HomeMy WebLinkAboutOpening of Proposal - Coal Line Trail Phase I Proj No. 115-063 - Lawson-Fisher Assoc. P.C.LAWSON-FISHER ASSOCIATES P.C.
CREATIVE. COLLABORATIVE. EFFECTIVE.
Authorized Negotiator
Paul A. Hummel, PE
President / Construction Director
(574) 234-3167 | phummel@lawson-fisher.com
Lawson-Fisher Associates P.C.
525 West Washington Avenue
South Bend, IN 46601LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C.
City of South Bend | Coal Line Trail (Phase 1) from Lincoln Way West to Riverside Drive
January 12, 2021
City of South Bend, Indiana Board of Public Works
County-City Building, 227 West Jefferson Boulevard
South Bend, Indiana 46601
Dear Board of Public Works:
Lawson-Fisher Associates P.C. (LFA) is pleased to submit this Letter of Interest
(LOI) to provide construction inspection services on Phase 1 of the Coal Line Trail
Project. Utilizing over 35 years of LPA/INDOT construction inspection experience
and our recent/ongoing experience with the City of South Bend on the Bendix Drive
Reconstruction Project, the LFA team stands behind its proven project approach that
focuses on client satisfaction, proactive inspection, and outward communication. LFA
is ready to lead the City of South Bend in successfully realizing its vision for this project.
Located in the heart of South Bend, LFA is a locally owned firm with local Employees
and Construction Staff. In fact, our office is 5 minutes from the project site. We have
the proven track record, capacity, and flexibility to provide successful management of
this rails to trails project. We look forward to reinforcing these demonstrated attributes
to the City and are confident you will be satisfied with your choice of the LFA Team.
Very truly yours,
LAWSON-FISHER ASSOCIATES P.C.
Paul A. Hummel, PE Jared M. Huss, PE
President / Construction Director Business Development Director
94% Repeat Client Service Record
Construction Manager
With over 31 years of experience, our overall construction manager,
Ric Reimke, has successfully managed many LPA and INDOT Projects
across northern Indiana including multi-use path and road reconstruction
projects in the INDOT LaPorte District. Ric will lead an LFA inspection team that is
INDOT and SiteManager certified and will be assisted by Don Dietz who is familiar
with what the City of South Bend expects from their construction managers and
construction project deliverables. (See page 3 for Don’s resume.)
Capacity to Perform Work
With an anticipated March 2021 Letting Date and an August 15, 2021
Contract Completion Date, LFA is fully aware of the need to maintain
our fullest attention on the project to meet the contract goals. Adding
American Structurepoint as additional partner allows LFA management staff to
maintain focus on pushing schedule and addressing potential schedule impacts like
Utility Relocations. The identified LFA team has the depth and breadth of experiences
in roadway, trails, drainage, utilities, and hardscape features to ensure this project’s
success. (See pages 2 through 5 for the Project Organizational Chart and supporting
resumes.)
Project Approach
This multi-use path project will require close coordination with the
impacted utilities, schools, residents and businesses to ensure that
schedule and proper communication is maintained. This includes
maintaining pedestrian and vehicular traffic as well as ensuring all ADA and access
requirements are achieved both during construction and for the completed project.
Proactive construction management, timely/consistent documentation and technical
proficiency will be primary factors to ensure a successful project. (See pages 6
through 8 for our Project Understanding and Project Approach.)
City of South Bend | Coal Line Trail (Phase I) from Lincoln Way West to Riverside Drive (Des. No. 1401810) in LaPorte District | Page 2LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C.
ORGANIZATION
Don Dietz | Jared Huss, PE
QC/QA and Client Liaison
Jon "Ric" Riemke, PE
Project Supervisor/Engineer
INDOT
Patrick Patterson, PE
Area Engineer
City of South Bend
Toy Villa
Construction Manager
Kyle Sylvius
Assistant City Engineer
Why the LFA Team
Ric Riemke will be leading the LFA Team as the project engineer/supervisor throughout the entirety of the project duration and will be supplemented by Don Dietz,
who will serve as a client liaison. The combination of Don’s experience with the City of South Bend and Ric’s specific project experience on multi-use paths, ADA
requirements and utility coordination will be critical to this project’s success. Recent specific examples of LFA’s success with the City of South Bend or multi-use
path projects include the Olive & Sample Reconstruction Project, the ongoing Bendix Drive Road Reconstruction, LaSalle Trail and the C.R. 8 Multi-Use Path Project.
Having the Team Capacity, Work Type Experience and Team Availability makes the LFA Team the right choice for this project.
LFA Staff Yrs. Exp.
Don Dietz 35
Randy Kilbase 33
Jared Huss 16
Project Partners Yrs. Exp.
Josh Reeves (Structurepoint)12
Tracy McCormick (ME)26
Fidel Chavez (VSE) 6
Percentage
of Work
13.1
Construction Inspection
LFA 60%
Structurepoint 35%
ME* 2%
VSE* 3%
Solicited Services Prime Support * DBE
*Disadvantaged Business Enterprise (DBE)
Team Capacity
With a Contract Completion Date of August 15,
this project will require specific attention to Utility
Coordination and project elements that have direct
impacts on schedule. Adding a project partner like
American Structurepoint to the team provides capacity
by allowing Ric the opportunity to focus on driving
the aforementioned critical schedule items, thus
resulting in a project that is completed on schedule
and in accordance with the contract documents.
The addition of Don Dietz also provides additional
resources to ensure the City’s needs are addressed as
the project progresses.
Work Type Experience
As you will see in the following resumes, the LFA
Team possesses considerable experience in each of
the major project elements. This will ultimately provide
the required insight to supervise and inspect each
major element while identifying potential time and cost
savings measures as the project progresses. Specific
experience in road reconstruction, utility relocation,
drainage, ADA Requirements, signals and architectural
features will be critical.
Team Availability
The LFA PE/PS and identified American
Structurepoint staff have no project commitments for
the 2021 construction season. Although Ric and many
of the LFA staff typically run multiple jobs during any
given year; we will ensure that the LFA Team will be
fully dedicated to the project upon selection. Ensuring
availability also provides consistency of the staff
involved. This consistency will be critical to maintaining
pace on utility relocations and interpretation of ADA
requirements.
Don and Jared’s Involvements:
• Resolution Assistance
• As Needed Progress Meeting Attendance
• Schedule Oversight
City of South Bend | Coal Line Trail (Phase I) from Lincoln Way West to Riverside Drive (Des. No. 1401810) in LaPorte District | Page 3LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C.
PROJECT SUPERVISOR
Jon "Ric" Riemke, PE will be the Senior
Construction Engineer for this
Construction Inspection project. With over
31 years’ experience in the engineering
construction industry, Ric has been
involved in numerous multi-use paths, road rehabilitation
projects involving turn lanes with traffic signals, and
various roadway construction projects requiring
extensive utility relocations. Ric has supervised projects
of various sizes and types and is certified in all INDOT
testing requirements. He has managed multiple local
and state funded projects. Ric’s experience in various
multi-use path projects, will be critical to the success of
the Coal Line Trail (Phase I) project.
Certifications
• Bituminous Paving
• Bridge Construction/Deck Repair
• Concrete Paving
• Traffic, Miscellaneous Concrete, and Miscellaneous
Construction Items
• Construction Layout/Measurement and Pipe
Structures
• Construction Earthwork
• INDOT PE/PS Training
• Competent Trenching & Excavation
• INDOT Storm Water Certification
Construction Project Types
• Roadway Construction/Reconstruction/Resurfacing/
Roundabouts
• Concrete Pavement Restoration
• Sanitary/Storm Sewers/Watermain
• Traffic Signals
• Utility Relocations
• Intersection Improvements
• ADA and Curb Ramp Reconstruction
Past Project Experience
• St. Joseph County:
- McKinley/Ash Road
- Edison and Ash Road Roundabout
- County Bridge 12 over Geyer Ditch on Johnson
Road
• Oakland Avenue (U.S. 6 to C.R. 52)
• Mishawaka Riverwalk Improvements and Extension
• Mishawaka Hospice Site Infrastructure
• S.R. 23 at Koontz Lake Dam
• S.R. 49 (Indiana Toll Road to U.S. 12 Resurfacing)
• Indiana Toll Road – Milepost 17
• U.S. 12 over CSXT & Norfolk & Southern Railroad
• I-94 (U.S. 421 to U.S. 20/35)
• U.S. 30 & U.S. 41 Intersection Improvements
• U.S. 20 Bridge over the Grand Calumet River
Ric’s Focus for the Success of
This Project:
• Monitoring construction sequencing and
utility coordination progress.
• Ensuring compliance to ADA requirements.
• Intentional and consistent communication
with project partners and impacted residents
and businesses.
Jon "Ric" Riemke, PE
Senior Construction Engineer
Relevant Trail Experience:
• LaSalle Trail from Cleveland Road to Darden
Road - St. Joseph County, Indiana
• C.R. 8 Shared Use Path - Elkhart,Indiana
• Boston/Larson Street - LaPorte, Indiana
• North Oakland Avenue - Nappanee, Indiana
Ric’s areas of experience and
knowledge include:
LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C.
Olive Street & Sample StreetBittersweet/Day Road Boston/LarsonLaSalle Trail
LFA and Ric Riemke have significant knowledge
coordinating work with LPA Projects involving
trails and will apply this experience to the success
of the City of South Bend's project.
C.R. 8 Shared Use Path North Oakland Avenue
South Bend | Coal Line Trail (Phase I) from Lincoln Way West to Riverside Drive (Des. No. 1401810) | Page 4LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C.
KEY STAFF
Randy is a Senior Construction Inspector with experience in
road and bridge rehabilitation/replacement projects throughout
northern Indiana. He has been working as an inspector for
state, local, and public agencies on federal-aid and locally
funded projects throughout his career.
Certifications
• Hot Mix Asphalt (Construction)
• Bridge Construction and Deck Repair
• Concrete Paving
• Construction Earthworks
• Construction Layout, Measurement and Pipe Structures
Construction Project Types
• Roadway Construction/Reconstruction/Resurfacing
• Sanitary Sewer
• Expanded Polystyrene (EPS)
• Bridge Construction/Reconstruction
• Water and Watermain
• CIPP Lateral Lining
• Traffic Signals/Signing
• Underdrains
• Directional Drilling
• Lighting
• Subgrade Treatment
• Inverted Siphon
• River Crossings
• Concrete Pavement/Barrier Wall
• Jack and Boring
• HMA Pavement
Past Project Experience
• U.S. 41, Section 3, Hoffman to Huehn
• U.S. 12/Amtrak Bridge at Bethlehem Steel Entrance
• Indiana Toll Road - Milepost 17 Interchange
• I-94 (U.S. 421 to U.S. 20/35)
• S.R. 49 (Toll Road to U.S. 12)
• U.S. 31 from I-80 (Toll Road ) to Michigan State Line
Senior Construction Inspector
Randy Kilbase
Josh is responsible for documenting work, recording material
data, tracking quantities, material testing, and assisting the
project supervisor with daily project requirements. He has
worked as an inspector for state, local, and public agencies on
federal-aid and locally-funded bridge, road, and utility infrastructure projects since 2008.
Certifications
• ACI Concrete Field Testing Technician Grade I
• INDOT Certified Technician (all categories)
• INDOT Qualified Technician Tests
• INDOT SiteManager Certification
• IWEA Water & Sewer Construction Observation
• OSHA 10 Hour Training-Construction
Construction Project Types
• Road Reconstruction
• Bridge Rehabilitation
• Intersection Improvements
• Multi-Use Path
• Sanitary/Storm Sewers
• Watermain
• Roundabout
• Traffic Signal
• MSE Wall Installation
Past Project Experience
• Cleveland Road Reconstruction and Bridge Rehabilitation, South Bend, Indiana
• S.R. 49 at C.R. 400 North New Interchange and Bridge Construction, Valparaiso,
Indiana
• Prairie Street Railroad Grade Separation, Elkhart, Indiana
• Lake County Bridge No. 2 Replacement, Crown Point, Indiana
• 169th Street Rehabilitation, Phase IV, Hammond, Indiana
• Calumet, Roosevelt, and Vale Park Roundabout Construction Inspection,
Valparaiso, Indiana
• Sixth Street Reconstruction Phase V from Rickey Road to C.R. 225, Monticello,
Indiana
Construction Inspector
Josh Reeves
LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C.
City of South Bend | Coal Line Trail (Phase I) from Lincoln Way West to Riverside Drive (Des. No. 1401810) in LaPorte District | Page 5LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C.
KEY STAFF
Certifications
• Bituminous Paving
• Bridge Construction/Deck Repair
• Concrete Paving
• Traffic, Miscellaneous Concrete, and Miscellaneous
Construction Items
• Construction Layout/Measurement Pipe Structures
• Construction Earthwork
• INDOT PE/PS Training
• Certified Technician Program
• Confined Space Entry
• Competent Trenching and Excavation
• PCCP/HMA Field Supervisor
• Radiation Safety and Safety Officer Training
Construction Project Types
• Roadway Construction/Reconstruction/Resurfacing
Roundabouts
• Bridge Construction/Reconstruction
• Sanitary/Storm Sewers/Watermain
• Conspan/Box Culvert Installation
• Jack and Bore
• Traffic Signal
Past Project Experience
• Olive Street and Sample Street Overpass Intersection
Reconstruction
• Miami Road from Jackson to Kern
• Diamond Avenue
• South Main Street to Lafayette Boulevard
• S.R. 49
• U.S. 6 Added Travel Lanes
• Indiana Toll Road - Milepost 17
• U.S. 12 over CSXT & Norfolk & Southern Railroad
• C.R. 4 over Christiana Creek
• U.S. 30 and U.S. 41 Intersection Improvements
QA/QC Liason
Donald R. Dietz
Certifications
• Professional Engineer – Indiana 19800331
• INDOT SiteManager Certificate of Proficiency
• INDOT Certified Technician
• INDOT Construction Storm Water Certification
Construction Project Types
• Hydrologic & Hydraulic Calculations
• Grading Plans
• Earthwork Calculations
• Site Development
• Storm Sewer Design
• Concrete Testing
• Construction Observation for INDOT & LPA Projects
• Field Testing
Construction Inspector
Tracy McCormick
LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C.
Since 1971, LFA has been directly involved in numerous
projects throughout the northern and central Indiana
area. Serving the needs of municipalities, counties
and INDOT, our team works with clients from project
inception through construction. Our experienced
staff has the breadth, depth and collective project
experience to meet the unique requirements of our
clients and their construction inspection needs. LFA is
well versed in nearly all facets of transportation and
municipal engineering and will be at the forefront of
ensuring successful completion of your project.
American Structurepoint employs construction
inspectors, licensed engineers, surveyors,
environmental specialists, right-of-way engineers, and
land acquisition experts who work collaboratively to
move roadway improvement projects from concept to
completion and are recognized for their professionalism,
quality work, and customer service. They will become
invested in your vision throughout the entire project.
McCormick Engineering, LLC (ME), and VS Engineer,
Inc. (VS) are certified Indiana DBEs. ME is also a
certified WBE. The firms have teamed with LFA on
various construction inspection projects. They are
committed to understanding the needs of each project
and are able to define project success by their ability
to meet the goals and objectives of the client. Based
on these objectives, ME and VS will be an asset to the
success of your project.
Certifications
• IDOT Certificate, Doumentation of Contract
Quantities
• INDOT PE/PS Training
• INDOT SiteManager
• INDOT Certified Technician Program
Construction Project Types
• Traffic Signal Installations
• Intelligent Traffic System Installations (ITS)
• HMA Paving (Overlays, Widenings)
• Concrete Material Projects (Sign Foundations, Bridge
Deck Repairs/Replacements)
Construction Inspector
Fidel Chavez (VSE)
City of South Bend | Coal Line Trail (Phase I) from Lincoln Way West to Riverside Drive (Des. No. 1401810) in LaPorte District | Page 6LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C.
Coal Line Trail (Phase1) from Lincoln Way West to Riverside Drive
PROJECT UNDERSTANDING
The Coal Line Trail Project is a 2-phase project that
utilizes the existing NFS right-of-way corridor to connect
areas of urban redevelopment to existing shared use
infrastructure to facilitate pedestrian movement and
encourage neighborhood revitalization. Phase 1 of
the trail project is a Local Public Agency (LPA) Project
funded with CMAQ federal dollars and a 20% local
match. The purpose of this rails to trails project is to
construct a shared use path connecting the Lincolnway
West corridor and surrounding neighborhoods to the
established Riverside Trail. Additional project drivers
are to improve pedestrian safety and connectivity to
community assets like schools and parks. The project
will result in approximately 4,000 lft of separated shared
use path requiring roadway work and intersection
improvements; along with trail amenities to enhance
functionality and safety. The project has an estimated
construction amount of $1,919,420 with an anticipated
project duration of 5 to 6 months. Through a meeting
with the City of South Bend on December 21, a site visit
and a review of the most recent available plans, LFA
has gained a clear understanding of the critical project
elements, which are listed below, that will assist us in
achieving a successful project for the City of South Bend.
Roadway, Intersections, Grading and MOT
Roadway improvements will be required on Wilber
Street to accommodate the path as it heads toward the
old railroad right-of-way. This work will include reducing
the overall pavement
widths by adjusting the
east curb line; resulting
in adjustments to the
storm sewer network
and overhead utilities
along with intersection
improvements at Lincolnway West and Van Buren Street,
which include curb ramps. Coordination with Monarch,
a laundering business, that occupies buildings on both
sides of Wilber Street will be required during construction.
LFA has the experience and the management skill set to
ensure that Monarch can maintain operation between
buildings throughout the project duration.
The intersection of Vasser Avenue and Lawndale
Avenue will require radius improvements, installation
of curb ramps, storm sewer adjustments, installation of
curb ramps at each quadrant and additional concrete
work for trail amenities. Additional work includes mill
and overlay of the intersection. Grading outside the curb
and HMA finished surface grades will be important to
achieve intersection mobility and a proper drainage.
Significant grading will be
required as the path splits
just south of Portage
Avenue. This will require
significant clearing and
grubbing. Benching the
existing 2:1 slope and
properly placing fill to achieve desired grading will
be critical. Installation of a storm sewer network and
establishing the outfall at the existing basin on Angela
Boulevard will require work through the existing Portage
Avenue structure. While no modifications to the
structure are anticipated, LFA designed this structure
and has intricate knowledge should any issues arise
during construction. Lincoln Way WestLincoln Way WestHoly CrossHoly CrossMuessel GroveMuessel Grove
ParkPark
Diamond AvenueDiamond Avenue
Muessel Muessel Intermediate
Intermediate Portage AvenuePortage AvenueWoodward AvenueWoodward AvenueBrownfieldBrownfield
Park Park
Riverside DriveRiverside Drive
St. Joseph RiverSt. Joseph River
LFA has the experience and the management
skill set to ensure that Monarch can maintain
operation between buildings throughout the
project duration.
Shopping CenterShopping Center
City of South Bend | Coal Line Trail (Phase I) from Lincoln Way West to Riverside Drive (Des. No. 1401810) in LaPorte District | Page 7LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C.
PROJECT UNDERSTANDING
The mid-block path crossing at Woodward Avenue
includes a speed table and a solar powered pedestrian
crossing signage. The installation of the speed table will
require storm sewer inlets to capture drainage on the
upstream side of the speed table. LFA will ensure that
casting elevations are properly set to achieve proper
drainage.
Each of these identified areas requires specific attention
to grading plans and ADA requirements. Modifications
to the details for grades and curb ramp layout will require
coordination with the designer and contractor followed
by proper documentation of the modifications. LFA has
the experience to navigate any modifications that may
arise during the project.
All vehicular traffic will be maintained during the project
except for Woodward Avenue, which will require a
detour. Pedestrian traffic for Lincolnway, Wilber Street,
and the Vasser/Lawndale Intersection will require detour
routes as well. Special attention should be paid to the
Vasser/Lawndale Intersection as it is flanked by Muessel
Intermediate School, Holy Cross, and Muessel Park and
needs to accommodate pedestrian traffic throughout
the project.
Utilities, Relocations and Lighting
Construction along Wilber Street, intersection
improvements at Vasser/Lawndale and improvements
near the shopping center will require relocation of
AEP overhead utility facilities. These facilities are
also occupied by several other telecommunications.
Frequent and early coordination will be paramount to
maintaining schedule on these relocations.
Coordination with the City of South Bend Water
Department will be required to extend a service
line to the drinking fountain at the Vasser/Lawndale
Intersection. This typically requires installation of the
fountain, service line and meter with a final inspection
prior to making the final connection between the meter
and service line. LFA will coordinate directly with the
Water Department to ensure this is completed. LFA
will also pay close attention to the proposed storm
sewer crossing at Woodward Avenue as the City has an
existing 8” and 12” watermain in that vicinity. LFA will
work with the contractor and City to pothole to verify
depth prior to extensive work in the area.
Lighting will be installed along the entire project length
with casing pipes installed at each intersection, road
and structure crossing. Once installation of the bases,
conduit, and wiring is competed the service point will
need to be energized. LFA will coordinate with AEP,
the contractor and the City to ensure the completion of
the process and transfer of proper billing for the meter
connection.
Utility delays can have a major impact on schedule
and budget; cost incurred as a result of delays is not
reimbursed by INDOT. LFA has significant experience
in working through utility relocation plans and schedules
and will apply that knowledge to successfully address
proper coordination.
Architectural Features and Landscaping
Architectural features on the project include benches,
3 different bollard types, bike repair stations, a drinking
fountain, lighting, a shade shelter and wayfinding
signage. These items often have long lead times, making
early shop drawing review imperative to the project
schedule. Also critical is ensuring bolt patterns for the
foundations of these various features is procured so
that the contractor can proceed with construction while
waiting for the manufacturing process. Both items will
be emphasized during the Pre-Construction Meeting
and will remain focal points on progress meetings until
completion.
Landscaping on the project includes the planting of
trees, shrubs, and grasses. Proper watering and timing
of these plantings is critical to establishment and long-
term survival. Successful acceptance of these plantings
will be critical to achieve Notice of Termination (NOT)
on the project.
AEP Overhead UtilityPedestrian MOT Routes
Vehicular MOT Routes
City of South Bend | Coal Line Trail (Phase I) from Lincoln Way West to Riverside Drive (Des. No. 1401810) in LaPorte District | Page 8LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C.
PROJECT APPROACH
Communication
LFA’s goal is to keep City of South Bend Public Works
staff well-informed of project progress through Bi-Weekly
Progress Meetings. An example of the items to be covered
at the progress meeting can be seen adjacent to this
paragraph. However, communication is not limited to the
owner or the bi-weekly timeframe. LFA has found that
creating a Log of Resident Concerns serves to not only
keep a timeline of issues and concerns but also to allow
for timely responses, resulting in more satisfied residents
and businesses. Toy Villa and Kyle Silveus, City of South
Bend’s project contacts, will be updated regularly as to
the status of all construction activities. Communication
also includes maintaining a level of project awareness
with the public and appropriate entities prior to closures
or other construction activities which may result in
disturbance of the normal traffic operations in the area.
When appropriate, LFA’s project supervisor will reach
out to schools, local residents, and business owners/
operators to explain pending construction events and
allow for ample time to alter schedules or operations
as the situation might dictate. This specifically will
be employed with the Monarch on Wilber Street and
both Schools
near the Vasser
and Lawndale
intersection. The
LFA inspection
team is committed
to ensuring that
sufficient and safe
access is always
provided.
Proactive Project Inspection
We challenge our staff to be problem solvers, to look
forward anticipating and identifying potential issues.
Individual members of LFA’s construction inspection
team can draw upon the collective experience of our
entire inspection team should issues arise that require
specialized attention. Our experience allows us to
identify issues early, enabling multiple possible solutions
to be explored with the most fitting being presented to
City staff for consideration and evaluation. This cross-
sharing of experience provides a proactive approach to
resolving construction issues resulting in savings of both
time and expense.
$$Cost Savings And
Containment
As mentioned previously, being diligent
regarding utility relocations will be critical
to the project’s success and maintaining schedule.
Utility delays can have a major impact on schedule
and budget; cost incurred as a result of delays is not
reimbursed by INDOT. LFA has significant experience
in working through utility relocation plans and schedules
and will apply that knowledge to successfully manage
the relocation of the overhead utilities. As demonstrated
above, this project will rely heavily on previous experience
in the areas of ADA requirements, utility relocation, strong
project management, and excellent communication
skills. LFA exemplifies these attributes. This approach
to construction inspection has often resulted in cost
savings to the client on the constructed project and
the inspection budget. Additionally, this allows City of
South Bend staff to engage only when critical items or
decisions need to be addressed. Even in this interaction
it is our approach to provide options for addressing
these issues and not just drop the problem at the feet
of your staff. An example of this approach resulting in a
successful project is the Olive Street & Sample Street
Overpass Project that resulted in a savings of $400,000
in construction costs while utilizing approximately 85%
of the construction inspection fee.
Bi-Weekly Progress Meeting
Agenda
• Appropriate Attendees – Contractor,
Subcontractors, City of South Bend, INDOT, LFA,
Utilities, and Designer (if needed)
• Review of Construction Progress-to-Date
• Scheduled Work for Upcoming Period
• Overall Schedule Review
• Seeding, Sodding Dates, Tree Removal Dates
• Delays
• Utility Relocation Progress
• Signal Work Coordination
• Change Orders
• City of South Bend Concerns
• Material Certifications/Testing
• Submittals/Shop Drawings
• Benches, Ballards, Lighting, Shelter, etc.
• Failed Materials
• Maintenance of Traffic/Access
• Safety
• Security
• Public Relations (Municipal Concerns, Resident
Issues, Public Communication)
• Contractor Issues
• Inspection Team Issues
Ongoing Communication
• Active Utility Coordination Updates
• Schools, Resident and Business Concerns Log
• Discuss Changes to (MOT) and Notifications -
Provide Proper Notifications
• Muessel Intermediate and Holy Cross
• Upcoming Work/Progress to Date/Outstanding
Issues
• Erosion Control and Environmental/Permit
Requirements Status
Muessel Intermediate
Holy Cross School
South Bend | Coal Line Trail (Phase I) from Lincoln Way West to Riverside Drive (Des. No. 1401810) | Page 9LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C.
RELEVANT EXPERIENCE
The Diamond Avenue Reconstruction Project, Phase I consisted of a full reconstruction of
the Riverside Drive/Angela Boulevard Intersection. The reconstruction included full-depth
pavement replacement, new storm drainage, installation of a roundabout, Conspan structure,
retention basin and green outfall treatments, manufactured
stone retaining walls and installation of a pedestrian/bike
path near the Notre Dame Campus. The pedestrian/bike
path included features such as handrails, architectural
brick and pillar treatments, and access ramps with specific
signage. Field adjustments to the drainage and path features
enhanced the final product and client satisfaction.
A challenging feature of the project included a highly active
adjacent neighborhood which, during Notre Dame home
games, experiences elevated levels of traffic. The use of Google Documents software and
public daily blogs allowed the project supervisor to provide real time project updates to
the public including access and maintenance of traffic issues. Additionally, it allowed the
City of South Bend to track quantities, change orders, budget and overall project status in
real time. LFA was heavily involved in coordinating the Maintenance of Traffic set-up for
the construction area for home game weekends. This coordination included interaction
and planning with the South Bend Police Department, Engineering, and the general public.
Utilizing the internet based application allowed LFA to effectively communicate with the
general public during these high traffic time periods.
Diamond Avenue
City of South Bend, Indiana
Client: City of South Bend
Cost: $3.1 million
Key Staff: Paul Hummel, Don Dietz
Project Manager: Toy Villa
Lawson-Fisher Associates P.C. was selected by St. Joseph County to perform
construction inspection services for an extension of the LaSalle Trail multi-use path
between Cleveland Road and Darden Road. This section of trail is approximately 1/2
mile in length, along a straight and generally level section
of an old railroad right-of-way and includes crossings of
both Cleveland Road and Juday Creek. The high volume
of traffic along Cleveland Road made an uncontrolled
pedestrian and bicycle crossing hazardous. The plans
included a High intensity Activated CrosswalK (HAWK)
pedestrian crossing at this location. The HAWK signal
is pedestrian activated and coordinated with the nearby
traffic signal located at the intersection of S.R. 933 and
Cleveland Road. The curve on Cleveland road west of the crossing made visibility of the
HAWK signal difficult. During construction, LFA coordinated with St. Joseph County
and INDOT to add a flashing beacon at the beginning of the curve to warn motorists of
the upcoming activated HAWK signal. LFA performed inspection of the construction
activities that included testing of subgrade, portland cement concrete pavement and
modular block retaining wall. The existing railroad bridge over Juday Creek was utilized
by rehabilitating the structure with new wooden decking and handrails. LFA prepared
and submitted the Final Construction Record at the end of construction.
LaSalle Trail
St. Joseph County, Indiana
Client: St. Joseph County
Cost: $441,000
Key Staff: Paul Hummel, Jon "Ric" Riemke
Project Manager: Jessica Clark, PE
Key Relevant Project Aspects
• Multi-Use Path Construction
• Significant Utility Relocations
• Significant Client and Public Communication
and Coordination Efforts
• Road Reconstruction
South Bend | Coal Line Trail (Phase I) from Lincoln Way West to Riverside Drive (Des. No. 1401810) | Page 10LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C.
RELEVANT EXPERIENCE
Leading a team of LFA, Lochmueller, and McCormick Engineering staff, Don Dietz
served as the Project Supervisor and provided Construction Observation and
Inspection services for the Olive Street & Sample Street
Overpass Intersection Reconstruction Project. The project
was a combined effort between St. Joseph County and
the City of South Bend. This multi-jurisdictional and multi-
construction season project included bridge rehabilitation
on both Olive Street and Sample Street bridges over the
Norfolk Southern and Grand Trunk Western Railroad
(Canadian National), requiring significant coordination.
Additional work included reconstruction of 3,660 ft of
Olive Street and 2,750 ft of Sample Street to improve
drainage, install lighting, and improve pedestrian movement. A roundabout was also
constructed at the intersection of Olive Street and Sample Street. Significant effort was
required to coordinate utility relocations for MetroNet, AEP, NIPSCO, and Comcast.
Additionally, LFA coordinated water utility work with the City of South Bend during the
street reconstruction and roundabout construction process. Beyond the coordination
challenges on the project, Don worked with the County
to determine a better temporary barrier rail system on
the bridge that resulted in less long term maintenance
concerns on the bridge deck. One of the most critical
items of this project was Maintenance of Traffic and
impacts on local residents, businesses, and industry. Don
proactively addressed these concerns through direct
contact with the impacted parties.
By actively engaging the contractor on work flow and
anticipated upcoming work, Don Dietz successfully managed the Olive Street &
Sample Street Overpass Intersection Reconstruction project which resulted in a
savings of $400,000 in construction costs while only utilizing 85% of the construction
inspection budget.
Olive Street & Sample Street Overpass Intersection Reconstruction
South Bend, Indiana
Client: St. Joseph County, Indiana
Cost: $10.6 million
Key Staff: Paul Hummel, Don Dietz, Darrell Baker
Project Manager: Andrew Hayes
Key Relevant Project Aspects
• Road Reconstruction
• Significant Utility Relocations
• Significant Public Communication and
Coordination Efforts
• Pedestrian MOT
South Bend | Coal Line Trail (Phase I) from Lincoln Way West to Riverside Drive (Des. No. 1401810) | Page 11LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C.
RELEVANT EXPERIENCE
This project was for the construction of approximately 1/2 mile of a new shared path
along CR 17 and CR 10/8. LFA provided construction services and worked closely with
the Elkhart County Engineering Department who provided onsite inspection. The path
was built over an existing tributary to the St. Joseph River. In the area of the tributary,
approximately 675 ft of peat needed to be excavated along the path. After the peat
was removed the contractor placed and compacted into
the soft soil (marl) No. 2 stone. This operation continued
until the stone could no longer be pushed into the soil.
Prior to, during and after the placement of the stone a
Geotechnical Engineer from INDOT’s list of approved firms
visited the site to provide guidance and recommendations.
LFA coordinated with the Geotechnical Engineer and
implemented the recommendations. At the end of the
operations the Geotechnical Engineer approved the
subgrade and the remaining pavement section was constructed which consisted of
geotextile over the stone, approximately 1/2 ft of "B" Borrow and 1 ft of No. 53 stone for
the base of the asphalt path. The contract quantity of the No. 2 stone was not needed
to obtain the approved subgrade to begin construction, this resulted in a savings to the
contract of approximately $21,000. In this area LFA also ensured the contactor placed
and maintained appropriate erosion control measures to prevent sediment from entering
the waterway. The project was completed on time and was approximately 11 percent
under the original contract amount.
C.R. 8 Shared Use Path
Elkhart, Indiana
Client: Elkhart County, Indiana
Cost: $315,750
Key Staff: Jared Huss, Jon "Ric" Riemke,
Project Manager: Tom Rushlow, PE
LFA provided construction inspection services for the Boston Street/Larson Street and
S.R. 2 Intersection reconstruction project in LaPorte. This intersection improvement project
included HMA pavement replacement, significant utility relocations (NIPSCO, Verizon,
Comcast), multiple Maintenance of Traffic Phases, new storm sewer construction, water main
relocation, modular block wall construction, installation and maintenance of erosion control
measures. and traffic signal installation. Project improvements
required the demolition of two houses and one business. LFA
ensured the contractor secured the proper IDEM permits
and disposed of abandoned underground storage tanks in
accordance with State and Federal regulations. LFA also
ensured the contractor coordinated with the Norfolk Southern
Railroad during the jack and bore of a 60 inch steel casing
pipe under their tracks for the proposed 36 inch storm sewer.
LFA coordinated with the City, local residents and businesses
to ensure that access was provided to their properties during construction. LFA was able to
coordinate with the City and one business, which was impacted the most by the construction,
to revise the maintenance of traffic plan to accommodate their delivery trucks which cut
approximately one month off the completion date for the project.
LFA provided complete construction inspection services in accordance with INDOT criteria
and played a key role in all on-going construction engineering decisions. Construction
documentation was completed using INDOT’s SiteManager software.
.
Boston/Larson Street Reconstruction and S.R. 2 Intersection
LaPorte, Indiana
Client: City of LaPorte, Indiana
Cost: $1.1 million
Key Staff: Paul Hummel, Jon "Ric" Riemke, Darrell Baker
Project Manager: Nick Minich, PE
Key Relevant Project Aspects
• Significant Utility Coordination Efforts
• Multi-Lane Road Reconstruction with
Multi-Use Path
• Pedestrian and Vehicular MOT
Page 1 of 1
Request for Proposals Bulletin: City of South Bend, Indiana
Coal Line Trail (Phase I) from Lincoln
Way West to Riverside Drive
(Des. No. 1401810) in LaPorte District
AFFIRMATIVE ACTION CERTIFICATION
I do hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business
Enterprises (DBEs) certified in the State of Indiana to participate as part of this proposal. I acknowledge that this
certifications to be made an integral part of this proposal. I understand and agree that the submission of a blank
certification may cause the proposal to be rejected. I certify that I have consulted the following DBE website to
confirm that the firms listed below are currently certified DBEs:
https://financial.gmis.in.gov/psc/guest/EMPLOYEE/ERP/c/SOL_APPS_MWBE.SOI_DBE-CERT.GLD?&
I certified that I have contacted the certified DBEs listed below, and if my company becomes the CONSULTANT,
these DBEs have tentatively agreed to perform the services as indicated.
I understand that neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract
award, any change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must
have prior approval by INDOT’s Economic Opportunity Division.
SUBCONSULTANTS
DBE SUBCONSULTANTS TO BE APPLIED TOWARD GOAL
Certified DBE Name Service Planned Estimated Percentage to be Paid to
DBE*
McCormick Engineering, LLC 13.1 2%
VS Engineering, Inc. 13.1 3%
DBE SUBCONSULTANTS TO BE USED BEYOND GOAL
Certified DBE Name Service Planned Estimated Percentage to be Paid to
DBE*
Total Percentage Credited toward DBE Goal: 5 %
DBE Total Percentage of Voluntary DBE Work Anticipated over DBE Goal: 0 %
Name of Company: Lawson-Fisher Associates P.C.
By: Date: January 12, 2021
Paul A. Hummel, P.E., President/Senior Civil Engineer
*It is understood that these individual firm percentages and dollar amounts are estimates only and that amounts paid
may be greater or less as a result of negotiation of the contract scope of work. My firm will use good faith efforts
to meet the overall DBE goal through the use of these or other certified and approved DBE firms.
Indiana DBE Certification Program
In accordance with 49 CFR Part 26 as published in the code of federal regulations, the Indiana
Department of Transportation acknowledges
VS Engineering, Inc.
as a certfied DBE in the State of Indiana.
Date Issued:04/07/2014 No Change Affidavit Due:08/31/2021
(Reference the Indiana Department of Transportation's DBE Public Search at
http://www.in.gov/2674.htm for the most current information regarding this certification)
Elizabeth Kiefner Crawford, Director
Economic Opportunity Division
Derrick Casson, Certification Manager
Economic Opportunity Division