RE: Change Order No. 2 — River Walk from Beyer St. to Notre Dame Boathouse
Project No. 117-083
Dear Mr. Hilary:
At its February 23, 2021 meeting, the Board of Public Works approved the above
referenced Change Order for an increase of $41,591.85 with an additional thirty-two (32) days,
bringing the revised contract amount to $3,266,472.07 with a new completion date of January 1,
2021.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-9251.
Enclosures
AF/lh
Sincerely,
Is/Anne Fuchs
Arne Fuchs, Clerk
ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR
Project Number:
,�yOUIH"e4;v
180
117-083A
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
Project Name:
River Walk from Beyer Street to Howard Park Change Order #: 2
_
DATE INITIATED: 8/15/2020 BPW DATE: 12/17/2020
Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.).
Various added items including bank stabilization for a failing section of the existing river wall,
temporary fencing to allow for pedestrian sidewalk use, landscaping for a more proper drainage a
park/trail transition, electrical circuit tie-in adjustments, and additional sidewalk fixes due to existing
undermining in certain areas (including minimal brush clearing). See attached breakdown.
Attachments: (List documents support change — required)
See attached price breakdown and descriptions
Amount of Dlncrease / El Decrease: $ 41 ,591.85
Previously approved Change Order(s): $
25,880.22
Current Percent of Change:
1.29
New Total Amount: $ 3,266,472.07
Total Percent of Change: 2.11
Funding Secured From:
(filled out by PM)
RECOMMENDED BY:
Dan Jones
Project Inspector (Print Name)
REVIEWED BY:
PO-0001785
Toy Villa
Construction Manager (Print Name)
APPROVED BY:
Scott Kreeger
Engineering Project Manager (Print Name)
APPROVED BY:
Kara Boyles
City Engineer (Print Name)
Categories (Pick One):
� Scope of Work
0 Differing Site Conditions, Changed Conditions
% Conflicted Specifications and Drawings
❑ Failed Materials
❑ Error
❑ Omission
❑ Final Quantity Adjustment
171
G�
(Signature)
/b ld&
(Signatu )
(Signature)
(Signature)
12-10-20
(Date)
12/10/2020
(Date)
12/10/2020
(Date)
12/10/2020
(Date)
CITY OF SOUTH BEND, INDIANA
DEPARTMENT OF PUBLIC WORKS
PROJECT CHANGE ORDER
DATE:
PROJECT NO:
PROJECT NAME:
CONTRACT DATE:
CHANGE ORDER NO:
SUBJECT OF CHANGE ORDER
1/12/2021
117-083A
River Walk from Beyer Street to Howard Park
1 /28/2020
2
vnHp.,
llc�
PCR #7-Bank Stabilization PCR #8-Temporary Fence PCR #9-
Additional Restoration PCR #10-Electrical Tie-in & Foundation PCR
#11-Added Sidewalk Replacement PCR #12-Added Brush Removal
The original contract sum
Net change by previously authorized change orders
The contract sum prior to this change order
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion date/time
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
CONTRACTOR
Contractor Signature
Printed Name and Title
Walsh Kelly Inc. _
Company Name
24358 State Road 23
Address
South Bend, IN 46614
City, State, Zip
$ 3,199,000.00
$ 25,880.22
FRI $ _ 3,224,880.22
Increased
Decreased $ 41,591.85
$ 3,266,472.07
1.29 %
2.11 %
11 /30/2020
32 days
0 days
1 /1 /2021
RECOMMENDED FOR APPROVAL
CONS1tRUCTION MANAGER
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
Approved Date: February 23, 2021
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Garry AA.�Gilot,, Member
Attest: Anne Fuchs, Clerk
Jordan V. Gathers, Member
��
Joseph R. Molnar, Member
Riverwalk Change Order #2 Breakdown
Item
Description
Cost
Will not appear on BPW Breakdown
Bank Stabilization
Stabilization of a failing section of riverwall to prevent future failure and erosion
issues
$ 19,459.88
Self-explanatory
Temporary Fence
Add a safetyfence along the newly constructed sidewalk until the permanent
$ 4,375.00
Self-explanatory
railing is installed so it can be opened to public immediately
Additional Restoration
Additional landscaping was needed to adjust drainage grades and tie in the
5 5,153.12
"OriEinal $7,155.03; Deducted $2,001 41 for
protect limit into Howard Park aesthat;cally
overpaymcn!s from vrevious pay app items
Electrical Tie-in &Foundation
Tie-in point per the plans was non-existant; added conduit and wiring was
$ 8,449.40
*These are covering various other overruns
needed to tie-in lights to other circuits
throughout the project; I want to save the term
'overruns/underruns' for a final CO If needed.
Added Sidewalk Replacement
Undermined sidewalk was re laced to allow for proper public safety
$ 3,552.00
Added Brush Removal
Additional tree/brush removal was needed to proceed with work
$ 602.45
Total CO Add = $ 41,591.85
120ON CouNTY-CITY BUILDING
227 W. JEFFERSON BLvD.
SOUTH BEND, INDLANA 46601-1830
CITY OF SOUTH BEND, IN
JAMES MUELLER, MAYOR
PHONE 574.235.9216
FAx 574.235.9928
DEPARTMENT OF ADMINISTRATION AND FINANCE
FROM: Dan Parker, City Controller
Date: January 5, 2021
RE: 2020 Year -End Purchase Order Rollover
Part of the City's year-end process includes rolling forward purchase orders that were created in the prior year
and need to be maintained in the new year. This process is in accordance with Supplement 106 and Supplement
406.
When the City tested the purchase order rollover in the DFO TEST Environment to roll 2020 purchase orders to
2021, a number of PO's (41 in total) were not rolled forward correctly and which had a variance between the
actual encumbrance remaining on the PO and the encumbrance that was rolled forward in DFO's BRE. In
investigating this issue with Crowe, it was discovered that these PO's (all of which were partially invoiced) had a
variety of issues related to how invoices were posted against the PO's. Crowe engaged with Microsoft in an
attempt to solve the issue. However, due to time constraints and the need to reopen purchasing and accounts
payable for 2021, the City elected not to wait for Microsoft's solution and instead to simply liquidate the
problematic PO's and recreate them as new, standalone PO's. This ensured that budget was brought forward
correctly, and that these new PO's were available for future invoicing.
The table below crosswalks the old PO number to the new PO number:
Old PO#
New PO #
Vendor
Vendor Name
Amount
Remaining
on PO
PO-0000071
PO-0006572
V-00001639
SYSTEMS & SOFTWARE
174,858.19
PO-0000100
PO-0006573
V-00001309
PLEWS SHADLEY RACHER & BRAUN
2,241.11
PO-0000187
PO-0006574
V-00000161
AUNALYTICS INC
10,930.00
PO-0000233
PO-0006575
V-00001417
RITSCHARD BROS INC
19,065.00
PO-0000292
PO-0006576
V-00001383
RECAST CITY LLC
4,800.00
PO-0000524
PO-0006577
V-00001059
MAY OBERFELL & LORBER
4,532.12
PO-0000542
PO-0006578
V-00000161
AUNALYTICS INC
1,661.09
PO-0000555
PO-0006579
V-00001933
WETZEL LYNN
3,346.13
PO-0001108
PO-0006580
V-00001604
STEINER AARON
45,205.33
PO-0001691
PO-0006581
V-00003099
SOUTH BEND WATERWORKS
2,630.27
PO-0001988
PO-0006582
V-00003262
Ahmed Makki
37,113.55
PO-0003246
PO-0006583
V-00000153
AT&T
2,737.44
Old PO#
New PO #
Vendor
Vendor Name
Amount
Remaining
on PO
PO-0003442
PO-0006584
V-00000937
KEMIRA WATER SOLUTIONS INC
11,848.64
PO-0004319
PO-0006585
V-00003680
GOVERNMENT FINANCE O
43,000.00
PO-0004330
PO-0006586
V-00000526
ENFOCUS INC
182,228.00
PO-0005199
PO-0006587
V-00001553
SOUTH BEND TRIBUNE
485.80
PO-0000075
PO-0006590
V-00001048
MARTELL ELECTRIC
906,533.17
PO-0000108
PO-0006591
V-00000296
CARDNOINC
10,580.00
PO-0000173
PO-0006592
V-00000019
ABONMARCHE CONSULTANTS OF IN
1,046.00
PO-0000208
PO-0006593
V-00000665
GIBSON LEWIS LLC
86,149.55
PO-0000270
PO-0006594
V-00001789
WALSH & KELLY INC
33,810.05
PO-0000303
PO-0006595
V-00001471
SELGE CONSTRUCTION CO INC
15,335.50
PO-0000375
PO-0006596
V-00000472
DLZ INDIANA LLC
16,107.50
PO-0000438
PO-0006597
V-00000750
HIGH CONCRETE GROUP LLC
356,324.00
PO-0000525
PO-0006598
V-00001222
NORTHERN INDIANA CONSTRUCTION
75,109.96
PO-0000601
PO-0006599
V-00001905
JUSTICE TRAX INC
29,432.99
PO-0000617
PO-0006600
V-00000019
ABONMARCHE CONSULTANTS OF IN
45,350.00
PO-0001014
PO-0006601
V-00000822
INDIANA EARTH
153,496.48
PO-0001777
PO-0006602
V-00000982
LAWSON-FISHER ASSOCIATES
64,935.35
PO-0001779
PO-0006603
V-00001411
RIETH RILEY CONSTRUCTION
69,076.55
PO-0001785
PO-0006604
V-00001789
WALSH & KELLY INC
346,745.78
PO-0001786
PO-0006605
V-00001789
WALSH & KELLY INC
64,616.62
PO-0001787
PO-0006606
V-00001518
SMITHGROUP INC
121,790.91
PO-0001792
PO-0006607
V-00000975
LARSON DANIELSON CONSTRUCTION CO
13,010.44
PO-0002110
PO-0006608
V-00001038
MAJORITY BUILDERS INC
99,872.94
PO-0002678
PO-0006609
V-00003633
Victor A Butcher
85,257.55
PO-0002743
PO-0006610
V-00000443
DC BYERS COMPANY
14,247.50
PO-0003063
PO-0006611
V-00000048
AIDS MINISTRIES AIDS ASSIST
19,246.34
PO-0003148
PO-0006612
V-00001381
REAL SERVICES OF ST JOSEPH COUNTY
213,433.51
PO-0003263
PO-0006613
V-00001589
ST VINCENT DEPAUL SOCIETY
291,759.61
PO-0005019
PO-0006614
V-00001513
SLATILE ROOFING & SHEET METAL
70,528.00
Page 2 of 2
City of South Bend
Department of Administration & Finance
Change Order Request Form
Changing the line amount:
You can only change a line amount if it has NOT been invoiced against.
• If the line has NOT been invoiced — reduce the line amount to equal what it should be.
• If the line has been invoiced — cancel the delivery remainder and finalize the individual line, then add a new line for the
amount that should be remaining.
Multiple PO lines:
If you have changes to more than two lines on the same PO, fill out a separate section for each line affected by the change
order.
Project POs:
For change orders on project -related POs, this form must be approved by the Project Accounting Team as described in
Supplement 508.
PO Number
6604
Line Number
4
Original Dollar Amount
$25,880.22
New Dollar Amount
For liquidation request, enter $0
$32,947.07
Reason Code if changed)
Financial Dimensions (fund-dept-
division -subdivision -main account
471-11-206-282-444000
Project Code if applicable)
Proj-0072
Description of change (include
bud et impact)
Change order #2 for the additional bank stabilization and temporary fencing along the
project limits.
APPROVED BY PROJECT
ACCOUNTING TEAM (if applicable)
Ron O'Connor 2-5-2021
PO Number
6604
Line Number
5
Original Dollar Amount
$0.00
New Dollar Amount
For liquidation request, enter $0
$34,525.00
Reason Code if changed)
SV
Financial Dimensions (fund-dept-
division -subdivision -main account
251-06-600-506-442001
Project Code if applicable)
Proj-0072
Description of change (include
budget impact)
Change order #2 for the additional bank stabilization and temporary fencing along the
project limits.
APPROVED BY PROJECT
ACCOUNTING TEAM (if applicable)
Ron O'Connor 2-5-2021
PO Number
Line Number
Original Dollar Amount
2021 02 February 5 PO 6604 Walsh Kelly VPA Change Order Request Form 1 of 3
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date January 7, 2021
Department Public
Name Scott
BPW Date February 23, 2021 Phone Extension 9245
Required Prior to Submittal to Board
BPW Attorney ❑ Attorney Name Clara McDaniels
Dept. Attorney ❑ Attorney Name
Purchasing ❑ Michael Schmidt
Check the Appropriate Item Type — Required. for All Submissions
❑ Professional Services Agreement ❑ Contract ❑ Proposal
❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA
❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes
❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA
® Chg. Order, No. 2 ❑ Traffic Control ❑ Resolution
n Other: n Ease./Encroach
Company or Vendor Name Walsh &
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Information
U YesU If Yes, Approved by Purchasing
® No
❑❑ WBE Completed E-Verify Form Attached ❑❑ Yes
No
River walk from Beyer Street to ND Boathouse
117-083
TIF — River East Development
$41,591.85
LS
Purpose/Description Additional bank stabilization alongeisting river wall, temporM
fencing for pedestrian sidewalk, electrical circuit tie-in adjustments, and
sidewalk repairs.
Amount of ® Increase $ 41,591.85
❑ Decrease ($ )
Previous Amount $ 3,224,880.22
Increase 1.29%
Current Percent of Change:
New Amount
Total Percent of Change:
Time Extension Amount:
New Completion Date:
Decrease %
$ 3,266,472.07
Increase 2.11 %
Decrease ( %