Loading...
HomeMy WebLinkAboutSewer and Water Service Agreement - Extension Utilities for Eddy Street Phase III Grocery Store – KRG Eddy Street Land IIIBOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 3/16/20 Name Sue Ellen Doudrick Department DPW BPW Date 3/23/21 Phone Extension 3057 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Clara McDaniels Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Utility Extension Agreement Ease./Encroach Required Information Company or Vendor Name New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Eddy and Howard Street Sewer Relocation and Water Main Loop Project Number DP 20-020 Funding Source n/a Account No. n/a Amount n/a Terms of Contract n/a Purpose/Description Utility Extension Agreement for the Eddy Street Phase III Grocery Store development which is private development that requires the extension of utilities (water main loop and sanitary sewer relocation) to serve the site. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: SEWER AND WATER SERVICE AGREEMENT This Sewer and Water Service Agreement (“Agreement”) is made on the ____ day of _____, 2021 by and between KRG Eddy Street Land III, LLC, its successors and assigns (“Owner”) and the City of South Bend, a municipal corporation existing under the laws of Indiana, acting by and through its Board of Public Works (“City”). WHEREAS, Owner intends to develop approximately 3 acres between Howard Street and Corby Boulevard west of South Bend Avenue for a grocery store and commercial use development; and WHEREAS, Owner plans to extend and make additions to existing water and relocate and abandon an existing sanitary sewer system to serve said development as shown on the Exhibit A, attached and incorporated hereto (the "Dedicated Improvements"), and desires certain commitments from City; and WHEREAS, the engineering design for said Dedicated Improvements has been, or will be, accomplished by competent professional engineers registered and licensed in the State of Indiana; and NOW, THEREFORE, in consideration of the obligations, terms and conditions contained herein, the adequacy of which the parties expressly acknowledge, Owner and the City agree as follows: 1. Design The Owner shall consult the City and allow the City Engineer or her designee input prior to designating the project engineer who shall be responsible for the engineering design and inspection in connection with the installation of the Dedicated Improvements (the "Project Engineer"). The Owner shall inspect the site during construction to ensure the Project Engineer’s conformance to area planning requirements, adequacy of design, and conformance to the City's specifications and standards regarding location, size and depth of line, capacity and arrangement of lift stations, and quality of construction of the Dedicated Improvements. The Owner shall provide the plans with a City of South Bend cover sheet and specifications for the Dedicated Improvements along with an engineer’s estimate to the City (plans provided as Exhibit B). The Owner shall also provide to the City a statement from the Project Engineer certifying that the materials and workmanship including pipes, bedding, thrust blocks, valves, fire hydrants, manholes, lift station equipment and other related materials and work meet the City’s specifications and standards. Upon request of the City, the certification shall be substantiated by material affidavits from suppliers and by applicable test results for inflow/infiltration, exfiltration, deflection, pressure, leaks, bacteria, compaction and other tests required by the City. All construction, engineering, and inspection costs in connection with the Dedicated Improvements shall be borne by the Owner. The Owner understands the proposed development, along with the recently constructed Eddy Street Phases I and II developments, that vehicular traffic surrounding the site is expected to increase. The Owner is committed to coordination with the City and its consultants and contractors to accommodate the planned improvements to the right-of-way. Such coordination of construction elements shall not unreasonably increase costs to the Owner or the City. 2. Construction Inspection The Owner has provided the City with Exhibit B, which depicts drawings of the Dedicated Improvements, which the City acknowledges conforms to the City’s standards. The Owner shall allow the City to inspect the Dedicated Improvements during construction to ensure conformance to the agreed standards, in particular with regard to area planning requirements, adequacy of design, and quality of construction. The Owner shall contact the City’s Engineering Department at least two (2) business days in advance to arrange for the attendance of a City inspector at the following key milestones: water main construction, sewer construction, sewer abandonment, mandrel deflection testing, sanitary sewer taps, and water main taps. The Owner agrees to perform any necessary adjustments as reasonably required by the City Engineer (or her designee) in her sole discretion, as a result of such inspections. 3. Permits It shall be Owner’s sole responsibility and expense to obtain any and all permits associated with the construction and installation of the Dedicated Improvements. Permits for the project are included as Exhibit C. 4. Engineer’s Estimate The Owner has provided an Engineer’s Estimate (See, Exhibit D, incorporated herein by reference and attachment) for the cost to construct the Dedicated Improvements, including but not limited to, excavation, pipe materials, valves, hydrants, and all other appurtenant materials, supplies and equipment, permit fees, backfill and bedding, pavement, restoration of the areas impacted by construction to a condition the sam e as or better than existed prior to construction, and any other work required for the System. 5. Performance Bond The Owner shall provide the City with a performance bond for an amount equal to one hundred twenty–five percent (125%) of the engineer’s estimate covering all work performed or to be performed pursuant to this Agreement. Upon the approval of the City of South Bend, Indiana Board of Public Works Project Completion Affidavit (the “Completion Affidavit”), the obligation to maintain the Performance Bond shall cease without any further action or confirmation required from City. The performance bond is included as Exhibit E. 6. Maintenance Bond Within ten (10) days of City’s acceptance of the Dedicated Improvements, Owner shall provide the City with a maintenance bond equal to ten percent (10%) of the hard construction cost covering all work performed or to be performed pursuant to this Agreement, and such bond shall remain in effect for three (3) years after dedication as described in Section 8 below. 7. System Development Charges Simultaneously with the execution of this Agreement, the Owner shall pay the City a sum of $10,260 for access to the City’s water and sewer sanitary systems. For purposes of this Section 7 of the Agreement, an equivalent residential unit (“ERU”) shall mean a single-family residence. For purposes of customers that are not single-family residences, one ERU shall equal estimated wastewater and water flows of 310 gallons per day, respectively. No customer will be less than one ERU. For every new connection to the South Bend Municipal Sewer Works, a capital contribution of $1,145.00 shall be collected per ERU. For every new connection to the South Bend Municipal Water Works, a system development charge of four hundred and seventy-five dollars ($475.00) shall be collected per ERU and additional portion thereof to be connected. All charges shall be paid to the City at the time the application for connection is filed. For all other types of structures, the ERU calculation shall be based upon the ratio of Average Daily Flow as computed pursuant to 327 IAC 3-6-11 in relationship to 310 gallons per day. For structures not listed in 327 IAC 3-6-11, the ERU shall be calculated as the relationship between the Average Daily Flow reported in the sewer capacity certification for the structure and 310 gallons per day. For customers with greater than 20 ERUs, the ERU shall be adjusted based upon the Peaking Factor as computed herein. The Peaking Factor shall be calculated by dividing the Peak Daily Flow by the Average Daily Flow, both as reported in the sewer and water capacity certifications . In no event will a Peaking Factor less than 2.0 be used for purposes of the adjustment described in this Subsection. The Peaking Factor divided by 4.0 (the Peaking Factor for residential connections) will be multiplied by the number of ERUs for purposes of computing the capital contribution owed by the customer. The City reserves the right to require an additional capital contribution should Owner’s flow rate exceed the predicted level. Such additional capital contribution will be based on the proportional share of Owner’s use of the City's water and/or sewer sanitary system. The receipt of the System Development Charge and Utility Verification Fee is provided in Exhibit F, incorporated herein by reference and attachment. 8. Dedication Owner understands the completion of the Dedicated Improvements and the dedication to the City is a requirement for the successful completion of the project. Upon completion of the construction of said Dedicated Improvements, Owner and City shall cooperate in good faith to ensure that said Dedicated Improvements are accepted by the City in a timely manner; provided that Owner shall not be required to incur any additional liability or any material cost in connection with such dedication. City’s acceptance of the Dedicated Improvements and/or any easements required in connection therewith shall not be unreasonably conditioned, withheld or delayed. City acknowledges that Owner is a ground lessee, not the fee simple owner, of the property being developed, and that any easements required by City must be approved by the University of Notre Dame Du Lac (“University”). Owner shall use commercially reasonable efforts to secure any required easements from University, with good faith cooperation from the City, so long as the owner is not required to undertake any additional and unreasonable liability or obligation and does not incur any unreasonable cost. Additionally, prior to dedication, the following must be satisfied: a. All parts and labor must meet the standards and requirements stated in the design specifications as presented to and accepted by the City Engineering Department. b. Lien waivers must be received with regard to all workmanship and materials used in connection with these improvements. c. The Completion Affidavit must be furnished to Owner by the Board of Public Works. d. Owner must provide copies of test reports or cut sheets on all materials supplied. e. Owner must provide As-Built drawings in accordance with the City of South Bend Prevailing Specifications for Public Works, which may be found at https://southbendin.gov/wp-content/uploads/2018/07/SBN-Spec-Stand-FINAL-062618- REV-2_BPWSignature.pdf 9. Term Except as otherwise provided herein, the term of this Agreement shall continue from the Effective Date listed above until the earlier of: (a) all of Owner’s obligations under this Agreement have been satisfied, including but not limited to, City review and approval of “As -Builts” and dedication of the System to the City, or (b) August 1, 2021, unless otherwise approved by the City Board of Public Works. 