Dear Mr. Silveus:
Trail projects can appear to be a walk in the park to those of us in the engineering field, but to the many
families in the adjacent neighborhoods that have to adjust their lives during construction, it becomes
inconvenient and frustrating without effective communication and coordination by an experienced
construction team. The city of South Bend’s Coal Line Trail, Phase I construction inspection project
will be a success with a construction management team who will bring solid communication skills,
recent trail experience, seamless construction coordination, and familiarity with the project area.
Burke has experience working for the city on challenging construction inspection projects. Our team
knows and understands your process. This knowledge, experience, and longstanding established
relationship provide us with the tools to avoid gaps or missteps in the construction management
process.
Our proposed subconsultant, Advanced Engineering Services (AES), completes our construction
management team and is a registered MBE/DBE. AES will be a key member to our team by providing
crucial material testing and geotechnical support. Our commitment to detail and strong communications
has afforded us a reputation as a professional team that can address nearly any construction issue, even
an accidental discovery like the one found on the Boland Trail project.
We applaud your efforts to improve the trail connectivity in South Bend and we look forward to
working with you during the construction of this project. Thank you in advance for your consideration.
Sincerely,
Jon D. Stolz, PE
Managing Vice President
jstolz@cbbel-in.com
Indianapolis
Columbus
Crown Point
South Bend
cbbel-in.com
317-266-8000
Coal Line Trail | Page 2
FIRM PROFILE
Stemming from water resources, our passion to enhance and
preserve our environment has deepened through exciting and
diverse projects. This passion drives our staff to deliver the
exceptional service our clients have come to expect. Christopher
B. Burke Engineering, LLC, provides planning, design and
construction management services for municipal and private
infrastructure projects ranging from transportation and
recreation to flood control and environmental management.
When it comes to construction engineering, Burke engineers
have tackled multi-year tunneling projects, week-long ADA
update projects, and everything in between. Inspections
involve not only visually confirming construction practices
but also coordinating teams in sometimes difficult situations.
Burke’s commitment to communication means fair and
effective management in the ability to address nearly any
construction issue.
Services
Roadway and trail construction
Underground infrastructure
Dam and levee inspection
Private development
Sewer rehabilitation
Small structure replacement
50 32
professionals
solving problems
years
in business
4 83,000
offices
across Indiana
miles
biked to work
Burke by the numbers
Construction
engineering for
sustainable solutions.
Coal Line Trail | Page 3
RELEVANT PROJECT EXPERIENCE
The city of South Bend sought to create a connection between communities on the west
side of the city with the popular trail along the Saint Joseph River downtown. Boland Drive
was historically dangerous for pedestrians and cyclists. The city turned to Burke to help
with the construction and project management of a new trail that would increase the area’s
safety and connectivity.
The project site proved challenging, winding along wetlands and an old known pauper
cemetery. Through consistent progress meetings and the use of mobile workstations,
the project team was able to construct a new trail without disturbing the surrounding
environment.
PROJECT HIGHLIGHTS
• Trail construction to connect
communities with existing
downtown trail system
• Construction in
environmentally-sensitive
areas
• Construction observation and
project management services
• INDOT SiteManager
and mobile workstations
streamlined the process and
kept costs to a minimum
CLIENT
City of South Bend
Toy Villa
574.235.5920
TIME PERIOD
2018 - 2019
COST
$1,346,996
PROJECT TEAM
Jason Durr
Mike Carey
BOLAND DRIVE SHARED-USE PATH | SOUTH BEND, IN
Coal Line Trail | Page 4
As one of the main corridors into downtown Elkhart, Main Street was in need of an
upgrade to make the street safer and more inviting. Main Street, like many city roads and
streets, was originally designed specifically for vehicular traffic. The city wanted to design
improvements to help make the corridor more accessible and beautiful.
The Burke team worked with the city to devise a phased construction approach, giving the
city the option to implement projects as the funds became available. The improvements
will provide better access to the homes and businesses along the corridor, as well as safer
pedestrian facilities. The team incorporated green infrastructure practices to address the
localized drainage issue, providing environmentally-friendly solutions that will last well into
the future.
PROJECT HIGHLIGHTS
• Topographic survey
• Geotechnical investigation
• Community engagement
• Concept development
• Design
• Rule 5 Permit
• Bidding assistance
CLIENT
City of Elkhart
Jeff Schaffer
574.293.2572
TIME PERIOD
2017 - Present
PROJECT TEAM
Jason Durr
Mike Carey
Andy Gebhard
Matt Derucki
SOUTH MAIN STREET STREETSCAPE IMPROVEMENTS | ELKHART, IN
RELEVANT PROJECT EXPERIENCE
Coal Line Trail | Page 5
RELEVANT PROJECT EXPERIENCE
Westenedge Drive is a collector street passing through a residential neighborhood in
Columbus, Indiana and is also a major vehicular and pedestrian route to elementary, middle
and high schools. Despite the high traffic volume in the area, the street did not have a storm
drainage system.
The Burke team designed transportation improvements including a new multi-use path
on the east side as part of the city’s People Trail system and a sidewalk on the west side.
A new chicane designed for the intersection at Laurel Drive serves as a traffic calming
measure. The drainage design was especially challenging as the city requested it stay within
the current right-of-way. There was very little grade change, no nearby storm sewers, and
no receiving waters with adequate capacity to accept additional runoff. Burke engineers
designed the project with a PaveDrain gutter above an infiltration system, taking advantage
of the granular soils in the project area.
PROJECT HIGHLIGHTS
• Extensive public involvement
phase which included
neighborhood meetings
• Challenging drainage design
to stay within current right-of-
way
• Main route to multiple schools
meant increased pedestrian
traffic
• Proposed improvements
includng curb, pave drain
gutter, drainage swales,
sidewalk, multi-use path, and a
chicane for traffic calming
• PaveDrain gutter above an
infiltration system to collect
runoff and improve water
quality
CLIENT
City of Columbus
Dave Hayward
812.376.2540
TIME PERIOD
2006 - 2013
2016 - 2019
CONSTR. COST
$1,750,000
PROJECT TEAM
Jenny Leshney
Andrew Miller
Sheila McKinley
Sarah Wright
Angela Force
Jason Durr
WESTENEDGE DRIVE IMPROVEMENTS | COLUMBUS, IN
Coal Line Trail | Page 6
RELEVANT PROJECT EXPERIENCE
JEFFERSON BOULEVARD STREETSCAPE | SOUTH BEND, IN
The Jefferson Boulevard streetscape project was one of South Bend’s first projects to
incorporate complete street concepts. With mulitple projects under construction at the
same time, the city asked Burke to provide construction observation as well as project
management services for this groundbreaking project.
Garnering buy-in from the community and store owners along Jefferson Boulevard was of
utmost importance for the first of many planned projects of this type. The city worked to
create a space that was aesthetically pleasing and functional for pedestrians and vehicular
traffic at the same time. Updated intersections, improved pedestrican crossings and paths,
and improved parking all added to the project’s benefits.
In an effort to streamline the construction process, our inspectors created a Google Docs
account as well as a project blog to share with the entire project team. Using the technology
in this way kept the team easily informed with daily progress updates. Burke managed the
project to complete it on time and within budget.
