To: Redevelopment Commission, Board of Public Works
From: Bill Schalliol
Subject: Resolution 3098 and
Amendment to the Addendum To Master Agency Agreement
Main - Lafayette Corridor Project, Supplement #7
Date: November 21, 2012
Attached to this memorandum is Resolution 3098 and Amendment to the Addendum To Master Agency
Agreement for the Main - Lafayette Corridor Project, Supplement V.
The purpose of this supplement is to add funding in the amount of $97,600.00 to the professional service
contract with Lawson- Fisher & Associates to cover additional survey services and additional design tasks
associated with the final design of the Main - Lafayette project. The additional work involves design work
associated with modification to drainage plans, revisions and modification to utility plans due to AEP and City
utility conflict plan management, site and plat modification due to property acquisition from Carl Kay
Memorials, Lock Joint Tube, Heraeus Kulzer, Wendy's, Caroline Partners and others. The additional fee also
provides funds for revisions for re- advertisement of the project (the project was proposed for bid in April
2012 but delayed due to lack of right of way under control).
The following is a table with the actions and costs to date:
Action
Exhibit
Date
Type
Amount
Addendum
A
8/30/10
Project Design— LFA
436,000.00
Amendment #1
B
2/14/11
ROW Acquisition —Sl LFA/DLZ
439,000.00
Amendment #2
C
5/9/11
ROW Acquisition 52 LFA/DLZ
18,900.00
Amendment #3
D
11/21/11
Project Design —53 LFA
260,320.00
Amendment #4
E
11/21/11
ROW Acquisition Budget
1,225,000.00
Amendment #5
F
5/15/12
1 Construction Budget
4,500,000.00
Amendment #6
G
8/9/12
Demolition of 3 properties
37,000.00
Amendment #7
H
Pending
Project Design —S4 LFA
97,600.00
Staff requests approval of Resolution 3098 and the Addendum To Master Agency Agreement for the Main -
Lafayette Corridor Project, Supplement V.
What We Do Today Makes A Difference!
RESOLUTION NO. 3098
RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION
APPROVING AND AUTHORIZING THE EXECUTION OF AN AMENDMENT
TO THE ADDENDUM TO THE MASTER AGENCY AGREEMENT
(Main- Lafayette Connector Design Project - Supplement #7)
WHEREAS, effective January 1, 2012, the South Bend Department of
Redevelopment, acting by and through its Redevelopment Commission (the
"Commission ") and the South Bend Board of Public Works (the "BPW ") entered into a
Master Agency Agreement which authorized the BPW to act as agent for and on behalf
of the Commission for certain projects during 2012; and
WHEREAS, effective January 1, 2012, the Commission and the BPW entered
into a Master Agency Agreement which authorized the BPW to act as agent for and on
behalf of the Commission for the limited purpose of contracting for and managing the
completion of existing Projects; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission added
the Main - Lafayette Connector Design Project to the Master Agency Agreement by way
of an Addendum on August 23, 2010; and
WHEREAS, the Commission amended the Addendum with Supplement #1 by
way of Resolution 2838 on January 21, 2011; and
WHEREAS, the Commission amended the Addendum with Supplement #2 by
way of Resolution 2873 on May 10, 2011; and
WHEREAS, the Commission amended the Addendum with Supplement #3 by
way of Resolution 2953 on November 8, 2011; and
WHEREAS, the Commission amended the Addendum with Supplement #4 by
way of Resolution 2954 on November 8, 2011; and
WHEREAS, the Commission amended the Addendum with Supplement #5 by
way of Resolution 3023 on April 24, 2012; and
WHEREAS, the Commission amended the Addendum with Supplement #6 by
way of Resolution 3058 on July 26, 2012; and
WHEREAS, the Commission desires to amend the Addendum by way of this
Amendment.
NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment
Commission as follows:
Section 1. The Commission hereby approves the Amendment to the
Addendum to the Master Agency Agreement (Main- Lafayette Connector Design Project -
Supplement #7) and hereby authorizes its execution in substantially the form attached
hereto with such changes as the Commission may deem necessary or appropriate upon
the advice of counsel, said execution thereof to be conclusive evidence of the
Commission's approval of such changes. The Clerk is hereby directed to file a copy of
this Amendment to the Addendum with the BPW.
Section 2. This Resolution shall be in full force and effect after its adoption
by the Commission.
Section 3. Commission staff members are authorized to execute on behalf of
the Commission any documents necessary to carry out the intent of this resolution.
ADOPTED at a meeting of the South Bend Redevelopment Commission held on
November 21, 2012, at 9:30 a.m., in Room 1308, County -City Building, South Bend,
Indiana 46601.
(Signature Page Follows)
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPMENT
South Bend Redevelopment Commission
ATTEST:
South Bend Redevelopment Commission
AMENDMENT TO THE ADDENDUM TO THE
MASTER AGENCY AGREEMENT
(Main- Lafayette Connector Design Project - Supplement #7)
3098 -11
This Amendment to the Addendum to the Master Agency Agreement (this
"Amendment "), made and entered into as of the 11th day of December, 2012, by and
between the South Bend Department of Redevelopment, acting by and through its
Redevelopment Commission (the "Commission ") and the City of South Bend, Indiana, a
municipal corporation duly organized and existing pursuant to the laws of the State of
Indiana, acting by and through its Board of Public Works (the "BPW ") for purposes of
the Commission designating the BPW to act as the Commission's agent to undertake the
Main- Lafayette Connector Design Project - Supplement #7 (the "Project ").
WHEREAS, effective January 1, 2012, the Commission and the BPW entered
into a Master Agency Agreement which authorized the BPW to act as agent for and on
behalf of the Commission for certain projects during 2012; and
WHEREAS, effective January 1, 2012, the Commission and the BPW entered
into a Master Agency Agreement which authorized the BPW to act as agent for and on
behalf of the Commission for the limited purpose of contracting for and managing the
completion of existing Projects; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission added
the Main - Lafayette Connector Design Project to the Master Agency Agreement by way
of an Addendum on August 23, 2010; and
WHEREAS, the Addendum was amended by both the BPW and the Commission
by Supplement #1 during February 2011; and
WHEREAS, the Addendum was amended by both the BPW and the Commission
by Supplement #2 during May 2011; and
WHEREAS, the Addendum was amended by both the BPW and the Commission
by Supplement #3 during November 2011; and
WHEREAS, the Addendum was amended by both the BPW and the Commission
by Supplement #4 during November 2011; and
WHEREAS, the Addendum was amended by both the BPW and the Commission
by Supplement #5 during April 2012; and
WHEREAS, the Addendum was amended by both the BPW and the Commission
by Supplement #6 during July /August 2012; and
WHEREAS, the Commission desires to amend the Addendum by way of this
Amendment.
NOW, THEREFORE, in consideration of the mutual covenants and promises
contained herein, and for other good and valuable consideration, the receipt of which is
hereby acknowledged, the BPW and the Commission agree as follows:
1. The Commission hereby empowers and appoints the BPW, pursuant to the
Master Agency Agreement, to act as the Commission's agent for the limited purpose of
contracting for and managing the completion of the Project, the scope of said Project
being originally described in "Exhibit A ", amended by Supplement #1 as described in
"Exhibit B ", amended by Supplement #2 as described in "Exhibit C ", amended by
Supplement #3 as described in "Exhibit D ", amended by Supplement #4 as described in
"Exhibit E ", amended by Supplement #5 as described in "Exhibit F ", amended by
Supplement #6 as described in "Exhibit G ", and now amended as described in `Exhibit
H ", attached hereto and made a part hereof.
2. All of the terms and conditions of the Master Agency Agreement shall
control this appointment and this Addendum shall be attached to the Master Agency
Agreement.
3. Commission staff members are authorized to execute on behalf of the
Commission any documents necessary to carry out the intent of this resolution.
IN WITNESS WHEREOF, the undersigned execute this Addendum to Master
Agency Agreement to be effective as of the date first written above.
(Signature Page Follows)
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPMENT
South Bend Redevelopment Commission
ATTEST:
South Bend Redevelopment Commission
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
Gary Gilot, President
Don Inks, Member
Kathryn Roos, Member
Mark Neal, Member
Michael Mecham, Member
ATTEST:
Linda Martin, Clerk
Exhibit "A"
MAIN- LAFAYETTE CONNECTOR DESIGN PROJECT
See attached Proposal from Lawson- Fisher Associates P.C. dated August 9, 2010
Approved by the Board of Public Works on August 23, 2010
1316 C )UNYY -QTY BUILDING
227 � JEEFELmHBDUI.RnARD
SOUTH BEND, INDIANA 46601.1830
Crt"Y OF SOUTH BEND STEPHEN J. LUECKE, MAYOR
B'QARD OF PUBLIC WORKS
August 30, 2010
Mr. Gregory Holden & Mr. Paul Hummel
Lawson- Fisher Associates
525 West Washington Avenue
South Bend, Indiana 46601
RE: Professional Services Proposal - Main/Lafayette Corridor Design
Project No. 110 -058
Dear Mr. Holden & Mr. Hummel:
PHONE 57412359251
1" 574)255-9173
TDD 574/235 -5567
The Board of Public Works, at its meeting held on August 23, 2010, approved the above
referenced Professional Services Proposal in the amount of $436,000.00.
Enclosed is a copy of the Professional services Proposal for your records.
If you have any questions, please contact me at (574) 235 -9251.
Sincerely,
�Linda M. Martin, Clerk
Enclosure
c: Bill Scballiol, CED
Michael Johnston, LFA
GARY A. GIL oT, P.E Dowim E INxs j OHN H. M juHY
Exhibit "B"
MAIN- LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT #1
See attached Proposal from Lawson- Fisher Associates P.C. dated January 4, 2011
Approved by the Board of Public Works on February 14, 2011
1316 CouNr Crr. RuItDINC
227 W JEffzw , BouuvAw
Sourm BEND, INDIANA 46601.1830
CrIY OF SOUrK BEND STEPHEN J. LUEM, MAYOR
BOARD OF PUBuc WORKS
February 14, 2011
Mr. Paul Hummel
Lawson- Fisher Associates, PC
525 Wesl Washington Avenue
South Bend, Indiana 46601
PHON0741235.9251
Exr 5741235 -9171
RE: Professional Services proposal — Main - Lafayette Connector Design - project No. 110-
058
Dear Mr. Hummel:
The Board Of Public Works, at its meeting held on February 14, 201 1, approved the
above referenced Professional Services PTOPOSn1 in the amount of $439,000.00.
Enclosed please find a copy of the Professional Services Proposal for year records.
If you have any questions, please contact me at (574) 235 -9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
c: Bill Schalliol, CED
Michael Johnston, LFA
Beth Leonard, CED
Judy Love, CED
GA Pais ILO+r,P.E. DONAWE.INK EEC1
CAU P. Llrr. .
ML Mru«re
Exhibit "C"
MAIN - LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT #2
See attached Proposal from Lawson- Fisher Associates P.C. dated March 15, 2011
Approved by the Board of Public Works on May 9, 2011
1316 Couvrr -Clry Bu LDIND
2171A JERAToN Boma v
sour BEND, INDIANA 466o] -1830
Cm of Sour BEND STEPHEN J. LUxF, MAYOR
W
BOARD OF PUBLIC WORKS
May 11, 2011
Mr. Michael Johnston
Lawson Fisher Associates
525 West Washington Avenue
South Bend, Indiana 46601
PROM 574 / 295 -9251
Fu 574/Z35-917)
RE: Professional Services Agreement Supplement 2 — Main - Lafayette Connector
Dear Mr. Johnston!
The Board of Public Works, at its meeting held on May 9, 2011, approved the above
referenced Professional Scrvioes Agreement Supplement 2 in the amount of $18,900.00.
Enclosed is a copy of the Professional Services Agreement Supplement 2 for your
records.
