HomeMy WebLinkAbout11242020 Board of Public Works MeetingREGULAR MEETING NOVEMBER 24, 2020 207
AGENDA REVIEW MEETING
The Agenda Review Session of the Board of Public Works scheduled for November 19, 2020
was cancelled.
REGULAR MEETING NOVEMBER 24, 2020
The Regular Meeting of the Board of Public Works was convened at 9:33 a.m. on Tuesday,
November 24, 2020, by Board President Gary A. Gilot. The meeting was streamed live to the
public with Board President Gary A. Gilot and Board Members Elizabeth Maradik and Jordan
Gathers present. Board Member Joseph Molnar was absent. Mr. Gathers confirmed the presence
of the members with a roll call. Also present was Attorney Sandra Kennedy and Clerk of the
Board Linda Martin. Mr. Gilot announced there was a caller that wanted to speak at the last
meeting that he didn't see was present. He apologized and asked if anyone was present today that
wished to speak to please use the Live Chat Q&A.
APPROVE MINUTES OF PREVIOUS MEETING
Upon a motion made by Ms. Maradik, seconded by Mr. Gathers and carried by roll call, the
minutes of the Regular Meeting of the Board held on November 10, 2020 were approved.
PUBLIC HEARING — NEW MASSAGE ESTABLISHMENT LICENSE — HEART TO HEART
MASSAGE AND WELLNESS
Mr. Gilot advised that this was the date set for the Board's Public Hearing concerning and
license application for Heart to Heart Massage and Wellness, 115 N. William St. It was noted
favorable recommendations were received from City staff. There being no one present wishing
to address the Board concerning this matter, the Public Hearing was closed. Therefore, upon a
motion made by Ms. Maradik, seconded by Mr. Gathers and carried by roll call, the license
application was approved.
OPENING OF BIDS — ONE (1) OR MORE, 2020 OR NEWER, TRUCK MOUNTED STREET
SWEEPER — SPEC S (PR-00004787)
This was the date set for receiving and opening of sealed bids for the above referenced project.
The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found
to be sufficient. The following bids were opened and publicly read:
HOOSIER EQUIPMENT LLC
11465 Redwood Rd.
Plymouth, IN 46563
hoosierequipmentllc@yahoo.com
Bid was signed by Mr. Zach Tanner
Non -Collusion, Non -Discrimination Affidavit Form was completed
Indiana Local Business Preference Claim form completed
No Bid Bond was Submitted
I:1I11
Description
Year/Make/Model
Unit Price
Mechanical Sweeper
2020 Schwarze M6 Avalanche
$276,825.00
JACK DOHENY COMPANIES. INC. DBA JACK DOHENY COMPANY
777 Doheny Dr.
Northville, MI 48167
AshleyGroves@dohenycompany.com
Bid was signed by Mr. Steve Shafer
Non -Collusion, Non -Discrimination Affidavit Form was completed
Ten percent (10%) Bid Bond was submitted
I:_D
Description
Year/Make/Model
Unit Price
Elgin Road Wizard Swee er
2021/El in/Road Wizard
$299,230.00
Upon a motion made by Ms. Maradik, seconded by Mr. Gathers and carried by roll call, the
above bids were referred to Central Services for review and recommendation.
REGULAR MEETING NOVEMBER 24, 2020 208
OPENING OF BIDS — TWO (2) MORE OR LESS, 2020 OR NEWER, MID -SIZE FOUR
DOOR HYBRID SEDAN AUTOMOBILES — SPEC F (PR-00004847)
This was the date set for receiving and opening of sealed bids for the above referenced project.
The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found
to be sufficient. The following bid was opened and publicly read:
JORDAN AUTOMOTIVE GROUP
609 E. Jefferson Blvd.
Mishawaka, IN 46545
dstarkweather@jordanauto.com
Bid was signed by Ms. Debra Starkweather
Non -Collusion, Non -Discrimination Affidavit Form was completed
Indiana Local Business Preference Claim form completed
Ten percent (10%) Bid Bond was submitted
o
Descri tion
Year/Make/Model
Unit Price
Four Door H brid Sedan
2021 Camry Hybrid LE
$23,705.00 Each
Estimated number of days for delivery from award date. 1 3 to 4 Months
Upon a motion made by Ms. Maradik, seconded by Mr. Gathers and carried by roll call, the
above bid was referred to Central Services for review and recommendation.
OPENING OF BIDS — ONE (1) OR MORE. 2020 OR NEWER. VACUUM AIR STREET
SWEEPER —SPEC R (PR-00004785)
This was the date set for receiving and opening of sealed bids for the above referenced project.
The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found
to be sufficient. The following bids were opened and publicly read:
HOOSIER EQUIPMENT LLC
11465 Redwood Rd.
Plymouth, IN 46563
hoosierequipmentllc@,yahoo.com
Bid was signed by Mr. Zach Tanner
Non -Collusion, Non -Discrimination Affidavit Form was completed
Indiana Local Business Preference Claim form completed
Bid Bond was not submitted
I
Description
Year/Make/Model JUnit
Price
Vacuum Sweeper
2020 Schwarze Hypervac
1 $275,567.00
Year
Make/Model — Trade In
Unit Price
2012
SN4471 Global Sweeper
$5,000.00
1 G9GM4HH9CS462009
2014
SN4472 Johnston Sweeper
$5,000.00
1 FVACYDT8EHFM4874
Alternate #
Description
Cost
Total
1
Hydrostatic chassis drive system when
in the sweeping mode.
N/A
$
2
In cab gutter broom tilt control.
Comes Standard
$0
3
Remote camera within cab monitor.
Comes Standard
$0
Estimated number of days for delivery from award date. 170 days or less
BEC ENTERPRISES LLC., DBA BROWN EQUIPMENT COMPANY
10603 Majic Port Lane
Fort Wayne, IN 46819
REGULAR MEETING
NOVEMBER 24, 2020 209
scott@,brownequipment.net
Bid was signed by Mr. Scott Brown
Non -Collusion, Non -Discrimination Affidavit Form was completed
Bid Bond was not submitted
me
Description
I Year/Make/Model
E Unit Price
Vacuum Street Sweeper
12021 Johnston/Bucher Municipal V65T
1 $295,000.00
Year
Make/Model — Trade In
Unit Price
2012
SN4471 Global Sweeper
$15,000.00
1 G9GM4HH9CS462009
2014
SN4472 Johnston Sweeper
$20,000.00
1FVACYDT8EHFM4874
Alternate #
Description
Cost
Total
1
Hydrostatic chassis drive system when
in the sweeping mode.
$0.00
$0.00
2
In cab tter broom tilt control.
$49200.00
$4,200.00
3
Remote camera within cab monitor.
$1,600.00
$1,600.00
Estimated number of days for delivery from award date. 120-150
Upon a motion made by Ms. Maradik, seconded by Mr. Gathers and carried by roll call, the
above bids were referred to Central Services for review and recommendation.
OPENING OF BIDS — SEITZ PARK RECONSTRUCTION — PROJECT NO. 117-093A (PR-
00004857
This was the date set for receiving and opening of sealed bids for the above referenced project.
The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found
to be sufficient. The following bids were opened and publicly read:
LARSON-DANIELSON CONSTRUCTION CO.. INC.
302 Tyler St.
LaPorte, IN 46350
mcdna,ldconstruction.com
Bid was signed by Mr. Timothy F. Larson
Non -Collusion, Non -Discrimination Affidavit Form was completed
Five percent (5%) Bid Bond was submitted
BID PACKAGE NO. 1 ITEMS
Division A
— Base Bid
$1,321,893.52
Division B
— Base Bid
$1,454,372.26
Division C
— Base Bid
$1,439,622.51
Division D
— Base Bid
$2,304,318.43
Division E
— Base Bid
$491,183.57
Total Bid Package No. 1
$7,011,390.29
BID PACKAGE NO.2 ITEM
Division F — Base Bid $138,512.95
Total Bid Package No. 2 $138,512.95
BID ALTERNATE ITEMS
Bid Alternate No. 1
$162,557.15
Bid Alternate No. 2
$88,249.63
Bid Alternate No. 3
$170,254.58
Total Bid Alternates
ZIOLKOWSKI CONSTRUCTION. INC.
4050 Ralph Jones Dr.
$421,061.36
REGULAR MEETING
NOVEMBER 24, 2020 210
South Bend, IN 46628
kkromer(cr�,zbuild. com
Bid was signed by Mr. Bill Favors
Non -Collusion, Non -Discrimination Affidavit Form was completed
Five percent (5%) Bid Bond was submitted
BID PACKAGE NO.1 ITEMS
Division A
— Base Bid
$1,219,288.00
Division B
— Base Bid
$1,564,165.00
Division C
— Base Bid
$1,438,423.00
Division D
— Base Bid
$2,196,694.00
Division E —
Base Bid
$447,001.00
Total Bid Package No. 1
$6,865,571.00
BID PACKAGE NO.2 ITEM
Division F — Base Bid $120,892.00
Total Bid Package No. 2 $120,892.00
BID ALTERNATE ITEMS
Bid Alternate No. 1
$151,688.00
Bid Alternate No. 2
$106,585.00
Bid Alternate No. 3
$90,096.00
Total Bid Alternates
$348,369.00
Upon a motion made by Ms. Maradik, seconded by Mr. Gathers and carried by roll call, the
above bids were referred to Engineering and Venues, Parks, and Arts for review and
recommendation.
BOARD MEMBER JOINS MEETING
Board Member Joseph Molnar joined the meeting in progress at 9:45 a.m.
OPENING OF BIDS — DUCTILE IRON PIPES VALVES AND HYDRANT — PROJECT NO.
120-054 (PR-00004693)
This was the date set for receiving and opening of sealed bids for the above referenced project.
The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found
to be sufficient. The following bids were opened and publicly read:
FERGUSON WATERWORKS
1077 Oliver Plow Ct.
South Bend, IN 46601
Thomas. HolmergFerguson. com
Bid was signed by Mr. Devin Nuner
Non -Collusion, Non -Discrimination Affidavit Form was completed
Five percent (5%) Bid Bond was submitted
BID: Base Bid Total $322,921.95
CORE & MAIN
731 W. Ireland Road
South Bend, IN 46614
Jorge.Camacho@coreandmain.com
Bid was signed by Mr, Chris Dearborn
Non -Collusion, Non -Discrimination Affidavit Form was completed
Five percent (5%) Bid Bond was submitted
BID: Base Bid Total $310,366.20
UTILITY SUPPLY COMPANY
6310 South Harding St.
Indianapolis, IN 46217
erichnugent@utilitysLapply.com
REGULAR MEETING
NOVEMBER 24, 2020 211
Bid was signed by Mr. Edward D. Nugent
Non -Collusion, Non -Discrimination Affidavit Form was completed
5% Cashier's Check was submitted
BID: Base Bid Total $297,676.93
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
above bids were referred to Engineering for review and recommendation.
OPENING OF BIDS — SHERIDAN ST. AND SAMPLE ST. SIGNAL IMPROVEMENTS —
PROJECT NO. 116-127A (PR-00004690)
This was the date set for receiving and opening of sealed bids for the above referenced project.
The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found
to be sufficient. The following bids were opened and publicly read:
WALSH & KELLY, INC.
24358 State Road 23
South Bend, IN 46614
akrueger@walshkelly.com
Bid was submitted by Mr. John M. Peisker
Non -Collusion, Non -Discrimination Affidavit Form was completed
Five percent (5%) Bid Bond was submitted
BID: $469,600.00
RIETH-RILEY CONSTRUCTION CO., INC.
25200 State Road 23
South Bend, IN 46614
ralvarado @,nri eth-ril ey. com
Bid was submitted by Mr. Ruben Alvarado
Non -Collusion, Non -Discrimination Affidavit Form was completed
Five percent (5%) Bid Bond was submitted
BID: $425,448.92
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
above bids were referred to Engineering for review and recommendation.
OPENING OF QUOTATIONS — CLEVELAND WELL NOS. 2 & 3 REFURBISHMENTS —
WELL CLEANING — PROJECT NO. 118-021 E (PR-00005225)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for
the above referenced project. The following quotation was opened and read:
PEERLESS MIDWEST, INC.
55860 Russell Industrial Pkwy.
Mishawaka, IN 46545
francis.williarns@suez.com
Quotation was submitted by Mr. Frank Williams
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION:
Base Quote
$56,850.00
Alternate No. 1
$45,850.00
Base Quote Plus Alternate
$102,700.00
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
above quotation was referred to Engineering for review and recommendation.
OPENING OF QUOTATIONS — EDISON WELL NO. 4 REFURBISHMENTS — WELL
CLEANING — PROJECT NO. 120-060 (PR-00005227)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for
the above referenced project. The following quotation was opened and read:
REGULAR MEETING
NOVEMBER 24, 2020 212
PEERLESS MIDWEST, INC.
55860 Russell Industrial Pkwy.
Mishawaka, IN 46545
francis.williams@suez.com
Quotation was submitted by Mr. Frank Williams
Non -Collusion, Non -Discrimination Affidavit Form was completed
UOTATION:
Base Quote
$60,900.00
Alternate No. 1
$10,500.00
Base Quote Plus Alternate
$71,400.00
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
above quotation was referred to Engineering for review and recommendation.
OPENING OF QUOTATIONS — NORTH WATER TREATMENT PLANT RAW WATER
HEADER IMPROVEMENTS — PROJECT NO. 119-01 lA (PR-00005229)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for
the above referenced project. The following quotations were opened and read:
BOWEN ENGINEERING CORPORATION
8802 N. Meridian St.
Indianapolis, IN 46260
Mar aretB e,BowenEn ing eering com
Quotation was submitted by Mr. Chris Manges
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION: $27,840.00
D.A. DODD, LLC
14 E. Michigan St., PO Box 430
Rolling Prairie, IN 46371
judilange@dadodd.com
Quotation was submitted by Mr. Jason R. DeMeyer
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION: $15,950.00
ZIMMERMAN INDUSTRIAL PIPING, INC.
1117 N. Clay St.
Mishawaka, IN 46545
bk@zipi-usa.com
Quotation was submitted by Mr. Robert Kelsey
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION: $34,805.00
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
above quotations were referred to Engineering for review and recommendation.
OPENING OF QUOTATIONS — CURB & SIDEWALK REPAIRS — PROJECT NO. 120-001A
(PR-00005362)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for
the above referenced project. The following quotations were opened and read:
RIETH-RILEY CONSTRUCTION CO., INC.
25200 State Road 23
South Bend, IN 46614
ralvarado@Zneth-rilpy.com
Quotation was submitted by Mr. Ruben Alvarado
Non -Collusion, Non -Discrimination Affidavit Form was completed
REGULAR MEETING
NOVEMBER 24, 2020 213
UOTATION:
Base Quote
$93,265.00
Alternate No. 1
$16,275.00
Base Quote Plus Alternate
$109,540.00
PREMIUM CONCRETE SERVICES, INC.
712 Richmond St.
Elkhart, IN 46516
rbecker@premiumconcreteonline.com
Quotation was submitted by Mr. Max A. Yeakey
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION:
Base Quote
$695870.00
Alternate No. 1
$15,635.00
Base Quote Plus Alternate
$85,505.00
SELGE CONSTRUCTION CO. INC.
2833 S. 11TH. St.
Niles, MI 49120
Bkuhns@Selgeconstruction.com
Quotation was submitted by Mr. Robert Kuhns
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION:
Base Quote
$108,350.00
Alternate No. 1
$21,473.75
Base Quote Plus Alternate
$129,823.75
TX CONCRETE, LLC
24899 Fillmore Rd.
South Bend, IN 46619
quuijadasl bcglobal.net
Quotation was submitted by Mr. Jose L. Quijada
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION:
Base Quote
$59,467.50
Alternate No. 1
$9,330.00
Base Quote Plus Alternate
$68,797.50
ZIOLKOWSKI CONSTRUCTION, INC.
4050 Ralph Jones Dr.
South Bend, IN 46628
kkromer@zbuild.com
Quotation was signed by Mr. Bill Favors
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION:
Base Quote
$81,510.00
Alternate No. 1
$14,960.00
Base Quote Plus Alternate
$96,470.00
WALSH & KELLY, INC.
24358 State Road 23
South Bend, IN 46614
akrueger@walshkelly.com
Quotation was submitted by Mr. John M. Peisker
Non -Collusion, Non -Discrimination Affidavit Form was completed
REGULAR MEETING
NOVEMBER 24, 2020 214
QUOTATION:
Base Quote
$125,110.00
Alternate No. 1
$23,495.00
Base Quote Plus Alternate
$148,605.00
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
above quotations were referred to Engineering for review and recommendation.
OPENING OF QUOTATIONS — EAST RACE SIDEWALK REPAIR — PROJECT NO. 117-
13E (PR-00005484)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for
the above referenced project. The following quotations were opened and read:
WALSH & KELLY, INC.
24358 State Road 23
South Bend, IN 46614
akrueger@walshkelly.com
Quotation was submitted by Mr. John M. Peisker
Non -Collusion, Non -Discrimination Affidavit Form was completed
UOTATION:
Base Quote
$71,670.00
Alternate No. 1
$28,130.00
Base Quote Plus Alternate
$99,800.00
SELGE CONSTRUCTION CO. INC.
2833 S. IITH. St.
Niles, MI 49120
Bkuhns@S el geconstruction. com
Quotation was submitted by Mr. Robert Kuhns
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION:
Base Quote
$88,130.00
Alternate No. 1
$34,399.00
Base Quote Plus Alternate
$122,529.00
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
above quotations were referred to Engineering and Venues, Parks, and Arts for review and
recommendation.
OPENING OF QUOTATIONS — PINHOOK WELL NO. 4 REFURBISHMENT — WELL
CLEANING — PROJECT NO. 120-061 (PR-00005228)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for
the above referenced project. The following quotation was opened and read:
PEERLESS MIDWEST, INC.
55860 Russell Industrial Pkwy.
Mishawaka, IN 46545
francis.williams@suez.com
Quotation was submitted by Mr. Frank Williams
Non -Collusion, Non -Discrimination Affidavit Form was completed
QUOTATION: $55,250.00
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
above quotation was referred to Engineering for review and recommendation.
AWARD BID— TWO (2), MORE OR LESS 2020 OR NEWER THREE-QUARTER (3/4)
TON FOUR WHEEL DRIVE PICK-UP TRUCKS — SPEC L (PR-00003993)
REGULAR MEETING NOVEMBER 24, 2020 215
Mr. Jeff Hudak, Central Services, advised the Board that on October 13, 2020, bids were
received and opened for the above referenced trucks. After reviewing those bids, Mr. Hudak
recommended that the Board award the contract to the lowest responsive and responsible bidder,
Jordan Ford, 609 E. Jefferson Blvd., Mishawaka, IN 46545, in the amount of $43,918 for one
(1) base quote plus alternates 2, 3, and 4; one (1) base quote plus alternate 3 for a total of
$32,894; and one (1) base quote plus alternates 2 and 3 for a total of $39,424. Therefore, Ms.
Maradik made a motion that the recommendation be accepted, and the bid be awarded as
outlined above. Mr. Molnar seconded the motion, which carried by roll call.
AWARD BID — ONE (1) OR MORE, 2020 OR NEWER, FULL SIZE CARGO VANS — SPEC
Q(PR-00005423)
Mr. Jeff Hudak, Central Services, advised the Board that on October 13, 2020, bids were
received and opened for the above referenced vehicles. After reviewing those bids, Mr. Hudak
recommended that the Board award the contract to the lowest responsive and responsible bidder,
Jordan Ford, 609 E. Jefferson Blvd., Mishawaka, IN 46545, in the amount of $34,774.49 for one
(1) base quote plus alternates 1-5 & dealer options 1 & 2; and one (1) for a total of $37,492.49
for a base quote plus alternates 1-5 & dealer options 1, 2, & 3; for a total amount for two (2) of
$72,266.98. Therefore, Ms. Maradik made a motion that the recommendation be accepted, and
the bid be awarded as outlined above. Mr. Molnar seconded the motion, which carried by roll
call.
AWARD BID — FOUR (4), MORE OR LESS, 2020 OR NEWER STANDARD AWD 4-DOOR
UTILITY VEHICLES — SPEC I (PR-00003050)
Mr. Jeff Hudak, Central Services, advised the Board that on October 13, 2020, bids were
received and opened for the above referenced vehicles. After reviewing those bids, Mr. Hudak
recommended that the Board award the contract to the lowest responsive and responsible bidder,
Jordan Ford, 609 E. Jefferson Blvd., Mishawaka, IN 46545, in the amount of $24,739 each, for a
total for five (5) of $123,695. Therefore, Ms. Maradik made a motion that the recommendation
be accepted, and the bid be awarded as outlined above. Mr. Molnar seconded the motion, which
carried by roll call.
APPROVE CHANGE ORDER NO. 1 — ST. JOSEPH RIVER BACKWATER VALVES —
PROJECT NO. 119-018 (PO-0000303)
Mr. Gilot advised that Mr. Jacob Klosinski, Engineering, has submitted Change Order No. 1 on
behalf of Selge Construction Co., Inc., 2833 S. 11th. St., Niles, MI 49120, indicating the contract
amount be increased by $10,613 for a new contract sum, including this Change Order, in the
amount of $105,063. Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried
by roll call, the Change Order was approved.
APPROVE CHANGE ORDER NO. 1 — EAGLE WAY SEWER EXTENSION — PROJECT NO.
119-095 (PO-0001014)
Mr. Gilot advised that Mr. Kyle Silveus, Engineering, has submitted Change Order No. 1 on
behalf of Indiana Earth, Inc., 10343 McKinley Hwy., Osceola, IN 46561, indicating the contract
amount be increased by $28,737 for a new contract sum, including this Change Order, in the
amount of $268,181.56. Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and
carried by roll call, the Change Order was approved.
APPROVE CHANGE ORDER NO. 5 — WESTERN AVE. STREETSCAPE, PHASE III —
PROJECT NO. 118-076 (PO-0000394)
Mr. Gilot advised that Mr. Kyle Silveus, Engineering, has submitted Change Order No. 5 on
behalf of Indiana Earth, Inc., 10343 McKinley Hwy., Osceola, IN 46561, indicating the contract
amount be increased by $41,135 for a new contract sum, including this Change Order, in the
amount of $2,885,401.94. Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and
carried by roll call, the Change Order was approved.
APPROVE CHANGE ORDER NO. 1 — RIVER WALK FROM BEYER STREET TO
HOWARD PARK — PROJECT NO. 117-083A (PO-0001785)
Mr. Gilot advised that Mr. Scott Kreeger, Engineering, has submitted Change Order No. 1 on
behalf of Walsh & Kelly, Inc., 24358 State Road 23, South Bend, IN 46614, indicating the
contract amount be increased by $25,880.22 and an additional thirty-two (32) days for a new
contract sum, including this Change Order, in the amount of $3,224,880.22 and a new
REGULAR MEETING NOVEMBER 24, 2020 216
completion date of January 1, 2021. Upon a motion made by Ms. Maradik, seconded by Mr.
Molnar and carried by roll call, the Change Order was approved.
APPROVE PROJECT COMPLETION AFFIDAVIT — AT -LARGE COUNCIL OFFICE
RENOVATIONS — PROJECT NO. 119-105 (COUNCIL'S REPAIRS AND MAINTENANCE)
Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion
Affidavit on behalf of Premier 1 Construction, Inc., 105 E. Jefferson Blvd., Suite 216, South
Bend, IN 46601, for the above referenced project, indicating a final cost of $21,500. Upon a
motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the Project
Completion Affidavit was approved.
APPROVE PROJECT COMPLETION AFFIDAVIT — CENTURY CENTER ELEVATOR
RENOVATION —PROJECT NO. 118-104D (HOTEL/MOTEL TAX)
Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion
Affidavit on behalf of Gibson -Lewis, LLC, 1001 W. lla`. St., Mishawaka, IN 46544, for the
above referenced project, indicating a final cost of $168,700. Upon a motion made by Ms.
Maradik, seconded by Mr. Molnar and carried by roll call, the Project Completion Affidavit was
approved.
APPROVE PROJECT COMPLETION AFFIDAVIT — GEMINI AT COLFAX EXTERIOR
RENOVATIONS, WATER MAIN — PROJECT NO. 119-103D (RWDA TIF)
Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion
Affidavit on behalf of Ritschard Brothers, Inc., 1204 W. Sample St., South Bend, IN 46619, for
the above referenced project, indicating a final cost of $65,457. Upon a motion made by Ms.
Maradik, seconded by Mr. Molnar and carried by roll call, the Project Completion Affidavit was
approved.
APPROVE PROJECT COMPLETION AFFIDAVIT — MIAMI BASIN VALVE
REPLACEMENT — PROJECT NO. 116-082D (LRSA & SSDA TIF)
Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion
Affidavit on behalf of HRP Construction Co., Inc., 5777 Cleveland Rd., South Bend, IN 46624,
for the above referenced project, indicating a final cost of $175,259.48. Upon a motion made by
Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the Project Completion Affidavit
was approved.
APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS — TWO (2),
MORE OR LESS, 2020 OR NEWER, TRAILER MOUNTED ANTI -ICING SYSTEMS — SPEC
U (PR-00005495)
In a memorandum to the Board, Mr. Jeff Hudak, Central Services, requested permission to
advertise for the receipt of bids for the above referenced equipment. Therefore, upon a motion
made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the above request was
approved.
APPROVAL OF AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA
The following Agreements/Contracts/Proposals/Addenda were submitted to the Board for
approval:
Type
Business
Description
Amount/
Motion/
Funding
Second
Authorization
Honeywell
Drilling and Revocable
N/A
Maradik/Molnar
for Entry
International
Permit at 3520 Westmoor
Agreement
Inc.
St. for Environmental
Remediation
Professional
Jones Petrie
Design Services for
$8,500
Maradik/Molnar
Services
Rafinski
Streetscape Improvements
(PR-00005242)
Agreement
Corporation
for the 3400 Block of S.
Michigan St.
Emergency
HRP
Replacement of
$308,124.70
Maradik/Molnar
Sewer Repair
Construction
Deteriorated Sewer Main
(PO -
Work
Line and Manhole due to
00002249)
discovery of Sink Hole on
Corby, Ironwood and
Rockne Intersection
REGULAR MEETING
NOVEMBER 24, 2020 217
Project
Contribution
Indiana
Two (2) Agreements for
Re -Use Water
Maradik/Molnar
in Aid of
Michigan
Installation of Primary
Pump Station
Construction
Power Co.
Service Feed, Transformer
Building
Agreement
Relocation & Transformer
$4,359.28;
Removals at Wastewater
Compressor
Treatment Plant
Building
$11,173.07;
Total
$15,532.35
PR-00005428
Amendment
Abonmarche
Traffic Analysis and
$109,430;
Maradik/Molnar
No. 1 to
Consultants,
Design Services for Eddy
New Total
Owner-
Inc.
St. and Howard St.
$129,730
Engineer
Intersection
(PR-00005408)
Agreement
Real Property
Near Northwest
Transfer Properties for
$1.00
Maradik/Molnar
Transfer
Neighborhood
Development of
Agreement
Inc.
Affordable Housing, 912,
and Quit
914, 918 N. Sherman Ave.
Claim Deed
Amendment
Teamsters
Extend the Current Terms
N/A
Maradik/Molnar
to
Local Union
of the Teamster Master
Memorandum
No. 364
Agreement to December
of
31, 2021 and Increase
Understanding
Union Employee Base
Rate by 1 %
Sidewalk
Core South
Fifteen (15) Ft. Easement
N/A
Maradik/Molnar
Utility &
Bend, LLC
for City at 219 E. Ireland
Traffic Loop
Rd. Property Frontage for
Easement
Construction, Repair,
Agreement
Installation, and
Maintenance of Public
Sidewalk, certain Utility
Structures, and Traffic
Loops
Professional
Jones Petrie
Design Services for
NTE $44,185
Maradik/Molnar
Services
Rafinski
Drainage Improvements at
(PR-00005212)
Agreement
Corporation
several Locations and
Randolph Park
Improvements
Professional
McCormick
Laurel Woods Drainage
NTE $49,920
Maradik/Molnar
Services
Engineering,
Improvements Design
(PR-00005214)
Agreement
LLC
Professional
Arcadis U.S.,
2021-2025 Water Capital
NTE $49,000
Maradik/Molnar
Services
Inc.
Improvement Plan
(PR-00005358)
Agreement
Updates and Rate Case
Support
APPROVAL OF PERMIT AND LICENSE APPLICATIONS
The following permit and license applications were presented for approval:
Applicant
Description
Location
Motion
Carried
PGK Enterprises,
Encroachments/Revocable Permits -
1021 North St.
Maradik/Molnar
LLC
Install Hydronic Snowmelt System in
Peter St.
Driveway at Public Right -of -Way
JDL Corporation
Transient Merchant License Renewal
Convention Hall
Maradik/Molnar
d/b/a/
— Shipshewana on the Road Gift,
& Discovery Ball
Shipshewana on
Food, and Craft Show
Room, Century
REGULAR MEETING
NOVEMBER 24, 2020 218
the Road Center
REMOVE PETITION TO VACATE THE FIRST EAST/WEST ALLEY BETWEEN ST.
VINCENT ST. AND HOWARD ST. FROM ST. LOUIS BLVD. TO FIRST NORTH/SOUTH
ALLEY
Mr. Gilot stated this item was on the last Board agenda but there was an email from the
petitioner afterwards informing the Board that part of the application showing the construction of
a turn -around was missing from their paperwork. Mr. Gilot apologized that he did not recognize
the petitioner was on the call during that meeting. He noted he announced at the beginning of this
meeting if anybody wished to speak to indicate that through live Q&A. Mr. Gilot stated it was
brought to the Board's attention this morning that the Common Council approved this vacation at
their meeting last night so the Board has no action to take on this, noting the Common Council
has the final authority, the Board is just recommending based on the law.
APPROVE/DENY TRAFFIC CONTROL DEVICES
Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the
following traffic control device request was approved:
NEW INSTALLATION: Honorary Street Sign for James Charles Trotter, Sr.
(Frankie's Barbeque Owner)
LOCATION: Corner of W. Washington St. and Liston St.
REMARKS: All criteria have been met
APPROVE CONSENTS TO ANNEXATION AND WAIVER OF RIGHTS TO
REMONSTRATE
Mr. Gilot stated that the Board is in receipt of the following Consents to Annexation and
Waivers of Right to Remonstrate. The Consents indicate that in consideration for permission to
tap into public water/sanitary sewer system of the City, to provide water/sanitary sewer service
to the below referenced properties, the applicants waive and release any and all rights to
remonstrate against or oppose any pending or future annexations of the properties by the City of
South Bend:
A. Mr. James Burke, 51756 Ironwood Rd., South Bend, IN 46635
1. 51756 Ironwood Rd. — Water/Sewer (Key No. 002-2013-0260)
B. Mr. Thomas Morris, 128 N. Brook Ave., Mishawaka, IN 46544
1. 53080 Nadine St.— Water/Sewer (Key No. 002-1020-044302 & 002-1020-
0443)
C. Mr. Kyle O'Conner, PO Box 6157, South Bend, IN 46660-6157
1. 53169 Summer Breeze Dr.— Water/Sewer (Key No. 002-1020-045041)
Upon a motion by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the Consents
to Annexation and Waivers of Right to Remonstrate were approved as submitted.
RATIFY APPROVAL AND/OR RELEASE CONTRACTOR EXCAVATION AND
OCCUPANCY BONDS
The Division of Engineering Permit Department recommended that the following bonds be
ratified pursuant to Resolution 100-2000 and/or released as follows:
Business
Bond Type
Approved/
Released
Effective Date
Jhonny Pineda
Contractor Bond
Released
11/06/2020
Elf Excavating LLC
Excavation Bond
Released
11/06/2020
Fiber Optic Mgmt. LLC dba
Turnkey Network Solutions
Excavation Bond
Approved
11/12/2020
K & S Engineers Inc.
Excavation Bond
Approved
11/06/2020
Advanced Excavating LLC
Excavation Bond
Approved
11/13/2020
Inland Waters Pollution Control,
Inc.
Excavation Bond
Approved
11/13/2020
Custom Awning
Occu cy Bond
Released
11/06/2020
Davey Tree Expert Company
Occupancy Bond
Released
11/06/2020
Fiber Optic Mgmt. LLC dba
Turnkey Network Solutions
Occupancy Bond
Approved
11/12/2020
REGULAR MEETING
NOVEMBER 24, 2020 219
K & S Engineers Inc.
Occu cy Bond
Approved
11/06/2020
Advanced Excavating LLC
Occupancy Bond
Approved
11/13/2020
Burkhart Sign Systems, LLC
Occupancy Bond
Approved
11/12/2020
Inland Waters Pollution Control,
Inc.
Occupancy Bond
Approved
11/13/2020
Ms. Maradik made a motion that the bond's approval and/or release as outlined above be ratified.
Mr. Molnar seconded the motion, which carried by roll call.
APPROVE CLAIMS
Ms. Maradik stated that a request to pay the following claims in the amounts indicated has been
received by the Board; each claim is fully supported by an invoice; the person receiving the
goods or services has approved the claims; and the claims have been filed with the City Fiscal
Officer and certified for accuracy.
Name
Amount of Claim
Date
City of South Bend Claims GBN-7663/7662/7512/7803
$1,286,704.38
11/10/2020
City of South Bend Claims GBN-7876/7937/7901/7936
$1,962,713.60
11/17/2020
Therefore, Ms. Maradik made a motion that after review of the expenditures, the claims be
approved as submitted. Mr. Molnar seconded the motion, which carried by roll call.
ADJOURNMENT
There being no further business to come before the Board, upon a motion made by Mr. Gilot,
seconded by Ms. Maradik and carried by roll call, the meeting adjourned at 10:43 a.m.
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
Jordan V. Gathers, Member
Joseph R. Molnar, Member
ATTEST:
64 nda CUX&n
Linda M. Martin, Clerk