Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PSA - Technical Assistance for South Bend Dam 20202 DSSMR and On-Going FERC Complia – Christopher B. Burke Engineering, LLC
ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS January 12, 2021 Mr. Jason J. Durr, P. E. Christopher B. Burke Engineering, LLC 220 W. Colfax Ave., Suite 700 South Bend, IN 46601 jdurr@cbbel-in.com; africke@cbbel-in.com RE: Professional Services Agreement – Christopher B. Burke Engineering, LLC Dear Mr. Durr: At its January 12, 2021 meeting, the Board of Public Works approved the above referenced agreement for technical assistance for the South Bend 2021 Dam Safety Surveillance and Monitoring Report and Ongoing Federal Energy Regulatory Commission compliance for 2021 in an amount not to exceed $8,500. Enclosed please find a copy of the agreement for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, /s/ Anne Fuchs Anne Fuchs, Clerk Enclosures AF/lh January 12, 2021 Page 1 EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES THIS IS AN AGREEMENT effective as of January 12, 2021 (“Effective Date”) between Board of Public Works, City of South Bend, Indiana ("Owner") and Christopher B. Burke Engineering, LLC (“Engineer”). Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as follows: 2021 South Bend Dam Technical Assistance (“Project"). Engineer’s Services under this Agreement are generally identified as follows: SEE ATTACHED ENGINEER’S SCOPE OF SERVICES – ATTACHMENT A Owner and Engineer further agree as follows: 1.01 Basic Agreement and Period of Service A. Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If authorized by Owner, or if required because of changes in the Project, Engineer shall furnish services in addition to those set forth above. Owner shall pay Engineer for its services as set forth in Paragraphs 7.01 and 7.02. B. Engineer shall complete its services within a reasonable time, or within the following specific time period: 1. 2020 DSSMR Report – April 1, 2021 2. 2021 Annual Inspection – December 31, 2021 3. DSSMP Updates – April 1, 2021 4. Gate Operation Certification – December 31, 2021 5. Emergency Action Plan Exemption – December 31, 2021 C. If the Project includes construction-related professional services, then Engineer's time for completion of services is conditioned on the time for Owner and its contractors to complete Page 2 EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. construction not exceeding ___ months. If the actual time to complete construction exceeds the number of months indicated, then Engineer's period of service and its total compensation shall be appropriately adjusted. 2.01 Payment Procedures A. Invoices: Engineer shall prepare invoices in accordance with its standard invoicing practices and submit the invoices to Owner on a monthly basis. Invoices are due and payable within 30 35 days of receipt. If Owner fails to make any payment due Engineer for services and expenses within 30 days after receipt of Engineer’s invoice, then the amounts due Engineer will be increased at the rate of 1.0% per month (or the maximum rate of interest permitted by law, if less) from said thirtieth day. In addition, Engineer may, after giving seven days written notice to Owner, suspend services under this Agreement until Engineer has been paid in full all amounts due for services, expenses, and other related charges. Owner waives any and all non-disputed claims against Engineer for any such suspension. Payments will be credited first to interest and then to principal. 3.01 Termination A. The obligation to continue performance under this Agreement may be terminated: 1. For cause, a. By either party upon 30 days written notice in the event of substantial failure by the other party to perform in accordance with the Agreement’s terms through no fault of the terminating party. Failure to pay Engineer for its services is a substantial failure to perform and a basis for termination. b. By Engineer: 1) upon seven days written notice if Owner demands that Engineer furnish or perform services contrary to Engineer’s responsibilities as a licensed professional; or 2) upon seven days written notice if the Engineer’s services for the Project are delayed for more than 90 days for reasons beyond Engineer’s control. Engineer shall have no liability to Owner on account of a termination by Engineer under Paragraph 3.01.A.1.b. c. Notwithstanding the foregoing, this Agreement will not terminate as a result of a substantial failure under Paragraph 3.01.A.1.a if the party receiving such notice begins, within seven days of receipt of such notice, to correct its substantial failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of notice; provided, however, that if and to the extent such substantial failure cannot be reasonably cured within such 30 day period, and if such party has diligently attempted to cure the same and thereafter continues diligently to cure the same, then the cure period provided for herein shall extend up to, but in no case more than, 60 days after the date of receipt of the notice. 2. For convenience, by Owner effective upon Engineer's receipt of written notice from Owner. Page 3 EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. B. The terminating party under Paragraph 3.01.A may set the effective date of termination at a time up to 30 days later than otherwise provided to allow Engineer to complete tasks whose value would otherwise be lost, to prepare notes as to the status of completed and uncompleted tasks, and to assemble Project materials in orderly files. C. In the event of any termination under Paragraph 3.01, Engineer will be entitled to invoice Owner and to receive full payment for all non-disputed services performed or furnished in accordance with this Agreement and all reimbursable expenses incurred through the effective date of termination. 4.01 Successors, Assigns, and Beneficiaries A. Owner and Engineer are hereby bound and the successors, executors, administrators, and legal representatives of Owner and Engineer (and to the extent permitted by Paragraph 4.01.B the assigns of Owner and Engineer) are hereby bound to the other party to this Agreement and to the successors, executors, administrators, and legal representatives (and said assigns) of such other party, in respect of all covenants, agreements, and obligations of this Agreement. B. Neither Owner nor Engineer may assign, sublet, or transfer any rights under or interest (including, but without limitation, moneys that are due or may become due) in this Agreement without the written consent of the other, except to the extent that any assignment, subletting, or transfer is mandated or restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this Agreement. C. Unless expressly provided otherwise, nothing in this Agreement shall be construed to create, impose, or give rise to any duty owed by Owner or Engineer to any contractor, subcontractor, supplier, other individual or entity, or to any surety for or employee of any of them. All duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of Owner and Engineer and not for the benefit of any other party. 5.01 General Considerations A. The standard of care for all professional engineering and related services performed or furnished by Engineer under this Agreement will be the care and skill ordinarily used by members of the subject profession practicing under similar circumstances at the same time and in the same locality. Engineer makes no warranties, express or implied, under this Agreement or otherwise, in connection with Engineer’s services. Subject to the foregoing standard of care, Engineer and its consultants may use or rely upon design elements and information ordinarily or customarily furnished by others, including, but not limited to, specialty contractors, manufacturers, suppliers, and the publishers of technical standards. B. Engineer shall not at any time supervise, direct, control, or have authority over any contractor's work, nor shall Engineer have authority over or be responsible for the means, methods, techniques, sequences, or procedures of construction selected or used by any contractor, or the safety precautions and programs incident thereto, for security or safety at the Project site, nor for any failure of a contractor to comply with laws and regulations applicable to such contractor's furnishing and performing of its work. Page 4 EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. C. This Agreement is to be governed by the law of the state or jurisdiction in which the Project is located. D. Engineer neither guarantees the performance of any contractor nor assumes responsibility for any contractor’s failure to furnish and perform its work in accordance with the contract between Owner and such contractor. Engineer is not responsible for variations between actual construction bids or costs and Engineer's opinions or estimates regarding construction costs. E. Engineer shall not be responsible for the acts or omissions of any contractor, subcontractor, or supplier, or of any of their agents or employees or of any other persons (except Engineer’s own employees) at the Project site or otherwise furnishing or performing any construction work; or for any decision made regarding the construction contract requirements, or any application, interpretation, or clarification of the construction contract other than those made by Engineer. F. The general conditions for any construction contract documents prepared hereunder are to be the “Standard General Conditions of the Construction Contract" as prepared by the Engineers Joint Contract Documents Committee (EJCDC C-700, 2007 Edition) unless the parties agree otherwise. G. The Owner acknowledges the Engineer’s construction documents, including all electronic files, as instruments of professional services. Owner shall have a limited license to use the documents on the Project, extensions of the Project, and for related uses of the Owner, subject to the following limitations: (1) Owner acknowledges that such documents are not intended or represented to be suitable for use on the Project unless completed by Engineer, or for use or reuse by Owner or others on extensions of the Project, on any other project, or for any other use or purpose, without written verification or adaptation by Engineer; (2) any such use or reuse, or any modification of the documents, without written verification, completion, or adaptation by Engineer, as appropriate for the specific purpose intended, will be at Owner’s sole risk and without liability or legal exposure to Engineer or to its officers, directors, members, partners, agents, employees, and consultants; (3) Owner shall indemnify and hold harmless Engineer and its officers, directors, members, partners, agents, employees, and consultants from all claims, damages, losses, and expenses, including attorneys’ fees, arising out of or resulting from any use, reuse, or modification of the documents without written verification, completion, or adaptation by Engineer; and (4) such limited license to Owner shall not create any rights in third parties. Nevertheless, the final construction documents, including all electronic files, prepared under this agreement shall become the property of the Owner upon completion of services and payment in full of all monies due to the Engineer. H. To the fullest extent permitted by law, Owner and Engineer (1) waive against each other, and the other’s employees, officers, directors, agents, insurers, partners, and consultants, any and all claims for or entitlement to special, incidental, indirect, or consequential damages arising out of, resulting from, or in any way related to the Project, and (2) agree that Engineer’s total liability to Owner under this Agreement shall be limited to $50,000 or the total amount of compensation received by Engineer, whichever is greater. I. The parties acknowledge that Engineer’s scope of services does not include any services related to a Hazardous Environmental Condition (the presence of asbestos, PCBs, petroleum, hazardous substances or waste as defined by the Comprehensive Environmental Response, Compensation and Liability Act, 42 U.S.C. §§9601 et seq., or radioactive materials). If Engineer or any other party encounters a Hazardous Environmental Condition, Engineer may, at its option and without liability Page 5 EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. for consequential or any other damages, suspend performance of services on the portion of the Project affected thereby until Owner: (1) retains appropriate specialist consultants or contractors to identify and, as appropriate, abate, remediate, or remove the Hazardous Environmental Condition; and (2) warrants that the Site is in full compliance with applicable Laws and Regulations. J. Owner and Engineer agree to negotiate each dispute between them in good faith during the 30 days after notice of dispute. If negotiations are unsuccessful in resolving the dispute, then the dispute shall be mediated. If mediation is unsuccessful, then the parties may exercise their rights at law. 6.01 Total Agreement A. This Agreement (including any expressly incorporated attachments), constitutes the entire agreement between Owner and Engineer and supersedes all prior written or oral understandings. This Agreement may only be amended, supplemented, modified, or canceled by a duly executed written instrument. 7.01 Basis of Payment—Hourly Rates Plus Reimbursable Expenses A. Using the procedures set forth in Paragraph 2.01, Owner shall pay Engineer as follows: 1. An amount equal to the cumulative hours charged to the Project by each class of Engineer’s employees times standard hourly rates for each applicable billing class for all services performed on the Project, plus reimbursable expenses and Engineer’s consultants’ charges, if any. 2. Engineer’s Standard Hourly Rates are attached as Appendix 1. 3. The total compensation for services and reimbursable expenses is estimated to be $8,500. 7.02 Additional Services: For additional services of Engineer’s employees engaged directly on the Project, Owner shall pay Engineer an amount equal to the cumulative hours charged to the Project by each class of Engineer’s employees times standard hourly rates for each applicable billing class; plus reimbursable expenses and Engineer’s consultants’ charges, if any. Engineer's standard hourly rates are attached as Appendix 1. Attachments: Appendix 1, Engineer's Standard Hourly Rates Page 6 EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. IN WITNESS WHEREOF, the parties hereto have executed this Agreement, the Effective Date of which is indicated on page 1. Owner: Engineer: City of South Bend, Indiana Board of Public Works Christopher B. Burke Engineering, LLC By: By: Title: Elizabeth A. Maradik, President Title: Jon D. Stolz, P.E., Managing Vice President By: Title: Gary A. Gilot, Member By: Title: By: Title: Jordan V. Gathers, Member By: Title: Joseph R. Molnar, Member Attest: Title: Anne Fuchs, Clerk Date: Date: January 4, 2021 Engineer License or Firm's Certificate No. 45-3940525 State of: Indiana Address for giving notices: Address for giving notices: 227 West Jefferson Boulevard South Bend, Indiana 46601 220 West Colfax Avenue, Suite 700 South Bend, IN 46601 Designated Representative (Paragraph 8.03.A): Designated Representative (Paragraph 8.03.A): Kara M. Boyles, Ph.D., P.E. Jason J. Durr, P.E. Title: City Engineer Title: Director, Northern Indiana Phone Number: (574) 235-5933 Phone Number: (574) 282-8001 Facsimile Number: (574) 235-9171 Facsimile Number: (574) 282-8003 E-Mail Address:kboyles@southbendin.gov E-Mail Address:jdurr@cbbel-in.com January 12, 2021 Appendix 1, Standard Hourly Rates Schedule EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. Copyright ©2009 National Society of Professional Engineers for EJCDC. All rights reserved. Page 1 This is Appendix 1, Engineer’s Standard Hourly Rates, referred to in and part of the Short Form of Agreement between Owner and Engineer for Professional Services dated , . Engineer’s Standard Hourly Rates A.Standard Hourly Rates: 1.Standard Hourly Rates are set forth in this Appendix 1 and include salaries and wages paid to personnel in each billing class plus the cost of customary and statutory benefits, general and administrative overhead, non-project operating costs, and operating margin or profit. 2.The Standard Hourly Rates apply only as specified in Paragraphs 7.01 and 7.02, and are subject to annual review and adjustment. B.Schedule of Hourly Rates: Hourly rates for services performed on or after the Effective Date are: Personnel ($/Hr) Engineer VI ...................................................................................................................................... 216 Engineer V ........................................................................................................................................ 197 Engineer IV ...................................................................................................................................... 172 Engineer III ...................................................................................................................................... 144 Engineer I/II .................................................................................................................................... 113 Resource Planner V ......................................................................................................................... 160 Resource Planner IV ....................................................................................................................... 150 Resource Planner III ...................................................................................................................... 130 Resource Planner I/II ..................................................................................................................... 105 Engineering Technician IV ............................................................................................................ 155 Engineering Technician III ............................................................................................................ 139 Engineering Technician I/II .......................................................................................................... 105 CAD II .............................................................................................................................................. 130 CAD I ................................................................................................................................................ 107 GIS Specialist III ............................................................................................................................. 139 GIS Specialist I/II ........................................................................................................................... 100 Environmental Resource Specialist V .......................................................................................... 151 Environmental Resource Specialist IV ........................................................................................ 139 Environmental Resource Specialist III ........................................................................................ 125 Appendix 1, Standard Hourly Rates Schedule EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. Copyright ©2009 National Society of Professional Engineers for EJCDC. All rights reserved. Page 2 Environmental Resource Specialist I/II ...................................................................................... 105 Environmental Resource Technician ............................................................................................. 99 Administrative .................................................................................................................................... 75 Engineering Intern ............................................................................................................................ 60 Information Technician I/II ........................................................................................................... 75 Direct Costs Outside Copies, Blueprints, Messenger, Delivery Services, Mileage ....................... Cost + 12% 2021 South Bend Dam Technical Assistance January 4, 2021 Attachment A Page 1 Christopher B. Burke Engineering, LLC 220 West Colfax Avenue Suite 500 South Bend, IN 46601 574.282.8001 cbbel-in.com ATTACHMENT A The South Bend Dam (License No. 7569) is a low-head, run-of-the-river dam on the St. Joseph River near downtown South Bend. The Federal Energy Regulatory Commission (FERC) requires that a Dam Safety Surveillance and Monitoring Report (DSSMR) be completed annually to review instrumentation and monitoring data to determine if potential failure modes are developing. It is our understanding that the City of South Bend (City) is interested in having Burke complete the 2020 DSSMR (covering the 2020 calendar year) and other tasks related to ongoing FERC compliance in 2021. The scope of work will include the following tasks: Task 1 – 2020 DSSMR Report: Burke will review pertinent information regarding the dam necessary to complete the DSSMR which may include previous DSSMR reports and other information contained in either the City’s or IDNR’s file for the dam. It is expected that the City will provide the data from the last year for the two staff gages located along the East Race. Burke will prepare a brief written DSSMR in accordance with FERC guidance outlined in Chapter 14 of Engineering Guidelines for the Evaluation of Hydropower Projects. The report will be completed based on observations made by Burke in 2020. The level of detail and content of the report is expected to be similar to the 2019 DSSMR prepared by Burke. The report will be submitted to the City in draft format before finalizing. It is expected that the University of Notre Dame (license exemption holder) or its consultants will file the report with FERC. Task 2 – 2021 Annual Inspection: In preparation for the 2021 DSSMR and to fulfill the annual visual inspection requirement, a Burke registered professional engineer will perform visual observations of safely- accessible portions of the dam and appurtenant structures. Since the South Bend Dam is an in-channel structure, much of the dam and its appurtenances are not readily accessible for visual observation. Burke’s observations will be focused on potential dam safety concerns and to make a determination if the dam appears safe for continued operation. This scope of work specifically excludes preparation of the 2021 DSSMR report. It is expected that the annual inspection will occur on the same date as the gate operation certification. Task 3 – Update DSSMP: In accordance with a letter from FERC dated July 21, 2020, Burke will update the Dam Safety Surveillance and Monitoring Plan (DSSMP) for the South Bend Dam. Updates are expected to include incorporation of new staff gages and minor clarifications and edits requested by FERC. The updated DSSMP will be submitted to the City in draft format before finalizing. It is expected that the University of Notre Dame or its consultants will file the report with FERC concurrently with the 2020 DSSMR. Task 4 – Gate Operation Certification: The Spillway Gate Operation Certificate must be completed each year. Burke staff will observe operation of the three East Race gates by City staff and will assist in preparation of the certificate to submit to FERC. Burke will prepare a cover letter to accompany the certificate and will send to the University of Notre Dame or its consultants for submittal to FERC. 2021 South Bend Dam Technical Assistance January 4, 2021 Attachment A Page 2 Task 5 – Emergency Action Plan Exemption: Burke will perform a cursory desktop and visual evaluation to determine if there have been observable changes in upstream or downstream conditions that may affect the determination that no reasonably foreseeable emergency at the dam would endanger life, health, or property. This evaluation is expected to only include a review of publicly-available aerial photography and observations at the site and specifically excludes dam failure flood inundation mapping. Burke will prepare a brief annual report of the field reconnaissance in support of the continued Emergency Action Plan (EAP) exemption. Burke will prepare a cover letter to accompany the documentation and will send it to the University of Notre Dame or its consultants for submittal to FERC. Task 6 – Project Management and Meetings: This task is associated with management and administration of the project throughout its duration. Burke expects one meeting with City staff after completion of the DSSMR to discuss findings. It is expected that additional project coordination will occur via e-mail, telephone, or online meetings COST PROPOSAL FOR PROFESSIONAL SERVICES PROJECT INFORMATION Project Name:Proposal Date: 4-Jan-21 Project Location: South Bend, Indiana Prepared for: City of South Bend, Indiana Contact:Rebecca Plantz Board of Public Works Tel:574-235-5998 Office Fax: Email:rplantz@southbendin.gov Prepared by: Christopher B. Burke Engineering, LLC Contact:Aaron J. Fricke, P.E. PNC Center, Suite 1368 South Tel:317-266-8000 115 West Washington Street Fax:317-632-3306 Indianapolis, Indiana 46204 Email:africke@cbbel-in.com FEE SUMMARY (See following pages for Phase and Task details.) Burke Labor Subconsultant Direct Total Phase Description Fees Fees Costs Cost 1 8,453$ -$ 47$ 8,500$ 2-$ -$ -$ -$ 3-$ -$ -$ -$ 4-$ -$ -$ -$ 5-$ -$ -$ -$ 6-$ -$ -$ -$ 7-$ -$ -$ -$ 8-$ -$ -$ -$ 9-$ -$ -$ -$ -$ -$ -$ -$ Project Total 8,453$ -$ 47$ 8,500$ Subconsultant Support Summary Subconsultant Direct Percentage of Total Firm Work Description Fees Costs Total Fees Cost -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Total Subconsultant Fees -$ -$ -$ Included in Project Total Above 2021 South Bend Dam Technical Assistance Technical Assistance 2021 South Bend Dam Technical AssistanceSouth Bend, IndianaChristopher B. Burke Engineering LLCDate: 04-Jan-21STAFF FEES:TASK DESCRIPTIONEngineer VIEngineer VEngineer IVEngineer IIIEngineer I/IIRes. Planner VRes. Planner IVRes. Planner IIIRes. Planner I/IIEng Tech IVEng Tech IIIEng Tech I/IICAD IICAD IGIS Spec IVGIS Spec IIIGIS Spec I/IIEnv Resource Specialist VEnv Resource Specialist IVEnv Resource Specialist IIIEnv Resource Specialist I/IIEnv Resource TechnicianSpecial ClassificationAdministrativeTOTAL HOURSTOTAL FEE1 2020 DSSMR Report 1616 $2,7522 2021 Annual Inspection 1010 $1,7202 DSSMP Updates 88 $1,3763 Gate Operation Certification 44 $6884 Emergency Action Plan Exemption 44 $6885 Project Management and Administration 1 67 $1,2296714849 8,453$ $216 $197 $172 $144 $113 $160 $150 $130 $105 $155 $139 $105 $130 $107 $155 $139 $100 $151 $139 $125 $105 $99 $60 $75STAFF FEES:$197 $8,256 TOTAL STAFF FEES: 8,453$ SUBCONSULTANTS:DIRECT COSTS:IDFIRM NAMEROLE/DECSRIPTIONCLASSIDDESCRIPTIONAMOUNTUNITSRATETOTAL11days @ $2522miles @ $0.5533days @ $8044days @ $35055each @ $6.0066each @ $0.0777sets @ $2588lot @99days @ $2001010 47 @ $1 $47.0011@$112Lot @ $113Lot @ $1TOTAL SUBCONSULTANT FEE: TOTAL DIRECT COST: $47.00TOTAL COST: Technical AssistanceTOTAL FEETOTAL HOURS:2019 BILLING RATE:FEEDIRECT-$ -$-$Meals-$ -$-$Mileage-$ -$-$Lodging (incl phone)-$ -$-$Survey Equipment-$ -$-$Plotting-$ -$-$Photocopy-$ -$-$Supplies (binders, tabs, etc)-$ -$-$Laboratory Testing$8,500.00-$ -$-$Equipment Usage Fee-$ -$-$Miscellaneous 1 - Round UpMiscellaneous 2Miscellaneous 3Miscellaneous 4-$ BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 1/4/2021 Name Becca Plantz Department Public Works BPW Date 1/12/2021 Phone Extension 5998 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name Michael Patton BPW Attorney Attorney Name Clara McDaniels Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Christopher B. Burke Engineering, LLC New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name South Bend Dam 2021 DSSMR Project Number 121-012 Funding Source Stormwater Professional Services Account No. PR-00006361 Amount $8,500.00 Terms of Contract Hourly NTE Purpose/Description Technical assistance for the South Bend Dam 2020 DSSMR and on-going FERC compliance for 2021. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: