HomeMy WebLinkAbout12082020 Board of Public Works MeetingREGULAR MEETING DECEMBER 8, 2020 220
AGENDA REVIEW MEETING
The Agenda Review Session of the Board of Public Works scheduled for December 3, 2020 was
cancelled.
REGULAR MEETING DECEMBER 8, 2020
The Regular Meeting of the Board of Public Works was convened at 9:30 a.m. on Tuesday,
December 8, 2020, by Board President Gary A. Gilot. The meeting was streamed live to the
public with Board President Gary A. Gilot and Board Members Elizabeth Maradik, Joseph
Molnar, and Jordan Gathers present. Mr. Gathers confirmed the presence of the members with a
roll call. Also present was Board Attorney Clara McDaniels and Clerk of the Board Linda
Martin. Mr. Gilot stated if there was anyone present in the virtual meeting that had comments for
the Board to please present them through the live Q&A feature, adding he can't see people and
may miss someone wishing to address the Board.
APPROVE MINUTES OF PREVIOUS MEETING
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
minutes of the Regular Meeting of the Board held on November 24, 2020, were approved.
APPROVE 2021 BOARD OF WORKS MEETING SCHEDULES
Upon a motion by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the Board
approved the meeting schedules for the 2021 Claims Review, Agenda Review, and Regular
Meetings of the Board of Works.
APPPROVE 2021 CITY EMPLOYEE HOLIDAY SCHEDULE
In a memo to the Board, Mr. Dan Parker, City Controller, presented the proposed 2021 City
Employee Holiday Schedule, approved by the Mayor's Office. Upon a motion by Ms. Maradik,
seconded by Mr. Molnar and carried by roll call, the holiday schedule was approved as
presented.
OPENING OF APPLICATIONS — WATER WORKS UTILITY SERVICE LINE REPAIR
PROGRAM
This was the date set for receiving and opening of sealed applications for the Qualified Vendor
List for the for the above referenced program. The Clerk tendered proof of publication of Notice
in the South Bend Tribune, which was found to be sufficient. The following applications were
opened, and the names of the vendors publicly read:
BOB FRAME PLUMBING SERVICES, INC.
2442 Jaclyn Ct.
South Bend, IN 46614-3700
NIEZGODSKI PLUMBING, INC.
232 N. Mayflower Rd.
South Bend, IN 46619
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
above applications were referred to Water Works and Engineering for review and
recommendation.
OPENING OF BIDS — NORTH SHORE DRIVE BANK STABILIZATION — PROJECT NO.
I I8-005A (PR-00005053)
This was the date set for receiving and opening of sealed bids for the above referenced project.
The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found
to be sufficient. The following bids were opened and publicly read:
INDIANA EARTH, INC.
10343 McKinley Hwy.
Osceola, IN 46561
earth92inc@sbcglobal.net
Bid was signed by Mr. Mark Osler
Non -Collusion, Non -Discrimination Affidavit Form was completed
Five percent (5%) Bid Bond was submitted
REGULAR MEETING
DECEMBER 8, 2020 221
BID: $201,117.25
SELGE CONSTRUCTION CO. INC.
2833 S. IITH. St.
Niles, MI 49120
j butler&sel geconstruction. com
Bid was signed by Mr. Justin Butler
Non -Collusion, Non -Discrimination Affidavit Form was completed
Five percent (5%) Bid Bond was submitted
BID: $202,736.00
Itemized Base Bid Total Submitted as $202,732.00
HRP CONSTRUCTION INC.
5777 Cleveland Rd., PO Box 266
South Bend, IN 46624
JulieJ(cr bMconstruction.com
Bid was signed by Mr. Matthew D. Cain
Non -Collusion, Non -Discrimination Affidavit Form was completed
Five percent (5%) Bid Bond was submitted
BID: $179,634.00
NORTHERN INDIANA CONSTRUCTION CO.. INC.
PO Box 1333
Mishawaka, IN 46546
dmarable.nic&gmail.com; davidwalorski@cs.com
Bid was submitted by Mr. David J. Walorski
Non -Collusion, Non -Discrimination Affidavit Form was completed
Five percent (5%) Bid Bond was submitted
BID: $252,907.70
THE STANGER GROUP, INC.
15504 County Road 42
Goshen, IN 46528
csstaner abslenvirogroup.com
Bid was signed by Mr. Colby Stanger
Non -Collusion, Non -Discrimination Affidavit Form was completed
Cashier's Check No. 240413 $12,792.00
BID: $255,820.00
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
above bids were referred to Engineering for review and recommendation.
OPENING OF BIDS — GUARDRAIL REPLACEMENT AND INSTALLATION — PROJECT
NO. 118-084 (PR-00004815)
This was the date set for receiving and opening of sealed bids for the above referenced project.
The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found
to be sufficient. Attorney McDaniels stated there were no bids received. Mr. Gilot noted city
staff can seek vendors on the open market for this project.
OPENING OF QUOTATIONS — WEST SIDE QUIET ZONE IMPROVEMENTS — MEDIAN
& CURB —PROJECT NO. 117-114A (PR-00005685)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for
the above referenced project. The following quotations were opened and read:
WALSH & KELLY, INC.
24358 State Road 23
South Bend, IN 46614
akrueger@walshkelly.com
REGULAR MEETING
DECEMBER 8, 2020 222
Quotation was submitted by Mr. Dustin Hilary
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION:
Base Quote — Ford Street
$28,600.00
Alternate Quote — Grandview Ave.
$17,900.00
Base Quote Plus Alternate
$46,500.00
RIETH-RILEY CONSTRUCTION CO.. INC.
25200 State Road 23
South Bend, IN 46614
ralvarado@Zneth-riley.com
Quotation was submitted by Mr. Ruben Alvarado
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION:
Base Quote — Ford Street
$20,662.22
Alternate Quote — Grandview Ave.
$11,374.15
Base Quote Plus Alternate
$32,036.37
SELGE CONSTRUCTION CO. INC.
2833 S. 11TH. St.
Niles, MI 49120
jbutler@selgeconstruction.com
Quotation was submitted by Mr. Justin Butler
Non -Collusion, Non -Discrimination Affidavit Form was completed
UOTATION:
Base Quote — Ford Street
$35,069.00
Alternate Quote — Grandview Ave.
$18,948.00
Base Quote Plus Alternate
$54,017.00
PREMIUM CONCRETE SERVICES. INC.
712 Richmond St.
Elkhart, IN 46516
rbecker@premiumconereteonline.com
Quotation was submitted by Mr. Max A. Yeakey
Non -Collusion, Non -Discrimination Affidavit Form was completed
UOTATION:
Base Quote — Ford Street
$27,400.00
Alternate Quote — Grandview Ave.
$9,990.00
Base Quote Plus Alternate
$37,390.00
Attorney McDaniels noted there were two (2) quotes from Walsh and Kelly. She stated she read
the most recent one received at 8:46 a.m. Ed from Walsh & Kelly confirmed via Q&A the quote
is correct as read. Ms. Maradik noted Rieth Riley also submitted two quotes but after review they
appear to be duplicates. She noted Engineering should review and confirm that. Upon a motion
made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the above quotations
were referred to Engineering for review and recommendation.
OPENING OF QUOTATIONS — SPEED RADAR SIGN INSTALLATION — PROJECT NO
120-064 (PR-00005611)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for
the above referenced project. The following quotations were opened and read:
MICHIANA CONTRACTING INC.
7843 Lilac Rd., PO Box 929
Plymouth, IN 46563
skirk atp rick(a,michianacontracting.com
Quotation was submitted by Mr. Scott Kirkpatrick
Non -Collusion, Non -Discrimination Affidavit Form was completed
REGULAR MEETING
DECEMBER 8, 2020 223
QUOTATION:
Base Quote
$35,350.00
Alternate No.1
$9,500.00
Base Quote Plus Alternate
$35,350.00
"Base Quote plus Alternate Does Not Include Total for Alternate No. 1
MARTELL ELECTRIC LLC
4601 Cleveland Rd.
South Bend, IN 46628
areeves@martellelectric.com
Quotation was submitted by Ms. Jennifer Martell
Non -Collusion, Non -Discrimination Affidavit Form was completed
UOTATION:
Base Quote
$46,361.00
Alternate No.1
$13,246.00
Base Quote Plus Alternate
$59,607.00
PEMBERTON DAVIS ELECTRIC
916 E. McKinley Ave.
Mishawaka, IN 46545
tleibovitz&pembertondavis. com
Quotation was submitted by Mr. John A. Ferro
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION:
Base Quote
$46,480.00
Alternate No.1
$13,280.00
Base Quote Plus Alternate
$59,760.00
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
above quotations were referred to Engineering for review and recommendation.
OPENING OF QUOTATIONS — TRIUMPH COURT LIGHTING ADDITION — PROJECT
NO. 120-006E (PR-0000360)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for
the above referenced project. The following quotations were opened and read:
MICHIANA CONTRACTING INC.
7843 Lilac Rd., PO Box 929
Plymouth, IN 46563
skirkpatrickna.michianacontractina. com
Quotation was submitted by Mr. Scott Kirkpatrick
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION: $38,186.00
MARTELL ELECTRIC, LLC
4601 Cleveland Rd.
South Bend, IN 46628
areeves@.martellelectric.com
Quotation was submitted by Ms. Jennifer Martell
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION: $37,696.80
HAWK ENTERPRISES, INC.
1850 E. North St.
Crown Point, IN 46307
c4ylee@,hawk-inc.com
Quotation was submitted by Ms. Johanna Plank
REGULAR MEETING
DECEMBER 8, 2020 224
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION: $42,840.00
PEMBERTON DAVIS ELECTRIC
916 E. McKinley Ave.
Mishawaka, IN 46545
tleibovitz@pembertondavis.com
Quotation was submitted by Mr. John A. Ferro
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION: $39,996.00
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
above quotations were referred to Engineering for review and recommendation.
OPENING OF QUOTATIONS — CITY OF SOUTH BEND WAYFINDING SIGNAGE
PROGRAM, PHASE II — PROJECT NO. 120-020 (PR-00005610)
Ms. Kara Boyles, Engineering, informed the Board via Q&A that this quote does not open until
December 17, 2020 and should not be on this agenda. Attorney McDaniels confirmed there were
no quotes in the folder, so no quotes were received.
OPENING OF QUOTATIONS — SOUTH BEND DAM SIGNAGE AND STAFF GAGE
INSTALLATION —PROJECT NO. 119-112 (PR-00005673)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for
the above referenced project. Attorney McDaniels stated there were no quotes received for this
project.
AWARD BID — ONE (1) OR MORE, 2020 OR NEWER, 60' AERIAL TWO WHEEL DRIVE
TOWER TRUCK — SPEC J (PR-00003964)
Mr. Jeff Hudak, Central Services, advised the Board that on November 10, 2020, bids were
received and opened for the above referenced truck. After reviewing those bids, Mr. Hudak
recommended that the Board award the contract to the lowest responsive and responsible bidder,
Altec Industries, Inc., 325 South Center Dr., Daleville, VA 24083, in the amount of $193,866.
Therefore, Ms. Maradik made a motion that the recommendation be accepted, and the bid be
awarded as outlined above. Mr. Molnar seconded the motion, which carried by roll call.
AWARD BID — TWO (2), MORE OR LESS, 2020 OR NEWER THREE-QUARTER Q 4)
TON EXTENDED CAB FOUR WHEEL DRIVE PICK-UP TRUCKS — SPEC K (PR-
00003968)
Mr. Jeff Hudak, Central Services, advised the Board that on November 10, 2020, bids were
received and opened for the above referenced trucks. After reviewing those bids, Mr. Hudak
recommended that the Board award the contract to the lowest responsive and responsible bidder,
Jordan Ford, 609 E. Jefferson Blvd., Mishawaka, IN 46545, in the amount of $46,345 for one
(1) Base Bid plus Alternate Nos. 2-4 for the Sewer Department, and $38,726 for one (1) Base
Bid plus Alternate No. 2 for the Street Department. Therefore, Ms. Maradik made a motion that
the recommendation be accepted, and the bid be awarded as outlined above. Mr. Molnar
seconded the motion, which carried by roll call.
AWARD BID AND APPROVE CONTRACT — TWO (2) MORE OR LESS 2020 OR NEWER
18,000 LB. FOUR WHEEL DRIVE CHASSIS WITH DUMP BED — SPEC O (PR-00004026)
Mr. Jeff Hudak, Central Services, advised the Board that on November 10, 2020, bids were
received and opened for the above referenced trucks. After reviewing those bids, Mr. Hudak
recommended that the Board award the contract to the lowest responsive and responsible bidder,
Jordan Ford, 609 E. Jefferson Blvd., Mishawaka, IN 46545, in the amount of $101,190 each for
the Base Bid plus Alternate Nos. 1 and 3, for a total amount of $202,380 for two (2). Therefore,
Ms. Maradik made a motion that the recommendation be accepted, and the bid be awarded as
outlined above. Mr. Molnar seconded the motion, which carried by roll call.
REGULAR MEETING DECEMBER 8, 2020 225
AWARD BID AND APPROVE CONTRACT — SAMPLE AND SHERIDAN SIGNAL
IMPROVEMENTS —PROJECT NO. 116-127 (PR-00004690)
Ms. Leslie Biek, Engineering, advised the Board that on November 24, 2020, bids were received
and opened for the above referenced project. After reviewing those bids, Ms. Biek recommended
that the Board award the contract to the lowest responsive and responsible bidder, Rieth-Riley
Construction Co., Inc., 25200 State Road 23, South Bend, IN 46614, in the amount of
$425,448.92. Therefore, Ms. Maradik made a motion that the recommendation be accepted, and
the bid be awarded, and the contract approved as outlined above. Mr. Molnar seconded the
motion, which carried by roll call.
AWARD QUOTATION AND APPROVE CONTRACT — NORTH WATER TREATMENT
PLANT RAW WATER HEADER IMPROVEMENTS — PROJECT NO 119-OIIA (PR-
00005229)
Ms. Rebecca Plantz, Engineering, advised the Board that on November 24, 2020, quotations
were received and opened for the above referenced project. After reviewing those quotations,
Ms. Plantz recommended that the Board award the contract to the lowest responsive and
responsible quoter, D.A. Dodd, LLC, 14 E. Michigan St., PO Box 430, Rolling Prairie, IN
46371, in the amount of $15,950. Therefore, Ms. Maradik made a motion that the
recommendation be accepted, and the quotation be awarded, and the contract approved as
outlined above. Mr. Molnar seconded the motion, which carried by roll call.
AWARD QUOTATION AND APPROVE CONTRACT — CURB & SIDEWALK REPAIRS —
PROJECT NO. 120-001A (PR-00005362)
Ms. Alicia Czarnecki, Engineering, advised the Board that on November 24, 2020, quotations
were received and opened for the above referenced project. After reviewing those quotations,
Ms. Czarnecki recommended that the Board award the contract to the lowest responsive and
responsible bidder, TX Concrete, LLC, 24899 Fillmore Rd., South Bend, IN 46619, in the
amount of $68,797.50. Therefore, Ms. Maradik made a motion that the recommendation be
accepted, and the quotation be awarded, and the contract approved as outlined above. Mr.
Molnar seconded the motion, which carried by roll call.
AWARD QUOTATION AND APPROVE CONTRACT — CLEVELAND WELL NOS 2 & 3
REFURBISHMENTS — WELL CLEANING — PROJECT NO. 118-021E (PR-00005225)
Ms. Rebecca Plantz, Engineering, advised the Board that on November 24, 2020, quotations
were received and opened for the above referenced project. After reviewing those quotations,
Ms. Plantz recommended that the Board award the contract to the lowest responsive and
responsible bidder, Peerless Midwest, Inc., 55860 Russell Industrial Pkwy., Mishawaka, IN
46545, in the amount of $102,700. Therefore, Ms. Maradik made a motion that the
recommendation be accepted, and the quotation be awarded, and the contract approved as
outlined above. Mr. Molnar seconded the motion, which carried by roll call.
AWARD QUOTATION AND APPROVE CONTRACT — EDISON WELL NO 4
REFURBISHMENT — WELL CLEANING — PROJECT NO. 120-060 (PR-00005227)
Ms. Rebecca Plantz, Engineering, advised the Board that on November 24, 2020, quotations
were received and opened for the above referenced project. After reviewing those quotations,
Ms. Plantz recommended that the Board award the contract to the lowest responsive and
responsible bidder, Peerless Midwest, Inc., 55860 Russell Industrial Pkwy., Mishawaka, IN
46545, in the amount of $71,400. Therefore, Ms. Maradik made a motion that the
recommendation be accepted, and the quotation be awarded, and the contract approved as
outlined above. Mr. Molnar seconded the motion, which carried by roll call.
AWARD QUOTATION AND APPROVE CONTRACT — PINHOOK WELL NO 4
REFURBISHMENT — WELL CLEANING — PROJECT NO. 120-061 (PR-00005228)
Ms. Rebecca Plantz, Engineering, advised the Board that on November 24, 2020, quotations
were received and opened for the above referenced project. After reviewing those quotations,
Ms. Plantz recommended that the Board award the contract to the lowest responsive and
responsible bidder, Peerless Midwest, Inc., 55860 Russell Industrial Pkwy., Mishawaka, IN
46545, in the amount of $55,250. Therefore, Ms. Maradik made a motion that the
recommendation be accepted, and the quotation be awarded, and the contract approved as
outlined above. Mr. Molnar seconded the motion, which carried by roll call.
REGULAR MEETING DECEMBER 8, 2020 226
APPROVE CHANGE ORDER NO. 1 — TWO-WAY CONVERSION OF COLFAX AVE.
PHASE II —PROJECT NO. 115-053B (PO-0000270)
Mr. Gilot advised that Mr. Kyle Silveus, Engineering, has submitted Change Order No. 1 on
behalf of Walsh & Kelly, Inc., 24358 State Road 23, South Bend, IN 46614, indicating the
contract amount be increased by $25,059.38 for a new contract sum, including this Change
Order, in the amount of $619,959.38. Upon a motion made by Ms. Maradik, seconded by Mr.
Molnar and carried by roll call, the Change Order was approved.
APPROVE CHANGE ORDER NO. 2 — HISTORIC LEEPER PARK IMPROVEMENTS BID
PACKAGE 2 — PROJECT NO. 118-01 OB (PO-0000525)
Mr. Gilot advised that Mr. Kyle Silveus, Engineering, ^has submitted Change Order No. 2 on
behalf of Northern Indiana Construction Co., Inc., PO Box 1333, Mishawaka, IN 46546,
indicating the contract amount be increased by $19,196.77 for a new contract sum, including this
Change Order, in the amount of $808,584.42. Upon a motion made by Ms. Maradik, seconded
by Mr. Molnar and carried by roll call, the Change Order was approved.
APPROVE CHANGE ORDER NO. 6 — BENDIX DR., LATHROP TO INDIANA TOLL
ROAD — PROJECT NO. 114-065 (LRSA)
Mr. Gilot advised that Mr. Scott Kreeger, Engineering, has submitted Change Order No. 6 on
behalf of Rieth-Riley Construction Co., Inc., 25200 State Road 23, South Bend, IN 46614,
indicating the contract be increased by thirty-five (35) days, with a revised completion date of
November 3, 2020. Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried
by roll call, the Change Order was approved.
APPROVE PROJECT COMPLETION AFFIDAVIT — 2020 TREE AND STUMP REMOVAL —
PROJECT NO. 120-002 (MVH)
Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion
Affidavit on behalf of K&R Tree Service, LLC, 1724 S. Grant St., South Bend, IN 46613, for the
above referenced project, indicating a final cost of $49,875.12. Upon a motion made by Ms.
Maradik, seconded by Mr. Molnar and carried by roll call, the Project Completion Affidavit was
approved.
APPROVE PROJECT COMPLETION AFFIDAVIT — MAIN ST AND WAYNE ST
GARAGE IMPROVEMENTS — PROJECT NO. 119-066 (RWDA TIF)
Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion
Affidavit on behalf of Majority Builders, Inc., 62900 US 31 South, South Bend, IN 46614, for
the above referenced project, indicating a final cost of $437,967. Upon a motion made by Ms.
Maradik, seconded by Mr. Molnar and carried by roll call, the Project Completion Affidavit was
approved.
APPROVE PROJECT COMPLETION AFFIDAVIT — MORRIS THEATER EMERGENCY
PLASTER REPAIR — PROJECT NO. 118-094R (VPA MORRIS)
Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion
Affidavit on behalf of Gibson -Lewis, LLC, 1001 W. I I th. St., Mishawaka, IN 46544, for the
above referenced project, indicating a final cost of $346,394. Upon a motion made by Ms.
Maradik, seconded by Mr. Molnar and carried by roll call, the Project Completion Affidavit was
approved.
APPROVE PROJECT COMPLETION AFFIDAVIT — WESTERN AVE. STREETSCAPE
PHASE III — PROJECT NO. 118-076 (RWDA TIF)
Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion
Affidavit on behalf of Indiana Earth, Inc., 10343 McKinley Hwy., Osceola, IN 46561, for the
above referenced project, indicating a final cost of $2,885,401.94. Upon a motion made by Ms.
Maradik, seconded by Mr. Molnar and carried by roll call, the Project Completion Affidavit was
approved.
ADOPT RESOLUTION NO. 31-2020 — A RESOLUTION OF THE CITY OF SOUTH BEND
INDIANA BOARD OF PUBLIC WORKS ESTABLISHING THE 2021 PRIME BORROWING
RATE FOR CALCULATING INSTALLMENT PAYMENT AMOUNT FOR WATER/SEWER
INSTALLATION CHARGE
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
following Resolution was adopted by the Board of Public Works:
REGULAR MEETING DECEMBER 8, 2020 227
RESOLUTION NO.31-2020
A RESOLUTION OF THE CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS ESTABLISHING THE 2021 PRIME BORROWING
RATE FOR CALCULATING INSTALLMENT PAYMENT AMOUNT FOR
WATER/SEWER INSTALLATION CHARGE
WHEREAS, Section 17-85 of the City of South Bend Municipal Code (the "Municipal
Code") authorizes the Board of Public Works to establish the City's prime borrowing rate
("Prime Borrowing Rate") for purposes of determining the interest rate of installment payments
of water/sewer installation charges; and
WHEREAS, pursuant to Section 17-85 of the Municipal Code, the Board of Public
Works is to establish the Prime Borrowing Rate each year for the following calendar year; and
WHEREAS, Section 17-85 of the Municipal Code permits a single family residential real
property owner to pay water/sewer installation charges by making sixty (60) monthly installment
payments with an interest rate two (2) percent below the City's prime borrowing rate; and
WHEREAS, the interest rate at the commencement of a residential owner's sixty -month
payment plan shall remain constant throughout the sixty -month term.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF PUBLIC WORKS OF
THE CITY OF SOUTH BEND AS FOLLOWS:
1. The Board establishes the Prime Borrowing Rate for calendar year 2021 at a two (2)
percent interest rate.
2. The effective date of this Resolution is December 1, 2020.
ADOPTED at a meeting of the Board of Public Works of the City of South Bend, Indiana
held on December 8, 2020.
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
s/ Gary A. Gilot
s/ Elizabeth A. Maradik
s/ Jordan V. Gathers
s/ Joseph R. Molnar
ATTEST:
s/Linda M. Martin, Clerk
APPROVAL OF AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA
The following Agreements/Contracts/Proposals/Addenda were submitted to the Board for
approval:
Type
Business
Description
Amount/
Motion/
Funding
Second
Services
Elkhart
Three (3) Year Fish
N/A
Maradik/Molnar
Agreement
Department of
Study Supporting
Public Works
Biological Monitoring of
St. Joseph River
Natural Gas
Interstate Gas
One (1) Year Extension
$0.88/dekatherm
Maradik/Molnar
Purchase
Supply, Inc.
of Current Contract,
(Fees paid
Contract
March 2023 through
through Natural
April 2024
Gas Invoices
Professional
Black & Veatch
Lead and Copper Rule
NTE $46,065
Maradik/Molnar
Services
Corporation
Risk Management
(PR-00005686)
Agreement
Analysis
Amendment
Cardno, Inc.
Construction
NTE $6,500;
Maradik/Molnar
No. 4 to
Administration Support
New Total
Owner-
for North Shore Bank
$113,100
REGULAR MEETING
DECEMBER 8, 2020 228
Engineer
Stabilization Project
(PO-0000108)
Agreement
APPROVE TRAFFIC CONTROL DEVICE
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
following traffic control device request was approved:
APPLICANT: Barbara Savely
RENEWAL: Handicapped Accessible Parking Space Permit No. 4
LOCATION: North Side of Jefferson Blvd., East of Lafayette Blvd.
REMARKS: All criteria have been met
APPROVE CONSENTS TO ANNEXATION AND WAIVER OF RIGHTS TO
REMONSTRATE
Mr. Gilot stated that the Board is in receipt of the following Consents to Annexation and
Waivers of Right to Remonstrate. The Consents indicate that in consideration for permission to
tap into public water/sanitary sewer system of the City, to provide water/sanitary sewer service
to the below referenced properties, the applicants waive and release any and all rights to
remonstrate against or oppose any pending or future annexations of the properties by the City of
South Bend:
A. Mr. Brian Miller, PO Box 706, Osceola, IN 46561
1. 18123 Cloverleaf Dr., South — Water/Sewer (Key No.002-1015-030555)
B. Mr. Brian Miller, PO Box 706, Osceola, IN 46561
1. 52064 Cloverleaf Dr., East — Water/Sewer (Key No. 002-1015-030552)
Upon a motion by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the Consents
to Annexation and Waivers of Right to Remonstrate were approved as submitted.
APPROVE CLAIMS
Ms. Maradik stated that a request to pay the following claims in the amounts indicated has been
received by the Board; each claim is fully supported by an invoice; the person receiving the
goods or services has approved the claims; and the claims have been filed with the City Fiscal
Officer and certified for accuracy.
Name
Amount of Claim
Date
City of South Bend Claims GBN-
8281/7993/8075/8282/7998/8034/8135
$2,932,421.57
11/24/2020
City of South Bend Claims GBN-8329/8331
$811,507.37
11/30/2020
City of South Bend Claims GBN-8398/8399
$720,955.98
11/30/2020
City of South Bend Claims GBN-8424/8427
$7,232,946.71
11/30/2020
City of South Bend Claims GBN-8432/8433
$633,026.70
11/30/2020
City of South Bend Claims GBN-8431/8430
$714,726.57
12/01/2020
Therefore, Ms. Maradik made a motion that after review of the expenditures, the claims be
approved as submitted. Mr. Molnar seconded the motion, which carried by roll call.
PRIVILEGE OF THE FLOOR
Ms. Martin confirmed there were no postings in the Q&A Live Chat.
ADJOURNMENT
There being no further business to come before the Board, upon a motion made by Mr. Gilot,
seconded by Ms. Maradik and carried by roll call, the meeting adjourned at 10:15 a.m.
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
REGULAR MEETING DECEMBER 8, 2020 229
Elizabeth A. Maradik, Member
Jordan V. Gathers, Member
Joseph R. Molnar, Member
ATTEST:
Linda- C actin
Linda M. Martin, Clerk