Loading...
HomeMy WebLinkAbout6C1 CC Department of Community Investment Memorandum Monday, December 10, 2012 TO: Redevelopment Commission FROM: Don Inks SUBJECT: Bosch Site - Facility Documentation As we sought to market the Bosch site, we asked ADG to provide services related to better understanding the site. Early in 2012 we met with several companies at the Bosch site to show the property and see if it could meet their needs. In many cases we needed information about the building that was not readily available. We opted to use ADG given our work with them during 2011 as we tried to attract another tenant to the Bosch site. ADG built upon their previous work at the site and the attached letter dated 11/27/12 details the additional services they provided. The cost for these services totals $8,835 and Commission approval is requested. 227 W. JEFFERSON BLVD. SOUTH BEND, IN 46601 I P: 574-235-9371 I FAX: 574-235-9021 I SOUTHBENDIN.GOV A ARCHITECTURE DESIGN GROUP November 27,2012 Donald E. Inks City of South Bend Community and Economic Development 227 West Jefferson Boulevard,Suite 1200S South Bend. IN 46601-1830 RE: FACILITY DOCUMENTATION ROBERT BOSCH SITE 401 North Bendix Drive,South Bent! SUMMARY OF COMPLETED ARCHITECTURAL SERVICES Dear Don: This letter summarizes the architectural services completed by Architecture Design Group, Inc. (ADG)on behalf of the City of South Bend(Owner)for FACILITY DOCUMENTATION of the ROBERT BOSCH Site located at 401 North Bendix Drive, South Bend. UNDERSTANDING OF SERVICES PROVIDED As requested by the City of South Bend Community & Economic Development, ADG field measured. and photographed the 285,000 square feet building, and electronically documented the site and building plans. ADG services began on February 22,2012(initial meeting)and were completed on September 7, 2012. ADG SUMMARY OF COMPLETED SERVICES 1. Met with designated City of South Bend and Cressy&Everett/Grubb Ellis representatives; Initial meeting at Economic Development. February 22. 2012; Reviewed four prospective tenants interests in the facility and their specific objectives, and the suitability of the existing BOSCH building/site. 2. Met with two prospective tenants; Meetings were on-site, February 29,2012, with City of South Bend. Cressy & Everett/Grubb Ellis, Chamber of Commerce with New Carbon and Curtis Products; Reviewed interests in the facility,and their specific objectives,and the suitability of the existing BOSCH building/site. 3. Field measured BOSCH building; On-site measurements taken to update hard-copy documentation provided by BOSCH. 4. Prepared drawing documentation; Prepared computer-generated (AutoCad) building floor plans and site plans of the existing conditions;coordinated site plan information from City GIS tiles. 922 E. Wayne Street South Bend.IN 4661? tel 574.288.6626 fax 574.288.6624 1111 Relocation Project Summary of Completed Services Page 2 • 5. Provide City of South Bend all documentation: Provide hard-copy and electronic (AutoCad)files of all completed drawings, including, Site Plan. Floor Plans, Typical Building Section F (Manufacturing Area).and Front East Exterior Elevation. BASIS OF COMPENSATION ADG totaled 93 hours of billable time towards the services completed; the following hourly rates for our services were applied: Principal Architect $135/Hour x 12 hrs= $1,620 Project Architect $1 15/Hour x 21 hrs= $2,415 Intern $ 80/Hour x 60 hrs= $4,800 TOTAL= $8,835 Please contact me should you have any questions. Respectfully submitted, ARCHITECTURE DESIGN GROUP, INC. htzsivi William R. Lamie RA.AIA Principal JPR/Wightman Petrie Conceptual Design Proposals(Proposals date January 12th—April 6`h,2012) Proposal Date Approved by USTC Proposal Proposal Amount January 12 January 12 Proposal For Schematic Master Planning, 2,200.00 Building Design And Modeling The Renaissance Center January 25 February 15 Proposal For Additional Conceptual Modeling 1,360.00 For The Renaissance Center Site February 1 March 15 Proposal For Additional Conceptual Modeling 2,000.00 And Presentation Preparation February 14 March 15 Proposal For Modeling The Ivy Tower Interior, 1,360.00 Floor Plan And West Expansion Over United Drive February 24 February 25 Proposal For Renaissance Center Animation 510.00 And Conceptual Courtyard Concept Development February 27 February 25 Proposal For Renaissance Center Master Plan 3,400.00 & Ivy Tower Conceptual Design Development March 5 March 6 Proposal For Renaissance Center Presentation 680.00 Boards March 8 March 15 Proposal For Renaissance Center 510.00 Transportation Concept Modeling And Diagram March 15 March 19 Proposal For Renaissance District 1,075.00 Presentation Boards April 6 April 24 Proposal For Rail,Tunnel And Tenant Build- 2,210.00 out Design Development Drawings April 6 May 17 Proposal For Hourly-Based Design Hourly Rate as Development Fee attached Proposal Total Amount 14,170.00 Proposal Hourly Rate Amount 6,261.75 Conceptual Design Final Amount 20,431.75 JPR/Wightman Petrie—Other Service Proposals Proposal Date Approved by USTC Proposal Proposal Amount November 28 Proposal For Services To Obtain Railroad 17,029.00 Crossing Permit For Renaissance District Underground Utility Borings November 28 Proposal For Services To Provide Utility 36,020.00 Survey And GIS Data For Renaissance District Development Wightman Petrie Invoices(January 12th to Present) Conceptual Design—Ivy Tower(includes all proposals and hourly rate amount) 20,431.75 Underground Conduit RR Permit—Ivy Tower 885.00 Ivy Tower ALTA Survey 4,945.00 Total Amount of all Proposals and Invoices 26,261.75