If you have any questions, please contact me at (574) 235 -9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
PN
Bill Schalliol, CED
Judy Love, CED
Elizabeth Leonard, CED
GARYA. GIIOT, F.E. DmAID E. INKS CAALP hrnLEn
PWIDPN1 MEMaEE MEMAEA
Exhibit `°D"
MAIN- LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT #3
See attached Proposal from Lawson - Fisher Associates P.C. dated October 12, 2011
Approved by the Board of Public Works on November 21, 2011
1316 GDU Tr -cm BUILDING
227W.J Boui"ARD
SOUYH BIND, INDIANA 46601 -1830
CriY OF SOUrtr BEND STUMN J. LUECO, MAYOR
BOARD OF PUBLIC WORKS
November 21, 2011
Mr. Michael Johnston
Lawson - Fisher Associates
525 West Washington Street
South Bend, Indiana 46601
RE: Professional Services Proposal Supplement No. 3
Main - Lafayette Corridor Design Project
Dear Mr. Johnston:
PHONE 5741235 -9251
F� 574/233 -9171
The Board of Public Works, at its meeting held on November 21, 2011, approved the
above referenced Professional Services Proposal Supplement No. 3 in the amount of
$260,320.00.
records. Enclosed is a copy of the Professional Services Proposal Supplement No. 3 for your
Enclosed please find the City's Employment Eligibility Ver" cation form
State for your signature. Please return the fully executed form as soon as ro9� by the
enclosed please find the City's Minority and Women Business possible. Additionally
Development, erprise Diversity
If you have any questions, please contact me at (574) 2359251,
Sincerely,
Linda. Martin, Clerk
Enclosure
c: Bill Schalliol, CED
Bath Leonard, CED
Judy Love, CED
LM:jc
GAAYA. Gs.Or, P.E. DO-NALD E. INK$ CARL P Lm
nEr:
PWDENr 14Meea
Exhibit "E"
MAIN- LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT #4
See attached Budget Table prepared by Lawson - Fisher Associates P.C.
Approved by the Board of Public Works on November 21, 2011
at
MAIN- LAFAYETTE CONNECTOR INFORMATION
PERMANENT
PERMANENT & TEMP PARCELS
PVCtI
475
South een4idh LreeA Developmtnt tic
COMMONS EMnp mall)
PARTMI
Num v
OWN, Name
eufinets Name
Type PI
Cal[ubletl
6J,124
I j .
TEMPORARY PARCELS
A4 PIMM.
Ana ail.
s
' y.
_
DEVIL Wool. ' in
DaNtlt Wliryen
RESIDENCE UV YAROI
TEMP
PARTIAL
iEP
420,
RESIDENCE
CE
RESIDENCE
41,191
39,039
United SalesofAmOKa
U3 POST OFFICE
TEMP
39363
7a
RLN'Em,.Inc.
MOTION WDUETRIES, INC
TEMP
$%an
SOR
N.S. Aftrtan, Inc
H.S ALTMAN, INC.
TEMP
441930
102
RNhad and Kathleen AftgaPJ
INDUSTRIAL DOOR
TEMP
$0,105
789"
..,4?)..
Wtndyi of frort Ways, IN
WENDY'E RESTAURANT
TEMP
48,505
43,022
DennYO.aN*NYt.Wetstr
..�,..�.,..
TEMP
76,715
at
36c
ONilne PIRMS, tic. el 0,
PERMANENT
PERMANENT & TEMP PARCELS
475
South een4idh LreeA Developmtnt tic
COMMONS EMnp mall)
PARTMI
137163:
. -486
Wa JOINT TUOE INC.
IOCK JOINT TORE, INC.
p ARTIAI
6J,124
I j .
at Build MBi, LLC
C a L OPTICAL ONE
PARTIAL
;079,989
421
Ric & Janet A. Da r
RESIDENCE
PARTIAL
47,929
420,
t
Pi[ LlaneJ Da euyner
Yss"
RESIDENCE
PARTIAL
39,039
�
( WaM. LLP
:.fly,
VACANT
NONE
WORE
38.479
30.479
:.
C LIP
VACANT
PARTIAL
7,606
Car)M. Kay
CARL KAY MEMORIALS
PAREAt
9,123
374,
South GleWay Properties, LLC
SEARS HARDWARE
PARTIAL
31,872
PAR17AL
43,022
Patricia MOnn Properties, LLC
SCOOTER WAREHOUSE
' SOL!
Nalle Preoenes, UC
DISCOUNT TIRE
PARTIAL
56,520
. .003 -
-
Jeffrey L. Nhkenen
HONKERS
PARTIAL
4pyH
002
iri[k llmiad LhWllry CPmpany
Uf[RESTAURANT
DAIRY QUf[N
PARTIAL
5912 >1
^'
PWS mvenmem Propene LLC
PRECISION WALL SYSTEMS
PARTIAL
40,026
001,•
Richards RenauninU, Inc
A 6 6 GA COMPANY
PARTIAL
J37,916
'gotTIC
Showiplace 1 th,U S and 19, LLC
AMC SHOWPLACE SOUTH REND 16
PARTIAL
88,427
f01
NERAFN3 KUIZER, IC.
INC.
