Loading...
HomeMy WebLinkAboutOpening of Proposal - Coal Line Trail Phase I Proj No. 115-063 - Christopher B. Burke Engineering, LLCJanuary 8, 2021 Kyle Silveus, PE Assistant City Engineer 227 W. Jefferson Blvd. 1316 County-City Building South Bend, IN 46601 Dear Mr. Silveus: Trail projects can appear to be a walk in the park to those of us in the engineering field, but to the many families in the adjacent neighborhoods that have to adjust their lives during construction, it becomes inconvenient and frustrating without effective communication and coordination by an experienced construction team. The city of South Bend’s Coal Line Trail, Phase I construction inspection project will be a success with a construction management team who will bring solid communication skills, recent trail experience, seamless construction coordination, and familiarity with the project area. Burke has experience working for the city on challenging construction inspection projects. Our team knows and understands your process. This knowledge, experience, and longstanding established relationship provide us with the tools to avoid gaps or missteps in the construction management process. Our proposed subconsultant, Advanced Engineering Services (AES), completes our construction management team and is a registered MBE/DBE. AES will be a key member to our team by providing crucial material testing and geotechnical support. Our commitment to detail and strong communications has afforded us a reputation as a professional team that can address nearly any construction issue, even an accidental discovery like the one found on the Boland Trail project. We applaud your efforts to improve the trail connectivity in South Bend and we look forward to working with you during the construction of this project. Thank you in advance for your consideration. Sincerely, Jon D. Stolz, PE Managing Vice President jstolz@cbbel-in.com Indianapolis Columbus Crown Point South Bend cbbel-in.com 317-266-8000 Coal Line Trail | Page 2 FIRM PROFILE Stemming from water resources, our passion to enhance and preserve our environment has deepened through exciting and diverse projects. This passion drives our staff to deliver the exceptional service our clients have come to expect. Christopher B. Burke Engineering, LLC, provides planning, design and construction management services for municipal and private infrastructure projects ranging from transportation and recreation to flood control and environmental management. When it comes to construction engineering, Burke engineers have tackled multi-year tunneling projects, week-long ADA update projects, and everything in between. Inspections involve not only visually confirming construction practices but also coordinating teams in sometimes difficult situations. Burke’s commitment to communication means fair and effective management in the ability to address nearly any construction issue. Services Roadway and trail construction Underground infrastructure Dam and levee inspection Private development Sewer rehabilitation Small structure replacement 50 32 professionals solving problems years in business 4 83,000 offices across Indiana miles biked to work Burke by the numbers Construction engineering for sustainable solutions. Coal Line Trail | Page 3 RELEVANT PROJECT EXPERIENCE The city of South Bend sought to create a connection between communities on the west side of the city with the popular trail along the Saint Joseph River downtown. Boland Drive was historically dangerous for pedestrians and cyclists. The city turned to Burke to help with the construction and project management of a new trail that would increase the area’s safety and connectivity. The project site proved challenging, winding along wetlands and an old known pauper cemetery. Through consistent progress meetings and the use of mobile workstations, the project team was able to construct a new trail without disturbing the surrounding environment. PROJECT HIGHLIGHTS • Trail construction to connect communities with existing downtown trail system • Construction in environmentally-sensitive areas • Construction observation and project management services • INDOT SiteManager and mobile workstations streamlined the process and kept costs to a minimum CLIENT City of South Bend Toy Villa 574.235.5920 TIME PERIOD 2018 - 2019 COST $1,346,996 PROJECT TEAM Jason Durr Mike Carey BOLAND DRIVE SHARED-USE PATH | SOUTH BEND, IN Coal Line Trail | Page 4 As one of the main corridors into downtown Elkhart, Main Street was in need of an upgrade to make the street safer and more inviting. Main Street, like many city roads and streets, was originally designed specifically for vehicular traffic. The city wanted to design improvements to help make the corridor more accessible and beautiful. The Burke team worked with the city to devise a phased construction approach, giving the city the option to implement projects as the funds became available. The improvements will provide better access to the homes and businesses along the corridor, as well as safer pedestrian facilities. The team incorporated green infrastructure practices to address the localized drainage issue, providing environmentally-friendly solutions that will last well into the future. PROJECT HIGHLIGHTS • Topographic survey • Geotechnical investigation • Community engagement • Concept development • Design • Rule 5 Permit • Bidding assistance CLIENT City of Elkhart Jeff Schaffer 574.293.2572 TIME PERIOD 2017 - Present PROJECT TEAM Jason Durr Mike Carey Andy Gebhard Matt Derucki SOUTH MAIN STREET STREETSCAPE IMPROVEMENTS | ELKHART, IN RELEVANT PROJECT EXPERIENCE Coal Line Trail | Page 5 RELEVANT PROJECT EXPERIENCE Westenedge Drive is a collector street passing through a residential neighborhood in Columbus, Indiana and is also a major vehicular and pedestrian route to elementary, middle and high schools. Despite the high traffic volume in the area, the street did not have a storm drainage system. The Burke team designed transportation improvements including a new multi-use path on the east side as part of the city’s People Trail system and a sidewalk on the west side. A new chicane designed for the intersection at Laurel Drive serves as a traffic calming measure. The drainage design was especially challenging as the city requested it stay within the current right-of-way. There was very little grade change, no nearby storm sewers, and no receiving waters with adequate capacity to accept additional runoff. Burke engineers designed the project with a PaveDrain gutter above an infiltration system, taking advantage of the granular soils in the project area. PROJECT HIGHLIGHTS • Extensive public involvement phase which included neighborhood meetings • Challenging drainage design to stay within current right-of- way • Main route to multiple schools meant increased pedestrian traffic • Proposed improvements includng curb, pave drain gutter, drainage swales, sidewalk, multi-use path, and a chicane for traffic calming • PaveDrain gutter above an infiltration system to collect runoff and improve water quality CLIENT City of Columbus Dave Hayward 812.376.2540 TIME PERIOD 2006 - 2013 2016 - 2019 CONSTR. COST $1,750,000 PROJECT TEAM Jenny Leshney Andrew Miller Sheila McKinley Sarah Wright Angela Force Jason Durr WESTENEDGE DRIVE IMPROVEMENTS | COLUMBUS, IN Coal Line Trail | Page 6 RELEVANT PROJECT EXPERIENCE JEFFERSON BOULEVARD STREETSCAPE | SOUTH BEND, IN The Jefferson Boulevard streetscape project was one of South Bend’s first projects to incorporate complete street concepts. With mulitple projects under construction at the same time, the city asked Burke to provide construction observation as well as project management services for this groundbreaking project. Garnering buy-in from the community and store owners along Jefferson Boulevard was of utmost importance for the first of many planned projects of this type. The city worked to create a space that was aesthetically pleasing and functional for pedestrians and vehicular traffic at the same time. Updated intersections, improved pedestrican crossings and paths, and improved parking all added to the project’s benefits. In an effort to streamline the construction process, our inspectors created a Google Docs account as well as a project blog to share with the entire project team. Using the technology in this way kept the team easily informed with daily progress updates. Burke managed the project to complete it on time and within budget. PROJECT HIGHLIGHTS • Streetscape project incorporating complete street concept • Blog and Google Docs for easy distribution of daily updates • Part-time construction observation • Field reports, record keeping and daily logs of progress • Payment application processing • Project management and close-out CLIENT City of South Bend Division of Engineering TIME PERIOD 2014 CONSTRUCTION COST $1,496,000 PROJECT TEAM Jason Durr Jeremy Morris Coal Line Trail | Page 7 Below is an organizational chart depicting the Burke project team. Led by project manager/lead inspector Mike Carey, our team offers the knowledge and capacity to successfully complete the Coal Line Trail project. Our team includes Advanced Engineering Services. Burke has worked with AES on several projects and we believe that our strong relationship and technical expertise will be instrumental in providing efficient, responsive and creative solutions for the trail project. We have assembled our team members based on availability as well as technical expertise. Each firm has the depth and capacity to successfully complete the project in a timely manner. Specifically, Mike will be 100% available for this project based on his current and projected workload. City of South Bend Jason Durr Principal in Charge T.J. Gordon Construction Engineer Mike Carey Project Manager / Lead Inspector Daniel Parrett Construction Engineering Tech. Akhtar Zaman Principal Geotechnical Engineer AES ORGANIZATIONAL CHART Jose Vargas Project Manager/Senior Inspector AES Paul Taylor Field and Lab Technician AES Coal Line Trail | Page 8 TEAM RESUMES CERTIFICATIONS American Concrete Institute - Concrete Field Testing Technician - Grade I Confined Space Entry OSHA Construction Safety and Health INDOT Certified Technician: • Bridge Construction & Deck Repair • Construction Earthworks • Constr. Procedures Part 1 • Constr. Procedures Part 2 • Hot Mix Asphalt Paving • Concrete Paving Mike will lead the Burke team for the Coal Line Trail project. He has nearly 15 years of experience, including working for South Bend’s engineering department, giving him a familiarity with municipal projects and procedures. Mike’s responsibilities include planning, analysis, design, and review of site development, utility and stormwater, and roadway design projects. He coordinates with clients and government agencies, prepares contract documents, and assists with project bidding and construction administration. RELEVANT EXPERIENCE • Boland Drive Improvements Construction Inspection, South Bend, IN • Berens Monaldi Neighborhood Drainage and Roadway Improvements, Dyer, IN • South Main Street Streetscape Improvements, Elkhart, IN • High and Ireland Intersection Improvements, South Bend, IN • Weasel Creek Regulated Drain Maintenance Design, Grant County, IN • Chet Waggoner Court Construction Observation, South Bend, IN • Eisenhower Detention Basin Design, Warsaw, IN • Carmel Creek Floodway Permit and Letter of Map Revision, Carmel, IN • Sheetz Hardiman Tile Reconstruction, Benton County, IN • Mascot Hall of Fame Site and Parking Lot Design, Whiting, IN • Cordry Sweetwater Elk Drive Stabilization, Brown County, IN MIKE CAREY PROJECT MANAGER / LEAD INSPECTOR REGISTRATIONS Professional Engineer IN, MI CERTIFICATIONS FEMA Certified IS-00100, PW FEMA Certified IS-00200 RELEVANT EXPERIENCE • Boland Drive Improvements Construction Inspection, South Bend, IN • South Main Street Streetscape, Elkhart, IN • Berens Monaldi Drainage and Roadway Improvements, Dyer, IN • Ireland Road Intersection Improvements, South Bend, IN • Mascot Hall of Fame Site and Parking Lot Design, Whiting, IN • 117th Street Sewer and Water Replacement Project, Whiting, IN • Beckett’s Run Relocation Project, Fort Wayne, IN • Upper Beaver Lake East Lateral Ditches, Newton County, IN • Eisenhower Detention Basin Design and Downstream Drainage Report, Warsaw, IN • Weasel Creek Regulated Drain Maintenance Design, Grant County, IN • 5 Points Utility Relocation Report, South Bend, IN JASON DURR, PE PRINCIPAL IN CHARGE Coal Line Trail | Page 9 TEAM RESUMES CERTIFICATIONS INDOT Site Manager INDOT Certified Technician American Concrete Institute Concrete Field Testing Technician - Grade 1 IDOT Documentation of Contract Quantities RELEVANT EXPERIENCE • South Shore Stormwater Improvement Project, Cedar Lake, IN • Squirrel Creek Diversion/Midway Drive Detention Expansion, South Haven, IN • Taft Street Construction Services, Merrilville, IN • Lake County On-call MS4 Coordination Services, Lake County, IN • 129th Avenue Road Improvements, Cedar Lake, IN • Town Club Ditch Water Quality/BMP Improvement Project, Cedar Lake, IN • NIPSCO Gas Pipeline Project, South Bend, IN • Martha Street Storm Sewer Improvement, Highland, IN • 133rd Avenue Reconstruction, Cedar Lake, IN • Little Calumet Watershed Study, Lake County Surveyor’s Office, IN • Town Engineer Services, Cedar Lake, IN T.J. GORDON CONSTRUCTION ENGINEER CERTIFICATIONS Certified Inspector of Sediment & Erosion Control RELEVANT EXPERIENCE • City of Indianapolis Pennsy Trail Phase 3B, Indianapolis, IN • Taggart Memorial Restoration and Performance Venue, Indianapolis, IN • Franklin and Perry Townships Drainage Improvements, Indianapolis, IN • 21st & Butler Neighborhood Drainage Improvements Phase II, Indianapolis, IN • 37th & Lafayette/Washington & Burke Drainage Improvements, Indianapolis, IN • City of Indianapolis Department of Neighborhood and Business Services On-call Inspection Services, Indianapolis, IN • Fall Creek Tunnel CCS Inspection, Indianapolis, IN • Lower Pogues Tunnel CCS Inspection, Indianapolis, IN • Upper Pogues Abatement Inspection, Indianapolis, IN • Service Area 21 Water and Sewer Extension Inspection, Lafayette, IN DANIEL PARRETT CONSTRUCTION ENGINEERING TECHNICIAN Coal Line Trail | Page 10 TEAM RESUMES AES REGISTRATIONS Professional Engineer IN, IL, MI, WI LEED AP BD+C CERTIFICATIONS OSHA 40-hours HAZOPER OSHA 30-hours Construction Safety and Health ABET Program Evaluator for Civil Engineering Accreditation Programs RELEVANT EXPERIENCE • CN Underpass on 45th Street, Munster, IN • Wisconsin Street Bridge over Lake George, Hobart, IN • Bridges along Interstate 65 over Kankakee River, Lake/Newton Counties, IN • Railroad Relocation at Gary International Airport, Gary, IN • Main Street Bridge over Hart Ditch, Munster, IN • Chase Street Bridge over Little Calumet River, Gary, IN • Little Calumet River Levee, Lake County, IN • Wolf Lake Pedestrian Bridge over Calumet Avenue, Hammond, IN • State Road 249 Bridge over US Route 12 and Railroad Tracks, Porter County, IN AKHTAR (ART) ZAMAN, PE, LEED AP BD+C PRINCIPAL GEOTECHNICAL ENGINEER CERTIFICATIONS ACI Concrete Field Technician Level 1 ACI Concrete Laboratory Technician Level 1 ACI Aggregate Laboratory Technician Level 1 INDOT Approved Field and Lab Technician 10-Hour OSHA & 8 Hour Confined space entry training RELEVANT EXPERIENCE • Wolf Lake Pedestrian Bridge over Calumet Avenue, Hammond, IN • Gary Chicago International Airport Taxiway Improvements, Gary, IN • Crisman/Willowcreek Road Bypass Improvements, Portage, IN • Reconstruction of US12/20 Intersection, Gary, IN • Joliet Road Reconstruction, St. John, IN • CN Underpass on 45th Street, Munster, IN • Marquette Greenway Trail, Burns Harbor, IN JOSE VARGAS PROJECT MANAGER/SENIOR INSPECTOR CERTIFICATIONS ACI Field Technician Level I, Troxler Certified, Safety trained through e-rail safe ACI Lab Concrete Strength Testing Technician RELEVANT EXPERIENCE • 45th Street Grade Separation, Munster, IN • Data Center, Hammond, IN • USS Lead Remediation, East Chicago, IN • Gary Fire Station No. 5, Gary, IN • Hammond Sanitary District Improvements, Hammond, IN • BP Amoco Refinvery, Whiting, IN • Lyons Levee, Lyons, IL • Cline Avenue Bridge Reconstruction, East Chicago, IN PAUL TAYLOR FIELD AND LAB TECHNICIAN Coal Line Trail | Page 11 Project Familiarity Our team is aware of the importance of the Coal Line Trail and its connectivity to the Riverside Trail. The new Coal Line Trail will provide access for the Northwest and Near Northwest neighborhoods and connectivity to Muessel Grove and Brownfield Parks. Our team has explored the proposed project area and identified unique challenges for this project that include potential wetlands, old railroad corridor impacts, and construction access concerns. Also, adjacent to the project area are a combination of residential and commercial properties that will require diligent coordination and communication efforts to help navigate this project to a successful completion. While the railroad corridor does provide some isolation from the traveling public, mindful construction sequencing and traffic safety during construction of at-grade crossings will be critical. The immediate planning and field verification of grades and rights-of- way with the contractor prior to starting construction is crucial. Potential issues can be identified and addressed before they become costly field changes. Our team knows that each project area and each property is unique and will require constant care to deliver a final product that meets the need of the public as well as the expectations of the directly-impacted residents and neighborhoods. Scope of Services PROJECT APPROACH Project Initiation • Review of contract documents • Gather names of key contact persons • Coordinate with contractor to develop a schedule for contractor’s submittals • Conduct field visits prior to construction • Videotape project site prior to construction • Coordinate kick-off meeting with Burke project team and the city of South Bend staff Pre-construction Conference • Organize and set agenda for conference • Notify representatives of the city, contractor, utilities and INDOT • Develop and distribute meeting minutes and sign-in sheet • Phone non-attendees and verify pertinent information Coal Line Trail | Page 12 PROJECT APPROACH Field Office Filing System • Develop and maintain a filing system as outlined in the INDOT GIFE • Integrate electronic management, as required Full-time Construction Inspection • Inform contractor as soon as possible of observed deficiency in contractor’s work • Conduct regular project progress meetings. Keep and distribute project progress meeting minutes. • Complete a daily report and diary form for each day’s work in the format desired by the city and INDOT • Maintain a series of field notebooks, which will be used to record information that cannot be shown on the daily reports • Maintain a daily progressive record of the quantities and locations of materials placed • Submit weekly or monthly progress reports to the project manager, as required • Review the contractor’s schedule on a weekly basis and compare actual progress to the approved schedule with consideration of weather and field conditions • Collect and forward certified payrolls to the project manager, as required Shop Drawing / Submittal Review • Coordinate shop drawings and submittal reviews with the design engineer and city Survey / Layout Quality Assurance • Provide periodic checks of the contractor’s general layout for quality assurance Testing • Perform as needed on-site and at-plant inspection of materials at the direction of the city and in accordance with the INDOT GIFE manual Contractor Application for Payment • Review and agree to pay item quantities with contractor prior to submitting applications for payment • Review contractor’s applications for payment, sign and transmit payment applications to the city’s project manager and INDOT Change Orders • Implement change order procedures as outlined in the INDOT GIFE manual Project Close-out • Issue a certificate of substantial completion • Prepare a pre-final punch list • Conduct a final project walk-through with the city’s project manager and INDOT • Prepare and transmit a final project punch list • Verify completion of punch list items • Determine final quantities and complete daily progressive record • Assemble final project files and documents • Coordinate redline markup record drawings with the contractor throughout construction • Review and approve final application for payment and prepare final change order • Complete a final construction record Standard RFP Form Ver. 8-22-18 6 (Rev. 06/27/18) Des. #: Click here to enter text. Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE) I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f). I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confirm that the firms listed below are currently certified DBEs: INDOT: https://entapps.indot.in.gov/DBELocator/ KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx I certify that I have contacted the certified DBE’s listed below, and if my company becomes the CONSULTANT, these DBEs have tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division. I. DBE Subconsultants to be applied toward DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* % % % % II. DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* % % % % Estimated Total Percentage Credited toward DBE Goal:___________ Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal:__________ Company Name: ____________________________________________________________________ Signature: ___________________________________________ Date: ________________________ ∗ It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result of negotiation of contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these or other certified and approved DBE firms. Advanced Engineering Services Materials Testing 5 Advanced Engineering Services Materials Testing 5 5 Christopher B. Burke Engineering, LLC 5 January 8, 2021 Indiana DBE Certification ProgramIn accordance with 49 CFR Part 26 as published in the code of federal regulations, the Indiana Department of Transportation acknowledgesAdvanced Engineering Servicesas a certfied DBE in the State of Indiana.Date Issued:06/02/2014No Change Affidavit Due:09/30/2021(Reference the Indiana Department of Transportation's DBE Public Search athttp://www.in.gov/2674.htm for the most current information regarding this certification)Elizabeth Kiefner Crawford, DirectorEconomic Opportunity DivisionDerrick Casson, Certification ManagerEconomic Opportunity Division BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date January 4, 2021 Department Public Works Name Kyle Silveus Division/Bureau Engineering BPW Date January 12, 2021 Phone Extension 9083 Required Prior to Submittal to Board Legal Attorney Name: Clara McDaniels Controller Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing Michael Schmidt Check the Appropriate Item Type – Required for All Submissions Agreement Contract Proposal Addendum Professional Services Resolution Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Change Order No. C/O & PCA No. PCA Ease/Encroach. Traffic Control: Other: Required Information Company or Vendor Name N/A New Vendor Yes No If Yes, Approved by Purchasing MBE/WBE Contractor MBE WBE MBE/WBE Contractor Requested No Yes Name of Company Project Name Coal Line Trail Phase I Project Number ENG: 115-063 DES No: 1401810 Funding Source Riverwest TIF Account No. Amount N/A Terms of Contract Purpose/Description HNTE Opening of Proposals for Construction Inspection Services Required Contractor’s Certification Forms Attached (Non- Collusion, Non-Discrimination, Non-Debarment, E-Verify, Iran, etc.) Required For Change Orders Only Amount of Increase Decrease $ $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: % Dispersal After Approval Copy Original Kyle Silveus Chris Dressel 1/4/202101/04/20211/4/21ANNE FUCHSELIZABETH A. MARADIKGARY A. GILOTCLERKJORDAN V. GATHERSJOSEPH R. MOLNAR