Loading...
HomeMy WebLinkAboutOpening of Quotes - El Campito Water Tap Quote Proj No. 121-017 - Selge Construction Co., Inc. Version 2/14/2020 Page - 1 Public Works Quote SCOPE OF WORK CITY OF SOUTH BEND PROJECT NAME: El Campito Water Tap Quote PROJECT NO. 121-017 QUOTES DUE March 9th, 2021 at 9:00am Local Time – electronic bids should be submitted to bpwbids@southbendin.gov I. PROJECT DESCRIPTION A. The project includes the furnishing of all equipment, material, insurance, and labor for water tap and utility connection for the proposed El Campito community garden within the City of South Bend, IN. Work to be performed shall include utility connection to the proposed community garden as specified in these documents. II. PREVAILING SPECIFCIATIONS AND CONSTRUCTION STANDARDS AND SPECIFICATIONS A. The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and CONSTRUCTION STANDARDS AND SPECIFICATIONS, most recent version, are to be used on this project. B. Each Quote provider is specifically instructed to become completely familiar with the most recent version of the PREVAILING SPECIFICATIONS and the CONSTRUCTION STANDARDS AND SPECIFICATIONS prior to submitting a quote. C. Wherever the PREVAILING SPECIFICATIONS refer to “State Specifications,” it shall mean the 2020 INDOT Standard Specifications for the letting effective after September 1, 2019. D. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS. E. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS, the SPECIAL PROVISIONS will govern. III. TERM “OR EQUAL” A. Prevailing Specifications: None B. Additions 1. Where the term "or equal" is used in these specifications, the Quote provider deviating from specified item shall file with his/her/its Quote a letter fully explaining and justifying his/her/its proposed article or equal. The City of South Bend shall be the sole judge in determining if the “or equal” offered meets the specification. IV. TAX EXEMPT A. Prevailing Specifications: None B. Additions 1. Materials and properties purchased under contract with the Owner that becomes a permanent part of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax). The exemption number will be furnished to the Contractor upon award. V. INDEMNIFICATION A. Prevailing Specifications: None B. Additions 1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents, officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees, and other expenses, arising from or out of the negligent performance of this Contract by Contractor, or because of arising out of any defect in the goods, materials or equipment supplied by the Quote provider. Version 2/14/2020 Page - 2 Public Works Quote VI. INSURANCE A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 103 B. Additions: 1. All Contractors and subcontractors doing business with the City of South Bend shall present a Certificate of Insurance showing coverage in the following minimum amount: a. General Liability: Premises-Completed Operations or Products, Bodily Injury and Property Damage Combined Single Limit - $5,000,000. b. There shall be no exclusion for explosion, collapse or underground hazard. c. Workmen’s Compensation: Statutory State of Indiana Employer's Liability - $100,000. d. Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000. e. The City of South Bend shall be named as additional insured on the Certificate of Insurance. VII. CONTROL OF WORK A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 105 B. Additions: 1. The complete responsibility for this project lies with the Director of Public Works of the City of South Bend, Indiana acting through his authorized representatives. 2. Construction Engineering - The Contractor shall provide all the necessary, qualified personnel, equipment and supplies to perform all work required under this item. There will be no direct payment for this item. 3. The contractor is responsible to maintain the site which includes but is not limited to; dust control, site security, erosion control, and protecting adjacent properties. 4. Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No work shall be permitted on weekends, Holidays, or after hours unless approved by the City of South Bend Department of Public Works. VIII. LEGAL RELATIONS A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 107 B. Additions: 1. The Owner, where mentioned in these documents, is the City of South Bend. The Engineer, where mentioned in these documents, is the City of South Bend Department of Public Works, Division of Engineering. 2. The Contractor shall apply for and obtain any and all required permits for the work from local, state, and federal agencies and shall comply with permit requirements, including the St. Joseph County / City of South Bend Building Department. 3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor shall provide the Owner with proof that the Contractor is duly licensed, qualified and registered with the Secretary of State of Indiana to engage in business within the State of Indiana. 4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner reserves the right to immediately terminate the public work project awarded should the Contractor be found to be in violation of any provision of Indiana Code 5-16-13 and such violation shall result in the forfeiture of Contractor’s performance bond to the Owner. Version 2/14/2020 Page - 3 Public Works Quote IX. PROSECUTION AND PROGRESS A. Prevailing Specifications: 2020, INDOT Standard Specifications Sec. 108 B. Additions: 1. The project will have a completion date of April 30, 2021. The contract time will start when the Notice to Proceed is delivered and signed. a. Contractor shall be responsible for coordinating work with City in anticipation of volunteer day at El Campito site. Work should tentatively take place the week of April 26th to provide for shortest possible temporary street closure time. Contractor shall be responsible for coordinating in advance with City Water Works to ensure that tap can be made during tentative work period. 2. The City, Engineer, and Contractor will hold a pre-construction meeting following award of the contract. The date of the Notice to Proceed will be agreed at that meeting. 3. Contractor shall provide a schedule to the Owner prior to beginning any work on the site. X. CHANGE OF CONTRACT TIME A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 108 B. Additions 1. The Contract Time may only be changed by Change Order. Any Claim for an extension in the Contract Time shall be based on written notice delivered to the Department of Public Works within seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent of the claim with supporting data shall be delivered within fourteen (14) calendar days after such occurrence unless an official of the Public Works Department allows an additional period of time to ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost to delays beyond the control of the Contractor if a claim is made in accordance with this provision. Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God. 2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An extension is granted for weather conditions significantly more severe than normal if the Contractor demonstrates to the satisfaction of the City that the delay in the progress of the work was due to such weather. The basis to define normal weather with be the data compiled by the United States Department of Commerce, National Oceanic and Atmospheric Administration (NOAA). 3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including fault or negligence of Contractor’s subcontractors, caused the delay, or for which any remedies are provided under any other provision of this agreement. 4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of any rights or remedies existing under this contract at law or in equity. XI. DEFAULT AND TERMINATION A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 108 B. Additions: 1. Events of Default shall include Contractor’s failure to perform any of its obligations under this contract including failure to commence work at the time specified, failure to perform the work in accordance with these specifications, unauthorized discontinuation of the work, failure to carry out the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or regulations, and failure to comply with any other term of this contract. 2. If an Event of Default occurs, the City shall provide Contractor written notice and may permit Contractor ten (10) calendar days after the date of the notice to cure the default. If the default is not cured within the ten (10) day cure period, the City may at any time thereafter terminate this contract in which case the termination shall be final and effective. 3. Upon an Event of Default, the City may invoke the following remedies in addition to those remedies provided under separate provisions of this contract, the right of set-off against any payments due or to become due to the Contractor against the retainage, the right to take over and complete the Work. If the City notifies Contractor that City is invoking its right to complete the Work, all rights that Version 2/14/2020 Page - 4 Public Works Quote the Contractor has in order under Contractor’s subcontracts are assigned to the City, subject to the City’s right to take assignment of all or only selected subcontracts at the City’s discretion. The sole obligation accepted by the City under such subcontracts is to pay for Work satisfactorily performed after the date of the assignment. In the event a conditional assignment has not been executed, the Contractor shall execute or cause to be executed any assignment, agreement, or other document that may be necessary in the sole opinion of legal counsel to the City’s Board of Public Works to evidence compliance with this provision. The Contractor shall promptly deliver such documents upon the City’s request. In the case of such assignment, unless otherwise agreed in writing, The Contractor remains liability to subcontractors for any payment already involved, and for any claim, suit or cause of action based upon or resulting from any error, omission, negligence or other breach of contract by the Contractor, its officers, employees, or agents arising prior to the date of assignment to the City. XII. LIQUIDATED DAMAGES A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 108 B. Additions: 1. The contractor shall proceed with the work at such rate of progress to insure full completion within the Contract Time. It is expressly understood and agreed, by and between the Contractor and the Owner, that the Contract Time for completion of the work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the work, and excludes the time for unavoidable delays which were beyond the control and without the fault of the Contractor. 2. If the Contractor shall fail to complete the work within the Contract Time, or extension of time granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages a sum of five hundred dollars ($500.00) for each calendar day that the Contractor shall remain in default after the time of completion stipulated in the Contract Documents. 3. The Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the work is due to the following and the Contractor has promptly given written notice of such delay to the Owner and Engineer/Architect. a. To any preference, priority, or allocation order duly issued by the Owner. b. To unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God, acts of public enemy, acts of the Owner, acts of another Contractor in the performance of a Contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather. XIII. RETAINAGE AND FINAL PAYMENT A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 109 B. Additions: 1. Payments will be made every thirty (30) calendar days 2. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of payments throughout the duration of the project. 3. Before final payment and retainage are released the Contractor must satisfy the following: a. All parts and labor meet requirements stated in the specifications. b. Provide copies of test reports or cut sheets on all materials supplied. c. Provide As-Built drawings in accordance with the City of South Bend Prevailing Specifications for Public Works. d. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final Waiver of Lien. Version 2/14/2020 Page - 5 Public Works Quote XIV. WARRANTY A. Prevailing Specifications: None B. Additions 1. All Parts shall include the following: a. Performance specifications b. Bill of Materials c. Warranties on all parts d. Installation and safety requirements XV. OTHER UTILITIES A. Prevailing Specifications: None B. Additions: 1. The Contractor shall verify the locations of all utilities by contacting Indiana811 by calling 811 (in Indiana) or 1-800-382-5544 (outside of Indiana), or via www.indiana811.org, at least two (2) working days, not counting Saturdays, Sundays or federal and state holidays before proceeding with construction. It shall also be the Contractor’s responsibility to contact any other utility that is not contacted by Indiana811 and verify the utility locations. 2. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone, etc. in order to assure that all utilities that need to be replaced or relocated can be done with a minimum disturbance to service. The Contractor shall also be responsible for coordinating schedules with the various utilities such that they can proceed with their relocation work as efficiently as possible. 3. If the odor of natural gas is detected in a work area at any time during the course of work, the Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also immediately notify the residents of adjacent properties. The Contractor shall advise the residents to evacuate their homes immediately if the odor is present within the dwelling. 4. Restoration of sprinkler systems damaged by the Contractor's operations shall be repaired by the Contractor at no additional cost to the City or the Owner of the system. XVI. MAINTENANCE OF TRAFFIC A. Prevailing Specifications: 2020, INDOT Standard Specifications Sections 105 & 801 B. Additions: 1. Maintenance of traffic during construction shall conform to the “Indiana Manual on Uniform Traffic Control Devices” and the City of South Bend Design and Construction Standards. 2. The attached “Traffic Closure Request” form is to be used for any lane restrictions or closures and required to be filled out and sent to the Department of Public Works 3. The Contractor shall arrange and prosecute the work specified for this contract in such a manner that traffic on existing streets is unrestricted throughout the Project. The Engineer shall approve the method of traffic control. No construction equipment, vehicles, materials, supplies or temporary facilities shall be left unattended in the right-of-way of any street or left parked overnight without proper marking and lighting. 4. After the award of the contract and before beginning the work, the Contractor shall submit his/her/its proposed schedule of operations for the review of the Engineer. The schedule of operations as reviewed by the Engineer shall be maintained at all times. 5. There will be no direct payment for this work. Version 2/14/2020 Page - 6 Public Works Quote XVII. DESCRIPTION OF WORK A. Prevailing Specifications: None B. Additions 1. Work to be performed shall include furnishing all labor, services, materials, insurance and equipment to complete water tap and utility connection for the proposed El Campito community garden within the City of South Bend. 2. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and their property from damage caused by the Contractor’s operations. XVIII. MOBILIZATION AND DEMOBILIZATION A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 110 B. Additions: 1. The payment of mobilization will be limited to the greater of 5% of the total contract cost and 50% of the lump sum cost of the contract item for mobilization and demobilization. The remainder of the payment for the item will be considered for demobilization and paid at the completion of the project. 2. Mobilization and Demobilization will be paid for under the lump sum item and price as set forth in the Proposal. XIX. BRICK PAVEMENT REMOVE AND PALLETIZE A. Prevailing Specifications: City of South Bend Construction Standards & Specifications, Standard 2-49 B. Additions: 1. All work shall be done according to City of South Bend Standard 2-49, see Appendix B. 2. Existing brick pavement shall be removed for a width 3 feet greater than the anticipated trench. Existing brick pavement to be restored shall be salvaged undamaged, palletized, and delivered to the South Bend Street Department (731 S Lafayette Blvd). The Contractor shall be responsible for ensuring the security of the salvaged brick during the period between removal and delivery. 3. Brick pavement shall be re-installed by others at a future date. 4. Payment shall be made at the Unit Price as specified in the Proposal as follows: Brick Pavement Remove and Palletize ……….SY XX. CONCRETE CURB AND GUTTER, REMOVE AND REPLACE A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 202, 605 B. Additions: 1. The pay item Concrete Curb and Gutter, Remove and Replace, shall include removing the full depth of existing curb and gutter, and installing new curb and gutter in accordance with the plans and special provisions herein. 2. Removal limits shall include all areas designated on the plans necessary for installation. Precise removal limits shall be coordinated with the City prior to starting work. The Contractor shall dispose of the removed concrete at an offsite disposal site properly licensed to receive such material. Removed material shall not be stockpiled at the work location. The cost of hauling of materials offsite shall not be paid for separately but included in the cost of concrete curb removal. The Contractor shall be responsible for preventing any removed materials from entering any storm drains. 3. Concrete or other items outside the removal limits damaged by the Contractor or any subcontractors during the removal process will be repaired or replaced to the satisfaction of the Engineer at no additional cost. 4. Saw cuts required for removal shall not be paid for separately, but included in the cost of the removal items. 5. The contractor shall minimize the area of disturbances not included in the plans. 6. The Contractor shall ensure that adequate drainage exists once new concrete curb and gutter are installed. The Contractor shall ensure that low spots do not exist and that water can flow to existing inlets similar to pre-existing conditions. 7. If tree roots are encountered and must be removed due to grades, the contractor shall contact a representative from the City of South Bend Engineering Division. Tree roots shall not be removed without the on-site approval of the Engineer. The cost of root removal shall not be paid for separately but shall be included on the cost of other items. 8. Payment shall be made at the Unit Price specified in the Proposal as follows: Concrete Curb and Gutter, Remove and Replace………………. LFT Version 2/14/2020 Page - 7 Public Works Quote XXI. CONCRETE SIDEWALK, REMOVE AND REPLACE A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 202, 605 B. Additions: 1. The pay item Concrete Sidewalk, Remove and Replace, shall include removing the full depth of existing sidewalk and installing new sidewalk in accordance with with the Americans with Disabilities Act (ADA) guidelines, the United States Access Board Public Right-Of-Way Accessibility Guidelines (PROWAG), the South Bend Construction Standards and Specifications, and the special provisions herein. 2. Removal limits shall include all areas designated on the plans necessary for installation. Precise removal limits shall be coordinated with the City prior to starting work. The Contractor shall dispose of the removed concrete at an offsite disposal site properly licensed to receive such material. Removed material shall not be stockpiled at the work location. The cost of hauling of materials offsite shall not be paid for separately but included in the cost of concrete curb removal. The Contractor shall be responsible for preventing any removed materials from entering any storm drains. 3. Concrete or other items outside the removal limits damaged by the Contractor or any subcontractors during the removal process will be repaired or replaced to the satisfaction of the Engineer at no additional cost. 4. Saw cuts required for removal shall not be paid for separately, but included in the cost of the removal items. 5. The contractor shall minimize the area of disturbances not included in the plans. 6. Cross slope for all concrete sidewalks shall be a maximum of 1.5%. 7. Contractor shall replace concrete sidewalks to the nearest existing joint. 8. Payment for joints and joint materials will not be paid for directly but shall be included in the cost of the concrete sidewalk. 9. Transverse control joints shall be placed at equal intervals at a maximum of 5 ft. 10. The use of slag or local aggregate will not be permitted. 11. The Contractor shall ensure that adequate drainage exists once new concrete sidewalks are installed. The Contractor shall ensure that low spots do not exist and that water can flow to existing inlets similar to pre-existing conditions. 12. If tree roots are encountered and must be removed due to grades, the contractor shall contact a representative from the City of South Bend Engineering Division. Tree roots shall not be removed without the on-site approval of the Engineer. The cost of root removal shall not be paid for separately but shall be included on the cost of other items. 13. Payment shall be made at the Unit Price specified in the Proposal as follows: Concrete Sidewalk, Remove and Replace………………. SY XXII. PARKING LANE AND CONCRETE HEADER, REMOVE AND REPLACE A. Prevailing Specifications: B. Additions 1. The pay item Parking Lane and Concrete Header, Remove and Replace, shall include removing the full depth of existing asphalt parking lane and concrete header, and installing new 6” concrete parking lane and concrete header in accordance with the plans and special provisions herein. 2. Removal limits shall include all areas designated on the plans necessary for installation. Precise removal limits shall be coordinated with the City prior to starting work. The Contractor shall dispose of the removed asphalt and concrete at an offsite disposal site properly licensed to receive such material. Removed material shall not be stockpiled at the work location. The cost of hauling of materials offsite shall not be paid for separately but included in the cost of concrete curb removal. The Contractor shall be responsible for preventing any removed materials from entering any storm drains. 3. Concrete or other items outside the removal limits damaged by the Contractor or any subcontractors during the removal process will be repaired or replaced to the satisfaction of the Engineer at no additional cost. 4. Saw cuts required for removal shall not be paid for separately, but included in the cost of the removal items. 5. The contractor shall minimize the area of disturbances not included in the plans. 6. The Contractor shall ensure that adequate drainage exists once new concrete parking lane and concrete header are installed. The Contractor shall ensure that low spots do not exist and that water can flow to existing inlets similar to pre-existing conditions. Version 2/14/2020 Page - 8 Public Works Quote 7. If tree roots are encountered and must be removed due to grades, the contractor shall contact a representative from the City of South Bend Engineering Division. Tree roots shall not be removed without the on-site approval of the Engineer. The cost of root removal shall not be paid for separately but shall be included on the cost of other items. 8. Payment shall be made at the Unit Price specified in the Proposal as follows: Parking Lane and Concrete Header, Remove and Replace………………. SY XXIII. WATER SERVICE, 2” TYPE K COPPER A. Prevailing Specifications: City of South Bend Standards, Section 5 Water Works B. Additions 1. Water service pipe and fittings shall be Type “K” Copper Pipe. 2. All curb valves and boxes will be located in the parking lane. 3. The service shall include the copper, corporation stop curb and valve. Curb box shall be provided by City. 4. The Contractor shall be responsible for coordination with South Bend Water Works and all tapping requirements per City of South Bend Standard 5-1, see Appendix B. 5. The cost of work for excavation, backfill, compact aggregate, compacting, leveling and grading shall not be paid separately but included in the cost of Water Service. All work shall be done according to City of South Bend Standard 2-49, see Appendix B. 6. Payment shall be made at the Unit Price as specified in the Proposal as follows: Water Service 1” Type K Copper ………. LFT XXIV. WATER METER PIT A. Prevailing Specifications: City of South Bend Standards, Section 5 Water Works B. Additions 1. Water Meter Pit shall be according to City of South Bend Standard 5-13, see Appendix B. 2. The pay item Water Meter Pit shall include all labor and materials to provide fully functional water meter pit with 48” casting, water meter, piping, valves and backflow preventor. Backflow preventor should include a vandal cover with padlock system. 