HomeMy WebLinkAboutAppeal - Reconnect Water Service Line for 215 E. Ireland Road as Prohibited in Section X, Paragraph F on Page 26 – Cage Civil Engineering1316 COUNTY -CITY BUILDING
227 W.JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
December 17, 2020
Mr. Frederick W. Thaete, P.E.
Cage Civil Engineering, Inc.
3110 Woodcreek Dr.
Downers Grove, IL 60515
fwthaete(k ca gecivil. com
RE: Appeal
Dear Mr. Thaete:
PHoNE 574/235-9251
FAx 574/235-9171
The Board of Public Works, at its meeting held on December 17, 2020, approved the above
referenced appeal for Section X, Paragraph F on Page 26 in South Bend Municipal Utilities
Rules and Regulations for water service line reconnection at 215 E. Ireland Road, subject to
confirmation of a copper service line from the service location to the main line.
Enclosed please find a copy of the appeal for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
s/Linda M. Martin, Clerk
Enclosure
GARY A. GILOT ELIZABETH A. MARADIK JORDAN V. GATHERS JOSEPH R. MOLNAR
A'W',CAGE
Tff CIVIL ENGINEERING
November 19, 2020
Ken Smith
City of South Bend - Water Works
125 W Colfax Avenue
South Bend, IN 46601
RE: Valvoline
215 E Ireland Road
Dear Mr. Smith:
The purpose of this letter is to present information to your office and the Board of Public Utilities
with respect to Core Acquisitions (property owner) request to re -commission the existing water
service tap located at 215 E Ireland Rd.
During the initial due diligence period as the logistics of this potential redevelopment project were
being evaluated, CAGE Engineering made contact with the City of South Bend to discuss existing
utilities servicing the property. Zach Hurst (City of South Bend Project Engineer) provided
information related to the sizing and locations of the municipal utilities adjacent the property. CAGE
asked Mr. Hurst if the City permitted the re -use of existing water taps and Mr. Hurst replied "we
always push people to reuse existing taps where practical" (email dated November 5, 2019).
CAGE prepared engineering improvement plans following the direction from the City of South Bend
with the plans showing the re -use of the existing water service connection located adjacent to
Ireland Road. The plans were submitted for permit review on June 15, 2020. The City reviewed the
plans, provided comments and CAGE revised the drawings for submittals on July 6t", August 3rd and
August 17t" all with the plan depicting the re -use of the existing water service tap. On August 26,
2020, the Engineering Department issued a comment stating that South Bend's Rules and
Regulations require that for any demolished building, a new tap is required. That was four reviews
before the requirement was brought to our attention and contradicts what was relayed to us during
our initial conversations with the City.
When we inquired about the reasoning behind this regulation, the City informed us that the primary
driver for this regulation is the desire for any old, lead water service taps to be removed from the
system. The property owner had the site contractor excavate the existing water service curb stop so
that a visual inspection could be made in order to ascertain the pipe material. Upon excavating the
service, it appears that the piping is copper from the curb stop to the corporation stop at the water
main. There is no way to know with certainty that the water service is in fact copper fully to the
water main, but the water service was constructed in 1973 and it was becoming increasingly rare
that lead services lines were being installed new in 1973.
We ask that you also understand and take into consideration that there is an extensive array of
buried public utilities located along the north side of Ireland Rd between the water service
connection and the public water main. Known utilities include buried telephone, buried electric,
buried fiber optic, sanitary sewer as well as overhead electric. The presence of all of these utilities
significantly adds to the complexity of the excavation and risks associated with the installation of a
new water service line. The excavation also will require the temporary closures and traffic control
for westbound traffic and a permanent pavement patch repair to Ireland Road. This is all significant
risk to public utilities and the compromising of the public roadway all for what appears to be an "in
kind" replacement of a water service.
We understand that this replacement is a part of the Rules and Regulations and that an appeal may
not be able to be resolved administratively. If that is the case, we request that this petition for relief
be presented to the Board of Public Works for further consideration.
Should you have any questions or comments, please do not hesitate to contact me at
630-688-8621 or fwthaete@cagecivil.com
Sincerely,
CAGE ENGINEERING, INC.
Frederick W. Thaete, P.E.
Senior Manager
Enclosures
BOARD OF PUBLIC WORKS
Gary A. Gilot, President - n/
Y vv�
Elizabeth A. Maradik, Member
Jordan V. Gathers, Member
Joseph R. Molnar, Member
ATTEST:
(�Znda Ogarttn
Linda M. Martin, Clerk
F. Demolition
Building demolition, due to condemnation or redevelopment of
property, requires proper disconnection of water service lines to
prevent leakage. The Utility will disconnect the service line at the
property owner's expense, (at the current demolition fee). This charge
shall be fixed by the Utility based on number and size of services to the
property. The demolition contractor shall be responsible for the water
service demolition fee prior to any work being done. The contractor
will also be responsible for the return of any meter or other fixtures
belonging to the Utility which the Utility was unable to retrieve prior
to demolition.
When buildings are demolished, the instituting agency, usually the
Department of Code Enforcement, shall include in its specification the
requirement that all water service lines shall be disconnected in
conformity with Utility Rules; and it may include the water service
demolition fee in its contract with the demolition contractor. Re -use of
disconnected service lines is prohibited.
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 12/14/20
Name Ken Smith Department Utilities
BPW Date 12/17/20 Phone Extension 6108
Review and Approval Required Prior to Submittal to Board
Diversity Compliance ❑
Officer Name
and Inclusion Officer
BPW Attorney ® Attorney Name
Dept. Attorney ❑ Attorney Name
Clara McDaniels
Purchasing ❑
Check the Appropriate Item Type — Re uired or All Submissions
❑ Professional Services Agreement ❑ Contract ❑ Proposal
❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA
❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes
❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA
❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution
N Other: Anneal n Ease./Encroach
Information
Company or Vendor Name
Cage Engineering
❑ Yes❑ If Yes, Approved by Purchasing
New Vendor
❑ No
❑
MBE/WBE Contractor
Completed E-Verify Form Attached
❑ WBE ❑ Nos
Project Name
Project Number
Funding Source
N/A
Account No.
Amount
Terms of Contract
Purpose/Description Appeal for water service for 215 Ireland Road. Requesting permission to
reconnect a service line, as prohibited in Section X, paragraph F on page 36
outlined in the SBMU Rules and Regulations. Appeals must be brought before
the Board of Public Works.
For Change Orders Only
Amount of ❑ Increase $
❑ Decrease ($ )
Previous Amount $
Current Percent of Change:
New Amount
Total Percent of Change:
Time Extension Amount:
New Completion Date:
Increase %
Decrease ( %)
Increase %
Decrease ( %)