Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Amendment No. 1 to PSA - Design, Inspection and Recommendation Services for SBPD Roof Repairs – WDi Architecture, Inc.
ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS January 12, 2021 Ms. Daryl Williams-Dotson WDI Architecture, Inc. 15 W. 28th. Street Indianapolis, IN 46208 daryl_wd@wdiarchitecture.com RE: Amendment No. 1 to Professional Services Agreement – WDi Architecture, Inc. Dear Ms. Williams-Dotson: At its January 12, 2021 meeting, the Board of Public Works approved the above referenced amendment for additional design, inspection and recommendation services for the South Bend Police Department for roof repairs in the amount of $38,080. Enclosed please find the original of the amendment for your signature. Please sign and return the original amendment to lhensley@southbendin.gov. Please retain a copy for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, /s/ Anne Fuchs Anne Fuchs, Clerk Enclosures AF/lh INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Board of Public Works Clara McDaniels, Assistant City Attorney Public Works Linda M. Martin, Clerk FROM: Leslie Biek, P.E., Assistant City Engineer SUBJECT: PN: 119-080 SBPD Roof Repair (PROJ00000234; PR-00005919) Amendment #1 to PSA Agmt with WDi Architecture DATE: 12/9/2020 Attached is Amendment #1 to the PSA with WDi Architecture for the SBPD Roof Repair Project (119-080). Last year WDi was contracted to perform on-site inspection of the roof of the South Bend Police Department Headquarters Building (701 W Sample St) and provided recommendations. The SBPD has now secured the funding to proceed with the repair, therefore WDi has provided an addendum to perform the design and provide the bidding documents for the roof repair. The project will include partial replacement and rehabilitation of the roof, removal and inspection of the roof top ductwork, application of 5,000ft2 insulated metal wall panels to improve energy efficiency, ladder, stair system, and fall protection. Funding: Building Improvements 404-43001 It is requested the Board of Public Works approve Amendment #1 to the SBPD Roof Repair (119-080) PSA with WDi Architecture for an increase of $38,080 to the contract price bring the final contract price to $52,360.00. Thank you for your consideration of this request. 1 | P a g e APPENDIX A: CONTRACT AMENDMENT #1 AGREEMENT made as of the 13th day of November in the year 2020. BETWEEN the Architect’s client identified as the Owner/Client: EJCDC – Engineers Joint Contract Documents Committee AMERICAN COUNCIL OF ENGINEERING COMPANIES ASSOCIATED GENERAL CONTRACTORS OF AMERICA AMERICAN SOCIETY OF CIVIL ENGINEERS PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE A Practice Division of the NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS And the Architect: WDi Architecture, Inc. 15 W. 28th Street Indianapolis, IN 46208 For the following Project: South Bend Police Department Headquarters Building Roofing Project 701 West Sample Street South Bend, Indiana Project Description: Design Option #2 of the partial replacement and rehabilitation: Remove designation “C” shaped option of the existing membrane roofing and its associated insulation, flashings, and metal copings from all areas of the building and replacing them with a new system. The standing seam metal and flat seam metal roofing would remain. Then inspect underlying decking thoroughly for any defects which may materially affect the performance of the new roof. Any defects revealed by the removal of the old roofing and insulation for replacement before installing the new system. The replacement system will consist of new insulation, new white 60 mil KEE/PVC blend membrane, and new flashing and sheet metal for a 20 year warranty. The membrane roofing to remain, will be restored by applying a fluid applied coating system. After any needed repairs are completed- the roofing membrane will be cleaned and a base coat of 48 mils of base coat with reinforcement installed. After the base cures, a finish coat will be adhered at 32 mils creating an approximate 140 mil (including the original 60mil membrane). This membrane can be restored at the end of its service life and offers a 20 year full system warranty - including all new and existing components. Insulate Roof Top Ductwork: The existing insulation will be removed and the ductwork inspected. If any defects are found in the ductwork they will be noted for repair and then new polyisocyanurate insulation to be installed on all four sides of the duct. The insulation is then wrapped with a weather-resistant barrier. 2 | P a g e Repair Metal Panels: Apply insulated panels to the existing wall will have a direct impact on energy savings. Currently, approximately 5,000 square feet of non-insulated metal wall panels. Ladder: Provide a stair system that is compliant with current regulations and has a small platform at the top to allow for more movement. Fall Protection - Add Alternate 1: Provide protection for twelve 52”x52” square skylights across the roof. A. Compensation: For the Architect’s Amended Services described above, the Owner shall compensate the Architect as Follows: The Architect’s compensation shall be a Flat Fee base structure at a maximum not-to exceed cost of $ 38,080.00 (Thirty-Eight thousand eighty dollars and no/cents). The Architect shall bill at the following Phases in services (Also see EXHIBIT ‘C’): Schematic Design & Design Development (SD/DD) 30% $11,424.00 Construction Documents (CD) 45% $17,136.00 Bidding/Negotiation Phase (BID) 5% $ 1,904.00 Construction Administration CA) 20% $ 7,616.00 Total $ 100% $38,080.00 This contract shall end 120 days from the contract date unless noted otherwise. B. Projected Schedule: Task Start (estimated) Complete Contract Negotiations December 16, 2021 January 6, 2021 Kick-off Meeting January 20, 2021 Schematic Design & Design Development 100% January 20, 2021 January 28, 2021 DD Owner Review January 28, 2021 January 30, 2021 Construction Documents 100% January 31, 2021 February 14, 2021 CD Owner Review February 14, 2021 February 21, 2021 Advertise for Bid February 24, 2021 February 28, 2021 Bid and Negotiations March 6, 2021 Construction Kick - off March 9, 2021 Shop Drawing Review March 16,2021 March 27, 2021 Construction Start Date April 1, 2021 June 29, 2021 Construction Punch June 29, 2021 Submit Substantial Completion June 30, 2021 D. WDi Insurance: For the insurance coverage WDi will assign EJCDC as holder of the types and in the amounts described below: General Liability Insurance – with a combined single limit of not less than $1,000,000 each occurrence/$1,000,000 in the annual aggregate. Business Automobile Liability Insurance – with a combined single limit of not less than $1,000,000 each accident. 3 | P a g e Professional Liability (Errors and Omissions) Insurance - with a limit not less than $1,000,000 each occurrence/$1,000,000 in the annual aggregate. Workers’ Compensation Insurance – as required by the State of Indiana. Employer’s Liability Insurance - in the amount of $1,000,000 per accident for bodily injury or disease. If additional insurance is required, this agreement will be modified to accommodate such a requirement. This three-page Agreement entered as of the day and year first written above. WDI Architecture, Inc. Daryl Williams-Dotson AIA, NCARB, WDi President License # AR10100103 Liability INS # 73165 Upon acceptance of this proposal letter, and your signature below WDi will proceed to said service unless instructed otherwise. __________________________________________ Architect (Signature) __________________________________________ _________________________________________ Owner (Signature) _________________________________________ (Printed name and title) (Printed name and title) ________________________________________ __________________________________________ (Date signed) (Date signed) CONTRACT AMENDMENT FORM AMENDMENT NO. 1 In reference to the Contract between the Indiana Convention Center and Lucas Oil Stadium (CLIENT) and WDi Architecture, Inc. (ARCHITECT), dated _August 29, 2019, and signed August 29, 2019, for Architectural Design for _ ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE (“Contract”): I.COMPENSATION The Lump Sum includes compensation for Engineer’s services and services of Engineer’s Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to account for labor, overhead, profit, and Reimbursable Expenses. a.For services outlined in the original agreement – of the Contract, the ARCHITECT shall be paid an amount not-to- exceed Fourteen thousand two hundred eighty dollars and no/cents ($14,280.00) with incidental expenses. b.The phase “Total compensation, under the contract is not-to-exceed Dollars ($14,280.00) with incidental expenses” is deleted and replaced with “Total compensation under the contract is not-to-exceed $52,360.00 Dollars. (Fifty-two thousand three hundred sixty dollars and .00/cents). **************************************End of Amendment************************************ January 12, 2021 Page 1 Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. SUGGESTED FORMAT (for use with E-500, 2008 Edition) This is EXHIBIT C, consisting of 2 pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated 29, August. Payments to Engineer for Services and Reimbursable Expenses COMPENSATION PACKET BC-1: Basic Services – Lump Sum Article 2 of the Agreement is supplemented to include the following agreement of the parties: ARTICLE 2 – OWNER’S RESPONSIBILITIES C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum Method of Payment A.Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of Engineer’s Resident Project Representative, if any, as follows: 1.A Lump Sum amount of $52,360.00 based on the following estimated distribution of compensation: a.Study and Report Phase $ 14,280.00 - PAID b.Preliminary Design Phase $ 11,424.00 c.Final Design Phase $ 17,136.00 d.Bidding and Negotiating Phase $ 1,904.00 e.Construction Phase $ 6,216.00 f.Post-Construction Phase $ 1,400.00 2.Engineer may alter the distribution of compensation between individual phases noted herein to be consistent with services actually rendered, but shall not exceed the total Lump Sum amount unless approved in writing by the Owner. 3.The Lump Sum includes compensation for Engineer’s services and services of Engineer’s Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to account for labor, overhead, profit, and Reimbursable Expenses. 4.The portion of the Lump Sum amount billed for Engineer’s services will be based upon Engineer’s estimate of the percentage of the total services actually completed during the billing period. B.Period of Service: The compensation amount stipulated in Compensation Packet BC-1 is conditioned on a period of service not exceeding 120 months. If such period of service is extended, the compensation amount for Engineer's services shall be appropriately adjusted. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 12/9/2020 Name Leslie Biek, PE Department PW BPW Date 1/12/2020 Phone Extension Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name Larry King BPW Attorney Attorney Name Clara McDaniels Dept. Attorney Attorney Name Clara McDaniels Purchasing Amy Sherk Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name WDi Architecture New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name SBPD Roof Repair Project Number 119-080 PROJ00000234 Funding Source Building Improvements Account No. 404-443001 Amount $38,080 PR-00005919 Terms of Contract Bidding deliverables due 120 days after contract award. Purpose/Description Amendment #1 is to add design services to the Professional Services contract with WDi. WDi performed the inspection and provided recommendations along with estimates and the City has secured the funding to proceed forward. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: