HomeMy WebLinkAbout6C5 � c (s)
SpLTF14.„
/S 1'1t��11.7f+ 4
Department of
` � ` 14 Community Investment
�' ''
Memorandum
Friday, December 07,2012
TO: South Bend Redevelopme ommission
FROM: Bill Schalliol
SUBJECT: Professional Service Proposal - US 31 IP Replat, Lots 5 & 6
Attached to this memorandum is a professional service proposal from Danch, Harner&Associates to
provide replat services for Lots 5 & 6 of the US 31 Industrial Park, Phase 1. The Redevelopment
Commission was the original developer of this industrial park and this action will help to correct an
issue with ownership, maintenance and control of the park's two common area retention ponds.
The professional service proposal will provide survey services to prepare a Two Lot/One Outlot Minor
Subdivision for Lots # 5 & 6 of the U.S. 31 Industrial Park Subdivision Phase II Subdivision. The
purpose of the Minor Subdivision is to split off from the buildable portion of the lot the existing
retention basin.The proposed Outlot that will contain the retention basin will be owned by the City of
South Bend. City Ordinances require the Minor Subdivision process for splitting the property as
described above. Our cost estimate for the preparation of the Minor Subdivision is shown below:
The cost for the preparation of the Minor Subdivision, all required paper work, setting of property
corners, attendance at required Plat Committee meetings, filing and recording fees would be
$4,350.00.
Staff requests approval of the proposal.
227 W.JEFFERSON BLVD. SOUTH BEND, IN 46601 I P: 574-235-9371 I FAX; 574-235-9021 I SOUTHBENDIN.GOV
MNDanch, Harner & Associates, Inc.
Michael J. Danch, L.A. Land Surveyors• Professional Engineers
Ron Harner, P.S. Landscape Architects• Land Planners
Mr. Bill Schalliol-Assistant Director December 7, 2012
Community&Economic Development
Department of South Bend
12th Floor County-City Building
227 West Jefferson Blvd.
South Bend, Indiana 46601
RE: Preparation of a Two Lot/One Outlot Minor Subdivision,
Lots 5 &6,U.S. 31 Ind.Park Phase II, South Bend, Indiana:
Dear Mr. Schalliol:
Please accept this letter as our written cost proposal to provide your Department with Survey services
to prepare a Two Lot/One Outlot Minor Subdivision for Lots# 5 & 6 of the U.S. 31 Industrial Park Phase
II Subdivision. The purpose of the Minor Subdivision is to split off from the buildable portions of lots 5
& 6 the existing retention basin. The proposed Outlot that will contain the retention basin will be owned
by the City of South Bend. City Ordinances require the Minor Subdivision process for splitting the
property as described above. Our cost estimate for the preparation of the Minor Subdivision is shown
below:
A).Preparation of a Two Lot/One Outlot Minor Subdivision for Lots# 5 &6;
1). The cost for the preparation of the Minor Subdivision, all required paper work, setting of property
corners,attendance at required Plat Committee meetings, filing and recording fees would be$4,350.
If this proposal is acceptable, we will require a copy of the deed for the properties. With project
approval by December 14t, we could have crew on site within 8-12 working days or less, and submit the
subdivision for approval by Jan 14th with approval on February 21st
Any requested drawing revisions by any review agency would be done at our standard hourly rates,
which are attached.
If you have any questions concerning this matter,please feel free to give me a call at(574)234-4003.
Sincerely, Approved By:
tizeiAti J. Dmiei Date:
Michael J. Danch
President
Danch,Harner&Associates, Inc.
"C" B. Schalliol Minor for Lots 5 &6 Md.
1643 Commerce Drive•South Bend, IN 46628 208 West Mars•Berrien Springs,MI 49103
Office:(574)234-4003/(800)594-4003•Fax:(574)234-4119 Office:(269)471-3010•Fax: (269)471-7237
-2- December 7,2012
DANCH, HARNER & ASSOCIATES, INC.
EFFECTIVE DATE: JANUARY 2012
SCHEDULE OF HOURLY RATES AND DIRECT EXPENSES
CLASSIFICATION HOURLY BILLING RATE
Senior Professional Engineer $138.00
Engineering Designer $80.00
Project Engineer $70.00
Senior Professional Land Surveyor $138.00
Senior Survey/Engineering Tech $80.00
Survey/Engineering Tech $55.00
Senior Professional Landscape Architect $138.00
Survey Manager $70.00
Two Person Field Crew $120.00
Principal $138.00
Clerical $45.00
ITEM UNITS UNIT PRICE
Mileage Miles $0.50
Copies* Each $0.25
Standard Size Prints(24 x 36) Each $4.00
Oversize Prints Square Foot $1.00
Vellums (24 x 36 size) Each $10.00
Overnight Travel:
Meals Cost
Lodging Cost
Public Transportation Cost
*Note:Copies include 81/2 x 11,81/2 x 14,or 11 x 17 size sheets.
� Lot 14
/
cscnt
1-(3/
(cTA
(1) 111
14
Ws: -