3. Payment shall be made at the Unit Price specified in the Proposal as follows: Water Meter Pit………………. EA XXV. “B” BORROW (ALTERNATE) A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 211 B. Additions 1. The Contractor shall furnish all necessary equipment, labor, and materials to complete backfill of excavations with “B” Borrow material if excavated material is determined to be unsatisfactory for backfill by the Engineer. It is anticipated that native material will be acceptable for backfill. No topsoil or organic material will be allowed to be used as backfill. 2. The actual quantity of “B” Borrow completed and accepted will be measured for payment at the unit cost set forth in the proposal. 3. Payment shall be made at the Unit Price as specified in the Proposal as follows: “B” Borrow ………. CY XXVI. EXHIBITS A. Prevailing Specifications: City of South Bend CONSTRUCTION STANDARDS AND SPECIFICATIONS B. Additions: 1. The exhibits consist of 12 Sheets in total, including appendix fly sheets. 2. The work shall conform to the plans. 3. The drawings are schematic in nature. 4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. 5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. C. Appendices: 1. Appendix A – Displays showing new water service plan, as-builts, and reference photos (3 Sheets) 2. Appendix B – City of South Bend Standard Drawings 2-49, 5-1 – 5-3, and 5-13 (5 Sheets) 3. Appendix C – Traffic Control and Occupancy Request Form (1 Sheet) Version 2/14/2020 Page - 9 Public Works Quote CITY OF SOUTH BEND, INDIANA CONTRACTOR’S QUOTE FOR PUBLIC WORK PROJECT NAME: El Campito Water Tap Quote PROJECT NO. 121-017 QUOTES DUE March 9th, 2021 at 9:00am Local Time – electronic bids should be submitted to bpwbids@southbendin.gov (Must be completed for all quotes. Please type or print) Date: Firm: Address: City/State/Zip: Telephone Number: ( ) Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: the City of South Bend, Indiana, in accordance with plans and specifications prepared by: The City of South Bend, Department of Public Works and dated for the sum of (enter the Total Quote as shown on the Proposal) ($ ) (Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. ACCEPTANCE The above quote is accepted this day of 20 Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President , Member Gary A. Gilot, Member Jordan V. Gathers, Member Joseph R. Molnar, Member Attest: Anne Fuchs, Clerk By (Signature) (Printed Name of Person Signing) Version 2/14/2020 Page - 10 Public Works Quote When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF ___________ ) ) SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, “Iran” means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time-to-time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time-to-time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized Version 2/14/2020 Page - 11 Public Works Quote alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor’s newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor’s documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor’s good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business (“MBE”) or as a Women’s Business Enterprise (“WBE”) as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16- 8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel Version 2/14/2020 Page - 12 Public Works Quote products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. *** I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this day of , 20__ Contractor/Bidder (Firm) Signature of Contractor/Bidder or Its Agent Printed Name and Title Subscribed and sworn to before me this day of , 20 My Commission Expires Notary Public County of Residence Version 2/14/2020 Page - 13 Public Works Quote QUOTE/PROPOSAL CITY OF SOUTH BEND PROJECT NAME El Campito Water Tap Quote PROJECT NO. 121-017 QUOTES DUE March 9th, 2021 at 9:00am Local Time – electronic bids should be submitted to bpwbids@southbendin.gov Base Quote Item No. Description Quantity Unit Unit Price Total Amount 1 Mobilization/Demobilization 1 LS $ 3 Brick Pavement, Remove and Palletize 10 SY 4 Concrete Curb and Gutter, Remove and Replace 8 LFT 5 Concrete Sidewalk, Remove and Replace 5 SY 6 Parking Lane and Concrete Header, Remove and Replace 8 SY 7 Water Service, 2” Type K Copper 30 LFT 8 Water Meter Pit 1 EA Total Amount of Quote $ Alternate 1 1 “B” Borrow 30 CY Firm: Address: City/State/Zip: Telephone Number: ( ) Fax Number: ( ) By (Signature) (Printed Name of Person Signing) Appendix A 121-017 El Campito Water Tap Quote El Campito Water Tap QuoteNew Water Service PlanDisplay 1 / 3 01/28/2021 121-017City of South BendDept. of Public Works227 W Jefferson Blvd. #1316South Bend, IN 46601Phone: (574) 235-9251Fax: (574) 235-9171LAUREL STTHOMAS ST 1011 1009 220 218 222 225 1005 919 916 6 inch 4 inch St Joseph County, Esri, HERE, Garmin, INCREMENT P, USGS, EPA, USDA Legend NewWaterTap NewCurbStop NewMeterPit NewBackflowPreventor Water MainLineValve Water Hydrant Valve Water Stop Box Water Hydrant Water LateralLine +/-80 ftEl Camipto Site Approximate Excavation El Campito Water Tap Quote Water As-BuiltsDisplay 2 / 301/28/2021121-017City of South Bend Dept. of Public Works 227 W Jefferson Blvd. #1316 South Bend, IN 46601 Phone: (574) 235-9251 Fax: (574) 235-9171 El Campito Water Tap Quote Reference PhotosDisplay 3 / 301/28/2021121-017City of South Bend Dept. of Public Works 227 W Jefferson Blvd. #1316 South Bend, IN 46601 Phone: (574) 235-9251 Fax: (574) 235-9171 Appendix B 121-017 El Campito Water Tap Quote GENERAL NOTES: 1. Temporary Patch: If it is not possible, due to weather conditions, for the contractor to replace the pavement within 24 hours following backfilling of cut, a coarse aggregate base 8" thick and a cold asphaltic surface of 4" shall be applied and maintained as a temporary patch until permanent repairs can be made. When temperature falls below 50°F within 72 hour cure time, concrete to be used shall be 7 bag w/ 2% accelerator. Such temporary patches shall be replaced with permanent repairs no later than May 1 of the following year. 2. All utilities must be located prior to making pavement cut. BRICK PAVER PREPARATION: 1. Remove organic, unstable or unconsolidated material from site. Verify conformance of subgrade preparation, compacted density and elevations to specified requirements. 2. Clean and re-use existing street brick pavers removed during site demolition. Remaining pavers not used will be returned to the city. Backfill Brick Pavements Shall be Removed for a Width 3 ft. Greater Than the Anticipated Trench and Restored Upon Completion Trench Cut3'3'12"Compacted #53 Base Course, 12" min. Compacted Sand Setting Bed 1" min. Street Pavers 1"Slopes as per Trenching Safety Policy 29 CFR 1926, Subpart P - Excavation & Trenching Trench Cut Max. 24" Wider Than O.D. of Utility See Section 3 for Bedding and Backfill Requirements 6/26/18 CITY OF SOUTH BEND Item Revision Approved Date STANDARD EFFECTIVE DATE: REF STD SPEC SEC APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS STANDARDS FOR DESIGN AND CONSTRUCTION Kara M. Boyles, Ph.D., P.E. Date PAVEMENT PATCHING AND UTILITY CUTS - BRICK 2-49 2-6 June 26, 2018 SECTION 2 - STREETS AND PATHS 1" AND 2" TAP * 1" Tap Shall be Level to 45° up * 2" Taps Shall be Level * Depth Shall be 1' Below Main (at Main) * Tap Shall be a Min. 1' Laterally From Other Taps or Joints * 1' Below Water Main * 1' Behind Water Main * 5' Wide Excavation * 5' in Front of Water Main 4" TO 12" TAP * Tap Shall be Level * Depth Shall be 2' Below Main (at Main) * Tap Shall be a Min. 2' Laterally From Other Taps or Joints * Install Tap in Middle of Excavation * 2' Below Water Main * 4' Behind Water Main * 8' Wide Excavation * 8' in Front of Water Main Back Front 8'4'8'12'+ OverallPipe Dia. TOP VIEW SIDE VIEW 12' + Overall 4'8' Front Pipe Dia.2'Sloping to 1.5 x Depth TOP VIEW SIDE VIEW 6' + Overall 1'5' Front Pipe Dia.1'Sloping to 1.5 x Depth Back Front 5'1'5'6'+ OverallPipe Dia. 1 1.5 1" AND 2" TAP EXCAVATION 4" TO 12" TAP EXCAVATION NOTE: Shown are minimum excavations required - sheeting and shielding or sloping to 1.5 x depth is also needed. 1 1.5 SOUTH BEND WATER WORKS TAPPING REQUIREMENTS: 1. Call 811 or (800) 382-5544 for utility locates a minimum of 48 hours prior to excavation. 2. The plumber or contractor must obtain all permits required by the City Engineering Department. (excavation, street cuts, and sidewalk permits) 3. Call Engineering Department (574) 235-9251 a minimum of 48 hours prior to excavation and street closure. 4. Call City Water Works Department at (574) 235-9279 for tap fee requirements. The tap fee is to be paid to the Water Works Engineering Department, 830 N Michigan St. 5. Schedule taps through Field Operations number at (574) 235-9464. 6. Excavate, expose and clean water main for tap. 7. Material supplied by South Bend Water Works: 2" and smaller - corporation stop, curb stop and stop box 4" and larger - tapping sleeve and valve, roadway/valve box 8. All excavations must meet O.S.H.A. excavation standards. 9. Contractor shall provide all sheeting and shielding. 10. Domestic branches off of fire lines are strictly prohibited. 11. Any abandoned service lines within the property frontage of the new tap shall be disconnected at the water main by the contractor during the tap excavation. This applies to services at the same address as well as any other connections.6/26/18 CITY OF SOUTH BENDItemRevision STANDARD EFFECTIVE DATE: REF STD SPEC SEC APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS STANDARDS FOR DESIGN AND CONSTRUCTION Kara M. Boyles, Ph.D., P.E. Date TAPPING REQUIREMENTS 5-1 5-2.5(e) and 5-2.5(g) June 26, 2018 SECTION 5 - WATER WORKS NOTES: 1. Tapping valves shall be Clow, Mueller, or approved equal. 2. The physical tapping of the existing water main shall be performed by the city's utility distribution department. All excavation and preparation work shall be performed by the contractor, and the contractor shall provide all materials. The utility will only perform the physical tap. Contractor shall coordinate with the Water Department. Tapping Valve New Main H304 Stainless Steel Tapping Sleeve Ex. Main TAP MADE UNDER PRESSURE (WET TAP) CONNECTING NEW MAIN TO EXISTING MAIN Flanged JointRestrain With Wedge Action Restraints 6/26/18 CITY OF SOUTH BENDItemRevision STANDARD EFFECTIVE DATE: REF STD SPEC SEC APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS STANDARDS FOR DESIGN AND CONSTRUCTION Kara M. Boyles, Ph.D., P.E. Date TAPPING SLEEVE AND VALVE 5-2 5-2.5(e) June 26, 2018 SECTION 5 - WATER WORKS Service Shut-Off Box (See Note 1) (Tyler 95E or Approved Equal) 1" Type "K" Service Pipe to Establishment 1" Compression Curb Stop (Ball Valve) Brick 1" Type "K" Copper Service (Perpendicular to Main) Ball Type Corporation Stop (1" CC Threads X 1" Copper Compression or Approved Equal) Water Main For 1" & 2" Services, a Twin Strap Nylon or Epoxy Coated Saddle is Required 60" Minimum - 72" MaximumCast Iron Access Cap (4" - 2 Hole) Finish Ground (See N o t e 2 ) Shut-Off Box Rod 45° NOTES: 1. Service shut-off box shall be placed in the public right-of-way in grass between curb and sidewalk. 2. For a 2" service the corporation stop shall be located at 90° (level).6/26/18 CITY OF SOUTH BENDItemRevision STANDARD EFFECTIVE DATE: REF STD SPEC SEC APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS STANDARDS FOR DESIGN AND CONSTRUCTION Kara M. Boyles, Ph.D., P.E. Date TYPICAL WATER SERVICE CONNECTION 5-3 5-2.1 and 5-2.5(g) June 26, 2018 SECTION 5 - WATER WORKS Light Duty Cast Iron Frame and Cover (See Note 3)Grade Inlet Ball Valve Outlet Ball Valve 1", 1 1 2", or 2" Meter Direction of Flow 12" Min.36" Max.4'-0" (Square or Circular) 4"4" 1" Holes for Drainage 6'-0" Min.6"Min.6"Precast Conc. Base Gravel (INDOT No. 8) Core Holes for Piping (Typ.) (See Note 2) Precast Conc. 6" Min. 6" Min.6"Min.Link Seal (Typ.) or Approved Equal Type "K" Copper Pipe NOTES: 1. Precast Conc. structure shall be manufactured and installed in compliance with ASTM C-478 (round str.) or ASTM C-913 (rectangular/square str.) 2. The cored opening shall be large enough to allow passage of the pipe flange. 3. Lid shall have the word "WATER" cast into it. If placed in a paved area, casting shall be heavy duty. SECTION VIEW Curb Stop Valve and Box Street Sidewalk 1", 1 1 2", or 2" Meter Inlet Ball Valve Outlet Ball ValveCurb Stop Valve and Box Direction of Flow PLAN VIEW 2'-0"10" Clearance (Typ.) 24" Min. Clearance 6/26/18 CITY OF SOUTH BENDItemRevision STANDARD EFFECTIVE DATE: REF STD SPEC SEC APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS STANDARDS FOR DESIGN AND CONSTRUCTION Kara M. Boyles, Ph.D., P.E. Date METER PIT SPECS. FOR 1", 1 1/2", AND 2" METERS 5-13 5-2.7 June 26, 2018 SECTION 5 - WATER WORKS Appendix C 121-017 El Campito Water Tap Quote Version 3.1 [10/24/2017] **SUBMIT 5 WORKING DAYS MINIMUM PRIOR TO PROJECT START DATE Parking Lane Travel Lane Full Road Closure Alley Submission Date: Applicant/Company: Email Address: Phone #: Project STREET ADDRESS (eg: 110 W. Smith RD.): Project Location (Block limits/Streets From and To): Requested Start & End Dates:Requested Start & End Times: Contractor Performing Work: On-Site Contact: Phone #: Reason for Closure: Affected Customers:ATTACH THE FOLLOWING ITEMS: 1. Traffic Control Plan 2.Detour Plan 3. Barricades, Signs, or Flashers Placement ENGINEERING OFFICE USE ONLY: Approved Approved as Noted Revise Not Approved Comments: ____________________________________________________________________________ _________________________________________________________________________________________ City of South Bend/Engineering Division Authorized Signature Date: SOUTH BEND,INDIANA 46601 TDD 574/ 235-5567 Reason for Closure: City of South Bend Public Works Engineering Division 4227 W. Jefferson, County City Building 1316 South Bend, IN 46601-1830 PLAN YOUR START DATE ACCORDINGLY TO AVOID DELAYS Complete 1 - 5 Incomplete Submittals Cannot Be Processed (Refer to MUTCD for Traffic Control Device Requirements) Failure to use traffic control for traffic restrictions or closures will result in stop work orders and/or delay in permitting. Office Cell Name: Office Cell Excavation/Boring? > Requires Excavation Form Construction? > Requires Curb Cut application or sidewalk permit 1 2 3 4 5 Affected Customers: ~ Contractors are responsible for resolving safety issues and access concerns with affected customers ~ Phone: 574.235.9251 Email: dhanson@southbendin.gov TRAFFIC CONTROL AND OCCUPANCY REQUEST Sidewalk Closure THIS OCCUPANCY PERMIT REQUEST IS NON-TRANSFERABLE AND A SIGNATURE SUBJECTS THE NAMED CONTRACTOR/PERMITTEE TO ALL APPLICABLE RULES, DUTIES AND OBLIGATIONS IMPOSED BY THE CITY OF SOUTH BEND MUNICIPAL CODE AND TO ALL REGULATIONS IMPOSED BY THE SOUTH BEND BOARD OF PUBLIC WORKS. Applicant Signature _______________________________ Date ________________ BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 02/17/2021 Name Alicia Pellegrino Department Engineering BPW Date 03/09/2021 Phone Extension 5903 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name TBD New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name El Campito Water Tap Quote Project Number 121-017 Funding Source West Washington TIF Account No. 422-10-102-121-431000—PROJ00000233 Amount Terms of Contract Purpose/Description For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: