Loading...
HomeMy WebLinkAboutChange Order No 1 - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Co., Inc.  GARY A. GILOT ELIZABETH A. MARADIK JORDAN V. GATHERS JOSEPH R. MOLNAR 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS December 17, 2020 Mr. Michael W. Frahn Midland Engineering Company, Inc. 52369 State Road 933 North South Bend, IN 46637 rhaas@midlandengineering.com RE: Change Order No. 1 – Olive Street Station Roof Repairs – Project No. 120-028 Dear Mr. Frahn: The Board of Public Works, at its meeting held on December 17, 2020, approved the above referenced Change Order for an increase of $35,480 and an additional forty-one (41) days, bringing the current contract amount to $183,680, with a new completion date of December 31, 2020. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, s/Linda M. Martin, Clerk Enclosure INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Linda M. Martin, Clerk Board of Public Works FROM: Zach Hurst, Project Engineer SUBJECT: Change Order No. 1 - Project No. 120-028 Olive Street Station Roof Repairs DATE: November 3, 2020 Change Order no. 1 for the subject project brings the cumulative total of changes beyond the state-mandated 20% threshold for added work. However, the entirety of the addition portion of the change order represents unforeseen conditions, as follows: • The substrate material below the existing tile roof is more complex than anticipated, requiring more material and labor to remove and replace the timber blocking and place a waterproofing sealant before resuming the tile replacement • The internal copper gutter system is beyond repair and must be replaced in full. A portion was assumed for replacement in the original contract, but as the Contractor began to uncover the material and begin to work on it, he realized it was beyond its useful life and the entire system must be replaced to keep the roof water-tight and help to eliminate the mold problem in the building December 17, 2020 DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Project Number: _______________ Project Name: __________________________ Change Order #: ____ DATE INITIATED:BPW DATE: Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Attachments: (List documents support change required) Amount of Increase / Decrease: $____________________Categories (Pick One): Scope of Work Differing Site Conditions, Changed Conditions Conflicted Specifications and Drawings Failed Materials Error Omission Final Quantity Adjustment ______________________ Previously approved Change Order(s): $___________________ Current Percent of Change: ____________________ % New Total Amount: $____________________ Total Percent of Change: ____________________ % Funding Secured From: __________________________ (filled out by PM) RECOMMENDED BY: Project Inspector (Print Name)(Signature)(Date) REVIEWED BY: Construction Manager (Print Name)(Signature)(Date) APPROVED BY: Engineering Project Manager (Print Name)(Signature)(Date) APPROVED BY: City Engineer (Print Name)(Signature)(Date) BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 11/03/2020 Name Zach Hurst Department DPW BPW Date 11/10/2020 Phone Extension 3057 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 1 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Midland Engineering Company, Inc. New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Olive Street Station Roof Repairs Project Number 120-028 Funding Source Water Works Capital Account No. PO-0005217 Amount $35,480.00 Terms of Contract Purpose/Description Change order covering unforeseen conditions under tile roof, and replacement of copper gutter. For Change Orders Only Amount of Increase Decrease $ 35,480.00 ($ ) Previous Amount $ 148,200.00 Current Percent of Change: Increase Decrease 23.94% ( %) New Amount $ 183,680.00 Total Percent of Change: Increase Decrease 23.94% ( %) Time Extension Amount: 41 days New Completion Date: 12/31/2020