminous
84%
7/17/2019
$5,847,382 TRAVELER'S CASUALTY
US-131from Milham Rd to M-43
paving
AND SURETY
R-37443-A
INDOT
Don Yost
Inspection Supervisor/
317-443-7241
Asphalt Pavement
85%
10/29/2019
$4,711,574 TRAVELER'S CASUALTY
276th Steet Recons
RQAW Consultants
AND SURETY
Elkhart County Highway
Elkhart County Highway Dept
Rick Easton
Technician - Engineering Section
574-534-9394
Asphalt Pavement
93%
11/1/2019
$4,259,982 TRAVELER'S CASUALTY
2019 Paving Program
AND SURETY
RS-41963-A
INDOT
Christien Reynolds
Area Engineer
219-325-7524
Asphalt Pavement
26%
10/1/2019
$3,738,878 TRAVELER'S CASUALTY
LaPorte Patch
AND SURETY
Duke Energy Plainfield
Terracon
Anthony Zink
Program Director
937-763-7078
Asphalt Pavement
83%
6/28/2019
$3,531,558 TRAVELER'S CASUALTY
AND SURETY
RS-39978
ISR
INDOT
Paul Balaba
Construction Manager
765-376-9130
Asphalt Pavement
86%
7/1/2019
$3,355,045 TRAVELER'S CASUALTY
28 Clinton Budget
AND SURETY
RIETH-RILEY CONSTRUCTION CO., INC.
SAMPLE WORK -IN -PROGRESS
Project Name
RR Job ii HIDE
Owner
Construction Manager
Title
Phone
Email
SCOPE OF WORK
Contract Amount
% Comol
Pro[ Comol Date
SURETY
ITR Push II Road/Bridge 2019
3681010
ITR Concession Company, LLC
Brian Cherry
Infrastructure Manager
574-651-2464
bcherry@indianatollroad.org
Asphalt Overlay
$61,182,341
74%
May 2020
TRAVELER'S CASUALTY
Construction
ANDSURETY
R-39093-A
3208260
INDOT
Ed Wilson
Project Supervisor
765-617-4357
slindway@indot.in.gov
Asphalt Pavement
$40,732,641
98%
June-2020
TRAVELER'S CASUALTY
1-69 Design Build
AND SURETY
IndyGo Red Line
3200735
Indianapolis Public Transportation Corp.
Sri Venugopalan, P.E.
Director of Engineering
317-614-9305
pspragg@indygo.net
Combined Job
$38,820,778
98%
July 2020
TRAVELER'S CASUALTY
& Construction
Without Asphalt
AND SURETY
16-ENG-05
3200713
City of Carmel
Tim Connaroe
Construction Manager
317-401-0263
tconarroe@structurepoint.com
Earthwork,
$31,090,668
78%
September202O TRAVELER'S CASUALTY
96th Street and Keystone
Asphalt, Concrete
AND SURETY
Const. Inspection Section
R-39504-A
3208296
INDOT
Cory Mahan, P.E.
Manager
317-780-7262
cmahan@chacompanies.com
Asphalt Pavement
$29,814,167
1%
October 2021
TRAVELER'S CASUALTY
146th Street Over SR 37 N
AND SURETY
R-40511-B
3208295
INDOT
Elsidig Ibrahim
Project Engineer
(317)260-3992
e[brahim@indot.in.gov
Bridges
$28,086,000
0%
October 2020 TRAVELER'S CASUALTY
1-70 South Split to 465W
AND SURETY
R-33950
3648090
INDOT
Dave Barich
Area Engineer
219-809-8609
dbarich@indot.in.gov
Asphalt Pavement
$27,330,178
98%
June 2020
TRAVELER'S CASUALTY
1-94 & 1-65 Bundle
AND SURETY
R-39500-A
3208283
INDOT
Greg Peterson
Project Supervisor
(765)570-8003
gpeterson@indot.in.gov
Asphalt Pavement
$22,600,681
13%
June 2021
TRAVELER'S CASUALTY
126th Street & SR 37
AND SURETY
R-34439-A
3648097
INDOT
Martin Navarro
Construction
219-214-2934
mnavarro@indot.in.gov
Asphalt Pavement
$21,440,373
98%
June 2020
TRAVELER'S CASUALTY
US 30/ SR 53 Bundle
Project Manager
AND SURETY
R-41769-A
3208280
INDOT
Sean Hendrickson
Project Engineer
765-745-1731
shendrickson@indot.in.gov
Asphalt Pavement
$21,202.853
98%
May 2020
TRAVELER'S CASUALTY
1-465 Northwest
AND SURETY
State Street Overhead
3200609
Plenary Roads State Street, LLC
Simon Stachnik
Project Manager
303-905-1340
simon.stachnik@plenarygroup.com
Earthwork,
$47,201,460
95%
March 2021
TRAVELER'S CASUALTY
Asphalt, Concrete
AND SURETY
11111-115754
7118236
MDOT
Chrislacobs
Project Engineer
269-849-1496
jacobsc@michigan.gov
Asphalt, Bituminous
$17,144,685
59%
June 2020
TRAVELER'S CASUALTY
1-96
Paving
AND SURETY
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset #
Description
Acquisition Date
Used
Cost
Accum Depr
NBV
C185000006
2019 SULLAIR 185-KUB-DPQAIR COMPRESSOR
3/28/2019,
N
19,581.00
4,895.28
14,685.72
C185000007
2019 SULLAIR 185-KUB-DPQ AIR COMPRESSOR
3/28/2019
N
19,581.00
4,895.28
14,685.72
C185000008
2019 SULLAIR 185-KUB-DPQAIR COMPRESSOR
3/28/2019
N
19,581.00
4,895.28
14,685.72
C185000009
2019 SULLAIR 185-KUB-DPQAIR COMPRESSOR
3/28/2019
N
19,581.00
4,895.28
14,685.72
C185000010
2019 SULLAIR 185-KUB-DPQAIR COMPRESSOR
3/28/2019
N
19,581.00
4,895.28
14,685,72
C185000011
2019 SULLAIR 185-KUB-DPQAIR COMPRESSOR
3/28/2019
N
19,581.00
4,895.28
14,685.72
C185000012
2019 SULLAIR 185-KUB-DPQAIR COMPRESSOR
3/28/2019
N
19,581.00
4,895.28
14,685.72
C185000013
2019 SULLAIR 185-KUB-DPQAIR COMPRESSOR
3/28/2019
N
19,581.00
4,895.28
14,685.72
DD35000013
2019 WACKER RS12A-90 35" VIBRATORY COMPACTOR
4/18/2019
N
17,914.00
4,478.52
13,435.48
JT30000001
TRUCK ITON
2/1/2005
N
9,667.20
6,627.20
3,040.00
JT30000002
TRUCK 1 TON
2/1/2007
N
10,278.15
7,046.15
3,232.00
JT30000003
TRUCK 1TON
12/11/2008
N
8,743.20
6,334.20
2,409.00
JT30000004
TRUCK 1 TON
12/11/2008
N
8,743.20
6,334.20
2,409.00
JT30000005
TRUCK 1 TON
12/11/2008
N
11,398.90
8,287.40
3,111.50
JT30000006
TRUCK 1TON
12/11/2008
N
11,398.90
8,287.40
3,111.50
JT30000007
TRUCK ITON
12/11/2008
N
11,398,90
8,287.40
3,111.50
JT30000008
TRUCK 1 TON
12/11/2008
N
11,292.37
8,180.87
3,111.50
JT30000009
TRUCK 1 TON
12/11/2008
N
11,292.37
11,292.37
-
JT30000010
TRUCK 1 TON
12/1/2009
N
10,409.73
7,135.73
3,274.00
JT30000011
TRUCK 1 TON
12/1/2009
N
10,409.73
7,135.73
3,274.00
JT30000012
TRUCK 1 TON
12/1/2009
N
10,409.73
7,135.73
3,274.00
JT30000013
TRUCK 1 TON
12/1/2009
N
10,409.73
7,135.73
3,274.00
JT30000014
TRUCK 1 TON
12/1/2009
N
10,409.73
7,135.73
3,274.00
JT30000015
TRUCK 1 TON
12/1/2009
N
10,507.94
7,233.94
3,274.00
JT30000016
TRUCK 1 TON
12/1/2009
N
10,507.94
7,233.94
3,274.00
JT30000017
TRUCK 1 TON
12/1/2009
N
10,507.94
7,233.94
3,274.00
JT30000018
TRUCK 1 TON
12/1/2009
N
10,409.73
7,135.73
3,274.00
JT30000019
TRUCK 1 TON
12/1/2009
N
10,507.94
7,233.94
3,274.00
JT30000020
TRUCK 1TON UTILITY
6/3/2012
N
12,733.75
11,460.38
1,273.37
JT30000021
TRUCK 1TON UTILITY
6/3/2012
N
12,733.75
11,460.38
1,273.37
JT30000022
TRUCK ITON
6/3/2012
N
12,135.08
10,921.57
1,213.51
JT30000023
TRUCK 1TON
6/3/2012
N
12,021,67
10,819.50
1,202.17
JT30000024
TRUCK 1 TON
6/3/2012
N
12,021.67
10,819.50
1,202.17
JT30000025
TRUCK 1 TON
6/3/2012
N
12,295.58
11,066.02
1,229.56
JT30000026
TRUCK 1 TON
6/15/2011
N
16,760.50
16,760.50
-
JT30000027
TRUCK 1 TON UTILITY
6/13/2011
N
14,193.77
14,193.77
JT30000028
TRUCK 1 TON UTILITY .
6/13/2011
N
14,193.77
14,193.77
JT30000029
TRUCK 1 TON
6/13/2011
N
14,327.67
14,327.67
JT30000030
TRUCK 1 TON UTILITY
6/13/2011
N
14,327.67
14,327.67
JT30000031
TRUCK 1 TON UTILITY
6/13/2011
N
14,327.67
14,327.67
JT30000032
TRUCK 1 TON UTILITY
6/13/2011
N
14,327.67
14,327.67
JT30000033
TRUCK 1 TON UTILITY
6/13/2011
N
14,327.67
14,327.67
JT30000034
TRUCK 1 TON
6/15/2011
N
13,390.03
13,390.03
JT30000035
TRUCK 1 TON
6/15/2011
N
13,390.03
13,390.03
JT30000036
TRUCK 1 TON
6/15/2011
N
13,390.03
13,390.03
JT30000037
TRUCK 1 TON
6/15/2011
N
13,390.03
13,390.03
-
JT30000039
TRUCK 1TON
8/25/2017
N
17,536.43
15,782.79
1,753.64
JT40000001
TRUCK 1.5 TON
7/17/2017
N
15,624.47
14,062.02
1,562.45
JT40000002
TRUCK 1.5 TON
7/17/2017
N
15,878.80
14,290,92
1,587.88
JT40000003
TRUCK 1.5 TON UTILITY
12/28/2013
N
44,910.02
44,910.02
-
JT40000004
TRUCK 1.5 TON UTILITY
7/17/2017
N
17,759.33
15,983.40
1,775.93
JT40000005
TRUCK 1.5 TON UTILITY
7/17/2017
N
19,039.15
17,135.23
1,903.92
JT40000006
TRUCK 1.5 TON UTILITY
7/17/2017
N
19,083.13
17,174.82
1,908.31
JT40000007
TRUCK 1.5 TON UTILITY
7/18/2017
N
19,083.13
17,174.82
1,908.31
JT40000008
TRUCK 1.5 TON UTILITY
12/15/2017
N
24,575.25
24,575.25
-
JT40000009
TRUCK 1.5 TON UTILITY
12/15/2017
N
25,351.90
25,351.90
-
JT40000010
TRUCK 1.5 TON UTILITY
12/15/2017
N
24,204.49
24,204.49
-
JT40000011
TRUCK 1.5 TON UTILITY
12/15/2017
N
25,351.89
25,351.89
-
JT40000012
TRUCK 1.5 TON UTILITY
12/15/2017
N
23,868.76
23,868.76
-
JT40000013
TRUCK 1.5 TON UTILITY
12/15/2017
N
23,868.76
23,868.76
-
JT40000014
TRUCK 1.5 TON UTILITY
12/15/2017
N
24,204.49
24,204.49
-
JT40000015
TRUCK 1.5 TON UTILITY
12/15/2017
N
24,204.49
24,204.49
-
JT40000016
TRUCK 1.5 TON UTILITY
12/15/2017
N
23,978.28
23,978.28
-
1T40000017
TRUCK 1.5 TON UTILITY
12/15/2017
N
25,174.45
25,174.45
-
JT40000018
TRUCK 1.5 TON UTILITY
12/15/2017
N
25,174.45
25,174.45
-
JT40000019
TRUCK 1.5 TON UTILITY
12/15/2017
N
24,204.49
24,204.49
-
JT40000020
TRUCK 1.5 TON
4/8/2016
N
60,230.30
47,431.44
12,798.86
JT40000021
TRUCK 1.5 TON
4/8/2016
N
60,230.30
47,431.44
12,798.86
JT40000022
TRUCK 1.5 TON
4/8/2016
N
60,230.30
47,431.44
12,798.86
JT40000023
TRUCK 1.5 TON
4/8/2016
N
60,230.30
47,431.44
12,798.86
JT40000024
TRUCK 1.5 TON
4/8/2016
N
60,230.30
47,431.44
12,798.86
JT40000025
TRUCK 1.5 TON
4/8/2016
N
59,667.40
46,988.04
12,679.36
JT40000026
TRUCK 1.5 TON
4/8/2016
N
60,230.30
47,431.44
12,798.86
JT40000027
TRUCK 1.5 TON
4/8/2016
N
59,667.40
46,988.04
12,679.36
JT40000028
TRUCK 1.5 TON
3/28/2016
N
59,667.40
46,988.04
12,679.36
JT40000029
TRUCK 1.5 TON
3/28/2016
N
59,667.40
46,988.04
12,679.36
JT40000030
TRUCK 1.5 TON
4/8/2016
N
60,230.30
47,431.44
12,798.86
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
JT40000031 TRUCK 1.5 TON UTILITY
6/1/2017
N
60,071.94
38,901.83
21,170.11
JT40000032 TRUCK 1.5 TON UTILITY
4/20/2017
N
60,071.94
40,548.60
19,523.34
IT40000033 TRUCK 1.5 TON UTILITY
5/4/2017
N
60,071.94
39,422.25
20,649.69
JT40000034 TRUCK 1.5 TON UTILITY
4/20/2017
N
60,071.94
40,548.60
19,523.34
JT40000035 TRUCK 1.5 TON UTILITY
4/20/2017
N
60,071.94
40,548.60
19,523.34
JT40000036 TRUCK 1.5 TON UTILITY
6/1/2017
N
60,071.94
38,902.41
21,169.53
JT40000037 TRUCK 1.5 TON UTILITY
4/20/2017
N
60,071.94
40,548.60
19,523.34
JT40000038 TRUCK 1.5 TON UTILITY
6/1/2017
N
60,071.94
38,902.41
21,169.53
JT40000039 TRUCK 1.5 TON UTILITY
5/4/2017
N
60,071.94
39,422.25
20,649.69
IT40000040 TRUCK 1.5 TON UTILITY
6/1/2017
N
60,071.94
38,902.41
21,169.53
JT40000041 TRUCK 1.5 TON UTILITY
4/20/2017
N
60,071.94
40,548.60
19,523.34
JT40000042 TRUCK 1.5 TON UTILITY
6/1/2017
N
60,071.94
38,902.41
21,169.53
JT40000043 TRUCK 1.5 TON UTILITY
4/20/2017
N
60,071.94
40,548.60
19,523.34
JT40000044 TRUCK 1.5 TON UTILITY
6/1/2017
N
60,071.94
38,902.41
21,169.53
JT40000045 TRUCK 1.5 TON UTILITY
6/1/2017
N
60,071.94
38,902.41
21,169.53
JT40000046 TRUCK 1.5 TON UTILITY
4/20/2017
N
60,071.94
40,548.60
19,523.34
JT40000047 TRUCK 1.5 TON UTILITY
6/1/2017
N
60,071.94
38,902.41
21,169.53
JT40000048 TRUCK 1.5 TON UTILITY
4/20/2017
N
59,510.52
40,169.52
19,341.00
JT40000049 TRUCK 1.5 TON
12/5/2018
N
61,644.84
20,536.32
41,108.52
JT40000050 TRUCK 1.5 TON
12/5/2018
N
61,644.84
20,536.32
41,108.52
JT40000051 TRUCK 1.5TON
12/5/2018
N
61,644.84
20,174.64
41,470.20
JT40000052 TRUCK 1.5 TON
12/5/2018
N
61,644.84
20,536.32
41,108.52
JT40000053 TRUCK 1.5 TON
12/5/2018
N
61,644.84
20,536.32
41,108.52
JT40000054 TRUCK 1.5 TON
12/5/2018
N
61,644.84
20,536.32
41,108.52
JT40000055 TRUCK 1.5 TON
12/5/2018
N
61,644.84
20,536.32
41,108.52
JT40000056 TRUCK 1.5 TON
12/5/2018
N
61,644.84
20,536.32
41,108.52
JT40000057 TRUCK 1.5 TON
12/19/2018
N
61,644.84
20,536.32
41,108.52
JT40000058 2019CHEVROLET 4500UTILITY TRUCK
8/28/2019
N
61,746.58
10,291.12
51,455.46
JT40000059 2019 CHEVROLET 4500 UTILITY TRUCK
10/3/2019
N
61,746.58
7,718.34
54,028.24
JT40000060 2019CHEVROLET 4500UTILITY TRUCK
8/28/2019
N
61,746.58
10,291.12
51,455.46
JT40000061 2019CHEVROLET 4500UTILITY TRUCK
8/28/2019
N
61,746.58
10,291.12
51,455.46
JT40000062 2019 CHEVROLET 4500 UTILITY TRUCK
10/4/2019
N
61,746.58
7,718.34
54,028.24
JT40000063 2019CHEVROLET 4500UTILITY TRUCK
10/2/2019
N
61,746.58
7,718.34
54,028.24
JT40000064 .2019 CHEVROLET 4500 UTILITY TRUCK
10/4/2019
N
61,746.58
7,718.34
54,028.24
JT40000065 2019 CHEVROLET 4500 UTILITY TRUCK
10/3/2019
N
61,746.58
7,718.34
54,028.24
JT40000066 2019CHEVROLET 4500UTILITY TRUCK
10/7/2019
N
61,746.58
7,718.34
54,028.24
P120000001 TRUCK PICKUP 1/2 TON
2/2/2011
N
5,350.03
4,815.03
535.00
P120000002 TRUCK PICKUP 1/2 TON
7/3/2011
N
5,350.03
3,567.03
1,783.00
P120000003 TRUCK PICKUP 1/2 TON
12/15/2017
N
14,714.45
14,714.45
-
P120000004 TRUCK PICKUP 1/2 TON
12/15/2017
N
14,714.45
14,714.45
P120000005 TRUCK PICKUP 1/2 TON
12/15/2017
N
14,714.45
14,714.45
P120000006 TRUCK PICKUP 1/2 TON
12/15/2017
N
14,714.45
14,714.45
P120000007 TRUCK PICKUP 1/2 TON
12/15/2017
N
14,714.45
14,714.45
-
P120000008 TRUCK PICKUP 1/2 TON
12/15/2017
N
14,714,45
14,714.45
-
P120000009 TRUCK PICKUP 1/2 TON
12/15/2017
N
14,621.52
14,621.52
-
P120000010 TRUCK PICKUP 1/2 TON
12/15/2017
N
15,199.37
15,199.37
-
P120000011 TRUCK PICKUP 1/2 TON
12/15/2017
N
15,199.37
15,199.37
-
P120000012 TRUCK PICKUP 1/2 TON
12/15/2017
N
13,304.80
13,304.80
-
P120000013 TRUCK PICKUP 1/2 TON
12/15/2017
N
13,304.80
13,304.80
-
P120000014 TRUCK PICKUP 1/2 TON
12/15/2017
N
13,753.85
13,753.85
-
P120000015 TRUCK PICKUP 1/2 TON W/PRO
5/18/2016
N
41,304.67
32,527.44
8,777.23
P120000016 TRUCK PICKUP 1/2 TON
4/1/2006
U
6,360.00
5,724.00
636.00
P120000017 TRUCK PICKUP 1/2 TON
4/1/2006
U
1,060.00
954.00
106.00
P120000018 TRUCK PICKUP 1/2 TON
4/1/2006
U
10,600.00
9,540.00
1,060.00
P120000019 TRUCK PICKUP 1/2 TON
1/29/2008
U
1,855.00
1,669.50
185.50
P120000020 2019 DODGE 1500 PICKUP TRUCK CA
4/22/2019
N
36,842.61
9,210.60
27,632.01
P140000001 TRUCK PICKUP 1/2 TON
6/3/2016
N
10,052.46
9,047.21
1,005.25
P140000002 TRUCK PICKUP 1/2 TON
6/3/2016
N
9,907.71
8,916.94
990.77
P140000003 TRUCK PICKUP 1/2 TON 4X4
6/3/2016
N
17,917.90
16,126.11
1,791.79
P140000004 TRUCK PICKUP 1/2 TON 4X4
6/3/2016
N
17,709.05
15,938.14
1,770.91
P140000005 TRUCK PICKUP 1/2 TON 4X4
6/3/2016
N
14,877.67
13,389.90
1,487.77
P140000006 TRUCK PICKUP 1/2 TON 4X4
12/15/2017
N
16,105.38
16,105.38
-
P140000007 TRUCK PICKUP 1/2 TON 4X4
12/15/2017
N
16,105.38
16,105.38
-
P140000008 TRUCK PICKUP 1/2 TON 4X4
5/18/2016
N
38,839.98
30,586.50
8,253.48
P220000001 TRUCK PICKUP 3/4 TON
2/3/2003
N
21,233.80
19,110.42
2,123.38
P220000002 TRUCK PICKUP 3/4 TON
2/18/2008
N
6,632.75
4,546.75
2,086.00
P220000003 TRUCK PICKUP 3/4 TON
4/29/2008
N
7,791.59
5,341.59
2,450.00
P220000004 TRUCK PICKUP 3/4 TON
12/11/2008
N
6,735.30
4,896.80
1,838.50
P220000005 TRUCK PICKUP 3/4 TON
12/11/2008
N
6,672.35
4,833.85
1,838.50
P220000006 TRUCK PICKUP 3/4 TON
12/11/2008
N
6,699.21
4,853.21
1,846.00
P220000007 TRUCK PICKUP 3/4 TON
12/11/2008
N
6,699.21
4,853.21
1,846.00
P220000008 TRUCK PICKUP 3/4 TON
12/11/2008
N
6,699.21
4,853.21
1,846.00
P220000009 TRUCK PICKUP 3/4 TON
12/11/2008
N
6,699.21
4,853.21
1,846.00
P220000010 TRUCK PICKUP 3/4 TON
12/11/2008
N
6,699.21
4,853.21
1,846.00
P220000011 TRUCK PICKUP 3/4 TON
12/11/2008
N
6,699.21
4,853.21
1,846.00
P220000012 TRUCK PICKUP 3/4 TON
2/1/2010
N
6,227.40
4,287.40
1,940.00
P220000013 TRUCK PICKUP 3/4 TON
2/1/2010
N
6,227.40
4,287.40
1,940.00
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset q Description
Acquisition Date
Used
Cost
Accum Depr
NBV
P220000014 TRUCK PICKUP 3/4 TON
2/1/2010
N
6,227.40
4,287.40
1,940.00
P220000015 TRUCK PICKUP 3/4 TON
2/1/2010
N
6,227.40
4,287.40
1,940.00
P220000016 TRUCK PICKUP 3/4 TON
2/1/2010
N
6,227.40
4,287.40
1,940.00
P220000017 TRUCK PICKUP 3/4 TON
2/1/2010
N
6,227.40
4,287.40
1,940.00
P220000018. TRUCK PICKUP 3/4 TON
2/1/2010
N
6,169.20
4,229.20
1,940.00
P220000019 TRUCK PICKUP 3/4 TON
2/1/2010
N
6,169.20
4,229.20
1,940.00
P220000020 TRUCK PICKUP 3/4 TON
3/15/2010
N
7,235.33
4,981.33
2,254.00
P220000021 TRUCK PICKUP 3/4 TON
7/3/2011
N
7,036.32
4,844.32
2,192.00
P220000022 TRUCK PICKUP 3/4 TON
7/3/2011
N
7,036.32
4,844.32
2,192.00
P220000023 TRUCK PICKUP 3/4 TON
2/2/2011
N
7,034.16
6,330.74
703.42
P220000024 TRUCK PICKUP 3/4 TON
7/3/2011
N
7,036.32
4,844.32
2,192.00
P220000025 TRUCK PICKUP 3/4 TON
7/3/2011
N
7,036.32
4,844.32
2,192.00
P220000026 TRUCK PICKUP 3/4 TON
7/3/2011
N
7,036.32
4,844.32
2,192.00
P220000027 TRUCK PICKUP 3/4 TON
2/2/2011
N
7,034.16
6,330.74
703.42
P220000028 TRUCK PICKUP 3/4 TON
7/3/2011
N
7,314.00
5,014.00
2,300.00
P220000029 TRUCK PICKUP 3/4 TON
7/3/2011
N
7,383.00
5,083.00
2,300.00
P220000030 TRUCK PICKUP 3/4 TON
7/3/2011
N
7,314.00
5,014.00
2,300.00
P220000031 TRUCK PICKUP 3/4 TON
7/3/2011
N
7,383.00
5,083.00
2,300.00
P220000032 TRUCK PICKUP 3/4 TON
7/3/2011
N
6,996.20
4,664.20
2,332.00
P220000033 TRUCK PICKUP 3/4 TON
7/3/2011
N
7,073.24
4,716.24
2,357.00
P220000034 TRUCK PICKUP 3/4 TON
7/3/2011
N
6,788.19
4,673.19
2,115.00
P220000035 TRUCK PICKUP 3/4 TON
2/4/2012
N
6,933.60
6,240.24
693.36
P220000036 TRUCK PICKUP 3/4 TON
2/4/2012
N
7,083.45
6,375.10
708.35
P220000037 TRUCK PICKUP 3/4 TON
2/4/2012
N
7,083.45
6,375.10
708.35
P220000038 TRUCK PICKUP 3/4 TON
2/4/2012
N
7,083.45
6,375.10
708.35
P220000039 TRUCK PICKUP 3/4 TON
2/4/2012
N
7,083.45
6,375.10
708.35
P220000040 TRUCK PICKUP 3/4 TON
2/4/2012
N
7,083.45
6,375.10
708.35
P220000041 TRUCK PICKUP 3/4 TON
6/3/2012
N
7,150.28
6,435.25
715.03
P220000042 TRUCK PICKUP 3/4 TON
6/3/2012
N
7,083.45
6,375.10
708.35
P220000043 TRUCK PICKUP 3/4 TON
6/3/2012
N
7,083.45
6,375.10
708.35
P220000044 TRUCK PICKUP 3/4 TON
6/3/2012
N
7,083.45
6,375.10
708.35
P220000045 TRUCK PICKUP 3/4 TON
6/3/2012
N
7,083.45
6,375.10
708.35
P220000046 TRUCK PICKUP 3/4 TON
6/3/2012
N
7,083.45
6,375.10
708.35
P220000047 TRUCK PICKUP 3/4 TON
6/3/2012
N
7,083.45
6,682.50
400.95
P220000048 TRUCK PICKUP 3/4 TON
6/3/2012
N
7,083.45
6,375.10
708.35
P220000049 TRUCK PICKUP 3/4 TON
6/3/2012
N
7,083.45
6,375.10
708.35
P220000050 TRUCK PICKUP 3/4 TON
6/3/2012
N
7,083.45
6,375.10
708.35
P220000051 TRUCK PICKUP 3/4 TON
6/3/2012
N
7,083.45
6,375.10
708.35
P220000052 TRUCK PICKUP 3/4 TON
6/3/2012
N
7,150.28
6,435.25
715.03
P220000053 TRUCK PICKUP 3/4 TON
6/3/2012
N
7,150.28
6,435.25
715.03
P220000054 TRUCK PICKUP 3/4 TON
6/13/2011
N
9,311.76
9,311.76
-
P220000055 TRUCK PICKUP 3/4 TON
6/13/2011
N
9,311.76
9,311.76
-
P220000056 TRUCK PICKUP 3/4 TON
6/13/2011
N
9,224.73
9,224.73
-
P220000057 TRUCK PICKUP 3/4 TON
6/13/2011
N
9,224.73
9,224.73
-
P220000058 TRUCK PICKUP 3/4 TON
6/13/2011
N
9,224.73
9,224.73
-
P220000059 TRUCK PICKUP 3/4 TON
6/13/2011
N
9,311.76
9,311.76
-
P220000060 TRUCK PICKUP 3/4 TON
6/22/2011
N
9,311.76
9,311.76
-
P220000061 TRUCK PICKUP 3/4 TON
6/22/2011
N
9,311.76
9,311.76
-
P220000062 TRUCK PICKUP 3/4 TON
6/22/2011
N
9,311.76
9,311.76
P220000063 TRUCK PICKUP 3/4 TON
6/22/2011
N
9,860.67
9,860.67
P220000064 TRUCK PICKUP 3/4 TON
6/22/2011
N
9,860.67
9,860.67
-
P220000065 TRUCK PICKUP 3/4 TON
6/22/2011
N
9,860.67
9,860.67
-
P220000066 TRUCK PICKUP 3/4 TON
6/22/2011
N
9,860.67
9,860.67
-
P220000067 TRUCK PICKUP 3/4 TON
6/22/2011
N
9,860.67
9,860.67
-
P220000068 TRUCK PICKUP 3/4 TON
5/22/2017
N
11,832.15
10,648.94
1,183.21
P220000069 TRUCK PICKUP 3/4 TON
5/22/2017
N
13,358.54
12,022.72
1,335.82
P220000070 TRUCK PICKUP 3/4 TON
12/15/2017
N
15,682.09
15,682.09
-
P220000071 TRUCK PICKUP 3/4 TON
12/15/2017
N
15,682.09
15,682.09
P220000072 TRUCK PICKUP 3/4 TON
12/15/2017
N
16,923.86
16,923.86
-
P220000073 TRUCK PICKUP 3/4 TON
12/15/2017
N
16,157.91
16,157.91
-
P220000074 TRUCK PICKUP 3/4 TON
12/15/2017
N
16,870.19
16,870.19
-
P220000075 TRUCK PICKUP 3/4 TON
12/15/2017
N
16,870.19
16,870.19
-
P220000076 TRUCK PICKUP 3/4 TON
12/15/2017
N
17,676.87
17,676.87
-
P220000077 TRUCK PICKUP 3/4 TON
12/15/2017
N
17,099.06
17,099.06
-
P220000078 TRUCK PICKUP 3/4 TON
12/15/2017
N
17,215.37
17,215.37
-
P220000079 TRUCK PICKUP 3/4 TON
4/8/2016
N
39,355.95
30,992.76
8,363.19
P220000080 TRUCK PICKUP 3/4 TON
4/8/2016
N
39,355.95
30,992.76
8,363.19
P220000081 TRUCK PICKUP 3/4 TON
4/8/2016
N
38,988.13
35,089.32
3,898.81
P220000082 TRUCK PICKUP 3/4 TON
4/8/2016
N
38,988.13
30,703.14
8,284.99
P220000083 TRUCK PICKUP 3/4 TON
4/8/2016
N
39,355.95
30,992.76
8,363.19
P220000084 TRUCK PICKUP 3/4 TON
4/8/2016
N
38,988.14
30,703.14
8,285.00
P220000085 TRUCK PICKUP 3/4 TON
4/8/2016
N
38,988.14
30,703.14
8,285.00
P220000086 TRUCK PICKUP 3/4 TON
4/8/2016
N
38,988.13
30,703.14
8,284.99
P220000087 TRUCK PICKUP 3/4 TON
4/8/2016
N
38,988.13
30,703.14
8,284.99
P220000088 TRUCK PICKUP 3/4 TON
4/8/2016
N
39,355.95
30,992.76
8,363.19
P220000089 TRUCK PICKUP 3/4 TON
3/28/2016
N
39,355.95
39,355.95
-
P220000090 TRUCK PICKUP 3/4 TON
4/8/2016
N
39,355.95
30,992.76
8,363.19
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
P220000091 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000092 TRUCK PICKUP 3/4TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000093 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000094 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000095 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000096 TRUCK PICKUP 3/4 TON W/LIF
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000097 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896,08
12,949.93
P220000098 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000099 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,346.01
26,896.08
12,949.93
P220000100 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000101 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000102 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000103 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000104 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,346.01
26,896.08
12,949.93
P220000105 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000106 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000107 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000108 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000109 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000110 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000111 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000112 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000113 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000114 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000115 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000116 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896.08
12,949.93
P220000117 TRUCK PICKUP 3/4 TON W/LIF
4/1/2017
N
42,272.01
28,533.60
13,738.41
P220000118 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,473.62
26,644.68
12,828.94
P220000119 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,473.62
26,644.68
12,828.94
P220000120 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,473.62
26,644.68
12,828.94
P220000121 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,473.62
26,644.68
12,828.94
P220000122 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,473.62
26,644.68
12,828.94
P220000123 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,473.62
26,644.68
12,828.94
P220000124 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,473.62
26,644.68
12,928.94
P220000125 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,473.62
26,644.68
12,828.94
P220000126 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,473.62
26,644.68
12,828.94
P220000127 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,473.62
26,644.68
12,828.94
P220000151 TRUCK PICKUP 3/4 TON
8/29/2018
N
40,026.93
16,210.92
23,816.01
P220000152 TRUCK PICKUP 3/4 TON
8/15/2018
N
40,026.93
16,210.92
23,816.01
P220000153 TRUCK PICKUP 3/4 TON
8/15/2018
N
40,026.93
16,210.92
23,816.01
P220000154 TRUCK PICKUP 3/4 TON
8/14/2018
N
40,026.93
16,210.92
23,816.01
P220000155 TRUCK PICKUP 3/4 TON
9/6/2018
N
40,026.93
15,431.13
24,595.80
P220000156 TRUCK PICKUP 3/4 TON
8/23/2018
N
40,026.93
16,210.92
23,816.01
P220000157 TRUCK PICKUP 3/4 TON
8/15/2018
N
40,026.93
16,210.92
23,816.01
P220000158 TRUCK PICKUP 3/4 TON
9/6/2018
N
40,026.94
15,431.13
24,595.81
P220000159 TRUCK PICKUP 3/4 TON
8/23/2018
N
40,026.94
15,498.84
24,528.10
P220000160 TRUCK PICKUP 3/4 TON
8/14/2018
N
40,026.93
15,498.84
24,528.09
P220000161 TRUCK PICKUP 3/4 TON
9/6/2018
N
40,026.94
14,416.74
25,610.20
P220000162 TRUCK PICKUP 3/4 TON
8/21/2018
N
40,404.56
15,645.00
24,759.56
P220000163 TRUCK PICKUP 3/4 TON
8/14/2018
N
40,404.56
15,645.00
24,759.56
P220000164 TRUCK PICKUP 3/4 TON
8/21/2018
N
40,404.55
15,645.00
24,759.55
P220000165 TRUCK PICKUP 3/4 TON
8/14/2018
N
40,404.56
15,645.00
24,759.56
P220000166 TRUCK PICKUP 3/4 TON
8/23/2018
N
40,404.56
15,645.00
24,759.56
P220000167 TRUCK PICKUP 3/4 TON
9/6/2018
N
40,404.56
15,098.85
25,305.71
P220000168 TRUCK PICKUP 3/4 TON
8/29/2018
N
40,404.56
15,645.00
24,759.56
P220000169 TRUCK PICKUP 3/4 TON
9/6/2018
N
40,404.56
15,098.85
25,305.71
P220000170 TRUCK PICKUP 3/4 TON
8/15/2018
N
40,404.56
15,645.00
24,759.56
P220000171 TRUCK PICKUP 3/4 TON LIFTG
8/23/2018
N
40,026.93
15,498.84
24,528.09
P220000172 TRUCK PICKUP 3/4 TON
8/29/2018
N
40,404.56
15,645.00
24,759.56
P220000173 TRUCK PICKUP 3/4 TON
3/16/2009
U
19,335.89
17,402.30
1,933.59
P220000174 TRUCK PICKUP 3/4 TON
3/16/2009
U
15,668.53
14,101.68
1,566.85
P220000175 2019 RAM 2500 TRUCK PICKUP
6/4/2019
N
42,760.41
8,017.60
34,742.81
P220000176 2019 RAM 2500 TRUCK PICKUP
6/27/2019
N
42,760.41
8,017.60
34,742.81
P220000177 2019 RAM 2500 TRUCK PICKUP
6/4/2019
N
42,760.41
8,017.60
34,742.81
P220000178 2019 RAM 2500 TRUCK PICKUP
6/27/2019
N
42,760.41
8,017.60
34,742.81
P220000179 2019 RAM 2500 TRUCK PICKUP
6/14/2019
N
42,760.41
8,017.60
34,742.81
P220000180 2019 RAM 2500 TRUCK PICKUP
5/31/2019
N
42,760.41
8,819.36
33,941.05
P220000181 2019 RAM 2500 TRUCK PICKUP
6/4/2019
N
42,760.41
8,017.60
34,742.81
P220000182 2019 RAM 2500 TRUCK PICKUP
6/27/2019
N
42,760.41
8,017.60
34,742.81
P220000183 2019 RAM 2500 TRUCK PICKUP W/LIFTGATE
6/27/2019
N
45,949.01
8,615.40
37,333.61
P220000184 2019 RAM 2500 TRUCK PICKUP
5/31/2019
N
42,760.41
8,819.36
33,941.05
P220000185 2019 RAM 2500 TRUCK PICKUP
5/31/2019
N
42,760.41
8,819.36
33,941.05
P220000186 2019 RAM 2500 TRUCK PICKUP
6/4/2019
N
42,760.41
8,017.60
34,742.81
P220000187 2019 RAM 2500 TRUCK PICKUP
6/4/2019
N
42,760.41
8,017.60
34,742.81
P220000188 2019 RAM 2500 TRUCK PICKUP
6/4/2019
N
42,760.41
8,017.60
34,742.81
P220000189 2019 RAM 2500 TRUCK PICKUP
5/31/2019
N
42,760.41
8,819.36
33,941.05
P220000190 2019 RAM 2500 TRUCK PICKUP
5/31/2019
N
42,760.41
8,819.36
33,941.05
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
P220000191 2019 RAM 2500 TRUCK PICKUP
6/4/2019
N
42,760.41
8,017.60
34,742.81
P220000192 2019 RAM 2500 TRUCK PICKUP
5/31/2019
N
42,760.41
8,819.36
33,941.05
P220000193 2019 RAM 2500 TRUCK PICKUP
6/14/2019
N
42,760.41
8,017.60
34,742.81
P220000194 2019 RAM 2500 TRUCK PICKUP
6/4/2019
N
42,760.41
8,017.60
34,742.81
P220000195 2019 RAM 2500 TRUCK PICKUP
6/14/2019
N
42,760.41
8,017.60
34,742.81
P220000196 2019 RAM 2500 TRUCK PICKUP
6/14/2019
N
42,760.41
8,017.60
34,742.81
P220000197 2019 RAM 2500 TRUCK PICKUP
'
6/4/2019
N
42,760.41
8,017.60
34,742.81
P220000198 2019 RAM 2500 TRUCK PICKUP
6/4/2019
N
42,760.41
8,819.36
33,941.05
P240000001 TRUCK PICKUP 3/4 TON 4X4
2/3/2003
N
24,165.80
21,749.22
2,416.58
P240000003 TRUCK PICKUP 3/4 TON 4X4
2/2/2011
N
10,243.30
9,218.97
1,024.33
P240000004 TRUCK PICKUP 3/4 TON 4X4
7/3/2011
N
7,869.00
5,418.00
2,451.00
P240000005 TRUCK PICKUP 3/4 TON 4X4
6/22/2011
N
10,513.61
10,513.61
P240000006 TRUCK PICKUP 3/4 TON 4X4
6/22/2011
N
10,859.37
10,859.37
_
P240000007 TRUCK PICKUP 3/4 TON 4X4
6/22/2011
N
10,859.37
10,859.37
P240000008 TRUCK PICKUP 3/4 TON 4X4
5/22/2017
N
13,392.57
8,788.85
4,603.72
P240000009 TRUCK PICKUP 3/4 TON 4X4
12/15/2017
N
18,268.76
18,268.76
P240000010 TRUCK PICKUP 3/4 TON 4X4
12/15/2017
N
18,846.61
18,846.61
P240000011 TRUCK PICKUP 3/4 TON 4X4
12/15/2017
N
18,846.61
18,846.61
-
VAN0000001 VAN PASSENGER
4/2/2016
N
36,090.79
28,421.52
7,669.27
WRKTIS0002 2019 ROAD WIDENER FHDR DUALSIDE ATTACHMENT
4/24/2019
N
63,880.83
13,308.50
50,572.33
WRKT190003 2019 CATERPILLAR BKT320-48 GRAPTOR ATTACHMENT
7/10/2019
N
25,773.63
4,832.55
20,941.08
WRKT190004 2019 CATERPILLAR BKT320-48 GRAPTOR ATTACHMENT
7/10/2019
N
25,773.62
4,832.55
20,941.07
DT10000001 TRUCK FLATBED DUMP
5/1/2001
N
16,735.33
12,751.33
3,984.00
DT10000002 TRUCK FLATBED DUMP
5/1/2001
N
16,735.33
12,751.33
3,984.00
DT10000003 TRUCK FLATBED DUMP
5/1/2001
N
16,735.33
12,751.33
3,984.00
DT10000004 TRUCK FLATBED DUMP
5/1/2001
N
18,011.82
14,027.82
3,984.00
DT10000005 TRUCK FLATBED DUMP
7/15/1996
N
8,963.49
8,067.14
896.35
DT10000006 TRUCK FLATBED DUMP
8/2/1999
N
31,823.66
28,223.66
3,600.00
DT10000007 TRUCK FLATBED DUMP
2/9/2004
N
15,900.00
9,929.10
5,970.90
DT10000008 TRUCK FLATBED DUMP
2/9/2004
N
17,911.80
11,940.90
5,970.90
DT10000009 TRUCK FLATBED DUMP
6/21/2004
N
59,855.02
53,869.52
5,985.50
DT10000010 TRUCK FLATBED DUMP
3/31/2010
N
21,762.38
13,775.18
7,987.20
DT10000011 TRUCK FLATBED DUMP
3/31/2010
N
20,571.77
13,025.04
7,546.73
DT10000013 TRUCK FLATBED DUMP
6/3/2012
N
24,164.56
21,748.10
2,416.46
DT30000014 TRUCK FLATBED DUMP
6/3/2012
N
24,164.56
21,748.10
2,416.46
DT10000015 TRUCK FLATBED DUMP
6/3/2012
N
23,938.72
21,544.85
2,393.87
DT10000016 TRUCK FLATBED DUMP
9/30/2013
N
34,153.14
30,737.83
3,415.31
DT10000017 TRUCK FLATBED DUMP
3/25/2010
N
31,722.83
31,722.83
FB10000601 TRUCK FLATBED S/A
6/9/1997
N
42,694.54
38,425.09
4,269.45
FB10000002 TRUCK FLATBED
4/1/2006
U
8,480.00
7,632.00
848.00
FBS1000001 TRUCK FLATBED SERVICE
5/1/2001
N
17,902.41
13,942.41
3,960.00
FB51000002 TRUCK FLATBED SERVICE
12/2/2002
N
20,840.42
15,303.42
5,537.00
FBSW200001 TRUCK FLATBED SERVICE WATE
3/31/2010
N
24,146.07
15,204.81
8,941.26
FBSW200002 TRUCK FLATBED SERVICE WATE
2/5/2013
N
23,015.57
20,714.01
2,301.56
FRM1000001 TRUCK FORM
3/15/2010
N
18,187.71
11,932.71
6,255.00
FRM1000002 TRUCK FORM
6/3/2012
N
31,996.96
28,797.26
3,199.70
JT30000038 TRUCK MECHANIC 1 TON
12/15/2017
N
20,333.39
20,333.39
-
JT30000040 TRUCK MECHANIC 1 TON
12/15/2017
N
22,844.97
15,230.04
7,614.93
MST0000001 TRUCK MECHANIC 2 TON
3/22/2006
N
20,347.55
13,948.95
6,398.60
MST0000002 TRUCK MECHANIC 2 TON
3/22/2006
N
20,347.55
13,948.95
6,398.60
MST0000003 TRUCK MECHANIC 2 TON
3/22/2006
N
20,347.55
13,948.95
6,398.60
MST0000004 TRUCK MECHANIC 2 TON
4/7/2003
N
68,534.70
61,681.23
6,853.47
MST0000005 TRUCK MECHANIC 2 TON
3/17/2008
N
20,952.07
14,363,07
6,589.00
MST0000006 TRUCK MECHANIC 2 TON
3/31/2010
N
22,919.48
16,018.48
6,901.00
MST0000007 TRUCK MECHANIC 2TON
3/31/2010
N
24,185.69 ''
17,193.69
6,992.00
MST0000008 TRUCK MECHANIC 2 TON
3/31/2010
N
24,792.90
17,469.90
7,323.00
MST0000009 TRUCK MECHANIC 2 TON
3/31/2010
N
24,561.19
17,238.19
7,323.00
MST0000010 TRUCK MECHANIC 2.5 TON
5/1/2012
U
6,420.00
5,820.00
600.00
MST0000011 TRUCK MECHANIC
12/15/2017
N
48,278.98
48,278.98
-
MST0000012 TRUCK MECHANIC
12/15/2017
N
48,278.98
48,278.98
-
MST0000013 TRUCK MECHANIC
12/15/2017
N
48,278.98
48,278.98
-
MST0000014 2016 HINO 268A SERVICE TRUCK
10/7/2019
U
54,499.08
12,262.32
42,236.76
MST0000015 2015 HINO 268A SERVICE TRUCK
10/7/2019
N
54,499.08
12,262.32
42,236.76
MST0000016 2015 HINO 268A SERVICE TRUCK
10/7/2019
N
54,499.08
12,262.32
42,236.76
MST0000018 TRUCK MECHANIC
5/18/2018
N
154,514.42
45,114.69
109,399.73
MST0000019 TRUCK MECHANIC
5/18/2018
N
154,514.42
45,114.69
109,399.73
MST0000020 TRUCK MECHANIC
5/18/2018
N
154,514.42
45,114.69
109,399.73
MST0000021 TRUCK LUBE
5/11/2018
N
152,988.60
44,669.24
108,319.36
TFW2000003 TRUCK WATER FUEL
3/31/2010
N
25,761.39
15,204.81
10,556.58
TKMS000001 TRUCK DRYER JET
4/1/2006
U
25,000.00
25,000.00
-
AD30000001 TRUCK DUMP ARTICULATED
7/1/2016
U
250,000.00
142,788.44
107,211.56
AD35000001 TRUCK DUMP ARTICULATED
7/1/2016
U
125,000.00
112,500.00
12,500.00
AD40000001 TRUCK DUMP ARTICULATED
12/15/2017
N
190,970.80
127,313.88
63,656.92
AD40000002 TRUCK DUMP ARTICULATED
12/15/2017
N
190,970.81
121,526.88
69,443.93
AD40000003 TRUCK DUMP ARTICULATED
12/15/2017
N
195,165.95
130,110.68
65,055.27
AP06000001 PAVER 6 FTTRACK AP255E
4/19/2018
U
34,023.08
17,011.56
17,011.52
AP08000001 PAVER 8FTTRACK APS55D
5/3/2010
N
89,790.00
89,790.00
-
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
AP08000002 PAVER 8FTTRACK AP655D
12/15/2017
N
140,394.96
140,394.97
(0.01)
AP08000010 PAVER 8 FTTRACK P385B
8/3/2017
N
52,404.15
17,468.16
34,935.99
AP08000015 PAVER 8FT TRACK PF4410
3/27/2009
U
120,000.00
120,000.00
-
AP10000002 PAVER 1OFTTRACK RP195
3/31/2010
N
97,189.93
97,189.93
APIOOO0003 PAVER 10FT RUBBER TIRED RP
3/31/2010
N
90,280.00
90,280.00
APIOOO0004 PAVER 10FTTRACK PF5510 RE
6/16/2005
N
332,018.99
332,018.99
-
AP10000005 PAVER 10FTTRACK RP195
4/1/2013
N
69,308.80
69,308.80
-
AP10000006 PAVER IOFTTRACKAP1055D
4/15/2009
N
80,273.65
80,273.65
-
AP10000007 PAVER 10FT TRACK AP1055D
4/15/2009
N
72,381.82
72,381.82
-
AP10000008 PAVER 10FTTRACK AP1055D
3/22/2010
N
97,463.40
97,463.40
-
AP10000009 PAVER 10FTTRACK AP1055D
3/22/2010
N
113,281.63
113,281.63
-
AP10000011 PAVER 10FTTRACK AP1055E
12/15/2017
N
146,701.93
146,701.94
(0.01)
AP10000012 PAVER IOFTTRACK AP1055E
12/15/2017
N
147,561.81
147,561.82
(0.01)
APIOOOOO13 PAVER 10FTTRACK AP1055E
12/15/2017
N
147,212.99
147,213.00
(0.01)
APIOOOOO14 PAVER 10FTTRACK AP1055E
12/15/2017
N
147,124.45
147,124.46
(0.01)
APIOOOOO15 PAVER 10FT TRACK AP1055E
12/15/2017
N
152,557.33
152,557.34
(0.01)
APIOOOOO16 PAVER 10FT TRACK AP1055E
12/15/2017
N
153,996.55
153,996.56
(0:01)
AP10000020 PAVER 10FTTRACK 5200-21
4/1/2015
N
420,980.00
236,801.33
184,178.67
AP10000043 PAVER 10FTTRACK PF5510
3/17/2009
U
125,000.00
125,000.00
-
AP10000044 PAVER l0FTTRACK PF5510
3/17/2009
U
30,000.00
30,000.00
-
APC0000001 PAVER CURB ASPHALT
4/1/2006
U
1,000.00
900.00
100.00
APT0000001 PAVER PULLTYPE H500B
4/4/1988
N
12,895.37
11,605.83
1,289.54
ATT7713 ATTACHMENT BED WATER/FUEL
4/9/2008
N
55,704.62
55,704.62
-
BKT1000001 ATTACHMENT BUCKET
9/6/1995
N
6,983.55
6,285.19
698.36
BKT1000002 ATTACHMENT BUCKET
7/18/1995
N
5,856.90
5,271.21
585.69
BL15000001 LOADER BACKHOE 420F2
4/19/2018
U
51,039.15
16,332.55
34,706.60
BLISOO0002 LOADER BACKHOE 420F2
4/19/2018
U
51,073.93
16,343.64
34,730.29
BL15000003 LOADER BACKHOE 420 W/FORKS
4/19/2018
U
30,529.85
8,359.44
22,170.41
BL15000004 2018 CATERPILLAR 420F2 LOADER BACKHOE
8/30/2019
N
5,500.00
1,222.24
4,277.76
BL15000005 2018 CATERPILLAR 4201`2 LOADER BACKHOE
12/19/2019
N
24,175.26
2,686.16
21,489.10
BM60000001 LIFT BOOM 60'
7/l/2016
U
4,393.00
3,953.70
439.30
C185000003 COMPRESSOR AIR 185
4/1/2000
U
2,300.00
2,100.00
200.00
C185000005 COMPRESSORAIR
4/l/2006
U
1,000.00
1,000.00
-
CBRK000001 BREAKER CONCRETE
2/25/2002
N
41,825.75
37,943.37
3,882.38
CBRK000002 BREAKER CONCRETE
4/26/2002
N
58,275.00
52,447.50
5,827.50
CP80000002 COLD PLANER ROTOMILL
4/l/2013
N
98,142.54
88,328.29
9,814.25
CRB0000001 PAVER CURB & GUTTER GT6300
4/10/1997
N
151,320.00
136,188.00
15,132.00
CRB0000002 PAVER CURB & GUTTER GT3600
7/20/2000
N
159,280.40
143,352.36
15,928.04
CRB0000003 PAVER CURB & GUTTER GT3600
4/23/2001
N
129,617.55
116,655.79
12,961.76
CRB0000004 PAVER CURB & GUTTER GT3600
4/l/2002
N
130,480.46
117,432.41
13,048.05
CRB0000005 PAVER CURB & GUTTER TP880
7/3/2011
N
60,660.00
40,440.00
20,220.00
CRB0000006 PAVER CURB & GUTTER GT3600
4/30/1997
U
127,000.00
122,300.00
4,700.00
CRB0000007 PAVER CURB & GUTTER GT3600
8/1/2016
U
65,000.00
65,000.00
-
CRB0000008 2017 POWER CURBER 5700-C CURB & GUTTER CONCRETE PAVER
4/1/2017
N
339,551.66
127,332.00
212,219.66
CRB0000009 2018 POWER CURBER 5700-CMAX CURB & GUTTER CONCRETE PAVER
4/1/2018
N
463,440.54
115,860.24
347,580.30
CR130000010 2019 POWER CURBER 5700-C CURB & GUTTER CONCRETE PAVER
4/1/2019
N
345,524.40
43,190.52
302,333.88
CSP0000001 SPREADER CHIP
7/21/1977
N
34,121.36
34,121.36
-
CSP0000002 SPREADER CHIP
4/1/2018
U
108,123.50
54,061.68
54,061.82
CST3000001 COMPACTOR STATICC330A
12/10/1987
N
29,744.00
26,769.60
2,974.40
CST3000002 COMPACTOR STATICC330A
12/10/1987
N
29,744.00
26,769.60
2,974.40
CST3000003 COMPACTOR STATIC C330B
8/23/1988
N
28,860.00
25,974.00
2,886.00
CST3000004 COMPACTOR STATIC C330B
8/23/1988
N
28,860.00
25,974.00
2,886.00
CST3000005 COMPACTOR STATIC C330B
4/30/2009
U
3,000.00
3,000.00
-
CST3000006 COMPACTOR STATIC C330B
4/30/2009
U
3,000.00
3,000.00
-
CST3000007 COMPACTOR STATIC C330B
4/30/2009
U
3,000.00
3,000.00
-
CST3000008 COMPACTOR STATIC BW5AS
3/31/2005
U
5,000.00
5,000.00
-
CST3000009 COMPACTOR STATIC C330A
3/31/2005
U
2,500.00
2,250.00
250.00
CWKT100001 ATTACHMENTTIE BAR INSERTE
4/1/2004
N
61,340.66
55,206.59
6,134.07
CWKT110001 ATTACHMENT BURLAP DRAG W/6
5/18/2001
N
13,604.30
12,243.87
1,360.43
CWKT300001 ATTACHMENT CONV GOMACO W/6
J 6/3/1997
N
22,745.00
20,470.50
2,274.50
CWKT400001 ATTACHMENT EXTENSION W/537
7/22/1994
N
3,870.03
3,483.03
387.00
CWKT500001 FINISHER FINAL BIDWELL W/5
8/15/1994
N
28,432.50
25,589.25
2,843.25
CWKT500002 FINISHER FINAL BIDWELL W/5
2/10/1995
N
30,460.00
27,414.00
3,046.00
CWKT500003 PAN HYDRAULIC VIBRATOR W/5
6/14/2001
N
3,591.31
3,232.18
359.13
CWKT600002 MOLD CURB W/6894
3/22/2000
N
15,312.00
13,780.80
1,531.20
CWKT600003 MOLD PARAPET W/6136
5/20/2001
N
22,415.00
20,173.50
2,241.50
CWKT600004 MOLD CURB 31 IN F/6894 PAV
8/4/2003
N
5,942.52
5,348.26
594.26
D080000001 DOZER 70 HP FD5 LT
7/1/2016
U
6,000.00
5,400.00
600.00
D090000001 DOZER 85 HP D4K XL
4/28/2016
N
121,771.74
54,797.28
66,974.46
D090000002 DOZER 90 HP D5G
3/16/2009
U
38,000.00
34,200.00
3,800.00
D105000001 DOZER 100 HP D5K2 LGP
12/15/2017
N
45,651.61
27,391.00
13,260.61
D105000003 DOZER 100 HP D5K2 LGP
12/15/2017
N
45,652.93
27,391.84
18,261.09
D105000004 DOZER 100 HP D5K LGP
3/18/2013
U
70,860.00
55,802.16
15,057.84
D105000005 DOZER 100 HP D5K LGP
3/18/2013
U
83,580.00
65,819.16
17,760.84
D105000006 2014 CATERPILLAR D5K2 LGP DOZER
12/23/2019
N
23,433.56
2,343.36
21,090.20
DIOSO00007 DOZER 100 HP D5K LGP
4/l/2017
U
106,713.64
41,160.96
65,552.68
D105000008 DOZER 100 HP D5K2 LGP
4/1/2017
U
103,010.60
39,732.72
63,277.88
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
D105000009 DOZER 100 HP D5K2 LGP
4/1/2017
U
102,941.29
39,705.84
63,235.45
D105000010 DOZER 100 HP D5K2 LGP
4/1/2017
U
109,873.34
42,379.68
67,493.66
D1o5000011 DOZER 100 HP D5K2 LGP W/RI
4/1/2017
U
118,547.46
45,725.40
72,822.06
D105000013 2015 CATERPILLAR D5K2 LGP DOZER - USED
9/30/2019
U
89,880.00
7,864.50
82,015.50
D130000001 2017 CATERPILLAR D6K2 LGP DOZER
12/19/2019
U
4,000.00
444.44
3,555.56
D185000001 DOZER 150 HP 750K LGP
12/27/2017
U
91,607.94
38,475.36
53,132.58
D185000002 DOZER 150 HP D6N LGP
6/17/2015
U
219,271.13
132,476.18
86,794.95
D225000001 2014 CATERPILLAR D6TXL DOZER
4/18/2019
N
101,497.95
30,449.40
71,048.55
D225000002 2014 CATERPILLAR D6TXL DOZER
12/23/2019
N
54,390.35
5,439.04
48,951.31
DC20000001 TRUCK TRACTOR TANDEM
3/1/2006
N
23,443.91
15,629.27
7,814.64
DC20000002 TRUCK TRACTOR TANDEM
4/1/2003
N
89,897.66
80,907.89
8,989.77
DC20000003 TRUCK TRACTOR TANDEM
3/19/2009
N
29,128.16
19,968.36
9,159.80
DC20000004 TRUCK TRACTOR DUMP
3/15/2004
N
77,633.36
69,070.39
8,562.97
DC20000005 TRUCK TRACTOR DUMP
3/15/2010
N
25,280.40
16,853.60
8,426.80
DC20000006 TRUCK TRACTOR TANDEM
3/31/2010
N
31,227.28
21,407.28
9,820.00
DC20000007 TRUCK TRACTOR TANDEM
3/31/2010
N
31,227.28
21,407.28
9,820.00
DC20000008 TRUCK TRACTOR TANDEM
3/31/2010
N
31,227.28
21,407.28
9,820.00
DC20000009 TRUCK TRACTOR TANDEM
3/31/2010
N
31,227.28
21,407.28
9,820.00
DC20000010 TRUCK TRACTOR TANDEM
3/31/2010
N
28,850.52
19,862.52
8,988.00
DC20000011 TRUCK TRACTOR DUMP
4/1/2013
N
18,356.40
16,520.76
1,835.64
DC20000012 TRUCK TRACTOR DUMP
4/1/2013
N
18,356.40
16,520.76
1,835.64
DC20000013 TRUCK TRACTOR TANDEM
4/1/2013
N
22,978.68
20,680.81
2,297.87
DC20000014 TRUCK TRACTOR TANDEM
2/5/2013
N
34,862.53
31,376.28
3,486.25
DC20000015 TRUCK TRACTOR DUMP
2/5/2013
N
31,542.60
28,388.34
3,154.26
DC20000016 TRUCK TRACTOR DUMP
2/5/2013
N
29,527.51
26,574.76
2,952.75
DC20000017 TRUCK TRACTOR DUMP
2/5/2013
N
27,595.80
24,836.22
2,759.58
DC20000018 TRUCK TRACTOR DUMP
9/30/2013
N
33,173.92
29,856.53
3,317.39
DC20000019 TRUCK TRACTOR DUMP
3/12/2010
N
28,191.90
28,191.90
-
DC20000020 TRUCK TRACTOR DUMP
3/12/2010
N
28,191.90
28,191.90
-
DC20000021 TRUCK TRACTOR TANDEM
3/1/2016
N
46,412.76
41,771.48
4,641.28
DC20000022 TRUCK TRACTOR TANDEM
4/26/2016
N
155,329.40
69,898.20
85,431.20
DC20000023 TRUCK TRACTOR TANDEM
4/26/2016
N
155,329.40
69,898.20
85,431.20
DC20000024 TRUCKTRACTOR
4/22/2016
N
178,626.00
80,381.76
98,244.24
DC20000025 TRUCKTRACTOR
4/22/2016
N
178,626.00
80,381.76
98,244.24
DC20000026 TRUCKTRACTOR
4/22/2016
N
178,626.00
80,381.76
98,244.24
DC20000027 TRUCKTRACTOR
4/22/2016
N
178,626.00
80,381.76
98,244.24
DC20000028 TRUCK TRACTOR T/A
5/18/2017
N
160,608.54
52,699.73
107,908.81
DC20000029 TRUCK TRACTOR TANDEM
4/1/2006
U
5,830.00
5,247.00
583.00
DC20000030 TRUCK TRACTOR TANDEM
4/1/2006
U
13,780.00
12,402.00
1,378.00
DC20000031 TRUCK TRACTOR TANDEM
4/1/2006
U
22,790.00
20,511.00
2,279.00
DC20000032 TRUCK TRACTOR TANDEM
4/1/2006
U
63,600.00
57,240.00
6,360.00
DC20000033 TRUCK TRACTOR TANDEM
4/1/2006
U
71,190.00
64,071.00
7,119.00
DC20000034 TRUCK TRACTOR TANDEM
4/1/2006
U
71,550.00
64,395.00
7,155.00
DC20000035 TRUCK TRACTOR TANDEM
1/29/2008
U
57,240.00
51,516.00
5,724.00
DC20000036 TRUCK TRACTOR TANDEM
3/16/2009
U
8,480.00
7,632.00
848.00
DC20000037 TRUCK TRACTOR TANDEM
3/16/2009
U
8,480.00
7,632.00
848.00
DC20000038 TRUCK TRACTOR TANDEM
3/31/2005
U
3,312.50
2,981.25
331.25
DC30000001 TRUCK TRACTOR TRIAXLE
3/12/2010
N
39,641.25
39,641.25
-
DC20000039 TRUCK TRACTOR TRIAXLE
3/1/2016
N
171,877.16
78,956.15
92,921.01
DC30000004 TRUCKTRACTOR
4/22/2016
N
178,626.00
80,381.76
98,244.24
DC20000040 TRUCKTRACTOR
4/22/2016
N
178,626.00
80,381.76
98,244.24
DCW2000001 TRUCK WATER FIFTH WHEEL
5/1/2001
N
23,150.89
16,020.77
7,130.12
DCW2000002 TRUCK WATER FIFTH WHEEL
6/3/2002
N
34,281.78
32,881.78
1,400.00
DCW2000003 TRUCK WATER FIFTH WHEEL
6/3/2002
N
34,281.78
25,732.78
8,549.00
DCW2000004 TRUCK WATER FIFTH WHEEL
6/3/2002
N
34,281.78
25,732.78
8,549,00
DCW2000005 TRUCK WATER FIFTH WHEEL
2/16/2004
N
21,066.47
10,597.10
10,469.37
DCW3000001 TRUCK WATER FIFTH WHEEL
5/1/1995
N
83,758.84
75,382.95
8,375.89
DCW3000002 TRUCK WATER FIFTH WHEEL
2/16/2000
N
40,535.84
32,099.26
8,436.58
DCW3000003 TRUCK WATER FIFTH WHEEL
2/16/2000
N
40,615.86
32,099.26
8,516.60
DCW3000004 TRUCK WATER FIFTH WHEEL
5/1/2001
N
27,596.52
20,250.89
7,345.63
DCW3000005 TRUCK WATER FIFTH WHEEL
5/1/2001
N
27,912.88
20,250.89
7,661.99
DCW3000006 TRUCK WATER FIFTH WHEEL
3/16/2004
N
98,058.95
87,573.95
10,485.00
DCW3000007 TRUCK WATER FIFTH WHEEL
3/15/2010
N
32,086.22
21,047.41
11,038.81
DCW3000008 TRUCK WATER FIFTH WHEEL
3/1/2010
N
37,123.93
35,042.65
2,081.28
DD35000008 COMPACTOR VIBR 35"" RD12A-9
5/1/2017
N
17,596.00
11,547.43
6,048.57
DD35000009 COMPACTOR VIBR 35"" RD12A-9
5/3/2018
N
17,914.00
7,725.47
10,188.53
DD48000001 COMPACTOR VIBR 48"" CB24B
5/17/2016
N
42,191.18
37,181.00
5,010.18
DD48000002 COMPACTOR VIBR 48"" CB24B
5/17/2016
N
42,589.21
37,531.73
5,057.48
DD48000003 COMPACTOR VIER 48"" CB24B
5/17/2016
N
42,589.21
37,531.73
5,057.48
DD48000004 COMPACTOR VIER 48"" CB24B
5/17/2016
N
42,191.18
37,181.00
5,010.18
DD48000005 COMPACTOR VIER 48"" CB24B
5/17/2016
N
42,191.18
37,181.00
5,010.18
DD48000006 COMPACTOR VIBR 48"" CB24B
5/17/2016
N
42,589.21
37,531.73
5,057.48
DD48000007 COMPACTOR VIBR 48"" CB24B
5/23/2016
N
42,191.18
37,181.00
5,010.18
DD48000008 COMPACTOR VIBR 48"" CB24B
5/23/2016
N
42,191.18
37,181.00
5,010.18
DD48000009 COMPACTOR VIBR 48"" CB24B
5/23/2016
N
42,191.18
37,181.00
5,010.18
D048000010 COMPACTOR VIBR 48"" CB24B
5/23/2016
N
42,191.18
37,181.00
5,010.18
DD48000011 COMPACTOR VIBR 48"" CB24B
5/23/2016
N
42,589.21
37,531.73
5,057.48
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
DD48000012 COMPACTOR VIBR 48"" CB24B
5/17/2016
N
42,191.18
37,181.00
5,010.13
DD48000013 COMPACTOR VIBR 48"" CB24B
5/17/2016
N
42,191.18
37,181.00
5,010.18
DD48000014 COMPACTOR VIBR 48"" CB24B
5/23/2016
N
42,589.21
37,531.73
5,057.48
DD48000015 COMPACTOR VIBR 48"" CB24B
5/23/2016
N
42,191.18
37,181.00
5,010.18
DD48000016 COMPACTOR VIBR 48"" CB24B
5/23/2016
N
42,191.18
37,181.00
5,010.18
DD48000017 COMPACTOR VIBR 48"" CB24B
5/24/2018
N
42,574.90
18,360.44
24,214.46
DD48000018 COMPACTOR VIBR 48"" 224
3/16/2009
U
15,800.00
15,800.00
-
DD51000001 COMPACTOR VIBR 51"" CB34B
4/29/2016
N
56,168.34
50,551.51
5,616.83
DD51000002 COMPACTOR VIBR 51"" CB34B
4/29/2016
N
56,698.23
51,028.41
5,669.82
DD51000003 COMPACTOR VIBR 51"" CB34B
4/29/2016
N
56,168,34
50,551.51
5,616.83
DDS1000004 COMPACTOR VIBR 51"" CB34B
4/29/2016
N
56,698.23
51,028.41
5,669.82
DD51000005 COMPACTOR VIBR 51"" CB34B
4/29/2016
N
56,698.23
51,028.41
5,669.82
DD51000006 COMPACTOR VIBR 51"" CB34B
4/29/2016
N
56,698.23
51,028.41
5,669.82
DD51000007 COMPACTOR VIBR 51"" CB348
5/6/2016
N
56,168.34
49,498.40
6,669.94
DD51000008 COMPACTOR VIBR 51"" CB34B
5/6/2016
N
56,698.23
49,965.35
6,732.88
DD51000009 COMPACTOR VIBR 51"" CB34B
5/6/2016
N
56,698.23
49,965.35
6,732.88
D051000010 COMPACTOR VIBR 51"" C834B
5/6/2016
N
56,168.34
49,498.40
6,669.94
DD51000011 COMPACTOR VIBR 51"" CB34B
8/3/2017
U
18,182.80
5,454.72
12,728.08
DDC5100001 2019 CATERPILLAR CC34B 541" VIBR COMPACTOR
10/4/2019
N
58,392.04
3,284.58
55,107.46
DD59000001 COMPACTOR VIBR 59"" CB7
5/24/2018
N
123,847.15
26,704.61
97,142.54
DD59000002 COMPACTOR VIBR 59"" CB7
7/17/2018
N
123,847.15
24,382.47
99,464.68
DD59000003 COMPACTOR VIBR 59"" C137
7/17/2018
N
123,847.15
24,382.47
99,464.68
D059000004 COMPACTOR VIBR 59"" CB7
6/3/2018
N
123,847.15
25,543.54
98,303.61
DDS9000005 2019 CATERPILLAR CB7 59" VIBRATORY COMPACTOR
5/24/2019
N
123,847.15
11,610.70
112,236.45
OD66000003 COMPACTOR VIBr 66"" CB54B
4/30/2018
U
123,157.97
42,951.39
80,206.58
DD66000005 2018 CATERPILLAR CB10 67" VIBR COMPACTOR
8/30/2019
N
21,924.60
4,872.16
17,052.44
DD66000006 2018 CATERPILLAR CB10 67" VIBR COMPACTOR
8/30/2019
N
6,000.00
1,333.36
4,666.64
DD78000001 COMPACTOR VIBR 78"" CC522HF
3/31/2010
N
42,529.83
32,584.83
9,945.00
DD78000002 COMPACTOR VIBR 78"" CC522HF
11/15/2012
N
22,154.00
20,064.00
2,090.00
DD78000005 COMPACTOR VIBR 78"" HD120V
4/24/2007
N
137,749.50
123,974.55
13,774.95
DD78000006 COMPACTOR VIBR 78"" HD120V
4/25/2007
N
137,749.50
123,974.55
13,774.95
DD78000007 COMPACTOR VIBR 78"" CB534D
2/1/2010
N
56,068.00
44,566.00
11,502.00
DD78000009 COMPACTOR VIBR 78"" CB534D
4/1/2009
N
25,167.17
25,167.17
-
DD78000010 COMPACTOR VIBR 78"" CB534D
4/1/2009
N
25,167.17
25,167.17
DD78000012 COMPACTOR VIBR 78"" CB54 XW
3/5/2010
N
36,542.64
36,542.64
-
DD78000020 COMPACTOR VIBR 78"" CB54 XW
4/26/2016
U
92,607.05
55,564.32
37,042.73
DD78000021 COMPACTOR VIBR 78"" CB54 XW
4/26/2016
U
82,735.22
74,461.70
8,273.52
DD78000022 COMPACTOR VIBR 78"" CB54 XW
8/3/2017
U
19,897.85
5,969.28
13,928.57
DD78000023 COMPACTOR VIBR 78"" CB54 XW
4/26/2016
U
49,480.71
44,532.64
4,948.07
DD78000024 COMPACTOR VIBR 78"" CB54 XW
4/26/2016
U
81,058.58
72,952.72
8,105.86
DD78000025 COMPACTOR VIBR 78"" CB54 XW
4/26/2016
U
79,705.46
47,823.36
31,882.10
DD78000026 COMPACTOR VIBR 78"" CB54 XW
6/17/2016
U
53,261.72
47,881.55
5,320.17
DD78000027 COMPACTOR VIBR 78"" CB54 XW
5/12/2016
N
144,749.60
63,780.41
80,969.19
DD78000028 COMPACTOR VIBR 78"" CB54 XW
5/12/2016
N
143,396.80
63,184.33
80,212.47
DD78000029 COMPACTOR VIBR 78"" CB54 XW
5/12/2016
N
144,749.60
63,780.41
80,969.19
DD78000030 COMPACTOR VIBR 78"" CB54 XW
5/12/2016
N
143,373.48
63,173.99
80,199.49
DD78000031 COMPACTOR VIBR 78"" CB54 XW
8/3/2017
U
26,002.48
10,400.96
15,601.52
DD78000032 COMPACTOR VIBR 78"" CB54 XW
5/12/2016
N
144,749.60
63,780.41
80,969.19
DD78000033 COMPACTOR VIBR 78"" CB54 XW
5/12/2016
N
144,749.60
63,780.41
80,969.19
DD78000034 COMPACTOR VIBR 78"" CB54 XW
8/3/2017
U
22,547.55
9,019.00
13,528.55
DD78000035 COMPACTOR VIBR 78"" CB64B
8/3/2017
U
50,892.04
17,448.64
33,443.40
DD78000036 COMPACTOR VIBR 78"" CB64B
8/3/2017
U
49,782.61
17,068.36
32,714.25
DD78000037 COMPACTOR VIBR 78"" CB54 XW
4/19/2018
U
1,274.08
636.96
637.12
DD78000038 COMPACTOR VIB 78"" CB54XW
4/19/2018
U
21,148.84
10,221.96
10,926.88
DD78000039 COMPACTOR VIBR 78"" CB64B
4/30/2018
U
105,190.06
26,109.72
79,08D.34
DD78000040 COMPACTOR VIBR 78"" CB64B
4/30/2018
U
103,907.80
25,791.42
78,116.38,
DD78000041 COMPACTOR VIBR 78"" CB64B
4/30/2018
U
109,525.66
27,185.87
82,339.79
DD78000042 COMPACTOR VIBR 78"" CB64B
4/30/2018
U
143,648.86
35,655.63
107,993.23
DD78000043 COMPACTOR VIBR 78"" CB64B
4/30/2018
U
144,978.29
35,985.66
108,992.63
DD78000044 COMPACTOR VIBR 78"" CB64B
4/30/2018
U
152,169.55
37,770.65
114,398.90
DD78000045 COMPACTOR VIBR 78"" CB64B
4/30/2018
U
156,790.68
38,917.66
117,873.02
DD78000046 COMPACTOR VIBR 78"" CB64B
4/30/2018
U
153,568.85
38,117.94
115,450.91
DD78000047 COMPACTOR VIBR 78"" CB64B
4/30/2018
U
158,529.53
39,349.27
119,180.26
DD78000048 COMPACTOR VIBR 78"" DD120C
4/27/2018
U
109,275.89
28,099.44
81,176.45
DD78000049 COMPACTOR VIBR 78"" DD120C
4/27/2018
U
109,296.22
28,104.72
81,191.50
DD78000050 COMPACTORR VIBR 78"" DD120C
4/27/2018
U
104,686.66
26,919.36
77,767.30
DD78000051 COMPACTOR VIBR 78"" DD120C
4/27/2018
U
109,989.13
28,025.76
80,963.37
DD78000052 COMPACTOR VIBR 78"" CB534C
3/31/2005
U
11,000.00
9,900.00
1,100.00
DD84000001 COMPACTOR VIBR 84"" CC722
11/15/2012
N
31,565.00
28,615.00
2,950.00
DD84000002 COMPACTOR VIBR 84"" CC722
11/15/2012
N
31,565.00
28,615.00
2,950.00
DDS4000003 COMPACTOR VIBR 84"" CB64
4/19/2018
U
16,735.07
6,443.04
10,292.03
DDS4000004 COMPACTOR VIBR 84"" CB64
4/19/2018
U
39,651.14
15,265.68
24,385.46
DDS4000005 COMPACTOR VIBR 84"" HD+1401
4/30/2018
U
15,762.05
10,048.35
5,713.70
DIS1000001 TRUCK DISTRIBUTOR SINGLE
7/15/1996
N
5,151.94
4,636.75
515.19
DIS1000002 TRUCK DISTRIBUTOR SINGLE
5/1/2001
N
33,020.23
26,049.23
6,971.00
DIS1000003 TRUCK DISTRIBUTOR SINGLE
5/1/2001
N
33,020.23
26,049.23
6,971.00
DIS3000004 TRUCK DISTRIBUTOR SINGLE
5/1/2001
N
33,333.94
26,362.94
6,971.00
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
DIS1000005 TRUCK DISTRIBUTOR SINGLE
5/1/2001
N
33,020.23
26,049.23
6,971.00
DIS1000006 TRUCK DISTRIBUTOR SINGLE
5/1/2001
N
33,333.94
26,362.94
6,971.00
DIS1000007 TRUCK DISTRIBUTOR SINGLE
5/1/2001
N
33,020.23
26,049.23
6,971.00
DIS1000008 TRUCK DISTRIBUTOR SINGLE
5/1/2001
N
33,020.23
26,049.23
6,971.00
DIS1000009 TRUCK DISTRIBUTOR SINGLE
5/1/2001
N
33,333.94
26,362.94
6,971.00
DIS1000010 TRUCK DISTRIBUTOR SINGLE
9/3/1997
N
37,592.40
29,727.90
7,864.50
DIS1000011 TRUCK DISTRIBUTOR SINGLE
5/4/1998
N
81,090.00
72,981.00
8,109.00
DIS1000012 TRUCK DISTRIBUTOR SINGLE
7/2/2001
N
41,179.61
33,529.61
7,650.00
DIS1000013 TRUCK DISTRIBUTOR SINGLE
2/9/2004
N
21,200.00
13,100.00
8,100.00
DIS1000014 TRUCK DISTRIBUTOR SINGLE
2/1/2005
N
31,361.44
22,561.44
8,800.00
DIS1000015 TRUCK DISTRIBUTOR SINGLE
4/30/2006
N
27,379.80
27,379.80
-
DIS1000016 TRUCK DISTRIBUTOR SINGLE
3/25/2010
N
44,375.36
44,375.36
-
DIS1000017 TRUCK DISTRIBUTOR SINGLE
3/1/2016
N
55,643.93
50,079.54
5,564.39
D151000019 TRUCK DISTRIBUTOR SINGLE
4/1/2006
U
66,250.00
59,625.00
6,625.00
DIS1000020 TRUCK DISTRIBUTOR SINGLE
3/16/2009
U
63,600.00
57,240.00
6,360.00
DIS1O00021 TRUCK DISTRIBUTOR SINGLE
3/16/2009
U
10,600.00
9,540.00
1,060.00
DIS1000022 TRUCK DISTRIBUTOR SINGLE
3/16/2009
U
31,800.00
23,620.00
3,180.00
DIS2000001 TRUCK DISTRIBUTOR TANDEM
3/5/2013
N
28,961.74
26,065.57
2,896.17
DI52000002 TRUCK DISTRIBUTOR TANDEM
3/5/2013
N
28,961.74
26,065.57
2,896.17
D152000003 TRUCK DISTRIBUTOR TANDEM
9/30/2013
N
28,292.80
25,463.60
2,829.20
DIS2000004 TRUCK DISTRIBUTOR TANDEM
9/30/2013
N
55,711.46
50,140.32
5,571.14
DIS2000005 TRUCK DISTRIBUTOR TANDEM
9/30/2013
N
56,237.04
50,613.34
5,623.70
DIS2000006 TRUCK DISTRIBUTOR TANDEM
12/27/2017
N
115,031.25
53,625.04
61,406.21
D152000007 TRUCK DISTRIBUTOR TANDEM
12/27/2017
N
116,116.44
54,243.96
61,872.48
DI52000008 TRUCK DISTRIBUTOR T/A
6/4/2017
N
215,510.16
68,693.94
146,816.22
DIS2000009 TRUCK DISTRIBUTOR T/A
6/4/2017
N
215,510.16
68,693.94
146,816.22
DIS2000010 TRUCK DISTRIBUTOR T/A
6/4/2017
N
215,510.16
68,693.94
146,816.22
DIS2000011 TRUCK DISTRIBUTOR T/A
7/23/2018
N
211,926.79
44,646.21
167,280.58
DIS2000012 TRUCK DISTRIBUTOR T/A
7/23/2018
N
211,926.79
44,646.21
167,280.58
DIS2000013 2020 KENWORTH T470 T/A DISTRIBUTOR TRUCK
6/25/2019
N
224,072.65
18,906.12
205,166.53
DIS2000014 2020 KENWORTH T470 T/A DISTRIBUTOR TRUCK
6/25/2019
N
224,072.65
21,006.81
203,065.84
DPT0000001 DISTRIBUTOR PULL TYPE
5/1/1997
N
21,451.50
19,306.35
2,145.15
DPT0000002 DISTRIBUTOR PULL TYPE
5/1/1997
N
21,451.50
19,306.35
2,145.15
DPT0000003 DISTRIBUTOR PULL TYPE
5/13/1998
N
23,494.52
21,145.07
2,349.45
DT10000012 TRUCK FLATBED DUMP
4/1/2006
U
70,320.30
62,010,00
8,310.30
DT20000001 TRUCK DUMP TANDEM
7/2/2001
N
42,770.47
35,874.47
6,896.00
DT20000002 TRUCK DUMP TANDEM
2/9/2004
N
22,373.42
15,208.52
7,164.90
DT20000003 TRUCK DUMP TANDEM
2/9/2004
N
22,396.75
15,119.85
7,276.90
DT20000004 TRUCK DUMP TANDEM
4/1/2000
U
55,800.00
50,800.00
5,000.00
DT20000005 TRUCK DUMP TANDEM
5/2/2015
U
10,500.00
10,500.00
-
DT20000008 TRUCK DUMP TANDEM
4/1/2006
U
5,300.00
4,770.00
530.00
DT20000009 TRUCK DUMP TANDEM
4/1/2006
U
10,600.00
9,540.00
1,060.00
DT20000010 TRUCK DUMP TANDEM
4/1/2006
U
47,700.00
42,930.00
4,770.00
DT20000011 TRUCK DUMP TANDEM
4/1/2006
U
45,050.00
40,545.00
4,505.00
DT20000013 TRUCK DUMP TANDEM
3/31/2005
U
5,300.00
4,770.00
530.00
DT20000014 TRUCK DUMP TANDEM
3/31/2005
U
7,089.28
6,380.35
708.93
DT20000015 TRUCK DUMP TANDEM
3/31/2005
U
8,149.28
7,334.35
814.93
DT30000001 TRUCK DUMP TRIAXLE
2/1/2005
N
40,908.91
29,768.91
11,140.00
DT30000002 TRUCK DUMP TRIAXLE
2/1/2005
N
40,908.91
29,768.91
11,140.00
DT30000003 TRUCK DUMP TRIAXLE
2/1/2005
N
40,908.91
29,768.91
11,140.00
DT30000004 TRUCK DUMP TRIAXLE
4/1/2013
N
26,896.00
24,206.40
2,689.60
DT30000005 TRUCK DUMP TRIAXLE
8/29/2015
N
164,600.00
86,415.16
78,184.84
DT30000006 TRUCK DUMP TRIAXLE
8/29/2015
N
167,900.00
88,147.36
79,752.64
DT30000007 TRUCK DUMP TRIAXLE
8/29/2015
N
167,500.00
87,937.36
79,562.64
DT30000008 TRUCK DUMP TRIAXLE
8/29/2015
N
168,150.00
88,278.84
79,871.16
DT30000009 TRUCK DUMP TRIAXLE
8/29/2015
N
167,250.00
87,806.32
79,443.68
DT30000010 TRUCK DUMP TRIAXLE
8/29/2015
N
167,762.00
88,075.12
79,686.88
DT30000011 TRUCK DUMP TRIAXLE
8/29/2015
N
167,550.00
87,963.68
79,586.32
DT30000012 TRUCK DUMP TRIAXLE
8/29/2015
N
167,400.00
87,885.16
79,514.84
DT30000013 TRUCK DUMP TRIAXLE
4/26/2016
U
120,548.40
75,945.54
44,602.86
DT30000014 TRUCK DUMP TRIAXLE
4/1/2017
U
105,513.60
40,698.00
64,815.60
DT30000015 TRUCK DUMP TRIAXLE
4/1/2017
N
163,531.64
55,191.96
108,339.68
DT30000016 TRUCK DUMP TRIAXLE
4/1/2017
N
163,531.64
55,191.96
108,339.68
DT30000017 TRUCK DUMP TRIAXLE
4/1/2006
U
26,500.00
23,850.00
2,650.00
DT40000001 TRUCK DUMP QUAD
3/1/2006
N
34,041.30
22,694.20
11,347.10
DT40000002 TRUCK DUMP QUAD
3/1/2006
N
34,041.30
22,694.20
11,347.10
DT40000003 TRUCK DUMP QUAD
3/1/2006
N
34,041.30
22,694.20
11,347.10
DT40000004 TRUCK DUMP QUAD
3/1/2006
N
34,041.30
22,694.20
11,347.10
DT40000005 TRUCK DUMP QUAD
3/1/2006
N
34,041.30
22,694.20
11,347.10
DT40000006 TRUCK DUMP QUAD
3/1/2006
N
34,041.30
22,694.20
11,347.10
DT40000007 TRUCK DUMP QUAD
4/1/2004
N
120,729.10
107,492.99
13,236.11
DT40000008 TRUCK DUMP QUAD
3/31/2010
N
41,689.36
28,899.36
12,790.00
DT40000009 TRUCK DUMP QUAD
7/3/2011
N
38,723.40
25,815.40
12,908.00
DT40000010 TRUCK DUMP QUAD
7/3/2011
N
38,723.40
25,815.40
12,908.00
DT40000011 TRUCK DUMP QUAD
7/3/2011
N
38,723.40
25,815.40
12,908.00
DT40000012 TRUCK DUMP QUAD
7/3/2011
N
38,723.40
25,815.40
12,908.00
DT40000013 TRUCK DUMP QUAD
4/1/2013
N
27,097.00
24,387.30
2,709.70
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset #
Description
Acquisition Date
Used
Cost
Accum Depr
NBV
DT40000014
TRUCK DUMP QUAD
4/1/2013
N
27,097.00
24,387.30
2,709.70
DT40000015
TRUCK DUMP QUAD
4/1/2013
N
27,097.00
24,387.30
2,709.70
DT40000016
TRUCK DUMP QUAD
4/1/2013
N
27,097.00
24,387.30
2,709.70
DT40000017
TRUCK DUMP QUAD
3/1/2016
N
60,243.87
54,219.48
6,024.39
DT40000018
TRUCK DUMP QUAD
3/1/2016
N
60,243.87
54,219.48
6,024.39
DT40000019
TRUCK DUMP QUAD
3/1/2016
N
60,243.87
54,219.48
6,024.39
DT40000020
TRUCK DUMP QUAD AXLE
2/29/2016
N
183,196.00
82,438.08
100,757.92
DT40000021
TRUCK DUMP QUAD AXLE
4/1/2018
U
90,950.00
43,959.12
46,990.88
DT40000022
TRUCK DUMP QUAD
7/23/2018
N
185,701.00
39,121.35
146,579.65
EX08000001
EXCAVATOR OW17308E2
4/1/2017
U
85,392.25
32,937.12
52,455.13
EX08000002
EXCAVATOR OW 17 308E TC
4/1/2017
U
81,820.14
31,559.16
50,260.98
EX13000001
EXCAVATOR OW 25-30 312CL
3/31/2005
U
85,000.00
76,500.00
8,500.00
EX15000001
EXCAVATOR OW 30-35 314ELCR
9/27/2013
U
185,071.94
152,298.69
32,773.25
EX15000002
EXCAVATOR OW 30-35 314E LC
4/27/2018
U
59,397.86
221,868.16
36,529.70
EX23000001
EXCAVATOR OW 40-55 320EL
8/1/2016
N
106,623.27
70,371.40
36,251.87
EX23000002
EXCAVATOR OW 40-55 320ELRR
8/1/2016
N
112,122.76
74,000,96
38,121.80
EX23000003
EXCAVATOR OW 40-55 320ELRR
8/1/2016
N
104,493.47
68,965.60
35,527.87
EX23000004
EXCAVATOR OW 40-55 320ELRR
4/26/2016
U
167,349.13
100,409.40
66,939.73
EX23000005
EXCAVATOR OW 40-55 320ELRR
4/26/2016
U
167,949.84
100,769,88
67,179.96
EX23000006
EXCAVATOR OW 40-55 320EL R
4/19/2018
U
8,255.61
2,641.80
5,613.81
EX23000009
EXCAVATOR 23 MT323F
1/1/2019
U
25,688.55
4,128.52
21,560.03
EX40000001
EXCAVATOR OW 70-85 336EL
8/1/2016
N
152,777.96
100,833.48
51,944.48
EX40000002
EXCAVATOR OW 70-85 336EL
8/1/2016
N
152,478.65
100,635.92
51,842.73
EX40000003
EXCAVATOR OW 70-85 336EL
8/1/2016
N
152,495.15
100,646.80•
51,848.35
EX40000004
2014 CATERPILLAR 336EL 40 M TON EXCAVATOR
12/23/2019
N
54,143.74
5,414.36
48,729.38
EX40000005
2014 CATERPILLAR 336EL 40 M TON EXCAVATOR
12/23/2019
N
57,837.89
5,783.80
52,054.09
EX40000006
EXCAVATOR OW 70-85 336EL
2/1/2016
U
210,148.00
126,088.80
84,059.20
EX40000010
EXCAVATOR OW 70-85 328DL C
4/18/2018
U
6,976.09
2,685.77
4,290.32
EX40000013
EXCAVATOR 40 MT 336F
1/1/2019
U
77,015.14
12,377.40
64,637.74
EX40000014
EXCAVATOR 328DLCR 40 METRIC TON
3/5/2020
U
175,000.00
4,375.00
170,625.00
EX50000001
2013 CATERPILLAR 349EL 50 METRIC TON EXCAVATOR
12/23/2019
N
68,114.86
6,811.48
61,303.38
EX50000002
2013 CATERPILLAR 349EL 50 M TON EXCAVATOR
12/23/2019
N
79,418.40
7,941.84
71,476.56
FIN0000001
PAVER CONCRETE FINISHER BR
4/26/1995
N
36,870.75
33,182,95
3,687.80
FIN0000002
PAVER CONCRETE FINISHER 36
3/29/2016
N
168,888.44
86,203.37
82,685.07
FKL0000001
FORKLIFT
2/28/1984
N
21,997.50
19,797.75
2,199.75
FKL0000003
FORKLIFT
4/23/2002
N
22,832.72
18,627.72
4,205.00
FRK4000001
ATTACHMENT FORKS
4/1/2000
U
400.00
-
400.00
FUEL6606
FUEL TANKS W/6578 DUMP TRK
11/21/2018
N
5,999.45
5,399.50
599.95
GEN0000001
GENERATOR
4/21/1976
N
10,413.52
10,413.52
-
GEN0000002
GENERATOR
3/6/1978
N
38,734.50
38,734.50
-
GEN0000005
GENERATOR
7/29/1995
U
15,000.00
13,500.00
1,500.00
HDG2000001
TRAILER LOWBOY
5/28/1987
N
40,415.58
36,374.02
4,041.56
HDG2000002
TRAILER LOWBOY
7/15/1996
N
6,249.49
5,624.54
624.95
HDG2000003
TRAILER LOWBOY
5/1/2001
N
15,137.14
11,533.14
3,604.00
HDG2000004
TRAILER LOWBOY
4/10/1997
N
37,667.55
33,900.79
3,766.76
HDG2000005
TRAILER LOWBOY
4/10/1997
N
37,667,55
33,900.79
3,766.76
HDG2000006
TRAILER LOWBOY
4/1/2006
U
19,080.00
17,172.00
1,908.00
HDG3000001
TRAILER LOWBOY
4/22/1991
N
52,180.35
46,962.31
5,218.04
HDG3000002
TRAILER LOWBOY
5/19/1995
N
49,234.98
48,458.76
776.22
HDG3000003
TRAILER LOWBOY
5/19/1995
N
10,296.02
9,266.42
1,029.60
HDG3000004
TRAILER LOWBOY
5/1/2001
N
21,211.01
16,161.01
5,050.00
HDG3000005
TRAILER LOWBOY40T
5/1/2001
N
21,211.01
16,161.01
5,050.00
HDG3000006
TRAILER LOWBOY
5/1/2001
N
18,298.76
13,982.76
4,316.00
HDG3000007
TRAILER LOWBOY
5/1/2001
N
18,298.76
13,982.76
4,316.00
HDG3000008
TRAILER LOWBOY
4/18/2007
N
17,022.22
11,348.14
5,674.08
HDG3000009
TRAILER LOWBOY
3/19/2009
N
17,022.22
11,669.32
5,352.90
HDG3000010
TRAILER LOWBOY
3/31/2010
N
16,411.55
11,468.55
4,943.00
HDG3000011
TRAILER LOWBOY
4/1/2009
N
24,012.41
24,012.41.
-
HDG3000012
TRAILER LOWBOY GOOSENECK 4
3/15/2010
N
20,223.00
20,223.00
-
HDG3000013
TRAILER LOWBOY
8/4/2015
N
82,607.73
43,369.20
39,238.53
HDG3000014
TRAILER LOWBOY
8/4/2015
N
82,607.73
43,369.20
39,238.53
HDG3000015
TRAILER LOWBOY GOOSENECK 5
8/4/2015
N
83,309.09
43,737.24
39,571.85
HDG3000016
TRAILER LOWBOY
9/1/2015
U
44,520.00
40,068.00
4,452.00
HDG3000017
TRAILER LOWBOY 50T
3/31/2005
U
14,906.78
13,416.10
1,490.68
HDG3000018
2017XLTRAILER XL110LOWBOY TRAILER
6/3/2019
U
81,616.15
7,651.50
73,964.65
HDG4000001
TRAILER LOWBOY
3/31/2005
U
27,560.00
24,804.00
2,756.00
HEV0000001
TRUCK HYDROVAC
2/1/2018
U
360,025.80
90,637.56
269,388.24
HST2000001
TRAILER LOWBOY HYDRAULICT
7/24/2018
U
32,100.00
12,639.36
19,460.64
HST2000002
TRAILER LOWBOY HYDRAULICT
7/24/2018
U
32,100.00
12,652.50
19,447.50
HST2000003
TRAILER LOWBOY HYDRAULICT
3/31/2005
U
12,190.00
10,971.00
1,219.00
LT30000001
LOADER TRACK 963K W/FORKS
4/19/2018
U
68,940.37
22,061.04
46,879.83
MG20000001
GRADER 120G
3/31/2005
U
16,875.00
15,187.50
1,687.50
MG40000001
GRADER 140H
4/1/2004
U
210,043.47
189,039.12
21,004.35
MG40000002
GRADER 140H
4/1/2007
N
252,346.78
227,112.10
25,234.68
MG40000003
2014 CATERPILLAR 140M2 GRADER
12/23/2019
N
62,618.22
6,261.84
56,356.38
MG40000004
GRADER MOTOR 160M AWD
4/19/2018
U
496.13
496.13
-
MG40000005
GRADER 140G
4/1/2006
U
40,000.00
36,000.00
4,000.00
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
q
Used
Cost
Accum Depr
NBV
MG40000006 GRADER 14G
3/31/2005
U
20,188.00
18,169.20
2,018.80
MG40000007 GRADER 140G
3/31/2005
U
28,125.00
25,312.50
2,812.50
MG40000008 GRADER 140G
3/31/2005
U
61,500.00
55,350.00
6,150.00
MG40000009 GRADER 160H
3/31/2005
U
101,000.00
90,900.00
10,100.00
M150000001 PATCHER JOINT SEALER
4/11/2013
N
41,810.25
41,810.25
-
M1S0000002 PATCHER JOINT SEALER
4/11/2013
N
41,810.25
41,810.25
-
MJ50000003 PATCHER JOINT SEALER
4/11/2013
N
41,810.25
41,810.25
-
MJ50000004 PATCH ER JOINT SEALER
4/11/2013
N
41,810.25
41,810.25
-
MJS0000005 PATCHER JOINT SEALER
4/1/2017
N
46,587.80
27,952.68
18,635.12
MJS0000006 PATCHER JOINT SEALER
4/1/2017
N
46,587.80
27,952.68
18,635.12
MJS0000007 2019 CINLINE M4DHP JOINT SEALER
12/4/2019
U
51,376.67
3,425.12
47,951.55
MM05000001 COLD PLANER ROTOMILL
3/1/2005
U
47,500.00
42,750.00
4,750.00
MST0000017 TRUCK SERVICE
7/1/2016
U
' 15,000.00
13,500.00
1,500.00
MTA0000001 MATERIAL TRANSFER ASPHALT
12/15/2017
N
171,415.61
114,277.08
57,138.53
MTA0000002 MATERIAL TRANSFER ASPHALT
12/15/2017
U
142,834.02
95,222.68
47,611.34
MTA0000003 2012 WEILDER E2850 ASPHALT TRANSFER
12/23/2019
U
75,039.06
8,337.68
66,701.38
MTA0000004 2012 WEILDER E2850 ASPHALT TRANSFER
12/23/2019
U
65,520.38
7,280.04
58,240.34
MTA0000005 MATERIAL TRANSFER ASPHALT
4/8/2015
N
519,680.31
324,800.28
194,880.03
MTA0000006 MATERIAL TRANSFER ASPHALT
4/26/2016
N
408,428.15
233,387.52
175,040.63
MTA0000008 MATEAIAL TRANSFER ASPHALT
4/27/2016
N
499,455.56
249,727.68
249,727.88
MTA0000009 MATERIAL TRANSFER ASPHALT
5/26/2016
N
499,455.56
244,525.02
254,930.54
MTA0000010 MATERIAL TRANSFER ASPHALT
5/26/2016
N
499,455.56
244,525.02
254,930.54
MTC0000001 MATERIAL TRANSFER CONCRETE
8/9/1994
N
199,660.00
179,694.00
19,966.00
MTC0000002 MATERIAL TRANSFER CONCRETE
4/21/1995
N
243,376.79
230,072.37
13,304.42
MTC0000003 MATERIAL TRANSFER CONCRETE
11/5/2001
N
85,746.92
66,743.92
19,003.00
MTC0000004 MATERIAL TRANSFER CONCRETE
2/22/2016
N
107,025.00
107,025.00
-
OD78000001 COMPACTOR VIBR 78"" HD120 V
4/1/2017
N
32,677.80
29,410.02
3,267.78
OD78000002 COMPACTOR VIBR 78"" HD120 V
12/15/2017
N
25,304.16
11,808.60
13,495.56
OD78000003 2014 HAMM HD120VO 78 VIBR COMPACTOR
12/23/2019
U
25,853.40
2,585.36
23,268.04
OD78000004 2014 HAMM HD120VO 78" VIBR COMPACTOR
12/23/2019
U
24,783.13
2,478.32
22,304.81
OD78000005 2014 HAMM HD120VO 78" VIBR COMPACTOR
12/23/2019
U
24,783.13
2,478.32
22,304.81
OD78000006 COMPACTOR VIBR 78" HD+120i
4/30/2018
U
23,978.45
8,961.92
15,016.53
OD78000007 COMPACTOR VIBR 78"" HD+120i
4/30/2018
U
28,417.09
10,620.94
17,796.15
OD78000018 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
5/24/2019
N
180,219.03
18,585.05
161,633.98
OD78000019 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
5/24/2019
N
180,219.03
18,585.05
161,633.98
OD78000020 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
5/24/2019
N
180,219.03
18,585.05
161,633.98
OD78000021 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
5/24/2019
N
180,219.03
18,585.05
161,633.98
OD78000022 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
5/24/2019
N
185,435.28
19,123.06
166,312.22
OD78000023 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
5/24/2019
N
185,435.28
19,123.06
166,312.22
OD78000024 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
5/24/2019
N
185,435.28
19,123.06
166,312.22
OD78000025 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
5/24/2019
N
185,435.28
19,123.06
166,312.22
OD78000026 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
5/24/2019
N
185,435.28
17,384.60
168,050.68
OD78000027 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
5/24/2019
N
185,435.28
17,384.60
168,050.68
PAC0000020 CRUSHER
2/2/1971
N
5,066.67
4,560.00
506.67
PAS0000001 PLANTSCREEN
11/5/2001
N
48,295.44
37,211.44
11,084.00
PBF0000002 CONVEYOR BELT
2/17/1978
N
10,456.00
10,456.00
-
PBS0000005 CONVEYOR WEIGH BELT
7/22/1980
N
10,787.63
10,797.63
-
PCA0000017 CONVEYOR
3/29/1980
N
14,350.00
14,350.00
-
PCA0000021 CONVEYOR BELT
3/19/1975
N
12,115.43
11,173.32
942.11
PCA0000022 CONVEYOR
8/31/1978
N
19,400.42
19,400.42
-
PCA0000023 CONVEYOR
8/31/1978
N
19,400.42
19,400.42
-
PCA0000036 CONVEYOR
2/17/1978
N
10,456.00
10,456.00
-
PCA0000063 CONVEYOR
3/28/1975
N
15,485.23
14,281.08
1,204.15
PCC0000020 CONVEYOR
3/29/1980
N
14,350.00
14,350.00
-
PCM0000018 COMPRESSOR AIR 185
6/21/2017
U
13,684.60
12,384.60
1,300.00
PCR0000011 CRUSHER
10/24/1976
N
13,000.00
13,000.00
-
PF84000001 COMPACTOR VIBR GRADE 84"" C
12/15/2017
N
59,387.82
35,632.68
23,755.14
PF84000002 COMPACTOR VIBR GRADE 84"" C
12/15/2017
N
67,202.66
40,321.68
26,880.98
PF84000003 2014 CATERPILLAR CP56 84" PADFOOT SOIL COMPACTOR
12/23/2019
U
30,766.91
3,076.68
27,690.23
PF84000004 COMPACTOR VIBR GRADE 84"" C
3/31/2005
U
50,000.00
45,000.00
5,000.00
PN70000001 COMPACTOR PNE TIRED PS300B
3/31/2005
U
36,471.00
32,823.90
3,647.10
PN90000001 COMPACTOR PNE TIRED PT140A
4/23/1999
U
21,915.11
19,723.60
2,191.51
PN90000002 2013 CATERPILLAR PS150C PNEU COMPACTOR
12/23/2019
U
11,831.48
1,183.16
10,648.32
PN90000003 2013 CATERPILLAR PS150C PNEU COMPACTOR
12/23/2019
U
13,181.98
1,318.20
11,863,78
PN90000004 COMPACTOR PNE TIRED PS150C
8/3/2017
U
689.26
689.26
-
PN90000005 COMPACTOR PNE TIRED PS150
4/19/2018
U
5,595.50
2,797.68
2,797.82
PN90000006 COMPACTOR PNE TIRED 530A
4/1/2006
U
9,000.00
8,100.00
900.00
PN90000007 COMPACTOR PNE TIRED C530
3/31/2005
U
4,375.00
3,937.50
437.50
PN90000008 COMPACTOR PNE TIRED C530A
3/31/2005
U
9,375.00
8,437.50
937.50
PN90000009 COMPACTOR PNE TIRED C530A
3/31/2005
U
3,750.00
3,375.00
375.00
PS20000001 PLACER SPREADER
6/17/1992
N
217,149.30
195,434.37
21,714.93
P520000002 PLACER SPREADER
11/5/2001
N
105,753.84
76,032.84
29,721.00
P520000003 PLACER SPREADER
3/31/2005
U
139,519.38
125,567.45
13,951.93
PS20000004 PLACER SPREADER
4/1/2017
N
97,696.35
97,696.35
-
PSC0000002 SAND SCREW
3/2/1979
N
34,500.00
34,500.00
-
PSS0000012 SCREEN AGGREGATE
4/27/1991
N
41,861.41
37,675.27
4,186.14
PTC0000009 CONVEYOR
7/27/1966
N
11,778.79
10,862.87
915.92
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
PWS0000006 WASHER EAGLE
9/13/1974
N
15,000.00
13,833.60
1,166.40
PWS0000007 TANK CLASSIFYING
4/2/1989
N
105,262.20
94,735.98
10,526.22
RM00000001 GRADER MAINTAINER
4/1/2017
U
21,859.32
19,673.39
2,185.93
SCR1100001 SCRAPER 613C
3/31/2005
U
31,875.00
28,687.50
3,187.50
SD66000001 COMPACTOR VIBR GRADE 66"" 8
4/1/2000
U
29,300.00
24,000.00
5,300.00
SD66000002 COMPACTOR VIBR GRADE 66"" C
3/16/2009
U
22,000.00
19,800.00
2,200.00
SD66000003 COMPACTOR VIER GRADE 66"" C
3/31/2005
U
60,000.00
54,000.00
6,000.00
SD84000003 2014 CATERPILLAR C556B 84" SOIL COMPACTOR
12/23/2019
U
31,564.47
3,156.44
28,408.03
SD84000004 COMPACTOR VG 84"" C556B
4/19/2018
U
27,286.21
9,624.60
17,661.61
SD84000005 2016 CATERPILLAR C556B 84" SOIL COMPACTOR
8/30/2019
U
6,500.00
1,444.48
5,055.52
SD84000006 2017 CATERPILLAR C556B 84" 501L COMPACTOR
12/19/2019
U
8,300.00
922.24
7,377.76
SF20000001 PAVER SLIPFORM SF450
5/4/1988
N
370,650.00
333,585.00
37,065.00
SF20000002 PAVER SLIPFORM 2-TRACK 350
6/28/1988
N
256,369.00
230,732.10
25,636.90
SF20000003 PAVER SLIPFORM SF550
4/26/1991
N
405,623.35
365,061.02
40,562.33
SF20000004 PAVER SLIPFORM 2-TRACK GP2
4/1/2000
N
161,936.38
132,250.48
29,685.90
SF40000001 PAVER CONCRETE 4-TRACK GT6
2/9/2004
N
179,845.72
153,520.82
26,324.90
SF40000002 PAVER CONCRETE 4-TRACK S172
11/15/2012
N
103,057.40
103,057.40
-
SF40000003 PAVER CONCRETE 4-TRACK GT6
6/4/2010
N
200-189.23
200,189.23
-
SKL0000001 GRADER MAINTAINER 2145
4/1/2000
U
35,200.00
30,200.00
5,000.00
SKL0000002 GRADER MAINTAINER 2145
4/1/2006
U
25,000.00
22,500.00
2,500.00
SKL0000004 GRADERMAINTAINER724
3/31/2005
U
6,250.00
5,625.00
625.00
SKL0000005 GRADER MAINTAINER 724
3/31/2005
U
7,500.00
6,750.00
750.00
SKL0000006 GRADER MAINTAINER 724
3/31/2005
U
7,500.00
6,750.00
750.00
SKL0000007 GRADER MAINTAINER 724
3/31/2005
U
7,500.00
6,750.00
750.00
SKL0000008 GRADER MAINTAINER 724
3/31/2005
U
7,500.00
6,750.00
750.00
SPF0000001 2012 CATERPILLAR 815F SHEEPSFOOT COMPACTOR
12/23/2019
U
70,875.43
7,087.56
63,787.87
SSL0000001 SKID STEER WHEEL
4/1/2000
U
7,800.00
6,800.00
1,000.00
SSL0000002 LOADER SKID STEER
7/1/2016
U
30,000.00
27,000.00
3,000.00
SSL0000006 SKID STEER WHEEL
4/1/2006
U.
20,000.00
18,000.00
2,000.00
SSL0000007 SKID STEER WHEEL
4/1/2006
U
20,000.00
18,000.00
2,000.00
SSL0000008 SKID STEER WHEEL
1/29/2008
U
19,750.00
17,775.00
1,975.00
SSL0000009 SKID STEER WHEEL
3/31/2005
U
12,500.00
11,250.00
1,250.00
SWP0000001 SWEEPER ROAD
4/1/2000
U
5,500.00
4,000.00
1,500.00
SWP0000002 SWEEPER ROAD
3/31/2005
U
5,000.00
4,500.00
500.00
TB80000001 TRUCK BOOM 80'
3/24/2011
U
59,920.00
53,928.00
5,992.00
TC00000001 TEXTURE CURE CONCRETE
4/26/1991
N
56,713.68
51,042.31
5,671.37
TC00000002 TEXTURE CURE CONCRETE
3/14/2006
N
70,615.16
49,461.36
21,153.80
TC00000003 TEXTURE CURE CONCRETE
4/1/2004
N
231,922.25
208,730.02
23,192.23
TD20000001 TRAILER DUMP SEMI
5/3/1995
N
6,288.97
5,660.07
628.90
TD20000002 TRAILER DUMP SEMI
5/1/2001
N
16,173.73
12,140.73
4,033.00
TD20000003 TRAILER DUMP SEMI
5/1/2001
N
16,173.73
12,140.73
4,033.00
TD20000004 TRAILER DUMP SEMI
5/1/2001
N
16,173.73
12,140.73
4,033.00
TD20000005 TRAILER DUMP SEMI
5/1/2001
N
16,173.73
12,140.73
4,033.00
TD20000006 TRAILER DUMP SEMI
5/1/2001
N
16,173.73
12,140.73
4,033.00
TD20000007 TRAILER DUMP SEMI
5/1/2001
N
16,173.73
12,140.73
4,033.00
TD20000008 TRAILER DUMP SEMI
4/30/2006
N
14,632.65
9,754.65
4,878.00
TD20000009 TRAILER DUMP SEMI
4/30/2006
N
14,632.65
14,632.65
-
TD20000010 TRAILER DUMP CONSTRUCTION
6/5/2006
N
26,888.72
24,199.85
2,688.87
TD20000011 TRAILER DUMP SEMI
9/1/2016
N
41,930.00
17,223.48
24,706.52
TD20000012 TRAILER DUMP SEMI
9/1/2016
N
42,180.00
17,326.28
24,853.72
TDRL000001 TRUCK 1 TON DRILL
11/30/1983
N
14,490.00
13,041.00
1,449.00
TEX0000001 EXCAVATOR TELESCOPING SL41
7/11/2008
N
277,091.48
249,382.33
27,709.15
TF20000001 TRUCK FUELTANDEM
7/2/2001
N
40,382.86
34,071,86
6,311.00
TFW1000001 TRUCK WATER/FUELS/A
3/31/2005
U
15,900.00
14,310.00
1,590.00
TFW1000002 TRUCK WATER/FUEL
3/31/2005
U
15,900.00
14,310.00
1,590.00
TFW1000003 TRUCK WATER/FUEL
3/31/2005
U
16,562.50
14,906.25
1,656.25
TFW1000004 TRUCK WATER/FUEL
3/31/2005
U
19,875.00
17,887.50
1,987.50
TFW1000005 TRUCK WATER/FUEL
3/31/2005
U
27,825.00
25,042.50
2,782.50
TFW2000001 TRUCK WATER/FUEL T/A
2/16/2004
N
20,029.94
11,929.94
8,100.00
TFW2000002 TRUCK WATER/FU EL T/A
2/9/2004
N
18,311.94
9,513.00
8,798.94
TFW2000004 TRUCK WATER/FUELT/A
4/1/2013
N
27,975.15
25,177.63
2,797.52
TFW2000005 TRUCK WATER/FUELT/A
2/5/2013
N
29,723.78
26,751.40
2,972.38
TFW2000006 TRUCK WATER/FUELT/A
9/30/2013
N
51,508.80
46,357.92
5,150.88
TFW2000007 TRUCK WATER/FUELT/A
3/1/2016
N
66,900.54
60,210.49
6,690.05
TFW2000008 TRUCK WATER/FU EL T/A
3/1/2016
N
66,900.54
60,210.49
6,690.05
TFW2000009 TRUCK WATER/FUELT/A
6/4/2017
N
232,729.74
74,182.56
158,547.18
TFW2000010 TRUCK WATER/FUEL T/A
6/4/2017
N
232,729.74
74,182.56
158,547.18
TFW2000011 TRUCK WATER/FUELT/A
6/4/2017
N
234,702.03
74,811.22.
159,890.81
TG10000003 TRAILERTILTTOP
3/16/2009
U
1,060.00
954.00
106.00
TG20000001 TRAILER PULL TYPE 26'
5/2/2015
N
23,126.10
12,955.44
10,170.66
TG20000002 TRAILER TILTTAG 20T
5/24/2018
N
24,478.30
5,278.04
19,200.26
TG20000003 TRAILERTILTTOP
3/16/2009
U
10,600.00
9,540.00
1,060.00
TG20000004 TRAILERTILTTOP
3/16/2009
U
7,910.00
7,119.00
791.00
TGN3000001 TRAILER TILTTOP GOOSENECK
5/1/2001
N
13,960.79
10,667.79
3,293.00
TGN3000002 TRAILER TILTTOP GOOSENECK
3/20/1998
N
26,877.54
24,077.54
2,800.00
TGN3000003 TRAILER TILTTOP GOOSENECK
7/2/2001
N
23,115.99
20,315.99
2,800.00
TGN3000004 TRAILER TILTTOP GOOSENECK
4/12/2017
N
43,698.57
14,748.24
28,950.33
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset fs
Description
Acquisition Date
Used
Cost
Accum Depr
NBV
TGN3000005
TRAILER TILTTOP GOOSENECK
3/16/2009
U
23,320.00
20,988.00
2,332.00
TGN3000006
TRAILER TILTTOP GOOSENECK
3/16/2009
U
3,180.00
2,862.00
318.00
TGN3000007
TRAILER TILTTOP GOOSENECK
3/16/2009
U
8,480.00
7,632.00
848.00
TLB4000001
TRAILER 4AXLE
4/1/2006
U
41,340.00
37,206.00
4,134.00
TLB4000002
TRAILER 4AXLE
4/1/2006
U
41,340.00
37,206.00
4,134.00
TLB8000001
TRAILER 8 AXLE
5/1/1989
U
84,240.00
75,816.00
8,424.00
TLB8000002
TRAILER 8 AXLE
5/1/1989
U
84,240.00
75,816.00
8,424.00
TLB8000003
TRAILER 8 AXLE
7/6/1992
N
108,107.50
97,296.75
10,810.75
TLB8000004
TRAILER 8 AXLE
7/16/1992
N
108,107.50
97,296.75
10,810.75
TLB8000005
TRAILER 8 AXLE
4/5/1994
U
19,760.00
17,784.00
1,976.00
TLB8000006
TRAILER 8 AXLE
4/5/1994
N
19,760.00
17,784.00
1,976.00
TLB8000007
TRAILER 8 AXLE
4/5/1994
N
19,760.00
17,784.00
1,976.00
TLB8000008
TRAILER 8 AXLE
4/5/1994
N
19,760.00
17,784.00
1,976.00
TLB8000009
TRAILER 8 AXLE
4/5/1994
U
19,760.00
17,784.00
1,976.00
TLB8000010
TRAILER 8 AXLE
5/1/1997
U
10,143.45
0.33,
10,143.12
TLB8000011
TRAILER 8 AXLE
5/1/1997
U
8,362.97
0.22
8,362.75
TLB8000012
TRAILER 8 AXLE
5/1/1997
U
8,404.45
0.22
8,404.23
TLB8000013
TRAILER 8 AXLE
1/25/1999
N
40,539.81
33,924.81
6,615.00
TLB8000014
TRAILER 8 AXLE
5/1/1997
N
26,766.62
15,766.62
11,000.00
TLB8000015
TRAILER 8 AXLE
1/25/1999
N
40,539.81
33,924.81
6,615.00
TLB8000016
TRAILER 8 AXLE
5/1/1997
N
26,373.32
15,373.32
11,000.00
TLB8000017
TRAILER 8 AXLE
6/24/1999
U
37,100.00
27,100.00
10,000.00
TLB8000018
TRAILER 8AXLE
6/24/1999
N
37,100.00
27,100.00
10,000.00
TLB8000019
TRAILER 8 AXLE
6/29/1999
N
37,100.00
27,100.00
10,000.00
TLB8000020
TRAILER 8 AXLE
6/24/1999
N
37,100.00
27,100.00
10,000.00
TLB8000021
TRAILER 8 AXLE
6/24/1999
N
37,100.00
27,100.00
10,000.00
TLB8000022
TRAILER 8 AXLE
2/16/2000
N
47,216.20
36,674.90
10,541.30
TLB8000023
TRAILER 8 AXLE
2/16/2000
N
47,216.20
36,674.90
10,541.30
TLB8000024
TRAILER 8 AXLE
2/16/2000
N
47,216.20
36,674.90
10,541.30
TLB8000025
TRAILER 8 AXLE
2/16/2000
N
47,216.19
36,674.89
10,541.30
TLB8000026
TRAILER 8 AXLE
2/16/2000
N
47,216.19
36,674.89
10,541.30
TLB8000027
TRAILER 8 AXLE
2/16/2000
N
47,216.19
36,674.89
10,541.30
TLB8000028
TRAILER 8 AXLE
5/1/2001
N
25,583.24
17,538.24
8,045.00
TLB8000029
TRAILER 8 AXLE
5/1/2001
N
25,583.23
17,538.23
8o045.00
TLB8000030
TRAILER 8 AXLE
5/1/2001
N
25,583.24
17,538.24
8,045.00
TLB8000031
TRAILER 8 AXLE
5/1/2001
N
25,583.24
17,538.24
8,045.00
TLB8000032
TRAILER 8 AXLE
5/1/2001
N
25,583.24
17,538.24
8,045.00
TLB8000033
TRAILER 8 AXLE
5/1/2001
N
25,583.24
17,538.24
8,045.00
TLB8000034
TRAILER 8 AXLE
5/1/2001
N
25,583.24
17,538.24
8,045.00
TLB8000035
TRAILER 8 AXLE
5/1/2001
N
25,583.24
17,538.24
8,045.00
TLB8000036
TRAILER 8 AXLE
3/31/2010
N
40,649.45
28,906.45
11,743.00
TLB8000037
TRAILER 8 AXLE
3/31/2010
N
40,649.45
28,906.45
11,743.00
TLB8000038
TRAILER 8 AXLE
4/1/2006
U
77,812.05
70,030.85
7,781.20
TLB8000039
TRAILER 8 AXLE
6/6/2014
U
53,000.00
47,700.00
5,300.00
TLB8000040
TRAILER 8 AXLE
6/6/2014
U
45,050.00
40,545.00
4,505.00
TLB8000041
TRAILER 8 AXLE
6/6/2014
U
47,700.00
42,930.00
4,770.00
TLB8000042
TRAILER 8 AXLE
5/30/2015
N
167,649.60
92,731.36
74,918.24
TLB8000043
TRAILER 8 AXLE
5/30/2015
N
167,649.60
92,731.36
74,918.24
TLB8000044
TRAILER 8 AXLE
5/30/2015
N
167,649.60
92,731.36
74,918.24
TL88000045
TRAILER 8 AXLE
5/30/2015
N
167,649.60
92,731.36
74,918.24
TLB8000046
TRAILER 8 AXLE
1/2/2016
N
170,063.22
81,311.34
88,751.88
TLB8000047
TRAILER 8 AXLE
1/2/2016
N
170,063.22
81,311.34
88,751.88
TLB8000048
TRAILER 8 AXLE
1/2/2016
N
170,063.22
81,311.34
88,751.88
TLB8000049
TRAILER 8 AXLE
1/2/2016
N
170,063.22
81,311.34
88,751.88
TLB8000050
TRAILER 8 AXLE
1/2/2016
N
170,063.22
81,311.34
88,751.88
TLB8000051
TRAILER 8 AXLE
1/2/2016
N
170,063.22
81,311.34
88,751.88
TLB8000052
TRAILER 8AXLE
4/1/2017
U
91,236.52
35,191.20
56,045.32
TLB8000053
TRAILER 8 AXLE
4/1/2017
U
91,236.52
35,191.20
56,045.32
TLB8000054
TRAILER 8 AXLE
4/1/2017
U
91,236.52
35,191.20
56,045.32
TLB8000055
TRAILER 8 AXLE
4/1/2017
U
91,236.52
35,191.20
56,045.32
TLB8000057
TRAILER 8 AXLE
4/1/2006
U
54,060.00
48,654.00
5,406.00
TL88000058
TRAILER 8 AXLE
4/1/2006
U
54,060.00
48,654.00
5,406.00
TLB8000059
TRAILER 8 AXLE
4/1/2006
U
62,010.00
55,809.00
6,201.00
TLB8000060
TRAILER 8 AXLE
4/1/2006
U
62,010.00
55,809.00
6,201.00
TLB8000061
TRAILER 8 AXLE
4/1/2006
U
67,310.00
60,579.00
6,731.00
TLB8000062
TRAILER 8 AXLE
3/31/2005
U
31,800.00
28,620.00
3,180.00
TLB8000063
TRAILER 8 AXLE
3/31/2005
U
31,800.00
28,620.00
3,180.00
TLB8000064
TRAILER 8 AXLE
3/31/2005
U
31,800.00
28,620.00
3,180.00
TLB8000065
TRAILER 8 AXLE
3/31/2005
U
31,800.00
28,620.00
3,180.00
TLB8000066
TRAILER 8 AXLE
3/31/2005
U
31,800.00
28,620.00
3,180.00
TLB8000067
2018 RED RIVER OLB84ONGH 8 AXLE LIVE BOTTOM TRAILER
5/7/2019
U
82,944.33
8,553.60
74,390.73
TLB8000068
2018 RED RIVER OLB84ONGH 8 AXLE LIVE BOTTOM TRAILER
5/7/2019
U
90,303.60
9,312.60
80,991.00
TLB8000069
2018 RED RIVER OLB84ONGH 8 AXLE LIVE BOTTOM TRAILER
5/7/2019
U
83,124.33
8,572.19
74,552.14
TLB8000070
2018 RED RIVER OLB84ONGH 8 AXLE LIVE BOTTOM TRAILER
5/7/2019
U
83,221.73
8,582.20
74,639.53
TLB8000071
2018 RED RIVER OLB84ONGH 8 AXLE LIVE BOTTOM TRAILER
5/7/2019
U
89,916.96
9,272.67
80,644.29
TRC0000001
COMPACTOR TRENCH FABR
2/21/1983
N
39,132.76
35,219.48
3,913.28
TR00000002
COMPACTOR TRENCH TR-100
3/17/2010
N
30,495.00
30,495.00
—
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
TRCH000001 TRENCHER
7/9/2015
U
69,015.00
65,564.25
3,450.75
TRLD000001 TRAILER DUMP LEAD
4/1/2006
U
11,660.00
10,494.00
1,166.00
TRLD000002 1988 EAST LEAD DUMP TRAILER
1/29/2008
U
15,900.00
14,310.00
1,590.00
TRLD000003 TRAILER DUMP LEAD
1/29/2008
U
19,080.00
17,172.00
1,908.00
TRLD000004 TRAILER DUMP LEAD
1/29/2008
U
21,200.00
19,080.00
2,120.00
TRLD000005 TRAILER DUMP PUP
1/29/2008
U
26,500.00
23,850.00
2,650.00
TRLD000006 TRAILER DUMP PUP
1/29/2008
U
31,800.00
28,620.00
3,180.00
TSF2000001 TRUCK WATER SPRAYBAR
7/12/1988
N
70,634.27
59,452.67
11,181.50
TSF2000002 TRUCK WATER SPRAYBAR
6/14/1990
N
80,136.46
72,122.82
8,013.64
TSF2000003 TRUCK WATER SPRAYBAR
4/4/1991
N
81,927.03
72,806.97
9,120.06
TSF2000004 TRUCK WATER SPRAYBAR
5/1/1995
N
20,297.82
17,266.49
3,031.33
TSF2000005 TRUCK WATER SPRAYBAR
5/1/2001
N
28,797,73
21,957.73
6,840.00
TSF2000006 TRUCK WATER SPRAYBAR
5/1/2001
N
25,988.29
16,020.77
9,967.52
TSF2000007 TRUCK WATER SPRAYBAR
5/1/2001
N
30,739.05
21,957.73
8,781.32
TSF2000008 TRUCK WATER
4/1/2006
U
9,540.00
8,586.00
954.00
TSF2000009 TRUCK WATER
3/31/2005
U
7,685.00
6,916.50
768.50
TSF3000001 TRUCK WATER SPRAYBAR
5/1/1995
N
86,974.65
76,182.57
10,792.08
TT10000001 TRAILERTILTTOP
3/16/2009
U
7,730,00
6,957.00
773.00
TF20000001 TRAILERTILTTOP
8/31/1995
N
17,173.23
15,455.90
1,717.33
Tf20000002 TRAILERTILTTOP
4/1/1997
N
17,043.64
15,339.28
1,704.36
TT20000003 TRAILERTILTTOP
4/1/1997
N
17,043.64
15,339.28
1,704.36
TT20000004 TRAILERTILTTOP
4/1/1997
N
16,897.33
15,207.60
1,689.73
TT20000005 TRAILERTILTTOP
4/1/1997
N
16,897.33
15,207.60
1,689.73
TT20000006 TRAILERTILTTOP
3/20/1998
N
11,370.18
9,720.18
1,650.00
TT20000007 TRAILERTILTTOP
3/20/1998
N
11,370.18
9,720.18
1,650.00
TT20000008 TRAILERTILTTOP
3/20/1998
N
11,370.18
9,720.18
1,650.00
TT20000009 TRAILERTILTTOP
7/2/2001
N
8,941.06
7,291.06
1,650.00
720000010 TRAILERTILTTOP
7/2/2001
N
8,856.73
7,206.73
1,650.00
TT20000011 TRAILERTILTTOP
7/2/2001
N
8,856.73
7,206.73
1,650.00
TT20000012 TRAILERTILTTOP
6/3/2002
N
6,454.71
4,804.71
1,650.00
1720000013 TRAILER TILTTOP
6/3/2002
N
6,516.18
4,866.18
1,650.00
TT20000014 TRAILERTILTTOP
8/2/1999
N
14,369.32
12,724.32
1,645.00
TT20000015 TRAILERTILTTOP
12/2/2002
N
4,363.21
2,718.21
1,645.00
TT20000016 TRAILER TILTTOP
5/14/1999
N
19,650.00
17,685.00
1,965.00
Tl"20000017 TRAILERTILTTOP
5/9/2006
N
26,403.25
23,762.92
2,640.33
TT20000018 TRAILERTILTTOP
4/19/2010
N
15,565.04
14,008.54
1,556.50
TT20000019 TRAILER TILT 20T
4/1/2017
N
32,127.03
10,842.84
21,284.19
TT20000020 TRAILER TILT 20T
4/1/2017
N
31,857.05
10,751.76
21,105.29
TT20000021 TRAILERTILT20T
4/1/2017
N
31,857.05
10,751.76
21,105.29
TT20000023 TRAILERTILTTOP
3/16/2009
U
7,730.00
6,957.00
773.00
TT20000024 TRAILER TI LTTOP 20T
3/31/2005
U
2,517.50
2,265.75
251.75
TT20000025 TRAILER TILTTOP 20T
3/31/2005
U
2,517.50
2,265.75
251.75
TT20000026 TRAILER TILTTOP 20T
3/31/2005
U
2,517.50
2,265.75
251.75
T1720000027 TRAILER TILTTOP 20T
3/31/2005
U
2,517.50
2,265.75
251.75
TT20000028 TRAILER TILTTOP 20T
3/31/2005
U
2,517.50
2,265.75
251.75
TT20000029 TRAILERTILTTOP
3/31/2005
U
2,517.50
2,517.50
-
TT20000030 TRAILER TILTTOP20T
3/31/2005
U
2,650.00
2,385.00
265.00
TT20000031 TRAILERTILTTOP 20T
3/31/2005
U
2,650.00
2,385.00
265.00
TT20000032 TRAILERTILTTOP 20T
3/31/2005
U
2,650.00
2,385.00
265.00
TT20000033 TRAILER TILT 20T
3/31/2005
U
4,770.00
4,293.00
477.00
TT20000034 2019XLTRAILEIRS XL40TILTTAGTRAILER
7/17/2019
N
36,847.16
3,108.96
33,738.20
Tf20000035 2019 X L TRA I LE RS X L40 TI LT TAG TRAI L E R
7/17/2019
N
36,847.16
3,108.96
33,738.20
TT20000036 2019 XL TRAILERS XL40 TILT TAG TRAILER
7/17/2019
N
36,847.16
3,108.96
33,738.20
TT20000037 20 19 X L TRAI LE RS X L40 TI LT TAG TRA I LE R
5/7/2019
U
27,786.50
2,865.50
24,921.00
TT25000001 TRAILERTILTTOP
6/18/1996
N
22,973.80
20,676,42
2,297.38
TT25000002 TRAILER TILTTOP
9/18/2007
N
32,741.00
29,466.90
3,274.10
TT25000003 TRAILERTILTTOP
4/2/2008
N
32,741.00
29,466.90
3,274.10
TT25000004 TRAILERTILTTOP
4/2/2008
N
32,741.00
29,466.90
3,274.10
TTK0000001 TRAILERTANKER
5/5/1988
N
30,287.63
27,258.87
3,028.76
TW10000001 TRUCK WATER
7/1/2016
U
20,000.00
18,000.00
2,000.00
TW10000002 TRUCK WATER
3/16/2009
U
250.00
-
250.00
TW10000003 TRUCK WATER
3/31/2005
U
11,925.00
10,732.50
1,192.50
TW20000001 TRUCK WATER TANDEM
6/3/2002
N
35,488.51
26,995.51
8,493.00
TW20000002 TRUCK WATER TANDEM
12/2/2002
N
29,372.33
21,155.33
8,217.00
UTF0000003 TRACTOR FARM
7/1/2016
U
44,776.00
37,947.66
6,828.34
UTF0000007 TRACTOR FARM
3/31/2005
U
2,813.00
2,531.70
281.30
WD08000001 WIDENERSPD-8
12/2/2012
N
20,823.48
18,877.36
1,946.12
WD10000001 WIDENER RW100
4/1/1987
N
86,709.00
78,038.10
8,670.90
WD10000002 WIDENERRW100A
12/2/2004
N
72,005.68
72,005.68
-
WD10000003 WIDENER W530
12/15/2017
N
77,691.66
51,794.40
25,897.26
WD10000004 WIDENER W530
4/26/2016
U
123,184.45
101,998.18
21,286.27
WD10000005 WIDENER W530A
4/26/2016
N
242,617.65
160,098.00
82,519.65
WD10000006 2018 WEILER W530A WIDENER
9/3/2019
U
153,167.16
8,787.08
149,380.08
WD10000008 2018 WEILER W530A WIDENER
9/3/2019
U
166,602.23
16,197.44
150,404.79
WD14000001 WIDENER RW195D
4/28/1993
U
131,039.59
117,935.63
13,103.96
WD14000002 WIDENER RW195D
7/1/1998
N
177,226.00
155,753.00
21,473.00
WD14000003 WIDENER RW195D
7/2/2001
N
109,609.12
94,127.12
15,482.00
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
WD14000004 WIDENER RW195D
4/1/2006
U
172,500.00
155,250.00
17,250.00
WD14000005 WIDENER RW195D
11/2/2010
U
32,527.50
32,527.50
-
WD14000006 WIDENER RW195
3/31/2005
U
31,250.00
28,125.00
3,125.00
WL01000001 LOADER WHEEL907H
8/3/2017
U
20,279.37
18,251.43
2,027.94
WL01000002 LOADER WHEEL9081-12
8/3/2017
U
33,481.17
20,088.64
13,392.53
WL01000003 LOADER WHEEL907M
4/19/2018
U
30,923.16
11,905.44
19,017.72
WL03000001 LOADER WHEEL938K
8/1/2016
N
103,895.57
68,571.04
35,324.53
WL03000002 LOADER WHEEL938K
8/1/2016
N
107,013.24
70,628.80
36,384.44
WL03000003 LOADER WHEEL938K
12/27/2017
N
119,456.87
50,171.80
69,285.07
WL03000004 LOADER WHEEL938K
12/27/2017
N
119,501.92
50,190.84
69,311.08
WL03000005 LOADER WHEEL938K
12/27/2017
N
119,466.10
50,175.72
69,290.38
WL03000006 LOADER WHEEL938K
12/27/2017
N
119,416.68
50,155.00
69,261.68
WL03000007 LOADER WHEEL938K
12/27/2017
N
130,137.16
54,657.68
75,479.48
WL03000012 LOADER WHEEL938M
4/19/2018
U
22,984.14
7,354.92
15,629.22
WL04000001 LOADER WHEEL950K
12/15/2017
N
93,917.45
56,350.56
37,566.89
WL04000002 LOADER WHEEL950K
12/17/2018
N
124,662.36
40,798.56
83,863.80
WL05000001 LOADER WHEEL962G
6/20/2005
N
210,996.18
189,896.56
21,099.62
WL05000002 LOADER WHEEL962H
4/28/2006
N
231,897.26
208,707.53
23,189.73
WL05000003 LOADER WHEEL962H
4/28/2006
N
243,416.28
219,074.65
24,341.63
WL06000001 LOADER WHEELWA480-5
7/1/2016
U
30,000.00
27,000.00
3,000.00
WL07000001 LOADER WHEEL972K
8/1/2016
N
170,569.37
112,575.76
57,993.61
WL07000002 LOADER WHEEL972K
12/15/2017
N
122,740.10
73,644.08
49,096.02
WL07000003 LOADER WHEEL95ZV-2
12/15/2017
N
119,790.73
55,902.28
63,888.45
WL07000004 LOADER WHEEL972K
3/24/2014
N
170,072.76
55,660.12
114,412.64
WL07000005 LOADER WHEEL CAT972K
3/6/2020
U
148,400.00
2,782.50
145,617.50
WL07000006 2014 CATERPILLAR 972M WHEEL LOADER
9/19/2019
U
163,686.31
12,276.48
151,409.83
WL07000007 LOADER WHEEL 972M XE
7/1/2016
N
413,130.21
177,424.84
235,705.37
WL07000008 LOADER WHEEL 972M XE
7/1/2016
N
413,130.21
177,424.84
235,705.37
WL07000009 LOADER WHEEL 972MXE
8/1/2016
N
409,269.18
168,823.60
240,445.58
WL07000010 LOADER WHEEL 972M XE
8/1/2016
N
409,269.18
168,823.60
240,445.58
WL07000012 LOADER WHEEL WA500-7
7/1/2016
U
220,000.00
186,450.00
33,550.00
WL07000013 LOADER WHEEL WA500-7
7/1/2016
U
425,000.00
208,392.86
216,607.14
WL08000001 LOADER WHEEL 980H REBUILD
4/28/2006
N
404,867.00
364,380.30
40,486.70
WL08000002 LOADER WHEEL 980H REBUILD
5/2/2006
N
397,828.60
358,045.74
39,782.86
WL08000003 LOADER WHEEL 980H REBUILD
5/3/2006
N
401,426.24
361,283.62
40,142.62
WL08000004 LOADER WHEEL 980H REBUILD
4/15/2008
N
472,743.50
440,968.19
31,775.31
WL08000005 LOADER WHEEL 980H REBUILD
3/31/2009
N
338,664.78
312,859.41
25,805.37
WL08000006 LOADER WHEEL 980H
4/29/2009
N
74,759.48
74,759.48
-
WL08000007 LOADER WHEEL 980H
3/5/2010
N
108,264.95
108,264.95
-
WL08000008 LOADER WHEEL 980H REBUILD
11/4/2016
N
37,188.80
33,209.51
3,979.29
WL08000009 LOADERWHEEL980H
11/4/2016
N
37,188.80
33,209.60
3,979.20
WL08000010 LOADER WHEEL 980H
11/4/2016
N
37,188.80
33,246.79
3,942.01
WL08000012 LOADER WHEEL 980M
4/27/2016
U
398,851.87
239,311.20
159,540.67
WL08000013 LOADER WHEEL980M
4/28/2016
N
465,702.52
209,566.08
256,136.44
WL09000001 LOADER WHEEL982M
4/27/2016
U
486,726.48
292,035.84
194,690.64
WL09000002 LOADER WHEEL982M
4/28/2016
N
535,252.52
240,863.52
294,389.00
WL10000001 LOADER WHEEL 98BG
11/19/2014
N
117,500.00
105,750.00
11,750.00
WL10000002 LOADER WHEEL 10 CY986H
1/1/2019
U
118,414.87
26,643.30
91,771.57
WRKT100001 HAMMER VIER EXTRACTOR
12/2/2004
U
42,373.46
38,136.46
4,237.00
WRKT100002 BREAKER DIESEL
2/10/2004
N
39,432.00
35,488.80
3,943.20
WRKT100003 BREAKER DIESEL
2/10/2004
N
75,101.00
67,590.90
7,510.10
WRKT100004 BREAKER LEADS
2/10/2004
N
17,172.00
15,454.80
1,717.20
WRKT130001 ATTACHMENT PAN SCRAPER
7/1/2016
U
15,000.00
12,712.50
2,287.50
WRKT140001 ATTACHMENT SCREED WEDGELOC
9/9/1997
N
37,129.92.
33,416.93
3,712.99
WRKT140002 MATERIAL REFERENCE SKI
9/10/2003
N
6,914.84
6,223.35
691.49
WRKT160001 SPREADER BOX
10/8/2001
N
21,108.62
18,997.76
2,110.86
WRKT160002 SPREADER BOX
5/3/2007
N
34,144.72
30,730.24
3,414.48
WRKT400001 ATTACHMENT BROOM
12/10/1997
N
16,296.89
14,667.20
1,629.69
WRKT700001 ATTACHMENTD15K
10/30/1975
N
5,524.56
5,094.96
429.60
WRKT700002 ATTACHMENTDISK
4/23/1999
U
3,559.81
3,203.83
355.98
WX19000001 EXCAVATOR WHEEL M318F
4/30/2018
U
110,357.56
34,210.85
76,146.71
WX19000003 2018 CATERPILLAR M317F CR WHEELED EXCAVATOR
8/30/2019
N
18,000.00
4,000.00
14,000.00
WX20000001 EXCAVATOR WHEEL M320F
4/30/2018
U
106,436.62
32,995.42
73,441.20
WX22000001 EXCAVATOR WHEEL M322F
4/30/2018
U
122,847.48
38,082.65
84,764.83
APT0000002 PAVER BOX
4/10/2007
N
118,167.00
119,167.00
-
ATF7186 ATTACHMENT SCREED W/6800
4/30/2018
N
62,947.00
62,947.00
-
ATT7676 ATTACHMENTJOINT HEATER
3/26/2008
N
37,240.98
37,240.98
-
ATT7727 ATTACHMENT PAVER AUTO
11/13/2013
N
25,964.70
25,964.70
-
ATT7872 ATTACHMENT PAVER AUTOW/10
12/3/2015
N
20,156.00
20,156.00
-
ATT7946 ATTACHMENT PAVER AUTO W/79
11/9/2018
N
33,893.50
33,893.50
-
BKT1000003 ATTACHMENT BUCKET
5/16/2005
N
9,574.45
8,617.00
957.45
BKT1000004 ATTACHMENT BUCKET
5/18/2006
N
5,136.76
4,623.09
513.67
CWKT100002 ATTACHMENTTIE BAR INSERTE
3/25/2010
N
21,000.00
21,000.00
-
CWKT100003 ATTACHMENTTIE BAR INSERTE
4/22/2010
N
21,205.90
21,205.90
-
CWKT200001 PAVING PACKAGE
4/22/2005
N
12,402.68
11,162.41
1,240.27
CWKT600005 MOLD SIDEWALK 4 5 AND 6 FT
6/14/2006
N
20,070.80
18,063.72
2,007.08
CWKT600006 ATTACHMENT MEDIAN MOLD
8/16/2006
N
12,960.10
11,807.10
1,153.00
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset It
Description
Acquisition Date
Used
Cost
Accum Depr
NBV
CWKT800001
ATTACHMENT 24 FTSKEW W/67
6/20/2006
N
19,159.00
17,243.10
1,915.90
CWKT900001
ATTACHMENTTINING SYSTEM
3/25/2010
N
12,918.40
12,918.40
-
PH00000009
HEATERASPHALT
5/1/2016
N
18,746.40
18,355.85
390.55
WRKT400007
ATTACHMENTBROOM
3/31/2005
U
5,575.00
5,017.50
557.50
WRKT600001
ATTACHMENT CONVEYOR C-3 40
7/3/2011
N
51,500.00
46,350.00
5,150.00
WRKT800001
ATTACHMENT GRABBLER
1/29/2008
U
3,500.00
3,150.00
350.00
BLDI6942
TRANSFORMER & METER
6/21/2002
N
45,599.83
45,599.83
-
BLDI7133
PUMP AC UNLOADING
5/15/2004
N
6,194.48
6,194.48
-
BLO17036
ELECTRICAL BUILDING UPGRADE
4/1/2003
N
3,980.00
3,980.00
-
BLS14179
TANK ASPHALT
3/1/2012
N
18,834.55
18,834.55
-
BLS16858
PLANT SETUP 327 60%
11/9/2001
U
63,501.67
63,501.67
-
BLS16947
INSULATION HOT OIL LINES
10/9/2002
N
11,830.00
11,830.00
BLS17024
RACK TRUCK SPRAY DOWN
4/1/2004
N
7,016.48
7,016.48
-
BLS17059
RACK TRUCK SPRAY DOWN
4/1/2003
N
3,850.71
3,850.71
-
BLSI7065
SAFETY CATWALK & STAIRS
8/27/2003
U
7,900.00
7,900.00
-
BLS17120
LADDERS & PLATFORMS SAFETY
4/1/2004
N
41,432.63
41,432.63
-
BLSI7158
INSULATION HOT OIL LINES
8/19/2004
N
9,600.00
9,600.00
-
BL517293
INSULATION HOT OIL LINES
8/1/2005
N
4,800.00
4,800.00
_
BL517445
RACK TRUCK SPRAY DOWN
6/1/2018
N
4,459.02
4,459.02
-
BLSI7603
LIQUID AC TRANSFER SYSTEM
5/19/2007
U
151,676.51
151,676.51
-
BL517604
LIQUID AC TRANSFER SET UP
5/19/2007
N
284,655.59
284,655.59
-
BL5I7621
RACK TRUCK SPRAY DOWN
5/14/2001
N
20,108.76
20,108.76
-
BLSI7725
RACK TRUCK SPRAY DOWN
5/3/2008
N
9,304.65
9,304.65
-
DRAG000001
1978 BUCYRUS-ERIE 88-B HD DRAGLINE
5/1/2019
N
119,063.52
21,828.29
97,235.23
GEN0000006
GENERATOR
4/20/1998
N
85,012.20
76,511.20
8,501.00
GEN0000007
GENERATOR
4/20/1998
N
30,395.68
27,355.68
3,040.00
GEN0000009
GENERATOR
3/22/2000
U
5,375.08
5,375.08
-
GEN0000010
GENERATOR
6/16/2003
U
55,759.45
55,759.45
-
GEN0000011
GENERATOR
4/1/2008
U
139,002.47
139,002.47
-
GEN0000014
GENERATOR 750 KW
3/7/2016
U
52,000.00
52,000.00
-
GEN0000015
GENERATOR SET825KW
4/1/2017
U
85,162.67
51,097.68
34,064.99
GEN0000016
GENERATOR SET 125KW
4/1/2017
U
26,263.07
15,757.92
10,505.15
GEN0000017
GENERATOR NIGHT56KW
7/1/2018
N
31,992.94
3,732.54
28,260.40
GEN0000018
GENERATOR NIGHT56KW
7/1/2018
N
26,024.97
2,014.52
24,010.45
GEN0000023
GENERATOR
3/31/2005
U
8,000.00
7,200.00
800.00
GEN0000025
GENERATOR SET455KW
7/1/2016
U
26,000.00
4,976.94
21,023.06
GEN0000026
GENERATOR SET 25OKW
7/1/2016
U
10,000.00
1,914.30
8,085.70
GEN0000027
GENERATOR SET 225KW
7/1/2016
U
24,000.00
9,398.56
14,601.44
GEN0000028 'GENERATOR
SET 100 KW
7/1/2016
U
8,000.00
1,531.26
6,468.74
GNT0000001
TRAILER GENERATOR
9/21/1999
U
46,664.07
41,997.66
4,666.41
GNT0000004
TRAILER GENERATOR
3/31/2005
U
493.96
444.56
49.40
GNT0000005
TRAILER GENERATOR
3/31/2005
U
212.00
190.80
21.20
GNT0000006
TRAILER GENERATOR
3/31/2005
U
530.00
477.00
53.00
LAN14549
WASTE RECOVERY SYSTEM
3/22/1982
N
116,299.13
104,669.22
11,629.91
PAB0000001
CONTROLS PLANT/BLENDING
7/30/2018
N
94,206.67
15,786.04
78,420.63
PAB0000002
AUTO CONTROL
12/14/2010
U
108,379.81
108,379.81
-
PAB0000003
CONTROL HOUSE
7/21/2007
N
87,532,03
63,242.31
24,289.72
PAB0000004
AUTO CONTROL
4/1/2000
N
25,901.28
23,311.15
2,590.13
PAB0000006
AUTO CONTROL & HOUSE
3/3/2012
U
99,835.00
47,921.16
51,913.84
PAB0000007
AUTO CONTROL & HOUSE
3/3/2012
U
79,355.00
38,090.76
41,264.24
PAB0000008
AUTO CONTROL
4/1/1992
N
38,107.56
34,296.70
3,810.86
PAB0000009
AUTO CONTROL
10/1/2006
N
15,680.01
15,680.01
-
PAB0000010
AUTO CONTROL
4/1/2009
N
46,978.67
46,978.67
-
PAB0000011
CONTROLS BURNER
4/23/1985
N
4,757.50
4,281.75
475.75
PAB0000012
CONTROLS PLANT/BLENDING
4/1/2015
N
114,454.08
57,226.92
57,227.16
PAB0000013
AUTO CONTROL
6/1/1992
N
26,807.06
26,807.06
-
PAB0000014
CONTROLS PLANT/BLENDING
4/1/2017
N
375,659.91
112,698.00
262,961.91
PAB0000015
CONTROLS BURNER
4/1/2017
N
23,966.78
7,189.92
16,776.86
PAB0000016
AUTO CONTROL & HOUSE
4/28/2008
N
125,736.69
125,736.69
-
PAB0000019
AUTO CONTROL
12/15/1995
N
11,484.93
11,484.93
-
PAB0000020
AUTO CONTROL & HOUSE
4/1/2006
U
95,245.00
75,561.24
19,683.76
PAB0000021
AUTO CONTROL
3/16/2009
U
31,000.00
23,017.92
7,982.08
PAB0000022
AUTO CONTROL
4/4/1989
N
22,897.87.
20,608.08
2,289.79
PAB0000023
AUTO CONTROL BLENDING SYST
2/16/2013
N
41,948.18
30,063.02
11,885.16
PAB0000024
AUTO CONTROL
4/1/2000
N
24,364.65
21,928.18
2,436.47
PAB0000025
CONTROLS PLANT/BLENDING
4/30/2017
N
418,569.57
122,518.76
296,050.81
PAB0000026
CONTROLS BURNER
4/30/2017
N
23,836.78
6,977.24
16,859.54
PAB0000027
CONTROLS PLANT/BLENDING
4/3012017
N
367,431.69
107,550.35
259,881.34
PAB0000028
CONTROLS PLANT/BLENDING
4/30/2017
N
380,370.65
111,337.72
269,032.93
PAB0000029
CONTROLS PLANT/BLENDING
4/1/2018
N
46,364.25
9,272.88
37,091.37
PAB0000030
CONTROLBURNER
3/31/2005
N
13,157.22
11,183.64
1,973.58
PAB0000032
CONTROL
3/31/2005
U
10,000.00
8,500.00
1,500.00
PAB0000033
CONTROLS PLANT/BLENDING
4/30/2017
N
44,243.93
12,950.58
31,293.35
PAB0000034
AUTO CONTROL
4/1/2000
N
23,601.20
21,241.08
2,360.12
PAB0000035
CONTROLS PLANT/BLENDING
4/1/2018
N
42,216.17
8,443.20
33,772.97
PAB0000036
AUTO CONTROL
5/2/1998
N
31,725.53
28,552.98
3,172.55
PAB0000040
AUTO CONTROL UPGRADE
7/26/2010
N
38,593.73
37,628.85
964.88
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset #
Description
Acquisition Date
Used
Cost
Accum Depr
NBV
PAB0000042
AUTO CONTROL UPGRADE
6/30/2001
N
39,943.24
39,943.24
-
PAB0000043
AUTO CONTROL UPGRADE
5/31/2005
N
37,598.66
37,598.66
-
PAB0000044
AUTO CONTROL UPGRADE
4/3/2001
N
22,555.32
20,299.79
2,255.53
PAB0000045
AUTO CONTROL UPGRADE
5/2/2009
N
12,412.37
12,412.37
-
PAB0000046
CONTROL PC UPGRADE
5/2/2015
N
31,000.00
30,523.08
476.92
PAB0000047
AUTO CONTROL UPGRADE
4/22/2000
N
48,365.94
43,529.34
4,836.60
PAB0000048
AUTO CONTROL UPGRADE
4/1/2002
N
34,837.50
34,837.50
-
PAC0000001
HOPPER W/PLATE FEEDER
7/1/2016
U
4,000.00
765.86
3,234.14
PAC0000002
HOPPER AGGR
7/1/2016
U
4,000.00
765.86
3,234.14
PAC0000003
CRUSHER CONE 4.25
4/1/2016
N
141,601.35
28,320.36
113,280.99
PAC0000004
CRUSHER AGGREGATE
3/24/2007
U
265,348.42
173,582,22
91,766.20
PAC0000005
CRUSHER
3/31/2005
U
10,000.00
9,000.00
1,000.00
PAC0000006
CRUSHER JAW
7/1/2016
U
78,000.00
14,931.16
63068.84
PAC0000007
CRUSHER CONE
3/31/2005
U
20,000.00
18,000.00
2,000.00
PAC0000008
CRUSHER CONE
4/18/2008
U
190,000.00
114,000.36
75,999.64
PAC0000009
CRUSHER CONE
3/31/2005
U
149,763.00
134,786.70
14,976.30
PAC0000010
CRUSHER
3/31/2005
U
57,609.00
51,848.10
5,760.90
PAC0000011
CRUSHER AGGREGATE
4/1/2006
U
268,403.01
187,882.44
80,520.57
PAC0000012
CRUSHER
3/31/2005
U
252,930.00
227,637.00
25,293.00
PAC0000013
CRUSHER CONE
7/1/2016
U
295,000.00
56,470.54
238,529.46
PAC0000014
CRUSHER CONE
7/1/2016
U
45,000.00
8,614.08
36,385.92
PAC0000015
CRUSHER JAW W/FEEDER
5/31/2018
U
590,323.22
67,887.26
522,435.96
PAC0000016
PLANTJAW
7/1/2016
U
305,000.00
58,384.50
246,615.50
PAC0000017
PLANT CONE
7/1/2016
U
240,000.00
47,527.04
192,472.96
PAC0000019
CRUSHERSYSTEM
6/24/1998
N
11,542.82
10,388.54
1,154.28
PAP0000002
TRACKMOBILE RAILCAR MOVER
7/3/2000
N
202,858.03
183,030.46
19,827.57
PAP0000003
MAGNET 24""
5/17/2009
N
6,494.69
4,726.48
1,768.21
PAP0000004
MAGNET 42 INCH SELF CLEANI
11/9/2007
U
10,500.00
10,500.00
-
PAP0000005
CYCLONE (2)
7/1/2016
U
3,000.00
574.28
2,425.72
PAS0000002
PLANTSCREENING
2/4/2003
U
88,300.00
79,470.00
8,830.00
PAS0000003
PLANTSCREENING
41V2006
U
40,000.00
36,000.00
4,000.00
PAS0000004
SCREENER PLANT
2/22/2017
N
250,584.00
25,05834
225,525.66
PAS0000005
PLANTSCREENING
2/4/2003
N
33,300.00
29,970.00
3,330.00
PAS0000006
PLANT SCREEN
7/1/2016
U
15,000.00
2,871.40
12,128.60
PAS0000007
PLANTSCREENING
3/31/2005
U
44,000.00
39,600,00
4,400.00
PAS0000008
PLANTAGGR
7/1/2016
U
85,000.00
16,271,30
68,728.70
PAS0000009
PLANT RIP RAP 54X24
5/9/2017
U
245,000.00
53,593.75
191,406.25
PA50000010
PLANT TRACK SCREEN
7/1/2016
U
125,000.00
23,928.06
101,071.94
PBE0000001
BUCKET ELEVATOR
3/3/2012
U
5,621.00
2,698.44
2,922.56
PBE0000002
ELEVATOR BUCKET MODIFICATI
7/30/2015
N
15,838.12
15,046.17
791.95
PBF0000001
FEEDER BELT RAW
3/31/2005
U
9,500.00
8,550.00
950.00
PBF0000003
CONVEYOR BELT
2/17/1978
N
10,456.00
10,456.00
-
PBH0000001
BAGHOUSE
3/31/2005
U
80,000.00
72,000.00
8,000.00
PBH0000002
BAGHOUSE
12/14/2010
U
142,984.12
142,984.12
-
PBH0000003
BAGHOUSE
4/4/1989
N
98,994.68
89,095.21
9,899.47
PBH0000004
BAGHOUSE
4/4/2003
N
471,713.50
424,542.15
47,171.35
PBH0000005
AIR DUST SYSTEM
3/3/2012
U
99,835.00
47,921.16
51,913.84
PBH0000006
AIR DUST SYSTEM
3/3/2012
U
132,260.00
63,484.80
68,775.20
PBH0000007
BAGHOUSE
7/21/2007
N
361,592.24
261,250.44
100,341.80
PBHOOO0008
BAGHOUSE
4/18/2009
U
535,320.15
535,320.15
-
PBH0000009
BAGHOUSE 76718 CFM
4/1/2016
N
591,379.43
236,551.68
354,827.75
PBH0000010
BAGHOUSE
6/3/2018
N
514,243.71
94,277.92
419,965.79
PBH0000011
BAGHOUSE
3/28/2014
N
99,232.12
85,669.44
13,562.68
PBH0000012
BAGHOUSE
4/1/1992
N
58,939.35
58,939.35
-
PBH0000013
BAGHOUSE
6/30/2001
N
53,525.00
53,525.00
-
PBH0000014
DUST COLLECTOR C & W MODEL
6/14/1989
N
47,405.00
47,405.00
-
PBH000O015
DUST COLLECTION SYSTEM
7/29/1995
U
10,000.00
9,000.00
1,000.00
PBH0000016
BAGHOUSE
5/3/2014
N
311,286.37
111,908.64
199,377.73
PBH0000017
BAGHOUSE
3/16/2009
U
620,000.00
409,200.00
210,800.00
PBH0000018
BAGHOUSE
4/23/1999
U
159,893.40
143,904.06
15,989.34
PBH0000019
BAGHOUSE
7/1/1987
N
263,021.11
236,719.00
26,302.11
PBH0000020
BAGHOUSE
3/16/2009
U
354,000.00
233,640.00
120,360.00
PBH0000021
DUST RECOVERY SYSTEM
7/27/1983
N
165,100.00
148,590.00
16,510.00
PBH0000022
BAGHOUSE
3/31/2005
U
144,430.00
122,765.50
21,664.50
PBH0000023
BAGHOUSE
3/31/2005
U
59,780.00
53,802.00
5,978.00
PBH0000024
BAGHOUSE
4/28/2005
U
209,942.69
209,942.69
-
PBH0000025
AIR DUST SYSTEM
5/13/1993
N
194,073.06
174,665.76
19,407.30
PBH0000029
STACK EXTENSION 60-42
8/4/2018
N
29,854.98
29,854.98
-
PBH0000030
BAGHOUSE UPGRADE
3/31/1994
N
16,972.75
15,275.48
1,697.27
PBH0000031
AUGER DUST
5/11/2013
N
33,447.67
23,134.59
10,313.08
PBH0000032
KNOCK OUT BOX W/DUCTWORK
4/1/2016
N
65,985.95
26,394.24
39,591.71
PBH0000033
AIR SYSTEM UPGRADE
4/15/1996
N
129,485.79
116,987.64
12,498.15
PBH0000034
EXHAUST STACK FAN
4/1/2006
U
25,000.00
12,916.58
12,083.42
PBH0000035
EXHAUST FAN INSTALL W/DUCT
4/1/2015
N
42,869.22
21,434.52
21,434.70
PBH0000036
EHAUST FAN
4/1/2015
N
137,179.56
68,589.72
68,589.84
PBH0000037
STACK
4/1/2015
N
20,140.67
10,070.40
10,070.27
PBH0000038
CYCLONE
3/28/2014
N
33,425.02
28,879.20
4,545.82
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
PBH0000039 EXHAUST FAN ASSEMBLY
4/30/2017
N
43,146.15
12,629.25
30,516.90
PBH0000040 BAGHOUSE DUCTWORK
4/19/2003
N
45,744.12
45,744.12
-
PSH0000041 EXHAUST STACK EXTENSION
4/24/2004
N
6,710.04
6,710.04
-
PBH0000042 STACK
4/30/1994
N
22,135.41
19,921.87
2,213.54
PBH0000043 STACK EXTENSION
5/26/2007
N
38,652.63
38,652.63
_
PBH0000044 EXHAUST STACK FAN
8/11/2001
N
42,385.21
38,146.68
4,238.53
PBH0000051 BAGHOUSE
11/28/2019
N
726,356.93
66,582.67
659,774.26
PBH0000053 BAGHOUSE
11/2/2018
N
796,030.73
66,335.90
729,694.83
PBH0000055 BAGHOUSE
12/14/2018
N
789,105.08
65,758.80
723,346.28
PBS0000004 SCALE BELT AGGRREGATE
4/1/2010
N
17,401.07
17,401.07
PBS0000006 CONVEYOR SCALE COLD FEED
3/16/2009
U
25,500.00
16,830.00
8,670.00
PBS0000007 CONVEYOR SCALE RECYCLE
3/16/2009
U
35,000.00
23,100.00
11,900.00
PB50000008 SCALE BELT
4/26/2003
N
23,963.04
23,963.04
-
PBS0000009 CONVEYOR SCALE COLD FEED
3/16/2009
U
25,500.00
16,830.00
8,670.00
PBS0000010 CONVEYOR SCALE RECYCLE
3/16/2009
U
35,000.00
23,100.00
11,900.00
PBS0000011 CONVEYOR SCALE COLD FEED
3/16/2009
U
19,500.00
12,870.00
6,630.00
PBS0000012 CONVEYOR SCALE RECYCLE
3/16/2009
U
29,000.00
19,140.00
9,860.00
PBS0000013 CONVEYOR AGG SCALE
7/27/1983
N
26,320.75
21,688.67
4,632.08
PBS0000014 SCALE BELT AGGRREGATE
11/1/2003
N
13,473.36
13,473.36
-
PBS0000015 SCALE BELT RECYCLE
5/14/2007
N
13,186.81
13,186.81
-
PB50000016 SCALE BELT AGGRREGATE
5/6/2006
N
7,808.49
7,244.46
564.03
PBS0000017 SCALE BELTAGGRREGATE
5/6/2006
N
8,737.49
8,106.30
631.19
PBS0000019 CONVEYOR SCALE
3/31/2005
U
5,350.00
4,815.00
535.00
PBS0000020 SCALE BELT AGGRREGATE
5/6/2006
N
8,396.02
7,789.24
606.78
PBS0000021 BELTSAMPLER
10/16/2004
N
14,216.42
14,216.42
-
PBS0000022 BELTSCALES
5/18/2002
N
24,032.46
24,032.46
-
PCA0000001 CONVEYOR STACKER
2/22/2017
N
132,500.00
13,249.98
119,250.02
PCAOD00012 CONVEYOR
4/1/2009
U
3,500.00
3,500.00
-
PCA0000014 CONVEYOR 42"" X 2800'
7/1/2016
U
450,000.00
86,141.28
363,858.72
PCA0000015 CONVEYOR CHANNEL FRAME
7/1/2016
U
27,000.00
5,168.52
21,831.48
PCA0000016 CONVEYOR
7/1/2016
U
5,000.00
956.98
4,043.02
PCA0000018 CONVEYOR
5/18/1980
N
57,097.35
57,097.35
_
PCA0000019 CONVEYOR UNLOADING
12/11/1987
N
21,717.03
19,545.33
2,171.70
PCA0000020 WEIGH BRIDGE
5/20/2000
N
13,413.59
12,072.23
1,341.36
PCA0000024 CONVEYOR SYSTEM
6/24/1998
N
174,246.74
156,822.07
17,424.67
PCA0000025 WEIGH BRIDGE
7/22/2000
N
8,743.75
7,869.39
874.36
PCA0000026 CONVEYOR (2)
5/30/2002
N
93,667.49
84,300.74
9,366.75
PCA0000027 CONVEYOR SAND SCREW
6/3/2002
N
81,099.44
81,099.44
-
PCA0000028 CONVEYOR SYSTEM LATTICE
12/29/2006
U
31,312.64
31,312.64
-
PCA0000030 CONVEYOR
3/31/2005
U
8,410.00
7,569.00
841.00
PCA0000032 CONVEYOR
3/31/2005
U
8,100.00
7,290.00
810.00
PCA0000034 CONVEYOR
3/31/2005
U
9,600.00
8,640.00
960.00
PCA0000035 CONVEYOR
3/31/2005
U
20,000.00
18,000.00
2,000.00
PCA0000039 CONVEYOR
6/1/2008
U
194,103.67
120,761.18
73,342.49
PCA0000040 CONVEYOR TRI PACK
5/1/2010
N
106,450.00
70,869.60
35,580.40
PCA0000041 CONVEYOR SLIDE -PAC 36 X 80
7/30/2018
N
132,316.92
14,753.40
117,563.52
PCA0000042 CONVEYOR RAW AGGRREGATE
3/31/2005
U
4,800.00
4,320.00
480.00
PCA0000043 CONVEYOR
3/31/2005
U
3,000.00
2,700.00
300.00
PCA0000045 CONVEYOR RAW AGGRREGATE
3/31/2005
U
10,000.00
9,000.00
1,000.00
PCA0000046 CONVEYOR
3/31/2005
U
3,365.00
3,028.50
336.50
PCA0000048 CONVEYOR
3/31/2005
U
5,050.00
4,545.00
505.00
PCA0000049 CONVEYOR
3/31/2005
U
3,385.00
3,046.50
338.50
PCA0000051 CONVEYOR SLIDE -PAC 36 X 80
7/30/2018
N
132,316.91
14,753.40
117,563.51
PCA0000052 CONVEYOR
3/31/2005
U
7,385.00
6,646.50
738.50
PCA0000053 CONVEYOR
3/31/2005
U
6,760.00
6,084.00
676.00
PCA0000054 CONVEYOR
3/31/2005
U
6,100.00
5,490.00
610.00
PCA0000055 CONVEYOR
3/31/2005
U
17,615.00
15,853.50
1,761.50
PCA0000058 CONVEYOR
3/31/2005
U
39,485.00
35,536.50
3,948.50
PCA0000064 CONVEYOR
6/1/2009
N
10,000.00
10,000.00
-
PCA0000069 CONVEYOR CHANNEL FRAME
7/1/2016
U
8,000.00
1,531.26
6,468.74
PCA0000070 CONVEYOR
7/1/2016
U
30,000.00
5,742.80
24,257.20
PCA0000071 CONVEYOR
7/1/2016
U
20,000.00
3,828.38
16,171.62
PCA0000072 CONVEYOR
7/1/2016
U
5,000.00
956.98
4,043.02
PCA0000073 CONVEYOR FEEDING
7/1/2016
U
6,000.00
1,148.56
4,851.44
PCA0000074 CONVEYOR LATTICE FRAME
7/1/2016
U
8,000.00
1,531.26
6,468.74
PCA0000075 CONVEYOR A FRAME
7/1/2016
U
10,000.00
1,914.30
8,085.70
PCA0000076 CONVEYOR FIELD
7/1/2016
U
10,000.00
1,914.30
8,085.70
PCA0000077 CONVEYOR
7/1/2016
U
4,000.00
765.86
3,234.14
PCA0000078 CONVEYOR FEED
7/1/2016
U
8,000.00
1,531.26
6,468.74
PCA0000079 CONVEYOR FEEDER
7/1/2016
U
12,000.00
2,297.12
9,702.88
PCA0000080 CONVEYOR
7/1/2016
U
5,000.00
956.98
4,043.02
PCA0000081 CONVEYOR
7/1/2016
U
5,000.00
956.98
4,043.02
PCA0000082 CONVEYOR FEEDER
7/1/2016
U
10,000.00
1,914.30
8,085.70
PCA0000085 SUPER STACKER
8/13/2019
N
256,800.00
11,413.36
245,386.64
PCB0000000 BATCHING SYSTEM CONCRETE
4/2/1989
N
69,839.54
69,839.54
-
PCB0000001 BATCHING SYSTEM
4/12/1996
N
169,615.77
169,615.77
-
PCC0000001 CONVEYOR
3/31/2005
U
1,080.00
972.00
108.00
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
PCC0000002 CONVEYOR
3/31/2005
U
19,750.00
17,775.00
1,975.00
PCCO000003 CONVEYOR RECYCLE
3/31/2005
U
16,700.00
15,030.00
1,670.00
PCCO000004 CONVEYOR COLD FEED
4/1/2009
N
52,811.50
52,811.50
-
PCC0000005 CONVEYOR
3/29/1980
N
14,350.00
12,915.00
1,435.00
PCC0000006 CONVEYOR RECYCLE
6/22/1991
N
19,487.37
17,538.63
1,948.74
PCC0000007 CONVEYOR FEED BIN
6/1/1992
N
32,569.95
32,569.95
-
PCC0000008 CONVEYOR VIRGIN AGGREGATE
2/25/2000
N
65,626.64
57,423.31
8,203.33
PCC0000009 CONVEYOR
11/3/1966
N
10,892.80
10,892.80
-
PCC0000010 CONVEYOR
11/3/1966
N
10,892.80
10,892.80
-
PCC0000011 CONVEYOR
11/3/1966
N
10,892.80
10,892.80
-
PCC0000012 CONVEYOR RECYCLE
9/30/1982
N
22,626.84
22,626,84
-
PCC0000013 CONVEYOR
3/29/1972
N
13,469.58
13,469.58
-
PCC0000014 CONVEYOR AGG R FEED
7/29/1995
U
10,000.00
9,000.00
1,000.00
PCC0000015 CONVEYOR SAND FEED
7/29/1995
U
10,000.00
9,000.00
1,000.00
PCC0000016 CONVEYOR FEED BIN
2/4/2003
U
5,300.00
4,770.00
530.00
PCC0000017 CONVEYOR COLLECTING
3/16/2009
U
15,500.00
10,230.00
5,270.00
PCC0000018 CONVEYOR COLLECTING
3/16/2009
U
15,500.00
10,230.00
5,270.00
PCCO000019 CONVEYOR
3/16/2009
U
20,000.00
13,200.00
6,800.00
PCCO000021 CONVEYOR COLLECTING
3/16/2009
U
7,750.00
5,115.00
2,635.00
PCC0000022 CONVEYOR COLLECTING
3/16/2009
U
7,750.00
5,115.00
2,635.00
PCC0000023 CONVEYOR COLLECTING
3/16/2009
U
5,250.00
3,465.00
1,785.00
PCC0000024 CONVEYOR COLLECTING
3/16/2009
U
5,250.00
3,465.00
1,785.00
PCCO000025 CONVEYOR COLD FEED
3/31/2005
U
83,500.00
70,975.00
12,525.00
PCC0000028 CONVEYOR
3/31/2005
U
15,285.00
13,756.50
1,528.50
PCC0000029 CONVEYOR RECYCLE
3/31/2005
U
28,750.00
25,875.00
2,875.00
PCC0000030 CONVEYOR VIRGIN AGGREGATE
9/21/1999
U
21,929.26
19,736.34
2,192.92
PCD0000001 DRUM MIXER CONCRETE
7/3/2011
N
150,213.00
131,436.66
18,776.34
PCD0000002 PLANTCONCRETE
11/3/1966
N
122,199.00
122,199.00
-
PCD0000003 PLANT CONCRETE
5/8/1972
N
145,605.21
145,605.21
-
PCD0000004 PLANT CONCRETE REX MODELS
7/29/1995
U
40,000.00
36,000.00
4,000.00
PCD0000005 MIXER CONE
4/17/2004
N
46,094.66
46,094.66
-
PCF0000001 BIN VIRGIN AGGREGATE
12/21/2009
N
57,247.09
41,360.73
15,886.36
PCF0000002 BIN VIRGIN AGGREGATE
12/21/2009
N
57,247.10
41,360.73
15,886.37
PCF0000003 BIN COLD FEED (6)
12/14/2010
U
111,638.24
111,638.24
-
PCF0000004 BIN COLD FEED
4/1/1996
N
42,588.74
38,329.87
4,258.87
PCF0000005 BIN COLD FEED
5/2/1998
N
33,230.37
29,907.33
3,323.04
PCF0000006 BIN AGGREGATE
4/1/1985
N
15,502.27
13,952.04
1,550.23
PCF0000007 BIN AGGREGATE
4/1/1985
N
15,502.27
13,952.04
1,550.23
PCF0000008 BIN COLD FEED SYSTEM
7/1/1987
N
110,103.73
99,093.36
11,010.37
PCF0000009 BIN COLD FEED
4/4/1989
N
35,409.06
31,868.15
3,540.91
PCF0000010 BIN COLD FEED
5/6/1995
N
34,992.82
31,493.54
3,499.28
PCF0000011 BIN COLD FEED (6)
3/3/2012
U
93,180.00
44,726.40
48,453.60
PCF0000012 BIN COLD FEED (6)
3/3/2012
U
99,195.00
47,613.96
51,581.04
PCF0000013 BIN COLD FEED 14'
4/1/2018
N
46,221.64
9,244.32
36,977.32
PCF0000014 BIN COLD FEED (4)
7/21/2007
N
279,235.47
201,178.38
78,057.09
PCF0000015 BIN COLD FEED (6)
4/23/1999
U
102,791.86
92,512.67
10,279.19
PCF0000016 BIN COLD FEED
7/31/1982
N
41,583.98
37,425.58
4,158.40
PCF0000017 BIN COLD FEED SYSTEM
6/24/1998
N
30,233.95
27,210.55
3,023.40
PCF0000018 BIN COLD FEED SYSTEM
4/3/1987
N
143,997.77
129,597.99
14,399.78
PCF0000019 BIN COLD FEED
4/4/1989
N
3,184.29
2,865.86
318.43
PCF0000020 BIN AGGREGATE
4/1/1985
N
12,861.14
11,575.03
1,286.11
PCF0000021 BIN AGGREGATE
4/1/1985
N
12,861.14
11,575.03
1,286.11
PCF0000022 BIN AGGREGATE
4/1/1985
N
12,861.14
11,575.03
1,286.11
PCF0000023 BIN AGGREGATE
4/1/1985
N
12,861.14
11,575.03
1,286.11
PCF0000024 BIN COLD FEED
4/15/1996
N
43,689.95
39,320.95
4,369.00
PCF0000025 BIN COLD FEED
5/6/1995
N
34,992.81
31,493.53
3,499.28
PCF0000026 BIN COLD FEED (6)
4/1/2007
N.
95,680.59
60,243.34
35,437.25
PCF0000027 BIN COLD FEED (8)
2/25/2000
N
115,255.62
99,961.47
15,294.15
PCF0000028 BIN COLD FEED (3)
2/19/2008
N
117,758.67
117,758.67
-
PCF0000029 BIN COLD FEED (5)
3/28/2014
N
56,812.43
49,086.00
7,726.43
PCF0000030 BIN AGGREGATE
7/29/1995
U
15,000.00
13,500.00
1,500.00
PCF0000031 BIN COLD FEED (6)
4/1/2006
U
81,710.00
64,823.04
16,886.96
PCF0000032 BIN COLD FEED
4/30/2017
N
59,587.50
17,441.76
42,145.74
PCF0000033 BIN COLD FEED
4/30/2017
N
59,587.50
17,441.76
42,145.74
PCF0000034 BIN COLD FEED 10
3/16/2009
U
226,100.00
149,226.00
76,874.00
PCF0000035 BIN COLD FEED SYSTEM
3/30/1981
N
60,703.86
54,633.47
6,070.39
PCF0000036 BIN AGGREGATE
4/1/1985
N
12,861.14
11,575.03
1,286.11
PCF0000037 BIN AGGREGATE
4/1/1985
N
12,861.14
11,575.03
1,286.11
PCF0000038 BIN COLD FEED
4/4/1989
N
23,936.27
21,542.64
2,393.63
PCF0000039 BIN COLD FEED (6)
5/8/1999
N
238,381.41
214,543.27
23,838.14
PCF0000040 BIN COLD FEED (3)
4/4/1989
N
109,082.67
98,174.40
10,908.27
PCF0000041 BIN COLD FEED
4/1/1992
N
35,281.94
31,753.74
3,528.20
PCF0000042 BIN COLD FEED (10)
3/16/2009
U
141,000,00
93,060.00
47,940.00
PCF0000043 BIN COLD FEED (4)
9/21/1999
U
72,631.93
65,368.74
7,263.19
PCF0000044 BIN COLD FEED (4)
8/9/2005
U
35,658.48
35,658.48
-
PCF0000045 BIN COLD FEED (9)
3/16/2009
U
136,100.00
89,826.00
46,274.00
PCF0000046 BIN COLD FEED
7/27/1983
N
108,433.50
97,590.15
10,843.35
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset It
Description
Acquisition Date
Used
Cost
Accum Depr
NBV
PCF0000047
BIN AGGREGATE
6/24/1984
N
13,165.70
11,849.13
1,316.57
PCF0000048
BIN AGGREGATE
6/24/1984
N
13,165.69
11,849.12
1,316.57
PCF0000050
BIN AGGREGATE
7/10/1979
N
30,000.00
21,000.00
9,000.00
PCF0000051
BIN COLD FEED
4/1/1992
N
25,780.42
23,202.38
2,578.04
PCF0000052
BIN COLD FEED
4/1/1992
N
25,780.42
23,202.38
2,578.04
PCF0000053
BIN COLD FEED (4)
5/30/1998
N
100,670.13
90,603.12
10,067.01
PCF0000054
BIN AGGREGATE
6/24/1984
N
13,165.70
11,849.13
1,316.57
PCF0000055
BIN AGGREGATE
6/24/1984
N
13,165.70
11,849.13
1,316.57
PCF0000056
BIN COLD FEED
8/29/1988
N
6,642.14
5,977.93
664.21
PCF0000057
BIN COLD FEED
5/13/1993
N
30,111.27
27,100.15
3,011.12
PCF0000058
BIN HOPPER
3/31/2005
U
19,500.00
17,550.00
1,950.00
PCF0000074
STARTING GEAR
5/18/2002
N
45,885.05
45,885.05
_
PCH0000001
TRAILER CONTROL
3/31/2005
U
20,200.00
18,180.00
2,020.00
PCH0000002
CONTROL.HOUSE
5/2/1992
N
177,577.00
159,819.30
17,757.70
PCH0000003
CONTROL HOUSE
11/29/2008
U
3,405.00
3,405.00
_
PCH0000004
CONTROL HOUSE
2/25/2000
N
125,645.49
111,570.71
14,074.78
PCH0000005
TRAILER CONTROL
4/2/1990
N
15,161.87
15,161.87
-
PCH0000006
TRAILER CONTROL
4/24/1991
N
15,650.00
15,650.00
-
PCH0000007
PLANT - BASE TRAILER
7/29/1995
U
40,000.00
36,000.00
4,000.00
PCH0000008
PLANT -CEMENT SECTION TRA
7/29/1995
U
30,000.00
27,000.00
3,000.00
PCH0000009
TRAILER CONTROL
7/29/1995
U
70,000.00
63,000.00
7,000.00
PCH0000010
CONTROL HOUSE
3/16/2009
U
85,000.00
56,100.00
28,900.00
PCH0000011
CONTROL HOUSE
10/14/1986
N
18,813.60
16,932.24
1,881.36
PCH0000013
CONTROL HOUSE
3/16/2009
U
20,000.00
13,200.00
6,800.00
PCH0000014
CONTROL HOUSE
8/9/2005
U
16,682.07
16,682.07
-
PCH0000015
CONTROLHOUSE
3/16/2009
U
20,000.00
13,200.00
6,800.00
PCH0000016
CONTROL HOUSE
7/27/1983
N
13,350.00
12,015.00
1,335.00
PCH0000017
CONTROL HOUSE
7/27/1983
N
19,230.75
17,307,67
1,923.08
PCH0000019
CONTROLHOUSE
9/21/1999
U
44,330.29
39,897.26
4,433.03
PCH0000021
TRAILER CONTROL
4/2/2007
U
21,734.21
21,734.21
-
PCH0000022
TRAILER CONTROL
3/31/2005
N
5,000.00
4,500.00
500.00
PCH0000023
TRAILER CONTROL
4/18/2006
U
19,538.18
18,236.04
1,302.14
PCM0000001
COMPRESSOR AIR
3/31/2005
U
320.00
288.00
32.00
PCM0000002
COMPRESSOR AIR
6/21/2010
N
11,100.00
11,100.00
_
PCM0000003
COMPRESSOR AIR
3/14/2013
N
28,195.07
28,195.07
-
PCM0000004
COMPRESSOR AIR 75 HP
6/2/2017
N
28,632.00
8,321.84
20,310.16
PCM0000005
COMPRESSOR AIR
4/12/1996
N
8,532.10
8,532.10
PCM0000006
COMPRESSOR 75 HP
4/1/2016
N
27,850.00
22,280.04
5,569.96
PCM0000007
. COMPRESSOR 352 CFM
7/5/2018
N
25,215.00
4,622.74
20,592.26
PCM0000008
COMPRESSOR AIR 75 HP
4/1/2017
N
26,965.00
8,089.56
18,875.44
PCM0000009
COMPRESSOR AIR
4/28/2010
N
4,040.00
4,040.00
_
PCM0000011
COMPRESSOR 352 CFM
4/1/2018
N
32,734.59
6,546.96
26,187.63
PCM0000012
COMPRESSOR AIR
3/16/2009
U
2,000.00
1,320.00
680.00
PCM0000014
COMPRESSORAIR
3/16/2009
U
1,000.00
660.00
340.00
PCM0000015
COMPRESSOR AIR 75 HP
4/30/2017
N
27,714.37
8,112.17
19,602.20
PCM0000016
COMPRESSORAIR
3/16/2009
U
700.00
462.00
238.00
PCM0000019
AIR COMPRESSOR 75 HP
1/1/2019
N
32,826.58
4,103.25
28,723.33
PCM0000020
REGENERATIVE AIR DRYER
7/31/2001
N
8,388.51
7,549.65
838.86
PCM0000021
AIR COMPRESSOR
3/8/2019
N
32,032.35
2,936.34
29,096.01
PCR0000001
CRUSHER SYSTEM
5/15/2004
N
119,384.61
119,384.61
-
PCR0000002
CRUSHER SYSTEM
6/30/2000
N
621,392.22
559,253.00
62,139.22
PCR0000003
BREAKER RECYCLE
4/30/2018
N
73,611.29
73,611.29
-
PCR0000004
CRUSHER RECYCLE
6/22/1991
N
23,236.11
20,912.50
2,323.61
PCR0000005
BREAKER RECYCLE
4/1/2016
N
41,395.87
16,558.44
24,837.43
PCR0000006
BREAKER RECYCLE
4/1/2016
N
50,548.09
20,219.16
30,328.93
PCR0000007
BREAKER RECYCLE
4/1/2016
N
42,778.78
17,111.52
25,667.26
PCR0000008
CRUSHER SYSTEM
4/22/2006
N
230,469.42
230,469.42
-
PCR0000009
BREAKER RECYCLE
4/1/2018
N
47,907.55
9,581.52
38,326.03
PCR0000010
BREAKER RECYCLE
6/3/2018
N
43,282.87
7,935.18
35,347.69
PCR0000012
CRUSHER
4/1/2006
U
18,000.00
15,120.00
2,880.00
PCR0000013
CRUSHER RECYCLE
4/1/1992
N
18,365.00
15,528.50
1,836.50
PCR0000015
RECYCLE BREAKER
2/18/2019
N
87,200.32
7,993.37
79,206.95
PCR0000016
RECYCLE BREAKER
2/18/2019
N
49,318.57
4,520.89
44,797.68
PDC0000001
CONVEYOR DRAG
9/29/2008
N
104,000.00
104,000.00
_
PDC0000002
CONVEYOR DRAG
4/15/2010
N
77,402.10
77,402.10
_
PDC0000003
CONVEYOR DRAG
4/22/2005
N
171,735.19
171,735.19
_
PDC0000004
CONVEYOR DRAG
5/4/2014
N
352,870.10
208,781.30
144,088.80
PDC0000005
CONVEYOR DRAG
3/16/2009
U
89,000.00
58,740.00
30,260.00
PDC0000006
CONVEYOR DRAG SLAT CROSS
4/30/2018
N
73,988.00
14,249.63
59,738.37
PDC0000007
CONVEYOR DRAG
3/16/2009
U
42,000.00
31,185.00
10,815.00
PDC0000008
CONVEYOR DRAG
3/16/2009
U
69,000.00
45,540.00
23,460.00
PDC0000009
CONVEYOR DRAG
5/18/2002
N
136,530.61
136,530.61
-
PDC0000010
STAIR/HANDRAIL FOR DRAG CO
6/16/1994
N
7,980.00
7,182.00
798.00
PDD0000001
DRYER DRUM
3/3/2012
U
266,225.00
127,788.36
138,436.64
PDD0000002
DRUM DRYER
7/2/2016
N
294,789.47
112,663.80
182,125.67
PD50000001
BURNER
3/31/2005
U
14,650.00
13,185.00
1,465.00
PDS0000002
TANK BURNER FUEL
3/31/2005
U
13,500.00
12,150.00
1,350.00
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
PDS0000003 TANK FUEL
3/6/1980
N
70,884.32
63,795.89
7,088.43
PD50000004 TANK FUEL
4/26/1997
N
13,846.22
12,461.60
1,384.62
PD50000005 TANK FUEL (3)
4/29/2006
N
121,014.71
121,014.71
-
PDS0000006 TANK CALIBRATION
4/1/2003
N
47,214.00
42,492.60
4,721.40
PDS0000007 BURNER
3/3/2012
U
22,484.00
10,792.32
11,691.68
PD50000008 BURNER
7/21/2007
N
116,301.93
60,089.16
56,212.77
PD50000009 BURNER
4/18/2009
N
89,000.00
89,000.00
-
PD50000010 TANK FUEL
4/1/1997
N
54,303.74
48,873.37
5,430.37
PDS0000011 BURNER
7/2/2016
N
107,623.00
41,131.84
66,491.16
PDS0000012 TANK FUEL
4/14/1970
N
1,315.60
1,213.30
102.30
PDS0000013 TANK CALIBRATION
2/25/2000
N
21,293.83
18,866.72
2,427.11
PDS0000014 TANK FUEL
3/28/2014
N
18,449.87
15,940.68
2,509.19
PD50000015 TANK CALIBRATION
3/28/2014
N
4,829.92
4,173.12
656.80
PDSOOOOO16 BURNER
5/3/2014
N
103,000.00
41,143.08
61,856.92
PD50000017 BURNER DRUM
3/16/2009
U
25,000.00
16,500.00
8,500.00
PDS000oo18 TANK CALIBRATION
3/16/2009
U
8,000.00
5,280.00
2,720.00
PDS0000019 TANK FUEL
3/16/2009
U
18,000.00
11,880.00
6,120.00
PDS0000020 BURNER
5/7/1994
N
33,611.47
30,250.32
3,361.15
PD50000021 TANK FUEL
5/2/1998
N
33,448.30
30,103.47
3,344.83
PD50000022 TANK FUEL
6/1/1979
N
3,842.00
3,457.80
384.20
PD50000023 BURNER NATURAL GAS
4/15/2017
N
150,499.42
45,149.76
105,349.66
PDS0000024 TANK CALIBRATION
3/16/2009
U
8,000.00
5,280.00
2,720.00
PDS0000025 TANK FUEL
9/21/1999
U
42,215.47
37,993.92
4,221.55
PDS0000026 TANK FUEL
8/9/2005
U
20,726.23
20,726.23
-
PDS0000027 TANKCALIBRATION
3/16/2009
U
8,000.00
5,280.00
2,720.00
PDS0000028 BURNER
3/16/2009
U
15,300.00
10,098.00
5,202.00
PDS0000029 TANK RUO
3/31/2005
U
10,000.00
8,500.00
1,500.00
PD50000030 TANK RUO
3/31/2005
U
19,325.00
16,426.25
2,898.75
PD50000031 TANK RUO/TACK
3/31/2005
U
10,000.00
8,500.00
1,500.00
PD50000032 BURNER
3/31/2005
U
9,780.00
8,802.00
978.00
PD50000033 TANK PROPANE
3/31/2005
U
2,950.00
2,655.00
295.00
PD50000034 TANK BURNER FUEL
6/18/1979
N
60,630.25
54,567.22
6,063.03
PDS0000035 TANK BURNER FUEL
4/1/1992
N
19,606.52
17,645.87
1,960.65
PDS0000036 TANK FUEL
5/2/1998
N
33,634.85
30,271.36
3,363.49
PDS0000037 BURNER DRYER CONV TO NAT'L
8/1/2012
N
27,353.68
20,971.28
6,382.40
PDS0000038 GAS TRAIN & REGULATOR
4/1/2009
N
17,705.26
17,705.26
-
PDS0000039 CONVERT BURNER TO NATURAL
4/1/2009
N
15,440.47
15,440.47
-
PDS0000040 BURNER EXTENSION
5/2/2015
N
10,325.00
10,166.16
158.84
PDS0000042 BURNER DRYER CONVTO NAT'L
9/2/2012
N
47,235.93
35,820.45
11,415.48
PD50000043 BURNER DRYER CONV TO NAT'L
8/1/2012
N
31,578.23
24,209.92
7,368.31
PDS0000044 BURNER DRYER DRUM CONVERSI
5/2/2009
N
49,574.29
49,574.29
-
PDS0000045 BURNER DRYER CONV TO NAT'L
8/11/2012
N
94,214.47
72,231.04
21,983.43
PDS0000046 BURNER DRYER CONV TO NAT'L
8/1/2012
N
61,076.49
46,825.24
14,251.25
PFR0000001 FUME COLLECTION SYSTEM
10/16/2010
N
539,930.31
512,933.88
26,996.43
PFR0000002 BLUE SMOKE RECOVERY SYSTEM
4/1/2007
N
14,174.52
9,449.68
4,724.84
PFR0000003 BLUE SMOKE RECOVERY SYSTEM
4/28/2008
N
99,532.09
99,532.09
-
PFR0o00004 BLUE SMOKE RECOVERY SYSTEM
5/2/2015
N
109,741.03
54,720.24
55,020.79
PFR0000005 BLUE SMOKE RECOVERY SYSTEM
3/16/2009
U
250,000.00
165,000.00
85,000.00
PFR0000006 BLUE SMOKE RECOVERY SYSTEM
4/24/1999
N
20,370.48
18,333,43
2,037.05
PFR0000007 BLUE SMOKE RECOVERY SYSTEM
3/16/2009
U
180,600.00
119,196.00
61,404.00
PFR0000008 BLUE SMOKE RECOVERY SYSTEM
4/15/2006
N
318,034.71
318,034.71
-
PFR0000009 FUGITIVE SYSTEM
4/30/1994
N
21,501.60
19,351.44
2,150.16
PFR0000010 BLUE SMOKE RECOVERY SYSTEM
5/29/2007
N
169,258.95
169,258.95
-
PFR0000011 FUME EVACUATION SYSTEM
5/18/2002
N
169,220.39
152,298.35
16,922.04
PFR0000012 FUGITIVE SYSTEM
7/29/1995
N
16,382.16
14,743.94
1,638.22
PFR0000013 BLUE SMOKE RECOVERY SYSTEM
7/1/1997
N
40,019.78
36,017.80
4,001.98
PFR0o00014 FUME EVACUATION MODIFICATI
5/2/1998
N
3,505.10
3,154.59
350.51
PFR0000015 PLT IMPROVE SILO AIR POLLU
10/23/1993
N
11,913.94
10,722.55
1,191.39
PFR0000016 TANK ASPHALT CON DENSOR
8/2/2003
N
15,671.25
15,671.25
-
PH00000007 TANK HOT OIL
3/31/2005
U
9,700.00
8,730.00
970.00
PH00000008 HEATER HOT OIL
1/3/2015
U
18,676.80
18,676.80
-
PH00000010 HEATER INLINE FUEL
7/7/2001
N
10,683.00
10,683.00
PH00000011 HOT OIL HEATER
4/1/2008
N
35,922.18
35,922.18
-
PH00000012 HEATER HOT OIL
1/3/2016
N
49,012.51
20,830.44
28,182.07
PH00000013 HOT OIL HEATER
4/1/1992
N
44,315.35
39,883.81
4,431.54
PHO0000014 HEATER HOT OIL
10/7/1998
N
27,825.00
25,042.50
2,782.50
PH00000015 HOT OIL HEATER
2/25/2000
N
18,651.58
16,488.69
2,162.89
PH00000016 HOT OIL HEATER
9/21/1999
U
13,532.20
12,178.98
1,353.22
PH000o0017 HEATER HOT OIL
7/1/2018
N
161,643.60
28,287.63
133,355.97
PH00000018 HEATER HOT OIL
3/16/2009
U
15,000.00
9,900.00
5,100.00
PH00000019 PREHEATER OIL
9/20/1979
N
3,784.56
3,406.10
378.46
PH00000020 HEATER HOT OIL 275 GAL
10/15/1999
N
31,581.75
28,423.57
3,158.18
PH00000021 HEATER HOT OIL
6/3/2018
N
82,127.32
15,056.58
67,070.74
PH00000022 HEATER HOT OIL
3/16/2009
U
10,000.00
6,600.00
3,400.00
PH00000023 HEATER HOT OIL
8/9/2005
U
6,643.60
6,643.60
-
PH00000024 HOT FUEL OIL STORAGE
8/29/1988
N
12,064.78
10,858.30
1,206.48
PH00000026 HEATER ASPHALT
3/31/2005
U
5,000.00
4,250.00
750.00
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset #
Description
Acquisition Date
Used
Cost
Accum Depr
NBV
PH00000027 PREHEATER OIL
3/31/2005
U
3,000.00
2,550.00
450.00
PH00000028 HOT OIL HEATER
4/29/2000
N
41,757.95
37,582.15
4,175.80
PH00000029 HEATER HOT OIL
8/13/1975
N
44,809.28
41,325.00
3,484.28
PH00000030 BURNER HOT OIL CONVERSION
4/1/2009
N
53,180.40
53,180.40
-
PH00000031 INSULATION HOT OIL LINES
9/11/2001
N
22,420.00
20,178.00
2,242.00
PH00000032 BURNER HOT OIL CONVERSION
5/31/2009
N
26,341.67
26,341.67
-
PH00000033 BURNER HOT OIL CONV NAT'L
8/11/2012
N
7,859.12
6,025.20
1,833.92
PH00000034 BURNER HOT OIL CONV NAT'L
8/1/2012
N
7,080.92
5,428.80
1,652.12
PH00000038 HOT OIL HEATER
3/27/2019
N
65,832.67
5,486.10
60,346.57
PLS0000005
TANK LIQUID AC
3/31/2005
U
13,500.00
12,150.00
1,350.00
PLS0000006
TANKS (3)
7/21/2007
N
81,387.70
81,387.70
-
PLS0000007
LIQUID ASPHALT SYSTEM
12/14/2010
U
178,552.71
178,552.71
-
PLS0000008
PUMP AC UNLOADING
11/27/2010
N
5,048.12
5,048.12
-
PLS000O009
TANK ASPHALT
4/6/1971
N
5,559.00
5,126.80
432.20
PLS0000010
TANK ASPHALT
8/8/1972
N
2,500.00
2,250.00
250.00
PLS0000011
TANK AC
4/19/1997
N
69,248.69
62,323.82
6,924.87
PLS0000012
TANK LIQUID AC
9/6/2000
N
123,133.75
110,820.37
12,313.38
PLS0000013
TANK
6/20/1979
N
14,638.00
13,174.20
1,463.80
PLS0000014
TANK
6/3/1980
N
14,736.80
13,263.12
1,473.68
PLS0000015
TANK ASPHALT
2/17/1981
N
18,621.20
16,759.08
1,862.12
PLS0000016
STORAGE ASPHALT
7/1/1987
N
39,120.11
35,208.10
3,912.01
PLS0000017
LATEX IN -LINE BLENDING
6/6/2009
N
16,037.59
16,037.59
-
PLS0000018
LIQUID ASPHALT SYSTEM
4/4/1989
N
3,534.89
3,181.40
353.49
PLS0000019
LIQUID STORAGE SYSTEM
3/3/2012
U
166,390.00
79,867.20
86,522.80
PLS0000020
LIQUID STORAGE SYSTEM
3/3/2012
U
198,385.00
95,225.16
103,159.84
PL50000021
TANK AC
12/21/2009
N
111,700.00
77,449.50
34,250.50
PLS0000022
LIQUID ASPHALT SYSTEM
4/23/1999
U
95,720.73
86,148.66
9,572.07
PLS0000023
LIQUID ASPHALT SYSTEM
4/23/1999
U
90,791.87
81,712.68
9,079.19
PLS0000024
STORAGE ASPHALT 30000 GAL
4/3/1987
N
40,709.97
36,638.97
4,071.00
PLS0000025
TANK AC 30000 GALLON
6/3/2018
N
223,190.86
40,918.24
182,272.62
PLS0000026
TANK AC 30000 GALLON
6/3/2018
N
223,190.85
40,918.24
182,272.61
PLS0000027
TANK ASPHALT
2/28/1968
N
3,950.00
3,642.85
307.15
PL50000028
TANK ASPHALT
2/28/1968
N
4,750.00
4,380.64
369.36
PLS0000029
TANK ASPHALT
2/28/1968
N
4,750.00
4,380.64
369.36
PL50000030
PUMP AC W/METER PACKAGE 2-
8/30/2015
N
67,901.22
33,384.68
34,516.54
PLS0000031
TANK LIQUID AC
4/29/2002
N
71,023.41
63,921.07
7,102.34
PL50000032
LIQUID ASPHALT SYSTEM
4/1/2007
N
126,689.96
84,459.97
42,229.99
PL50000033
TANK
2/26/1970
N
5,236.40
4,829.22
407.18
PL50000034
TANK ASPHALT
4/6/1973
N
5,954.00
5,491.04
462.96
PL50000035
TANK AC
2/25/2000
N
80,098.24
71,790.69
8,307.55
PLS0000036
TANKAC
4/13/2002
N
95,959.63
86,363.67
9,595.96
PLS0000037
TANK ASPHALT
9/21/1999
U
45,658.10
41,092.29
4,565.81
PL50000038
PUMP AC METERING
3/28/2014
N
8,733.25
8,383.92
349.33
PLS0000039
TANK AC
3/28/2014
N
36,229.26
31,302.12
4,927.14
PLS0000040
TANK AC
3/28/2014
N
27,744.30
23,971.08
3,773.22
PLS0000041
PUMP UNLOADING
3/28/2014
N
2,644.35
2,538.60
105.75
PLS0000042
TANK ASPHALT CONDENSOR & P
4/1/2007
U
7,663.35
7,663.35
-
PL50000043
TANK AC
5/19/2007
U
37,100.00
37,100.00
-
PLS0000044
TANK AC
5/19/2007
U
31,800.00
31,800.00
-
PL50000045
TANK AC
4/1/2006
U
38,097.50
19,683.76
18,413.74
PLS0000047
TANK AC 30000 GALLON
10/28/2017
N
198,184.48
49,546.20
148,638.28
PLS0000048
TANK AC
3/16/2009
U
56,000.00
36,960.00
19,040.00
PL50000049
TANK AC
3/16/2009
U
56,000.00
36,960.00
19,040.00
PL50000050,
TANK AC
3/16/2009
U
56,000.00
36,960.00
19,040.00
PLS0000051
TANK TACK
3/16/2009
U
15,000.00
9,900.00
5,100.00
PL50000052
METERING SYSTEM LIQUID AC
3/16/2009
U
15,000.00
9,900.00
5,100.00
PL50000053
TANK
3/27/1980
N
76,499.03
68,849.13
7,649.90
PL50000054
TANK
10/14/1986
N
67,108.15
60,397.33
6,710.82
PL50000055
TANK LIQUID AC
5/24/2003
N
46,609.47
46,609.47
-
PLS0000056
PUMP AC METERING
3/19/2012
N
34,468.67
27,575.04
6,893.63
PLS0000057
TANK
7/18/1991
U
20,800.00
18,720.00
2,080.00
PLS0000058
TANK AC
7/18/1991
U
1,040.00
936.00
104.00
OLS0000059
TANK AC
8/4/2001
N
102,174.05
91,956.64
10,217.41
PLS0000060
TANK PORTABLE 30000 GALS
5/11/2018
U
41,708.52
7,994.11
33,714.41
PL50000061
TANK ASPHALT
8/23/1967
N
3,950.00
3,642.85
307.15
PL50000062
TANK AC
8/23/1967
N
4,750.00
4,380.64
369.36
PLS0000063
PUMP AC METERING
10/25/2008
N
5,156.48
5,156.48
-
PL50000064
TANK AC 30000 GALLON
5/13/2017
N
148,868.29
43,419.95
105,448.34
PL50000065
TANK TACK 20000 GALLON
5/13/2017
N
125,866.27
36,711.03
89,155.24
PLS0000066
TANK ASPHALT
8/23/1967
N
4,750.00
4,380.64
369.36
PLS0000067
TANK ASPHALT
8/23/1967
N
4,750.00
4,380.64
369.36
PLS0000068
TANK AC
3/16/2009
U
42,000.00
27,720.00
14,280.00
PL50000069
TANKAC
3/16/2009
U
33,000.00
21,780.00
11,220.00
PLS0000070
METERING SYSTEM LIQUID AC
3/16/2009
U
15,000.00
9,900.00
5,100.00
PLS0000071
PUMP AC UNLOADING
5/8/2004
N
5,413.03
5,413.03
-
PLS0000072
TANK LIQUID AC
6/18/2005
U
137,419.06
137,419.06
-
PLS0000073
TANKAC
8/9/2005
U
22,415.79
22,415.79
-
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
PLS0000074 TANKAC
5/2/2015
N
102,983.23
51,350.40
51,632.83
PL50000075 TANKAC
5/2/2015
N
102,983.22
51,350.40
51,632.82
PLS0000076 TANKAC
3/16/2009
U
51,000.00
33,660,00
17,340.00
PLS0000077 TANK AC
3/16/2009
U
2,300.00
1,518.00
782.00
PL50000078 METERING SYSTEM LIQUID AC
3/16/2009
U
15,000.00
9,900.00
5,100.00
PLS0000079 TANK
9/12/1983
N
86,933.65
78,240.28
8,693.37
PL50000080 TANK
9/12/1983
N
48,472.56
43,625.30
4,847.26
PLS0000082 PUMP UNLOADING
4/1/2008
N
50,090.73
50,090.73
-
PL50000083 TANK ASPHALT
3/31/2005
U
13,455.00
11,436.75
2,018.25
PL50000084 TANK LIQUID ASPHALT
3/31/2005
U
25,000.00
21,250.00
3,750.00
PL50000087 TANK
3/31/2005
U
9;075.00
8,167.50
907.50
PLS0000088 TANK ASPHALT
6/18/1979
N
47,886.75
43,098.07
4,788.68
PL50000089 METER MASS FLOW
9/21/1999
N
20,000.00
18,000.00
2,000.00
PLS0000090 TANK LIQUID AC
5/18/2002
N
277,586.76
277,586.76
-
PL50000091 PUMP ASPHALT
4/14/2007
N
4,153.51
4,153.51
-
PL50000092 PUMP AC
2/5/1970
N
1,474.10
1,359.47
114.63
PLS0000093 TANK
8/13/1975
N
24,887.60
22,952.40
1,935.20
PLS0000094 LIQUID ASPHALT SYSTEM
4/4/1989
N
5,654.19
5,088.77
565.42
PLS0000095 LIQUID ASPHALTSYSTEM
5/13/1993
N
23,407.35
21,066.62
2,340.73
PL50000096 PUMP AC UNLOADING
7/24/2004
N
28,231.85
28,231.85
-
PL50000097 TANKAC
9/21/1999
N
53,779.47
48,401.52
5,377.95
PLS0000115 TANK AC STORAGE INSULATION
9/22/1997
N
10,049.41
9,044.47
1,004.94
PLS0000116 TANK INSULATE A/C
11/22/1988
N
25,854.73
23,269.26
2,585.47
PLS0000117 ASPHALTTANK INSULATION
4/1/1992
N
13,542.00
12,187.80
1,354.20
PLS0000118 PIPING & INSULATION
8/23/2010
N
99,267.91
95,958.92
3,308.99
PL50000119 INSULATE TANK/LINE
8/29/1988
N
19,158.42
17,242.58
1,915.84
PLS0000120 PIPING SYSTEM ASPHALT
3/28/2014
N
10,232.18
9,822.96
409.22
PLS0000121 TANK AC INSULLATION
12/12/2017
N
18,247.68
8,736.85
9,510.83
PLS0000122 AC SYSTEM RECONFIGURATION
5/30/2015
N
148,266.73
72,897.92
75,368.81
PLS0000123 AC TANK INSTALL 2319
5/30/2015
N
38,947.41
19,149.04
19,798.37
PLS0000124 AC TANK INSTALL 2320
5/30/2015
N
38,947.41
19,149.04
19,798.37
PL50000125 LIQUID ASPHALT PUMP CONVER
8/1/2012
U
8,369.48
6,416.88
1,952.60
PMC0000002 ELECTRICAL POWER HOOK UP
10/17/2000
N
6,765.00
6,088.50
676.50
PMC0000003 ELECTRICAL SYSTEM
12/14/2010
U
42,917.34
42,917.34
-
PMC0000005 ENERGYCENTER
7/21/2007
N
120,299.87
86,916.36
33,383.51
PMC0000007 ELECTRICAL SYSTEM
6/24/1998
N
244,451.05
220,005.94
24,445.11
PMC0000008 CONTROL CENTER
4/3/1987
N
182,966.29
164,669.66
18,296.63
PMC0000009 ELECTRICAL SYSTEM
4/1/2007
N
21,345.40
14,230.27
7,115.13
PMC0000010 ENERGYCENTER
2/25/2000
N
40,599.08
36,136.34
4,462.74
PMC0000012 ELECTRICAL SYSTEM
4/1/2006
U
71,275.00
56,545.08
14,729.92
PMC0000013 ELECTRICAL SYSTEM
3/16/2009
U
131,000.00
86,460.00
44,540.00
PMC0000014 CONTROL HOUSE MOTOR
10/14/1986
N
15,080.00
13,572.00
1,508.00
PMC0000015 PLANT TOWER ASPHALT
7/18/1991
U
50,000.00
45,000.00
5,000.00
PMC0000017 ELECTRICAL SYSTEM
3/16/2009
U
95,000.00
62,700.00
32,300.00
PMC0000018 ELECTRICAL SYSTEM
3/16/2009
U
91,000.00
60,060.00
30,940.00
PMC0000019 ELECTRIC POWER
3/31/2005
U
16,810.00
15,129.00
1,681.00
PMC0000020 ELECTRICAL SYSTEM
5/13/1993
N
41,660.60
37,494.54
4,166.06
PMC0000021 ELECTRICAL SYSTEM UPGRADE
4/1/2009
N
49,800.53
49,800.53
-
PMC0000022 ELECTRICAL UPGRADE
4/15/1996
N
32,908.96
29,618.06
3,290.90
PMC0000023 ELECTRICAL UPGRADE
4/15/1997
N
7,975.00
7,177.50
797.50
PMC0000024 ELECTRICAL UPGRADE
4/4/1989
N
8,580.51
7,722.46
858.05
PMC0000025 AUTO CONTROL
4/28/2008
N
16,405.00
16,405.00
-
PMC0000026 AUTO CONTROL UPGRADE
4/28/2008
N
18,500.00
18,500.00
-
PMD0000001 DRUM MIXER
3/3/2012
U
28,105.00
10,047.24
18,057.76
PMD0000002 DRUM MIXING
6/27/2015
N
147,766.55
71,420.62
76,345.93
PMF0000001 BIN SILO MINERAL FILLER
6/4/2005
U
54,855.00
46,108.76
8,746.24
PMF0000002 BIN SILO MINERAL FILLER
4/1/2009
N
114,001.40
114,001.40
-
PMF0000003 FLY ASH SYSTEM
6/1/1992
N
58,227.46
58,227.46
PMF0000005 .BIN SILO MINERAL FILLER
8/9/2005
U
16,128.09
16,128.09
-
PMF0000006 MINERAL FILLER SILO
3/28/2014
N
33,891.64
29,282.40
4,609.24
PMF0000007 BIN SILO MINERAL FILLER
3/16/2009
U
45,000.00
29,700.00
15,300.00
PMF0000008 BIN SILO MINERAL FILLER
4/4/1989
N
15,600.00
14,040.00
1,560.00
PMF0000009 BIN SILO MINERAL FILLER
4/4/1975
N
16,090.09
14,838.96
1,251.13
PMF0000010 BIN SILO MINERAL FILLER
4/4/1989
N
34,144.26
30,729.83
3,414.43
PMF0000011 BIN SILO MINERAL FILLER
3/16/2009
U
35,000.00
23,100.00
11,900.00
PMF0000012 BIN SILO MINERAL FILLER
4/2/1989
N
31,571.91
28,415.62
3,156.29
PMF0000013 BIN SILO MINERAL FILLER
7/10/1979
N
52,000.00
46,800.00
5,200.00
PMS0000001 SILO DILLMAN 70T
3/31/2005
U
77,950.00
70,155.00
7,795.00
PMS0000002 SILO MIX STORAGE
9/29/2008
N
93,700.00
93,700.00
-
PM50000003 SILO MIX STORAGE
9/29/2008
N
93,650.00
93,650.00
PMS0000004 SILO MIX STORAGE
9/29/2008
N
93,650.00
93,650.00
-
PMS0000005 SILO SYSTEM
12/14/2010
U
128,804.16
128,804.16
-
PMS0000006 SILO MIX STORAGE 200 (2)
4/25/1985
N
189,050.22
170,145.20
18,905.02
PM50000007 SILO STORAGE
4/1/1990
N
110,444.42
99,399.98
11,044.44
PM50000008 SILO MIX STORAGE
5/2/1998
N
162,860.54
146,574.49
16,286.05
PMS0000009 SILO SYSTEM
7/1/1987
N
314,488.18
283,039.36
31,448.82
PM50000010 SILO MIX STORAGE
4/1/2003
N
140,088.45
126,079.60
14,008.85
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
PMS0000011 SILO MIX STORAGE (3)
3/3/2012
U
297,580.00
142,838.40
154,741.60
PMS0000012 SILO MIX STORAGE (2)
7/2/2000
U
68,381.55
61,543.39
6,838.16
PM50000013 SILO MIX STORAGE (3)
7/21/2007
N
386,216.15
279,041.28
107,174.87
PMS0000014 SILO MIX STORAGE
4/23/1999
U
100,761.40
90,685.26
10,076.14
PMS0000015 SILO SYSTEM
4/3/1987
N
314,168.57
282,751.71
31,416.86
PMS0000016 SILO MIX STORAGE (2)
8/1/1979
N
110,720.00
99,648.00
11,072.00
PMS0000017 SILO
4/15/1996
N
114,916.85
103,425.16
11,491.69
PMS0000018 SILO MIX STORAGE
4/11/2009
N
138,209.12
138,209.12
-
PMS0000019 SILO 200TON
6/3/2018
N
196,471.13
36,019.72
160,451.41
PM50000020 SILO MIX STORAGE SYSTEM
4/1/2007
N
136,246.08
90,830.73
45,415.35
PM50000021 SILO MIX STORAGE (3)
8/29/1988
N
449,951.83
404,956.65
44,995.18
PMS0000022 SILO MIX STORAGE
2/25/2000
N
246,926.99
218,384.41
28,542.58
PMS0000023 SILO MIX STORAGE (3)
4/28/2008
N
920,013.95
920,013.95
-
PM50000024 SILO SYSTEM
4/1/2006
U
213,795.00
169,610.88
44,184.12
PM50000025 SILO 200TON
5/29/2016
N
211,535.91
81,337.68
130,198.23
PMS0000026 SILO STORAGE 300T
4/1/2017
N
352,091.67
105,627.60
246,464.07
PMS0000027 SILO MIX STORAGE
3/16/2009
U
133,750.00
88,275.00
45,475.00
PMS0000028 SILO MIX STORAGE
3/16/2009
U
133,750.00
88,275.00
45,475.00
PMS0000029 SILO MIX STORAGE
3/16/2009
U
133,750.00
88,275.00
45,475.00
PM50000030 SILO MIX STORAGE
3/16/2009
U
133,750.00
99,309.12
34,440.88
PM50000031 SILO MIX STORAGE
6/7/1975
N
117,288.94
108,168.60
9,120.34
PMS0000032 SILO MIX STORAGE
10/14/1986
N
133,180.34
119,862.31
13,318.03
PMS0000033 SILO MIX STORAGE
4/24/1999
N
189,189.43
170,270.49
18,918.94
PM50000034 SILO MIX STORAGE.
5/27/1998
N
79,637.19
71,673.47
7,963.72
PM50000035 SILO MIX STORAGE 300T
6/17/2017
N
241,096.75
68,310.76
172,785.99
PM50000036 SILO MIX STORAGE
5/11/2013
N
212,825.63
147,204.53
65,621.10
PMS0000037 SILO 300TON
4/30/2018
N
264,117.17
50,867.10
213,250.07
PM50000038 SILO MIX STORAGE
3/16/2009
U
88,200.00
58,212.00
29,988.00
PM50000039 SILO MIX STORAGE
3/16/2009
U
75,600.00
49,896.00
25,704.00
PMS0000040 SILO MIX STORAGE
3/16/2009
U
75,600.00
49,896.00
25,704.00
PMS0000041 SILO MIX STORAGE
7/15/1999
N
147,511.98
147,511.98
-
PM50000042 SILO MIX STORAGE (2)
4/17/2004
N
313,258.60
313,258.60
-
PM50000043 51 LO M IX STO RAG E
8/9/2005
U
51,227.66
51,227.66
-
PMS0000044 SILO MIX STORAGE
3/16/2009
U
77,750.00
51,315.00
26,435.00
PMS0000045 SILO MIX STORAGE
3/16/2009
U
77,750.00
51,315.00
26,435.00
PMS0000046 SILO MIX STORAGE
3/16/2009
U
77,750.00
51,315.00
26,435.00
PM50000047 SILO MIX STORAGE
3/16/2009
U
77,750.00
51,315.00
26,435.00
PM50000048 SILO MIX STORAGE
4/21/1980
N
146,131.25
131,513.12
14,613.13
PMS0000049 SILO STORAGE
4/1/1990
N
120,726.76
108,654.09
12,072.67
PM50000050 SILO MIX STORAGE (4)
3/31/2005
U
300,000.00
255,000.00
45,000.00
PMS0000051 SILO MIX STORAGE (2)
3/31/2005
U
64,355.00
57,919.50
6,435.50
PMSOOOCO52 SILO
7/10/1979
N
67,000.00
53,600.00
13,400.00
PM50000053 SILO MIX STORAGE
8/3/1991
N
130,177.05
117,159.34
13,017.71
PMS0000054 SILO SYSTEM
5/13/1993
N
151,315.64
136,184.08
15,131.56
PMS0000055 SILO MIX STORAGE
5/2/1998
N
135,093.67
121,584.30
13,509.37
PMS0000056 SILO MIX STRAOGE
9/30/2000
N
136,157.64
122,541.87
13,615.77
PMS0000057 SILO MIX STORAGE
3/31/2005
U
22,320.00
20,088.00
2,232.00
PM50000058 BATCHER SILO (3)
3/3/2012
U
206,325.00
99,036.36
107,288.64
PMS0000059 BATCHER SILO (3)
4/1/2006
N
43,850.69
43,850.69
-
PMS0000060 SILO MIX STORAGE
10/23/1993
N
7,242.15
6,517.94
724.21
PRB0000001 BIN RECYCLE USED
8/2/2018
U
28,538.84
4,756.40
23,782.44
PRB0000002 RECYCLE SYSTEM
12/14/2010
U
50,331.57
50,331.57
-
PRB0000003 BIN RECYCLE
9/30/1982
N
21,032.08
18,928.87
2,103.21
PRB0000004 RECYCLE SYSTEM
5/13/1993
N
3,237.77
2,914.00
323.77
PRB0000005 BIN RECYCLE
4/1/2015
N
79,704.14
39,852.00
39,852.14
PRB0000006 RECYCLE SYSTEM
7/1/1987
N
64,516.98
58,065.28
6,451.70
PRB0000007 BIN RECYCLE
12/22/1983
N
20,785.32
18,706.79
2,078.53
PRB0000008 RECYCLE SYSTEM
3/3/2012
U
47,900.00
22,501.80
25,398.20
PRB0000009 RECYCLE SYSTEM
3/3/2012
U
79,355.00
38,090.76
41,264.24
PRB0000010 BIN RECYCLE
9/19/1980
N
18,208.18
16,387.36
1,820.82
PRB0000011 RECYCLE SYSTEM
7/21/2007
N
221,996.94
160,392.84
61,604.10
PRB0000012 RECYCLE SYSTEM
4/3/1987
N
73,241.01
65,916.91
7,324.10
PRB0000013 BIN RECYCLE
7/3/2011
N
79,147.69
68,379.15
9,768.54
PRB0000014 BIN RECYCLE
3/22/1982
N
18,108.00
16,297.20
1,810.80
PRB0000015 CONVEYOR RECYCLE
3/22/1982
N
14,958.14
13,462.33
1,495.81
PRB0000016 BIN RECYCLE W/FEEDER
4/1/2017
N
74,585.71
22,375.80
52,209.91
PRB0000017 CONVEYOR FEED BIN
6/1/1992
N
32,569,95
32,569.95
-
PRB0000018 BIN SHINGLE
9/20/1995
N
28,145.00
25,330.50
2,814.50
PRB0000019 BIN SHINGLE
11/2/2002
N
7,394.24
7,394.24
-
PRB0000020 RECYCLE SYSTEM
4/1/2007
N
60,212.15
40,141.43
20,070.72
PRB0000021 FEEDER RECYCLE
4/4/1989
N
4,696.84
4,227.16
469.68
PRB0000022 CONVEYOR RECYCLE
2/25/2000
N
37,146.92
32,041.76
5,105.16
PRB0000023 BIN RECYCLE
5/2/2009
N
17,460.07
17,460.07
-
PRB0000024 BIN RECYCLE
3/28/2014
N
43,113.37
37,249.92
5,863.45
PRB0000025 BIN RECYCLE
3/16/2009
U
15,000.00
9,900.00
5,100.00
PRB0000026 RECYCLE SYSTEM
4/1/2006
U
55,095.00
43,708.68
11,386.32
PRB0000028 BIN RECYCLE
3/16/2009
U
31,000.00
20,460.00
10,540.00
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
PRB0000029 BIN RECYCLE
10/14/1986
N
58,936.30
53,043.12
5,893.68
PRB0000030 BIN MIX
4/4/1989
N
21,542.48
19,388.23
2,154.25
PRB0000031 BIN RECYCLE
7/27/1983
N
20,000.00
18,000.00
2,000.00
PRB0000032 BIN RECYCLE
4/4/1989
N
10,786.77
9,708.09
1,078.68
PRB0000033 BIN RECYCLE W/GRIZZLY
4/15/2017
N
55,409.52
16,623.00
38,786.52
PRB0000034 CONVEYOR AGGREGATE
8/9/2005
U
14,355.12
14,355.12
-
PRB0000035 BIN RECYCLE
8/9/2005
U
28,711.14
28,711.14
-
PRB0000036 CONVEYOR RECYCLE
11/23/1981
N
13,433.13
12,089.82
1,343.31
PRB0000037 BIN RECYCLE
11/23/1981
N
15,714.09
14,142.68
1,571.41
PRB0000038 CONVEYOR RECYCLE
3/31/2005
U
75,000.00
63,750.00
11,250.00
PRB0000039 CONVEYOR RECYCLE
7/20/1981
N
13,806.60
12,425.94
1,380.66
PRB0000040 BIN RECYCLE
7/20/1981
N
14,397.18
12,957.46
1,439.72
PRB0000041 RECYCLE SYSTEM
7/10/1979
N
52,000.00
46,800.00
5,200.00
PRB0000042 BIN RECYCLE
9/21/1999
U
58,481.55
52,633.39
5,848.16
PRB0000043 PLT IMPROVE CONVEYOR HOT M
10/23/1993
N
9,631.60
8,668.44
963.16
PSA0000001 CONVEYOR STACKING
2/4/2003
U
14,300.00
12,870.00
1,430.00
PSA0000002 CONVEYOR STACKING
2/4/2003
U
5,000.00
4,500.00
500.00
PSA0000003 CONVEYOR STACKING
2/4/2003
U
14,300.00
12,870.00
1,430.00
PSA0000004 CONVEYOR STACKING
2/4/2003
U
14,300.00
12,870.00
1,430.00
PSA0000005 CONVEYOR STACKING
2/4/2003
U
30,000.00
27,000.00
3,000.00
PSA0000006 CONVEYOR STACKING
4/1/2009
U
2,500.00
2,500.00
-
PSA0000007 CONVEYOR STACKING
2/4/2003
U
18,300.00
16,470.00
1,830.00
PSA0000008 CONVEYOR STACKER RADIAL 10
9/21/2016
N
37,369.75
13,390.75
23,979.00
PSA0000009 CONVEYOR STACKING
4/1/2006
U
6,000.00
5,040.00
960.00
PSA0000010 CONVEYOR STACKING
6/3/2002
N
40,038.64
40,038.64
-
PSA0000011 CONVEYOR STACKING
4/1/2006
U
3,500.00
2,940.00
560.00
PSA0000012 CONVEYOR STACKING
3/31/2005
U
71,250.00
64,125.00
7,125.00
PSA0000013 CONVEYOR STACKING
3/31/2005
U
3,015.00
2,713.50
301.50
PSA0000015 CONVEYOR STACKING
4/1/2009
U
2,500.00
2,500.00
-
PSA0000016 CONVEYOR STACKING
2/4/2003
U
38,300.00
34,470.00
3,830.00
PSA0000017 CONVEYOR STACKING
2/4/2003
U
48,300.00
43,470.00
4,830.00
PSA0000018 CONVEYOR STACKING
7/31/2008
N
38,000.00
29,766.51
8,233.49
PSA0000019 CONVEYOR STACKER LATTICE
7/1/2016
U
7,500.00
1,435.70
6,064.30
PSA0000020 CONVEYOR STACKER RADIAL
7/1/2016
U
30,000.00
5,742.80
24,257.20
PSA0000021 CONVEYOR STACKER
7/1/2016
U
5,000.00
956.98
4,043.02
PSA0000022 CONVEYOR STACKER RADIAL
7/1/2016
U
15,500.00
2,966.96
12,533.04
PSA0000023 CONVEYOR STACKER RADIAL
7/1/2016
U
20,000.00
3,828.38
16,171.62
PSA0000024 CONVEYOR STACKER RADIAL
7/1/2016
U
8,000.00
1,531.26
6,468.74
PSA0000025 CONVEYOR STACKING 36 X 125
7/1/2017
N
147,170.00
27,737.06
119,432.94
PSA0000026 CONVEYOR STACKER RADIAL
7/1/2016
U
45,000.00
8,614.08
36,385.92
PSA0000027 CONVEYOR STACKER RADIAL
7/1/2016
U
8,500.00
1,627.28
6,872.72
PSB0000003 BINS SURGE (5)
7/1/2016
U
7,500.00
1,435.70
6,064.30
P560000004 SURGE BINS (2)
7/1/2016
U
2,000.00
382.70
1,617.30
PSC0000001 CONVEYOR SCREW
12/29/2006
U
3,420.00
3,420.00
-
PSC0000004 CONVEYOR SCREW
12/29/2006
U
2,280.00
2,280.00
PSC0000006 CONVEYOR SCREW
12/29/2006
U
11,400.00
11,400.00
-
PSS0000004 SCREEN DECK DOUBLE
3/31/2005
U
44,000.00
39,600.00
4,400.00
PSS0000005 SCREEN TRIPLE DECK
7/1/2016
U
18,000.00
3,445.68
14,554.32
PSS0000006 SCREEN RECYCLE
1/4/2010
N
18,000.00
18,000.00
-
PSS0000007 SCREEN RECYCLE
6/22/1991
N
16,806.72
15,184.90
1,621.82
PSS0000008 SCREEN DECK DOUBLE
5/30/1998
N
50,868.16
45,781.34
5,086.82
PSS0000009 SCREEN AGGREGATE UNDERFEED
4/1/1992
N
4,419.44
3,977.50
441.94
PSS0000010 SCREEN DECK DOUBLE
4/1/2003
N
47,424.09
42,681.68
4,742.41
PSS0000011 SCREEN RECYCLE 4 X 8
4/1/2018
N
25,041.17
5,008.32
20,032.85
PSS0000013 SCREEN SYSTEM
6/24/1998
N
105,484.80
94,936.32
10,548.48
PSS0000014 SCREEN SINGLE DECK
7/21/2007
N
7,000.00
5,057.94
1,942.06
PSS0000015 SCREEN S/D CMI SETUP #789
7/3/2011
N
13,535.62
11,843.88
1,691.74
PSS0000016 SCREEN COLD FEED 4 X 12
4/1/2018
N
34,973.42
6,994.68
27,978.74
PS50000017 SCREEN COLD FEED 5-X12'
4/1/2017
N
38,500.20
11,550.12
26,950.08
PS50000018 SCREEN VIRGIN AGGRREGATE
4/1/2013
N
41,904.01
29,332.80
12,571.21
PSS0000019 CHUTE RECYCLE CALIBRATION
5/20/1996
N
17,836.77
16,047.69
1,789.08
PSS0000020 SCREEN DECK DOUBLE
3/28/2014
N
31,136.81
26,902.20
4,234.61
PS50000021 SCREEN
4/1/2006
U
23,000.00
20,700.00
2,300.00
PSS0000022 SCREEN SCALPING COLD FEED
3/16/2009
U
25,400.00
16,764.00
8,636.00
PSS0000023 SCREEN SCALPING RECYCLE
3/16/2009
U
25,000.00
16,500.00
8,500.00
PSS0000024 SCREEN AGGR DOUBLE DECK
4/1/2017
N
50,162.84
15,048.72
35,114.12
PSS0000025 SCREEN SCALPING RECYCLE
3/16/2009
U
25,000.00
16,500.00
8,500.00
PSS0000026 SCREEN DECK DOUBLE
6/12/2000
N
24,879.52
22,391.57
2,487.95
PSS0000027 SCREEN SCALPING COLD FEED
3/16/2009
U
20,400.00
13,464.00
6,936.00
P550000028 SCREEN SCALPING RECYCLE
3/16/2009
U
25,000.00
16,500.00
8,500.00
PSS0000029 SCREEN DECK
3/31/2005
U
1,155.00
1,039.50
115.50
PS50000030 SCREEN DECK DOUBLE
7/11/1983
N
8,933.60
8,040.24
893.36
PSS0000031 SCREEN TRIPLE DECK
3/31/2005
U
47,500.00
42,750.00
4,750.00
PSS0000032 SCREEN DECK DOUBLE
3/19/2012
U
60,128.00
48,102.60
12,025.40
PSS0000034 SCREEN 3-DECK 7 X 20
7/7/2018
N
582,012.78
67,901.40
514,111.38
PSS0000035 SCREEN TRIPLE DECK
3/31/2005
U
40,500.00
36,450.00
4,050.00
PSS0000036 SCREEN TRIPLE DECK
3/31/2005
U
24,980.00
22,482.00
2,498.00
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset #
Description
Acquisition Date
Used
Cost
Accum Depr
NBV
PSS0000037
SCREEN TRIPLE DECK
3/31/2005
U
35,000.00
31,500.00
3,500'.00
P550000039
SCREEN DECK TRIPLE
12/29/2006
U
5,700.00
5,700.00
-
PSS0000040
SCREEN DECK TRIPLE
7/1/2016
U
25,000.00
4,785.70
20,214.30
PS50000041
SCREEN DECK TRIPLE
7/1/2016
U
25,000.00
4,785.70
20,214.30
PS50000042
SCREEN DECK TRIPLE
7/1/2016
U
5,000.00
956.98
4,043.02
PSS0000043
SCREEN DECK TRIPLE 7 X 20
5/31/2018
U
485,129.70
48,328.14
436,801.56
PS50000044
SCREEN DECK TRIPLE
7/1/2016
U
30,000.00
5,742.80
24,257.20
PSS0000047
SCREEN COLD FEED
1/17/2019
N
37,314.81
3,420.56
33,894.25
PS00000003
PLT IMPROVE-KENTY AVE
8/8/1986
N
96,750.15
87,075.13
9,675,02
PS00000004
PLT IMPROVEMENT-KTCY AVE
8/29/1987
N
105,667.06
95,100.35
10,566.71
PS00000005
INSPECTION SAMPLING RACK
4/13/2001
N
5,058.56
4,552.76
505.80
PS00000006
RACK TRUCK SPRAY DOWN
4/13/2001
N
5,194.00
4,674.60
519.40
PS00000007
PLANT ADD'L COST AFTER LEA
4/15/2001
N
32,755.63
27,459.93
5,295.70
PS00000008
PLANT SET UP #367
2/25/2000
N
516,846.61
465,161.95
51,684.66
PS00000009
SILO MINERAL FILLER (SETUP
4/29/2002
N
104,713.62
94,242.26
10,471.36
PS00000010
PLANT MODIFICATIONS
7/31/1986
N
82,657.01
82,657.01
-
PS00000011
PLANT SET UP
4/4/1989
N
11,676.09
10,508.48
1,167.61
PS00000012
INSPECTION SAMPLING RACK
5/22/2000
N
5,835.00
5,251.50
583.50
PSUOOOOO13
PLT IMPROVEMENT-H&B DRUM
8/29/1987
N
45,996.89
41,397.20
4,599.69
PSUOOOOO14
INSPECTION SAMPLING RACK
7/1/2002
N
5,349.82
4,814.84
534.98
PS00000015
PLT IMPROVEMENT-B-G DRUM
8/29/1987
N
49,125.72
44,213.15
4,912.57
PSUOOOOO16
PLATFORM 20' AND 40' WALKO
5/5/1998
N
9,860.00
8,874.00
986.00
PS00000019
FREIGHT PORTABLE PLANT#42
6/17/2005
N
34,700.00
34,700.00
-
PTC0000001
CONVEYOR TRANSFER
2/4/2003
U
9,300.00
8,370.00
930.00
PTC0000002
CONVEYOR TRANSFER
2/4/2003
U
9,300.00
9,370.00
930.00
PTC0000003
CONVEYOR TRANSFER
2/4/2003
U
9,300.00
8,370.00
930.00
PTC0000004
CONVEYOR TRANSFER
2/4/2003
U
8,300.00
7,470.00
830.00
PTC0000005
MIX CONVEYOR SYSTEM
12/14/2010
U
93,822.14
93,822.14
-
PTC0000006
CONVEYOR TRANSFER INCLINE
4/1/2003
N
65,091.63
58,582.47
6,509.16
PTC0000007
MIX CONVEYOR SYSTEM
7/21/2007
N
140,785.08
101,717.34
39,067.74
PTC0000008
CONVEYOR TRANSFER
4/1/2015
N
136,104.40
68,052.12
68,052.28
PTC0000010
CONVEYOR
3/27/1968
N
10,753.03
9,916.88
836.15
PTC0000011
MIX CONVEYOR SYSTEM
4/1/2007
N
77,020.84
51,347.23
25,673.61
PTC0000012
MIX CONVEYOR SYSTEM
4/1/2006
U
96,810.00
76,802.76
20,007.24
PTCOOOOO13
CONVEYOR TRANSFER INCLINE
5/29/2016
N
55,810.44
21,459.78
34,350.66
PTCOOOOO14
CONVEYOR TRANSFER CROSSOVE
3/16/2009
U
35,000.00
23,100.00
11,900.00
PTC0000015
CONVEYOR SILO
3/16/2009
U
35,000.00
23,100.00
11,900.00
PTCOCOOO16
CONVEYOR SILO
3/16/2009
U
35,000.00
23,100.00
11,900.00
PTC0000017
CONVEYOR TRANSFER
11/22/1988
N
38,676.00
33,880.96
4,795.04
PTCOOOOO18
CONVEYOR TRANSFER
6/17/2017
N
84,709.68
24,000.94
60,708.74
PTC0000019
CONVEYOR SILO
3/16/2009
U
22,000.00
14,520.00
7,480.00
PTC0000020
CONVEYOR SILO
3/16/2009
U
28,000.00
18,480.00
9,520.00
PTC0000021
CONVEYOR SILO
3/16/2009
U
22,000.00
14,520.00
7,480.00
PTC0000022
CONVEYOR SILO
3/16/2009
U
23,000.00
15,180.00
7,820.00
PTC0000023
CONVEYOR SILO
3/16/2009
U
29,000.00
19,140.00
9,860.00
PTC0000024
CONVEYOR SILO
3/16/2009
U
23,000.00
15,180.00
7,820.00
PTC0000025
CONVEYOR TRANSFER
3/31/2005
U
6,660.00
5,994.00
666.00
PTC0000026
CONVEYOR TRANSFER SAND
2/4/2003
U
9,300.00
8,370.00
930.00
PTC0000027
CONVEYOR TRANSFER
7/1/2016
U
1,000.00
191.58
808.42
PTS0000002
TRUCK SCALE 8X10
12/1/2018
N
61,850.00
8,708.74
53,141.26
PTS0000003
SCALE TRUCK
4/29/2004
N
52,538.30
52,538.30
-
PTS0000004
SCALE TRUCK
5/30/2006
U
55,895.62
51,858.63
4,036.99
PTS0000005
SCALE TRUCK
6/3/2006
N
85,663.88
85,663.88
-
PTS0000006
SCALE TRUCK
9/29/2008
N
17,000.00
17,000,00
PTS0000007
SCALE TRUCK SET UP
12/14/2010
U
24,754.85
24,754.85
-
PTS0000008
SCALETRUCK
5/8/1971
N
9,678.58
8,925.96
752.62
PTS0000009
SCALE TRUCK
2/4/1977
N
5,000.00
4,500.00
500.00
PTS0000010
SCALETRUCK
4/21/1978
N
400,000.00
400,000.00
-
PTS0000011
SCALETRUCK
7/8/1987
N
44,458.52
40,012.67
4,445.85
PTS0000012
SCALETRUCK
7/21/2007
N
59,173.26
42,752.79
16,420.47
PTSOOOOO13
SCALE TRUCK END SECTIONS (
4/15/2010
N
50,865.86
50,865.86
PTS0000014
SCALE TRUCK 100 TON
4/1/2016
N
57,160.19
22,863.96
34,296.23
PTS0000015
SCALETRUCK
8/9/1963
N
5,265.21
4,855.79
409.42
PTSOOOOO16
SCALE TRUCK
4/16/1964
N
5,498.82
5,071.24
427.58
PTSOOOOO17
SCALE TRUCK
9/4/1974
N
8,000.00
7,200.00
800.00
PTS0000018
SCALE UNDER SILO
8/8/1986
N
82,916.71
74,625.04
8,291.67
PTS0000019
TRUCK SCALE
9/21/2001
N
39,380.19
39,380.19
-
PTS0000020
SCALE TRUCK
4/1/2007
N
21,363.14
14,242.09
7,121.05
PTS0000021
SCALE TRUCK
2/25/2000
N
25,776.41
23,198.77
2,577.64
PTS0000022
SCALE TRUCK
6/30/2008
N
22,510.00
22,510.00
-
PTS0000023
SCALE TRUCK 110'
4/1/2016
N
60,756.58
24,302.52
36,454.06
PTS0000025
SCALE TRUCK
4/28/2008
N
85,704.95
85,704.95
-
PTS0000026
SCALETRUCK
4/1/2006
U
48,110.00
38,167.56
9,942.44
PTS0000027
SCALE TRUCK SECTION 20 X 1
4/1/2018
N
42,697.09
8,539.44
34,157.65
PTS0000028
SCALETRUCK EXTENSION 20'
4/1/2017
N
30,672.62
9,201.84
21,470.78
PTS0000029
SCALETRUCK
3/16/2009
U
34,000.00
22,440.00
11,560.00
PTS0000030
SCALETRUCK
3/16/2009
U
34,000.00
22,440.00
11,560.00
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
PTS0000031 SCALE TRUCK
4/29/1995
N
60,791.31
54,712.18
6,079.13
PTS0000032 SCALE TRUCK ADDITION
4/24/1999
N
16,950.88
15,255.79
1,695.09
PTS0000033 SCALE TRUCK
10/23/1993
N
30,660.35
27,594.32
3,066.03
PTS0000034 SCALE TRUCK ADDITION
5/2/1998
N
13,731.66
12,358.49
1,373.17
PTS0000035 SCALE TRUCK SECTION 160'
4/1/2018
N
115,426.88
23,085.36
92,341.52
PTS0000037 SCALE TRUCK
3/16/2009
U
37,200.00
24,552.00
12,648.00
PTS0000039 SCALE TRUCK
9/21/1999
U
4,442.49
3,998.24
444.25
PTS0000040 SCALE TRUCK
4/6/2002
N
36,151.87
32,536.68
3,615.19
PTS0000041 SCALE TRUCK
7/19/2004
U
26,524.87
26,524.87
-
PTS0000042 SCALE TRUCK
9/21/1999
U
8,623.66
7,761.29
862.37
PTS0000043 SCALE TRUCK
3/31/2005
U
24,790.00
21,071.50
3,718.50
PTS0000045 SCALE TRUCK
3/31/2005
U
2,660.00
2,394.00
266.00
PTS0000047 SCALE TRUCK
9/29/1988
N
51,795.55
46,615.99
5,179.56
PTS0000048 SCALE TRUCK
5/13/1993
N
37,312.70
33,581.43
3,731.27
PTS0000049 SCALE TRUCK ADDITION
5/2/1998
N
11,532.43
10,379.19
1,153.24
PTS0000050 SCALE TRUCK FABR 8911 PIT
6/30/2013
N
56,540.17
6,910.42
49,629.75
PTS0000055 SCALE TRUCK
8/19/1983
N
27,539.90
24,785.91
2,753.99
PT50000056 SCALE TRUCK
6/3/1977
N
29,417.64
29,417.64
-
PTS0000058 TICKET SENDING UNIT
4/15/2010
N
17,398.46
17,398.46
-
PTS0000059 INTERCOM AND TICKET
5/17/1997
N
11,591.75
10,432.57
1,159.18
PTS0000060 TICKET SENDING UNIT
8/31/2007
N
4,166.41
4,166.41
-
PTS0000061 TICKET SENDING UNIT (2)
8/29/2009
N
13,880.62
13,880.62
-
PTS0000062 TICKETSENDING UNIT
6/24/2009
U
9,96$.50
9,968.50
-
PUD0000001 DRYER DRUM
3/31/2005
U
20,000.00
18,000.00
2,000.00
PUD0000002 DRYER DRUM
12/14/2010
U
102,517.56
102,517.56
-
PUD0000003 DRUM MIXER
4/1/1996
N
49,872.40
44,885.16
4,987.24
PUD0000004 DRYER DRUM
4/1/2003
N
625,426.39
562,883.75
62,542.64
PUD0000005 DRUM DRYER 10 X 42
4/1/2016
N
228,976.34
91,590.60
137,38534
PUD0000006 DRYER DRUM
5/2/2015
N
331,992.75
165,541.80
166,450.95
PUD0000007 DRYER DRUM
4/27/2013
N
358,311.66
250,818.12
107,493.54
PUD0000008 DRUM DRYER
4/1/2007
N
173,225.85
115,483.90
57,741.95
PUD0000009 DRYER DRUM
4/1/2013
N
363,600.59
254,520.12
109,080.47
PUD0000010 DRYER DRUM
3/28/2014
N
122,301.09
105,668.16
16,632.93
PUD0000011 DRYER DRUM
5/3/2014
N
744,765.26
267,746.40
477,018.86
PUD0000012 DRUM MIXER
3/16/2009
U
601,000.00
396,660.00
204,340.00
PUD0000013 DRUM ASPHALT
10/14/1986
N
368,817.29
331,935.56
36,881.73
PUD0000014 DRUM DRYER
5/11/2013
N
360,192.92
249,133.51
111,059.41
PUD0000015 DRYER DRUM
7/1/2012
N
259,654.38
201,232.35
58,422.03
PUD0000016 DRUM MIXER
7/27/1983
N
297,730.00
267,957.00
29,773.00
PUD0000017 DRUM MIXER
3/31/2005
U
75,000.00
63,750.00
11,250.00
PUD0000018 DRYER DRUM
3/31/2005
U
44,000.00
39,600.00
4,400.00
PUD0000019 DRUM MIXER
9/21/1999
U
148,329.03
128,551.83
19,777.20
PUD0000020 DRUM REBUILD PORTABLE PTD4
4/26/2008
U
195,968.86
195,968.86
-
PUD0000021 DRUM MIXER
7/10/1979
N
300,000.00
270,000.00
30,000.00
PUD0000022 DRUM MIXER
3/31/2005
U
32,000.00
28,800.00
3,200.00
PUD0000023 DRYER SHELL REPLACEMENT
5/8/1999
N
50,952.86
45,857.57
5,095.29
PUD0000024 DRYER DRUM IMPROVEMENT
5/13/1993
N
31,917.77
28,726,00
3,191.77
PUD0000025 DRYER DRUM DISCHARGE HOOD
4/26/2003
N
36,696.29
36,696.29
-
PUD0000026 PLANT ASPHALT
3/16/2009
U
5,000.00
3,300.00
1,700.00
PUD0000037 UNIFIED DRUM
12/14/2019
N
817,596.19
68,133.00
749,463.19
PWM0000001 WARM MIX BLENDING SYSTEM
8/1/2012
U
21,208.20
16,259.96
4,948.24
PWM0000002 WARM MIX SYSTEM
4/19/2016
N
18,500.00
14,799.96
3,700.04
PWM0000003 WARM MIX BLENDING SYSTEM
3/19/2012
N
64,987.86
51,990.60
12,997.26
PWM0000004 WARM MIX SYSTEM
3/3/2012
U
5,621.00
2,698.44
2,922.56
PWM0000005 WARM MIX BLENDING SYSTEM
8/20/2010
N
67,886.02
65,623.28
2,262.74
PWM0000006 WARM MIX BLENDING SYSTEM
3/19/2012
N
67,185.67
53,748.48
13,437.19
PWM0000007 WARM MIX SYSTEM
7/2/2016
N
15,288.97
5,843.22
9,445.75
PWM0000008 WARM MIX BLENDING SYSTEM
6/27/2015
N
19,392.09
18,745.72
646.37
PWM0000009 WARM MIX BLENDING SYSTEM
6/8/2013
N
24,915.94
24,915.94
-
PWM0000010 WARM MIX BLENDING SYSTEM
5/2/2015
N
19,447.03
19,147.80
299.23
PWM0000011 WARM MIX BLENDING SYSTEM
5/4/2013
N
32,379.55
32,379.55
-
PWM0000012 WARM MIX BLENDING SYSTEM
6/15/2013
N
36,388.90
36,388.90
-
PWM0000013 WARM MIX BLENDING SYSTEM
6/1/2013
N
23,127.80
23,127.80
-
PWM0000014 WARM MIX BLENDING SYSTEM
3/19/2012
N
65,687.62
52,550.28
13,137.34
PWM0000015 WARM MIX BLENDING SYSTEM
5/30/2015
N
19,477.92
19,153.29
324.63
PWM0000016 WARM MIX BLENDING SYSTEM
5/30/2015
N
25,352.96
24,930.45
422.51
PWM0000017 WARM MIX BLENDING SYSTEM
6/27/2015
N
19,558.38
18,906.38
652.00
PWM0000018 WARM MIX BLENDING SYSTEM
3/19/2012
N
66,257.97
53,006.40
13,251.57
PWS0000002 PLANT WASHING AGGREGATE
4/1/2006
N
233,722.68
163,605.48
70,117.20
PWS0000003 PLANT WASHING AGGREGATE
9/21/2009
N
85,530.86
85,530.86
-
PWS0000004 WASHER LOG
11/20/2004
U
39,753.67
39,753.67
-
PW50000005 WASHER SAND
3/31/2005
U
10,000.00
9,000.00
1,000.00
PWS0000008 WATER PUMP SYSTEM
6/24/1998
N
33,109.14
29,798.23
3,310.91
PWS0000009 WASHER COURSE MATERIAL
5/20/2000
N
34,093.53
30,684.18
3,409.35
PWS0000010 WASHER COURSE MATERIAL
6/17/2000
N
27,311.93
24,580.74
2,731.19
PWS0000011 WASHER COURSE MATERIAL
4/1/2001
N
44,545.28
40,090.75
4,454.53
PWS0000012 PUMP
5/18/2005
N
9,800.09
9,800.09
-
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
PWS0000013 PUMP SLURRY
12/2/2012
N
24,620.13
24,620.13
-
PW50000015 PLANT OVERHEAD WATER STORA
7/29/1995
U
5,000.00
4,500.00
500.00
PWS0000016 HEATER WATER
11/20/2012
N
13,950.00
13,950.00
-
PWS0000022 WASHER MATERIAL FINE
7/1/2016
U
25,000.00
4,785.70
20,214.30
PWS0000023 WASHER MATERIAL FINE
7/1/2016
U
35,000.00
6,699.78
28,300.22
PW50000024 PUMPS WATER 6"" (2)
7/1/2016
U
3,000.00
574.28
2,425.72
PWS0000025 PLANT IMPROVEMENTS MOISTUR
12/15/1995
N
7,904.93
7,114.44
790.49
RAC17622 SAMPLING INSPECTION RACK
7/21/2007
N
10,695.00
10,695.00
-
TFD0000014 TRAILER FLATBED
3/31/2005
U
530.00
477.00
53.00
TQA0000002 CONTROL LAB
6/26/1988
N
43,198.70
38,878.83
4,319.87
TQA0000003 CONTROL LAB
6/26/1988
N
43,562.75
39,205.99
4,356.76
TQA0000014 TRAILER CIA 12X56 PORTABLE
4/21/2016
N
47,191.28
18,876.48
28,314.80
TQA0000017 TRAILER MOBILE OFFICE/CA
9/1/2018
N
37,359.38
6,193.48
31,165.90
TRTL000046 TRAILER TOOL
3/3/2012
U
13,310.00
6,388.80
6,921.20
TRTL000047 TRAILERTOOL
3/3/2012
U
13,225.00
6,348.36
6,876,64
TRTL000048 TRAILERTOOL
3/3/2012
U
13,225.00
6,348.36
6,876.64
TRTL000084 TRAILER TOOL VAN
3/31/2005
U
159.00
143.10
15.90
TRTL000085 TRAILER TOOL VAN
3/31/2005
U
1,446.90
1,302.21
144.69
TRTL000092 TRAILERTOOLVAN
3/31/2005
U
1,325.00
1,192.50
132.50
TTM5000016 TRAILER
3/31/2005
U
159.00
143.10
15.90
ASPH16187 PUMP UNDERSEAL ASPHALT
'
11/12/1996
N
13,020.00
13,020.00
-
ATT6720 ATTACHMENT SCALE BUCKET
12/5/2011
N
12,021.96
12,021.96
-
ATT7720 CUTTER EXTRACTOR FOR MANHOLE
7/29/2008
N
16,039.30
16,039.30
-
BLD17199 PUMP UNDERSEAL ASPHALT
3/4/2005
N
26,981.19
26,981.19
-
BLS110044 TANK FUEL
3/2/2016
U
2,508.12
2,508.12
-
BLS11990 PRESS HYDRAULIC-DAKE
3/23/1992
N
2,065.50
1,904.89
160.61
BLS13344 TANK FUEL
5/3/1992
N
2,865.20
2,642.41
222.79
BLS14647 MOBILE DRILL MODEL B-31
11/2/2017
N
19,713.73
19,713.73
-
BL515914 LUBRICATION SYSTEM - ELK S
7/21/1995
N
7,642.56
7,642.56
-
BLS16814 LUBRICATION SYSTEM - LAPOR
5/9/2001
N
6,606.53
6,606.53
-
BLS17039 LUBRICATION SYSTEM -GARY
8/4/2003
N
10,686.23
10,686.23
-
BLSI7464 SNOWPLOW POLY
11/2/2006
N
5,292.36
5,292.36
-
C150000001 COMPRESSOR AIR
4/1/2000
N
400.00
400.00
-
C175000001 COMPRESSOR AIR
4/30/2009
U
750.00
750.00
-
CWKT600001 BARRIER MOLD
8/31/1996
N
10,890.00
10,890.00
-
CWKT600007 CURB PAVER MOLD
6/6/1994
N
5,010.00
5,010.00
-
CWKT700001 SCREED CONCRETE TERRAMITE
4/28/1993
N
11,602.50
11,602.50
-
CWKT700002 SCREED CONCRETE TERRAMITE
9/9/1994
N
10,733.54
10,733.54
-
CWKT700003 SCREED CONCRETE TERRAMITE
3/23/1995
U
5,000.00
5,000.00
-
CWKT700004 SCREED CONCRETE MBW
5/31/1995
N
7,575.46
7,575.46
-
CWKT700005 SCREED CONCRETE MBW
10/1/2000
N
7,491.31
7,491.31
-
CWKT700006 SCREED CONCRETE WHITEMAN
10/18/2001
N
6,962.25
6,962.25
-
CWKT700007 SCREED CONCRETE METALFORM
8/23/2007
N
5,950.58
5,950.58
-
DD35000004 COMPACTOR VIBRATORY
7/5/2006
N
14,500.00
14,500.00
-
DD35000006 COMPACTOR VIBRATORY
4/1/2014
N
17,819.66
17,819.66
-
DD35000007 COMPACTOR VIBRATORY
4/1/2014
N
17,819.66
17,819.66
-
DD35000010 COMPACTOR VIBRATORY
3/31/2005
U
2,000.00
2,000.00
-
DD35000011 COMPACTOR VIBRATORY
3/31/2005
U
5,000.00
5,000.00
-
DD35000012 COMPACTOR VIBRATORY
3/31/2005
U
5,000.00
5,000.00
-
DPT0000005 DISTRIBUTOR PULLTYPE 250
3/31/2005
U
625.00
625.00
-
FKL0000002 FORKLIFT
2/1/1999
U
14,175.00
14,175.00
-
FKL0000004 FORKLIFT
12/17/2007
U
7,208.00
7,208.00
-
FKL0000005 FORKLIFT
1/29/2008
U
15,500.00
15,500.00
-
FRK4000002 ATTACHMENT FORKS
4/30/2009
U
3,000.00
3,000.00
_
FUEL6457 TANK FUEL
5/1/1998
N
17,160.00
17,160.00
-
GEN0000019 GENERATOR
1/29/2008
U
1,125.00
1,125.00
-
JOBT10320 TRENCH BOX
4/23/1999
U
1,412.88
1,412.88
-
JOBT10408 TACK SPRAYER LEEBOY L250
4/1/2000
U
3,200.00
3,200.00
-
JOBT10422 SAW WALK BEHIND
4/1/2000
U
1,200.00
1,200.00
-
JOBT105345 ATTACHMENT CONVEYOR
4/1/2006
U
1,000.00
1,000.00
-
JOBT105354 MIXER CEMENT
4/1/2006
U
500.00
500.00
-
JOBT105400 HEATER PAVEMENT KEIZER MOR
4/1/2006
U
1,000.00
1,000.00
-
JOBT11503 DRILL GANG50#
5/26/2016
N
14,338.00
11,860.38
2,477.62
JOBT5459 DRILL UNIT FOR UNDERSEAL P
4/1/1992
N
11,698.93
11,698.93
-
JOBT5497 FORMS CURB METAFORM
4/1/1992
N
8,197.85
8,197.85
-
JOBT5498 FORMS CURB METAFORM
4/1/1992
N
7,061.08
7,061.08
-
JOBT5529 HOPPER CMI
11/9/1992
U
2,625.00
2,625.00
-
JOBT5632 SCREED CONCRETE STRIKER HO
9/29/1993
N
6,942.77
6,942.77
-
JOBT5645 EXTRACTOR MANHOLE
5/7/1993
U
11,536.36
11,536.36
-
JOBT5673 TRENCH BOX EFFICIENCY
5/1/1994
N
8,143.57
8,143.57
-
JOBT5705 TRENCH BOX EFFICIENCY
5/27/1994
N
8,143.57
8,143.57
-
JOBT5756 DRILL UNIT FOR UNDERSEAL P
6/10/1994
N
3,900.77
3,900.77
-
JOBT6152 COMPACTOR WALK BEHIND
5/17/1996
U
6,300.00
6,300.00
-
JOBT6279 WASHER PRESSURE KEW 2540CA
4/11/1997
N
1,890.00
1,890.00
-
JOBT6280 WASHER PRESSURE KEW 2540CA
7/11/1997
N
1,890.00
1,890.00
-
JOST6294 SEALER INJECTION EPDXY
10/15/1997
N
14,675.84
14,675.84
-
JOBT6642 DRILL GANG
1/31/2000
N
14,574.00
14,574.00
-
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
JOBT6705 FORM SYSTEM
6/13/2000
N
82,901.62
82,901.62
-
JOBT6721 FORMS CURB METAFORM
7/7/2000
N
7,185.25
7,185.25
-
JOBT6794 COMPRESSOR AIR
4/19/2001
N
5,889.45
5,889.45
-
JOBT6827 WASHER PRESSURE KEW 40C3KA
6/14/2001
N
2,152.50
2,152.50
-
JOBT6890 PAVING FABRIC INSTALL MACH
3/12/2002
N
12,258.79
12,258.79
-
JOBT6896 SAW CONCRETE DIAMOND
4/1/2002
N
14,637.00
14,637.00
-
JOBT6931 TRENCH BOX TITAN PLUS
8/6/2002
N
8,723.24
8,723.24
-
JOBT6932 TRENCH BOX TITAN PLUS
8/6/2002
N
8,723.24
8,723.24
-
JOBT6933 TRENCH BOX TITAN PLUS
8/6/2002
N
8,723.25
8,723.25
-
JOBT6934 STONE BOX
8/6/2002
N
6,475.34
6,475.34
-
JOBT7121 FORM SIDEWALK
4/13/2004
N
5,199.79
5,199.79
-
JOBT7141 DRILLGANG
6/23/2004
N
10,070.00
10,070.00
-
JOBT7441 PUMP WATER
6/9/2006
N
11,448.00
11,448.00
-
JOBT7538 TRENCH BOX PRO6 W/SPREADER
5/26/2006
N
14,688.47
14,688.47
-
JOBT7557 DRILL GANG
3/30/2007
N
38,706.00
38,706.00
-
JOBT7561 SAW CONCRETE HUSQVARNA
3/31/2007
N
15,249.16
15,249.16
-
JOBT7904 DRILLGANG
7/27/2010
N
14,411.50
14,411.50
-
JOBT792839 COMPACTOR VIBRATORY
3/31/2005
U
1,750.00
1,750.00
-
JOBT794470 STREET PRINT FORMS
3/31/2005
U
9,375.00
9,375.00
-
LGPL000003 LIGHT PLANT
4/1/1992
N
9,450.00
9,450.00
-
LGPL000004 LIGHT PLANT
6/5/2007
N
7,246.27
7,246.27
LGPL000005 LIGHT PLANT
9/19/2007
N
7,900.18
7,900.18
-
PCH0000024 TRAILER CONTROL TOWER
4/1/2017
N
17,722.52
11,646,18
6,076.34
PCH0000025 TRAILER CONTROL TOWER
4/1/2017
N
28,852.53
18,960.18
9,892.35
PCM0000010 COMPRESSOR AIR
4/1/1997
N
9,682.00
9,682.00
-
PCM0000013 COMPRESSOR AIR
12/1/2014
N
15,643.95
15,643.95
PSS0000002 FEEDER HOPPER W/SCREEN DEC
4/1/2009
U
15,000.00
15,000.00
-
PTS0000038 SCALES TRUCK
9/24/1979
N
37,399.44
37,399.44
-
PTS0000046 SCALES TRUCK
8/17/1967
N
5,650.29
5,210.92
439.37
PTS0000051 SCALE TRUCK
4/10/2008
U
3,672.58
3,672.58
-
PTS0000052 SCALE TRUCK
1/29/2008
U
9,000.00
9,000.00
-
PWS0000014 TANK WATER
5/31/1956
N
2,510.76
2,259.68
251.08
QAE5422 PROFILE READER
5/10/1991
N
9,450.00
9,450.00
-
QAE7946891 TRAILER DRILL CORE GAS FAB
3/31/2005
U
8,000.00
8,000.00
-
SHOP10416 WASHER POWER
4/1/2000
U
800.00
800.00
-
SHOP70:60 CRANE -OVERHEAD
9/1/2003
N
27,655.00
27,655.00
-
SSL0000003 LOADER SKID STEER 226D
5/4/2017
N
13,405.87
12,412.92
992.95
SSL0000004 LOADER SKID STEER 226D
5/4/2017
N
13,405.87
12,412.92
992.95
SSL0000005 LOADER SKID STEER 226D
5/4/2017
N
13,405.88
12,412.92
992.96
TCN0000001 TRAILER CONE
6/3/1998
N
8,412.70
8,412.70
-
TCN0000002 TRAILER CONE
4/20/2005
N
4,309.96
4,309.96
-
TCN0000003 TRAILER CONE
4/11/2005
U
1,902.70
1,902.70
-
TCN0000004 TRAILER CONE
5/23/2005
N
1,372.70
1,372.70
-
TCN0000005 TRAILER CONE
5/23/2005
N
3,963.36
3,963.36
-
TCN0000006 TRAILER CONE
6/16/2005
N
4,193.36
4,193.36
-
TCN0000007 TRAILER CONE
7/11/2008
N
5,405.80
5,405.80
-
TCN0000008 TRAILER CONE
3/16/2010
N
5,777.00
5,777.00
-
TCN0000009 TRAILER CONE
7/8/2010
N
5,893.60
5,893.60
-
TFD0000009 TRAILER FLATBED 30' T/A
11/15/2017
U
16,408.80
10,782.96
5,625.84
TG04000001 TRAILER PULL TYPE 4T
4/6/1989
N
4,016.28
4,016.28
-
TG06000005 TRAILER PULL TYPE
5/2/1979
N
3,380.00
3,380.00
-
TG06000006 TRAILER PULL TYPE
12/6/1979
N
3,924.00
3,924.00
-
TG06000007 TRAILER PULL TYPE
7/24/1980
N
3,784.29
3,784.29
-
TG06000008 TRAILER PULL TYPE
3/30/1981
N
3,816.57
3,816.57
-
TG06000009 TRAILER PULL TYPE
11/8/1994
N
5,456.85
5,456.85
-
TG06000010 TRAILER PULL TYPE
4/15/1996
N
4,407.90
4,407.90
-
TG06000011 TRAILER PULL TYPE
6/4/1996
N
4,407.90
4,407.90
-
TG06000012 TRAILER PULL TYPE
6/4/1996
N
4,407.90
4,407.90
-
TG06000013 TRAILER PULL TYPE
3/31/1997
N
4,567.50
4,567.50
-
TG06000014 TRAILER PULL TYPE
5/15/1998
N
4,882.50
4,882.50
-
TG06000015 TRAILER PULL TYPE
5/15/1998
N
4,882.50
4,882.50
-
TG06000016 TRAILER PULL TYPE
4/18/2005
U
2,120.00
2,120.00
-
TG06000019 TRAILER PULL TYPE
5/23/2007
N
1,556.54
1,556.54
-
TG06000022 TRAILER PULL TYPE
3/26/1997
U
2,946.00
2,946.00
-
TG06000023 TRAILER PULL TYPE
4/1/2000
U
600.00
600.00
-
TG06000024 TRAILER PULL TYPE
4/1/2006
U
2,120.00
2,120.00
-
TG06000025 TRAILERTILTTOP
3/16/2009
U
2,120.00
2,120.00
-
TG06000028 TRAILER PULL TYPE
3/31/2005
U
500.00
500.00
-
TG08000001 TRAILER PULL TYPE
9/18/2000
N
10,330.00
10,330.00
-
TG10000002 TRAILERTILTTOP
3/16/2009
U
4,980.00
4,980.00
-
TG20000006 TRAILER PULLTYPE 20T
3/31/2005
U
1,656.78
1,656.78
-
TGM5000003 TRAILER PIPE
5/1/1993
U
11,363.85
11,363.85
-
TGMS000004 TRAILER UNDERSEAL
5/24/2004
N
2,808.20
2,808.20
-
TGMS000005 TRAILER PULL TYPE
4/23/1999
U
1,668.65
1,668.65
-
TGMS000006 TRAILER UTILITY CORE RIG
8/29/2016
N
24,302.04
20,102.58
4,199.46
TGMS000010 TRAILER PULL TYPE
3/31/2005
U
938.00
938.00
-
TGMS000011 TRAILER PULL TYPE
3/31/2005
U
188.00
188.00
-
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr
NBV
TGM5000012 TRAILER PULL TYPE
3/31/2005
U
500.00
500.00 .
-
TMF0000001 TRAILER FORM DYNAWELD
5/8/1998
N
4,637.50
4,637.50
-
TMF0000002 TRAILER CURE AND FORM OIL
10/28/1999
N
8,146.28
8,146.28
-
TMF0000003 TRAILER FORM NON TILT
7/3/2011
N
14,876.21
14,876.21
-
TM00000001 OFFICE MOBILE-WILLIAMS
11/23/1983
N
4,830.00
4,830.00
-
TM00000003 OFFICE MOBILE
7/22/1998
N
4,807.10
4,807.10
-
TM00000004 OFFICE MOBILE WILLIAMS
6/30/2001
N
4,929.75
4,929.75
-
TMS0000001 CONTAINER STORAGE
12/11/1995
N
2,677.50
2,677.50
-
TMS0000002 CONTAINER STORAGE
1/15/1999
N
3,695.00
3,695.00
-
TQA0000006 TRAILER QUALITY CONTROL
9/16/1991
U
1,935.59
1,935.59
-
TQA0000007 TRAILER QUALITY CONTROL
6/26/1995
U
2,395.60
2,395.60
-
TQA0000009 TRAILER QUALITY CONTROL
5/25/1999
N
3,915.45
3,915.45
-
TQA0000010 TRAILER QUALITY CONTROL
7/30/1999
N
28,440.25
28,440.25
-
TQA0000011 TRAILER QUALITY CONTROL
7/20/2005
N
32,186.90
32,186.90
-
TQA0000012 TRAILER QUALITY CONTROL
4/23/2007
N
34,014.34
34,014.34
-
TQA0000015 TRAILER LAB 10 X 36
4/1/2017
N
24,874.23
16,345.92
8,528.31
TQA0000016 TRAILER LAB 24X 64
6/4/2017
N
102,663.09
67,464.24
35,198.85
TRTL000011 TRAILER TOOL VAN
6/14/1972
N
1,530.00
1,377.00
153.00
TRTL000012 TRAILER TOOL
5/11/1978
N
4,160.00
4,160.00
-
TRTL000013 TRAILERTOOLVAN
6/9/1981
N
4,881.99
4,881.99
-
TRTL000014 TRAILERTOOLVAN
7/5/1983
N
4,200.00
4,200.00
-
TRTL000015 TRAILER TOOL
4/2/1990
N
4,254.65
4,254.65
-
TRTL000016 TRAILERTOOL
4/2/1990
N
4,254.65
4,254.65
-
TRTL000017 TRAILERTOOL
4/2/1990
N
4,268.84
4,268.84
-
TRTL000018 TRAILERTOOLVAN
5/13/1993
N
6,675.00
6,675.00
-
TRTL000019 TRAILERTOOLVAN
8/28/1995
U
4,725.00
4,725.00
-
TRTL000020 TRAILERTOOLVAN
8/28/1995
U
4,725.00
4,725.00
-
TRTL000021 TRAILER TOOL VAN
4/17/1997
N
3,543.75
3,543.75
-
TRTL000022 TRAILERTOOLVAN
4/21/1997
U
5,460.00
5,460.00
-
TRTL000024 TRAILER TOOL VAN
3/20/1998
U
6,300.00
6,300.00
-
TRTL000025 TRAILERTOOLVAN
5/14/1998
U
6,300.00
6,300.00
-
TRTL000026 TRAILERTOOLVAN
3/1/2000
U
5,101.43
5,101.43
-
TRTL000027 TRAILERTOOLVAN
3/17/2001
N
3,601.50
3,601.50
_
TRTL000028 TRAILERTOOLVAN
4/1/2001
N
4,194.75
4,194.75
-
TRTL000029 TRAILER STORAGE
12/10/2002
U
5,830.00
5,830:00
TRTL000030 TRAILERTOOLVAN
3/1/2004
N
3,736.50
3,736.50
TRTL000031 TRAILER TOOL VAN
3/15/2004
N
2,012.94
2,012.94
TRTL000032 TRAILERTOOLVAN
3/4/2005
N
4,770.00
4,770.00
TRTL000033 TRAILERTOOLVAN
6/8/2005
U
4,770.00
4,770.00
TRTL000034 TRAILERTOOLVAN
4/28/2006
N
4,943.84
4,943.84
TRTL000035 TRAILERTOOLVAN
4/3/2007
N
4,107.20
4,107.20
TRTL000036 TRAILERTOOL
7/21/2007
N
15,112.93
15,112.93
TRTL000037 TRAILER TOOL VAN
12/3/2007
U
11,990.34
11,990.34
TRTL000038 TRAILERTOOLVAN
12/3/2007
U
16,966.74
16,966.74
TRTL000039 TRAILERTOOLVAN
4/1/2008
U
13,938.94
13,938.94
TRTL000040 TRAILERTOOLVAN
3/21/2008
N
4,194.12
4,194.12
TRTL000041 TRAILERTOOLVAN
4/27/2008
N
2,450.30
2,450.30
TRTL000042 TRAILER TOOL VAN
4/15/2009
U
5,075.48
5,075.48
TRTL000044 TRAILER PULL TYPE
6/18/2010
N
4,770.00
4,770.00
TRTL000045 TRAILERTOOLVAN
4/23/1999
U
2,002.39
2,002.39
TRTL000051 TRAILER PULLTYPE
4/1/2006
U
2,650.00
2,650.00
TRTL000052 TRAILERTOOLVAN
4/1/2009
U
530.00
530.00
TRTL000065 TRAILER TOOL VAN
3/31/2005
U
1,590.00
1,590.00
TRTL000082 TRAILERTOOLVAN
3/31/2005
U
1,325.00
1,325.00
TRTL000086 TRAILER TOOL VAN
3/31/2005
U
1,192.50
1,192.50
TRTL000087 TRAILERTOOLVAN
3/31/2005
U
1,590.00
1,590.00
TRTL000088 TRAILERTOOLVAN
3/31/2005
U
1,192.50
1,192.50
TRTL000089 TRAILER TOOL VAN
3/31/2005
U
1,524.28
1,524.28
TRTL000090 TRAILER TOOL VAN
3/31/2005
U
331.78
331.78
TRTL000091 TRAILER TOOL VAN
3/31/2005
U
530.00
530.00
TRTL000093 TRAILER TOOL VAN
3/31/2005
U
1,855.00
1,855.00
TRTL000094 TRAILERTOOLVAN
3/31/2005
U
530.00
530.00
-
TRWT000002 TRAILER WATER
3/29/1972
N
1,455.07
1,341.90
113.17
TRWT000003 TRAILER WATER
8/2/1999
N
7,450.12
7,450.12
-
TRWT000004 TRAILER WATER
8/2/1999
N
7,375.66
7,375.66
TRV T000005 TRAILER WATER
6/16/2001
N
8,307.96
8,307.96
TRWT000006 TRAILER WATER
6/16/2001
N
8,307.96
8,307.96
-
TT06000003 TRAILER TILTTOP
8/31/1972
N
2,948.23
2,719.05
229.18
TT06000004 TRAILERTILTTOP
5/31/1996
N
4,593.75
4,593.75
-
TT06000005 TRAILERTILTTOP
6/28/1996
N
4,593.75
4,593.75
TT06000006 TRAILERTILTTOP
3/18/1997
N
4,593.75
4,593.75
TT06000008 TRAILER TILTTOP
8/12/1997
N
4,593.75
4,593.75
TT06000009 TRAILERTILTTOP
5/8/1998
N
4,637.50
4,637.50
TT06000010 TRAILERTILTTOP
3/4/1999
N
4,803.75
4,803.75
7706000011 TRAILERTILTTOP
3/4/1999
N
4,803.75
4,803.75
TT06000012 TRAILER TILTTOP
3/4/1999
N
4,803.75
4,803.75
-
TT06000013 TRAILERTILTTOP
4/1/2000
U
1,400.00
1,400.00
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acquired New or
Asset # Description
Acquisition Date
Used
Cost
Accum Depr NBV
TT06000014 TRAILER TILTTOP
5/2/2015
N
5,246.90
5,246.90 -
TT06000015 TRAILERTILTTOP
5/2/2015
N
5,246.90
5,246.90 -
TT06000016 TRAILER TILTTOP
5/2/2015
N
9,198.50
9,198.50 -
TT06000017 TRAILERTILTTOP
5/2/2015
N
9,948.98
9,948.98 -
TT06000018 TRAILER TILT
1/29/2008
U
2,915.00
2,915.00 -
TT06000019 TRAILERTILTTOP
3/16/2009
U
1,060.00
954.00 106.00
TT06000020 TRAILER TILTTOP
3/16/2009
U
4,560.00
4,560.00 -
TT06000022 TRAILER TILT
3/31/2005
U
994.28
994.28
TT08000001 TRAILERTILTTOP
4/30/2001
N
7,192.50
7,192.50 -
T1-08000002 TRAILER TILTTOP
4/30/2001
N
7,261.00
7,261.00 -
TT08000003 TRAILER TILTTOP
4/30/2001
N
7,261.00
7,261.00 -
TT08000004 TRAILERTILTTOP
4/8/2004
N
7,526.00
7,526.00 -
TT08000005 TRAILERTILTTOP
4/8/2004
N
7,526.00
7,526.00 -
TT08000006 TRAILERTILTTOP
4/8/2004
N
7,526.00
7,526.00 -
TT08000007 TRAILERTILTTOP
4/8/2004
N
7,526.00
7,526.00 -
TT08000008 TRAILERTILTTOP
4/8/2004
N
7,526.00
7,526.00 -
TT08000009 TRAILERTILTTOP
5/11/2004
N
7,526.00
7,526.00 -
TT08000010 TRAILERTILTTOP
5/11/2004
N
7,526.00
7,526.00 -
T708000011 TRAILERTILTTOP
2/17/2006
N
8,427.00
8,427.00 -
TT08000012 TRAILER TILTTOP
2/17/2006
N
8,427.00
8,427.00 -
TT08000013 TRAILER TILTTOP
2/17/2006
N
8,427.00
8,427.00 -
TT08000014 TRAILERTILTTOP
2/17/2006
N
8,427.00
8,427.00 -
TT08000015 TRAILERTILTTOP
4/4/2006
N
8,427.00
8,427.00 -
TT08000016 TRAILERTILTTOP
3/28/2007
N
8,586.00
8,586.00 -
TT08000017 TRAILER TILTTOP
6/7/2007
N
8,586.00
8,586.00 -
TT08000018 TRAILERTILTTOP
6/7/2007
N
8,586.00
8,586.00 -
TT08000019 TRAILERTILTTOP
2/5/2008
N
8,851.00
8,851.00 -
TT08000020 TRAILER TILTTOP
2/5/2008
N
8,851.00
8,851.00
TT08000021 TRAILERTILTTOP
2/5/2008
N
8,851.00
8,851.00
TT08000022 TRAILERTILTTOP
2/5/2008
N
8,851.00
8,851.00
TT08000023 TRAILERTILTTOP
3/2/2009
N
9,095.00
9,095.00
-rroW00024 TRAILER TILTTOP
3/2/2009
N
9,095.00
9,095.00
TT08000025 TRAILER TILTTOP
3/2/2009
N
9,095.00
9,095.00
TT08000026 TRAILERTILTTOP
3/2/2009
N
9,095.00
9,095.00
TT08000027 TRAILERTILTTOP
3/2/2009
N
9,095.00
9,095.00
TT08000028 TRAILER TILTTOP
3/2/2009
N
9,095.00
9,095.00
TT08000029 TRAILERTILTTOP
4/22/2010
N
9,537.88
9,537.88
TT08000030 TRAILERTILTTOP
5/29/2010
N
9,537.88
9,537.88 -
TT08000031 TRAILERTILTTOP
5/29/2010
N
9,627.86
9,627.86
TT08000032 TRAILER TILT
4/23/1999
U
1,891.14
1,891.14
TT08000033 TRAILER TILT
4/23/1999
U
3,003.58
3,003.58
TT06000023 TRAILER TILTTOP
3/16/2009
U
7,370.00
7,370.00
TTMS000001 DRILL CONCRETE CORE RIG
11/1/1995
N
19,268.50
19,268.50 -
TTMS000002 TRAILERTILTTOP
4/1/1998
U
1,874.87
1,874.87 -
TTMS000003 TRAILERTILTTOP
5/3/1999
N
3,753.75
3,753.75 -
TTM5000004 TRAILER TILTTOP
8/2/1999
N
4,053.99
4,053.99 -
TTMS000005 TRAILER TILTTOP
4/1/2006
U
1,590.00
1,590.00 -
TTMS000006 TRAILER PULL TYPE
4/1/2006
U
2,120.00
2,120.00 -
TTMS000013 TRAILER TILT
3/31/2005
U
1,590.00
1,590.00 -
TTMS000014 TRAILER TILT
3/31/2005
U
1,590.00
1,590.00 -
TTMS000017 TRAILERTILTTOP PULL TYPE
3/31/2005
U
1,590.00
1,590.00 -
UTF0000001 TRACTOR UTILITY
3/18/2005
N
18,179.00
18,179.00 -
UTF0000004 TRACTOR UTILITY
4/1/2006
U
3,000.00
3,000.00 -
UTF0000005 TRACTOR FARM
3/16/2009
U
8,000.00
8,000.00 -
UTF0000006 TRACTOR FARM
3/16/2009
U
10,000.00
10,000.00 -
WEL14697 WELDER
4/25/1984
N
4,510.00
4,510.00 -
WLD0000002 WELDER
9/16/1964
N
845.00
779.29 65.71
WLD0000003 WELDER
5/23/1995
N
8,477.70
8,477.70 -
WLD0000004 WELDER
4/23/1996
N
8,480.00
8,480.00 -
WLD0000005 WELDER
4/23/1996
N
8,999.71
8,999.71 -
WLD0000006 WELDER
10/11/1999
N
3,878.29
3,878.29 -
WLD0000007 TRAILER WELDER
4/10/2001
N
4,456.00
4,456.00 -
WLD0000008 WELDER
6/3/2005
N
3,512.75
3,512.75 -
WLD0000009 WELDER
6/6/2005
N
6,336.61
6,336.61 -
WLD0000010 WELDER
2/16/2006
N
2,411.20
2,411.20 -
WLD0000014 WELDER
4/30/2009
U
1,500.00
1,500.00 -
WLD0000028 WELDER
3/5/2010
N
3,795.54
3,795.54 -
WRKT110001 ATTACHMENT PLANER
11/15/1996
N
3,937.50
3,937.50 -
WRKT110002 ATTACHMENT PLANER
7/1/1997
U
5,565.00
5,565.00 -
WRKT110005 ATTACHMENT PLANER
3/28/2007
N
13,250.00
13,250.00 -
WRKT110007 ATTACHMENT PLANER
3/2/2009.
N
13,893.95
13,893.95 -
WRKT110008 ATTACHMENT PLANER
6/1/2009
N
5,358.30
5,358.30 -
WRKT110009 ATTACHMENT PLANER
3/25/2010
N
18,735.70
18,735.70 -
WRKT110010 ATTACHMENT PLANER
5/1/2010
N
13,250.00
13,250.00 -
WRKT110011 ATTACHMENT PLANER
6/25/2010
N
16,852.50
16,852.50 -
WRKT110012 ATTACHMENT PLANER
3/5/2015
N
19,738.56
19,738.56 -
WRKT110013 ATTACHMENT PLANER
4/20/2015
N
24,910.00
24,910.00 -
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Asset # Description
Acquisition Date
WRKT110014 ATTACHMENT PLANER18""
5/16/2016
WRKT110015 ATTACHMENT PLANER24""
5/16/2016
WRKT110016 ATTACHMENT PLANER
4/1/2006
WRKT110017 ATTACHMENT PLANER
4/30/2009
WRKT110023 ATTACHMENT PLANER
6/6/2014
WRKT170001 ATTACHMENT WHEEL SAW
6/25/2010
WRKT170002 ATTACHMENT SAW WHEEL
6/20/2016
WRKT170003 ATTACHMENT SAW WHEEL
6/20/2016
WRKT300001 ATTACHMENT BREAKER
4/1/1998
WRKT300002 ATTACHMENT BREAKER
7/3/2011
WRKT400002 ATTACHMENT SWEEPER
4/1/1998
WRKT400003 ATTACHMENT BROOM
4/30/2009
WRKT700003 ATTACHMENT DISK
12/22/2014
WRKT900001 ATTACHMENT GRADER
4/15/1998
Acquired New or
Used
Cost
Accum Depr
NBV
N
14,840.00
12,275.58
2,564.42
N
17,808.00
14,730.84
3,077.16
U
3,000.00
3,000.00
-
U
13,500.00
13,500.00
N
24,910.00
24,910.00
-
N
20,208.00
20,208.00
-
N
27,817.22
23,010.36
4,806.86
N
27,817.22
23,010.36
4,806.86
N
8,190.00
8,190.00
-
N
10,017.00
10,017.00
N
6,191.85
6,191.85
U
12,000.00
12,000.00
N
35,256.80
35,256.80-
_
N
4,935.00
4,935.00
-
140,857,691.10
90,905,044.25
49,952,646.85