HERA INC
PARTIAL
707,425
.140
Maryann 3hdman
RESIDENCE
RESIOEMCC
PARTIAL
227,383
1,39
Nancy Jo Pinney R Kaylyn Knmer
RESIDENCE
PARTIAL
&,644
441
Early l.&DuM K. lad son
RESIDENCE
PA471AL
13,136
PARTIAL
131096
TOTAL TAKE PARCELS
430
Ralph E. L Sharon S. Mink
RESIDENCE
377
Roben S. and Mary L eajski
PREMIER [OLLEGE OF COSMOOIOGY
EGE OF
TOTAL
16'763
419
Ric A.& Janet A. De f. r,,,
TOTM
32}34
Tm u
39
NON ACQUISITION PARCELS
36c
ONilne PIRMS, tic. el 0,
VACANT
349
Caroline Pannen, LLC
PARTMI
137163:
434
Canollne Pannen, LLC
VAGNT
PARTIAL
16,155
433
CITY Y
VACANT
PARTIAL
15,168
431
Llraline LLC
VACANT
NONE
NONE
16,599
429
CITY
CITY
VACANT
34,915
426
CITY
VACANT
NONE
WORE
U,511
427
CITY
23,6m
23,6%
NON ACQUISITION PARCELS (MISC)
443 City of South Send Park Dept 06111104 PARK ,ten[ 0
1W Ko3le Menha Ann NONV 366,831
RESIDENCE NONE 0
M'JIPA GROUP S
6915,OpppC
GROUP 2
"osaar Y` Yv: $25,000.00
GROVP3 $45,000,00
' :A0W •. .... GROUP4 6105,04.00
Amw GROUP 5 GI5,04.4
GROUP 6 CITY /CAROLINE SWAP
TOTAL Group 2 thru Group 9 S1,226,000.00
Exhibit "F"
MAIN- LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT #5
See attached Budget Table prepared by Lawson- Fisher Associates P.C. with construction
estimate for project at $4.5 Million Dollar amount
Approved by the Board of Public Works on May 15, 2012
ENGINEERS ESTIMATE
CITY OF SOUTH BEND
April 17, 2012
Project Name; Main 3~16fa tta BoulgWid Coo ftM
Project No.: mss
For Bids Due : 512212o12
BASE BID
ITEM N0. I DESCRIPTION
OTY
UNIT
UNIT PRICE
TOTAL AMOUNT
1 DEWATERING AND PROTECTIONOF EXISTING STRUCTURES
2 CONSTRUCTION ENGINEERING
3 CPM SCHEDULE
4 CPM SCHEDULE, MONTHLY UPDATE
1
1
1
13
LS
LS
LS
EA
$5,000.00
594,000.00
f1,250.00
$200,00
fS,00D.DD
594,000.00
$1250.00
$2,600.00
5 MOBILQATION AND DEMOBILQATION
1
LS
5233,000.00
$233.000 00
6 CLEARING RIGHT-OF-WAY
1
L�
$1401000,00
S1410,00D.00
7 PIPE, REMOVE EXISTING STORM SEWER
73
LFT
$1500
$1.095.00
8 PIPE, REMOVE EXIST ING WATER AWN
9 STRUCTURE REMOVE, EXISTING STORM MANHOLE
10
15
LFT
EACH
$15.00
$1.000.00
$150.00
$15,000.00
10 STRUCTURE REMOVE, EXISTING SANITARY MANHOLE
2
EACH
S1,2%.00
$2,400.00
11 REMOVE, EXISTING CAP, 64NCHES
2
EACH
$300.00
1600.00
12 REMOVE, EXISTING CAP, B- INCHES
1
EACH
$350.00
$350.00
13 REMOVE. EXISTING CAP, 1D- INCHES
1
EACH
$50000
$500.00
14 REMOVE. EXISTING FIRE HYDRANT
2
EACH
$1,000.00
$2,000.00
15 ABANDON, EXISTING STORM SEWER
589
LFT
$2000
311,780,00
16 ABANDON, EXISTING SANITARY SEWER
680
LFT
S20.1MD
St3,600.00
17 ABANDON. EXISTING SANITARY MANHOLE
2
EACH
$1,000.00
$2.000.00
18 ABANDON, EXISTING WATER MAIN
485
LFT
$15,00
17,275.00
18 PAVEMENT REMOVAL
100
SYS
$1500
511500.00
20 COMMON EXCAVATION
35,611
CYS
$8.00
$284,888.00 '
21 TEMPORARY EROSION AND SEDIMENT CONTROL
1
LS
$37,009.00
$37,000,00
22 COMPACTED AGGRE GA—E BASE, NO. 53, BASE
9,130
TON
$21 00
$191,730.00
13 COMPACTED AGGREGATE BASE, NO 73, BASE
20
TON
$2100
$(20.00
24 MILLING, ASPHALT, 1.112 INCH
176
SYS
$4.00
s704.00
25 HMA SURFACE, TYPE B
1,390
TON
568.00
594.520.00
16 HMA INTERMEDIATE, TYPE B
2,280
TON
584.00
5145,920.00
27 HMA BASE, TYPE B
7,290
TON
553.00
$3$6,370.00
28 HMA PATCHING, TYPE B
29 ASPHALT FOR TACK COAT
260
19.5
TON
SYS
$100.00
Si-00
$28,000.00
$19.50
39 PLAIN CEMENT CONCRETE PAVEMENT PATCH, B- INCHES
92
SYS
S45.00
$4,140.00
"-$-- Fish• ASSWah, P.C.
P14W File No 101014 40
Awd,, 2012
ENOINEER'S ESTIMATE
CITY OF SOUTH BEND
APrII 17, 2012
Project Name: M410 Street& fawns R^ulevard Conito
Prof cl No.: 110 -058
For Blds Due : Si 12012
BASE BID
ITEM N0. 1 DESCRIPTION
OTY,
UNIT
UNIT
PRICE
TOTAL AMOUNT
31 TEMPORARY FENCE
115
LFT
$30.00
33,450.00
32 SIDEWALK, CONCRETE. 4 -INCH
5,301
SYS
$30.00
$15B4O30.00
33 CURB RAMP, CONCRETE
292
SYS
5100.00
329,200.00
34 CURB, CONCRETE
Su
LFT
$14.50
$8,528.00
35 COMBINED CONCRETE CURB AND GUTTER, TYPE 8
9,382
LFT
$16.00
5150,112.00
36 COMBINED CONCRETE CURB AND GUTTER, TYPE A
50
LFT
31600
$800.00
37 HMA FOR APPROACHES, TYPE B
3.640
TON
$75.00
E273,000.00
38 PCCP FOR APPROACHES, 6 -INCH
2,217
SYS
$32
$70,044,00
39 1 PCCP FOR APPROACHES, B -INCH
2,139
SYS
$43,00
$81,977,00
40 PAVERS, RESET
33
SYS
37000
$2,310.00
41 MOBILIZATION AND DEMOBILIZATION FOR SEEDING
2
EACH
$470.00
$840.00
42 TOPSOIL
3,510
CYS
$30.00
$105,30000
43 FERTILIZER
2.12
TON
$1,400.00
$2.868.00
44 MULCHED SEEDING, J 25,596
SYS
$150
$38.394.00
45 WATER
230
KGAL
$1.20
$176.00
46 SODDING. NURSERY
4,424
SYS
$3.50
$15,484,00
47 FIELD OFFICE, A
18
MO
$1.900.00
$34,200.00
48 MONUMENTS —TYPEB
13
EACH
$585.00
$7,805.00
49 MONUMENTS — TYPE C
3
EACH
5450.00
S1.350.00
50 ADJUST WATER SERVICE LINE, RESIDENTIAL
2
EA
51,500.00
53,000.00
ST WATER SERVICE LINE, RESIDENTIAL. WITH RETAP AT
51 MAIN
2
EA
42,500.00
55,000.00
52 CAP EXISTING WATER SERVICE LINE
2
EA
$250.00
asDD.oD
WATER LINE RELOCATION UNDER PROPOSED UTILITY LINE, S.
53 INCH
2
EA.
55,00000
110,00000
54 WATER MAIN. PIPE, D.I., 6 -INCH
518
LFT
$50.00
$25,900.00
65 WATER MAIN, PIPE, 0.1., &INCH 1.774
LFT
W
$176.310.00
56 WATER MAIN. PIPE, D.L. 10 -INCH 294
LFT
$75.00
S22,060.0D
57 GATE VALVE 8 BOX, 6-INCH
2 EACH
51250.00
$2,500.00
56 GATE VALVE 8 BOX, 8-INCH
5 EACH
(1,600.00
$8,000.00
59 GATE VALVE d BOX. 10 -INCH
3 EACH
32,000.00
$6.000.00
60 INSERTVALVE. 8 -INCH
1 EACH
54,500.00
$4,600.00
P`q'W FIIe Na
201024.40
AWE,, 2012
ENGINEER'S ESTIMATE
CITY OF SOUTH BEND
April 17, 2012
Projxt Name : Main SfreeULafil""e Boulevard Conn.et
Projxt No.: ? 1 -0 8
For Ilia$ Due 4=2012
BASE BID
ITEM NO I DESCRIPTION
CITY UNIT
UNIT PRICE
TOTAL AMOUNT
67 TAPPING SLEEVE, 64NCH
1 EACH
$1,500,00
5150000
62 TAPPING SLEEVE, 8 -INCH
2
EACH
$2,000.00
Sa,000.D0
63 TAPPING SLEEVE, 104NCH X &INCH
I EACH
$2250.00
S2,250.DO
69 TAPPING VALVE, 6 -INCH
1 EACH
St,500.00
St,SC0.00
65 TAPPING VALVE, 84NCH
3
EACH
S2,25D.00
$6,750.00
66 WATER MAIN CROSSOVER, 64NCH
1 EACH
34.000.00
34,000.00
67 WATER MAIN CROSSOVER, 8 -INCH
2 EACH
55,000.00
$10,000.00
68 WATER MAIN CROSSOVER, 10 -INCH
2 EACH
$6,500.00
513,000.00
69 FIRE HYDRANT ASSEMBLY
6 EACH
54,500.00
$27,000.00
70 COMPRESSION COUPLING, 10 -INCH
2 EACH
$1,900.00
$3,BOppp
71 CAF, 6 -INCH
3 EACH
S200.00
$600.00
72 CAP, 8 -INCH
5 EACH
3250,00
31,250.00
73 CAP, 10-INCH.
1 EACH
$300.00
$300.00
74 REDUCER, &INCH X &INCH
2 EACH
5400.00
$800.00
75 REDUCER, ID4NCH X &INCH
1 EACH
5500.00
3500.00
76 TEE, 6 -INCH
1 EACH
3400.00
$400.00
77 TEE, 8-INCH X 6 -INCH
3 EACH
5600.00
$2,400.00
78 TEE, 10 -INCH X 6 -INCH
2 EACH
$900.00
sl,eoo.00
79 TEE, 10-fNCH
1 EACH
51,000.00
S1,000.0D
80 CROSS, &INCH
1 EACH
31250,00
$1.250,D0
81 11 Y DEG SEND, 6 -INCH
1 EACH
S460.00
g950.00
82 11 '/. DEG BEND. 8 -INCH
7 EACH
$550.00
$3,850,00
83 45 DEG BEND, 64NCH
4 EACH
$450 00
sl.soo.pp
84 45 DEG SEND, 8-INCH
1 EACH
$550.00
$550,00
85 45 DEG BEND, 10 -INCH
2 EACH
5750.00
E1,SOO.DO
86 90 DEG SEND, 8 -INCH
1 EACH
$600,00
$6m00
87 NEW WATER SERVICE, 1 -INCH
5 EACH
£150000
57,500.00
86 CAP, EXISTING WATER SERVICE
5 EACH
5250.00
£1.250.00
88 PROJECT INFORMATION SIGN
2 EA
31,0000D
$2.OM.00
90 STORM PIPE, D.1., 1pINCH
24 LFT
150.00
S 1,200.00
Le so+FMhWAUXW(es P.C.
PrOjOV FBa No. 201024.40
AA'e, 2012
ENGINEER'S ESTIMATE
CITY OF SOUTH BEND
ApH117. 2012
Project Name: Main 8treeVlahveH Bo I varQ nnector
Project No.: 11ao5e
For Bi0s Due: W212012
BASE 810
ITEM NO. DESCRIPTION
OTY.
UNIT
UNIT PRICE
TOTAL AMOUNT
721 CONTROL STRUCTURE, 60 INCH
1 EACH
$8,000.00
38,000.00
122 INLET, J-10. MOD
38 EACH
$5,202.00
1202,878.00
123 INLET, W 10, MOD
24
EACH
$3,200.00
;76,e00.0p
124 INLET CASTING. TYPE 2
1
EACH
S2,OOD.00
E2,000.00
125 INLET CASTING, NEENAH R- 3067.0, TYPE L GRATE
1
EACH
$500.00
sso6.oD
126 STRUCTURE, ADJUST CASTING TO GRADE
17
EACH
$250.00
54,250.00
127 CAST IN PLACE RETAINING WALL
63.5
SYS
$400.00
525.400.00
128 MODULAR CONCRETE BLOCK RETAINING WALL
18.5
SYS
$450.00
$8.325.00
128 TEMPORARY PANEL SIGN SUPPORTS
108
LET
£1000
£1,080.00
730 STANDARD BARRICADE, TYPE III -A
144
LET
$1000
$1 440.00
131 STANDARD BARRICADE, TYPE III -B
360
LET
515A0
$5.400 00
132 CONSTRUCTION SIGN, TYPE A
22
EACH
$120.00
$2.fiao 00
133 CONSTRUCTION SIGN, TYPE S
1
EACH
£100,D0
Sf00.OD
134 DETOUR ROUTE MARKER ASSEMBLIES
43
EACH
$66.00
$2,795.00
135 ROAD CLOSURE SIGN ASSEMBLIES
8
EACH
$250.00
$2,250.00
136 FLASHING ARROW BOARD
1
EACH
$5D0.00
3500.00
137 TEMPORARY PANEL SIGN
264
SET
$15.00
31,260.00
138 MAINTENANCE OF TRAFFIC
1
LS
$50,000.00
$50,000.00
738 TRAFFIC SIGNAL EOUIPMEM, REMOVE
1
LS
$5,000.00
$5,000.00
140 MISCELLANEOUS EQUIPMENT FOR TRAFFIC SIGNALS
1
LS
$1,000,00
$1,000.00
141 TRAFFIC SIGNAL HEAD, 3 FACE, 121N, RED, AMBER, GREEN
1S
EACH
SODO0D
516200,00
142 TRAFFIC SIGNAL HEAD, 3 FACE, 121N, RED, AMBER ARROW,
GREEN ARROW
2
EACH
395000
$190000
143 TRAFFIC SIGNAL HEAD, 5 FACE, 121N RED, AMBER, GREEN,
AMBER ARROW, GREEN ARROW
q
EACH
$1.400.00
$5,600,00
144 PEDESTRIAN SIGNAL HEAD WITH INTERNATIONAL
SYMSOLS,18', COUNTDOWN
22
EACH
5850.00
518,70000
145 SIGNAL SERVICE
3
EACH
s9oo•00
$z.7010.00
146 POWER SUPPLY, UNINTERRUPTIBLE
3
EACH
$7,500 DD
722.500.00
147 THERMAL VIDEO DETECTOR SYSTEM
8
EACH
$7,000.00
$56,000.00
148 PEDESTRIAN PUSH BUTTON AND SIGN
16
EACH
$175.00
$3,150.00
149 CONTROLLER AND CABINET, MENU DRIVEN, 12 PHASE TS2.
TYPE 1
1
EACH
325.ODO.00
£25,000.00
Prq'W FL@ No 207024.40
Apr0, 2012
ENGINEER'S ESTIMATE
CITY OF SOUTH BEND
April 17, 2012
Project Name : Main §tmet/Lalaystle 13mle,ard
Project No. 110 -Q,5
For Bloc Due : 512212012
BASE BID
ITEM NO. I DESCRIPTION
OTY.
UNIT
UNIT PRICE
TOTAL AMOUNT
ISO CONTROLLER AND CABINET, MENU DRIVEN, 12 PHASE 7S2,
TYPE 1, WITH LIGHTING
2 EACH
530,000.00
560,000,00
SIGNAL AND LIGHTING COMBINATION CANTILEVER
151 STRUCTURE, 40 FT. SIGNAL ARM. 20 FT. LUMINAIRE ARM 35 Fr.
1
EACH
$e 40000
$8,400.00
152 SIGNAL CANTILEVER STRUCTURE, MAST ARMS 40 FT AND 40
FT
EACH
38,000,00
$8,000.00
153 SIGNAL CANTILEVER STRUCTURE, 40 FT SIGNAL ARM
3
EACH
$2,500.00
$7,500.00
154 SIGNAL CANTILEVER STRUCTURE, 35 FT SIGNAL ARM
1
EACH
S2.D00 00
$2 00000
155 SIGNAL SUPPORT FOUNDATION, 36 IN X 36 IN X 96 IN
6
EACH
$1,500.00
$8,000.00
756 STEEL STRAIN POLE FOUNDATION, 361N X 144 IN
4
EACH
$2,500.00
S,0,000.D0
157 CONTROLLER CABINET FOUNDATION. Pi
3
EACH
$500 DO
$150000
758 HANDHOLE. SIGNAL
16
EACH
$500,00
38,000.00
159 INTERCONNECT CABLE, FIBER OPTIC
383
LFT
$2.00
$76600
160 THERMAL VIDEO DETECTOR CABLE
1,310
LFT
SIZ
$1,310.00
161 SIGNAL CABLE, XMGA
175
LIFT
$3.60
$61250
162 SIGNAL CABLE, 3C1140A
100
LFT
52.00
$200.00
163 SIGNAL CABLE, 5014GA
31000
LFT
$1.75
55.260.00
164 SIGNAL CABLE, 7G14GA
1,410
LFT
$1.75
52,487.50
165 SIGNAL CABLE, 2CI16GA
120
LFT
5200
$240.00
186 LOOP DETECTOR AMPLIFIER, DELAY, 2- CHANNEL
2
EACH
380000
$1,600.00
167 SAW CUT FOR ROADWAY LOOP SEALANT
324
LFT
S8A0
52,582.00
168 SIGNAL DETECTOR HOUSING
2
EACH
5650.00
$1,300.00
189 SIGNAL CABLE, ROADWAY LOOP, 1C1140A
1,016
LFT
51:00
51,015.00
170 DISCONNECT HANGER
4
EACH
s350.00
$7,400.00
171 SPAN, CATENARY AND TETHER
4
EACH
$1,750.00
$7,000.00
772 SIGNAL STRAIN POLE, STEEL, 35 FT
d
EACH
34,950.00
319.BUilm
LIGHTING SERVICE FOR TRAFFIC SIGNAL MOUNTED
173 LUMINAIRES
1
EACH
S400.D0
$400.00
174 LUMINAtRE, TRAFFIC SIGNAL MOUNTED, HIGH PRESSURE
SODIUM, 400 WATT
5
EACH
$800.00
$4,000,00
175 LIGHTING CABLE FOR TRAFFIC SIGNAL MOUNTED
LUMINAIRES, 3010
685
LFT
$1,50
$1,027.50
176 CABLE-DUCT MARKER
4
EACH
$100.00
$400.00
177 LIGHTING HANDHOLE
5 1
EACH
$550.00
54,400.00
Prgarl Flo No, 201024.40
W. 2072
ENGINEER'S ESTIMATE
CITY OF SOUTM BEND
April 17, 2012
Pro)ecl Name : Main tmg •r•,•••• a ulee a onnect
P'We No.: 110 oa
For Bids Due /1
BASE BID
ITEM N0. I DESCRIPTION
OTY. UNIT
UNIT PRICE
TOTAL AMOUNT
'76 LIGHTING FOUNDATION
37 EACH
$80O.D0
$29.60000
178 SERVICE POINT
7 EACH
33,600.00
53,500.00
180 STREET LIGHT
41 EACH
52,50009
5702,600.00
781 WIRE p4
7.456 LFT
S9.00
$67,104.00
182 WIRE# 10
5,417 LFT
$7.00
$5,417,07
183 CONDUIT. STEEL, GALVANIZED, 2 IN
2,976 LFT
$73.00
$38.711,00
184 LINE, THERMOPLASTIC, SOLID, WHITE, &INCH
2,590 LFT
$0.60
St,654.Op
185 LINE, THERMOPLASTIC. SOLID, WHITE. 4 -INCH
2,315 LFT
50.60
31,38900
186 LINE, THERMOPLASTIC, SOLID, YELLOW, 4 -INCH
11,870 LFT
$0.80
$7,122.00
187 LINE, THERMOPLASTIC, BROKEN, YELLOW. 4 -INCH
955 LFT
$0.60
Sb73.p0
188 TRANSVERSE MARKING, THERMOPLASTIC. SOLID, WHITE,
1
STOP LINE, 24 -INCH
610 LFT
55.50
$3,355.00
169 TRANSVERSE MARKING, THERMOPLASTIC. SOLID, YELLOW,
CROSS HATCH, 8 -INCH
376 LFT
$3.00
St 125.00
190 LINE REMOVE
200 LFT
$2.00
5400 00
161 PAVEMENT MESSAGE MARKING, THERMOPLASTIC, WHITE.
ARROW
40 EACH
$81),00
$3,20000
182 PAVEMENT MESSAGE MARKING, THERMOPLASTIC. WHITE,
TURN ARROW
10 EACH
$80.00
5800.D0
193 PAVEMENT MESSAGE MARKING, THERMOPLASTIC, WHITE,
WORD. -ONLY-
30 EACH
$80.01)
$2,400.00
194 VIDEO RECORD
1 LS
$2.000.00
$1,000.00
195 SIGN POST, SQUARE, 1 REINFORCED ANCHOR BASE
240 LFT
$8.00
S1,920.00
196 SIGN, SHEET. ENCAPSULATED LENS WAFGENO, 0060 IN
THICKNESS
68 SFT
$11 00
$884.00
797 SIGN, SHEET, ENCAPSULATED LENS W/LEGEND, 0.1D0 IN
THICKNESS
156 SIFT
575.00
$2.34000
198 SIGN, SHEET, ENCAPSULATED I ENS W /LEGEND, 0.125 IN.
THICKNESS
131 SFT
$21.00
$4,651.00
199 HOUSES AND BUILDINGS, PARCEL 369, REMOVE
1 LS
$20.00000
$20.000.00
200 HOUSES AND BUILDINGS, PARCEL 35Q REMOVE
1 LS
$20,01)0.00
520,000.00
207 HOUSES AND BUILDINGS, PARCEL 430, REMOVE
1 LS
520,090.03
320,000.00
202 HOUSES AND BUILDINGS, PARCEL 420, REMOVE
t
LS
520 Opp Op
E20,OOO.dJ
203 HOUSES AND BUILDINGS, PARCEL 377. REMOVE
1 LS
$20,000,00
520,000.00
TOTAL $4,559,256.00
ews a AaBp�lg/es
"'q-' Fe4 Na
20102!,40
Ap ,, 2012
ChWaA A W
No SCATS
4 1-nmmwiric'4.2 Bob
Jb
W*v ST,
POOLS QrAffo
AWCPMM *C'fI-VV`rAVr
"A"T' I MIN Ofs:ou ya firw- or-rfm
WlXlrt N*V4S MIN ANZMi&
kyfWC AV,
CITY OF SOUTH BEND, INDIANA
L ItIMAIN ST./WAYETTE BLVD- CONNECTOR( 201024.40
525 W. WASHINGTON AVENUE ANTICIPATED f!
SOUTH SEND. INDIANA 466111
PH. f5741234.3161 ACCESS 10 PARCELS
H.i
U
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPME
Marcia I. Jon , President
South Bend Redevelopment Commission
ATTEST:
Do ald Alford, 5 ., Secretary
South Bend Redevelopment Commission
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC-
, WORKS
�eCJ�
Garr Gdot, Pr sident
. c•
nInks,. ember
Kathryn Roos, Member
ATTEST:
ds Martin, Cl &k
Exhibit "G"
MAIN - LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT #6
See attached quote request to advertise for the demolition of three structures located
within the project area. Quotes are to be received by the Board of Public Works on
August 9, 2012.
Structures for Demolition are as follows:
4101 South Main Street (DeBuysser Parcel — residential structures)
4219 South Main Street (Mink Parcel — residential structures)
4043 South Michigan Street (Premier College of Cosmetology — commercial structure)
INVITATION TO QUOTERS
Notice is hereby given that the City of South Bend, Indiana, Board c, ,,� vvumb wui receive
sealed quotes at the office of the Board of Public Works, County City Building Room 1316, 227
W. Jefferson St., South Bend, Indiana, 46601 until the hour of 10:30 a m on Thursday
August 9, 2012 for the following:
Demolition of.
Former Debuysser Property, Parcel 420, 4101 S. Main St.
Fortner Premier College of Cosmetology, Parcel 377, 4043 S. Michigan St.
Former Mink Property, Parcel 430, 4219 S. Main St.
For Project No. 110 -058A
Work to be performed shall include furnishing all labor, services, materials, insurance and
equipment for the demolition and environmental abatement of buildings on the aforementioned
properties, all more particularly described in the following documents contained in this invitation.
The Contract Documents are on file and available for public inspection during regular working
hours at the Department of Public Works (1316 County -City Building, South Bend, Indiana), and
at the offices of Lawson - Fisher Associates, P.C., 525 West Washington Avenue, South Bend,
Indiana 46601, phone (574) 234 -3167
Quotes must be on the City of South Bend Contractor's Quote for Public Work form.
Each quoter or contractor (hereinafter the contractor) must fully comply with either the
Contractor's Non - Collusion Affidavit and Common Construction Wage Scale of these bid
conditions as to each construction trade it intends to use on this construction contract and all
other construction work (both federal and non - federal) in the St. Joseph County area during the
performance of this contract or subcontract. The contractor commits itself to the goals for
minority manpower utilization in either the Contractors Non - Collusion Affidavit and Common
Construction Wage Scale, as applicable, and all other requirements, terms and conditions of
these quote conditions by submitting a properly sealed quote.
Work under this project is subject to a Common Wage Determination as established in
accordance with IC 5- 16 -7-4.
The Contractor shall appoint a company executive to assume the responsibility for the
implementation of the requirements, terms and conditions of the quote conditions.
a.m. at the former Premier College of Cosmetology, 4043 S. Michigan Street. Each quoter is
required to visit the project site and become familiar with the job conditions prior to making a
quote, Any questions regarding bidding conditions must be addressed to the Owner in writing
no later than Friday, August 3, 2012.
The Board reserves the right to reject any or all quotes or to accept a full or partial award of the
quote or quotes which, in its judgment, will be to the best interests of the City of South Bend.
Board of Public Works
Linda M. Martin, Clerk
Exhibit "H"
MAIN - LAFAYETTE CONNECTOR DESIGN PROJECT - SUPPLEMENT #7
See attached Supplement Agreement #4 from Lawson- Fisher Associates P.C. dated
September 25, 2012
L FA.... PIGREGORY L. HOLDEN,
PER C. TITTLE,LP.EE P E.
LAWSON- FISHER ASSOCIATES P.C. MICHAEL J. GUZIK, P.E. 902214
September 25, 2012
Mr, Bill Schalliol
Community & Economic Development Specialist
City of South Bend
227 West Jefferson Boulevard, Suite 1200S
South Bend, Indiana 46601
RE: South Main Street to Lafayette Boulevard
Connector and Development Area
Supplemental Agreement #4
Additional Scope of Work
Dear Mr. Schalliol:
THOMAS S. SHARP, P.E.
THERESA E HARRISON, P.E.
JON E. RIEMKE, P.E.
JEFFREY L. McKEAN, P.E.
RANDOLPH J. LINDLEY, P.E
CHRISTOPHER J. DETER, P.E.
DENNIS A. ZEBELL, P.E.
BENJAMIN P. HOLDEN, P.E.
DAN G. DELGADO, P.E.
MICHAEL F. JOHNSTON. P.E
JEFFREY M. BYRD, P.E.
JARED M. MUSS, P.E.
SKY K. MEDORS, P.E.
GINA A. WEILBAKER, P.E.
AARON W. BLANK, P.L.S., P.E
Lawson - Fisher Associates P.C. (LFA) is pleased to submit this proposal to provide
Professional Engineering Services to the City of South Bend (City) for the Main Street to
Lafayette Boulevard Connector and Street Improvements.
The proposal includes the following documents:
• Scope of Additional Services, Appendix A
• Manhour Justification, Appendix B
The proposal was prepared at your request on the basis of our meetings on May 21,
2012 and September 20, 2012. It includes work items and work effort not envisioned or
included in our original proposal.
We propose this Scope of Services be performed on an hourly basis for a budgetary fee
of $97,600.00. Payments to LFA will be in accordance with Attachment "A" in our original
contract.
Please indicate your acceptance of this proposal by signing in the space provided below
and returning one copy to our office.
Thank you for the opportunity to provide additional Professional Engineering Services to
the City of South Bend.
525 WEST WASHINGTON AVENUE • SOUTH BEND, INDIANA 46601 .574.234- 3167.574- 236 -1330 (FAX)
L FAVAVA
Mr. Bill Schalliol
September 25, 2012
Page 2
If you have any questions, comments, or desire additional information, please do not
hesitate to contact us.
Very truly yours,
LAWSON - FISHER ASSOCIATES P.C.
Michael F. Johnston, P.E.
Senior Civil Engine r
aulA. Hummel, P.E.
Senior Vice President/Senior Civil Engineer
MFJ:PAH: /s
Encls.
c: Michael Mecham, P.E. City Engineer w /Encls.
ACCEPTED AND APPROVED this day of
(Authorization is also Notice to Proceed)
CITY OF SOUTH BEND REDEVELOPMENT COMMISSION
2012.
1 1
L FAVAVA
APPENDIX A
SCOPE OF ADDITIONAL SERVICES
South Main Street to Lafayette Connector
Our Design Agreement was originally based upon our proposal dated August 9, 2010, with the
Agreement executed on August 23, 2010. Since that time the Agreement has been
supplemented on three times. It was modified two times to add (1) R/W acquisition services
and (2) relocation agent services. The third supplemental increase (Submitted on October 12,
2011) covered the change in design from the construction of the first project of 3- Phases into
one project with revised and additional alignments and traffic signals replacing the initially
planned roundabout. At the time of the third Supplemental, increased design fees were
projected to carry the project through Construction Contract letting and begin construction.
However additional design and coordination tasks have been requested that are beyond the
vision available at that time.
It is noteworthy to mention that the existing agreement in -place at the time of the first planned
contract letting on May 29, 2012 would have substantially covered our increased design costs.
However a prudent decision made at that time (to delay the contract letting and construction
until 2013) by the City and its design team was instrumental in saving user costs and most likely
construction change orders due to wintering the project. This delay resulted in several
additional survey, design and coordination tasks including plan revisions to accommodate R/W
acquisition changes, additional street lighting, and a separate demolition project.
The following items are requested as effort not envisioned in our October 2011 Supplemental
Request:
Additional Survev Items
• Additional field survey.
• Field layout of the proposed design to facilitate plan interpretation
• Preparation of additional easements and parcel plat revisions.
• Supplemental title information requests.
Additional Design Tasks
• Design and plans for decorative City street lighting.
• Analysis, design and plans for an additional detention pond and outlet control
structure to serve the Caroline Properties (Gates) development.
• Water line extension added on East Barbie Street.
• Two additional plan revisions for the Carl Kay Parcel.
• Traffic analysis and multiple drive revisions for Lock Joint Tube.
• Design of a construction access driveway for Heraeus Kulzer.
• Quotation project and documents for a separate demolition contract of three parcels.
• Additional survey and design work for West Chippewa (south side).
• 2 n Letting and Construction Documents
• Wendy's drive revision
September, 2012 Page 1 Project File No. 9022.14
L FAVAVA
Additional Coordination Tasks
• Prepare agreement/offer document for AMC Theatres & Caroline Partners.
• Extra meetings with Lock Joint Tube, South Gateway Properties, Pinney Drive quote.
• Coordination and completion of locating work on Ladson's septic tank.
• Assistance with AEP Transmission Relocation Agreement.
September. 2012 Page 2 Project File No. 9022.14
K
�I
I
Z�
2�
aQ�
QU�
E W �
00 >�
KWLL�
i m g
i � O V
6
6� c
0
Sm
'uaq
20
s
z
a
a
J
e
i