PROJECT HIGHLIGHTS
• Streetscape project
incorporating complete street
concept
• Blog and Google Docs for
easy distribution of daily
updates
• Part-time construction
observation
• Field reports, record keeping
and daily logs of progress
• Payment application
processing
• Project management and
close-out
CLIENT
City of South Bend
Division of Engineering
TIME PERIOD
2014
CONSTRUCTION COST
$1,496,000
PROJECT TEAM
Jason Durr
Jeremy Morris
Coal Line Trail | Page 7
Below is an organizational chart depicting the Burke
project team. Led by project manager/lead inspector
Mike Carey, our team offers the knowledge and capacity
to successfully complete the Coal Line Trail project. Our
team includes Advanced Engineering Services. Burke
has worked with AES on several projects and we believe
that our strong relationship and technical expertise
will be instrumental in providing efficient, responsive
and creative solutions for the trail project. We have
assembled our team members based on availability as
well as technical expertise. Each firm has the depth and
capacity to successfully complete the project in a timely
manner. Specifically, Mike will be 100% available for this
project based on his current and projected workload.
City of South Bend
Jason Durr
Principal in Charge
T.J. Gordon
Construction Engineer
Mike Carey
Project Manager / Lead Inspector
Daniel Parrett
Construction Engineering Tech.
Akhtar Zaman
Principal Geotechnical Engineer
AES
ORGANIZATIONAL CHART
Jose Vargas
Project Manager/Senior Inspector
AES
Paul Taylor
Field and Lab Technician
AES
Coal Line Trail | Page 8
TEAM RESUMES
CERTIFICATIONS
American Concrete Institute -
Concrete Field Testing
Technician - Grade I
Confined Space Entry
OSHA Construction Safety
and Health
INDOT Certified Technician:
• Bridge Construction &
Deck Repair
• Construction Earthworks
• Constr. Procedures Part 1
• Constr. Procedures Part 2
• Hot Mix Asphalt Paving
• Concrete Paving
Mike will lead the Burke team for the Coal Line Trail project. He has nearly 15 years of
experience, including working for South Bend’s engineering department, giving him a familiarity
with municipal projects and procedures. Mike’s responsibilities include planning, analysis,
design, and review of site development, utility and stormwater, and roadway design projects.
He coordinates with clients and government agencies, prepares contract documents, and assists
with project bidding and construction administration.
RELEVANT EXPERIENCE
• Boland Drive Improvements Construction Inspection, South Bend, IN
• Berens Monaldi Neighborhood Drainage and Roadway Improvements, Dyer, IN
• South Main Street Streetscape Improvements, Elkhart, IN
• High and Ireland Intersection Improvements, South Bend, IN
• Weasel Creek Regulated Drain Maintenance Design, Grant County, IN
• Chet Waggoner Court Construction Observation, South Bend, IN
• Eisenhower Detention Basin Design, Warsaw, IN
• Carmel Creek Floodway Permit and Letter of Map Revision, Carmel, IN
• Sheetz Hardiman Tile Reconstruction, Benton County, IN
• Mascot Hall of Fame Site and Parking Lot Design, Whiting, IN
• Cordry Sweetwater Elk Drive Stabilization, Brown County, IN
MIKE CAREY
PROJECT MANAGER / LEAD INSPECTOR
REGISTRATIONS
Professional Engineer
IN, MI
CERTIFICATIONS
FEMA Certified
IS-00100, PW
FEMA Certified IS-00200
RELEVANT EXPERIENCE
• Boland Drive Improvements Construction Inspection, South Bend, IN
• South Main Street Streetscape, Elkhart, IN
• Berens Monaldi Drainage and Roadway Improvements, Dyer, IN
• Ireland Road Intersection Improvements, South Bend, IN
• Mascot Hall of Fame Site and Parking Lot Design, Whiting, IN
• 117th Street Sewer and Water Replacement Project, Whiting, IN
• Beckett’s Run Relocation Project, Fort Wayne, IN
• Upper Beaver Lake East Lateral Ditches, Newton County, IN
• Eisenhower Detention Basin Design and Downstream Drainage Report, Warsaw, IN
• Weasel Creek Regulated Drain Maintenance Design, Grant County, IN
• 5 Points Utility Relocation Report, South Bend, IN
JASON DURR, PE
PRINCIPAL IN CHARGE
Coal Line Trail | Page 9
TEAM RESUMES
CERTIFICATIONS
INDOT Site Manager
INDOT Certified Technician
American Concrete Institute
Concrete Field Testing
Technician - Grade 1
IDOT Documentation of
Contract Quantities
RELEVANT EXPERIENCE
• South Shore Stormwater Improvement Project, Cedar Lake, IN
• Squirrel Creek Diversion/Midway Drive Detention Expansion, South Haven, IN
• Taft Street Construction Services, Merrilville, IN
• Lake County On-call MS4 Coordination Services, Lake County, IN
• 129th Avenue Road Improvements, Cedar Lake, IN
• Town Club Ditch Water Quality/BMP Improvement Project, Cedar Lake, IN
• NIPSCO Gas Pipeline Project, South Bend, IN
• Martha Street Storm Sewer Improvement, Highland, IN
• 133rd Avenue Reconstruction, Cedar Lake, IN
• Little Calumet Watershed Study, Lake County Surveyor’s Office, IN
• Town Engineer Services, Cedar Lake, IN
T.J. GORDON
CONSTRUCTION ENGINEER
CERTIFICATIONS
Certified Inspector of
Sediment & Erosion Control
RELEVANT EXPERIENCE
• City of Indianapolis Pennsy Trail Phase 3B, Indianapolis, IN
• Taggart Memorial Restoration and Performance Venue, Indianapolis, IN
• Franklin and Perry Townships Drainage Improvements, Indianapolis, IN
• 21st & Butler Neighborhood Drainage Improvements Phase II, Indianapolis, IN
• 37th & Lafayette/Washington & Burke Drainage Improvements, Indianapolis, IN
• City of Indianapolis Department of Neighborhood and Business Services On-call
Inspection Services, Indianapolis, IN
• Fall Creek Tunnel CCS Inspection, Indianapolis, IN
• Lower Pogues Tunnel CCS Inspection, Indianapolis, IN
• Upper Pogues Abatement Inspection, Indianapolis, IN
• Service Area 21 Water and Sewer Extension Inspection, Lafayette, IN
DANIEL PARRETT
CONSTRUCTION ENGINEERING TECHNICIAN
Coal Line Trail | Page 10
TEAM RESUMES
AES
REGISTRATIONS
Professional Engineer
IN, IL, MI, WI
LEED AP BD+C
CERTIFICATIONS
OSHA 40-hours HAZOPER
OSHA 30-hours Construction
Safety and Health
ABET Program Evaluator
for Civil Engineering
Accreditation Programs
RELEVANT EXPERIENCE
• CN Underpass on 45th Street, Munster, IN
• Wisconsin Street Bridge over Lake George, Hobart, IN
• Bridges along Interstate 65 over Kankakee River, Lake/Newton Counties, IN
• Railroad Relocation at Gary International Airport, Gary, IN
• Main Street Bridge over Hart Ditch, Munster, IN
• Chase Street Bridge over Little Calumet River, Gary, IN
• Little Calumet River Levee, Lake County, IN
• Wolf Lake Pedestrian Bridge over Calumet Avenue, Hammond, IN
• State Road 249 Bridge over US Route 12 and Railroad Tracks, Porter County, IN
AKHTAR (ART) ZAMAN, PE, LEED AP BD+C
PRINCIPAL GEOTECHNICAL ENGINEER
CERTIFICATIONS
ACI Concrete Field
Technician Level 1
ACI Concrete Laboratory
Technician Level 1
ACI Aggregate Laboratory
Technician Level 1
INDOT Approved Field and
Lab Technician
10-Hour OSHA & 8 Hour
Confined space entry training
RELEVANT EXPERIENCE
• Wolf Lake Pedestrian Bridge over Calumet Avenue, Hammond, IN
• Gary Chicago International Airport Taxiway Improvements, Gary, IN
• Crisman/Willowcreek Road Bypass Improvements, Portage, IN
• Reconstruction of US12/20 Intersection, Gary, IN
• Joliet Road Reconstruction, St. John, IN
• CN Underpass on 45th Street, Munster, IN
• Marquette Greenway Trail, Burns Harbor, IN
JOSE VARGAS
PROJECT MANAGER/SENIOR INSPECTOR
CERTIFICATIONS
ACI Field Technician Level I,
Troxler Certified, Safety trained
through e-rail safe
ACI Lab Concrete Strength
Testing Technician
RELEVANT EXPERIENCE
• 45th Street Grade Separation, Munster, IN
• Data Center, Hammond, IN
• USS Lead Remediation, East Chicago, IN
• Gary Fire Station No. 5, Gary, IN
• Hammond Sanitary District Improvements, Hammond, IN
• BP Amoco Refinvery, Whiting, IN
• Lyons Levee, Lyons, IL
• Cline Avenue Bridge Reconstruction, East Chicago, IN
PAUL TAYLOR
FIELD AND LAB TECHNICIAN
Coal Line Trail | Page 11
Project Familiarity
Our team is aware of the importance of the Coal Line Trail and its
connectivity to the Riverside Trail. The new Coal Line Trail will provide
access for the Northwest and Near Northwest neighborhoods and
connectivity to Muessel Grove and Brownfield Parks. Our team has
explored the proposed project area and identified unique challenges for
this project that include potential wetlands, old railroad corridor impacts,
and construction access concerns. Also, adjacent to the project area are
a combination of residential and commercial properties that will require
diligent coordination and communication efforts to help navigate this
project to a successful completion. While the railroad corridor does
provide some isolation from the traveling public, mindful construction
sequencing and traffic safety during construction of at-grade crossings
will be critical.
The immediate planning and field verification of grades and rights-of-
way with the contractor prior to starting construction is crucial. Potential
issues can be identified and addressed before they become costly field
changes. Our team knows that each project area and each property is
unique and will require constant care to deliver a final product that meets
the need of the public as well as the expectations of the directly-impacted
residents and neighborhoods.
Scope of Services
PROJECT APPROACH
Project Initiation
• Review of contract documents
• Gather names of key contact persons
• Coordinate with contractor to develop a schedule for contractor’s
submittals
• Conduct field visits prior to construction
• Videotape project site prior to construction
• Coordinate kick-off meeting with Burke project team and the city
of South Bend staff
Pre-construction Conference
• Organize and set agenda for conference
• Notify representatives of the city, contractor, utilities
and INDOT
• Develop and distribute meeting minutes and sign-in
sheet
• Phone non-attendees and verify pertinent information
Coal Line Trail | Page 12
PROJECT APPROACH
Field Office Filing System
• Develop and maintain a filing system as outlined in the
INDOT GIFE
• Integrate electronic management, as required
Full-time Construction Inspection
• Inform contractor as soon as possible of observed
deficiency in contractor’s work
• Conduct regular project progress meetings. Keep and
distribute project progress meeting minutes.
• Complete a daily report and diary form for each day’s
work in the format desired by the city and INDOT
• Maintain a series of field notebooks, which will be used
to record information that cannot be shown on the
daily reports
• Maintain a daily progressive record of the quantities
and locations of materials placed
• Submit weekly or monthly progress reports to the
project manager, as required
• Review the contractor’s schedule on a weekly basis and
compare actual progress to the approved schedule with
consideration of weather and field conditions
• Collect and forward certified payrolls to the project
manager, as required
Shop Drawing / Submittal Review
• Coordinate shop drawings and submittal reviews with
the design engineer and city
Survey / Layout Quality Assurance
• Provide periodic checks of the contractor’s general layout
for quality assurance
Testing
• Perform as needed on-site and at-plant inspection of
materials at the direction of the city and in accordance
with the INDOT GIFE manual
Contractor Application for Payment
• Review and agree to pay item quantities with contractor
prior to submitting applications for payment
• Review contractor’s applications for payment, sign
and transmit payment applications to the city’s project
manager and INDOT
Change Orders
• Implement change order procedures as outlined in the
INDOT GIFE manual
Project Close-out
• Issue a certificate of substantial completion
• Prepare a pre-final punch list
• Conduct a final project walk-through with the city’s
project manager and INDOT
• Prepare and transmit a final project punch list
• Verify completion of punch list items
• Determine final quantities and complete daily progressive
record
• Assemble final project files and documents
• Coordinate redline markup record drawings with the
contractor throughout construction
• Review and approve final application for payment and
prepare final change order
• Complete a final construction record
Standard RFP Form Ver. 8-22-18
6
(Rev. 06/27/18)
Des. #: Click here to enter text.
Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE)
I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified
by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this
proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their
respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f).
I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a
blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confirm that
the firms listed below are currently certified DBEs:
INDOT: https://entapps.indot.in.gov/DBELocator/
KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx
I certify that I have contacted the certified DBE’s listed below, and if my company becomes the CONSULTANT, these DBEs have
tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE
utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be
applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division.
I. DBE Subconsultants to be applied toward DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to
be Paid*
%
%
%
%
II. DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to
be Paid*
%
%
%
%
Estimated Total Percentage Credited toward DBE Goal:___________
Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal:__________
Company Name: ____________________________________________________________________
Signature: ___________________________________________ Date: ________________________
∗ It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result
of negotiation of contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these
or other certified and approved DBE firms.
Advanced Engineering Services Materials Testing 5
Advanced Engineering Services Materials Testing 5
5
Christopher B. Burke Engineering, LLC
5
January 8, 2021
Indiana DBE Certification ProgramIn accordance with 49 CFR Part 26 as published in the code of federal regulations, the Indiana Department of Transportation acknowledgesAdvanced Engineering Servicesas a certfied DBE in the State of Indiana.Date Issued:06/02/2014No Change Affidavit Due:09/30/2021(Reference the Indiana Department of Transportation's DBE Public Search athttp://www.in.gov/2674.htm for the most current information regarding this certification)Elizabeth Kiefner Crawford, DirectorEconomic Opportunity DivisionDerrick Casson, Certification ManagerEconomic Opportunity Division
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date January 4, 2021 Department Public Works
Name Kyle Silveus Division/Bureau Engineering
BPW Date January 12, 2021 Phone Extension 9083
Required Prior to Submittal to Board Legal Attorney Name: Clara McDaniels
Controller Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Purchasing Michael Schmidt
Check the Appropriate Item Type – Required for All Submissions
Agreement Contract Proposal Addendum
Professional Services Resolution
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award
Change Order No. C/O & PCA No. PCA
Ease/Encroach. Traffic Control:
Other:
Required Information
Company or Vendor Name N/A
New Vendor Yes No If Yes, Approved by Purchasing
MBE/WBE Contractor MBE WBE
MBE/WBE Contractor Requested No Yes Name of Company
Project Name Coal Line Trail Phase I
Project Number ENG: 115-063 DES No: 1401810
Funding Source Riverwest TIF
Account No.
Amount N/A
Terms of Contract
Purpose/Description
HNTE
Opening of Proposals for Construction Inspection Services
Required Contractor’s Certification Forms Attached (Non-
Collusion, Non-Discrimination, Non-Debarment, E-Verify, Iran, etc.)
Required For Change Orders Only
Amount of
Increase
Decrease
$
$
Previous Amount $
Current Percent of Change: %
New Amount $
Total Percent of Change: %
Dispersal After Approval
Copy Original
Kyle Silveus
Chris Dressel
1/4/202101/04/20211/4/21ANNE FUCHSELIZABETH A. MARADIKGARY A. GILOTCLERKJORDAN V. GATHERSJOSEPH R. MOLNAR