10. Indemnification Owner agrees and undertakes to indemnify and hold the City, and its respective agents, employees, successors, and assigns, harmless from any liability, loss, costs, damages or expenses, including attorneys’ fees, which the City may suffer or incur as a result of any claims or actions which may be brought by any person or entity arising solely out of Owner’s construction of the Dedicated Improvements in accordance with this Agreement. If any action is brought against the City or its respective agents, employees, successors, or assigns, seeking to recover for any loss, costs, damages or expenses incurred solely in connection with owner’s construction of the Dedicated Improvements in accordance with this Agreement, Owner agrees to defend such action or proceedings at its own expense and to pay any judgment rendered therein. 11. Insurance Owner, at Owner’s sole expense, shall maintain during the term of this Agreement commercial general liability insurance covering the Company and the Activity in an amount not less than Five Million Dollars ($5,000,000.00) per occurrence. Owner agrees to include the City as an additional insured on any such policy and produce to the City a certificate of insurance evidencing the same upon receipt of City’s written request. Notwithstanding anything in this Agreement to the contrary, the City does not waive any governmental immunity or liability limitations available to it under Indiana law, and notwithstanding any provisions of this Agreement to the contrary, in no event shall Owner be liable to City for any amount (whether as a result of insured event, pursuant to any indemnity provided by Owner hereunder, or otherwise) in excess of the maximum liability of City under applicable law (including, without limitation, the Indiana Tort Claims Act). Owner may terminate the insurance required hereunder upon the successful dedication of the Dedicated Improvements to City. The certificate of insurance is provided as Exhibit G. 12. Assignment This Agreement may not be assigned by the Owner without the express written consent of the City, which such consent may not be unreasonably withheld, conditioned or delayed. 13. Governing Law This Agreement shall be construed and interpreted according to the laws of the State of Indiana. It is further agreed that all provisions of law now or hereafter in effect relating to water and sewer service by the City shall be applicable to this Agreement. 14. Severability If any provision of this Agreement is held by a court of competent jurisdiction to be invalid or unenforceable, such unenforceable provision shall be deemed severed from the remainder of this Agreement and shall not cause the remainder of this Agreement to be invalid or unenforceable. If any provision, or any portion of any provision, of this Agreement is deemed invalid due to its scope or breath, such provision shall be deemed valid to the extent of the scope or breadth permitted by law. 15. Entire Agreement This Agreement sets forth the entire agreement and understanding between the Owner and the City as to the subject matter hereof, and merges and supersedes all prior discussions, agreements, and understanding of any and every nature between them. 16. Corporate Authority The person signing on behalf of the Owner represents that he/she has been duly authorized to execute this Agreement on behalf of said Owner. IN WITNESS WHEREOF, the Owner and the City, through their duly authorized representatives, have caused this Agreement to be executed as of the day and year first written above. The parties have read and understand the foregoing terms of this Agreement and do, by their respective signatures hereby agree to its terms. (Remainder of page intentionally left blank) DocuSign Envelope ID: 37FB9474-EF8B-440A-806D-8C760F85DC2C3/22/2021President & Chief Operating OfficerThomas McGowan EXHIBIT A DEDICATED IMPROVEMENTS EDDY STREETHOWARD STREETS O U T H B E N D A V ECORBY STREETRETAILPAD SITEDNPREMISESEDDY STREET COMMONS PH IIISOUTH BEND, INDIANAEXHIBIT BPREMISESR-0000011805PREMISES1 EXHIBIT B EDDY PHASE III PLANS: EDDY AND HOWARD WATER MAIN LOOP AND SEWER RELOCATION PLANS 2/19/20212/19/202102/19/20212/19/2021 T3 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T3 MH: 20 T3 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T3 MH: 20 DN 5.71%T3 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T3 MH: 20 DN 5.71%T3 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T3 MH: 20 ↑ PROPOSED LAYOUT 361 STORMTECH MC-4500 CHAMBERS 46 STORMTECH MC-4500 END CAPS 12 STONE ABOVE (in) 9 STONE BELOW (in) 35 % STONE VOID 64547 INSTALLED SYSTEM VOLUME (CF) (PERIMETER STONE INCLUDED) 16242 SYSTEM AREA (ft²) 588 SYSTEM PERIMETER (ft) PROPOSED ELEVATIONS 741.59 MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED) 737.09 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC) 736.59 MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC) 736.59 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT) 736.59 MINIMUM ALLOWABLE GRADE (TOP OF RIGID PAVEMENT) 735.59 TOP OF STONE 734.59 TOP OF MC-4500 CHAMBER 731.51 24" TOP MANIFOLD INVERT 729.78 24" ISOLATOR ROW CONNECTION INVERT 729.59 BOTTOM OF MC-4500 CHAMBER 728.84 UNDERDRAIN INVERT 728.84 BOTTOM OF STONE DN 5.71%T3 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T3 MH: 20 NOTES ·MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECHNICAL NOTE 6.32 FOR MANIFOLD SIZING GUIDANCE. ·DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLD COMPONENTS IN THE FIELD. ·THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE-SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR DETERMINING THE SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED ONCE THIS INFORMATION IS PROVIDED. 24" X 24" ADS N-12 TOP MANIFOLD INVERT 23.05" ABOVE CHAMBER BASE (SEE NOTES) INSPECTION PORT (TYP 4 PLACES) STRUCTURE CB-29 PER PLAN W/ELEVATED BYPASS MANIFOLD MAXIMUM INLET FLOW 28.5 CFS (DESIGN BY ENGINEER / PROVIDED BY OTHERS) ISOLATOR ROW (SEE DETAIL / TYP 4 PLACES) PLACE MINIMUM 17.5' OF ADS GEOSYNTHETICS 315WTM WOVEN GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS 24" PARTIAL CUT END CAP, PART# MC4500IEPP24T OR MC4500IEPP24TW TYP OF ALL MC-4500 24" TOP CONNECTIONS 24" PARTIAL CUT END CAP, PART# MC4500IEPP24B OR MC4500IEPP24BW TYP OF ALL MC-4500 24" BOTTOM CONNECTIONS AND ISOLATOR ROWS 24" X 24" ADS N-12 TOP MANIFOLD MAXIMUM INLET FLOW 33.1 CFS INVERT 23.05" ABOVE CHAMBER BASE (SEE NOTES) 24" X 24" ADS N-12 TOP MANIFOLD INVERT 23.05" ABOVE CHAMBER BASE (SEE NOTES) 24" X 24" ADS N-12 TOP MANIFOLD INVERT 23.05" ABOVE CHAMBER BASE (SEE NOTES) STRUCTURE CB-16 PER PLAN W/ELEVATED BYPASS MANIFOLD (DESIGN BY ENGINEER / PROVIDED BY OTHERS) STRUCTURE CB-18 PER PLAN W/ELEVATED BYPASS MANIFOLD MAXIMUM INLET FLOW 19.0 CFS (DESIGN BY ENGINEER / PROVIDED BY OTHERS) STRUCTURE CB-8 PER PLAN W/ELEVATED BYPASS MANIFOLD MAXIMUM INLET FLOW 28.5 CFS (DESIGN BY ENGINEER / PROVIDED BY OTHERS) STRUCTURE CB-14 PER PLAN W/ELEVATED BYPASS MANIFOLD (DESIGN BY ENGINEER / PROVIDED BY OTHERS) 112.24' 77.92'21.57' 54 .29 '31.87'62.07'88.85' 81.94'46.67'44.67'54.50'54.75'32.59' 27.55' PROPOSED LAYOUT 361 STORMTECH MC-4500 CHAMBERS 46 STORMTECH MC-4500 END CAPS 12 STONE ABOVE (in) 9 STONE BELOW (in) 35 % STONE VOID 64547 INSTALLED SYSTEM VOLUME (CF) (PERIMETER STONE INCLUDED) 16242 SYSTEM AREA (ft²) 588 SYSTEM PERIMETER (ft) PROPOSED ELEVATIONS 741.59 MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED) 737.09 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC) 736.59 MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC) 736.59 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT) 736.59 MINIMUM ALLOWABLE GRADE (TOP OF RIGID PAVEMENT) 735.59 TOP OF STONE 734.59 TOP OF MC-4500 CHAMBER 731.51 24" TOP MANIFOLD INVERT 729.78 24" ISOLATOR ROW CONNECTION INVERT 729.59 BOTTOM OF MC-4500 CHAMBER 728.84 UNDERDRAIN INVERT 728.84 BOTTOM OF STONE PLEASE NOTE: 1.THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". 2.STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3.WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 4.ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. NOTES: 1.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION 60x101 2.MC-4500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3.THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 4.PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 5.REQUIREMENTS FOR HANDLING AND INSTALLATION: ·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. ·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3”. ·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 500 LBS/IN/IN. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT D FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.N/A PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PREPARATION REQUIREMENTS. C INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 24" (600 mm) ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER. GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR PROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER. AASHTO M145¹ A-1, A-2-4, A-3 OR AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 BEGIN COMPACTIONS AFTER 24" (600 mm) OF MATERIAL OVER THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN 12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR PROCESSED AGGREGATE MATERIALS. B EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE. CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹ 3, 4 A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER.CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹ 3, 4 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3 24" (600 mm) MIN* 7.0' (2.1 m) MAX 12" (300 mm) MIN100" (2540 mm) 12" (300 mm) MIN 12" (300 mm) MIN 9" (230 mm) MIN D C B A *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 30" (750 mm). 60" (1525 mm) DEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 9" (230 mm) MIN PERIMETER STONE (SEE NOTE 6) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) MC-3500 END CAP SUBGRADE SOILS (SEE NOTE 4) PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) **THIS CROSS SECTION DETAIL REPRESENTS MINIMUM REQUIREMENTS FOR INSTALLATION. PLEASE SEE THE LAYOUT SHEET(S) FOR PROJECT SPECIFIC REQUIREMENTS. MC-4500 TECHNICAL SPECIFICATION NTS PART #STUB B C MC4500REPE06T 6" (150 mm)42.54" (1.081 m)--- MC4500REPE06B ---0.86" (22 mm) MC4500REPE08T 8" (200 mm)40.50" (1.029 m)--- MC4500REPE08B ---1.01" (26 mm) MC4500REPE10T 10" (250 mm)38.37" (975 mm)--- MC4500REPE10B ---1.33" (34 mm) MC4500REPE12T 12" (300 mm)35.69" (907 mm)--- MC4500REPE12B ---1.55" (39 mm) MC4500REPE15T 15" (375 mm)32.72" (831 mm)--- MC4500REPE15B ---1.70" (43 mm) MC4500REPE18TC 18" (450 mm) 29.36" (746 mm)---MC4500REPE18TW MC4500REPE18BC ---1.97" (50 mm) MC4500REPE18BW MC4500REPE24TC 24" (600 mm) 23.05" (585 mm)---MC4500REPE24TW MC4500REPE24BC ---2.26" (57 mm) MC4500REPE24BW MC4500REPE30BC 30" (750 mm)---2.95" (75 mm) MC4500REPE36BC 36" (900 mm)---3.25" (83 mm) MC4500REPE42BC 42" (1050 mm)---3.55" (90 mm) NOTE: ALL DIMENSIONS ARE NOMINAL NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH)100.0" X 60.0" X 48.3" (2540 mm X 1524 mm X 1227 mm) CHAMBER STORAGE 106.5 CUBIC FEET (3.01 m³) MINIMUM INSTALLED STORAGE*162.6 CUBIC FEET (4.60 m³) WEIGHT 130.0 lbs.(59.0 kg) NOMINAL END CAP SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH)90.2" X 59.4" X 30.7" (2291 mm X 1509 mm X 781 mm) END CAP STORAGE 35.7 CUBIC FEET (1.01 m³) MINIMUM INSTALLED STORAGE*108.7 CUBIC FEET (3.08 m³) WEIGHT 135.0 lbs.(61.2 kg) *ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION AND BETWEEN CHAMBERS, 12" (305 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY. STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" END CAPS WITH A WELDED CROWN PLATE END WITH "C" END CAPS WITH A PREFABRICATED WELDED STUB END WITH "W" BUILD ROW IN THIS DIRECTION CUSTOM PRECORED INVERTS ARE AVAILABLE UPON REQUEST. INVENTORIED MANIFOLDS INCLUDE 12-24" (300-600 mm) SIZE ON SIZE AND 15-48" (375-1200 mm) ECCENTRIC MANIFOLDS. CUSTOM INVERT LOCATIONS ON THE MC-4500 END CAP CUT IN THE FIELD ARE NOT RECOMMENDED FOR PIPE SIZES GREATER THAN 10" (250 mm). THE INVERT LOCATION IN COLUMN 'B' ARE THE HIGHEST POSSIBLE FOR THE PIPE SIZE. VALLEY STIFFENING RIB CREST STIFFENING RIB CREST WEB UPPER JOINT CORRUGATION FOOT LOWER JOINT CORR. B C 52.0" (1321 mm) 48.3" (1227 mm) INSTALLED 60.0" (1524 mm) 100.0" (2540 mm)90.2" (2291 mm) 59.4" (1509 mm) 30.7" (781 mm) INSTALLED 35.1" (891 mm) MC-SERIES END CAP INSERTION DETAIL NTS NOTE: MANIFOLD STUB MUST BE LAID HORIZONTAL FOR A PROPER FIT IN END CAP OPENING. MANIFOLD HEADER MANIFOLD STUB STORMTECH END CAP MANIFOLD HEADER MANIFOLD STUB 12" (300 mm) MIN SEPARATION 12" (300 mm) MIN INSERTION 12" (300 mm) MIN SEPARATION 12" (300 mm) MIN INSERTION INSPECTION & MAINTENANCE STEP 1)INSPECT ISOLATOR ROW FOR SEDIMENT A.INSPECTION PORTS (IF PRESENT) A.1.REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN A.2.REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3.USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4.LOWER A CAMERA INTO ISOLATOR ROW FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B.ALL ISOLATOR ROWS B.1.REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW B.2.USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW THROUGH OUTLET PIPE i)MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY ii)FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2)CLEAN OUT ISOLATOR ROW USING THE JETVAC PROCESS A.A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B.APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN C.VACUUM STRUCTURE SUMP AS REQUIRED STEP 3)REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. STEP 4)INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. NOTES 1.INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2.CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. NOTES: 1.INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION VALLEY. 2.ALL SCHEDULE 40 FITTINGS TO BE SOLVENT CEMENTED (4" PVC NOT PROVIDED BY ADS). CONNECTION DETAIL NTS 8" (200 mm) 4" (100 mm) SCHED 40 PVC COUPLING 4" (100 mm) SCHED 40 PVC 4" (100 mm) SCHED 40 PVC CORE 4.5" (114 mm) Ø HOLE IN CHAMBER (4.5" HOLE SAW REQ'D) ANY VALLEY LOCATION STORMTECH CHAMBER 8" NYLOPLAST INSPECTION PORT BODY (PART# 2708AG4IPKIT) OR TRAFFIC RATED BOX W/SOLID LOCKING COVER CONCRETE COLLAR PAVEMENT 12" (300 mm) MIN WIDTH CONCRETE SLAB 6" (150 mm) MIN THICKNESS 4" PVC INSPECTION PORT DETAIL NTS CONCRETE COLLAR NOT REQUIRED FOR UNPAVED APPLICATIONS 4" (100 mm) SCHED 40 PVC CATCH BASIN OR MANHOLE MC-4500 ISOLATOR ROW DETAIL NTS STORMTECH HIGHLY RECOMMENDS FLEXSTORM PURE INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES COVER PIPE CONNECTION TO END CAP WITH ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE MC-4500 CHAMBER OPTIONAL INSPECTION PORT MC-4500 END CAP 24" (600 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE-CORED END CAP PART #: MC4500REPE24BC OR MC4500REPE24BW TWO LAYERS OF ADS GEOSYNTHETICS 315WTM WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 10.3' (3.1 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) DN 5.71%T3 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T3 MH: 20 DN 5.71%T3 MH: 20 T3 MH: 20 T3MH: 20T5MH: 20T5MH: 20T3MH: 20T5MH: 20 T3MH: 20T5MH: 20T5MH: 20T3MH: 20T5MH: 20T3MH: 20 DN 5.71%T3 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T3 MH: 20 GENERAL LANDSCAPE NOTES: 1. CONTRACTOR SHALL BE RESPONSIBLE TO NOTIFY ALL UTILITY COMPANIES AND VERIFY LOCATION OF ALL PRIVATE AND PUBLIC ON SITE UTILITIES PRIOR TO CONSTRUCTION. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE VERIFICATION OF ALL SITE CONDITIONS WHICH MAY EFFECT THE LANDSCAPE PLANT MATERIALS AND SITE AMENITY INSTALLATION. CONTRACTOR ALSO MUST NOTIFY LANDSCAPE ARCHITECT OF CONDITIONS THAT MAY BE DETRIMENTAL TO HEALTHY PLANT DEVELOPMENT, OR MAY CAUSE VOID TO PLANT WARRANTY. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF ALL LANDSCAPE MATERIALS IN ACCORDANCE WITH THE LATEST EDITION OF THE "USA STANDARD FOR NURSERY STOCK", PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERY MEN, INC. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR A MINIMUM OF (1) YEAR GUARANTEE FOR ALL PLANT MATERIALS FROM THE DATE OF SUBSTANTIAL COMPLETION. ANY DEAD PLANT MATERIALS SHALL BE REPLACED WITH MATERIAL EQUAL IN SIZE AND QUALITY AS LISTED IN THE MASTER PLANT LIST. ALL COST FOR REPLACING PLANT MATERIALS WITHIN THE GUARANTEE PERIOD WILL BE AT THE RESPONSIBILITY OF THE CONTRACTOR. 5. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH OTHER WORK DISCIPLINES TO ENSURE NO CONFLICT BETWEEN WORK TYPES. 6. ALL DECIDUOUS TREES AND EVERGREEN TREES SHALL BE BALLED AND BURLAP UNLESS OTHERWISE NOTED. 7. ALL SHRUBS MAY BE CONTAINER GROWN OR BALLED AND BURLAP. 8. THE CALIPER SIZE LISTED ON THE MASTER PLANT LIST INDICATES THE DIAMETER OF THE TRUNK TAKEN AT 6" ABOVE THE GROUND LEVEL. 9. SPACE PLANT MATERIALS AS INDICATED ON MASTER PLANT LIST OR PER PROPER HORTICULTURAL METHODS. 10. CONTRACTOR SHALL PROVIDE A TWO YEAR STRAIGHTENING GUARANTEE IN LIEU OF STACKING AND GUYING TREES. 11. CONTRACTOR SHALL VERIFY QUANTITIES OF PROPOSED PLANT MATERIALS AND SITE AMENITIES SHOW ON THE MASTER MATERIALS LIST AND PLANS. IF A DISCREPANCY APPEARS, THE ACTUAL COUNT ON THE PLANS SHALL PREVAIL. 12. KEEP BALLED AND CONTAINER PLANT MATERIAL WATERED UNTIL THEY ARE PLANTED. IF PLANTS CANNOT BE PLANTED IMMEDIATELY, THEY SHOULD BE HEELED IN AND COVERED WITH MULCH UNTIL TIME OF PLANTING. 13. CONDUCT SOILS TEST TO VERIFY FERTILITY OF TOPSOIL. AMEND SOIL IF PH IS LESS THAN 5.0 OR GREATER THAN 7.5. MAKE OTHER ADJUSTMENTS AS SOIL ANALYSIS INDICATES. ALL FINE GRADE SOIL PREPARATION OF PLANTINGAND LAWN AREAS SHALL BE PERFORMED BY THE LANDSCAPE CONTRACTOR UNLESS OTHERWISE SPECIFIED . 14. TOPSOIL DEPTH TO BE A MINIMUM OF 6" IN ALL PLANTING BEDS AND 3" IN LAWN AREAS. GENERAL CONTRACTOR IS TO SUPPLY TOPSOIL TO THESE STANDARDS AND PROVIDE FINISH GRADE. LANDSCAPE CONTRACTOR TO PROVIDE FINAL GRADE FOR SEED APPLICATION AND PLANT MATERIAL INSTALLATION. TOPSOIL TO BE CLEAN FRIABLE LOAM FROM LOCAL SOURCE AND FREE FROM STONES AND DEBRIS OVER 3/4" IN DIAMETER. TOPSOIL MUST BE FREE FROM TOXINS AND HERBICIDES. 15. LANDSCAPE BEDS SHALL BE DEFINED BY COMMERCIAL GRADE 5" BLACK VINYL EDGING, PRODUCED BY AN ESTABLISHED MANUFACTURER OR APPROVED EQUAL. 16. LANDSCAPE BEDS TO RECEIVE 3"- 4" INDUSTRY STANDARD SHREDDED HARDWOOD BARK MULCH. 17. ALL TREES NOT INCORPORATED INTO THE LANDSCAPE BEDS ARE TO RECEIVE A 3' RADIUS MULCH RING, 3" DEEP. 18. APPLY PRE-EMERGENT HERBICIDE TO ALL LANDSCAPE BEDS PRIOR TO MULCHING. 19. HYDROSEED: INSTALL HYDROSEED PER COMMON INDUSTRY STANDARDS WHERE INDICATED ON PLANS. SEED MIXTURE: 37.50% PERENIIAL RYE 31.00% KENTUCKY BLUE 31.50% CREEPING RED FESCUE 20. ALL LANDSCAPE & LAWN AREAS SHALL BE 100% IRRIGATED. IRRIGATION CONTRACTOR SHALL INSTALL ALL REQUIRED IRRIGATION STRUCTURES, PIPES, TAPS, VALVES, WIRING, BACK FLOW PREVENTERS, METERS, ETC. ALL UNDER PAVEMENT SLEEVES SHALL BE COORDINATED AND INSTALLED PRIOR TO PAVEMENT INSTALLATION BY THE SITE CONTRACTOR. ALL IRRIGATION PLANS ARE TO BE DESIGN BY A CERTIFIED IRRIGATION DESIGNER AND APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO ANY INSTALLATION. DN 5.71%T3 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 0.8 0.5 0.5 0.7 0.8 0.9 0.8 0.7 0.5 0.4 0.3 0.3 0.3 0.3 0.3 0.3 0.3 1.6 1.4 1.3 1.4 1.0 0.8 1.1 1.3 1.3 1.2 1.1 1.0 1.0 1.1 1.3 1.4 1.5 1.4 1.2 1.0 0.4 0.3 5.0 3.9 3.0 2.2 1.7 1.6 1.3 1.6 1.9 1.8 1.6 1.4 1.5 1.7 2.4 3.3 3.8 4.0 3.7 2.9 2.0 1.2 0.9 0.5 0.3 0.3 1.7 5.0 7.1 7.0 3.9 2.7 2.3 2.2 2.2 2.2 2.6 2.3 1.9 1.7 1.7 2.1 3.2 5.2 7.6 8.2 6.8 4.4 2.5 1.5 1.0 0.6 0.3 0.2 0.3 0.6 0.9 3.0 7.0 9.0 7.2 5.0 3.1 2.3 2.1 2.2 2.6 2.9 3.1 2.8 2.2 1.8 1.7 1.9 2.8 5.0 7.5 8.2 6.4 3.6 2.1 1.3 0.9 0.6 0.4 0.2 0.5 0.9 1.8 3.2 4.8 4.9 3.7 2.5 1.6 1.4 1.6 2.1 2.7 3.3 3.4 3.0 2.3 1.8 1.4 1.3 1.2 1.6 2.1 2.2 1.7 1.2 0.9 0.9 0.8 0.7 0.4 0.7 1.0 1.7 2.3 2.7 2.2 1.5 0.9 0.8 0.9 1.2 1.8 2.4 2.9 3.0 2.7 2.1 1.6 1.2 0.9 0.6 0.7 1.0 1.0 0.8 0.6 0.6 0.8 0.9 0.8 0.6 0.7 1.0 1.4 1.6 1.3 0.8 0.6 0.6 0.6 0.8 1.1 1.5 2.0 2.3 2.3 2.0 1.6 1.3 1.0 0.8 0.6 0.7 0.9 0.9 0.9 0.8 0.9 1.1 1.2 1.1 0.8 0.6 0.7 0.9 1.1 1.1 0.9 0.5 0.7 0.8 0.8 0.9 1.0 1.3 1.6 1.7 1.6 1.4 1.1 0.9 0.8 0.7 0.6 0.7 0.9 1.0 1.2 1.2 1.3 1.5 1.7 1.5 1.1 0.7 0.7 0.9 1.1 1.2 1.1 0.8 1.1 1.1 1.0 1.0 1.0 1.1 1.2 1.2 1.1 0.9 0.8 0.7 0.6 0.6 0.7 0.8 1.1 1.3 1.5 1.7 1.9 2.2 2.3 2.0 1.5 1.0 0.7 0.6 0.8 1.2 1.5 1.7 1.4 1.6 1.6 1.3 1.1 0.9 0.9 0.9 0.8 0.8 0.7 0.6 0.7 0.7 0.7 0.8 1.0 1.4 1.7 2.0 2.2 2.6 3.0 3.0 2.6 2.0 1.4 0.9 0.6 0.9 1.3 1.9 2.3 2.2 2.4 2.1 1.6 1.2 0.9 0.7 0.6 0.6 0.6 0.7 0.8 0.9 0.9 1.0 1.1 1.4 1.8 2.1 2.4 2.6 3.0 3.4 3.5 3.0 2.3 1.6 1.1 0.8 0.5 0.8 1.4 2.1 2.8 3.0 3.0 2.5 1.7 1.2 0.8 0.6 0.6 0.6 0.7 0.9 1.1 1.3 1.4 1.4 1.5 1.7 2.2 2.5 2.6 2.7 3.0 3.3 3.2 2.7 2.2 1.6 1.3 0.5 0.8 1.4 2.2 2.9 3.4 3.2 2.6 1.8 1.2 0.9 0.7 0.7 0.8 1.0 1.3 1.6 1.9 2.0 2.0 2.0 2.4 2.7 2.9 2.9 2.7 2.8 3.0 2.8 2.1 1.9 0.5 0.7 1.4 2.0 2.6 2.9 2.8 2.3 1.8 1.3 1.0 0.9 0.9 1.1 1.4 1.8 2.3 2.5 2.6 2.5 2.6 3.0 3.4 3.4 3.0 2.8 2.7 2.6 2.4 1.2 1.7 2.0 2.1 2.1 1.9 1.6 1.3 1.1 1.0 1.2 1.4 1.9 2.5 3.0 3.2 3.0 2.9 3.0 3.3 3.7 2.8 2.6 2.5 0.5 0.7 1.0 1.2 1.4 1.4 1.4 1.3 1.2 1.1 1.0 1.0 1.3 1.6 2.2 2.9 3.5 3.6 3.3 3.0 3.0 3.0 2.6 2.5 0.4 0.5 0.7 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.9 1.2 1.6 2.2 3.0 3.5 3.5 3.2 2.8 2.8 2.9 2.6 2.0 0.3 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.7 1.0 1.4 1.9 2.6 2.9 2.7 2.6 2.4 2.1 2.4 2.3 2.3 0.3 0.3 0.4 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.5 0.6 0.9 1.3 1.7 2.1 2.3 1.9 1.6 1.8 1.8 1.8 0.3 0.4 0.4 0.4 0.4 0.3 0.4 0.4 0.4 0.4 0.4 0.6 0.9 1.3 1.7 1.9 1.9 1.5 1.0 1.1 1.2 0.7 0.7 0.7 0.5 0.7 0.7 0.6 0.6 0.5 0.6 0.9 1.4 1.9 2.3 2.2 1.8 1.3 1.0 0.9 0.8 0.7 0.5 0.5 0.7 0.9 1.1 1.1 0.8 1.1 1.1 0.9 0.7 0.6 0.6 0.8 1.4 2.2 3.0 3.8 3.3 1.7 1.2 0.9 0.7 0.4 0.6 0.9 1.2 1.6 1.8 1.5 1.7 1.5 1.2 0.9 0.6 0.5 0.7 1.2 2.1 3.5 5.6 6.0 4.0 2.6 1.6 1.0 0.6 0.3 0.6 1.0 1.5 2.0 2.5 2.3 2.4 2.0 0.9 0.6 0.4 0.5 0.8 1.4 3.1 8.3 6.4 3.9 2.2 1.4 0.7 0.5 0.6 1.0 1.6 2.3 3.0 3.1 2.9 0.5 0.3 0.3 0.4 0.6 1.3 5.6 3.3 1.9 1.3 0.8 0.6 1.0 1.5 2.4 3.1 3.3 3.0 2.2 1.5 0.9 0.5 0.3 0.3 0.3 0.5 0.7 1.5 1.4 1.0 1.4 2.1 2.6 2.8 2.6 2.1 1.4 0.9 0.5 0.3 0.3 0.5 0.7 1.0 1.1 0.6 0.9 1.3 1.7 1.9 2.0 1.9 1.6 1.3 0.9 0.6 1.0 1.3 1.3 0.5 0.8 1.0 1.2 1.4 0.7 1.3 1.7 1.7 0.4 0.6 0.7 0.7 0.8 1.6 2.5 3.0 0.3 0.3 0.4 0.4 0.7 1.9 3.8 5.5 0.2 0.2 1.9 4.6 8.1 1.7 4.7 8.8 1.3 3.8 7.0 1.0 2.9 4.5 4.7 0.8 1.9 2.5 2.4 0.6 1.2 1.5 1.4 0.5 0.8 1.0 0.9 0.4 0.5 0.5 fc 0.5 fc 1 fc 1 fc 1 fc 1 fc 0.25 fc 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.3 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.3 0.3 0.2 0.1 0.1 0.2 0.2 0.1 0.3 0.4 0.5 0.5 0.5 0.4 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.6 0.5 0.3 0.2 0.4 0.6 0.2 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.6 0.0 0.8 0.5 0.9 0.8 0.6 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.5 1.2 1.6 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 9.6 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.6 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.8 0.5 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 1.4 0.9 0.6 0.4 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 2.0 0.4 0.6 0.4 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 0.8 3.8 3.2 2.3 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 3.3 3.5 2.5 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 2.9 2.0 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 1.7 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 1.2 1.2 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 2.5 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 6.4 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 7.0 10.2 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 1.1 3.1 7.6 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 1.4 1.0 1.2 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.5 1.0 1.1 0.6 0.2 0.3 0.5 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.5 0.3 0.3 1.0 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 1.2 1.2 1.2 1.0 0.7 0.5 0.3 0.3 1.1 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.7 0.7 0.7 0.7 0.7 0.6 0.4 0.3 0.2 1.7 0.3 0.2 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 0.4 0.4 0.4 0.4 0.3 0.3 0.2 0.2 3.5 0.5 0.4 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 7.1 1.2 0.8 0.6 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.3 9.5 1.5 0.8 0.6 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.3 7.8 0.7 0.4 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 1.1 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 1.0 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.7 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.5 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 fc 1 fc 0.25 fc 0.25 fc 0.1 fc 0.1 fc 0.1 fc 0.1 0.1 0.2 0.4 0.9 0.1 0.8 0.3 0.2 0.1 0.1 0.2 0.1 0.2 0.3 0.4 0.5 0.5 0.4 0.3 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.5 0.8 0.8 0.6 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 0.3 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.3 0.3 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.5 0.5 0.5 0.5 0.4 0.3 T3 MH: 20 PHOTOMETRIC PLAN DESIGNED BY ESL-SPECTRUM WWW.ESL-SPECTRUM.COM PHONE: 317.951.2300 Luminaire Schedule Project: 20200115-SC EDDY STREET COMMONS PHASE III - SITE LIGHTING Symbol Qty Label Arrangement Lum. Watts Lum. Lumens LLF Description 4 T3 SINGLE 169 18595 0.850 ASL-24L-3K-210-3 - 20' POLE 6 T5 SINGLE 169 18761 0.850 ASL-24L-3K-210-5 - 20' POLE Calculation Summary Project: 20200115-SC EDDY STREET COMMONS PHASE III - SITE LIGHTING Label CalcType Units Avg Max Min Avg/Min Max/Min EDDY STREET COMMONS @ GRADE Illuminance Fc 1.67 9.0 0.2 8.35 45.00 PERIMETER @ GRADE Illuminance Fc 0.12 10.2 0.0 N.A.N.A. PROPERTY LINE @ GRADE Illuminance Fc 0.16 0.9 0.0 N.A.N.A. PHOTOMETRIC PLAN DESIGNED BY ESL-SPECTRUM WWW.ESL-SPECTRUM.COM PHONE: 317.951.2300 CALCULATIONS ARE MAINTAINED HORIZONTAL ILLUMINANCE FIGURES IN FOOT-CANDLES POINTS SHOWN ARE AT GRADE FIXTURE MOUNTING HEIGHTS ARE SPECIFIED NEXT TO FIXTURES AS "MH" ESL-Spectrum's services are for estimation purposes only, and are not warranties. Final design and illumination levels must be determined and specified by an electrical engineer. Field results may differ from computer predictions because of many uncontrollable factors and adverse test conditions such as: line voltage variations, lamp performance, product manufacturing tolerances, jobsite conditions, and other unrecoverable light-loss factors. THE FIXTURE TYPE(S) AND LAMPING(S) SPECIFIED ON THIS LAYOUT MUST BE USED IN ORDER TO MEET THE EXACT CRITERIA AND PERFORMANCE DATA SHOWN. IES RECOMMENDED ILLUMINANCE TARGETS USED WHERE APPLICABLE. PIPE BOLLARD1 ACCESSIBLE LOGO/PAVEMENT5 ACCESSIBLE SIGN7 RESERVED PARKING VAN ACCESSIBLE A.D.A. RAMP DETAIL3ASPHALT PAVEMENT (STANDARD)2 STANDARD LIGHT BASE10 TRUCK DOCK TRENCH DRAIN11 ASPHALT PAVEMENT (HEAVY DUTY) 4 CATCH BASIN8 12 SOLID INLET CASTING14 TYPICAL SIDEWALK DETAIL6 STANDARD CURB13 BIKE RACK9 LANDSCAPE STONE MOW STRIP15 CONCRETE DUMPSTER PAD & TRUCK LOADING DOCK PAVEMENT SECTION 1 INDOT COMMERCIAL DRIVE APPROACH20 17 CURB AND GUTTER DETAIL TYPE "B" (SOUTH BEND) 16 SANITARY MANHOLE CASTING 18 STORM MANHOLE 19 STORM MANHOLE CASTING DN 5.71% T3 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T3 MH: 20 7IX#7TDCP«NCPF§6[PGT«EQORNGZ ««««««««««VQ«1 T3 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T3 MH: 20 T3 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T5 MH: 20 T5 MH: 20 T3 MH: 20 T5 MH: 20 T3 MH: 20 EXHIBIT C PERMITS EXHIBIT D ENGINEER’S ESTIMATE PROJECT NAME: DHA #: 200104.5 date:2/23/2021 Engineer's Estimated Cost of Construction Total:(+25% bond contingency)674,340.00$ ID ITEM UNIT QTY UNIT PRICE EXTENSION 1 Mobilization & Demobilization LS 1 $ 25,000.00 $ 25,000.00 2 Maintenance of Traffic LS 1 $ 15,000.00 $ 15,000.00 3 Construction Engineering LS 1 $ 750.00 $ 750.00 4 Constrtuction Record Survey LS 1 $ 3,000.00 $ 3,000.00 5 Clearing LS 1 $ 2,500.00 $ 2,500.00 6 Flowable Backfill, Non-Removable CYS 50 $ 210.00 $ 10,500.00 7 #53 Aggr. Base Course, 6 in., cip TON 431 $ 27.00 $ 11,634.75 8 Sidewalk, Concrete SYS 545 $ 60.00 $ 32,700.00 9 Modified Combo. Curb and Gutter LFT 861 $ 45.00 $ 38,745.00 10 Combo. Curb and Gutter, Type B LFT 266 $ 44.00 $ 11,704.00 11 Std Commercial Drive Entrance, Complete, w/ curb ramps EA 2 $ 18,000.00 $ 36,000.00 12 HMA Intermediate Course, 2-1/2 in. TON 238 $ 85.00 $ 20,230.00 13 HMA Base Course, 8 in. (2 lifts, min.) TON 759 $ 80.00 $ 60,720.00 14 HMA Surface Course, 1-1/2 in. TON 143 $ 90.00 $ 12,870.00 15 Asphalt For Tack Coat SYS 3450 $ 0.40 $ 1,380.00 16 Water Main, 12" Valve EA 1 $ 3,500.00 $ 3,500.00 17 Water Main, 12"x8" Reducer EA 1 $ 3,000.00 $ 3,000.00 18 Water Main, Ductile Iron, 8 in. LFT 737 $ 82.00 $ 60,434.00 19 Water Main Cross, 8"x8" EA 2 $ 3,500.00 $ 7,000.00 20 Water Main, 6"x8" Tee EA 2 $ 1,500.00 $ 3,000.00 21 Water Main, 6"x8" Reducer EA 4 $ 1,750.00 $ 7,000.00 22 Valve, Ductile Iron, 8 in. EA 6 $ 2,000.00 $ 12,000.00 23 1" Water Service LFT 100 $ 35.00 $ 3,500.00 24 2" Water Service LFT 25 $ 40.00 $ 1,000.00 25 6" Water Service, D.I. LFT 50 $ 75.00 $ 3,750.00 26 Hydrant EA 1 2400.00 $ 2,400.00 27 Pipe, Sanitary Sewer, 24" LFT 288 $ 150.00 $ 43,200.00 28 Pipe, PVC, 30 in. LFT 305 $ 200.00 $ 61,000.00 29 Sewer Lateral, PVC, 6" LFT 50 $ 90.00 $ 4,500.00 30 Connect to Ex. MH EA 1 $ 2,000.00 $ 2,000.00 31 Std. Manhole EA 3 $ 8,500.00 $ 25,500.00 32 Mulched Seeding, Type T SYS 638 $ 0.80 $ 510.67 33 Traffic Signal Detection Loops, Re-set LS 1 $ 10,000.00 $ 10,000.00 34 Grooving For Pavement Markings LFT 1192 $ 1.00 $ 1,192.00 35 Line, Thermoplastic, Solid, White, 4" LFT 76 $ 1.00 $ 76.00 36 Line, Thermoplastic, Solid, Yellow, 4 In. LFT 756 $ 1.00 $ 756.00 37 Line, Thermoplastic, Crosshatch, Yellow, 8 In. LFT 360 $ 2.00 $ 720.00 38 Transverse Markings, Thermoplastic, Yellow, Crosshatch, 12" LFT74 $ 4.00 $ 296.00 39 Pavement Message Marking, Thermoplastic, "ONLY", Whilte EA 1 $ 200.00 $ 200.00 40 Pavement Message Marking, Thermoplastic, Arrow, White EA 1 $ 200.00 $ 200.00 TOTAL 539,470.00$ PROJECT #: DP 20-020, Eddy Street & Howard Street Sewer Relocation & Water Main Loop EXHIBIT E PERFORMANCE BOND EXHIBIT F SYSTEM DEVELOPMENT CHARGE AND UTILITY VERIFICATION RECEIPT EXHIBIT G CERTIFICATE OF INSURANCE See below RE: Eddy Street Commons - 1233, 1234 & 1251 N. Eddy Street, South Bend, IN 46617 Additional Named Insureds: KRG Eddy Street Commons, LLC & Eddy Street Commons at Notre Dame Master Association, Inc. KITEREA1 3/8/2021 Tim Baumann Commercial Lines - (404) 923-3700 470.875.0517 610-537-1929 USI Insurance Services LLC tim.baumann@usi.com 1 Concourse Parkway NE, Suite 700 Atlanta, GA 30328 Endurance Assurance Corporation 11551 Sompo America Insurance Company 11126 Kite Realty Group Trust Markel American Insurance Company 28932 30 S. Meridian St.,Navigators Insurance Company 42307 Suite 1100 Indianapolis, IN 46204 15313255 XA GGR10012604103 1,000,00003/01/2021 03/01/2022 X 1,000,000 Excluded 1,000,000 2,000,000 X 2,000,000 B ADVS1127B0 03/01/2021 03/01/2022 1,000,000 X X X X XC MKLM6MM70000289 03/01/2021 03/01/2022 10,000,000 10,000,000 X 10,000 B WCDS1050Y0 03/01/2021 03/01/2022 X 1,000,000 N 1,000,000 1,000,000 D Excess - $15M xs $10M GA21EXRZ042PGIV 03/01/202103/01/2021 03/01/2022 Excess - $15M xs $10M (This certificate replaces certificate# 15304287 issued on 3/3/2021) City of South Bend Department of Public Works, Engineering Division 227 W Jefferson Blvd., Suite 1316 South Bend, IN 46601 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 12/19/20 Name Sue Ellen Doudrick Department DPW BPW Date 2/23/21 Phone Extension 3057 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Eddy and Howard Street Sewer Relocation and Water Main Loop Project Number DP 20-020 Funding Source n/a Account No. n/a Amount n/a Terms of Contract n/a Purpose/Description Eddy Street Phase III Grocery Store development requires the construction of a water main loop and sanitary sewer relocation. The Utility Extension Agreement is expected to be presented to the Board in an upcoming BPW mtg. Grocery store requires water and sewer by May 1. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: