Loading...
HomeMy WebLinkAboutWater Extension Agreement - Outlines Terms for PW Main Extension at Bracken Fern & Title Sheet – Four Horsemen Ventures, LLC  ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS February 23, 2021 Mr. Matthew Salamone Four Horsemen Ventures, LLC 1533 Skippack Pike Blue Bell, PA 19422 Fourhorsemenventures@gmail.com RE: Belle Terre Water Extension Agreement Dear Mr. Salamone: At its February 23, 2021 meeting, the Board of Public Works approved the above referenced agreement which outlines the terms for the public sewer and water main extension at Bracken Fern Court. Enclosed please find a copy of the agreement for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, /s/ Anne Fuchs Anne Fuchs, Clerk Enclosures AF/lh 23rd. February , 2021 EXHIBIT A DEDICATED IMPROVEMENTS CITY OF SOUTH BEND, INDIANA PREVAILING SPECIFICATIONS LATEST EDITION,TO BE USED WITH THESE PLANS.RECOMMENDATIONS OF CITY STAFFPLANS PREPARED BY:PLANS PREPARED FOR:BOARD OF PUBLIC WORKSTABLE OF CONTENTSSTANDARD DRAWINGSPROJECTSEWERWATERTRAFFICSTREETOTHERFEBRUARY, 2021SHEETS1 OF 17PROJECTLOCATIONxx2/10/212/10/2102/10/20202/16/2021 X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X XXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXUG UGUGUGUGUGUGOHE OHE OHE OHEOHEOHEOHEOHEOHESTORM STORM WV WV WV WV OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE XXXXXXXXXSTORM STORM STORM OHEOHE0 SCALE 1" =30' 30' 60' 90' UT UT CTV CTV UG UG OHE OHE W WX XUGE UGE FO FO FO C EV E BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date February 15, 2021 Name Kyle Silveus Department Engineering BPW Date February 23, 2021 Phone Extension Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Clara McDaniels Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type –Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Agreement Ease./Encroach Required Information Company or Vendor Name Four Horsemen Ventures, LLC New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Belle Terre Water Extension Agreement Project Number DP19-049 Funding Source N/A Account No. N/A Amount N/A Terms of Contract Purpose/Description Outlines the terms for a public water main extension in Bracken Fern Court. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % (%) New Amount $ Total Percent of Change: Increase Decrease % (%) Time Extension Amount: New Completion Date: X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X XXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXSTORM STORM WV WV WV WV XXXXXXXXXSTORM STORM STORM 0 SCALE 1" =30' 30'60'90' UT UT CTV CTV UG UG OHE OHE W WX XUGE UGE FO FO FO C EV E TYPICAL BRACKEN FERN CROSS SECTION X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X XXXXXXX X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXSTORM STORM WV WV WV WV XXXXXXSTORM STORM STORM SB2 SB1 SB3 0.00 AC IN 0.00 ACIN0.00 ACIN0 SCALE 1" =40' 40'80'120' UT UT CTV CTV UG UG OHE OHE W WX XUGE UGE FO FO FO C EV E LEGAL DESCRIPTION: “” “” “” “” CURB TRANSITION DETAIL X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X XXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXSTORM STORM WV WV WV WV OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE XXXXXXXXXW W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWW STORM STORM STORM UGUG UG UG UG UG UGSAN SANSANSANSANSANSANSANSANSANSANSANSANSANWWWWWWWV WV WV WV W W W W W W W W W W W W WWWWWVUGUGUGUGSAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SANSANSANSANSAN SAN SAN SAN WWWWW0 SCALE 1" =30' 30'60'90' UT UT CTV CTV UG UG OHE OHE W WX XUGE UGE FO FO FO C EV E · · · · 725 730 735 720 725 730 735 720 725 730 735 720 725 730 735 720 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXUG UG UG UG UG UGSAN SANSANSANSANSANSANSANSANSANSANSANSANWV WV WV WV W W W W W W W W W W W W WWWUGUGUGSAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SANSANWWUGUGUGUGSAN SAN SAN WWWVWVWWWWWV UG SANSANSANSANSANW W W W W 0 SCALE 1" =40' 40'80'120' 725 730 735 720 725 730 735 720 XXX X X X X X X X X X X X X X X X X X OHEOHEOHEWWWWSAN WVWSANSANSAN SAN SAN SAN SAN0 SCALE 1" =30' 30'60'90' UT UT CTV CTV UG UG OHE OHE W WX XUGE UGE FO FO FO C EV E ”” X X X X X X X X XXXXXWSTORM STORM STORM STORM STORM STORM STORM WV WV WV WV WVWV WV WV OHE OHE OHE OHE OHE W W W W W W W W W WWWWWWWWWWW OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHEOHE W W W WW W W W W W W W SANSANSAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN 725 730 735 740 725 730 735 740 745 750 745 750 W W W W W W W W W W W 720720 W W W W W W W W W W W 715 715 0 SCALE 1" =40' 40'80'120' UT UT CTV CTV UG UG OHE OHE W WX XUGE UGE FO FO FO C EV E 10" AN ALLOWABLE "W" OF 30" WILL BE PERMITTED WHERE DEPTH OF CUT EXCEEDS 12 FT. AND EXTRA STRENGTH PIPE IS SPECIFIED. FLEXIBLE PIPE MINIMUM OF 4" OF CLASS I, II, OR III TYPE MATERIAL. PIPE SHALL BE BEDDED ON A BE IN FIRM CONTACT WITH BARREL OF THE PIPE SHOULD THE LOWER 90 ARC OF THE UNDISTURBED EARTH. MAXIMUM WIDTH "W"15" 12" THESE SHOULD BE NO LARGER THAN NECESSARY TO SMALL EXCAVATIONS SHOULD BE MADE FOR THE BELLS. CLEAR THE BELL. 35" 24" 30" ALLOWABLE MAXIMUM WIDTH OF TRENCH AT TOP OF PIPE GRADE PIPE DIAM. 6" & SMALLER 8" "W" 18" 24" BACKFILL - IN STREETS, ALLEYS, OR PAVED AREAS: 6" LAYERS, SOLIDLY TAMPED TO SUB-GRADE OF STREET BASE. BACKFILL SHALL BE COMPACTED TO A MINIMUM OF 98% OF M.D.D. AS DETERMINED BY MODIFIED PROCTOR TEST. BACKFILL - IN EASEMENT OR OPEN AREAS: 18" LAYERS SOLIDLY TAMPED-IN-PLACE. HAND BACKFILLED & HAND COMPACTED-IN-PLACE, GRANULAR MATERIAL, CLASS 1 OR 2 HAND BACKFILLED & HAND COMPACTED-IN-PLACE, GRANULAR MATERIAL, CLASS 1 OR 2 RIGID PIPE PIPE SHALL BE BEDDED FIRMLY ON UNDISTURBED GROUND. EXCAVATE FOR BELLS. NO WEIGHT SHALL BE SUPPORTED BY THE BELLS. (SEE DETAIL AT RIGHT.) RIGID PIPE DETAIL MECHANICALLY TAMPED IN 4" LAYERS USING SUITABLE, GRANULAR, EXCAVATION MATERIAL, CLASS 1-3 OUTLET PIPE STANDARD CATCH BASIN 10" 18" LAYERS SOLIDLY TAMPED. OPEN AREAS: MAXIMUM WIDTH "W" BACK-FILL - IN EASEMENT OR 15" 18" 24" 21" 12" 35" 39" 45" 42" 24" 30" ALLOWABLE MAXIMUM WIDTH OF TRENCH AT TOP OF PIPE TO 100% STANDARD PROCTOR BACKFILL SHALL BE COMPACTED OR DRIVING AREAS: 6" LAYERS, SOLIDLY TAMPED TO SUB-GRADE BACK-FILL - IN STREETS, ALLEYS, OF STREET BASE. GRADE PIPE DIAM. 6" 8" "W" 18" 24" PIPE TRENCH CURB TRANSITION DETAIL X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X XXXXXXX X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXSTORM STORM WV WV WV WV XXXXXXSTORM STORM STORM SFSFSFSF SF SFSFUewA Urban land-Brems-Morocco complex 0 to 1 UgvA Urban land-Tyner complex 0 to 1 · · · · · · · · · · · · · · · · · LEGAL DESCRIPTION: “” “ ” “” “ ” 0 SCALE 1" =40' 40'80'120' G:\2010\100153.5 Mishawaka Utilities Parking lot\EROSION_IMAGES\SILT FENCE-3.TIF G:\2010\100153.5 Mishawaka Utilities Parking lot\EROSION_IMAGES\SILT FENCE-4.TIF G:\2010\100153.5 Mishawaka Utilities Parking lot\EROSION_IMAGES\SILT FENCE-6.TIF G:\2010\100153.5 Mishawaka Utilities Parking lot\EROSION_IMAGES\SILT FENCE-7.TIF G:\2010\100153.5 Mishawaka Utilities Parking lot\EROSION_IMAGES\CONCRETE WASHOUT-1.TIF G:\2010\100153.5 Mishawaka Utilities Parking lot\EROSION_IMAGES\CONCRETE WASHOUT-2.TIF G:\2010\100153.5 Mishawaka Utilities Parking lot\EROSION_IMAGES\CONCRETE WASHOUT-3.TIF G:\2010\100153.5 Mishawaka Utilities Parking lot\EROSION_IMAGES\CONCRETE WASHOUT-4.TIF G:\2010\100153.5 Mishawaka Utilities Parking lot\EROSION_IMAGES\CONCRETE WASHOUT-5.TIF G:\2010\100153.5 Mishawaka Utilities Parking lot\EROSION_IMAGES\CONCRETE WASHOUT-6.TIF TEMPORARY GRAVEL DRIVEEC1 SILT FENCEEC2 SILTSACK DETAILEC3 EXHIBIT B PERFORMANCE BOND EXHIBIT C SYSTEM DEVELOPMENT CHARGES Estimate Provided On:12/5/2019 Estimate Provided By:C. Brach Values Unit Type Single Family Homes # of Unit Types 12 houses Estimated Flow (gpd) for Single Family Homes 310 per house Estimated Total Flow for Single Family Homes 3720 gpd Estimated Total Flow for Belle Terre 3720 gpd ERU calculation 12.000 ERU ERU rounddown 12 ERU Sewer SDC Calculation ($1145 per ERU) Water SDC Calculation ($475 per ERU) Estimated Amount Due for Belle Terre Estimated 10% Discounted Total (Payment in full) **Estimate is based on projected uses and calculations provided by owner/consultant** 13,740.00$ 5,700.00$ (4) For multifamily structures (e.g., apartments, condominiums, mobile home communities), each individual unit shall be one (1) ERU. For all other types of structures, the ERU calculation shall be based upon the ratio of Average Daily Flow as computed pursuant to 327 IAC 3-6-11 in relationship to three hundred ten (310) gallons per day. For structures not listed in 327 IAC 3-6-11, the ERU shall be calculated as the relationship between the Average Daily Flow reported in the sewer capacity certification for the structure and three hundred then (310) gallons per day. (5) For customers with greater than twenty (20) ERUs as calculated pursuant to subsection (4) of this section, the ERU shall be adjusted based upon the Peaking Factor as computed herein. The Peaking Factor shall be calculated by dividing the Peak Daily Flow by the Average Daily Flow, both as reported in the sewer capacity certification. In no event will a Peaking Factor less than 2.0 be used for purposes of the adjustment described in this subsection. The Peaking Factor divided by 4.0 (the Peaking Factor for residential connections) will be multiplied by the number of ERUs for purposes of computing the system development charge owed by the customer. The City Board of Works may execute a contract with the customer authorizing an increase to the initial System Development Charge based upon actual usage data that is collected after connection. 19,440.00$ 17,496.00$ Estimate for System Development Charges Belle Terre South Bend, IN (1) For purposes of this section "ERU" shall be defined as an equivalent residential unit which means a single family residence. For purposes of customers that are not single family residences, one (1) ERU shall equal estimated wastewater flows of three hundred ten (310) gallons per day. No customer will be less than one (1) ERU. There will be no partial ERU's. The City shall round down to the closest applicable ERU calculation at all times. (3) System development charges per ERU shall also be collected from existing customers undertaking activities producing a permanent increase in wastewater flow of greater than three hundred ten (310) gallons per day. This subsection shall not apply to an existing customer who has, by contract, purchased reserved capacity from the City so long as the customer's flows remain within the reserved capacity. A permanent increase shall be deemed to have occurred when the average flow rate for six (6) consecutive months exceeds the current flow rate by at least three hundred ten (310) gallons per day. Per the Ordinance of the Common Council of the City of South Bend, System Development Charges are summarized below from Sections 17-79 and 17-80: (2) Except as provided in Subsections (5) and (6) of this section, for every new connection to the South Bend Municipal Sewer Works, a system development charge of one thousand one hundred forty-five dollars ($1,145.00) shall be collected per ERU and additional portion thereof to be connected. All charges shall be billed by the City at the time the application for service is filed. Sec. 17-79. - System Development Charge for Wastewater inside and outside City limits. (2) Except as provided in Subsections (5) and (6) of this section, for every new connection to the South Bend Municipal Water Works, a system development charge of five hundred dollars ($500.00) shall be collected per ERU and additional portion thereof to be connected. All charges shall be billed by the City at the time the application for service is filed. (3) System development charges per ERU shall also be collected from existing customers undertaking activities producing a permanent increase in water flow of greater than three hundred ten (310) gallons per day. This subsection shall not apply to an existing customer who has, by contract, purchased reserved capacity from the City so long as the customer's flows remain within the reserved capacity. A permanent increase shall be deemed to have occurred when the average flow rate for six (6) consecutive months exceeds the current flow rate by at least three hundred ten (310) gallons per day. (a) The property owner may pay all charges in full prior to time the installation work is commenced. Prepayment of expenses in advance under this section shall entitle the owner to a ten (10 ) percent discount of the total charge. Sec. 17-85. - Methods of payment; prepayment with discount; installment plan. (6) Where a prospective customer seeks to connect a new structure on property which replaces a prior structure of a similar use what was located on the same property and which was connected to the South Bend Municipal Sewer Works, no system development charge will be collected. For instance, if the prior structure was a single family structure and the new structure is to be used as a multi-family structure, a system development charge, as contemplated herein this section, shall be charged. The Board of Public Works shall make the final determination of whether the new property structure is a similar use to the prior property structure for the purposes of this subsection. (4) For multifamily structures (e.g., apartments, condominiums, mobile home communities), each individual unit shall be one (1) ERU. For all other types of structures, the ERU calculation shall be based upon the ratio of Average Daily Flow as computed pursuant to 327 IAC 3-6-11 in relationship to three hundred ten (310) gallons per day. For structures not listed in 327 IAC 3-6-11, the ERU shall be calculated as the relationship between the Average Daily Flow reported in the water capacity certification for the structure and three hundred ten (310) gallons per day. (5) For customers with greater than twenty (20) ERUs as calculated pursuant to subsection (4) of this section, the ERU shall be adjusted based upon the Peaking Factor as computed herein. The Peaking Factor shall be calculated by dividing the Peak Daily Flow by the Average Daily Flow, both as reported in the water capacity certification. In no event will a Peaking Factor less than 2.0 be used for purposes of the adjustment described in this subsection. The Peaking Factor divided by 4.0 (the Peaking Factor for residential connections) will be multiplied by the number of ERUs for purposes of computing the system development charge owed by the customer. The City Board of Works may execute a contract with the customer authorizing an increase to the initial System Development Charge based upon actual usage data that is collected after connection. (6) Where a prospective customer seeks to connect a new structure on property which replaces a prior structure of a similar use what was located on the same property and which was connected to the South Bend Municipal Water Works, no system development charge will be collected. For instance, if the prior structure was a single family structure and the new structure is to be used as a multi-family structure, a system development charge, as contemplated herein this section, shall be charged. The Board of Public Works shall make the final determination of whether the new property structure is a similar use to the prior property structure for the purposes of this subsection. Sec. 17-80. - System Development Charge for Water inside and outside City limits. (1) For purposes of this section "ERU" shall be defined as an equivalent residential unit which means a single family residence. For purposes of customers that are not single family residences, one (1) ERU shall equal estimated water flows of three hundred ten (310) gallons per day. No customer will be less than one (1) ERU. There will be no partial ERU's. The City shall round down to the closest applicable ERU calculation at all times. EXHIBIT D WATER MAIN EASEMENT EXHIBIT